Commitments and Contingencies (Exelon, Generation, ComEd, PECO and BGE)
12 Months Ended
Dec. 31, 2015
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies (Exelon, Generation, ComEd, PECO and BGE)
(Exelon, Generation, ComEd, PECO and BGE)
 
Commitments
Constellation Merger Commitments

In February 2012, the MDPSC issued an Order approving the Exelon and Constellation merger. As part of the MDPSC Order, Exelon agreed to provide a package of benefits to BGE customers, the City of Baltimore and the State of Maryland, resulting in an estimated direct investment in the State of Maryland of approximately $1 billion. The direct investment estimate includes $95 million to $120 million relating to the construction of a headquarters building in Baltimore for Generation’s competitive energy businesses.

The direct investment commitment also includes $500 million to $600 million relating to Exelon and Generation’s development or assistance in the development of 275 - 300 MWs of new generation in Maryland, which is expected to be completed within a period of 10 years. Exelon and Generation have incurred $393 million towards satisfying the commitment for new generation development in the state of Maryland, with approximately 220 MW of the new generation commencing with commercial operations to date. The MDPSC order contemplates various options for complying with the new generation development commitments, including building or acquiring generating assets, making subsidy or compliance payments, or in circumstances in which the generation build is delayed or certain specified provisions are elected, making liquidated damages payments. Exelon and Generation expect that the majority of these commitments will be satisfied by building or acquiring generating assets and, therefore, will be primarily capital in nature and recognized as incurred. However, during the third quarter of 2014, the conditions associated with one of the generation development commitments changed such that Exelon and Generation now believe that the most likely outcome will involve making subsidy payments and/or liquidated damages payments rather than constructing the specified generating plant. As a result, Exelon and Generation recorded a pre-tax $44 million loss contingency related to this generation development commitment which is included in Operating and maintenance expense in Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income for the year ended December 31, 2014. While this $44 million loss contingency represents Generation’s best estimate of the future obligation, it is reasonably possible that Exelon and Generation could ultimately be required to make cumulative subsidy payments of up to a maximum of approximately $105 million over a 20-year period dependent on actual generating output from a successfully constructed generating plant.

Equity Investment Commitments

As part of Generation's recent investments in technology development, Generation enters into equity purchase agreements that include commitments to invest additional equity through incremental payments to fund the anticipated needs of the planned operations of the associated companies. The commitment includes approximately $20 million of in-kind services and 100% of 2015 ESA Investco, LLC’s equity commitment since 2015 ESA Investco, LLC is consolidated by Generation (see Note 2 - Variable Interest Entities for additional details). As of December 31, 2015, Generation’s estimated commitment relating to its equity purchase agreements, including in-kind services contributions, is anticipated to be as follows:

 
Total
2016 (a)
$
299

2017
21

2018
7

2019

Total
$
327



___________________________
(a)
The noncontrolling interest holder of 2015 ESA Investco, LLC will contribute up to $172 million in support of a portion of this equity commitment.

Commercial Commitments
 
Exelon’s commercial commitments as of December 31, 2015, representing commitments potentially triggered by future events, were as follows:
 
 
 
 
Expiration within
 
Total
2016
 
2017
 
2018
 
2019
 
2020
 
2021
and beyond
Letters of credit (non-debt) (a)
$
1,583

 
$
1,565

 
$
5

 
$

 
$

 
$
13

 
$

Surety bonds(b)
809

 
733

 
49

 
3

 
2

 
16

 
6

Financing trust guarantees (c)
628

 

 

 

 

 

 
628

Energy marketing contract
guarantees (d)
3,126

 
3,126

 

 

 

 

 

Nuclear insurance premiums (e)
3,060

 

 

 

 

 

 
3,060

Total commercial commitments
$
9,206

 
$
5,424

 
$
54

 
$
3

 
$
2

 
$
29

 
$
3,694

___________________________
(a)
Letters of credit (non-debt)—Exelon and certain of its subsidiaries maintain non-debt letters of credit to provide credit support for certain transactions as requested by third parties.
(b)
Surety bonds—Guarantees issued related to contract and commercial agreements, excluding bid bonds.
(c)
Includes $200 million of Trust Preferred Securities of ComEd Financing III, $178 million of Trust Preferred Securities of PECO Trust III and IV and $250 million of Trust Preferred Securities of BGE Capital Trust II.
(d)
Energy marketing contract guarantees—Guarantees issued to ensure performance under energy commodity contracts. Amount includes approximately $3.1 billion of guarantees issued by Exelon and Generation on behalf of its Constellation businesses to allow it the flexibility needed to conduct business with counterparties without having to post other forms of collateral. The majority of these guarantees contain evergreen provisions that require the guarantee to remain in effect until cancelled. Exelon’s estimated net exposure for obligations under commercial transactions covered by these guarantees is approximately $0.5 billion at December 31, 2015, which represents the total amount Exelon could be required to fund based on December 31, 2015 market prices.
(e)
Nuclear insurance premiums—Represents the maximum amount that Generation would be required to pay for retrospective premiums in the event of nuclear disaster at any domestic site under the Secondary Financial Protection pool as required under the Price-Anderson Act as well as the current aggregate annual retrospective premium obligation that could be imposed by NEIL. See the Nuclear Insurance section within this note for additional details on Generation’s nuclear insurance premiums.

Generation’s commercial commitments as of December 31, 2015, representing commitments potentially triggered by future events, were as follows:
 
 
 
 
Expiration within
 
Total
2016
 
2017
 
2018
 
2019
 
2020
 
2021
and beyond
Letters of credit (non-debt) (a)
$
1,503

 
$
1,485

 
$
5

 
$

 
$

 
$
13

 
$

Surety bonds
737

 
692

 
45

 

 

 

 

Energy marketing contract
guarantees (b)
1,532

 
1,532

 

 

 

 

 

Nuclear insurance premiums (c)
3,060

 

 

 

 

 

 
3,060

Total commercial commitments
$
6,832

 
$
3,709

 
$
50

 
$

 
$

 
$
13

 
$
3,060

________________________
(a)
Letters of credit (non-debt)—Non-debt letters of credit maintained to provide credit support for certain transactions as requested by third parties.
(b)
Energy marketing contract guarantees—Guarantees issued to ensure performance under energy commodity contracts. Amount includes approximately $1.5 billion of guarantees issued by Generation on behalf of its Constellation businesses to allow it the flexibility needed to conduct business with counterparties without having to post other forms of collateral. The majority of these guarantees contain evergreen provisions that require the guarantee to remain in effect until cancelled. Generation’s estimated net exposure for obligations under commercial transactions covered by these guarantees is approximately $0.3 billion at December 31, 2015, which represents the total amount Generation could be required to fund based on December 31, 2015 market prices.
(c)
Nuclear insurance premiums — Represents the maximum amount that Generation would be required to pay for retrospective premiums in the event of nuclear disaster at any domestic site, including CENG sites, under the Secondary Financial Protection pool as required under the Price-Anderson Act as well as the current aggregate annual retrospective premium obligation that could be imposed by NEIL. See the Nuclear Insurance section within this note for additional details on Generation’s nuclear insurance premiums.

