The following is an update to the current status of commitments and contingencies set forth in Note 23 of the Exelon 2017 Form 10-K. See Note 4Mergers, Acquisitions and Dispositions of the Exelon 2017 Form 10-K for further discussion on the PHI Merger commitments.
Commitments
PHI Merger Commitments (Exelon, PHI, Pepco, DPL and ACE)
The merger of Exelon and PHI was approved in Delaware, New Jersey, Maryland and the District of Columbia. Exelon and PHI agreed to certain commitments including where applicable: customer rate credits, funding for energy efficiency and delivery system modernization programs, a green sustainability fund, workforce development initiatives, charitable contributions, renewable generation and other required commitments. In addition, the orders approving the merger in Delaware, New Jersey, and Maryland include a “most favored nation” provision which, generally, requires allocation of merger benefits proportionally across all the jurisdictions.
The following amounts represent total commitment costs for Exelon, PHI, Pepco, DPL and ACE that have been recorded since the acquisition date and the remaining obligations as of March 31, 2018:
Description
Expected Payment Period
 
Pepco
 
DPL
 
ACE
 
PHI
 
Exelon
Rate credits
2016 - 2017
 
$
91

 
$
67

 
$
101

 
$
259

 
$
259

Energy efficiency
2016 - 2021
 

 

 

 

 
122

Charitable contributions
2016 - 2026
 
28

 
12

 
10

 
50

 
50

Delivery system modernization
Q2 2017
 

 

 

 

 
22

Green sustainability fund
Q2 2017
 

 

 

 

 
14

Workforce development
2016 - 2020
 

 

 

 

 
17

Other
 
 
1

 
5

 

 
6

 
29

Total commitments
 
 
$
120

 
$
84

 
$
111

 
$
315

 
$
513

Remaining commitments
 
 
$
75

 
$
12

 
$
8

 
$
95

 
$
165


In addition, Exelon is committed to develop or to assist in the commercial development of approximately 37 MWs of new generation in Maryland, District of Columbia, and Delaware, 27 MWs of which are expected to be completed by 2018. These investments are expected to total approximately $137 million, are expected to be primarily capital in nature, and will generate future earnings at Exelon and Generation. Investment costs will be recognized as incurred and recorded on Exelon's and Generation's financial statements. Exelon has also committed to purchase 100 MWs of wind energy in PJM, to procure 120 MWs of wind RECs for the purpose of meeting Delaware's renewable portfolio standards, and to maintain and promote energy efficiency and demand response programs in the PHI jurisdictions.
Pursuant to the various jurisdictions' merger approval conditions, over specified periods Pepco, DPL and ACE are not permitted to reduce employment levels due to involuntary attrition associated with the merger integration process and have made other commitments regarding hiring and relocation of positions.
Constellation Merger Commitments (Exelon and Generation)
In February 2012, the MDPSC issued an Order approving the Exelon and Constellation merger. As part of the MDPSC Order, Exelon agreed to develop or assist in the development of 285-300 MWs of new generation. Exelon and Generation have incurred $458 million towards satisfying the commitment for new generation development in the State of Maryland, with 220 MW of new generation in operations to date and 10 MW of this commitment satisfied through a liquidated damages payment made in the fourth quarter of 2016. The remaining 55MW is expected to be satisfied via payment of liquidated damages or execution of a third party PPA, rather than by Generation constructing renewable generating assets. As a result, as of March 31, 2018 Exelon’s and Generation’s Consolidated Balance Sheets include a $50 million liability within Deferred credits and other liabilities for this remaining commitment, to be paid on or before January 15, 2023 unless the period is extended by consent of Exelon and the State. Refer to Note 23 - Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements in the Exelon 2017 Form 10-K for additional information regarding the Constellation Merger Commitments.
Commercial Commitments (All Registrants)
The Registrants’ commercial commitments as of March 31, 2018, representing commitments potentially triggered by future events were as follows:
 
 
Exelon
 
Generation
 
ComEd
 
PECO
 
BGE
 
PHI
 
Pepco
 
DPL
 
ACE
Letters of credit (non-debt)(a)
 
$
1,586

 
$
1,533

 
$
2

 
$
1

 
$
5

 
$
1

 
$
1

 
$

 
$

Surety bonds(b)
 
