Regulatory Matters (All Registrants)
12 Months Ended
Dec. 31, 2021
Regulated Operations [Abstract]  
Regulatory Matters (All Registrants) Regulatory Matters (All Registrants)
The following matters below discuss the status of material regulatory and legislative proceedings of the Registrants.
Utility Regulatory Matters (All Registrants)    
Distribution Base Rate Case Proceedings
The following tables show the completed and pending distribution base rate case proceedings in 2021.
Completed Distribution Base Rate Case Proceedings
Registrant/JurisdictionFiling DateServiceRequested Revenue Requirement (Decrease) Increase Approved Revenue Requirement (Decrease) Increase Approved ROEApproval DateRate Effective Date
ComEd - Illinois(a)
April 16, 2020Electric$(11)$(14)8.38 %December 9, 2020January 1, 2021
April 16, 2021Electric51 46 7.36 %December 1, 2021January 1, 2022
PECO - PennsylvaniaSeptember 30, 2020Natural Gas69 29 10.24 %June 22, 2021July 1, 2021
March 30, 2021Electric246 132 
N/A(b)
November 18, 2021January 1, 2022
BGE - Maryland(c)
May 15, 2020 (amended September 11, 2020)Electric203 140 9.50 %December 16, 2020January 1, 2021
Natural Gas108 74 9.65 %
Pepco - District of Columbia(d)
May 30, 2019 (amended June 1, 2020)Electric136 109 9.275 %June 8, 2021July 1, 2021
Pepco - Maryland(e)
October 26, 2020 (amended March 31, 2021)Electric104 52 9.55 %June 28, 2021June 28, 2021
DPL - DelawareMarch 6, 2020 (amended February 2, 2021)Electric23 14 9.60 %September 15, 2021October 6, 2020
ACE - New Jersey(f)
December 9, 2020 (amended February 26, 2021)Electric67 41 9.60 %July 14, 2021January 1, 2022
__________
(a)Pursuant to EIMA and FEJA, ComEd’s electric distribution rates are established through a performance-based formula, which sunsets at the end of 2022. See discussion of the Clean Energy Law below for details on the transition away from the electric distribution formula rate. The electric distribution formula rate includes decoupling provisions and, as a result, ComEd's electric distribution formula rate revenues are not impacted by abnormal weather, usage per customer, or number of customers. ComEd is required to file an annual update to its electric distribution formula rate on or before May 1st, with resulting rates effective in January of the following year. ComEd’s annual electric distribution formula rate update is based on prior year actual costs and current year projected capital additions (initial year revenue requirement). The update also reconciles any differences between the revenue requirement in effect for the prior year and actual costs incurred from the year (annual reconciliation).

ComEd’s 2021 approved revenue requirement reflects an increase of $50 million for the initial year revenue requirement for 2021 and a decrease of $64 million related to the annual reconciliation for 2019. The revenue requirement for 2021
and the revenue requirement for 2019 provide for a weighted average debt and equity return on distribution rate base of 6.28% inclusive of an allowed ROE of 8.38%, reflecting the monthly average yields for 30-year treasury bonds plus 580 basis points.

ComEd’s 2022 approved revenue requirement above reflects an increase of $37 million for the initial year revenue requirement for 2022 and an increase of $9 million related to the annual reconciliation for 2020. The revenue requirement for 2022 provides for a weighted average debt and equity return on distribution rate base of 5.72% inclusive of an allowed ROE of 7.36%, reflecting the monthly average yields for 30-year treasury bonds plus 580 basis points. The reconciliation revenue requirement for 2020 provides for a weighted average debt and equity return on distribution rate base of 5.69%, inclusive of an allowed ROE of 7.29%, reflecting the monthly yields on 30-year treasury bonds plus 580 basis points less a performance metrics penalty of 7 basis points.
(b)The PECO electric base rate case proceeding was resolved through a settlement agreement, which did not specify an approved ROE.
(c)Reflects a three-year cumulative multi-year plan for 2021 through 2023. The MDPSC awarded BGE electric revenue requirement increases of $59 million, $39 million, and $42 million, before offsets, in 2021, 2022, and 2023, respectively, and natural gas revenue requirement increases of $53 million, $11 million, and $10 million, before offsets, in 2021, 2022, and 2023, respectively. BGE proposed to use certain tax benefits to fully offset the increases in 2021 and 2022 and partially offset the increase in 2023. However, the MDPSC utilized the tax benefits to fully offset the increases in 2021 and January 2022 such that customer rates remained unchanged. For the remainder of 2022, the MDPSC chose to offset only 25% of the cumulative 2021 and 2022 electric revenue requirement increases and 50% of the cumulative gas revenue requirement increases. Whether certain tax benefits will be used to offset the customer rate increases in 2023 has not been decided, and BGE cannot predict the outcome.
(d)Reflects a cumulative multi-year plan with 18-months remaining in 2021 through 2022. The DCPSC awarded Pepco electric incremental revenue requirement increases of $42 million and $67 million, before offsets, for the remainder of 2021 and 2022, respectively. However, the DCPSC utilized the acceleration of refunds for certain tax benefits along with other rate relief to partially offset the customer rate increases by $22 million and $40 million for the remainder of 2021 and 2022, respectively.
(e)Reflects a three-year cumulative multi-year plan for April 1, 2021 through March 31, 2024. The MDPSC awarded Pepco electric incremental revenue requirement increases of $21 million, $16 million, and $15 million, before offsets, for the 12-month periods ending March 31, 2022, 2023, and 2024, respectively. Pepco proposed to utilize certain tax benefits to fully offset the increase through 2023 and partially offset customer rate increases in 2024. However, the MDPSC only utilized the acceleration of refunds for certain tax benefits to fully offset the increases such that customer rates remain unchanged through March 31, 2022. On February 23, 2022, the MDPSC chose to offset 25% of the cumulative revenue requirement increase through March 31, 2023. Whether certain tax benefits will be used to offset the customer rate increases for the twelve months ended March 31, 2024 has not been decided, and Pepco cannot predict the outcome.
(f)Requested and approved increases are before New Jersey sales and use tax. The order allows ACE to retain approximately $11 million of certain tax benefits which resulted in a decrease to income tax expense in Exelon's, PHI's, and ACE's Consolidated Statements of Operations and Comprehensive Income in the third quarter of 2021.