ComEd’s commercial commitments as of December 31, 2015, representing commitments potentially triggered by future events, were as follows:
 
 
 
 
Expiration within
 
Total
2016
 
2017
 
2018
 
2019
 
2020
 
2021
and beyond
Letters of credit (non-debt) (a)
$
16

 
$
16

 
$

 
$

 
$

 
$

 
$

Surety bonds(b)
8

 
6

 

 
2

 

 

 

Financing trust guarantees (c)
200

 

 

 

 

 

 
200

Total commercial commitments
$
224

 
$
22

 
$

 
$
2

 
$

 
$

 
$
200

_________________________ 
(a)
Letters of credit (non-debt)—ComEd maintains non-debt letters of credit to provide credit support for certain transactions as requested by third parties.
(b)
Surety bonds—Guarantees issued related to contract and commercial agreements, excluding bid bonds.
(c)
Performance guarantees—Reflects full and unconditional guarantee of Trust Preferred Securities of ComEd Financing III which is a 100% owned finance subsidiary of ComEd.

PECO’s commercial commitments as of December 31, 2015, representing commitments potentially triggered by future events, were as follows:
 
 
 
 
Expiration within
 
Total
2016
 
2017
 
2018
 
2019
 
2020
 
2021
and beyond
Letters of credit (non-debt) (a)
$
22

 
$
22

 
$

 
$

 
$

 
$

 
$

Surety bonds(b)
9

 
9

 

 

 

 

 

Financing trust guarantees (c)
178

 

 

 

 

 

 
178

Total commercial commitments
$
209

 
$
31

 
$

 
$

 
$

 
$

 
$
178

________________________
(a)
Letters of credit (non-debt)—PECO maintains non-debt letters of credit to provide credit support for certain transactions as requested by third parties.
(b)
Surety bonds—Guarantees issued related to contract and commercial agreements, excluding bid bonds.
(c)
Performance guarantees—Reflects full and unconditional guarantee of Trust Preferred Securities of PECO Trust III and IV, which are 100% owned finance subsidiaries of PECO.

BGE’s commercial commitments as of December 31, 2015, representing commitments potentially triggered by future events, were as follows:
 
 
 
 
Expiration within
 
Total
2016
 
2017
 
2018
 
2019
 
2020
 
2021
and beyond
Letters of credit (non-debt) (a)
$
2

 
$
2

 
$

 
$

 
$

 
$

 
$

Surety bonds (b)
10

 
10

 

 

 

 

 

Financing trust guarantees (c)
250

 

 

 

 

 

 
250

Total commercial commitments
$
262

 
$
12

 
$

 
$

 
$

 
$

 
$
250

________________________
(a)
Letters of credit (non-debt)—BGE maintains non-debt letters of credit to provide credit support for certain transactions as requested by third parties.
(b)
Surety bonds—Guarantees issued related to contract and commercial agreements, excluding bid bonds.
(c)
Performance guarantee—Reflects full and unconditional guarantee of Trust Preferred Securities of BGE Capital Trust which is an unconsolidated VIE of BGE.
 
 Leases
 
Minimum future operating lease payments, including lease payments for contracted generation, vehicles, real estate, computers, rail cars, operating equipment and office equipment, as of December 31, 2015 were:
 
 
Exelon (a)
 
Generation(a)(b)
 
ComEd (c)
 
PECO (c)
 
BGE (c)(d)
2016
$
133

 
$
86

 
$
14

 
$
3

 
$
12

2017
109

 
69

 
9

 
3

 
10

2018
86

 
57

 
5

 
2

 
9

2019
74

  
45

  
5

 
2

 
8

2020
70

 
44

 
3

 
2

 
7

Remaining years
702

 
655

 
1

 

 
19

Total minimum future lease payments
$
1,174

 
$
956

 
$
37

 
$
12

 
$
65

______________________
(a)
Excludes Generation’s contingent operating lease payments associated with contracted generation agreements.
(b)
The Generation column above includes minimum future lease payments associated with a 20-year lease agreement for the Baltimore headquarters that became effective during the second quarter of 2015. Generation’s total commitments under the lease agreement are $4 million, $10 million, $11 million, $13 million, $14 million, and $271 million related to years 2016, 2017, 2018, 2019, 2020 and thereafter, respectively.
(c)
Amounts related to certain real estate leases and railroad licenses effectively have indefinite payment periods. As a result, ComEd, PECO and BGE have excluded these payments from the remaining years, as such amounts would not be meaningful. ComEd’s, PECO’s, and BGE’s annual obligation for these arrangements, included in each of the years 2016—2020, was $2 million, $3 million, and $1 million respectively.
(d)
Includes all future lease payments on a 99 year real estate lease that expires in 2106.
The following table presents the Registrants’ rental expense under operating leases for the years ended December 31, 2015, 2014 and 2013:
 
For the Year Ended December 31,
Exelon
 
Generation (a)
 
ComEd
 
PECO
 
BGE
2015
$
922

 
$
851

 
$
12

 
$
9

 
$
32

2014
865

 
806

 
15

 
14

 
12

2013
806

 
744

 
15

 
21

 
11

__________________________ 
(a)
Includes contingent operating lease payments associated with contracted generation agreements that are not included in the minimum future operating lease payments table above. Payments made under Generation’s contracted generation lease agreements totaled $798 million, $755 million and $694 million during 2015, 2014 and 2013, respectively. Excludes contract amortization associated with purchase accounting and contract acquisitions.
For information regarding capital lease obligations, see Note 14—Debt and Credit Agreements.
 
Nuclear Insurance
 
Generation is subject to liability, property damage and other risks associated with major incidents at any of its nuclear stations, including the CENG nuclear stations. Generation has mitigated its financial exposure to these risks through insurance and other industry risk-sharing provisions.
 
