-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: webmaster@www.sec.gov Originator-Key-Asymmetric: MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB MIC-Info: RSA-MD5,RSA, WdwtOvkIMiXaioe/ipecJ/FZga8hjIHNCVXRbyh5v0+uGek6uiE3wICwwsJy338N VySeC0cRkc4Sg3wYlutRRw== 0001178913-10-000685.txt : 20100310 0001178913-10-000685.hdr.sgml : 20100310 20100310125400 ACCESSION NUMBER: 0001178913-10-000685 CONFORMED SUBMISSION TYPE: 20-F PUBLIC DOCUMENT COUNT: 13 CONFORMED PERIOD OF REPORT: 20091231 FILED AS OF DATE: 20100310 DATE AS OF CHANGE: 20100310 FILER: COMPANY DATA: COMPANY CONFORMED NAME: Ellomay Capital Ltd. CENTRAL INDEX KEY: 0000946394 STANDARD INDUSTRIAL CLASSIFICATION: PRINTING TRADES MACHINERY & EQUIPMENT [3555] IRS NUMBER: 000000000 STATE OF INCORPORATION: L3 FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 20-F SEC ACT: 1934 Act SEC FILE NUMBER: 000-26498 FILM NUMBER: 10669714 BUSINESS ADDRESS: STREET 1: 9 ROTHSCHILD BLVD. CITY: TEL AVIV STATE: L3 ZIP: 66881 BUSINESS PHONE: 011-972-3-797-1111 MAIL ADDRESS: STREET 1: 9 ROTHSCHILD BLVD. CITY: TEL AVIV STATE: L3 ZIP: 66881 FORMER COMPANY: FORMER CONFORMED NAME: NUR MACROPRINTERS LTD DATE OF NAME CHANGE: 19980331 FORMER COMPANY: FORMER CONFORMED NAME: NUR ADVANCED TECHNOLOGIES LTD DATE OF NAME CHANGE: 19950607 20-F 1 zk1008014.htm 20-F zk1008014.htm


 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549 

Form 20-F
(Mark One)
 
 
¨
REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934
 
OR
 
 
x
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
 
For the fiscal year ended December 31, 2009
 
OR
 
 
¨
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
 
OR
 
 
x
SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
 
Date of event requiring this shell company report…March 4, 2010
 
Commission File Number 000-26498

ELLOMAY CAPITAL LTD.
(Exact Name of Registrant as specified in its charter)
 
ISRAEL
(Jurisdiction of incorporation or organization)
 
9 Rothschild Boulevard, 2nd floor
Tel Aviv 66881, Israel
(Address of principal executive offices)
 
Kalia Weintraub, Chief Financial Officer
Tel: +972-3-797-1108; Facsimile: +972-3-797-1122
9 Rothschild Boulevard, 2nd floor
Tel Aviv 66881, Israel
(Name, Telephone, E-mail and/or Facsimile number and Address of Company Contact Person)
 
Securities registered or to be registered pursuant to Section 12(b) of the Act: None
 
Securities registered or to be registered pursuant to Section 12(g) of the Act:
 
Ordinary Shares
NIS 1.00 par value per share

Title of Class
 
 
 

 
 
Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:
 
None

Title of Class
 
Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of March 4, 2010:  73,786,428 ordinary shares, NIS 1.00 par value per share
 
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes o   No x

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934.

Yes o   No o

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes x   No o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of “accelerated filer and large accelerated filer” in Rule 12b-2 of the Exchange Act. (Check one):
 
Large accelerated filer o   Accelerated filer o   Non-accelerated filer x
 
Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:
U.S. GAAP x
 
 International Financial Reporting Standards as issued o
by the International Accounting Standards Board
 
 
Other o
 
 
If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow.
 
Item 17 o   Item 18 o

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act):

Yes o   No x

Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.

Yes o   No o
 
 
2

 
 
Table of Contents
 
 
 Page
 
5
     
5
     
Part I
   
     
7
     
7
     
7
 
   Selected Financial Data
7
 
   Capitalization and Indebtedness
10
 
   Risk Factors
10
     
21
 
   History and Development of Ellomay
21
 
   Business Overview
23
 
   Organizational Structure
45
 
   Property, Plants and Equipment
45
     
46
     
46
 
   Operating Results
47
 
   Liquidity and Capital Resources
57
 
   Research and Development, Patents and Licenses, Etc.
60
 
   Trend Information
60
 
   Off-Balance Sheet Arrangements
61
 
   Contractual Obligations
61
     
62
 
   Directors and Senior Management
62
 
   Compensation
65
 
   Board Practices
67
 
   Employees
75
 
   Share Ownership
76
     
82
 
   Major Shareholders
82
 
   Related Party Transactions
86
     
86
 
   Consolidated Statements and Other Financial Information
86
 
   Significant Changes
88
 
 
3

 
 
88
 
   Offer and Listing Details
88
 
   Markets
89
     
90
 
   Share Capital
90
 
   Memorandum of Association and Second Amended and Restated Articles
91
 
   Material Contracts
99
 
   Exchange Controls
102
 
   Taxation
102
 
   Dividends and Paying Agents
109
 
   Statement by Experts
109
 
   Documents on Display
109
     
110
     
110
 
Part II
 
 
Part III
 
 
 
4

 
 
 

The following is the Report on Form 20-F of Ellomay Capital Ltd. Unless the context in which such terms are used would require a different meaning, all references to “Ellomay,” “us,” “we,” “our” or the “Company” refer to Ellomay Capital Ltd. and its consolidated subsidiaries.

All references to “$,” “dollar,” “US$” or “U.S. dollar” are to the legal currency of the United States of America, references to “NIS” or “New Israeli Shekel” are to the legal currency of Israel and references to “Euro” or “EUR” are to the legal currency of the European Union.

All trademarks, service marks, trade names and registered marks used in this report are trademarks, trade names or registered marks of their respective owners.


In addition to historical information, this report on Form 20-F contains forward-looking statements. Some of the statements under “Item 3.D: Risk Factors,” “Item 4: Information on Ellomay,” “Item 5: Operating and Financial Review and Prospects” and elsewhere in this report, constitute forward-looking statements. These statements relate to future events or other future financial performance, and are identified by terminology such as “may,” “will,” “should,” “expect,” “scheduled,” “plan,” “intend,” “anticipate,” “believe,” “estimate,” “aim,” “potential,” or “continue” or the negative of those terms or other comparable terminology. These forward- looking statements are subject to certain risks, uncertainties and assumptions about us that could cause actual results to differ materially from those reflected in the forward-looking statements. These forward-looking statements are based, among other things, on assumptions in connection with:

our ability to identify, evaluate and consummate suitable business opportunities and strategic alternatives;
 
the price and market liquidity of our ordinary shares;
 
the fact that we may be deemed to be an “investment company” under the Investment Company Act of 1940 under certain circumstances (including as a result of the investments of assets following the sale of our business), and/or the risk that we may be required to take certain actions with respect to the investment of our assets or the distribution of cash to shareholders in order to avoid being deemed an “investment company”;
 
our plans with respect to the management of our financial and other assets;
 
 
5

 
 
our exposure to indemnity claims from Hewlett-Packard Company following the sale of our business;
 
the possibility of future litigation;
 
the profitability of the photovoltaic market which we are now entering;
 
market, economical and political factors in Italy, and generally in Europe and worldwide;
 
our contractors’ technical, professional and financial ability to deliver on and comply with their contractual undertakings with us and our subsidiaries; and
 
our ability to familiarize ourselves with the market which we are now entering, and to track, monitor and manage the projects which we have undertaken.
 