1,651

 
1,463

 
9

 
9

 
10

 
66

 
32

 
4

 
5

Financing trust guarantees
 
378

 

 
200

 
178

 

 

 

 

 

Guaranteed lease residual values(c)
 
22

 

 

 

 

 
22

 
7

 
9

 
6

Total commercial commitments
 
$
3,637

 
$
2,996

 
$
211

 
$
188

 
$
15


$
89

 
$
40

 
$
13

 
$
11

_________
(a)
Letters of credit (non-debt) - Exelon and certain of its subsidiaries maintain non-debt letters of credit to provide credit support for certain transactions as requested by third parties. Includes letters of credits issued under credit facility agreements arranged at minority and community banks and nonrecourse debt letters of credits.
(b)
Surety bonds—Guarantees issued related to contract and commercial agreements, excluding bid bonds.
(c)
Represents the maximum potential obligation in the event that the fair value of certain leased equipment and fleet vehicles is zero at the end of the maximum lease term. The maximum lease term associated with these assets ranges from 3 to 8 years. The maximum potential obligation at the end of the minimum lease term would be $58 million, $17 million of which is a guarantee by Pepco, $24 million by DPL and $16 million by ACE. The minimum lease term associated with these assets ranges from 1 to 4 years. Historically, payments under the guarantees have not been made and PHI believes the likelihood of payments being required under the guarantees is remote.
Nuclear Insurance (Exelon and Generation)
Generation is subject to liability, property damage and other risks associated with major incidents at any of its nuclear stations. Generation has mitigated its financial exposure to these risks through insurance and other industry risk-sharing provisions.
The Price-Anderson Act was enacted to ensure the availability of funds for public liability claims arising from an incident at any of the U.S. licensed nuclear facilities and also to limit the liability of nuclear reactor owners for such claims from any single incident. As of March 31, 2018, the current liability limit per incident is $13.2 billion and is subject to change to account for the effects of inflation and changes in the number of licensed reactors at least once every five years with the last adjustment effective September 10, 2013. In accordance with the Price-Anderson Act, Generation maintains financial protection at levels equal to the amount of liability insurance available from private sources through the purchase of private nuclear energy liability insurance for public liability claims that could arise in the event of an incident. Effective January 1, 2017, the required amount of nuclear energy liability insurance purchased is $450 million for each operating site. Claims exceeding that amount are covered through mandatory participation in a financial protection pool, as required by the Price Anderson-Act, which provides the additional $13.0 billion per incident in funds available for public liability claims. Participation in this secondary financial protection pool requires the operator of each reactor to fund its proportionate share of costs for any single incident that exceeds the primary layer of financial protection. Exelon’s share of this secondary layer would be approximately $2.8 billion, however any amounts payable under this secondary layer would be capped at $420 million per year.
In addition, the U.S. Congress could impose revenue-raising measures on the nuclear industry to pay public liability claims exceeding the $13.2 billion limit for a single incident.
As part of the execution of the NOSA on April 1, 2014, Generation executed an Indemnity Agreement pursuant to which Generation agreed to indemnify EDF and its affiliates against third-party claims that may arise from any future nuclear incident (as defined in the Price-Anderson Act) in connection with the CENG nuclear plants or their operations. Exelon guarantees Generation’s obligations under this indemnity. See Note 2Variable Interest Entities of the Exelon 2017 Form 10-K for additional information on Generation’s operations relating to CENG.
Generation is required each year to report to the NRC the current levels and sources of property insurance that demonstrates Generation possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. The property insurance maintained for each facility is currently provided through insurance policies purchased from NEIL, an industry mutual insurance company of which Generation is a member.
NEIL may declare distributions to its members as a result of favorable operating experience. In recent years NEIL has made distributions to its members, but Generation cannot predict the level of future distributions or if they will continue at all. In March 2018, NEIL declared a supplemental distribution. Generation's portion of the supplemental distribution declared by NEIL is estimated to be $31 million and was recorded as a reduction to Operating and maintenance expense within Exelon and Generation’s Consolidated Statements of Operations and Comprehensive Income for the three months ended March 31, 2018, with cash expected to be received during the second quarter 2018.
Premiums paid to NEIL by its members are also subject to a potential assessment for adverse loss experience in the form of a retrospective premium obligation. NEIL has never assessed this retrospective premium since its formation in 1973, and Generation cannot predict the level of future assessments if any. The current maximum aggregate annual retrospective premium obligation for Generation is approximately $360 million. NEIL requires its members to maintain an investment grade credit rating or to ensure collectability of their annual retrospective premium obligation by providing a financial guarantee, letter of credit, deposit premium, or some other means of assurance.