The Price-Anderson Act was enacted to ensure the availability of funds for public liability claims arising from an incident at any of the U.S. licensed nuclear facilities and also to limit the liability of nuclear reactor owners for such claims from any single incident. As of December 31, 2015, the current liability limit per incident is $13.5 billion and is subject to change to account for the effects of inflation and changes in the number of licensed reactors. An inflation adjustment must be made at least once every 5 years and the last inflation adjustment was made effective September 10, 2013. In accordance with the Price-Anderson Act, Generation maintains financial protection at levels equal to the amount of liability insurance available from private sources through the purchase of private nuclear energy liability insurance for public liability claims that could arise in the event of an incident. As of December 31, 2015, the amount of nuclear energy liability insurance purchased is $375 million for each operating site. Additionally, the Price-Anderson Act requires a second layer of protection through the mandatory participation in a retrospective rating plan for power reactors (currently 103 reactors) resulting in an additional $13.1 billion in funds available for public liability claims. Participation in this secondary financial protection pool requires the operator of each reactor to fund its proportionate share of costs for any single incident that exceeds the primary layer of financial protection. Under the Price-Anderson Act, the maximum assessment in the event of an incident for each nuclear operator, per reactor, per incident (including a 5% surcharge), is $127.3 million, payable at no more than $19 million per reactor per incident per year. Exelon’s maximum liability per incident is approximately $2.7 billion, including CENG's related liability.

In addition, the U.S. Congress could impose revenue-raising measures on the nuclear industry to pay public liability claims exceeding the $13.5 billion limit for a single incident.

As part of the execution of the NOSA on April 1, 2014, Generation executed an Indemnity Agreement pursuant to which Generation agreed to indemnify EDF and its affiliates against third-party claims that may arise from any future nuclear incident (as defined in the Price-Anderson Act) in connection with the CENG nuclear plants or their operations. Exelon guarantees Generation’s obligations under this indemnity. See Note 5 - Investment in Constellation Energy Nuclear Group, LLC for additional information on Generation’s operations relating to CENG.
 
Generation is required each year to report to the NRC the current levels and sources of property insurance that demonstrates Generation possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. The property insurance maintained for each facility is currently provided through insurance policies purchased from NEIL, an industry mutual insurance company of which Generation is a member.
 
NEIL may declare distributions to its members as a result of favorable operating experience. In recent years NEIL has made distributions to its members, but Generation cannot predict the level of future distributions or if they will continue at all. Generation's portion of the distribution declared by NEIL is estimated to be $20.7 million for 2015, and was $18.3 million for 2014 and $18.5 million for 2013. The distributions were recorded as a reduction to Operating and maintenance expense within Exelon and Generation’s Consolidated Statements of Operations and Comprehensive Income. Premiums paid to NEIL by its members are subject to assessment for adverse loss experience (the retrospective premium obligation). NEIL has never exercised this assessment since its formation in 1973, and while Generation cannot predict the level of future assessments, or if they will be imposed at all, as of December 31, 2015, the current maximum aggregate annual retrospective premium obligation for Generation is approximately $365 million. NEIL requires its members to maintain an investment grade credit rating or to ensure collectability of their annual retrospective premium obligation by providing a financial guarantee, letter of credit, deposit premium, or some other means of assurance.
 
NEIL provides “all risk” property damage, decontamination and premature decommissioning insurance for each station for losses resulting from damage to its nuclear plants, either due to accidents or acts of terrorism. If the decision is made to decommission the facility, a portion of the insurance proceeds will be allocated to a fund, which Generation is required by the NRC to maintain, to provide for decommissioning the facility. In the event of an insured loss, Generation is unable to predict the timing of the availability of insurance proceeds to Generation and the amount of such proceeds that would be available. In the event that one or more acts of terrorism cause accidental property damage within a twelve-month period from the first accidental property damage under one or more policies for all insured plants, the maximum recovery for all losses by all insureds will be an aggregate of $3.2 billion plus such additional amounts as the insurer may recover for all such losses from reinsurance, indemnity and any other source, applicable to such losses.
 
For its insured losses, Generation is self-insured to the extent that losses are within the policy deductible or exceed the amount of insurance maintained. Uninsured losses and other expenses, to the extent not recoverable from insurers or the nuclear industry, could also be borne by Generation. Any such losses could have a material adverse effect on Exelon’s and Generation’s financial condition, results of operations and liquidity.

 
Spent Nuclear Fuel Obligation
 
Under the NWPA, the DOE is responsible for the development of a geologic repository for and the disposal of SNF and high-level radioactive waste. As required by the NWPA, Generation is a party to contracts with the DOE (Standard Contracts) to provide for disposal of SNF from Generation’s nuclear generating stations. In accordance with the NWPA and the Standard Contracts, Generation historically had paid the DOE one mill ($0.001) per kWh of net nuclear generation for the cost of SNF disposal. On November 19, 2013, the D.C. Circuit Court ordered the DOE to submit to Congress a proposal to reduce the current SNF disposal fee to zero, unless and until there is a viable disposal program. On May 9, 2014, the DOE notified Generation that the SNF disposal fee remained in effect through May 15, 2014, after which time the fee was set to zero. As a result, for the year ended December 31, 2015, Generation did not incur any expense in SNF disposal fees. For the year ended December 31, 2014 and 2013, Generation incurred expense of $49 million and $136 million, respectively, in SNF disposal fees recorded in Purchased power and fuel expense within Exelon’s and Generation’s Consolidated Statements of Operations and Comprehensive Income, including Exelon’s share of Salem and net of co-owner reimbursements (not including such fees incurred by CENG). Until such time as a new fee structure is in effect, Exelon and Generation will not accrue any further costs related to SNF disposal fees. This fee may be adjusted prospectively in order to ensure full cost recovery. The NWPA and the Standard Contracts required the DOE to begin taking possession of SNF generated by nuclear generating units by no later than January 31, 1998. The DOE, however, failed to meet that deadline and its performance has been, and is expected to be, delayed significantly.
 
The 2010 Federal budget (which became effective October 1, 2009) eliminated almost all funding for the creation of the Yucca Mountain repository while the Obama administration devised a new strategy for long-term SNF management. A Blue Ribbon Commission (BRC) on America’s Nuclear Future, appointed by the U.S. Energy Secretary, released a report on January 26, 2012, detailing comprehensive recommendations for creating a safe, long-term solution for managing and disposing of the nation’s spent nuclear fuel and high-level radioactive waste.
 