Pending Distribution Base Rate Case Proceedings
Registrant/JurisdictionFiling DateServiceRequested Revenue Requirement IncreaseRequested ROEExpected Approval Timing
DPL - DelawareJanuary 14, 2022Natural Gas$14 10.30 %First quarter of 2023
DPL - Maryland(a)
September 1, 2021 (amended December 23, 2021)Electric27 10.10 %First quarter of 2022
__________
(a)On January 24, 2022, DPL filed a settlement agreement with the MDPSC. The settlement provides for a revenue requirement increase of $13 million. The 9.60% ROE in the agreement is solely for the purposes of calculating AFUDC and regulatory asset carrying costs. On February 15, 2021, the Chief Public Utility Law Judge issued a proposed order approving the settlement agreement without modification. The proposed order will become a final order of the MDPSC on March 2, 2022, subject to modification or reversal by the MDPSC.
Transmission Formula Rates
The Utility Registrants' transmission rates are each established based on a FERC-approved formula. ComEd, BGE, Pepco, DPL, and ACE are required to file an annual update to the FERC-approved formula on or before May 15, and PECO is required to file on or before May 31, with the resulting rates effective on June 1 of the same year. The annual update for ComEd is based on prior year actual costs and current year projected capital
additions (initial year revenue requirement). The annual update for PECO is based on prior year actual costs and current year projected capital additions, accumulated depreciation, and accumulated deferred income taxes. The annual update for BGE, Pepco, DPL, and ACE is based on prior year actual costs and current year projected capital additions, accumulated depreciation, depreciation and amortization expense, and accumulated deferred income taxes. The update for ComEd also reconciles any differences between the revenue requirement in effect beginning June 1 of the prior year and actual costs incurred for that year (annual reconciliation). The update for PECO, BGE, Pepco, DPL, and ACE also reconciles any differences between the actual costs and actual revenues for the calendar year (annual reconciliation).
For 2021, the following total increases/(decreases) were included in the Utility Registrants' electric transmission formula rate updates:
Registrant(a)
Initial Revenue Requirement Increase (Decrease)Annual Reconciliation Increase
Total Revenue Requirement Increase(b)
Allowed Return on Rate Base(c)
Allowed ROE(d)
ComEd$33 $12 $45 8.20 %11.50 %
PECO(2)26 24 7.37 %10.35 %
BGE38 27 65 7.35 %10.50 %
Pepco(9)21 12 7.68 %10.50 %
DPL19 33 52 7.20 %10.50 %
ACE27 24 51 7.45 %10.50 %
__________
(a)All rates are effective June 1, 2021 - May 31, 2022, subject to review by interested parties pursuant to review protocols of each Utility Registrant's tariff.
(b)In 2020, ComEd, BGE, Pepco, DPL, and ACE's transmission revenue requirement included a one-time decrease in accordance with the April 24, 2020 settlement agreement related to excess deferred income taxes which now completed has resulted in an increase to the 2021 transmission revenue requirement. In 2020, PECO's transmission revenue requirement included a one-time decrease in accordance with the December 5, 2019 settlement agreement related to refunds which now completed has resulted in an increase to the 2021 transmission revenue requirement.
(c)Represents the weighted average debt and equity return on transmission rate bases.
(d)As part of the FERC-approved settlements of ComEd’s 2007 and PECO's 2017 transmission rate cases, the rate of return on common equity is 11.50% and 10.35%, respectively, inclusive of a 50-basis-point incentive adder for being a member of a RTO, and the common equity component of the ratio used to calculate the weighted average debt and equity return for the transmission formula rate is currently capped at 55% and 55.75%, respectively. As part of the FERC-approved settlement of the ROE complaint against BGE, Pepco, DPL, and ACE, the rate of return on common equity is 10.50%, inclusive of a 50-basis-point incentive adder for being a member of a RTO.
Other State Regulatory Matters
Illinois Regulatory Matters
Clean Energy Law (Exelon and ComEd). On September 15, 2021, the Illinois Public Act 102-0662 was signed into law by the Governor of Illinois (“Clean Energy Law”). The Clean Energy Law includes, among other features, (1) procurement of CMCs from qualifying nuclear-powered generating facilities, (2) a requirement to file a general rate case or a new four-year multi-year plan no later than January 20, 2023 to establish rates effective after ComEd’s existing performance-based distribution formula rate sunsets, (3) an extension of and certain adjustments to ComEd’s energy efficiency MWh savings goals, (4) revisions to the Illinois RPS requirements, including expanded charges for the procurement of RECs from wind and solar generation, (5) a requirement to accelerate amortization of ComEd’s unprotected excess deferred income taxes that ComEd was previously directed by the ICC to amortize using the average rate assumption method which equates to approximately 39.5 years, and (6) requirements that the ICC initiate and conduct various regulatory proceedings on subjects including ethics, spending, grid investments, and performance metrics. Regulatory or legal challenges regarding the validity or implementation of the Clean Energy Law are possible and Exelon and ComEd cannot reasonably predict the outcome of any such challenges.
Carbon Mitigation Credit
The Clean Energy Law establishes decarbonization requirements for Illinois as well as programs to support the retention and development of emissions-free sources of electricity. Among other things, the Clean Energy Law
authorized the IPA to procure up to 54.5 million CMCs from qualifying nuclear plants for a five-year period beginning on June 1, 2022 through May 31, 2027. CMCs are credits for the carbon-free attributes of eligible nuclear power plants in PJM. The Byron, Dresden, and Braidwood nuclear plants located in Illinois participated in the CMC procurement process and were awarded contracts that commit each plant to operate through May 31, 2027. Pursuant to these contracts, ComEd will procure CMCs based upon the number of MWhs produced annually by each plant, subject to minimum performance requirements. The price to be paid for each CMC was established through a competitive bidding process that included consumer-protection measures that capped the maximum acceptable bid amount and a formula that reduces CMC prices by an energy price index, the base residual auction capacity price in the ComEd zone of PJM, and the monetized value of any federal tax credit or other subsidy if applicable. The consumer protection measures contained in the new law will result in net payments to ComEd ratepayers if the energy index, the capacity price and applicable federal tax credits or subsidy exceed the CMC contract price.
ComEd is required to purchase CMCs pursuant to these contracts and all its costs of doing so will be recovered through a new rider. That rider will provide for an annual reconciliation and true-up to actual costs incurred by ComEd to purchase CMCs, with any difference to be credited to or collected from ComEd’s retail customers in subsequent periods.
See Note 7 — Early Plant Retirements for the impacts of the provisions above on the Illinois nuclear plants and Exelon’s consolidated financial statements. The provisions do not impact ComEd’s consolidated financial statements until 2022.
ComEd Electric Distribution Rates
The Clean Energy Law contains requirements associated with ComEd’s transition away from the performance-based electric distribution formula rate. The law authorizing that rate setting process sunsets at the end of 2022. The Clean Energy Law, and tariffs adopted under it, governs both the remaining reconciliations of rates set under that formula process and requires ComEd to file in 2023 its choice of either a general rate case or a four-year multi-year plan to set rates that take effect in 2024.
On February 3, 2022, the ICC approved a tariff that establishes the process under which ComEd will reconcile its 2022 and 2023 rate year revenue requirements with actual costs. Those reconciliation amounts will be determined using the same process as were used for prior reconciliations under the performance-based electric distribution formula rate. Using that process, for the years 2022 and 2023 ComEd will ultimately collect revenues from customers reflecting each year’s actual recoverable costs, year-end rate base, and a weighted average debt and equity return on distribution rate base, with the ROE component based on the annual average of the monthly yields of the 30-year United States Treasury bonds plus 580 basis points.
If ComEd elects to file a multi-year plan, that plan would set rates for 2024 – 2027, based on forecasted revenue requirements and an ICC determined rate of return on rate base, including the cost of common equity. Each year of the multi-year plan is subject to after the fact ICC review and reconciliation of the plan’s revenue requirement for that year with the actual costs that the ICC determines are prudently and reasonably incurred for that year. That reconciliation is subject to adjustment for certain expenses and, unless the plan is modified, to a 5% cap on increases in certain costs over the costs in the previously approved multi-year rate plan revenue requirement. ComEd would make its initial reconciliation filing in 2025, and the rate adjustments necessary to reconcile 2024 revenues to ComEd’s actual 2024 costs incurred would take effect in January 2026 after the ICC’s review. The ICC must also approve certain annual performance metrics, which can impose symmetrical performance adjustments in the total range of 20 to 60 basis points to ComEd’s rate of return on common equity based on the extent to which ComEd achieved the annual performance goals. ComEd will recover from retail customers, subject to certain exceptions, the costs it incurs pursuant to the Clean Energy Law either through its electric distribution rate or other recovery mechanisms.
