-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: webmaster@www.sec.gov Originator-Key-Asymmetric: MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB MIC-Info: RSA-MD5,RSA, K4X1+3E7INkKdh5ukivg18SgA+fYCNTKa6OjgLiueR+HD8rk7KTyhCUFsF7jQqW/ D1qLc+bh0MbfeSL+XsUWSA== 0000950129-05-010070.txt : 20051025 0000950129-05-010070.hdr.sgml : 20051025 20051025172500 ACCESSION NUMBER: 0000950129-05-010070 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 2 CONFORMED PERIOD OF REPORT: 20051024 ITEM INFORMATION: Regulation FD Disclosure ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20051025 DATE AS OF CHANGE: 20051025 FILER: COMPANY DATA: COMPANY CONFORMED NAME: DIAMOND OFFSHORE DRILLING INC CENTRAL INDEX KEY: 0000949039 STANDARD INDUSTRIAL CLASSIFICATION: DRILLING OIL & GAS WELLS [1381] IRS NUMBER: 760321760 STATE OF INCORPORATION: DE FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-13926 FILM NUMBER: 051155180 BUSINESS ADDRESS: STREET 1: 15415 KATY FREEWAY CITY: HOUSTON STATE: TX ZIP: 77094 BUSINESS PHONE: 7134925300 MAIL ADDRESS: STREET 1: 15415 KATY FREEWAY CITY: HOUSTON STATE: TX ZIP: 77094 8-K 1 h29620e8vk.htm DIAMOND OFFSHORE DRILLING, INC. e8vk
 

 
 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
 
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934
     
Date of report (Date of earliest event reported):
  October 24, 2005
 
   
Diamond Offshore Drilling, Inc.
 
(Exact Name of Registrant as Specified in Charter)
         
Delaware   1-13926   76-0321760
         
(State or Other Jurisdiction
of Incorporation)
  (Commission File Number)   (IRS Employer
Identification No.)
15415 Katy Freeway
Houston, Texas 77094
 
(Address of Principal Executive Offices and Zip Code)
     
Registrant’s telephone number, including area code:
  (281) 492-5300
 
   
Not Applicable
 
(Former name or former address, if changed since last report)
     Check the appropriate line below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
___ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
___ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
___ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
___ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
 
 

 


 

Item 7.01.   Regulation FD Disclosure
     The Registrant hereby incorporates by reference into this Item 7.01 the summary report of the status, as of October 24, 2005, of the offshore drilling rigs of the Registrant attached as Exhibit 99.1, which is being furnished in accordance with Rule 101(e)(1) under Regulation FD and shall not be deemed to be filed.
     Statements in this report that contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, include, but are not limited to, statements regarding the current term, start and end dates and comments concerning future contracts and availability and other aspects of the Registrant’s drilling rigs, as well as statements concerning rigs being upgraded, rigs reserved for upgrade and rigs under construction. Such statements are inherently subject to a variety of risks and uncertainties that could cause actual results to differ materially from those anticipated or projected. A discussion of the risk factors that could impact these areas and the Registrant’s overall business and financial performance can be found in the Registrant’s reports and other documents filed with the Securities and Exchange Commission. These factors include, among others, general economic and business conditions, casualty losses, industry fleet capacity, changes in foreign and domestic oil and gas exploration and production activity, competition, changes in foreign, political, social and economic conditions, regulatory initiatives and compliance with governmental regulations, customer preferences and various other matters, many of which are beyond the Registrant’s control. Given these concerns, investors and analysts should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the rig status report, and the Registrant undertakes no obligation to publicly update or revise any forward-looking statements.
Item 9.01.   Financial Statements and Exhibits
(c)     Exhibits.
     
Exhibit number
  Description
 
 
 
 
   
99.1
  Rig Status Report as of October 24, 2005

2


 

SIGNATURES
     Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
         
  Diamond Offshore Drilling, Inc.
 
