Contingent Liabilities and Commitments
CONTINGENT LIABILITIES AND COMMITMENTS
Rate Matters
General rate case (Docket No. RP18-1126) On August 31, 2018, we filed a general rate case with the FERC for an overall increase in rates and to comply with the terms of the settlement in our prior rate case to file a rate case no later than August 31, 2018. On September 28, 2018, the FERC issued an order accepting and suspending our general rate filing to be effective March 1, 2019, subject to refund and the outcome of a hearing, except that rates for certain services that were proposed as overall rate decreases were accepted, without suspension, to be effective October 1, 2018. The decreased rates will not be subject to refund but may be subject to decrease prospectively under Section 5 of the Natural Gas Act of 1938, as amended.
Income tax matters On March 15, 2018, the FERC issued a revised policy statement (the March 15 Statement) in Docket No. PL17-1 regarding the recovery of income tax costs in rates of natural gas pipelines. The FERC found that an impermissible double recovery results from granting a Master Limited Partnership (MLP) pipeline both an income tax allowance and a return on equity pursuant to the discounted cash flow methodology. As a result, the FERC will no longer permit a MLP pipeline to recover an income tax allowance in its cost of service. The FERC further stated it will address the application of this policy to non-MLP partnership forms as those issues arise in subsequent proceedings. One of the benefits of the WPZ Merger is to allow us to continue to recover an income tax allowance in our cost of service rates.
On July 18, 2018, the FERC issued an order dismissing the requests for rehearing and clarification of the revised policy statement. In addition, the FERC provided guidance that an MLP pipeline (or other pass-through entity) no longer recovering an income tax allowance pursuant to the revised policy may eliminate previously accumulated deferred income taxes (ADIT) from its cost of service instead of flowing these previously accumulated ADIT balances to ratepayers. This guidance, if implemented, would significantly mitigate the impact of the March 15 Statement. However, the FERC stated that the revised policy statement and such guidance do not establish a binding rule, but are instead expressions of general policy intent designed to provide guidance by notifying entities of the course of action the FERC intends to follow in future adjudications. To the extent the FERC addresses these issues in future proceedings, it will consider any arguments regarding not only the application of the revised policy to the fact of the case, but also any arguments regarding the underlying validity of the policy itself. The FERC's guidance on ADIT likely will be challenged by customers and state commission, which would result in a long period of revenue uncertainty for pipelines eliminating ADIT from their cost of service. The WPZ Merger has the additional benefit of eliminating this uncertainty.
On March 15, 2018, the FERC also issued a Notice of Proposed Rulemaking in Docket No. RM18-11 proposing a filing process that will allow it to determine which natural gas pipelines may be collecting unjust and unreasonable rates in light of the reduction in the corporate income tax rate in Tax Reform and the revised policy statement. On July 18, 2018, the FERC issued a Final Rule in the docket, retaining the filing requirement and reaffirming the options that pipelines have to either reflect the reduced tax rate or explain why no rate change is necessary. FERC also clarified that a natural gas company organized as a pass-through entity all of whose income or losses are consolidated on the federal income tax return of its corporate parent is considered to be subject to the federal corporate income tax, and is thus eligible for a tax allowance. We believe this Final Rule and the previously discussed WPZ Merger allow for the continued recovery of income tax allowances in our rates. Our Docket No. RP18-1126 rate case filing (discussed above) reflects a tax allowance based on this clarification, and the FERC's September 28, 2018 order in that rate case proceeding finds that we are exempt from the FERC Form No. 501-G filing requirement established in Docket No. RM18-11.
On March 15, 2018, the FERC also issued a Notice of Inquiry in Docket No. RM18-12 seeking comments on the additional impacts of Tax Reform on jurisdictional rates, particularly whether, and if so how, the FERC should address changes relating to ADIT amounts after the corporate income tax rate reduction and bonus depreciation rules, as well as whether other features of Tax Reform require FERC action. We are evaluating the impact of these developments and currently expect any associated impacts would be prospective and determined through subsequent rate proceedings. We also continue to monitor developments that may impact our regulatory liabilities resulting from Tax Reform. It is reasonably possible that our future tariff-based rates collected may be adversely impacted.
Station 62 Incident
On October 8, 2015, an explosion and fire occurred at our Compressor Station No. 62 in Gibson, Louisiana. At the time of the incident, planned facility maintenance was being performed at the station and the facility was not operational. The incident was related to maintenance work being performed on the slug catcher at the station. Four contractor employees were killed in the incident and others were injured.
In responding to the incident, we cooperated with local, state and federal authorities, including the Louisiana State Police, Terrebonne Parish, the Louisiana Department of Environmental Quality, the U.S. Environmental Protection Agency (Region 6), the Occupational Safety and Health Administration, and the U.S. Department of Transportation's Pipeline and Hazardous Materials Safety Administration (PHMSA). On July 29, 2016, PHMSA issued a Notice of Probable Violation (NOPV), which includes a $1.6 million proposed civil penalty to us in connection with the incident. This penalty was accrued in the second quarter of 2016 and would not be covered by our insurance policies. We filed a response to the NOPV on August 25, 2016, and on July 14, 2017, PHMSA held a hearing on the NOPV. On December 20, 2018, the PHMSA issued a Final Order, which made findings of violation, reduced the civil penalty to $1.4 million, and specified actions that need to be taken by us to comply with pipeline safety regulations.