The Clean Energy Law, among other things, also requires ComEd’s rates to include a decoupling mechanism to eliminate any impacts of weather or load from ComEd’s electric distribution rate revenues. The Clean Energy Law also requires the ICC to initiate a docket to accelerate and fully credit to customers unprotected property related TCJA excess deferred income taxes no later than December 31, 2025.
Energy Efficiency
The Clean Energy Law extends ComEd’s current cumulative annual energy efficiency MWh savings goals through 2040, adds expanded electrification measures to those goals, increases low-income commitments and adds a new performance adjustment to the energy efficiency formula rate. ComEd expects its annual spend to increase in 2022 through 2040 to achieve these energy efficiency MWh savings goals, which will be deferred as a separate regulatory asset that will be recovered through the energy efficiency formula rate over the weighted average useful life, as approved by the ICC, of the related energy efficiency measures.
Energy Efficiency Formula Rate (Exelon and ComEd). FEJA allows ComEd to defer energy efficiency costs (except for any voltage optimization costs which are recovered through the electric distribution formula rate) as a separate regulatory asset that is recovered through the energy efficiency formula rate over the weighted average useful life, as approved by the ICC, of the related energy efficiency measures. ComEd earns a return on the energy efficiency regulatory asset at a rate equal to its weighted average cost of capital, which is based on a year-end capital structure and calculated using the same methodology applicable to ComEd’s electric distribution formula rate. Beginning January 1, 2018 through December 31, 2030, the ROE that ComEd earns on its energy efficiency regulatory asset is subject to a maximum downward or upward adjustment of 200 basis points if ComEd’s cumulative persisting annual MWh savings falls short of or exceeds specified percentage benchmarks of its annual incremental savings goal. ComEd is required to file an update to its energy efficiency formula rate on or before June 1st each year, with resulting rates effective in January of the following year. The annual update is based on projected current year energy efficiency costs, PJM capacity revenues, and the projected year-end regulatory asset balance less any related deferred income taxes (initial year revenue requirement). The update also reconciles any differences between the revenue requirement in effect for the prior year and actual costs incurred from the year (annual reconciliation). The approved energy efficiency formula rate also provides for revenue decoupling provisions similar to those in ComEd’s electric distribution formula rate.
During 2021, the ICC approved the following total increases in ComEd's requested energy efficiency revenue requirement:
Filing DateRequested Revenue Requirement Increase
Approved Revenue Requirement Increase(a)
Approved ROEApproval DateRate Effective Date
June 1, 2021$54 $54 7.36 %November 18, 2021January 1, 2022
_________
(a)ComEd’s 2022 approved revenue requirement above reflects an increase of $55 million for the initial year revenue requirement for 2022 and a decrease of $1 million related to the annual reconciliation for 2020. The revenue requirement for 2022 provides for a weighted average debt and equity return on the energy efficiency regulatory asset and rate base of 5.72% inclusive of an allowed ROE of 7.36%, reflecting the monthly average yields for 30-year treasury bonds plus 580 basis points. The revenue requirement for the 2020 reconciliation year provides for a weighted average debt and equity return on the energy efficiency asset and rate base of 6.26% inclusive of an allowed ROE of 8.46%, which includes an upward performance adjustment that increased the ROE. The performance adjustment can either increase or decrease the ROE based upon the achievement of energy efficiency savings goals. See table below for ComEd's regulatory assets associated with its energy efficiency formula rate.
Maryland Regulatory Matters
Maryland Revenue Decoupling (Exelon, BGE, PHI, Pepco, and DPL). In 1998, the MDPSC approved natural gas monthly rate adjustments for BGE and in 2007, the MDPSC approved electric monthly rate adjustments for BGE and BSAs for Pepco and DPL, all of which are decoupling mechanisms. As a result of the decoupling mechanisms, certain Operating revenues from electric and natural gas distribution at BGE and Operating revenues from electric distribution at Pepco Maryland (see also District of Columbia Revenue Decoupling below for Pepco District of Columbia) and DPL are not impacted by abnormal weather or usage per customer. For BGE, Pepco, and DPL, the decoupling mechanism eliminates the impacts of abnormal weather or customer usage by recognizing revenues based on an authorized distribution amount per customer by customer class. Operating revenues from electric and natural gas distribution at BGE and Operating revenues from electric distribution at Pepco Maryland and DPL are, however, impacted by changes in the number of customers.
Maryland Order Directing the Distribution of Energy Assistance Funds (Exelon, BGE, PHI, Pepco, and DPL). On June 15, 2021, the MDPSC issued an order authorizing the disbursal of funds to utilities in accordance with Maryland COVID-19 relief legislation. Under this order, BGE, Pepco, and DPL received funds of $50 million, $12 million, and $8 million, respectively, in July 2021. The funds have been used to reduce or eliminate certain qualifying past-due residential customer receivables.
District of Columbia Regulatory Matters
District of Columbia Revenue Decoupling (Exelon, PHI, and Pepco). In 2009, the DCPSC approved a BSA, which is a decoupling mechanism. As a result of the decoupling mechanism, Operating revenues from electric distribution at Pepco District of Columbia (see also Maryland Revenue Decoupling above for Pepco Maryland) are not impacted by abnormal weather or usage per customer. The decoupling mechanism eliminates the impacts of abnormal weather or customer usage by recognizing revenues based on an authorized distribution amount per customer by customer class. Operating revenues from electric distribution at Pepco District of Columbia are, however, impacted by changes in the number of customers.
New Jersey Regulatory Matters
Conservation Incentive Program (CIP) (Exelon, PHI, and ACE). On September 25, 2020, ACE filed an application with the NJBPU as was required seeking approval to implement a portfolio of energy efficiency programs pursuant to New Jersey’s clean energy legislation. The filing included a request to implement a CIP that would eliminate the favorable and unfavorable impacts of weather and customer usage patterns on distribution revenues for most customers. The CIP compares current distribution revenues by customer class to approved target revenues established in ACE’s most recent distribution base rate case. The CIP is calculated annually and recovery is subject to certain conditions, including an earnings test and ceilings on customer rate increases.
On April 27, 2021, the NJBPU approved the settlement filed by ACE and the third parties to the proceeding. The approved settlement addresses all material aspects of ACE’s filing, including ACE’s ability to implement the CIP prospectively effective July 1, 2021. As a result of this decoupling mechanism, operating revenues will no longer be impacted by abnormal weather or usage for most customers. Starting in third quarter of 2021, ACE will record alternative revenue program revenues for its best estimate of the distribution revenue impacts resulting from future changes in CIP rates that it believes are probable of approval by the NJBPU in accordance with this mechanism.
ACE Infrastructure Investment Program Filing (Exelon, PHI, and ACE). On February 28, 2018, ACE filed with the NJBPU the company’s IIP proposing to seek recovery of a series of investments through a new rider mechanism, totaling $338 million, between 2019-2022 to provide safe and reliable service for its customers. The IIP will allow for more timely recovery of investments made to modernize and enhance ACE’s electric system. On April 15, 2019, ACE entered into a settlement agreement with other parties, which allows for a recovery totaling $96 million of reliability related capital investments from July 1, 2019 through June 30, 2023. On April 18, 2019, the NJBPU approved the settlement agreement.
Advanced Metering Infrastructure Filing (Exelon, PHI, and ACE). On August 26, 2020, ACE filed an application with the NJBPU as was required seeking approval to deploy a smart energy network in alignment with New Jersey’s Energy Master Plan and Clean Energy Act. The proposal consisted of estimated costs totaling $220 million with deployment taking place over a 3-year implementation period from approximately 2021 to 2024 that involves the installation of an integrated system of smart meters for all customers accompanied by the requisite communications facilities and data management systems.
On July 14, 2021, the NJBPU approved the settlement filed by ACE and the third parties to the proceeding. The approved settlement addresses all material aspects of ACE's smart energy network deployment plan, including cost recovery of the investment costs, incremental O&M expenses, and the unrecovered balance of existing infrastructure through future distribution rates.
New Jersey Clean Energy Legislation (Exelon, PHI, and ACE). On May 23, 2018, New Jersey enacted legislation that established and modified New Jersey’s clean energy and energy efficiency programs and solar and RPS. On the same day, New Jersey enacted legislation that established a ZEC program that provides compensation for nuclear plants that demonstrate to the NJBPU that they meet certain requirements, including that they make a significant contribution to air quality in the state and that their revenues are insufficient to cover their costs and risks. Electric distribution utilities in New Jersey, including ACE, began collecting from retail distribution customers, through a non-bypassable charge, all costs associated with the utility’s procurement of the ZECs effective April 18, 2019. See Generation Regulatory Matters below for additional information.
Other Federal Regulatory Matters