Assumptions relating to the foregoing involve judgment with respect to, among other things, future economic, competitive and market conditions, and future business decisions, all of which are difficult or impossible to predict accurately and many of which are beyond our control. In light of the significant uncertainties inherent in the forward-looking information included herein, the inclusion of such information should not be regarded as a representation by us or any other person that our objectives or plans will be achieved. Factors that could cause actual results to differ from our expectations or projections include the risks and uncertainties relating to our business described in this report under “Item 3.D: Risk Factors,” “Item 5: Operating and Financial Review and Prospects” and elsewhere in this repo rt. Readers are cautioned not to place undue reliance on these forward-looking statements, which reflect management’s analysis as of the date hereof. We undertake no obligation to publicly revise these forward-looking statements to reflect events or circumstances that arise after the date hereof, except as required by applicable law. In addition to the disclosure contained herein, readers should carefully review any disclosure of risks and uncertainties contained in other documents that we file from time to time with the Securities and Exchange Commission (the “SEC”).

To the extent that this Report contains forward-looking statements (as distinct from historical information), we desire to take advantage of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 and we are therefore including this statement for the express purpose of availing ourselves of the protections of the safe harbor with respect to all forward-looking statements.
 
 
6

 
 
PART I


A.
Directors and Senior Management

See Item 6 “Directors, Senior Management and Employees”.

B.
Advisors

Not applicable

C.
Auditors

From 1995 until today, our independent auditors have been Kost, Forer Gabbay & Kasierer, a member of Ernst & Young Global. Their address is 3 Aminadav Street, Tel Aviv 67067, Israel.
 

Not Applicable.


A.           Selected Financial Data
 
The selected consolidated statements of income (operations) data for the years ended December 31, 2007, 2008 and 2009, and the selected consolidated balance sheet data as of December 31, 2008 and 2009, have been derived from the audited consolidated financial statements of Ellomay Capital Ltd. set forth in “Item 18: Financial Statements”. The selected consolidated statement of operations data for the years ended December 31, 2005 and 2006 and the selected consolidated balance sheet data as of December 31, 2005, 2006 and 2007 have been derived from our audited consolidated financial statements not included in this report. Our consolidated financial statements have been prepared in accordance with United States generally accepted accounting principles.
 
In February 2008 we sold our business to Hewlett-Packard Company (“HP”) pursuant to an asset purchase agreement executed on December 9, 2007 (the “Asset Purchase Agreement”), as more fully described below under Item 10.C “Material Contracts”.  Since the sale of our business to HP under the Asset Purchase Agreement and related agreements (the “HP Transaction”) and until our recent investment in the photovoltaic market as further described below and in Item 4, we did not purchase an operating business. Therefore, the results of operations rela ting to the business sold were reported in our consolidated financial statements in full detail, rather than reported as "discontinued operations" in accordance with ASC 360 "Property, Plant, and Equipment". See Note 1b to our consolidated financial statements included in this Report.  As part of the HP Transaction, we sold our holdings in three wholly owned subsidiaries (NUR Europe, NUR Japan and NUR Do Brazil) to several of HP’s subsidiaries.  Following the consummation of the HP Transaction, we wholly own, directly and indirectly, several subsidiaries that are currently inactive and we are in the process of dissolving, or have already arranged for the dissolution of, a number of such inactive subsidiaries.
 
 
7

 
 
The following tables present the financial data for Ellomay together with its subsidiaries as of the periods presented, some of which were sold to HP: Salsa Digital Printers (dissolved in 2008), NUR America (dissolved in 2008), NUR UK (dissolved in 2009), Excite Ink (dissolved in 2009), Encre Consumables B.V. (dissolved in 2009), NUR Europe (sold to HP), NUR DO Brazil Ltda. (sold to HP), NUR Japan (sold to HP), NUR Shanghai, NUR Asia Pacific, NUR Media Solutions, NUR Hungary Trading and Software Licensing Limited Liability Company,  NUR Italy and NUR Pro Engineering.
 
On March 4, 2010, we signed two Engineering Procurement & Construction Contracts (each, the “EPC Contract”) with an Italian contractor, Ecoware S.P.A. (“Ecoware”) for the construction, installation, testing, commissioning, operating and maintenance of two photovoltaic plants to be located in Italy (the “EPC Project”). The EPC Project will represent approximately 10% of our assets at current valuations. We may consider making additional investments is this market, in Italy, in the future and ha ve already begun due diligence activities with respect to a third photovoltaic plant.  See “Item 4.A: Information on Ellomay - History and Development of Ellomay” for more information.

The selected consolidated financial data set forth below should be read in conjunction with and is qualified by reference to Ellomay’s consolidated financial statements and the related notes, as well as “Item 5: Operating and Financial Review and Prospects” included elsewhere in this report.
 
 
8

 
 
Consolidated Statements of Income (Operations) Data
(in thousands of U.S. Dollars except per share and share data)

   
Year ended December 31,
 
   
2005
   
2006
   
2007
   
2008
   
2009
 
Revenues:
                             
Products
    67,072       72,576       80,228       10,563        
Services
    4,306       5,392       5,379       842       -  
                                         
Total revenues
    71,378       77,968       85,607       11,410       -  
Cost of revenues:
                                       
Products
    43,505       43,060       46,549       7,927       -  
Inventory write-off
    2,721       806       1,169       197       -  
      46,226       43,866       47,718       8,124       -  
Services
    5,772       7,379       8,759       2,862       -  
                                         
Total cost of revenues
    51,998       51,245       56,477       10,986       -  
                                         
Gross profit
    19,380       26,723       29,130       424       -  
                                         
Operating expenses:
                                       
Research and development, net
    7,086       5,827       7,046       1,942       -  
Selling and marketing
    10,865       11,747       13,815       3,075       -  
General and administrative
    12,171       9,803       11,129       9,830       2,194  
Doubtful accounts expenses (income)
    (1,132 )     (314 )     942       368       -  
Amortization of other intangible assets
    169       167       42       -       -  
                                         
Total operating expenses
    29,159       27,230       32,974       15,215       2,194  
                                         
Operating loss
    (9,779 )     (507 )     (3,844 )     (14,791 )     (2,194 )
Gain on sale of Company’s business, net
    -       -       -       95,137       -  
Financial income (expenses), net
    (3,448 )     (1,316 )     (1,738 )     7,596       1,329  
                                         
Income (loss) before taxes on income
    (14,668 )     (1,823 )     (5,582 )     87,942       (865 )
Taxes on income
    38       98       838       966       105  
                                         
Net Income (loss)
  $ (14,706 )   $ (1,921 )   $ (6,420 )   $ 86,976     $ 970  
                                         
Basic earnings (loss) per share
  $ (0.46 )   $ (0.03 )   $ (0.09 )   $ 1.19     $ (0.01 )
Diluted earnings (loss) per share
  $ (0.46 )   $ (0.03 )   $ (0.09 )   $ 1.01     $ (0.01 )
                                         