NEIL provides “all risk” property damage, decontamination and premature decommissioning insurance for each station for losses resulting from damage to its nuclear plants, either due to accidents or acts of terrorism. If the decision is made to decommission the facility, a portion of the insurance proceeds will be allocated to a fund, which Generation is required by the NRC to maintain, to provide for decommissioning the facility. In the event of an insured loss, Generation is unable to predict the timing of the availability of insurance proceeds to Generation and the amount of such proceeds that would be available. In the event that one or more acts of terrorism cause accidental property damage within a twelve-month period from the first accidental property damage under one or more policies for all insured plants, the maximum recovery by Exelon will be an aggregate of $3.2 billion plus such additional amounts as the insurer may recover for all such losses from reinsurance, indemnity and any other source, applicable to such losses.
For its insured losses, Generation is self-insured to the extent that losses are within the policy deductible or exceed the amount of insurance maintained. Uninsured losses and other expenses, to the extent not recoverable from insurers or the nuclear industry, could also be borne by Generation. Any such losses could have a material adverse effect on Exelon’s and Generation’s financial condition, results of operations and cash flows.
Environmental Remediation Matters
General.  The Registrants’ operations have in the past, and may in the future, require substantial expenditures to comply with environmental laws. Additionally, under Federal and state environmental laws, the Registrants are generally liable for the costs of remediating environmental contamination of property now or formerly owned by them and of property contaminated by hazardous substances generated by them. The Registrants own or lease a number of real estate parcels, including parcels on which their operations or the operations of others may have resulted in contamination by substances that are considered hazardous under environmental laws. In addition, the Registrants are currently involved in a number of proceedings relating to sites where hazardous substances have been deposited and may be subject to additional proceedings in the future. Unless otherwise disclosed, the Registrants cannot reasonably estimate whether they will incur significant liabilities for additional investigation and remediation costs at these or additional sites identified by the Registrants, environmental agencies or others, or whether such costs will be recoverable from third parties, including customers. Additional costs could have a material, unfavorable impact on the Registrants' financial conditions, results of operations and cash flows.
MGP Sites
ComEd, PECO, BGE and DPL have identified sites where former MGP activities have or may have resulted in actual site contamination. For almost all of these sites, there are additional PRPs that may share responsibility for the ultimate remediation of each location.
ComEd has identified 42 sites, 20 of which have been remediated and approved by the Illinois EPA or the U.S. EPA and 22 that are currently under some degree of active study and/or remediation. ComEd expects the majority of the remediation at these sites to continue through at least 2022.
PECO has identified 26 sites, 17 of which have been remediated in accordance with applicable PA DEP regulatory requirements and 9 that are currently under some degree of active study and/or remediation. PECO expects the majority of the remediation at these sites to continue through at least 2022.
BGE has identified 13 former gas manufacturing or purification sites, 9 of which the remediation has been completed and approved by the MDE and 4 that require some level of remediation and/or ongoing activity. BGE has determined that a loss associated with these sites is probable and has recorded an estimated liability, which is included in the table below. However, it is reasonably possible that BGE’s cost of remediation for one of its sites could be up to $13 million.
DPL has identified 3 sites, 2 of which remediation has been completed and approved by the MDE or the Delaware Department of Natural Resources and Environmental Control. The remaining site is under study and the required cost at the site is not expected to be material.
The historical nature of the MGP sites and the fact that many of the sites have been buried and built over, impacts the ability to determine a precise estimate of the ultimate costs prior to initial sampling and determination of the exact scope and method of remedial activity. Management determines its best estimate of remediation costs using all available information at the time of each study, including probabilistic and deterministic modeling for ComEd and PECO, and the remediation standards currently required by the applicable state environmental agency.  Prior to completion of any significant clean up, each site remediation plan is approved by the appropriate state environmental agency.
ComEd, pursuant to an ICC order, and PECO, pursuant to settlements of natural gas distribution rate cases with the PAPUC, are currently recovering environmental remediation costs of former MGP facility sites through customer rates. See Note 6Regulatory Matters for additional information regarding the associated regulatory assets. While BGE and DPL do not have riders for MGP clean-up costs, they have historically received recovery of actual clean-up costs in distribution rates.
As of March 31, 2018 and December 31, 2017, the Registrants had accrued the following undiscounted amounts for environmental liabilities in Other current liabilities and Other deferred credits and other liabilities within their respective Consolidated Balance Sheets:
March 31, 2018
Total environmental
investigation and
remediation reserve
 