 
  By:   /s/ William C. Long    
    William C. Long  
    Vice President, General Counsel and Secretary   
 
Dated: October 25, 2005

3


 

EXHIBIT INDEX
     
Exhibit number
  Description
 
 
 
 
   
99.1
  Rig Status Report as of October 24, 2005

4

EX-99.1 2 h29620exv99w1.htm RIG STATUS REPORT AS OF OCTOBER 24, 2005 exv99w1
 

1
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF October 24, 2005
                                         
Rig Name   WD   Design   Location   Status*   Operator   Current Term   Dayrate (000s)   Start Date   Est. End Date   Future Contracts and Other Information
Domestic Deepwater Semisubmersibles (7)
Ocean Quest   3,500’   Victory Class   GOM   Contracted   Noble   term   low 240’s   mid Oct. 2005   mid April 2006  
LOI for four months in mid 280’s beginning mid April 2006 and ending mid Aug. 2006. Available; actively marketing.
Ocean Star   5,500’   Victory Class   GOM   Contracted   Kerr-McGee   90 day term extension   low 140’s   mid July 2005   mid Nov. 2005  
Current estimated completion of storm repairs late Nov. Twelve month extension with Kerr-McGee in mid 170’s beginning after repair and extending for one year. Available; actively marketing.
Ocean America   5,500’   Ocean Odyssey   GOM   Contracted   Pioneer   three wells   mid 270’s   early May 2005   early Nov. 2005  
Following assignment wells with Pioneer, first of two extension wells with Mariner in mid 110’s beginning early Nov. 2005 and ending late Dec. 2005; followed by one additional extension well with Mariner in low 130’s beginning late Dec. 2005 and ending late Feb. 2006: followed by one year term plus option with Mariner in low 230’s beginning late Feb. 2006 and ending late Feb. 2007. Available; actively marketing.
Ocean Valiant   5,500’   Ocean Odyssey   GOM   Contracted   Kerr-McGee   180 day extension   mid 150’s   mid Sept. 2005   mid Mar. 2006  
One-year term extension plus option from Kerr-McGee in low 300,000’s beginning in mid Mar. 2006 and ending in mid Mar. 2007. Available; actively marketing.
Ocean Victory   5,500’   Victory Class   GOM   Contracted   Kerr-McGee   one well   mid 180’s   late Aug. 2005   early Nov. 2005  
One year term with Murphy in low 200’s beginning early Nov. 2005 and ending early Nov. 2006; followed by 2-year term extension with Murphy in mid 320’s beginning early Nov. 2006 and ending early Nov. 2008. Available; actively marketing.
Ocean Confidence   7,500’   DP Aker H-3.2 Modified   GOM   Contracted   BP   five-year term   mid 170’s   early Jan. 2001   early Jan. 2006  
Two-year term plus option with BP in low 280’s beginning early Jan. 2006 and ending early Jan. 2008. Available; actively marketing.
Ocean Baroness   7,000’   Victory Class   GOM   Mobe & Prep.   DODI   -   -   -   -  
One year plus option with Amerada Hess in low 200’s beginning mid Nov. 2005 and ending mid Nov. 2006. Available; actively marketing.
Domestic 2nd/3rd Generation Semisubmersibles (5)
Ocean New Era   1,500’   Korkut   GOM   Reactivating   DODI   -   -   -   -  
Est. availability mid Dec. 2005; followed by six-month term with Walter in low 100’s for first 30 days and mid 120’s for remainder of term beginning mid Dec. 2005 and ending mid July 2006. Available; actively marketing.
Ocean Voyager   2,000’   Victory Class   GOM   Contracted   ATP   two wells   mid 90’s   late June 2005   mid Nov. 2005  
One well with Amerada Hess in low 110’s beginning mid Nov. and ending early Jan. 2006; followed by one well with Petrobras in low 110’s beginning early Jan. and ending late Feb. 2006; followed by two wells plus option with Amerada Hess in mid 120’s beginning late Feb. 2006 and ending late May 2006. Available; actively marketing.
Ocean Concord   2,200’   F&G SS-2000   GOM   Contracted   Kerr-McGee   one well   mid 70’s   late Aug. 2005   mid Dec. 2005  
One assignment well from Kerr-McGee with Woodside in mid 90’s beginning mid Dec. 2005 and ending late Jan. 2006; followed by one well extension plus option with Kerr-McGee in mid 90’s beginning late Jan. 2006 and ending early Mar.; followed by 90-day term plus option with Tana in low 130’s beginning early Mar. and ending early June 2006; followed by 90-day term extension plus option in low 170’s beginning early June and ending late Aug 2006. Available; actively marketing.
Ocean Lexington   2,200’   F&G SS-2000   GOM   Contracted   Walter   four wells   low 60’s   mid Oct. 2005   mid Dec. 2005  
LOI for one well in mid 170’s beginning in mid Dec. 2005 and ending in early Feb. 2006; followed by one well plus option with Walter in low 80’s beginning early Feb. and ending early Mar. 2006. Available; actively marketing.
Ocean Saratoga   2,200’   F&G SS-2000   GOM   Contracted   LLOG   three wells   mid 60’s   mid Dec. 2004   early Nov. 2005  
Two wells plus option with LLOG in low 110’s following completion of existing contract and extending for approximately five months; followed by six month extension in low 120’s with LLOG beginning in early April 2006 and ending late Sept. 2006. Available; actively marketing.