Transmission-Related Income Tax Regulatory Assets (Exelon, ComEd, BGE, PHI, Pepco, DPL, and ACE). On December 13, 2016 (and as amended on March 13, 2017), BGE filed with FERC to begin recovering certain existing and future transmission-related income tax regulatory assets through its transmission formula rate. BGE’s existing regulatory assets included (1) amounts that, if BGE’s transmission formula rate provided for recovery, would have been previously amortized and (2) amounts that would be amortized and recovered prospectively. On November 16, 2017, FERC issued an order rejecting BGE’s proposed revisions to its transmission formula rate to recover these transmission-related income tax regulatory assets. In the fourth quarter of 2017, ComEd, BGE, Pepco, DPL, and ACE fully impaired their associated transmission-related income tax regulatory assets for the portion of the income tax regulatory assets that would have been previously amortized.
On February 23, 2018 (as amended on July 9, 2018), ComEd, Pepco, DPL, and ACE each filed with FERC to revise their transmission formula rate mechanisms to permit recovery of transmission-related income tax regulatory assets, including those amounts that would have been previously amortized and recovered through rates had the transmission formula rate provided for such recovery.
On September 7, 2018, FERC issued orders rejecting 1) BGE’s rehearing request of FERC's November 16, 2017 order and 2) the February 23, 2018 (as amended on July 9, 2018) filing by ComEd, Pepco, DPL, and ACE for similar recovery.
On November 2, 2018, BGE filed an appeal of FERC's September 7, 2018 order to the U.S. Court of Appeals for the D.C. Circuit. On March 27, 2020, the U.S. Court of Appeals for the D.C. Circuit Court denied BGE’s November 2, 2018 appeal.
On October 1, 2018, ComEd, BGE, Pepco, DPL, and ACE submitted filings to recover ongoing non-TCJA amortization amounts and credit TCJA transmission-related income tax regulatory liabilities to customers for the prospective period starting on October 1, 2018. On April 26, 2019, FERC issued an order accepting ComEd's, BGE's, Pepco's, DPL's, and ACE's October 1, 2018 filings, effective October 1, 2018, subject to refund and established hearing and settlement judge procedures. On April 24, 2020, ComEd, BGE, Pepco, DPL, ACE, and other parties filed a settlement agreement with FERC, which FERC approved on September 24, 2020. The settlement agreement provides for the recovery of ongoing transmission-related income tax regulatory assets and establishes the amount and amortization period for excess deferred income taxes resulting from TCJA. The settlement resulted in a reduction to Operating revenues and an offsetting reduction to Income tax expense in the second quarter of 2020.
Regulatory Assets and Liabilities
Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates. Regulatory liabilities represent the excess recovery of costs or accrued credits that have been deferred because it is probable such amounts will be returned to customers through future regulated rates or represent billings in advance of expenditures for approved regulatory programs.
The following tables provide information about the regulatory assets and liabilities of the Registrants as of December 31, 2021 and 2020:
December 31, 2021ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory assets
Pension and OPEB$2,409 $— $— $— $— $— $— $— 
Pension and OPEB - merger related893 — — — — — — — 
Deferred income taxes883 — 873 — 10 10 — — 
AMI programs - deployment costs145 — — 89 56 30 26 — 
AMI programs - legacy meters186 69 — 29 88 60 21 
Electric distribution formula rate annual reconciliations44 44 — — — — — — 
Electric distribution formula rate significant one-time events104 104 — — — — — — 
Energy efficiency costs1,181 1,181 — — — — — — 
Fair value of long-term debt557 — — — 443 — — — 
Fair value of PHI's unamortized energy contracts236 — — — 236 — — — 
Asset retirement obligations145 99 21 19 — 
MGP remediation costs283 266 — — — — 
Renewable energy219 219 — — — — — — 
Electric energy and natural gas costs96 — — 49 47 29 13 
Transmission formula rate annual reconciliations43 — 14 28 — 20 
Energy efficiency and demand response programs564 — — 283 281 199 79 
Under-recovered revenue decoupling157 — — 32 125 125 — — 
Removal costs758 — — 143 615 147 109 360 
DC PLUG charge70 — — — 70 70 — — 
Deferred storm costs49 — — — 49 43 
COVID-1982 28 33 13 10 — 
Under-recovered credit loss expense89 60 — — 29 — — 29 
Other327 135 42 30 130 57 18 23 
Total regulatory assets9,520 2,205 991 692 2,226 745 280 491 
        Less: current portion1,296 335 48 215 432 213 68 61 
Total noncurrent regulatory assets$8,224 $1,870 $943 $477 $1,794 $532 $212 $430 
December 31, 2021ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory liabilities
Deferred income taxes$4,005 $2,105 $— $819 $1,081 $525 $354 $202 
Nuclear decommissioning3,357 2,760 597 — — — — — 
Removal costs1,694 1,541 — 39 114 20 94 — 
Electric energy and natural gas costs113 25 71 — 17 
Transmission formula rate annual reconciliations— — — — 
Renewable portfolio standards costs500 500 — — — — — — 
Stranded costs35 — — — 35 — — 35 
Other292 61 102 58 15 10 
Total regulatory liabilities10,004 6,944 729 960 1,306 563 466 252 
        Less: current portion376 185 94 26 68 14 25 28 
Total noncurrent regulatory liabilities$9,628 $6,759 $635 $934 $1,238 $549 $441 $224 
December 31, 2020ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory assets
Pension and OPEB$3,010 $— $— $— $— $— $— $— 
Pension and OPEB - merger related1,014 — — — — — — — 
Deferred income taxes715 — 705 — 10 10 — — 
AMI programs - deployment costs174 — — 109 65 35 30 — 
AMI programs - legacy meters219 90 — 37 92 68 24 — 
Electric distribution formula rate annual reconciliations(14)(14)— — — — — — 
Electric distribution formula rate significant one-time events117 117 — — — — — — 
Energy efficiency costs982 982 — — — — — — 
Fair value of long-term debt598 — — — 478 — — — 
Fair value of PHI's unamortized energy contracts328 — — — 328 — — — 
Asset retirement obligations135 92 21 18 — 
MGP remediation costs285 271 10 — — — — 
Renewable energy301 301 — — — — — — 
Electric energy and natural gas costs95 — — 23 72 37 30 
Transmission formula rate annual reconciliations— — — 
Energy efficiency and demand response programs572 — — 289 283 203 80 — 
Under-recovered revenue decoupling113 — — 20 93 93 — — 
Stranded costs25 — — — 25 — — 25 
Removal costs701 — — 107 594 151 105 339 
DC PLUG charge100 — — — 100 100 — — 
Deferred storm costs50 — — — 50 41 
COVID-1981 22 38 10 11 — 
Under-recovered credit loss expense 107 89 — — 18 — — 18 
Other274 78 27 30 147 72 26 15 
Total regulatory assets9,987 2,028 801 649 2,373 784 280 470 
        Less: current portion1,228 279 25 168 440 214 58 75 
Total noncurrent regulatory assets$8,759 $1,749 $776 $481 $1,933 $570 $222 $395 
December 31, 2020ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory liabilities
Deferred income taxes$4,502 $2,205 $— $1,001 $1,296 $621 $404 $271 
Nuclear decommissioning3,016 2,541 475 — — — — — 
Removal costs1,649 1,482 — 47 120 20 100 — 
Electric energy and natural gas costs175 34 97 38 24 10 
Transmission formula rate annual reconciliations52 12 — 38 23 
Renewable portfolio standards costs427 427 — — — — — — 
Stranded costs24 — — — 24 — — 24 
Other221 40 85 59 17 13 
Total regulatory liabilities10,066 6,692 624 1,139 1,575 690 540 318 
        Less: current portion581 289 121 30 137 46 47 44 
Total noncurrent regulatory liabilities$9,485 $6,403 $503 $1,109 $1,438 $644 $493 $274 
Descriptions of the regulatory assets and liabilities included in the tables above are summarized below, including their recovery and amortization periods.
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Pension and OPEBPrimarily reflects the Utility Registrants' and PHI's portion of deferred costs, including unamortized actuarial losses (gains) and prior service costs (credits), associated with Exelon's pension and OPEB plans, which are recovered through customer rates once amortized through net periodic benefit cost. Also, includes the Utility Registrants' and PHI's non–service cost components capitalized in Property, plant and equipment, net on their Consolidated Balance Sheets.
The deferred costs are amortized over the plan participants' average remaining service periods subject to applicable pension and OPEB cost recognition policies. See Note 15 — Retirement Benefits for additional information. The capitalized non–service cost components are amortized over the lives of the underlying assets.
No
Pension and OPEB - merger related
The deferred costs are amortized over the plan participants' average remaining service periods subject to applicable pension and OPEB cost recognition policies. See Note 15 — Retirement Benefits for additional information. The capitalized non–service cost components are amortized over the lives of the underlying assets.
Legacy Constellation - 2038
Legacy PHI - 2032
No
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Deferred income taxesDeferred income taxes that are recoverable or refundable through customer rates, primarily associated with accelerated depreciation, the equity component of AFUDC, and the effects of income tax rate changes, including those resulting from the TCJA. These amounts include transmission-related regulatory liabilities that require FERC approval separate from the transmission formula rate. See Transmission-Related Income Tax Regulatory Assets section above for additional information.Over the period in which the related deferred income taxes reverse, which is generally based on the expected life of the underlying assets. For TCJA, generally refunded over the remaining depreciable life of the underlying assets, except in certain jurisdictions where the commissions have approved a shorter refund period for certain assets not subject to IRS normalization rules.No
AMI programs - deployment costs
Installation and ongoing incremental costs of new smart meters, including implementation costs at Pepco and DPL of dynamic pricing for energy usage resulting from smart meters.
BGE - 2026
Pepco - 2027
DPL - 2030
ACE - To be determined in next distribution rate case filed with NJBPU
BGE, Pepco, DPL - Yes