Portion of total related to
MGP investigation and
remediation
Exelon
$
462


$
313

Generation
117

 

ComEd
283

 
281

PECO
29

 
28

BGE
5

 
4

PHI
28



Pepco
26

 

DPL
1

 

ACE
1

 

December 31, 2017
Total environmental
investigation and
remediation reserve
 
Portion of total related to
MGP investigation and
remediation
Exelon
$
466


$
315

Generation
117

 

ComEd
285

 
283

PECO
30

 
28

BGE
5

 
4

PHI
29



Pepco
27

 

DPL
1

 

ACE
1

 


Solid and Hazardous Waste
Cotter Corporation.   The EPA has advised Cotter Corporation (Cotter), a former ComEd subsidiary, that it is potentially liable in connection with radiological contamination at a site known as the West Lake Landfill in Missouri. In 2000, ComEd sold Cotter to an unaffiliated third-party. As part of the sale, ComEd agreed to indemnify Cotter for any liability arising in connection with the West Lake Landfill. In connection with Exelon’s 2001 corporate restructuring, this responsibility to indemnify Cotter was transferred to Generation. On May 29, 2008, the EPA issued a Record of Decision (ROD) approving a landfill cover remediation approach. Generation had previously recorded an estimated liability for its anticipated share of a landfill cover remedy that was estimated to cost approximately $90 million in total. By letter dated January 11, 2010, the EPA requested that the PRPs perform a supplemental feasibility study for a remediation alternative that would involve complete excavation of the radiological contamination. On September 30, 2011, the PRPs submitted the supplemental feasibility study to the EPA for review. Since June 2012, the EPA has requested that the PRPs perform a series of additional analyses and groundwater and soil sampling as part of the supplemental feasibility study. This further analysis was focused on a partial excavation remedial option. The PRPs provided the draft final Remedial Investigation and Feasibility Study (RI/FS) to the EPA in January 2018, which formed the basis for EPA’s proposed remedy selection, as further discussed below. There are currently three PRPs participating in the West Lake Landfill remediation proceeding. Investigation by Generation has identified a number of other parties who also may be PRPs and could be liable to contribute to the final remedy. Further investigation is ongoing.
On February 1, 2018, the EPA announced its proposed remedy involving partial excavation of the site with an enhanced landfill cover. The proposed remedy was open for public comment through April 23, 2018 and Generation currently expects that a ROD will be issued during the third quarter of 2018. Thereafter, the EPA will seek to enter into a Consent Decree with the PRPs to effectuate the remedy, which Generation currently expects will occur in late 2018 or early 2019. The estimated cost of the remedy, taking into account the current EPA technical requirements and the total costs expected to be incurred by the PRPs in fully executing the remedy, is approximately $340 million, including cost escalation on an undiscounted basis, which would be allocated among the final group of PRPs. Generation has determined that a loss associated with the EPA’s partial excavation and enhanced landfill cover remedy is probable and has recorded a liability included in the table above, that reflects management’s best estimate of Cotter’s allocable share of the ultimate cost for the entire remediation effort. Given the joint and several nature of this liability, the magnitude of Generation’s ultimate liability will depend on the actual costs incurred to implement the ultimate required remediation remedy as well as on the nature and terms of any cost-sharing arrangements with the final group of PRPs. Therefore, it is reasonably possible that the ultimate cost and Generation’s associated allocable share could differ significantly once these uncertainties are resolved, which could have a material impact on Exelon's and Generation's future financial conditions, results of operations and cash flows.
On January 16, 2018, the PRPs were advised by the EPA that it will begin an additional investigation and evaluation of groundwater conditions at the West Lake Landfill. The PRPs have been provided with a draft statement of work that will form the basis of an Administrative Settlement Agreement and Order on Consent for the performance by the PRPs of the groundwater RI/FS and reimbursement of EPA’s oversight costs. The purposes of this new RI/FS are to define the nature and extent of any groundwater contamination from the West Lake Landfill site, determine the potential risk posed to human health and the environment, and evaluate remedial alternatives. Generation estimates the undiscounted cost for the groundwater RI/FS for West Lake to be approximately $20 million and Generation has recorded a liability included in the table above, that reflects management’s best estimate of Cotter’s allocable share of the cost among the PRPs. At this time Generation cannot predict the likelihood or the extent to which, if any, remediation activities will be required and cannot estimate a reasonably possible range of loss for response costs beyond those associated with the RI/FS component. It is reasonably possible, however, that resolution of this matter could have a material, unfavorable impact on Exelon’s and Generation’s future results of operations and cash flows.