 

2
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF October 24, 2005
                                         
Rig Name   WD   Design   Location   Status*   Operator   Current Term   Dayrate (000s)   Start Date   Est. End Date   Future Contracts and Other Information
Domestic Jackups (11)
Ocean Crusader   200’   Mat Cantilever   GOM   Contracted   Seneca   two wells   high 40’s   late Aug. 2005   early Nov. 2005  
One well with Seneca in low 50’s beginning early Nov. 2005 and ending mid Nov.; followed by one well with Woodside in low 50’s beginning mid Nov. 2005 and ending late Jan. 2006. Available; actively marketing.
Ocean Drake   200’   Mat Cantilever   GOM   Contracted   Chevron   term contract   mid 60’s   late July 2005   late June 2006  
Indexed term contract. Available; actively marketing.
Ocean Champion   250’   Mat Slot   GOM   Contracted   Stone   six month term   mid 50’s   late Oct. 2005   late April 2006  
Available; actively marketing.
Ocean Columbia   250’   Independent Leg
Cantilever
  GOM   Contracted   Newfield   180-day term   mid 50’s   early Aug. 2005   late Jan. 2006  
Available; actively marketing.
Ocean Spartan   300’   Independent Leg
Cantilever
  GOM   Contracted   LLOG   two wells   mid 80’s   mid Oct. 2005   mid Dec. 2005  
Available; actively marketing.
Ocean Spur   300’   Independent Leg
Cantilever
  GOM   Contracted   EOG   one well   mid 60’s   late Aug. 2005   late Oct. 2005  
One well with ADTI/Badger in mid 80’s beginning late Oct. and ending mid Nov. 2005. Available; actively marketing.
Ocean King   300’   Independent Leg
Cantilever
  GOM   Contracted   El Paso   one well extension   mid 60’s   late Sept. 2005   late Oct. 2005  
One well extension in low 60’s beginning late Oct. and ending early Nov. 2005; followed by one well with Forest in mid 70’s beginning early Nov. and ending late Dec.; followed by LOI for one well in mid 80’s beginning late Dec. 2005 and ending mid Jan. 2006. Available; actively marketing.
Ocean Nugget   300’   Independent Leg
Cantilever
  GOM   Contracted   Houston Expl.   two wells plus option   high 60’s   early Sept. 2005   late Nov. 2005  
Available; actively marketing.
Ocean Summit   300’   Independent Leg
Cantilever
  GOM   Contracted   LLOG   one well extension   mid 60’s   late June 2005   early Nov. 2005  
One well with Walter in upper 60’s beginning early Nov. and ending early Dec. 2005; followed by LOI for one well in mid 80’s beginning early Dec. 2005 and ending mid Jan. 2006. Available; actively marketing.
Ocean Titan   350’   Independent Leg
Cantilever
  GOM   Contracted   Walter   three wells   mid 70’s   mid Sept. 2005   mid Jan. 2006  
Six-month term with Dominion Exploration in high 70’s beginning mid Jan. 2006 and ending mid July 2006. Available; actively marketing.
Ocean Tower   350’   Independent Leg
Cantilever
  GOM   Contracted   Chevron   one well   high 60’s   late Sept. 2005   March 2006  
180-day term extension plus option with Chevron (Part I) in high 60’s beginning late Sept. and ending late Dec.; followed by Part II in high 80’s beginning late Dec. 2005 and ending late Mar. 2006. Available; actively marketing.