Weighted average number of shares used for computing basic earnings (loss) per share
    31,932,345       60,506,854       71,537,501       72,972,565       73,786,428  
Weighted average number of shares used for computing diluted earnings (loss) per share
    31,932,345       60,506,854       71,537,501       86,102,748       73,786,428  

Consolidated Balance Sheet Data (in thousands of U.S. Dollars except share data)

   
At December 31,
 
   
2005
   
2006
   
2007
   
2008
   
2009
 
Working capital (deficiency)
  $ (3,254 )   $ 546     $ (4,782 )   $ 76,119     $ 75,174  
Total assets
  $ 39,716     $ 41,203     $ 52,327     $ 78,278     $ 76,432  
Total liabilities
  $ 67,270     $ 62,206     $ 74,506     $ 7,349     $ 6,404  
Total shareholders’ Equity (deficiency)
  $ (27,554 )   $ (21,003 )   $ (22,179 )   $ 70,929     $ 70,028  
Capital stock
  $ 74,211     $ 75,591     $ 82,850     $ 89,109     $ 89,178  
Ordinary shares outstanding
    60,498,062       60,523,886       72,710,505       73,786,428       73,786,428  
 
 
9

 
 
B.           Capitalization and Indebtedness

The table below sets forth the historical capitalization and indebtedness, determined in accordance with U.S GAAP, as of December 31, 2009. The information in this table should be read with, and is qualified by reference to, the financial statements and notes thereto and other financial information included elsewhere or incorporated by reference into this report.

   
At December 31,
 
   
2009
 
       
Indebtedness
    -  
Share Capital
    16,820  
Capital Surplus
    72,358  
Accumulated Deficit
    (19,150 )
Total shareholders’ Equity
    70,028  
Total Capitalization and Indebtedness
    70,028  

C.           Reasons for the Offer and Use of Proceeds

Not Applicable.

D.           Risk Factors
 
Investing in our securities involves significant risk. You should carefully consider the risks described below as well as the other information contained in this report before making an investment decision. Any of the following risks could materially adversely affect our business, financial condition, results of operations and cash flows. In such case, you may lose all or part of your original investment.
 
The risks described below are not the only risks we face. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition or results of operations.
 
In February 2008, we sold our wide-format printing business, through the sale of substantially all of our assets and liabilities relating to such business, to HP.  Our assets currently mainly consist of the cash consideration received from HP, in cash and cash equivalents.  Since the consummation of the sale of our business, we have concentrated on activities relating to the investment of our funds and handling the winding up of the operations that were not transferred to HP and the remaining aspects relating to the transfer of the business to HP, as well as pursuing our current plan of operation, which is to identify and evaluate suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise.  Further to suc h efforts, we decided to enter the market of photovoltaic power plants in Italy, by way of contracting with a company currently operating in this field for the purpose of installing and operating such plants for commercial purposes. In parallel, we are continuing to explore other investment opportunities, both within the same market and in other markets.
 
 
10

 
 
We are exposed to potential liabilities in connection with the sale of our business to HP.  In connection with the HP Transaction, we have agreed to indemnify HP and its subsidiaries that purchased our assets, and their respective officers, directors, employees and affiliates, for certain breaches of the Asset Purchase Agreement, including, among others, any breach or inaccuracy of the representations and warranties, any liabilities that were not assumed by HP and certain environmental matters.  Our indemnification liability pursuant to the Asset Purchase Agreement is generally limited to amounts deposited in an escrow account pu rsuant to such Agreement ($9.5 million deposited in an indemnity escrow account for a period of 18 months and $5 million deposited for a period of 24 months, for a total of $14.5 million).  However, we agreed that claims for indemnity relating to certain liabilities, including, among others, fraud, willing and intentional breach of warranties, liabilities arising in connection with assets or liabilities that were not purchased by HP, failure to comply with certain restrictive covenants and environmental issues, will not be limited to the amounts deposited in escrow.  HP has, over the course of 2009, submitted claims for the release of amounts from the escrow funds on the basis of the abovementioned indemnification obligations, as further detailed in “Item 5: Operating and Financial Review and Prospects – Overview”. Such claims against us could result in substantial losses to us, wh ich we may be required to pay from the escrow funds and from sources other than the funds deposited in escrow, and which would have a negative impact on our financial condition.

We may not be successful in identifying and evaluating other suitable business opportunities or in consummating a business combination.  Except with respect to the agreements necessary or incidental to the EPC Project, we do not have an agreement or understanding with any third party with respect to the future operations of the Company. There can be no assurance that we will be successful in identifying and evaluating suitable business opportunities or in consummating a business combination and we expect to incur expenses in connection with this identification and evaluation process, whether or not such process results in an investment of our funds.  While we are actively exploring other strategic transactions and business opportunities further to our recent entry into the Italian photovoltaic power plants market, we have not targeted any particular industry or specific business within an industry in which to pursue such opportunities.  We may enter into a business combination with a business entity having no significant operating history or other negative characteristics such as having limited earnings or no potential for immediate earnings, limited assets and negative net worth.  We may also pursue a business combination, purchase of assets or other business opportunity that will not necessarily provide us with significant financial benefits in the short or long term.  In the event that we complete a business combination or asset purchase, the success of our operations will be dependent upon the performance of management of the target company (or the ability to successfully outsource certain managemen t functions) and our ability to retain such management and numerous other factors, some of which are beyond our control.  There is no assurance that we will be able to negotiate a business combination on terms favorable to us, or at all.

If we do not conduct an adequate due diligence investigation of a target business, we may be required to subsequently take write-downs or write-offs, restructuring, and impairment or other charges that could have a significant negative effect on our financial condition, results of operations and our stock price, which could cause you to lose some or all of your investment.  We must conduct a due diligence investigation of target businesses that we would intend to acquire. Intensive due diligence is time consuming and expensive due to the operations, accounting, finance and legal professionals who must be involved in the due diligence proce ss, such that in practice our due diligence efforts may be more limited in scope and extent.  Even if we conduct extensive due diligence on a target business, we cannot assure you that this due diligence will reveal all material issues that may affect a particular target business, or that factors outside the control of the target business and outside of our control will not later arise.  If our due diligence review fails to identify issues specific to a target business, industry or the environment in which the target business operates, we may be forced to later write-down or write-off assets, restructure our operations, or incur impairment or other charges that could result in losses.  Even though these charges may be non-cash items and may not have an immediate impact on our liquidity, the fact that we report charges of this nature could contribute to negative market perceptions about us or our ordinary shares.
 