In early 2013, the DOE issued an updated “Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste” in response to the BRC recommendations. This strategy included a consolidated interim storage facility that is planned to be operational in 2025.
 
Generation uses the 2025 date as the assumed date for when the DOE will begin accepting SNF for purposes of determining nuclear decommissioning asset retirement obligations.
 
In August 2004, Generation and the DOJ, in close consultation with the DOE, reached a settlement under which the government agreed to reimburse Generation, subject to certain damage limitations based on the extent of the government’s breach, for costs associated with storage of SNF at Generation’s nuclear stations pending the DOE’s fulfillment of its obligations. Settlement agreements pertaining to Calvert Cliffs and Ginna were executed during 2011, and Nine Mile Point during 2012, (the “DOE Settlement Agreements”), as amended in 2014 for Calvert Cliffs and Nine Mile Point, under which the government has agreed to reimburse the costs associated with SNF storage expended or to be expended through 2016 as a result of the DOE delaysThe DOE Settlement Agreement is expected to be amended for Ginna in a similar manner as needed. Generation, including CENG, submits annual reimbursement requests to the DOE for costs associated with the storage of SNF. In all cases, reimbursement requests are made only after costs are incurred and only for costs resulting from DOE delays in accepting the SNF.
 
Under the settlement agreement, Generation has received cumulative cash reimbursements for costs incurred as follows:
 
Total
Net (a)
Cumulative cash reimbursements (b)

$
945

$
804

_____________________________
(a)
Total after considering amounts due to co-owners of certain nuclear stations and to the former owner of Oyster Creek.
(b)
Includes $53 million and $49 million, respectively, for amounts received since April 1, 2014, for costs incurred under the CENG DOE Settlement Agreements prior to the consolidation of CENG.

As of December 31, 2015, and 2014, the amount of SNF storage costs for which reimbursement has been or will be requested from the DOE under the DOE settlement agreements is as follows:

 
December 31, 2015
December 31, 2014
DOE receivable - current (a)
$
76

$
82

DOE receivable - noncurrent (b)
14

7

Amounts owed to co-owners (a)(c)
(5
)
(5
)
_____________________________
(a)
Recorded in Accounts receivable, other.
(b)
Recorded in Deferred debits and other assets, other
(c)
Non-CENG amounts owed to co-owners are recorded in Accounts receivable, other.  CENG amounts owed to co-owners are recorded in Accounts payable. Represents amounts owed to the co-owners of Peach Bottom, Quad Cities, and Nine Mile Point Unit 2 generating facilities.
 
The Standard Contracts with the DOE also required the payment to the DOE of a one-time fee applicable to nuclear generation through April 6, 1983. The fee related to the former PECO units has been paid. Pursuant to the Standard Contracts, ComEd previously elected to defer payment of the one-time fee of $277 million for its units (which are now part of Generation), with interest to the date of payment, until just prior to the first delivery of SNF to the DOE. As of December 31, 2015, the unfunded SNF liability for the one-time fee with interest was $1,021 million. Interest accrues at the 13-week Treasury Rate. The 13-week Treasury Rate in effect, for calculation of the interest accrual at December 31, 2015, was 0.112%. The liabilities for SNF disposal costs, including the one-time fee, were transferred to Generation as part of Exelon’s 2001 corporate restructuring. The outstanding one-time fee obligations for the Nine Mile Point, Ginna, Oyster Creek and TMI units remain with the former owners. The Clinton and Calvert Cliffs units have no outstanding obligation. See Note 12Fair Value of Financial Assets and Liabilities for additional information.

Environmental Matters
 
General. The Registrants’ operations have in the past, and may in the future, require substantial expenditures in order to comply with environmental laws. Additionally, under Federal and state environmental laws, the Registrants are generally liable for the costs of remediating environmental contamination of property now or formerly owned by them and of property contaminated by hazardous substances generated by them. The Registrants own or lease a number of real estate parcels, including parcels on which their operations or the operations of others may have resulted in contamination by substances that are considered hazardous under environmental laws. In addition, the Registrants are currently involved in a number of proceedings relating to sites where hazardous substances have been deposited and may be subject to additional proceedings in the future.

ComEd, PECO and BGE have identified sites where former MGP activities have or may have resulted in actual site contamination. For almost all of these sites, there are additional PRPs that may share responsibility for the ultimate remediation of each location.

ComEd has identified 42 sites, 17 of which have been remediated and approved by the Illinois EPA or the U.S. EPA and 25 that are currently under some degree of active study and/or remediation. ComEd expects the majority of the remediation at these sites to continue through at least 2020.
PECO has identified 26 sites, 16 of which have been remediated in accordance with applicable PA DEP regulatory requirements. The remaining 10 sites are currently under some degree of active study and/or remediation. PECO expects the majority of the remediation at these sites to continue through at least 2021.
BGE has identified 13 former gas manufacturing or purification sites that it currently owns or owned at one time through a predecessor’s acquisition. Two gas manufacturing sites require some level of remediation and ongoing monitoring under the direction of the MDE. The required costs at these Two sites are not considered material. An investigation of an additional gas purification site was completed during the first quarter of 2015 at the direction of the MDE. For more information, see the discussion of the Riverside site below.

ComEd, pursuant to an ICC order, and PECO, pursuant to settlements of natural gas distribution rate cases with the PAPUC, are currently recovering environmental remediation costs of former MGP facility sites through customer rates. See Note 3Regulatory Matters for additional information regarding the associated regulatory assets. BGE is authorized to recover, and is currently recovering, environmental costs for the remediation of the former MGP facility sites from customers; however, while BGE does not have a rider for MGP clean-up costs, BGE has historically received recovery of actual clean-up costs in distribution rates. ComEd, PECO and BGE have recorded regulatory assets for the recovery of these costs.

As of December 31, 2015 and 2014, the Registrants had accrued the following undiscounted amounts for environmental liabilities in Other current liabilities and Other deferred credits and other liabilities within their respective Consolidated Balance Sheets:
 
December 31, 2015
Total environmental
investigation
and remediation reserve
 
Portion of total related to MGP
investigation and remediation (a)
Exelon
$
369

 
$
301

Generation
63

 

ComEd
266

 
264

PECO
37

 
35

BGE (a)
3

 
2

 
December 31, 2014
Total environmental
investigation
and remediation reserve
 
Portion of total related to MGP
investigation and remediation
Exelon
$
347

 
$
277

Generation
63

 

ComEd
238

 
235

PECO
45

 
42

BGE
1

 


 _____________________________
(a)
For BGE, includes reserve for Riverside, a gas purification site. See discussion below for additional information.