ACE - Yes, on incremental costs of new smart meters
AMI programs - legacy metersEarly retirement costs of legacy meters.
ComEd - 2028
BGE - 2026
Pepco - 2027
DPL - 2030
ACE - To be determined in next distribution rate case filed with NJBPU
ComEd, Pepco (District of Columbia), DPL (Delaware), ACE - Yes
BGE, Pepco (Maryland), DPL (Maryland) - No
Electric distribution formula rate annual reconciliations
Under/(Over)-recoveries related to electric distribution service costs recoverable through ComEd's performance-based formula rate, which is updated annually with rates effective on January 1st.
2023
Yes
Electric distribution formula rate significant one-time eventsDeferred distribution service costs related to ComEd's significant one-time events (e.g., storm costs), which are recovered over 5 years from date of the event.2025Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Energy efficiency costs
ComEd's costs recovered through the energy efficiency formula rate tariff and the reconciliation of the difference of the revenue requirement in effect for the prior year and the revenue requirement based on actual prior year costs. Deferred energy efficiency costs are recovered over the weighted average useful life of the related energy measure.2032Yes
Fair value of long-term debt
Represents the difference between the carrying value and fair value of long-term debt of BGE and PHI of $114 million and $443 million, respectively, as of December 31, 2021, and $120 million and $478 million, respectively, as of December 31, 2020, as of the PHI and Constellation merger dates.
BGE - 2036
PHI - 2045
No
Fair value of PHI’s unamortized energy contracts
Represents the regulatory assets recorded at Exelon and PHI offsetting the fair value adjustment related to Pepco's, DPL's, and ACE's electricity and natural gas energy supply contracts recorded at PHI as of the PHI merger date.2036No
Asset retirement obligationsFuture legally required removal costs associated with existing AROs.Over the life of the related assets.Yes, once the removal activities have been performed.
MGP remediation costs
Environmental remediation costs for MGP sites recorded at ComEd, PECO, and BGE.
Over the expected remediation period. See Note 19 — Commitments and Contingencies for additional information.
No
Renewable energyRepresents the change in fair value of ComEd‘s 20-year floating-to-fixed long-term renewable energy swap contracts. 2032No
Electric energy and natural gas costsUnder (over)-recoveries related to energy and gas supply related costs recoverable (refundable) under approved rate riders.2025
DPL (Delaware), ACE - Yes
ComEd, PECO, BGE, Pepco, DPL (Maryland) - No
Transmission formula rate annual reconciliations
Under (over)-recoveries related to transmission service costs recoverable through the Utility Registrants’ FERC formula rates, which are updated annually with rates effective each June 1st.
2023Yes
Energy efficiency and demand response programsIncludes under (over)-recoveries of costs incurred related to energy efficiency programs and demand response programs and recoverable costs associated with customer direct load control and energy efficiency and conservation programs that are being recovered from customers.
PECO - 2025
BGE - 2026
Pepco, DPL - 2036
ACE - 2031
BGE, Pepco, DPL, ACE - Yes
PECO - Yes on capital investment recovered through this mechanism
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Under-recovered revenue decoupling
Electric and / or gas distribution costs recoverable from customers under decoupling mechanisms.
BGE - 2022
Pepco (Maryland) - $22 million - 2022
Pepco (District of Columbia) - $103 million: $66 million to be recovered via monthly surcharge by 2024; $37 million to be recovered via monthly surcharge, estimated to be fully recovered by 2028
BGE and Pepco - No
Stranded costs
The regulatory asset represents certain stranded costs associated with ACE's former electricity generation business. The regulatory liability represents overcollection of a customer surcharge collected by ACE to fund principal and interest payments on Transition Bonds of ACE Transition Funding that securitized such costs. Stranded costs - 2022