 
11

 

The current general economic and business conditions around the world and any subsequent economic downturn may adversely affect our ability to consummate a business combination, the prospects of any business we may acquire and the trading price of our ordinary shares.   Since mid-2008, due to the severity of the crisis affecting financial institutions in the United States and throughout the world, the rising costs of various commodities, the limited growth and economic development in the United States and throughout the world, as well as the recession, the general economic and business conditions in many countries around the world worsened , affecting, among other things, credit ratings of borrowers, the perceived and actual credit risks faced by lenders and purchasers of debt securities, the solvency of trade partners, market entities’ appetite for risk, the spending habits of consumers, the ability to procure financing.  Although in the second half of 2009, in certain markets, including the United States and portions of Europe the general economic and business conditions around the world have shown indications of recovery, there is no assurance that this will continue over the short, medium or long term, or that the recession will be overcome in its entirety, or that any of the trends associated with such recession will be reversed in whole or in part.  Furthermore, if any further economic downturns ensue, this may adversely affect our ability to procure financing required for prospective business combinations, the value of businesses we acquire and our financial condition and results of operations.  In ad dition, if such economic downturn occurs, it may also affect the trading prices of securities in various capital markets around the world and may significantly and adversely affect the trading price of our ordinary shares.

We may not be able to consummate a business combination that will be beneficial to our shareholders.  We expect to encounter significant competition from entities having a business objective similar to ours, including venture capital funds, private equity funds, special purpose acquisition companies, operating businesses competing for acquisitions, and blank check companies.  Many of these potential acquirers are well established and have extensive experience in identifying and effecting business combinations directly or through affiliates.  Such entities may possess greater technical, human and other resources than we do and our financial resources may be relatively limited when contrasted with those of many of these competitors.  In addition, our history of operations and potential exposures relating to our previous operations may limit our ability to consummate a business combination that will be beneficial to our current shareholders.

When we do select a prospective target business or business in which to invest or with which to complete a business combination, we may be unable to ascertain the merits or risks of any particular target business’s operations.   To the extent we complete a business combination or investment transaction, we may be affected by numerous risks inherent in the business operations of the acquired business or businesses.  Although our management will endeavor to evaluate the risks inherent in a particular target business, we cannot assure you that we will properly ascertain or assess all of the significant risk factors, or th at we will have adequate resources to perform a complete due diligence process.
 
 
12

 

The consummation of a business combination may lead to the dilution of the value of our shares, and may involve the issuance of additional shares of our capital stock or the issuance of debt securities. Issuance of our capital stock would have a dilutive effect over the interests of our shareholders.  In the event we enter into a business combination or similar arrangement, it may involve the allocation of a significant amount of cash held by us as a result of the HP Transaction.  Depending upon the value of the assets acquired in such business combination or investment, the per share value of our ordinary shares may increase or decrease, possibly significantly.  In addition, we may need to raise additional financing by issuing our ordinary shares to investors, issuing debt securities or incurring bank or other debt in order to consummate business combinations or acquisitions, and the difficulty of raising capital in the current capital markets environment makes it possible that such ordinary shares or debt securities may be issued at discounts from prevailing market prices.  Our second amended and restated articles authorize the issuance of up to 170,000,000 ordinary shares. There are currently 54,465,171 ordinary shares available for issuance (after appropriate reservation for the issuance of the shares upon full exercise of our outstanding stock options and warrants).  The issuance of additional ordinary shares may significantly reduce your equity interest in Ellomay and may adversely affect prevailing market prices for our ordinary shares.  The incurrence of bank debt or the issuance of de bt securities may place restrictions on our ability to operate our business, including leading to default and foreclosure on our assets, subjecting us to restrictive covenants and limiting our ability to obtain additional financing.

Our ability to successfully effect business combinations or acquisitions and to be successful thereafter will be significantly dependent upon the efforts of our key personnel. Several of our key personnel allocate their time to other businesses.  Our ability to successfully effect a business combination or acquisition is dependent upon the efforts of our key personnel, including Shlomo Nehama, our chairman of the board, and other members of our board of directors.  Although we have entered into a Management Services Agreement with entities affiliated with three of our board members, including Mr. Nehama, these and our other direc tors are not required to commit their full time to our affairs, which could create a conflict of interest when allocating their time between our operations and their other commitments.  If our directors’ other business affairs require them to devote more substantial amounts of time to such affairs, it could limit their ability to devote time to our affairs and could have a negative impact on our ability to consummate a business combination.

If we acquire a business or effect a business combination with a company located outside of Israel or the United States, we would be subject to a variety of additional risks that may negatively impact our operations.  We may acquire or effect a business combination with a company located outside of Israel or the United States.  In such case, we would be subject to special considerations or risks associated with companies operating in the target business’ home jurisdiction, including rules and regulations or currency conversion or corporate withholding taxes on individuals, tariffs and trade barriers, regulations related to customs and import/export matters, different payment cycles, tax issues, such as tax law changes and variations in tax laws as compared to Israel and the United States, currency fluctuations and exchange controls, challenges in collecting accounts receivable, cultural and language differences, employment regulations, crime, strikes, riots, civil disturbances, terrorist attacks and wars and deterioration of political relations with Israel.  The EPC Project will subject us to a number of these risks, as well as the requirement to comply with Italian and European Union law.  We cannot assure you that we would be able to adequately address these additional risks.  If we were unable to do so, our operations might suffer.
 
 
13

 

If we are characterized as a passive foreign investment company, our U.S. shareholders may suffer adverse tax consequences.   As a result of the HP Transaction, since February 2008, our assets mainly consist of cash and cash equivalents producing passive income.  Under the PFIC rules, for any taxable year that our passive income or our assets that produce passive income, exceed specified levels, we will be characterized as a passive foreign investment company for U.S. federal income tax purposes. This characterization could result in adverse U.S. tax consequences for our U.S. shareholders, which may include having certain di stributions on our ordinary shares and gains realized on the sale of our ordinary shares treated as ordinary income, rather than as capital gains income, and having potentially punitive interest charges apply to the proceeds of sales of our ordinary shares and certain distributions.

Since our assets and income in 2009 exceeded the PFIC specified levels, we have not met the requirements set forth in Section 1298(b)(3) of the Internal Revenue Code, providing an exception from the PFIC status for a “change of business” situation for our 2008 taxable year.  Therefore, we believe that we are a PFIC with respect to any U.S. shareholder that held our shares in 2008 and 2009.  Since the determination of our PFIC status in 2010 (for shareholders that acquire our ordinary shares in 2010) depends on the type of assets we hold during the year and the income derived from such assets, we cannot determine as of yet whether or not we will be a PFIC for the 2010 tax year.

Certain elections may be made to reduce or eliminate the adverse impact of the PFIC rules for holders of our shares, but these elections may be detrimental to the shareholder under certain circumstances.  The PFIC rules are extremely complex and U.S. investors are urged to consult independent tax advisers regarding the potential consequences to them of our classification as a PFIC.  For a more detailed discussion of the consequences of our being classified as a PFIC, see “Item 10.E: Taxation” under the caption “U.S. Tax Considerations Regarding Ordinary Shares.”