The incident did not cause any rupture of the gas pipeline or any damage to the building containing the compressor engines. In anticipation of the planned maintenance, our Southeast Louisiana Lateral was taken out of service on October 4, 2015, which affected approximately 200 MMcf/d of natural gas production. The lateral was restored to service in early 2016 after repairs were made to the facilities damaged in the incident.
We, with the insurer of one of our contractors, have settled several claims against us for wrongful death and personal injury. In addition, we are a defendant in other lawsuits seeking damages for wrongful death, personal injury and property damages. We believe it is reasonably possible that losses will be incurred on some lawsuits. However, in management's judgment, the ultimate resolution of these matters will not have a material effect on our financial condition, results of operations or cash flows. While we also have claims for indemnification, we continue to believe that it is probable that any ultimate losses incurred will be covered by our contractors' insurance and our insurance.
Environmental Matters
We have had studies underway for many years to test some of our facilities for the presence of toxic and hazardous substances such as polychlorinated biphenyls (PCBs) and mercury to determine to what extent, if any, remediation may be necessary. We have also similarly evaluated past on-site disposal of hydrocarbons at a number of our facilities. We have worked closely with and responded to data requests from the U.S. Environmental Protection Agency (EPA) and state agencies regarding such potential contamination of certain of our sites. On the basis of the findings to date, we estimate that environmental assessment and remediation costs under various federal and state statutes will total approximately $5 million to $7 million (including both expense and capital expenditures), measured on an undiscounted basis, and will substantially be spent over the next four to six years. This estimate depends on a number of assumptions concerning the scope of remediation that will be required at certain locations and the cost of the remedial measures. We are conducting environmental assessments and implementing a variety of remedial measures that may result in increases or decreases in the total estimated costs. At December 31, 2018, we had a balance of approximately $3.5 million for the expense portion of these estimated costs, $1.5 million recorded in Accrued liabilities and $2.0 million recorded in Other Long-Term Liabilities - Other in the Consolidated Balance Sheet. At December 31, 2017, we had a balance of approximately $4.0 million for the expense portion of these estimated costs, $1.8 million recorded in Accrued liabilities and $2.2 million recorded in Other Long-Term Liabilities - Other in the Consolidated Balance Sheet.
We have been identified as a potentially responsible party (PRP) at various Superfund and state waste disposal sites. Based on present volumetric estimates and other factors, our estimated aggregate exposure for remediation of these sites is less than $0.5 million. The estimated remediation costs for all of these sites are included in the $5 million to $7 million range discussed above. Liability under the Comprehensive Environmental Response, Compensation and Liability Act and applicable state law can be joint and several with other PRPs. Although volumetric allocation is a factor in assessing liability, it is not necessarily determinative; thus, the ultimate liability could be substantially greater than the amounts described above.
The EPA and various state regulatory agencies routinely promulgate and propose new rules, and issue updated guidance to existing rules. These rulemakings include, but are not limited to, rules for reciprocating internal combustion engine maximum achievable control technology, air quality standards for one-hour nitrogen dioxide emissions, and volatile organic compound and methane new source performance standards impacting design and operation of storage vessels, pressure valves, and compressors. The EPA previously issued its rule regarding National Ambient Air Quality Standards for ground-level ozone. We are monitoring the rule’s implementation as it will trigger additional federal and state regulatory actions that may impact our operations. Implementation of the regulations is expected to result in impacts to our operations and increase the cost of additions to Total property, plant and equipment, net in the Consolidated Balance Sheet for both new and existing facilities in affected areas. We are unable to reasonably estimate the cost of additions that may be required to meet the regulations at this time due to uncertainty created by various legal challenges to these regulations and the need for further specific regulatory guidance.
We consider prudently incurred environmental assessment and remediation costs and the costs associated with compliance with environmental standards to be recoverable through rates. To date, we have been permitted recovery of environmental costs, and it is our intent to continue seeking recovery of such costs through future rate filings.
Other Matters
Various other proceedings are pending against us and are considered incidental to our operations.
Summary
We estimate that for all matters for which we are able to reasonably estimate a range of loss, including those noted above and others that are not individually significant, our aggregate reasonably possible losses beyond amounts accrued for all of our contingent liabilities are immaterial to our expected future annual results of operations, liquidity and financial position. These calculations have been made without consideration of any potential recovery from third parties. We have disclosed all significant matters for which we are unable to reasonably estimate a range of possible loss.
Other Commitments
Commitments for construction We have commitments for construction and acquisition of property, plant and equipment of approximately $137 million at December 31, 2018.