Overcollection - To be determined by refund mechanism filing with NJBPU
Stranded costs - Yes

Overcollection - No
Removal costs
For BGE, Pepco, DPL, and ACE, the regulatory asset represents costs incurred to remove property, plant and equipment in excess of amounts received from customers through depreciation rates. For ComEd, BGE, Pepco, and DPL, the regulatory liability represents amounts received from customers through depreciation rates to cover the future non–legally required cost to remove property, plant and equipment, which reduces rate base for ratemaking purposes.BGE, Pepco, DPL, and ACE - Asset is generally recovered over the life of the underlying assets.

ComEd, BGE, Pepco, and DPL - Liability is reduced as costs are incurred.
Yes
DC PLUG charge
Costs associated with DC PLUG, which is a projected six-year, $500 million project to place underground some of the District of Columbia’s most outage-prone power lines with $250 million of the project costs funded by Pepco and $250 million funded by the District of Columbia. Rates for the DC PLUG initiative went into effect on February 7, 2018.
2024Portion of asset funded by Pepco-Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Deferred storm costsFor Pepco, DPL, and ACE amounts represent total incremental storm restoration costs incurred due to major storm events recoverable from customers in the Maryland and New Jersey jurisdictions.
Pepco - 2024

DPL - $1 million - 2025; $2 million to be determined in pending distribution rate case filed with MDPSC

ACE - $36 million - 2024; $7 million to be determined in next distribution rate case filed with NJBPU
Pepco, DPL - Yes

ACE - No
Nuclear decommissioning
Estimated future decommissioning costs for the Regulatory Agreement Units that are less than the associated NDT fund assets. See Note 10 — Asset Retirement Obligations for additional information.
Not currently being refunded.
No
COVID-19
Incremental credit losses and direct costs related to COVID-19 incurred primarily in 2020 at the Utility Registrants, partially offset by a decrease in travel costs at BGE, Pepco and DPL. Direct costs consisted primarily of costs to acquire personal protective equipment, costs for cleaning supplies and services, and costs to hire healthcare professionals to monitor the health of employees.
ComEd - 2025

BGE - 2025

PECO - 2024

Pepco (District of Columbia) - $8 million to be determined in next distribution rate case filed with DCPSC

Pepco (Maryland) - $1 million - 2026; $1 million to be determined in next distribution rate case filed with MDPSC

DPL (Maryland) - $1 million to be determined in pending distribution rate case filed with MDPSC

DPL (Delaware) - $2 million to be determined in next distribution rate case filed with DEPSC
ComEd and BGE - Yes

PECO, Pepco, and DPL - No
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Under-recovered credit loss expenseFor ComEd and ACE, amounts represent the difference between annual credit loss expense and revenues collected in rates through ICC and NJBPU-approved riders. The difference between net credit loss expense and revenues collected through the rider each calendar year for ComEd is recovered over a twelve-month period beginning in June of the following calendar year. ACE intends to recover from June through May of each respective year, subject to approval of the NJBPU.ComEd - 2024

ACE - To be determined in next Societal Benefits Rider filing with NJBPU
No
Renewable portfolio standards costsRepresents an overcollection of funds from both ComEd customers and alternative retail electricity suppliers to be spent on future renewable energy procurements.
$432 million to be determined in the ICC annual reconciliation for 2023