We may be deemed an “investment company” under the Investment Company Act of 1940, which could subject us to material adverse consequences.  As a result of the HP Transaction, we could be deemed to be an “investment company” under the Investment Company Act of 1940, as amended (the “Investment Company Act”) if we invest more than 40% of our assets in “investment securities”, as defined in the Investment Company Act.  Investments in majority owned securities are not “investment securities” for purposes of this definition.  As until recently we have not entered i nto a business combination or developed an operating business, unless we limit the nature of our investments to cash and cash equivalents (which are generally not “investment securities”) and succeed in making strategic “controlling” investments, we may be deemed to be an “investment company.” We do not believe that our engagement in the EPC Project would result in our being deemed to be an “investment company”, as we shall control the Project via a wholly-owned subsidiary. If we were deemed to be an “investment company,” we would not be permitted to register under the Investment Company Act without an order from the SEC permitting us to register because we are incorporated outside of the United States and, prior to being permitted to register, we would not be permitted to publicly offer or promote our securities in the United States. Even if we were permitted to register, it would subject us to additional commitments and regulatory compliance.  ; Investments in cash and cash equivalents might not be as favorable to us as other investments we might make if we were not potentially subject to regulation under the Investment Company Act.  We seek to conduct our operations, including by way of investing our cash and cash equivalents, to the extent possible, so as not to become subject to regulation under the Investment Company Act.  In addition, because we are actively engaged in exploring and considering strategic investments and business opportunities, and in fact have entered the Italian photovoltaic power plants market through a controlling investment, we do not believe that we are currently engaged in “investment company” activities or business.
 
 
14

 
 
We have undergone, and may in the future undergo, tax audits and may have to make material payments to tax authorities at the conclusion of these audits, including in connection with the sale of our business to HP.  Previously to the sale of our business to HP, we conducted business globally and a substantial part of our operations was conducted in various countries. Our domestic and international tax liabilities are subject to the allocation of revenues and expenses in different jurisdictions and the timing of recognizing revenues and expenses and were not assumed or purchased by HP as part of the business sold. Additionally, the amount o f income taxes paid is subject to our interpretation of applicable laws in the jurisdictions in which we file. Not all of the tax returns of our operations in other countries and in Israel are final and may be subject to further audit and assessment by the applicable tax authorities. The consummation of the transaction with HP may increase the likelihood of additional audits of our tax returns in the future. While we believe we comply with applicable income tax laws, there can be no assurance that a governing tax authority will not have a different interpretation of the law and assess us with additional taxes, as a result of which our future results may be adversely affected.

Because our ordinary shares are quoted on the pink sheets and their trading may become subject to the Securities and Exchange Commission’s “penny stock” regulations, the market liquidity of our ordinary shares is very limited.  On May 19, 2005, our ordinary shares were delisted from the Nasdaq Capital Market. The basis of the delisting was our failure to comply with the minimum stockholders’ equity requirement for continued listing on the Nasdaq Capital Market.  Our ordinary shares are currently quoted on the over-the-counter market in the “Pink Sheets” under the symbol “EMYCF.PK.” As a result of the removal of our ordinary shares from quotation on the Nasdaq Capital Market, our ordinary shares are not regularly covered by securities analysts and the media and the liquidity of our ordinary shares is very limited. Such limited liquidity could result in lower prices for our ordinary shares than might otherwise prevail and in larger spreads between the bid and asked prices for our ordinary shares.  Additionally, certain investors will not purchase securities that are quoted on the pink sheets, which could materially impair our ability to raise funds through the issuance of our ordinary shares in the securities markets.

Because our ordinary shares have been removed from quotation on Nasdaq and the trading price of our ordinary shares is less than $5.00 per share, trading in our ordinary shares may become subject to the requirements of Rule 15g-9 promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”). Although we currently meet the criteria of net tangible assets in excess of $2 million set forth in Rule 3a51-1(g)(1) which exempts our ordinary shares from being deemed “penny stock, brokers are still subject to special record keeping requirements with respect to our ordinary shares and must demonstrate that we have met these criteria. Pursuant to Rule 15g-9, brokers and dealers who recommend penny stoc ks to persons other than established customers and accredited investors must satisfy special sales practice requirements, including a requirement that they make an individualized written suitability determination for the purchaser and receive the purchaser’s written consent prior to the transaction.

The Securities Enforcement Remedies and Penny Stock Reform Act of 1990 also requires additional disclosure in connection with any trades involving a stock defined as a penny stock (generally, according to regulations adopted by the SEC, any equity security not traded on an exchange or quoted on Nasdaq or the OTC Bulletin Board that has a market price of less than $5.00 per share, subject to certain exceptions), including the delivery, prior to any penny stock transaction, of a disclosure schedule explaining the penny stock market and the risks associated therewith.  Such requirements could further limit the market liquidity of our ordinary shares.
 
 
15

 
 
We do not intend to pay cash dividends in the near future.  We have not paid any cash dividends on our ordinary shares to date and do not intend to pay cash dividends in the near future.  The payment of dividends after completion of a significant business combination will depend on our revenues and earnings, if any, capital requirements and general financial condition after such business combination is completed and will be within the discretion of our then-board of directors.  As a result, any gains on an investment in our securities will need to come through appreciation of the value of such securities.< /font>

You may have difficulty enforcing U.S. judgments against us in Israel.  We are organized under the laws of Israel and our headquarters are in Israel. Most of our officers and directors reside outside of the United States. Therefore, you may not be able to enforce any judgment obtained in the U.S. against us or any of such persons. You may not be able to enforce civil actions under U.S. securities laws if you file a lawsuit in Israel. In addition, if a foreign judgment is enforced by an Israeli court, it will be payable in Israeli currency.

Currency fluctuations may affect the value of our assets and decrease our earnings.  Substantially all of the consideration for the sale of our business to HP was paid to us in US$. Some of our retained assets and liabilities however are denominated in other currencies. Our recent investment in the Italian photovoltaic power plants market will be denominated in Euro. The devaluation of the United States Dollar against the Euro, other currencies and other currency fluctuations may decrease the value of our assets and could impact our business.

Our stock price has decreased significantly and may continue to be volatile, which could adversely affect the market liquidity of our ordinary shares and our ability to raise additional funds.  Our ordinary shares have experienced substantial price volatility, particularly as there is very limited volume of trading in our ordinary shares and every transaction performed significantly influences the market price.  The market price for our ordinary shares has generally followed a historical downward trend since 2000.  On May 19, 2005, our ordi nary shares were delisted from the Nasdaq Capital Market due to our failure to comply with the minimum stockholders’ equity requirement for continued listing.  Our ordinary shares are currently quoted on the over-the-counter market in the “Pink Sheets” under the symbol “EMYCF.PK.”  We are now subject to price and volume fluctuations that affect trading in the securities of shell companies, special purpose acquisition companies and other publicly traded investment vehicles.  These factors, as well as general economic and political conditions, may materially adversely affect the market price of our ordinary shares in the future. Additionally, volatility or a lack of positive performance in our stock price may adversely affect our ability to retain or attract key employees, many of whom are generally granted stock options as part of their compensation package, and negatively affect our ability to raise funds through both debt and equity, discourage pot ential customers and partners from doing business with us, and could result in a material adverse effect on our business, financial condition, and results of operations.
 