During December 2015, the EPA took two actions related to the West Lake Landfill designed to abate what it termed as imminent and dangerous conditions at the landfill. The first involved installation by the PRPs of a non-combustible surface cover to protect against surface fires in areas where radiological materials are believed to have been disposed. Generation has accrued what it believes to be an adequate amount to cover its anticipated liability for this interim action, and the work is expected to be completed in 2018. The second action involved EPA's public statement that it will require the PRPs to construct a barrier wall in an adjacent landfill to prevent a subsurface fire from spreading to those areas of the West Lake Landfill where radiological materials are believed to have been disposed. At this time, Generation believes that the requirement to build a barrier wall is remote in light of other technologies that have been employed by the adjacent landfill owner. Finally, one of the other PRPs, the landfill owner and operator of the adjacent landfill, has indicated that it will be making a contribution claim against Cotter for costs that it has incurred to prevent the subsurface fire from spreading to those areas of the West Lake Landfill where radiological materials are believed to have been disposed. At this time, Exelon and Generation do not possess sufficient information to assess this claim and therefore are unable to estimate a range of loss, if any. As such, no liability has been recorded for the potential contribution claim. It is reasonably possible, however, that resolution of this matter could have a material, unfavorable impact on Exelon’s and Generation's financial conditions, results of operations and cash flows.
On August 8, 2011, Cotter was notified by the DOJ that Cotter is considered a PRP with respect to the government’s clean-up costs for contamination attributable to low level radioactive residues at a former storage and reprocessing facility named Latty Avenue near St. Louis, Missouri. The Latty Avenue site is included in ComEd’s indemnification responsibilities discussed above as part of the sale of Cotter. The radioactive residues had been generated initially in connection with the processing of uranium ores as part of the U.S. Government’s Manhattan Project. Cotter purchased the residues in 1969 for initial processing at the Latty Avenue facility for the subsequent extraction of uranium and metals. In 1976, the NRC found that the Latty Avenue site had radiation levels exceeding NRC criteria for decontamination of land areas. Latty Avenue was investigated and remediated by the United States Army Corps of Engineers pursuant to funding under FUSRAP. The DOJ has not yet formally advised the PRPs of the amount that it is seeking, but it is believed to be approximately $90 million from all PRPs. The DOJ and the PRPs agreed to toll the statute of limitations until August 2018 so that settlement discussions could proceed. Generation has determined that a loss associated with this matter is probable under its indemnification agreement with Cotter and has recorded an estimated liability, which is included in the table above.
Commencing in February 2012, a number of lawsuits have been filed in the U.S. District Court for the Eastern District of Missouri. Among the defendants were Exelon, Generation and ComEd, all of which were subsequently dismissed from the case, as well as Cotter, which remains a defendant. The suits allege that individuals living in the North St. Louis area developed some form of cancer or other serious illness due to Cotter's negligent or reckless conduct in processing, transporting, storing, handling and/or disposing of radioactive materials. Plaintiffs are asserting public liability claims under the Price-Anderson Act. Their state law claims for negligence, strict liability, emotional distress, and medical monitoring have been dismissed. The complaints do not contain specific damage claims. In the event of a finding of liability against Cotter, it is reasonably possible that Generation would be financially responsible due to its indemnification responsibilities of Cotter described above. The court has dismissed a number of the lawsuits as untimely, and that has been upheld on appeal. The parties have engaged in settlement discussions pursuant to court-ordered mediation and it is expected that resolution of this matter will not have a material, unfavorable impact on Exelon’s and Generation's financial conditions, results of operations and cash flows.