 

3
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF October 24, 2005
                                         
Rig Name   WD   Design   Location   Status*   Operator   Current Term   Dayrate (000s)   Start Date   Est. End Date   Future Contracts and Other Information
International Semisubmersibles (16)
MEXICO
Ocean Ambassador   1,100’   Bethlehem SS-2000   GOM   Contracted   PEMEX   four year term work   mid 50’s   late July 2003   mid Dec. 2007  
Available.
Ocean Whittington   1,500’   Aker H-3   GOM   Contracted   PEMEX   four year term work   low 60’s   late July 2003   early Oct. 2006  
Available.
Ocean Worker   3,500’   F&G 9500 Enhanced
Pacesetter
  GOM   Contracted   PEMEX   four year term work   high 60’s   mid Aug. 2003   late July 2007  
Available.
Ocean Yorktown   2,850’   F&G SS-2000   GOM   Contracted   PEMEX   four year term work   mid 40’s   late Oct. 2003   mid July 2007  
Available.
NORTH SEA
Ocean Nomad   1,200’   Aker H-3   North Sea   Contracted   Talisman   one year   low 80’s   early Jan. 2005   late Jan. 2006  
One year extension with Talisman in mid 150’s beginning late Jan. 2006 and ending late Jan. 2007. Available; actively marketing.
Ocean Guardian   1,500’   Earl & Wright Sedco
711 Series
  North Sea   Contracted   Shell   one year   low 80’s   late Mar. 2005   late Mar. 2006  
One-year term extension plus option with Shell in low 160’s beginning late Mar. 2006 and ending late Mar. 2007. (40-day survey Q3, 2005). Available; actively marketing.
Ocean Princess   1,500’   Aker H-3   North Sea   Contracted   Talisman   one year extension   low 80’s   early Jan. 2005   late Dec. 2005  
Two year extension with Talisman plus option in low 150’s beginning in late Dec. 2005 and ending in late Dec. 2007. Available; actively marketing.
Ocean Vanguard   1,500’   Bingo 3000   North Sea   Contracted   Statoil   one year term   low 140’s   late May 2005   early Sept. 2006  
One year plus option program in Norway with Statoil in low 140’s beginning in late May 2005 and ending in early Sept. 2006 (time period to include one well redrill with ENI in low 140’s beginning late July and ending late Nov. 2005). Available; actively marketing.
AUSTRALASIA
Ocean Bounty   1,500’   Victory Class   Australia   Contracted   ConocoPhillips   two wells   mid 80’s   late June 2005   early Nov. 2005  
One well with Coogee Res. in mid 80’s beginning early Nov. and ending early Dec.; followed by two wells plus option with Coogee in low 90’s beginning early Dec. 2005. and ending mid Feb. 2006; followed by LOI for one well plus option in mid 90’s beginning mid Mar. and ending mid May.; followed by four wells plus option in high 90’s with Woodside beginning mid May. 2006 and ending early Nov. 2006. Available; actively marketing.
Ocean Patriot   1,500’   Bingo 3000   Australia   Contracted   Apache   one well   high 70’s   early Oct. 2005   early Nov. 2005  
One assignment well with Nexus in low 150’s, mid Nov.-mid Dec. 2005; followed by 10-day survey ending late Dec. 2005; followed by first of three Anzon options in mid 130’s, late Dec. 2005-late Jan.; followed by second of three Anzon options in upper 130’s, late Jan.-late Feb.; followed by third well in low 140’s, late Feb.-late April; followed by one exercised assignment option well from Apache with Nexus in high 70’s, late April-mid July; followed by LOI for one well in upper 70’s, mid July-mid Aug.; followed by four wells plus option with NZOP in low 100’s, mid Aug. 2006-mid Jan. 2007. Available; actively marketing.
Ocean Epoch   1,640’   Korkut   Malaysia   Contracted   Murphy   six wells plus option   mid 70’s   late April 2005   mid Dec. 2005  
Three option wells exercised in mid 70’s beginning in mid Dec. 2005 and ending in late Mar. 2006; five option wells remain available. Available; actively marketing.
Ocean General   1,640’   Korkut   Malaysia   Contracted   CTOC   six wells   mid 70’s   mid June 2005   early Feb. 2006  
Note: 5th & 6th wells in mid 90’s beginning mid Nov. 2005 and ending early Feb. 2006; followed by fourth of six wells (assignment from CTOC to Hess) in mid 70’s beginning early Feb. and ending late Mar.; followed by one well with Premier in high 70’s in Viet Nam beginning late Mar. 2006 and ending mid May 2006; followed by LOI for three wells plus three options wells in mid 130’s beginning mid May 2006 and ending early Nov. 2006; followed by LOI for three wells in mid 170’s beginning early Nov. 2006 and ending late Mar. 2007. Available; actively marketing.
Ocean Rover   7,000’   Victory Class   Malaysia   Contracted   Murphy   950 day extension   mid 170’s   late June 2005   mid Jan. 2008  
Available; actively marketing.