 
16

 
 
If we fail to maintain effective disclosure controls and procedures and internal controls over financial reporting in accordance with Sections 302 and 404 of the Sarbanes-Oxley Act, our business, operating results and share price could be materially adversely affected.    The Sarbanes-Oxley Act of 2002 imposes certain duties on us and our executives and directors. Our efforts to comply with the requirements of Section 404, have resulted in increased general and administrative expense and a diversion of management time and attention, and we expect these efforts to require the continued commitment of resources.  Pursuant to th e requirements of Sections 302 and 404 of the Sarbanes-Oxley Act of 2002, our management is required to design and evaluate the effectiveness of our disclosure controls and procedures and of our internal control over financial reporting as of the end of the fiscal year that is the subject of this report.  Following its review of our internal controls for the fiscal years ended December 31, 2006 and 2007, our management concluded that due to the material weaknesses identified in our internal controls over financial reporting, our disclosure controls and procedures as of the end of such fiscal years were not effective.  In addition, due to the existence of these material weaknesses, our management concluded that our internal control over financial reporting was not effective as of December 31, 2007.  Although we have implemented corrective measures, documented and tested our internal control systems and procedures and have made improvements in order for us to comply with the requi rements of Section 404 and while our management concluded that our disclosure controls and procedures and our internal control over financial reporting were effective as of December 31, 2008 and 2009, we may still be exposed to claims from regulatory authorities and our shareholders in connection with our ineffective controls in prior years.  In addition, we cannot predict the outcome of our testing in future periods.  Beginning with our annual report for our fiscal year ending December 31, 2010, our report in connection with internal control over financial reporting must also contain a statement that our independent registered public accounting firm has issued an attestation report on their assessment of the effectiveness of such internal controls.  We may need to implement new internal control procedures over financial reporting with respect to the EPC Project and any other operating business we may acquire.  We may also experience higher than anticipated operating e xpenses and fees in this context.  If we are unable to implement these changes effectively or efficiently, or if our internal controls are found to be ineffective in future periods, whether by our management or by our independent registered accounting firm, it could harm our financial reporting or financial results, impact the market price of our ordinary shares, and could result in our being unable to obtain an unqualified report on internal controls from our independent registered public accounting firm.
 
We are controlled by a small number of shareholders, who may make decisions with which you may disagree.  In February and March 2008, a group of investors comprised of Kanir Joint Investments (2005) Limited Partnership (“Kanir”) and S. Nechama Investments (2008) Ltd. (“Nechama Investments”), acquired a substantial amount of our securities in a series of private transactions and have also entered into a shareholders agreement.  Consequently, these shareholders currently hold 62% of our outstanding ordinary shares and, taking into account the convertible securities and other rights held by them, are currentl y the beneficial owners of 72.2% of our ordinary shares.  Therefore, acting together, they could exercise significant influence over our business, including with respect to the election of our directors and the approval of change in control and other material transactions.  This concentration of control may have the effect of delaying or preventing changes in control or changes in management, or limiting the ability of our other shareholders to approve transactions that they may deem to be in their best interest.  Moreover, at our general meeting of shareholders held on December 30, 2008, our shareholders adopted our Second Amended and Restated Articles, which were presented to our shareholders at the request of Kanir and Nechama Investments.  Several of the amendments, including the casting vote provided to our Chairman of the Board under certain circumstances and the ability of members of our Board to demand that certain issues be approved by our shareholders, requir ing a special majority, all as more fully described in “Item 10.B: Memorandum of Association and Second Amended and Restated Articles,” may have the effect of delaying or preventing certain changes and corporate actions that would otherwise benefit our shareholders.
 
 
17

 
 
Provisions of Israeli law may delay, prevent or make difficult an acquisition of Ellomay, which could prevent a change of control and, therefore, depress the price of our shares.  Israeli corporate law regulates mergers, requires tender offers for acquisitions of shares above specified thresholds, requires special approvals for transactions involving directors, officers or significant shareholders and regulates other matters that may be relevant to these types of transactions. Furthermore, Israeli tax considerations may make potential transactions unappealing to us or to some of our shareholders. These provisions of Israeli law may delay, prevent or make difficult an acquisition of Ellomay, which could prevent a change of control and therefore depress the price of our shares.

Risks relating to the EPC Project and our entry into the Italian photovoltaic market

This recent investment in the Italian photovoltaic market will represent approximately 10% of our assets at current valuations. The following is a description of the risks specific to the EPC Project. It complements the risk factors described above, both generally and specifically with respect to entry in a new market in a foreign jurisdiction, and is solely based on our due diligence and research, as we have not yet begun operating in this market.

Our business depends to a large extent on the availability of financial incentives. The reduction or elimination of government subsidies and economic incentives could reduce our profitability and adversely impact our revenues and growth prospects. Many countries, most notably in Germany, Spain, Italy, the United States and Japan, offer substantial incentives to offset the cost of photovoltaic power systems in the form of feed-in tariffs or other incentives to promote the use of solar energy and to reduce dependence on other forms of energy. These government incentives could potentially be reduced or eliminated altogether. Currently, the overall photovoltaic capacity ceiling (in the aggregate, from all solar power plants connected to the national grid) that may benefit from the Italian incentives, is 1200 MWp  (however, the incentive will still be granted to plants that will be connected to the grid within 14 months following the achievement of the 1200 MWp cap). To date, such cap (1200 MWp) has not been achieved, however according to a published estimate of GSE, it is expected to be achieved in July 2010. If the Italian government will not extend the incentive plan beyond the 1200 MWp cap, this will adversely affect our ability to develop new photovoltaic plants. In general, uncertainty about the introduction of, reducti on in or elimination of incentives or delays or interruptions in the implementation of favorable laws could substantially affect our profitability and adversely affect our ability to continue and develop new photovoltaic plants. In addition, if we fail to build the photovoltaic plants as planned, we might lose our right to these incentives which could substantially affect our profitability.

Existing regulations, and changes to such regulations, may present technical, regulatory and economic barriers to the construction and operation of our photovoltaic power plants, which may significantly reduce our profitability. Installation of photovoltaic power systems are subject to oversight and regulation in accordance with international, European, national and local ordinances, building codes, zoning, environmental protection regulation, utility interconnection requirements and other rules and regulations. For example, various levels of government subject the installation and operation of the plants, and any other component of the EPC Pro ject, to the issuance of relevant permits, licenses and authorizations. If such permits, licenses and authorizations are not issued, or are issued but not on a timely basis, this could result in the interruption, cessation or abandonment of the EPC Project, or may require making significant changes to the EPC Project, any of which may cause severe losses. New government regulations or utility policies pertaining to photovoltaic power systems are unpredictable and may result in significant additional expenses or delays and, as a result, could cause a significant reduction in profitability. For example, total installations caps in certain jurisdictions effectively limit the aggregate amount of power that may be sold by solar power generators into the power grid.
 
 
18

 
 
We have no experience and no independent expertise in the field of photovoltaic power plants, and are reliant entirely on our professional advisors and on Ecoware for the implementation of the EPC Project. We lack experience and have no independent expertise in the field covered by the EPC Project, that is, the construction, installation, testing, commissioning, operation and maintenance of photovoltaic power plants and the supply of electricity to customers, whether in Italy or elsewhere. Accordingly, we are entirely dependent upon our professional advisors (such as technical and insurance experts) and on Ecoware’s representations, warranties and undertakings regarding, inter alia: the execution and implementation of the EPC Project, Ecoware’s expertise and experience, the use of high-quality materials, securing land use rights and obtaining applicable permits, obtaining the incentive agreement in order to secure the feed-in tariff for the production and delivery of power to the national electricity grid through our photovoltaic power plants, obtaining the power purchase agreement for the sale of the produced electricity to the Italian energy company, obtaining the interconnection agreement with the national electricity grid operator, the commissioning of power plants that are fit for long-term use, strict compliance with applicable legal requirements, Ecoware’s financial stability and the profitability of the venture. If the advice received from our professional advisors is inaccurate, incomplete or otherwise flawed, or if Ecoware’s represen tations or warranties are inaccurate or untrue, or if Ecoware defaults on its obligations, or provides us with a system that is not free from defect which causes a delay in the implementation of the EPC Project, this could result in the interruption, cessation or abandonment of the EPC Project, or may require making significant changes to the EPC Project, any of which may cause severe losses to Ellomay.  There is also no assurance that we could locate an alternative contractor in the place of Ecoware in a timely manner and on commercially reasonable terms.