$68 million to be determined based on the LTRRPP developed by the IPA
No
Capitalized Ratemaking Amounts Not Recognized
The following table presents authorized amounts capitalized for ratemaking purposes related to earnings on shareholders’ investment that are not recognized for financial reporting purposes in the Registrants' Consolidated Balance Sheets. These amounts will be recognized as revenues in the related Consolidated Statements of Operations and Comprehensive Income in the periods they are billable to the Utility Registrants' customers.
Exelon
ComEd(a)
PECO
BGE(b)
PHI
Pepco(c)
DPL(c)
ACE
December 31, 2021$43 $$— $37 $$$$— 
December 31, 202051 (1)— 45 — 
__________
(a)Reflects ComEd's unrecognized equity returns/(losses) earned/(incurred) for ratemaking purposes on its electric distribution formula rate regulatory assets.
(b)BGE's authorized amounts capitalized for ratemaking purposes primarily relate to earnings on shareholders' investment on its AMI programs.
(c)Pepco's and DPL's authorized amounts capitalized for ratemaking purposes relate to earnings on shareholders' investment on their respective AMI Programs and Energy Efficiency and Demand Response Programs. The earnings on energy efficiency are on Pepco DC and DPL DE programs only.
Generation Regulatory Matters (Exelon)
Impacts of the February 2021 Extreme Cold Weather Event and Texas-based Generating Assets Outages
Beginning on February 15, 2021, Generation’s Texas-based generating assets within the ERCOT market, specifically Colorado Bend II, Wolf Hollow II, and Handley, experienced outages as a result of extreme cold weather conditions. In addition, those weather conditions drove increased demand for service, dramatically increased wholesale power prices, and also increased gas prices in certain regions. In response to the high demand and significantly reduced total generation on the system, the PUCT directed ERCOT to use an administrative price cap of $9,000 per MWh during firm load shedding events.
The estimated impact to Exelon's Net Income for the year ended December 31, 2021 arising from these market and weather conditions was a reduction of approximately $800 million. The ultimate impact to Exelon's
consolidated financial statements may be affected by a number of factors, including the impacts of customer and counterparty defaults and recoveries, any additional solutions to address the financial challenges caused by the event, and related litigation and contract disputes.
During February and March 2021, various parties with differing interests, including generators and retail providers, filed requests with the PUCT to void the PUCT’s orders setting prices at $9,000 per MWh during firm load shedding events. Other requests were made for the PUCT to enforce its order and reduce prices for 33 hours between February 18 and February 19 after firm load shedding ceased, and to cap ancillary services at $9,000 per MWh. On March 2, 2021, a third party filed a notice of appeal in the Court of Appeals for the Third District of Texas challenging the validity of the PUCT’s actions. Generation intervened in that appeal and filed its initial brief on June 2, 2021 and reply brief on November 5, 2021. On April 19, 2021, Generation filed a declaratory action and request for judicial review of the PUCT’s orders setting prices at $9,000 per MWh in District Court of Travis County, Texas. Generation subsequently requested that the District Court of Travis County, Texas stay its proceeding pending action by the Court of Appeals in the third party proceeding. On May 17, 2021, Generation amended its petition for declaratory action and request for judicial review pending in the District Court of Travis County, Texas. Exelon cannot reasonably predict the outcome of these proceedings or the potential financial statement impact.
Due to the event, a number of ERCOT market participants experienced bankruptcies or defaulted on payments to ERCOT, resulting in approximately a $3.0 billion payment shortfall in collections, which is allocated to the remaining ERCOT market participants. As of December 31, 2021, Exelon has recorded Generation's estimated portion of this obligation, net of legislative solutions, of approximately $17 million on a discounted basis, which is to be paid over a term of 83 years. ERCOT rules historically have limited recovery of default from market participants to $2.5 million per month market-wide. In February 2021, the PUCT gave ERCOT discretion to disregard those rules, but ERCOT has declined to exercise that discretion as to the imposition of uplift charges. On March 8, 2021, a third party filed a notice of appeal in the Court of Appeals for the Third District of Texas challenging the validity of the PUCT's order to ERCOT in February 2021. Generation intervened in that appeal and filed its initial brief on July 7, 2021. The case has been stayed until March 3, 2022 to afford time for the PUCT to respond to ERCOT's November 18, 2021 request that the PUCT withdraw its February 2021 order. On May 7, 2021, Generation filed a declaratory action and request for judicial review of the PUCT's order in the District Court of Travis County, Texas. Generation subsequently requested that the District Court of Travis County, Texas stay its proceeding pending action by the Court of Appeals in the third party proceeding. Exelon cannot reasonably predict the outcome of these proceedings or the potential financial statement impact.
Additionally, several legislative proposals were introduced in the Texas legislature during February and March 2021 concerning the amount, timing and allocation of recovery of the $3.0 billion shortfall, as well as recovery of other costs associated with the PUCT's directive to set prices at $9,000 per MWh. Two of these proposals were enacted into law in June 2021 and establish financing mechanisms that ERCOT and certain market participants can utilize to fund amounts owed to ERCOT. Generation participated in proceedings before the PUCT addressing the proposed allocation of the $2.1 billion in securitized funds for reliability and ancillary service charges over $9,000 per MWh. In September 2021, Generation entered into a settlement agreement and stipulation to resolve the allocation issues. The PUCT approved the settlement agreement and stipulation on October 13, 2021.
In addition, other legislative proposals were introduced in the Texas legislature during February and March 2021 addressing cold-weather preparation for power plants and natural gas production and transportation infrastructure and the market structure for reliability services. The Texas legislature addressed these proposals by enacting a bill with a broad set of market reforms that, among other things, directed the PUCT to establish weatherization standards for electric generators within six months of enactment and gave the PUCT authority to impose administrative penalties if the new proposed standards, once adopted, are not met. On October 21, 2021, the PUCT adopted a rule change requiring generators by December 1, 2021 to complete a number of specified winter readiness preparations and to submit to ERCOT a report describing and certifying the completion of those preparations. The PUCT described these requirements as the first phase of its actions with respect to winter preparedness, which Generation completed timely, and will be followed by a second phase consisting of a year-round set of weather preparedness standards to be informed by a weather study conducted by ERCOT and submitted to the PUCT on December 15, 2021.
The legislation also directs the PUCT to evaluate whether additional ancillary services are needed for reliability in the ERCOT power region to provide adequate incentives for dispatchable generation. Throughout 2021, Exelon and others submitted various proposals to the PUCT with respect to a range of potential market reforms,
including the implementation of additional ancillary service products as well as changes to the high system-wide offer cap and operating reserve demand curve, which remain pending. On December 2, 2021, the PUCT reduced ERCOT’s high system-wide offer cap to $5,000 per MWh.
In February 2021, more than 70 local distribution companies (LDCs) and natural gas pipelines in multiple states throughout the mid-continent region, where Generation serves natural gas customers, issued operational flow orders (OFOs), curtailments or other limitations on natural gas transportation or use to manage the operational integrity of the applicable LDC or pipeline system. When in effect, gas transportation or use above these limitations is subject to significant penalties according to the applicable LDCs’ and natural gas pipelines’ tariffs. Gas transportation and supply in many states became restricted due to wells freezing and pipeline compression disruption, while demand was increasing due to the extreme cold temperatures, resulting in extremely high natural gas prices. Due to the extraordinary circumstances, many LDCs and natural gas pipelines have either voluntarily waived or have sought applicable regulatory approvals to waive the tariff penalties associated with the extreme weather event. During March 2021, three natural gas pipelines filed individual petitions with FERC requesting approval to waive OFO penalties. Generation also filed motions in March 2021 to intervene and filed comments in support of these FERC waiver requests. On March 25, 2021, FERC issued an order on one of the petitions approving a pipeline’s request for a limited waiver of penalties for February 15, 2021. On April 23, 2021, Generation and several other entities filed a request at FERC for rehearing of this order which was denied on May 24, 2021. Generation and the other entities filed an appeal of the rehearing of the order with the U.S. Court of Appeals for the D.C. Circuit on July 21, 2021. Additionally, Generation and the other entities filed a complaint requesting that FERC expand the order to include additional days of the weather event in February, from February 16 through February 19, 2021. On October 21, 2021, FERC denied the complaint finding that a pipeline has the discretion whether to waive penalties under its tariff, and on December 6, 2021 the related D.C. Circuit petition for review was withdrawn. During April 2021, FERC issued orders on the remaining petitions approving the requests to waive the penalties. During May 2021, an LDC filed a motion with the Kansas Corporation Commission (KCC) requesting the KCC to grant a waiver from the tariff and allow the LDC to reduce the amounts assessed by permitting the removal of a multiplier from the penalty calculation. On January 20, 2022, a unanimous settlement that was filed with the KCC that amended previously filed October 8, 2021 and November 30, 2021 nonunanimous settlements that, if approved, would resolve this matter. Exelon cannot predict the outcome of the KCC proceeding.