 

4

DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF October 24, 2005
                                         
Rig Name   WD   Design   Location   Status*   Operator   Current Term   Dayrate (000s)   Start Date   Est. End Date   Future Contracts and Other Information
BRAZIL
Ocean Yatzy   3,300’   DP DYVI Super Yatzy   Brazil   Contracted   Petrobras   700 day extension   mid 70’s   early Oct. 2005   Oct. 2009  
Four-year term extension with Petrobras in mid 110’s, plus potential bonus, beginning early Oct. 2005 and ending early Oct. 2009. (21-day maintenance Q3 or Q4). Available.
Ocean Winner   3,500’   Aker H-3   Brazil   Contracted   Petrobras   700 day extension   mid 50’s   early April 2004   mid Mar. 2006  
Four-year term extension with Petrobras in low 110’s, plus potential bonus, beginning mid Mar. 2006 and ending mid Mar. 2010. Available.
Ocean Alliance   5,000’   Alliance Class   Brazil   Contracted   Petrobras   four year extension   mid 150’s   early Sept. 2005   early Sept. 2009  
Available.
International Drillships (1)
Ocean Clipper   7,500’   DP Fluor/Mitsubishi   Brazil   Contracted   Petrobras   700 day extension   low 100’s   early Jan. 2003   mid Dec. 2005  
Five-year term extension with Petrobras in low 180’s, plus potential bonus, beginning mid Dec. 2005 and ending mid Dec. 2010. Available.
International Jackups (2)
                                       
 
Ocean Sovereign   250’   Independent Leg
Cantilever
  Indonesia   Contracted   Santos   eight wells   upper 60’s   early May 2005   early Nov. 2005  
Two wells with Amerada Hess plus two exercised option wells in mid 80’s beginning early Nov. and ending late Dec. 2005; followed by two option wells with Santos in mid 70’s beginning late Dec. 2005 and ending late Mar. 2006; followed by three wells with Santos in upper 60’s beginning late Mar. and ending mid June; followed by two wells with Anadarko in mid 80’s beginning late June and ending early Aug. 2006; followed by LOI for 18-month term in mid 90’s beginning early Aug. 2006 and ending early Feb. 2008. Available; actively marketing.
Ocean Heritage   300’   Independent Leg
Cantilever
  Qatar   Contracted   Conoco/Phillips   two wells plus option   low 70’s   mid June 2005   late Mar. 2006  
Available; actively marketing.
Upgrade (1)
Ocean Endeavor   2,000’   Victory Class   Shipyard   Upgrading   DODI   -   -   -   -  
Singapore shipyard for upgrade to 10,000 ft. capable 5th Generation rig. Estimated completion early 2007; followed by commissioning beginning early Mar. 2007; followed by LOI for a term of between two and four years earning approximate total revenue of between $198 million and $355 million depending upon the length of the contract selected by the operator no later than year-end 2005. Contract is expected to begin mid 2007. Available; actively marketing.
Cold Stacked—Reserved for Upgrade (1)
Garden Banks**   2,200’   Victory Class   GOM   Out of Service   -   -   -   -   -  
Currently retired from active service as drilling and production platform.
Rigs Under Construction (2)
Ocean Shield   350’   Independent Leg
Cantilever
  Shipyard   -   -   -   -   -   -  
Singapore shipyard, estimated completion Q1 2008. Available; actively marketing.
Ocean Scepter   350’   Independent Leg
Cantilever
  Shipyard   -   -   -   -   -   -  
Brownsville shipyard, estimated completion Q1 2008. Available; actively marketing.
NOTES:
*   Generally, rig utilization rates approach 95-98% during contracted periods; however, utilization rates can be adversely impacted by additional downtime due to unscheduled repairs and maintenance, weather conditions and other factors.
 
**   Diamond Offshore Services Company completed purchase of the Garden Banks on August 25, 2005.
GOM = Gulf of Mexico