The historical nature of the MGP sites and the fact that many of the sites have been buried and built over, impacts the ability to determine a precise estimate of the ultimate costs prior to initial sampling and determination of the exact scope and method of remedial activity. Management determines its best estimate of remediation costs using all available information at the time of each study, including probabilistic and deterministic modeling for ComEd and PECO, and the remediation standards currently required by the applicable state environmental agency.  Prior to completion of any significant clean up, each site remediation plan is approved by the appropriate state environmental agency.

During the third quarter of 2015, ComEd and PECO completed an annual study of their future estimated MGP remediation requirements. For ComEd, the results of the study resulted in a $50 million increase to ComEd's environmental liabilities and related regulatory assets. The increase at ComEd was primarily driven by refined assumptions and scopes based on further experience and analysis, including one site where a new option is being considered for a facility under which contamination exists and certain sites where another PRP leads the remediation efforts and ComEd shares responsibility. For PECO, the results of the study resulted in a $1 million decrease to PECO's environmental liabilities and related regulatory assets.

The Registrants cannot reasonably estimate whether they will incur other significant liabilities for additional investigation and remediation costs at these or additional sites identified by the Registrants, environmental agencies or others, or whether such costs will be recoverable from third parties, including customers.

 
Water Quality
 
Groundwater Contamination. In October 2007, a subsidiary of Constellation entered into a consent decree with the MDE relating to groundwater contamination at a third-party facility that was licensed to accept fly ash, a byproduct generated by coal-fired plants. The consent decree required the payment of a $1 million penalty, remediation of groundwater contamination resulting from the ash placement operations at the site, replacement of drinking water supplies in the vicinity of the site, and monitoring of groundwater conditions. As of December 31, 2015 and 2014, Generation’s remaining groundwater contamination reserve was $12 million and $13 million respectively.
 
 

Air Quality

Notices and Finding of Violations and Midwest Generation Bankruptcy. In December 1999, ComEd sold several generating stations to Midwest Generation, LLC (Midwest Generation), a subsidiary of Edison Mission Energy (EME). Under the terms of the sale agreement, Midwest Generation and EME assumed responsibility for environmental liabilities associated with the ownership, occupancy, use and operation of the stations, including responsibility for compliance by the stations with environmental laws before their purchase by Midwest Generation. Midwest Generation and EME additionally agreed to indemnify and hold ComEd and its affiliates harmless from claims, fines, penalties, liabilities and expenses arising from third party claims against ComEd resulting from or arising out of the environmental liabilities assumed by Midwest Generation and EME under the terms of the agreement governing the sale. In connection with Exelon’s 2001 corporate restructuring, Generation assumed ComEd’s rights and obligations with respect to its former generation business, including its rights and obligations under the sale agreement with Midwest Generation and EME.

Under a supplemental agreement reached in 2003, Midwest Generation agreed to reimburse ComEd and Generation for 50% of the specific asbestos claims pending as of February 2003 and related expenses less recovery of insurance costs and agreed to a sharing arrangement for liabilities and expenses associated with future asbestos-related claims as specified in the agreement.

On December 17, 2012 (Petition Date), EME and certain of its subsidiaries, including Midwest Generation, filed for protection under Chapter 11 of the U.S. Bankruptcy Code.
 
In 2012, the Bankruptcy Court approved the rejection of an agency agreement related to a coal rail car lease under which Midwest Generation had agreed to reimburse ComEd for all obligations incurred under the coal rail car lease. The rejection left Generation as the party responsible for making all remaining payments under the lease and performing all other obligations thereunder. A settlement was reached in January 2015, to resolve the claims related to the coal rail car lease for approximately $14 million and Exelon recorded a gain upon receipt of the funds, within Operating and maintenance expense in Exelon's and Generation's Consolidated Statement of Operations and Comprehensive Income. No further action is expected related to the rail car lease.

On March 11, 2014, the Bankruptcy Court for the Northern District of Illinois entered its Order Confirming Debtors’ Joint Chapter 11 Plan of Reorganization. On April 1, 2014 (Effective Date), NRG Energy purchased EME’s portfolio of generation, including Midwest Generation and the Joint Chapter 11 Plan of Reorganization (Plan) became effective. As part of the Plan, the sale agreement, including the environmental indemnity, and the asbestos cost-sharing agreement were rejected.
 
Generation increased its reserve for asbestos-related bodily injury claims pertaining to Midwest Generations’ share of liability as a result of the rejection of the asbestos cost sharing agreement in the bankruptcy proceedings. Exelon and Generation may be entitled to damages associated with the rejection of the agreement and a claim has been filed by Exelon for such damages. These amounts are considered to be contingent gains and would not be recognized until realized.

As a prior owner of the generating stations, ComEd (and Generation, through its agreement in Exelon’s 2001 corporate restructuring to assume ComEd’s rights and obligations associated with its former generation business) could face liability (along with any other potentially responsible parties) for environmental conditions at the stations requiring remediation, with the determination of the allocation among the parties subject to many uncertain factors. ComEd and Generation are unable to predict whether and to what extent they may ultimately be held responsible for remediation and other costs relating to the generating stations and as a result no liability has been recorded as of December 31, 2015. Any liability imposed on ComEd or Generation for environmental matters relating to the generating stations could have a material adverse impact on their future results of operations and cash flows.