Illinois Regulatory Matters
Clean Energy Law. See Clean Energy Law above for additional information related to Generation. See Note 7 – Early Plant Retirements for additional information on Generation’s Illinois nuclear plants.
New Jersey Regulatory Matters
New Jersey Clean Energy Legislation. On May 23, 2018, New Jersey enacted legislation that established a ZEC program that provides compensation for nuclear plants that demonstrate to the NJBPU that they meet certain requirements, including that they make a significant contribution to air quality in the state and that their revenues are insufficient to cover their costs and risks. Under the legislation, the NJBPU will issue ZECs to qualifying nuclear power plants and the electric distribution utilities in New Jersey, including ACE, will be required to purchase those ZECs. On April 18, 2019, the NJBPU approved the award of ZECs to Salem 1 and Salem 2. Upon approval, Generation began recognizing revenue for the sale of New Jersey ZECs in the month they are generated. On March 19, 2021, a three-judge panel of the Superior Court of New Jersey Appellate Division unanimously affirmed the NJBPU’s April 2019 order awarding ZECs for the first eligibility period. On April 8, 2021, New Jersey Rate Counsel filed a notice asking the New Jersey Supreme Court to hear the appeal of the Superior Court’s order. On July 9, 2021, the New Jersey Supreme Court declined to hear the appeal. On October 1, 2020, PSEG and Generation filed applications seeking ZECs for the second eligibility period (June 2022 through May 2025). On April 27, 2021, the NJBPU approved the award of ZECs to Salem 1 and Salem 2 for the second eligibility period. On May 11, 2021, the New Jersey Rate Counsel appealed the April 27, 2021 decision to the Superior Court of New Jersey Appellate Division. Briefing on the appeal is expected to conclude in the first half of 2022. Exelon cannot reasonably predict the outcome of this proceeding.
Federal Regulatory Matters
PJM and NYISO MOPR Proceedings. PJM and NYISO capacity markets include a MOPR. If a resource is subjected to a MOPR, its offer is adjusted to effectively remove the revenues it receives through a state government-provided financial support program - resulting in a higher offer that may not clear the capacity market. Prior to December 19, 2019, the MOPR in PJM applied only to certain new gas-fired resources. Currently, the MOPR in NYISO applies only to certain resources in downstate New York.
For Generation’s nuclear facilities in PJM and NYISO that are currently receiving state-supported compensation, for carbon-free attributes, an expanded MOPR would require exclusion of such compensation when bidding into future capacity auctions, resulting in an increased risk of these facilities not receiving capacity revenues in future auctions.
On December 19, 2019, FERC required PJM to broadly apply the MOPR to all new and existing resources including nuclear, renewables, demand response, energy efficiency, storage, and all resources owned by vertically-integrated utilities. This greatly expanded the breadth and scope of PJM’s MOPR, which became effective as of PJM’s capacity auction for the 2022-2023 planning year. While FERC included some limited exemptions, no exemptions were available to state-supported nuclear resources.
FERC provided no new mechanism for accommodating state-supported resources other than the existing FRR mechanism (under which an entire utility zone would be removed from PJM’s capacity auction along with sufficient resources to support the load in such zone). In response to FERC’s order, PJM submitted a compliance filing on March 18, 2020 wherein PJM proposed tariff language interpreting and implementing FERC's directives, and proposed a schedule for resuming capacity auctions that is contingent on the timing of FERC's action on the compliance filing.
On April 16, 2020, FERC issued an order largely denying most requests for rehearing of FERC's December 2019 order but granting a few clarifications that required an additional PJM compliance filing which PJM submitted on June 1, 2020.
A number of parties, including Exelon, have filed petitions for review of FERC's orders in this proceeding, which remain pending before the Court of Appeals for the Seventh Circuit.
As a result, the MOPR applied in the capacity auction for the 2022-23 planning year to Generation's owned or jointly owned nuclear plants in those states receiving a benefit under the Illinois ZES, and the New Jersey ZEC program. The MOPR prevented Quad Cities from clearing in that capacity auction.
At the direction of the PJM Board of Managers, PJM and its stakeholders developed further MOPR reforms to ensure that the capacity market rules respect and accommodate state resource preferences such as the ZEC programs. PJM filed related tariff revisions at FERC on July 30, 2021 and, on September 29, 2021, PJM's proposed MOPR reforms became effective by operation of law. Under the new tariff provisions, the MOPR will no longer apply to any of Generation’s owned or jointly owned nuclear plants. Requests for rehearing of FERC’s notice establishing the effective date for PJM’s proposed market reforms were filed in October 2021 and denied by operation of law on November 4, 2021. Several parties have filed petitions for review of FERC's orders in this proceeding, which remain pending before the Court of Appeals for the Third Circuit. Exelon is strenuously opposing these appeals. Exelon cannot predict the outcome of this proceeding.
On February 20, 2020, FERC issued an order rejecting requests to expand NYISO’s version of the MOPR (referred to as buyer-side mitigation rules) beyond its current limited applicability to certain resources in downstate. However, on October 14, 2020, two natural gas-fired generators in New York filed a complaint at FERC seeking to expand the MOPR in NYISO to apply to all resources, new and existing, across the entire NYISO market. Exelon is strenuously opposing expansion of FERC’s MOPR policies in the NYISO market. While it is too early in the proceeding to predict its outcome and there are significant differences between the NYISO and PJM markets that would justify a different result, if FERC applies the MOPR in NYISO broadly as requested in the complaint, Generation’s facilities in NYISO that are receiving ZEC compensation may be at increased risk of not clearing the capacity auction.
Operating License Renewals
Conowingo Hydroelectric Project. On August 29, 2012, Generation submitted an application to FERC for a new license for the Conowingo Hydroelectric Project (Conowingo). In connection with Generation’s efforts to obtain a water quality certification pursuant to Section 401 of the Clean Water Act (401 Certification) from MDE for Conowingo, Generation had been working with MDE and other stakeholders to resolve water quality licensing issues, including: (1) water quality, (2) fish habitat, and (3) sediment.
On April 21, 2016, Generation and the U.S. Fish and Wildlife Service of the U.S. Department of the Interior executed a settlement agreement (DOI Settlement) resolving all fish passage issues between the parties.
On April 27, 2018, MDE issued its 401 Certification for Conowingo. As issued, the 401 Certification contained numerous conditions, including those relating to reduction of nutrients from upstream sources, removal of all visible trash and debris from upstream sources, and implementation of measures relating to fish passage.
On October 29, 2019, Generation and MDE filed with FERC a Joint Offer of Settlement (Offer of Settlement) that would resolve all outstanding issues relating to the 401 Certification. Pursuant to the Offer of Settlement, the parties submitted Proposed License Articles to FERC to be incorporated by FERC into the new license in accordance with FERC’s discretionary authority under the Federal Power Act. Among the Proposed License Articles were modifications to river flows to improve aquatic habitat, eel passage improvements, and initiatives to support rare, threatened and endangered wildlife.
On March 19, 2021, FERC issued a new 50-year license for Conowingo, effective March 1, 2021. FERC adopted the Proposed License Articles into the new license only making modifications it deemed necessary to allow FERC to enforce the Proposed License Articles. Consistent with the Offer of Settlement, FERC found that MDE waived its 401 Certification and pursuant to a separate agreement with MDE (MDE Settlement), Generation agreed to implement additional environmental protection, mitigation, and enhancement measures over the 50-year term of the new license. These measures address mussel restoration and other ecological and water quality matters, among other commitments. On April 19, 2021, a few environmental groups filed with FERC a petition for rehearing requesting that FERC reconsider the issuance of the new Conowingo license, which was denied by operation of law on May 20, 2021. On June 17, 2021, the petitioners appealed FERC’s ruling to the U.S. Court of Appeals for the D.C. Circuit. On July 15, 2021, FERC issued an order addressing the arguments raised on rehearing, affirming the determinations of its March 19, 2021 order.
The financial impact of the DOI and MDE Settlements and other anticipated license commitments are recognized over the new license term, including capital and operating costs. The actual timing and amount of the majority of these costs are not currently fixed and will vary from year to year throughout the life of the new license.
Peach Bottom Units 2 and 3. On March 6, 2020, the NRC approved a second 20-year license renewal for Peach Bottom Units 2 and 3. Peach Bottom Units 2 and 3 are now licensed to operate through 2053 and 2054, respectively. See Note 8 – Property, Plant, and Equipment for additional information regarding the estimated useful life and depreciation provisions for Peach Bottom.