Benning Road Site. In September 2010, PHI received a letter from EPA identifying the Benning Road site as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. A portion of the site was formerly the location of a Pepco Energy Services electric generating facility. That generating facility was deactivated in June 2012 and plant structure demolition was completed in July 2015. The remaining portion of the site consists of a Pepco transmission and distribution service center that remains in operation. In December 2011, the U.S. District Court for the District of Columbia approved a Consent Decree entered into by Pepco and Pepco Energy Services with the DOEE, which requires Pepco and Pepco Energy Services to conduct a Remediation Investigation (RI)/ Feasibility Study (FS) for the Benning Road site and an approximately 10 to 15-acre portion of the adjacent Anacostia River. The RI/FS will form the basis for the remedial actions for the Benning Road site and for the Anacostia River sediment associated with the site. The Consent Decree does not obligate Pepco or Pepco Energy Services to pay for or perform any remediation work, but it is anticipated that DOEE will look to Pepco and Pepco Energy Services to assume responsibility for cleanup of any conditions in the river that are determined to be attributable to past activities at the Benning Road site. Pursuant to Exelon's March 23, 2016 acquisition of PHI, Pepco Energy Services was transferred to Generation.
Since 2013, Pepco and Pepco Energy Services (now Generation) have been performing RI work and have submitted multiple draft RI reports to the DOEE. Once the RI work is completed, Pepco and Generation will issue a draft “final” RI report for review and comment by DOEE and the public. Pepco and Generation will then proceed to develop an FS to evaluate possible remedial alternatives for submission to DOEE. The Court has established a schedule for completion of the RI and FS, and approval by the DOEE, by May 6, 2019.
Upon DOEE’s approval of the final RI and FS Reports, Pepco and Generation will have satisfied their obligations under the Consent Decree. At that point, DOEE will prepare a Proposed Plan regarding further response actions. After considering public comment on the Proposed Plan, DOEE will issue a Record of Decision identifying any further response actions determined to be necessary.
PHI, Pepco and Generation have determined that a loss associated with this matter is probable and have accrued an estimated liability, which is included in the table above.
Anacostia River Tidal Reach. Contemporaneous with the Benning RI/FS being performed by Pepco and Generation, DOEE and certain federal agencies have been conducting a separate RI/FS focused on the entire tidal reach of the Anacostia River extending from just north of the Maryland-D.C. boundary line to the confluence of the Anacostia and Potomac Rivers. In March 2016, DOEE released a draft of the river-wide RI Report for public review and comment. The river-wide RI incorporated the results of the river sampling performed by Pepco and Pepco Energy Services as part of the Benning RI/FS, as well as similar sampling efforts conducted by owners of other sites adjacent to this segment of the river and supplemental river sampling conducted by DOEE’s contractor. DOEE asked Pepco, along with parties responsible for other sites along the river, to participate in a “Consultative Working Group” to provide input into the process for future remedial actions addressing the entire tidal reach of the river and to ensure proper coordination with the other river cleanup efforts currently underway, including cleanup of the river segment adjacent to the Benning Road site resulting from the Benning RI/FS. Pepco responded that it will participate in the Consultative Working Group but its participation is not an acceptance of any financial responsibility beyond the work that will be performed at the Benning Road site described above. DOEE has advised the Consultative Working Group that the federal and DOEE authorities conducted the remedial investigation and a draft of that report was released to the public on April 1, 2018. Written comments will be accepted by the Agencies until May 14, 2018 and a Public Meeting to present the finding of the RI is scheduled for April 24, 2018. Pepco intends to submit comments, participate in the Public Hearing, and continue its outreach efforts as appropriate to the agencies, governmental officials, community organizations and other key stakeholders. A feasibility study of potential remedies is being prepared by the Agencies and is scheduled to be released in the late summer or early fall of this year. DOEE currently is working under a statutorily mandated date to complete the Record of Decision selecting the final remedy for the project by June 30, 2018. However, on January 11, 2018 the DOEE requested at a hearing of the District of Columbia Council Committee of the Environment that this statutory deadline be extended until December 31, 2019 to reflect the time necessary to complete the investigation. A recommendation by the Committee to the DC Council is expected in the near future. The District of Columbia Council will make the final determination to extend the deadline. An appropriate liability for Pepco’s share of investigation costs has been accrued and is included in the table above. Although Pepco has determined that it is probable that costs for remediation will be incurred, Pepco cannot estimate the reasonably possible range of loss at this time and no liability has been accrued for those future costs. It is anticipated that Pepco will likely be in a better position to estimate that range of loss when the draft Feasibility Study for the Project is released. The timing for that release is currently scheduled for late this summer or early fall.