 
Solid and Hazardous Waste
 
Cotter Corporation. The U.S. EPA has advised Cotter Corporation (Cotter), a former ComEd subsidiary, that it is potentially liable in connection with radiological contamination at a site known as the West Lake Landfill in Missouri. On February 18, 2000, ComEd sold Cotter to an unaffiliated third-party. As part of the sale, ComEd agreed to indemnify Cotter for any liability arising in connection with the West Lake Landfill. In connection with Exelon’s 2001 corporate restructuring, this responsibility to indemnify Cotter was transferred to Generation. On May 29, 2008, the U.S. EPA issued a Record of Decision approving the remediation option submitted by Cotter and the two other PRPs that required additional landfill cover. By letter dated January 11, 2010, the U.S. EPA requested that the PRPs perform a supplemental feasibility study for a remediation alternative that would involve complete excavation of the radiological contamination. On September 30, 2011, the PRPs submitted the final supplemental feasibility study to the U.S. EPA for review. Since, June 2012, the U.S. EPA has requested that the PRPs perform a series of additional analyses and groundwater and soil sampling as part of the supplemental feasibility study, that are now scheduled to be completed in mid-2016 to enable the EPA to propose a remedy for public comment by the end of 2016. Thereafter the U.S. EPA will select a final remedy and enter into a Consent Decree with the PRPs to effectuate the remedy. A complete excavation remedy would be significantly more expensive than the previously selected additional cover remedy; however, Generation believes the likelihood that the U.S. EPA would require a complete excavation remedy is remote. The U.S. EPA is also reviewing a partial excavation remedy; however, until the current sampling is concluded there is no basis to determine the likelihood and estimate of a partial excavation remedy. The current estimated cost of the landfill cover remediation for the site is approximately $60 million, which will be allocated among all PRPs. Recent investigation has identified a number of other parties who may be PRPs and could be liable to contribute to the final remedy. Further investigation is underway. Generation has accrued what it believes to be an adequate amount to cover its anticipated share of such liability.

During December 2015, the U.S. EPA took two actions related to the West Lake Landfill designed to abate what it termed as imminent and dangerous conditions at the landfill. The first involved installation of a non-combustible interim surface cover to protect against surface fires in areas where radiological materials are believed to have been disposed. Generation has accrued what it believes to be an adequate amount to cover its anticipated liability for this interim action. The second action involved EPA’s public statement that it will require the PRPs to construct a barrier wall in an adjacent landfill to prevent a subsurface fire from spreading to those areas of the West Lake Landfill where radiological materials are believed to have been disposed. At this time, EPA has not provided sufficient details related to the basis for and the requirements and design of a barrier wall to enable Generation to determine the likelihood such a remedy will ultimately be implemented, assess the degree to which Generation may have liability as a potentially responsible party, or develop a reasonable estimate of the potential incremental costs. It is reasonably possible, however, that resolution of this matter could have a material, unfavorable impact on Generation’s and Exelon’s future results of operations and cash flows. Finally, one of the other PRPs, the landfill owner and operator of the adjacent landfill, has indicated that it will be making a contribution claim against Cotter for costs that it has incurred to prevent the subsurface fire from spreading to those areas of the West Lake Landfill where radiological materials are believed to have been disposed. At this time, Generation and Exelon do not possess sufficient information to assess this claim and are therefore unable to determine the impact on their future results of operations and cash flows.

On February 2, 2015, the U.S. Senate passed a bill to transfer remediation authority over the West Lake landfill from the U.S. EPA to the U.S. Army Corps of Engineers, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Such legislation would become final upon passage in the U.S. House of Representatives and the signature of the President, and be subject to annual funding appropriations in the U.S. Budget. Remediation under FUSRAP would not alter the liability of the PRPs, but could delay the determination of a final remedy and its implementation.

On August 8, 2011, Cotter was notified by the DOJ that Cotter is considered a PRP with respect to the government’s clean-up costs for contamination attributable to low level radioactive residues at a former storage and reprocessing facility named Latty Avenue near St. Louis, Missouri. The Latty Avenue site is included in ComEd’s indemnification responsibilities discussed above as part of the sale of Cotter. The radioactive residues had been generated initially in connection with the processing of uranium ores as part of the U.S. government’s Manhattan Project. Cotter purchased the residues in 1969 for initial processing at the Latty Avenue facility for the subsequent extraction of uranium and metals. In 1976, the NRC found that the Latty Avenue site had radiation levels exceeding NRC criteria for decontamination of land areas. Latty Avenue was investigated and remediated by the United States Army Corps of Engineers pursuant to funding under the Formerly Utilized Sites Remedial Action Program. The DOJ has not yet formally advised the PRPs of the amount that it is seeking, but it is believed to be approximately $90 million. The DOJ and the PRPs agreed to toll the statute of limitations until August 2016 so that settlement discussions could proceed. Based on Generation’s preliminary review, it appears probable that Generation has liability to Cotter under the indemnification agreement and has established an appropriate accrual for this liability.
 
Commencing in February 2012, 37 lawsuits have been filed in the U.S. District Court for the Eastern District of Missouri. Among the defendants were Exelon, Generation and ComEd, all of which were subsequently dismissed from the case, and Cotter, which remains a defendant. The suits allege that individuals living in the North St. Louis area developed some form of cancer due to Cotter's negligent or reckless conduct in processing, transporting, storing, handling and/or disposing of radioactive materials. Plaintiffs have asserted claims for negligence, strict liability, emotional distress, medical monitoring, and violations of the Price-Anderson Act. The complaints do not contain specific damage claims. In the event of a finding of liability, it is reasonably possible that Exelon would be considered liable due to its indemnification responsibilities of Cotter described above. The court has dismissed the lawsuits filed by 30 of the plaintiffs. Pre-trial motions and discovery are proceeding in the remaining cases and a proposed pre-trial scheduling order has been filed with the court. At this stage of the litigation, Generation and ComEd cannot estimate a range of loss, if any.

68th Street Dump. In 1999, the U.S. EPA proposed to add the 68th Street Dump in Baltimore, Maryland to the Superfund National Priorities List, and notified BGE and 19 others that they are PRPs at the site. In March 2004, BGE and other PRPs formed the 68th Street Coalition and entered into consent order negotiations with the U.S. EPA to investigate clean-up options for the site under the Superfund Alternative Sites Program. In May 2006, a settlement among the U.S. EPA and 19 of the PRPs, including BGE, with respect to investigation of the site became effective. The settlement requires the PRPs, over the course of several years, to identify contamination at the site and recommend clean-up options. The PRPs submitted their investigation of the range of clean-up options in the first quarter of 2011. Although the investigation and options provided to the U.S. EPA are still subject to U.S. EPA review and selection of a remedy, the range of estimated clean-up costs to be allocated among all of the PRPs is in the range of $50 million to $64 million. On September 30, 2013, U.S. EPA issued the Record of Decision identifying its preferred remedial alternative for the site. The estimated cost for the alternative chosen by U.S. EPA is consistent with the PRPs' estimated range of costs noted above. Based on Generation’s preliminary review, it appears probable that Generation has liability and has established an appropriate accrual for its share of the estimated clean-up costs. A wholly owned subsidiary of Generation has agreed to indemnify BGE for most of the costs related to this settlement and clean-up of the site.