We are dependent on the supplier that will supply the panels that will be installed in our photovoltaic plants. The lack of reliability of such supplier or of its products, as well as such supplier’s insolvency, may have an adverse effect on our business. Our photovoltaic plant performance depends on the quality of the panels installed. One of the critical factors in the success of our photovoltaic plants is the existence of a reliable panel supplier, who guaranties the performance and quality of the panels he supplied. Degradation in such performance above a certain minimum level is guaranteed by the panel supplier, however, if the supplier i s unreliable or becomes insolvent, he may default on warranty obligations, and such default may cause an interruption in our business or reduction in the generation of energy power, and thus may have an adverse effect on us.

Success of the EPC Project, from the construction of the power plants through their commissioning and ongoing commercial operation, will depend to a large extent on the cooperation, reliability, solvency, and proper performance of Ecoware and of the other third parties involved, including subcontractors, financing entities, the land developer and land owners, suppliers of parts and equipment, the energy grid regulator, Italian governmental agencies and other potential purchasers of electricity, and the like. The EPC Project is a complex endeavor requiring timely input often of a highly specialized technical nature, from several parties, including wi thout limitation, the main supplier and contemplated plant operator (Ecoware), other suppliers of relevant parts and materials, the land developer and land owners, subcontractors, financing entities, the Italian government and related agency both as subsidizer and as the purchaser of the electricity to be generated by the power plants and Italian energy regulators. If any of these parties fails to perform its obligations properly and on a timely basis, at any point in the EPC Project, this could result in the interruption, cessation or abandonment of the EPC Project, or may require making significant changes to the EPC Project, any of which may cause severe losses to Ellomay.
 
 
19

 
 
 Our ability to leverage our investment and to increase profitability depends, inter alia, on our ability to obtain attractive financing from financial entities.  Our ability to obtain financing and the terms of such financing, including interest rates, equity to debt ratio and timing of debt availability will significantly impact the profitability of the EPC Project.

We and/or Ecoware may become subject to claims of infringement or misappropriation of the intellectual property rights of others with respect to the system components used in the EPC Project, which could prohibit us from implementing and profiting from the EPC Project as contemplated, require us and/or Ecoware to obtain licenses from third parties to develop non-infringing alternatives and subject us and/or Ecoware to substantial monetary damages and injunctive relief. The solar photovoltaic industry is characterized by the existence of a large number of patents that could result in frequent litigation based on allegations of patent infringement. Th e owners of these patents may assert that the manufacture, use, import, or sale of any part or component of the EPC Project, or the EPC Project as a whole, infringes one or more claims of their patents. Whether or not such claims and applications are valid, we cannot be certain that the components of our system do not infringe the intellectual property rights of such third parties. Any infringement or misappropriation claim could result in significant costs, substantial damages and an interruption, suspension or cessation of the EPC Project.

A drop in the retail price of conventional energy sources may negatively impact our ability to profit and expand. The decision to install a photovoltaic power plant is primarily driven by the cost and expected return on investment resulting from solar power systems. Fluctuations in economic and market conditions that impact the prices of conventional and non-solar alternative energy sources, such as decreases in the prices of oil and other fossil fuels, could cause the demand for solar power systems to decline, which would have a negative impact on our ability to profit and to expand our business should we wish to do so, and may cause a reduction in the governmental economic incentives.

Photovoltaic power plant installations have increased over the past few years. If such trend continues, the increasing demand may drive up the prices of solar panels and other components of the system (such as invertors, steel and cables), impacting our profitability. Additionally, if there is a shortage of key components necessary for the production of the solar panels, that may constrain our revenue growth.   The demand for solar panels and other components of the system will likely increase in the future, especially if economic recovery continues, resulting in an increase in the pricing of solar panels and/or other components of the sys tem. Should we decide to expand the business and construct additional plants over time, such increases may adversely affect our profitability. Silicon is a dominant component of the solar panels, and although manufacturing abilities have increased over-time, any shortage of silicon, or any other material component necessary for the manufacture of the solar panels, may adversely affect our business.
 
 
20

 
 
Our ability to produce solar power is dependant upon the magnitude and duration of sunlight as well as other meteorological factors.  As such, the power production has a seasonal cycle, and adverse meteorological conditions can have a material impact on the plant’s output and could result in production of electricity below expected output. This in turn could adversely affect our profitability.

As electric power accounts for a growing share of overall energy use, the market for solar energy is intensely competitive and rapidly evolving. Many of our competitors who strive to construct new photovoltaic power plants have established more prominent market positions and are more experienced in this field. If we fail to attract and retain ongoing relationships with photovoltaic plants developers, we will be unable to reach additional agreements for the development and operation of additional photovoltaic plants. This could adversely impact our revenues and growth prospects.
 

A.           History and Development of Ellomay

Our legal and commercial name is Ellomay Capital Ltd.  Our office is located at 9 Rothschild Boulevard, 2nd floor, Tel-Aviv 66881, Israel, and our telephone number is +972-3-7971111.  Our registered agent in the United States is CT Corporation System, 111 Eight Avenue, New York, New York 10011.

We were incorporated as an Israeli corporation under the name Nur Advertisement Industries 1987 Ltd. on July 29, 1987.  On August 1, 1993, we changed our name to NUR Advanced Technologies Ltd., on November 16, 1997, we again changed our name to NUR Macroprinters Ltd and on April 7, 2008, in connection with the closing of the sale of our business to HP, we again changed our name to Ellomay Capital Ltd.  Our corporate governance is controlled by the Israeli Companies Law, 1999, as amended (the “Companies Law”).

Our ordinary shares were traded on the Nasdaq National Market between October 1995 and July 2003. During 2002, the bid price for our ordinary shares closed below the minimum bid price of $1.00 per share as required for continued listing on the Nasdaq National Market for a period of 30 consecutive trading days.  Accordingly, in July 2003, we transferred our securities to the Nasdaq Capital Market, whereby we were granted an extension of 180 days to meet the minimum requirement of $1.00 per share.  We regained compliance with this requirement in October 2003.  Our ordinary shares were traded on the Nasdaq Capital Market between July 2003 and May 2005.  As a result of our failure to comply with th e minimum $2.5 million stockholders’ equity requirement for continued listing set forth in Marketplace Rule 4320(e)(2)(B) and Rule 4310(c)(3)(A), our ordinary shares were delisted from the Nasdaq Capital Market on May 19, 2005 and are currently quoted in the over-the-counter market in the “Pink Sheets” under the symbol “EMYCF.PK.”