Conectiv Energy Wholesale Power Generation Sites. In July 2010, PHI sold the wholesale power generation business of Conectiv Energy Holdings, Inc. and substantially all of its subsidiaries (Conectiv Energy) to Calpine Corporation (Calpine). Under New Jersey’s Industrial Site Recovery Act (ISRA), the transfer of ownership triggered an obligation on the part of Conectiv Energy to remediate any environmental contamination at each of the nine Conectiv Energy generating facility sites located in New Jersey. Under the terms of the sale, Calpine has assumed responsibility for performing the ISRA-required remediation and for the payment of all related ISRA compliance costs up to $10 million. Predecessor PHI was obligated to indemnify Calpine for any ISRA compliance remediation costs in excess of $10 million. According to PHI’s estimates, the costs of ISRA-required remediation activities at the nine generating facility sites located in New Jersey are in the range of approximately $7 million to $18 million, and predecessor PHI recorded an estimated liability for its share of the estimated clean-up costs. Pursuant to Exelon’s March 2016 acquisition of PHI, the Conectiv Energy legal entity was transferred to Generation and the liability for Predecessor PHI's share of the estimated clean- up costs was also transferred to Generation and is included in the table above as a liability of Generation. The responsibility to indemnify Calpine is shared by PHI and Generation. 
Brandywine Fly Ash Disposal Site. In February 2013, Pepco received a letter from the MDE requesting that Pepco investigate the extent of waste on a Pepco right-of-way that traverses the Brandywine fly ash disposal site in Brandywine, Prince George’s County, Maryland, owned by NRG Energy, Inc. (as successor to GenOn MD Ash Management, LLC) (NRG). In July 2013, while reserving its rights and related defenses under a 2000 agreement covering the sale of this site, Pepco indicated its willingness to investigate the extent of, and propose an appropriate closure plan to address, ash on the right-of-way. Pepco submitted a schedule for development of a closure plan to MDE on September 30, 2013 and, by letter dated October 18, 2013, MDE approved the schedule.
Pepco has determined that a loss associated with this matter is probable and has recorded an estimated liability, which is included in the table above. Pepco believes that the costs incurred in this matter may be recoverable from NRG under the 2000 sale agreement, but has not recorded an associated receivable for any potential recovery.
Litigation and Regulatory Matters
PHI Merger
In July 2015, the OPC, Public Citizen, Inc., the Sierra Club and the Chesapeake Climate Action Network (CCAN) filed motions to stay the MDPSC order approving the Exelon and PHI merger. The Circuit Court judge issued an order denying the motions for stay on August 12, 2015. On January 8, 2016, the Circuit Court judge affirmed the MDPSC’s order approving the merger and denied the petitions for judicial review filed by the OPC, the Sierra Club, CCAN and Public Citizen, Inc.  On January 19, 2016, the OPC filed a notice of appeal to the Maryland Court of Special Appeals, and on January 21, the Sierra Club and CCAN filed notices of appeal. On January 27, 2017, the Maryland Court of Special Appeals affirmed the Circuit Court's judgment that the MDPSC did not err in approving the merger. The OPC and Sierra Club filed petitions seeking further review in the Court of Appeals of Maryland, which is the highest court in Maryland. On June 21, 2017, the Court of Appeals granted discretionary review of the January 27, 2017 decision by the Maryland Court of Special Appeals. The Maryland Court of Appeals will review the OPC argument that the MDPSC did not properly consider the acquisition premium paid to PHI shareholders under Maryland’s merger approval standard and the Sierra Club’s argument that the merger would harm the renewable and distributed generation markets. The two lower courts examining these issues rejected these arguments, which Exelon believes are without merit. All briefs have been filed and oral arguments were presented to the court on October 10, 2017.
Asbestos Personal Injury Claims
Exelon and Generation   Generation maintains a reserve for claims associated with asbestos-related personal injury actions in certain facilities that are currently owned by Generation or were previously owned by ComEd and PECO. The estimated liabilities are recorded on an undiscounted basis and exclude the estimated legal costs associated with handling these matters, which could be material.