Rossville Ash Site. The Rossville Ash Site is a 32-acre property located in Rosedale, Baltimore County, Maryland, which was used for the placement of fly ash from 1983-2007. The property is owned by Constellation Power Source Generation, LLC (CPSG), a wholly-owned subsidiary of Generation. In 2008, CPSG investigated and remediated the property by entering it into the Maryland Voluntary Cleanup Program (VCP) to address any historic environmental concerns and ready the site for appropriate future redevelopment. The site was accepted into the program in 2010 and is currently going through the process to remediate the site and receive closure from MDE. Exelon currently estimates the cost to close the site to be approximately $9 million, which has been fully reserved as of December 31, 2015.
 
Sauer Dump. On May 30, 2012, BGE was notified by the U.S. EPA that it is considered a PRP at the Sauer Dump Superfund site in Dundalk, Maryland. The U.S. EPA offered BGE and three other PRPs the opportunity to conduct an environmental investigation and present cleanup recommendations at the site. In addition, the U.S. EPA is seeking recovery from the PRPs of $1.7 million for past cleanup and investigation costs at the site. On March 11, 2013, BGE and three other PRPs signed an Administrative Settlement Agreement and Order on Consent with the U.S. EPA which requires the PRPs to conduct a remedial investigation and feasibility study at the site to determine what, if any, are the appropriate and recommended cleanup activities for the site. The ultimate outcome of this proceeding is uncertain. Since the U.S. EPA has not selected a cleanup remedy and the allocation of the cleanup costs among the PRPs has not been determined, an estimate of the range of BGE’s reasonably possible loss, if any, cannot be determined.
 
Riverside. In 2013, the Maryland Department of the Environment (MDE), at the request of U.S. EPA, conducted a site inspection and limited environmental sampling of certain portions of the 170 acre Riverside property owned by BGE. The site consists of several different parcels with different current and historical uses. The sampling included soil and groundwater samples for a number of potential environmental contaminants. The sampling confirmed the existence of contaminants consistent with the known historical uses of the various portions of the site. In March 2014, the MDE requested that BGE conduct an investigation of three specific areas of the site, and a site-wide investigation of soils, sediment, groundwater, and surface water to complement the MDE sampling. The field investigation was completed in January 2015, and a final report was provided to MDE on June 2, 2015. On November 3, 2015, MDE provided BGE with its comments and recommendations on the report which require BGE to conduct further investigation and sampling at the site to better delineate the nature and extent of historic contamination, including off-site sediment and soil sampling. MDE did not request any interim remediation at this time. Upon completion of the investigation the MDE will determine if the site requires further action and/or remediation.  Based upon the investigation to date, BGE has established what it believes is an appropriate reserve. As the investigation and potential remediation proceed, it is possible that additional reserves could be established, in amounts that could be material to BGE.

Litigation and Regulatory Matters
 
Asbestos Personal Injury Claims (Exelon, Generation, PECO and BGE).
 
Exelon and Generation. Generation maintains a reserve for claims associated with asbestos-related personal injury actions in certain facilities that are currently owned by Generation or were previously owned by ComEd and PECO. The reserve is recorded on an undiscounted basis and excludes the estimated legal costs associated with handling these matters, which could be material.
 
At December 31, 2015 and 2014, Generation had reserved approximately $95 million and $100 million, respectively, in total for asbestos-related bodily injury claims. As of December 31, 2015, approximately $21 million of this amount related to 228 open claims presented to Generation, while the remaining $74 million of the reserve is for estimated future asbestos-related bodily injury claims anticipated to arise through 2050, based on actuarial assumptions and analyses, which are updated on an annual basis. On a quarterly basis, Generation monitors actual experience against the number of forecasted claims to be received and expected claim payments and evaluates whether an adjustment to the reserve is necessary.
 
On November 22, 2013, the Supreme Court of Pennsylvania held that the Pennsylvania Workers Compensation Act does not apply to an employee’s disability or death resulting from occupational disease, such as diseases related to asbestos exposure, which manifests more than 300 weeks after the employee’s last employment-based exposure, and that therefore the exclusivity provision of the Act does not preclude such employee from suing his or her employer in court. The Supreme Court’s ruling reverses previous rulings by the Pennsylvania Superior Court precluding current and former employees from suing their employers in court, despite the fact that the same employee was not eligible for workers compensation benefits for diseases that manifest more than 300 weeks after the employee’s last employment-based exposure to asbestos. Since the Pennsylvania Supreme Court’s ruling in November 2013, Exelon, Generation, and PECO have experienced an increase in asbestos-related personal injury claims brought by former PECO employees, all of which have been reserved against on a claim by claim basis.  Those additional claims are taken into account in projecting estimated future asbestos-related bodily injury claims. 

On November 4, 2015, the Illinois Supreme Court found that the provisions of the Illinois’ Workers’ Compensation Act and the Workers’ Occupational Diseases Act barred an employee from bringing a direct civil action against an employer for latent diseases, including asbestos-related diseases that fall outside the 25-year limit of the statute of repose. The Illinois Supreme Court’s ruling reversed previous rulings by the Illinois Court of Appeals, which initially ruled that the Illinois Worker’s Compensation law should not apply in cases where the diagnosis of an asbestos related disease occurred after the 25-year maximum time period for filing a Worker’s Compensation claim. As a result of this ruling, Exelon, Generation, and ComEd have not recorded an increase to the asbestos-related bodily injury liability as of December 31, 2015.

There is a reasonable possibility that Exelon may have additional exposure to estimated future asbestos-related bodily injury claims in excess of the amount accrued and the increases could have a material adverse effect on Exelon’s, Generation’s and PECO’s future results of operations and cash flows.

BGE. Since 1993, BGE and certain Constellation (now Generation) subsidiaries have been involved in several actions concerning asbestos. The actions are based upon the theory of “premises liability,” alleging that BGE and Generation knew of and exposed individuals to an asbestos hazard. In addition to BGE and Generation, numerous other parties are defendants in these cases.
 
Approximately 454 individuals who were never employees of BGE or certain Constellation subsidiaries have pending claims each seeking several million dollars in compensatory and punitive damages. Cross-claims and third-party claims brought by other defendants may also be filed against BGE and certain Constellation subsidiaries in these actions. To date, most asbestos claims which have been resolved have been dismissed or resolved without any payment by BGE or certain Constellation subsidiaries and a small minority of these cases has been resolved for amounts that were not material to BGE or Generation’s financial results.
 
Discovery begins in these cases after they are placed on the trial docket. At present, only two of the pending cases are set for trial. Given the limited discovery in these cases, BGE and Generation do not know the specific facts that are necessary to provide an estimate of the reasonably possible loss relating to these claims; as such, no accrual has been made and a range of loss is not estimable. The specific facts not known include:
the identity of the facilities at which the plaintiffs allegedly worked as contractors;
the names of the plaintiffs’ employers;
the dates on which and the places where the exposure allegedly occurred; and
the facts and circumstances relating to the alleged exposure.
Insurance and hold harmless agreements from contractors who employed the plaintiffs may cover a portion of any awards in the actions.
 
Continuous Power Interruption (ComEd)
 
Section 16-125 of the Illinois Public Utilities Act provides that in the event an electric utility, such as ComEd, experiences a continuous power interruption of four hours or more that affects (in ComEd’s case) more than 30,000 customers, the utility may be liable for actual damages suffered by customers as a result of the interruption and may be responsible for reimbursement of local governmental emergency and contingency expenses incurred in connection with the interruption. Recovery of consequential damages is barred. The affected utility may seek from the ICC a waiver of these liabilities when the utility can show that the cause of the interruption was unpreventable damage due to weather events or conditions, customer tampering, or certain other causes enumerated in the law. As of December 31, 2015 and 2014, ComEd did not have any material liabilities recorded for these storm events.
 
Telephone Consumer Protection Act Lawsuit (ComEd)
 
On November 19, 2013, a class action complaint was filed in the Northern District of Illinois on behalf of a single individual and a presumptive class that would include all customers that ComEd enrolled in its Outage Alert text message program. The complaint alleged that ComEd violated the Telephone Consumer Protection Act (TCPA) by sending text messages to customers without first obtaining their consent to receive such messages. The complaint sought certification of a class along with statutory damages, attorneys’ fees, and an order prohibiting ComEd from sending additional text messages. ComEd and the plaintiff agreed in principle to settle the suit for $5 million, with payments to the class commencing in the fourth quarter 2015.
 
Fund Transfer Restrictions (Exelon, Generation, ComEd, PECO and BGE)
 
Under applicable law, Exelon may borrow or receive an extension of credit from its subsidiaries. Under the terms of Exelon’s intercompany money pool agreement, Exelon can lend to, but not borrow from the money pool.
 
The Federal Power Act declares it to be unlawful for any officer or director of any public utility “to participate in the making or paying of any dividends of such public utility from any funds properly included in capital account.” What constitutes “funds properly included in capital account” is undefined in the Federal Power Act or the related regulations; however, FERC has consistently interpreted the provision to allow dividends to be paid as long as: (1) the source of the dividends is clearly disclosed; (2) the dividend is not excessive; and (3) there is no self-dealing on the part of corporate officials. While these restrictions may limit the absolute amount of dividends that a particular subsidiary may pay, Exelon does not believe these limitations are materially limiting because, under these limitations, the subsidiaries are allowed to pay dividends sufficient to meet Exelon’s actual cash needs.
 
Under Illinois law, ComEd may not pay any dividend on its stock unless, among other things, “[its] earnings and earned surplus are sufficient to declare and pay same after provision is made for reasonable and proper reserves,” or unless it has specific authorization from the ICC. ComEd has also agreed in connection with financings arranged through ComEd Financing III that it will not declare dividends on any shares of its capital stock in the event that: (1) it exercises its right to extend the interest payment periods on the subordinated debt securities issued to ComEd Financing III; (2) it defaults on its guarantee of the payment of distributions on the preferred trust securities of ComEd Financing III; or (3) an event of default occurs under the Indenture under which the subordinated debt securities are issued.
 
PECO’s Articles of Incorporation prohibit payment of any dividend on, or other distribution to the holders of, common stock if, after giving effect thereto, the capital of PECO represented by its common stock together with its retained earnings is, in the aggregate, less than the involuntary liquidating value of its then outstanding preferred securities. On May 1, 2013, PECO redeemed all outstanding preferred securities. As a result, the above ratio calculation is no longer applicable. Additionally, PECO may not declare dividends on any shares of its capital stock in the event that: (1) it exercises its right to extend the interest payment periods on the subordinated debentures, which were issued to PEC L.P. or PECO Trust IV; (2) it defaults on its guarantee of the payment of distributions on the Series D Preferred Securities of PEC L.P. or the preferred trust securities of PECO Trust IV; or (3) an event of default occurs under the Indenture under which the subordinated debentures are issued.
 
BGE is subject to certain dividend restrictions established by the MDPSC. First, BGE was prohibited from paying a dividend on its common shares through the end of 2014. Second, BGE is prohibited from paying a dividend on its common shares if (a) after the dividend payment, BGE’s equity ratio would be below 48% as calculated pursuant to the MDPSC’s ratemaking precedents or (b) BGE’s senior unsecured credit rating is rated by two of the three major credit rating agencies below investment grade. Finally, BGE must notify the MDPSC that it intends to declare a dividend on its common shares at least 30 days before such a dividend is paid. There are no other limitations on BGE paying common stock dividends unless: (1) BGE elects to defer interest payments on the 6.20% Deferrable Interest Subordinated Debentures due 2043, and any deferred interest remains unpaid; or (2) any dividends (and any redemption payments) due on BGE’s preference stock have not been paid.
 
Baltimore City Franchise Taxes (BGE)
 
The City of Baltimore claims that BGE has maintained electric facilities in the City’s public right-of-ways for over one hundred years without the proper franchise rights from the City. BGE has reviewed the City's claim and believes that it lacks merit. BGE has not recorded an accrual for payment of franchise fees for past periods as a range of loss, if any, cannot be reasonably estimated at this time. Franchise fees assessed in future periods may be material to BGE’s results of operations and cash flows.
 
General (Exelon, Generation, ComEd, PECO and BGE)
 
The Registrants are involved in various other litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. The Registrants maintain accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of reasonably possible loss, particularly where (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss.
 
Income Taxes (Exelon, Generation, ComEd, PECO and BGE)
 
See Note 15Income Taxes for information regarding the Registrants’ income tax refund claims and certain tax positions, including the 1999 sale of fossil generating assets.