At March 31, 2018 and December 31, 2017, Generation had recorded estimated liabilities of approximately $76 million and $78 million, respectively, in total for asbestos-related bodily injury claims. As of March 31, 2018, approximately $21 million of this amount related to 232 open claims presented to Generation, while the remaining $55 million is for estimated future asbestos-related bodily injury claims anticipated to arise through 2050, based on actuarial assumptions and analyses, which are updated on an annual basis. On a quarterly basis, Generation monitors actual experience against the number of forecasted claims to be received and expected claim payments and evaluates whether adjustments to the estimated liabilities are necessary.
On November 22, 2013, the Supreme Court of Pennsylvania held that the Pennsylvania Workers Compensation Act does not apply to an employee’s disability or death resulting from occupational disease, such as diseases related to asbestos exposure, which manifests more than 300 weeks after the employee’s last employment-based exposure, and that therefore the exclusivity provision of the Act does not preclude such employee from suing his or her employer in court. The Supreme Court’s ruling reverses previous rulings by the Pennsylvania Superior Court precluding current and former employees from suing their employers in court, despite the fact that the same employee was not eligible for workers compensation benefits for diseases that manifest more than 300 weeks after the employee’s last employment-based exposure to asbestos. Since the Pennsylvania Supreme Court's ruling in November 2013, Exelon, Generation, and PECO have experienced an increase in asbestos-related personal injury claims brought by former PECO employees, all of which have been accrued for on a claim by claim basis. Those additional claims are taken into account in projecting estimated future asbestos-related bodily injury claims.
On November 4, 2015, the Illinois Supreme Court found that the provisions of the Illinois' Workers' Compensation Act and the Workers' Occupational Diseases Act barred an employee from bringing a direct civil action against an employer for latent diseases, including asbestos-related diseases that fall outside the 25-year limit of the statute of repose. The Illinois Supreme Court's ruling reversed previous rulings by the Illinois Court of Appeals, which initially ruled that the Illinois Worker's Compensation law should not apply in cases where the diagnosis of an asbestos related disease occurred after the 25-year maximum time period for filing a Worker's Compensation claim. As a result of this ruling, Exelon, Generation, and ComEd have not recorded an increase to the asbestos-related bodily injury liability as of March 31, 2018.
There is a reasonable possibility that Exelon may have additional exposure to estimated future asbestos-related bodily injury claims in excess of the amount accrued and the increases could have a material unfavorable impact on Exelon's, Generation's and PECO's financial conditions, results of operations and cash flows.
City of Everett Tax Increment Financing Agreement (Exelon and Generation)
On April 10, 2017, the City of Everett petitioned the Massachusetts Economic Assistance Coordinating Council (EACC) to revoke the 1999 tax increment financing agreement (TIF Agreement) relating to Mystic 8 & 9 on the grounds that the total investment in Mystic 8 & 9 materially deviates from the investment set forth in the TIF Agreement.  On October 31, 2017, a three-member panel of the EACC conducted an administrative hearing on the City’s petition. On November 30, 2017, the hearing panel issued a tentative decision denying the City’s petition, finding that there was no material misrepresentation that would justify revocation of the TIF Agreement. On December 13, 2017, the tentative decision was adopted by the full EACC. On January 12, 2018, the City filed a complaint in Massachusetts Superior Court requesting, among other things, that the court set aside the EACC’s decision, grant the City’s request to decertify the Project and the TIF Agreement, and award the City damages for alleged underpaid taxes over the period of the TIF Agreement. Generation vigorously contested the City’s claims before the EACC and will continue to do so in the Massachusetts Superior Court proceeding. Generation continues to believe that the City’s claim lacks merit. Accordingly, Generation has not recorded a liability for payment resulting from such a revocation, nor can Generation estimate a reasonably possible range of loss, if any, associated with any such revocation.  Further, it is reasonably possible that property taxes assessed in future periods, including those following the expiration of the current TIF Agreement in 2019, could be material to Generation’s results of operations and cash flows.
General
The Registrants are involved in various other litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. The Registrants maintain accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of reasonably possible loss, particularly where (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss.
Income Taxes
See Note 12Income Taxes for information regarding the Registrants’ income tax refund claims and certain tax positions, including the 1999 sale of fossil generating assets.