During the first half of 2006 we made leasehold improvements in our new manufacturing site in Lod, Israel.  We invested in these leasehold improvements approximately $0.80 million. During 2007, our ERP system and IT infrastructure was upgraded for an aggregate investment of approximately $0.69 million. During 2008 and 2009, we did not have any principal capital expenditures or divestitures. As of the date of filing of this Form 20-F, we do not have any principal capital expenditures and divestitures currently in progress, except for several anticipated capital expenditures in connection with the Engineering Procurement & Construction Agreement and the Operations & Maintenance Agreement for construction, installation , assembly, testing, commissioning operation and management of photovoltaic systems in Italy, as further described below.
 
 
21

 

In the beginning of 2007 we raised $6.3 million through the private placement of 11,734,950 of our ordinary shares to various investors at a price of $0.54 per share. The investors also received warrants to purchase additional 3,520,485 ordinary shares at an exercise price of $0.65 per share, exercisable for a period of five years following the closing of the private placement. The private placement included two stages, an initial closing resulting in gross proceeds in the amount of $3.8 million in January 2007 and a follow-on investment resulting in gross proceeds of $2.5 million in February 2007. In connection with the private placement, we paid our adviser, Meitav Underwriting Ltd., a cash fee of $0.25 million.

On December 9, 2007, we entered into an Asset Purchase Agreement with Hewlett-Packard Company (“HP”) for the sale of our business to HP and several of its subsidiaries (the “HP Transaction”). The Asset Purchase Agreement contemplated the sale of substantially all of our assets and liabilities relating to our business, with the exclusion of cash, debt and other specific assets and liabilities as agreed upon between the parties to the Asset Purchase Agreement.  In connection with the Asset Purchase Agreement, HP and several of its su bsidiaries also agreed to acquire three of our subsidiaries, NUR Europe S.A., a company organized pursuant to the laws of Belgium, NUR Japan Ltd., a company organized pursuant to the laws of Japan and NUR Do Brazil Ltda., a company organized pursuant to the laws of Brazil.

The HP Transaction was consummated on February 29, 2008 (the “Closing Date”).  The aggregate consideration in connection with the HP Transaction amounted to $122.6 million. Of the total consideration, an amount of $0.5 million withheld in connection with NUR Europe's obligations with respect to the government grants, and $14.5 million was deposited into an escrow account to secure the indemnity obligations of the Company and its remaining subsidiaries. The escrow funds, net of amounts distributed to HP in satisfaction of indemnity obligations, were to be distributed to the Company in two installments, however, HP has submitted claims demanding the release of amounts from the escrow funds to HP, as further detail ed in “Item 5: Operating and Financial Review and Prospects – Overview”.

In March 2008, following the consummation of the HP Transaction, we repaid our short-term debt to our lender banks, Bank Hapoalim B.M., Bank Leumi Le-Israel B.M. and Israel Discount Bank Ltd. (the “Banks”), in the amount of $9.8 million and, in early April 2008, we fully repaid our long-term debt to the Banks in the amount of $12.1 million.

Following the closing of the HP Transaction we ceased to conduct operational activities, focusing instead on exploring investment and other business opportunities.

Further to such efforts, on March 4, 2010 we entered into the EPC Project and executed the EPC Contracts with an Italian contractor, Ecoware. Under these agreements, Ecoware is responsible for the design, supply, construction, assembly and commissioning of two photovoltaic plants to be located in the Marche region in Italy. The EPC Project requires an initial investment of approximately 4.5 million Euros, for the construction, assembly, installation, testing and commissioning of the photovoltaic plants (but excluding the annual operation and maintenance costs) and an additional approximate sum of 200,000 Euros for ancillary expenses. It is our intention to finance the majority of the EPC Project by obtaining financing from a financia l institution. These agreements are further detailed below (see “Item 4.B: Business Overview”).
 
 
22

 

We may consider making additional investments is this market, in Italy or elsewhere, in the future and have already begun due diligence activities with respect to a third photovoltaic plant in Italy. We are also continuing to identify and evaluate other suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise.

For information on our financing activities please refer to “Item 5: Operating and Financial Review and Prospects.”

B.           Business Overview

As mentioned above, following the closing of the HP Transaction and the sale of our operating business to HP and several of its subsidiaries on February 29, 2008, we ceased all of the operations of our business as conducted prior to such date. We currently hold substantially all of our assets in cash and cash equivalents.

Approximately 10% of such cash and cash equivalents are currently allocated for the EPC Project, although it is our intention to obtain bank financing for the majority of the funds required for the project. Our current plan of operation is to identify and evaluate additional suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise, whether in the same field of photovoltaic and solar energy or in other industries or businesses.

Description of the EPC Project

The EPC Project consists of the engagement of Ecoware, an Italian contractor, in order to build, assemble, install, test, commission, operate and maintain two photovoltaic power plants located in the Marche region in Italy, for the benefit of Ellomay PV One S.R.L (“Ellomay PV One”), a wholly-owned Italian subsidiary of Ellomay.

Ellomay PV One will be the registered owner of the power plants and holder of the land use rights and relevant permits in respect thereof. It is also the intention of Ellomay to incorporate another wholly-owned subsidiary under the laws of Luxemburg, and to transfer its holdings in Ellomay PV One, to the Luxemburg subsidiary.

The EPC Project is to be implemented on the basis of the following agreements:
 
- two EPC Contracts, each of which governs the installation, testing and commissioning of a photovoltaic plant by Ecoware, such plant having an expected output of 734.40 KWp;
- two Operating and Maintenance Agreements (each, an “O&M Agreement”), each of which governs the operation and maintenance of the respective plants by Ecoware;
 
 
23

 
 
- a side agreement between Ellomay PV One and Ecoware, whereby the panels required for the construction of the photovoltaic plants will be purchased by Ellomay PV One directly from a third party supplier of such panels, and then transferred to Ecoware.
- a number of ancillary agreements, including:
 
(i) one or more “incentive agreements” with the Gestore dei Servizi Elettrici (GSE), Italy’s energy regulation agency responsible, inter alia, for incentivizing and developing renewable energy sources in Italy , purchasing energy and re-selling it on the electricity market. The incentive agreement will be entered into prior to connection of the plants to the Italian national grid. Under such agreement, it is anticipated that GSE will grant the applicable feed-in tariff governing the purchase of electricity (feed-in tariffs are further detailed in “Item 4.B: Government Regulations - Regulatory Framework of EPC Project”);
 
(ii) one or more power purchase agreements with GSE, specifying the power output to be purchased by GSE for resale and the consideration in respect thereof;
 
(iii) one or more “interconnection agreements” with the national electricity grid operator which provides the terms and conditions for the connection to the national grid;
 
 (iv) optionally, one or more project financing agreements with financing entities, the terms of which have not yet been negotiated.

The construction of the two power plants is expected to require disbursements of approximately 4.5 million Euros (excluding the annual operation and maintenance costs) and an additional 200,000 Euros for ancillary expenses, for an aggregate of 4.7 million Euros for both plants.

The operation and maintenance of both power plants is expected to require disbursements to Ecoware of approximately 60,000 Euros annually (linked to the Italian inflation rate on consumer prices for workers' families), with minimum production guarantee by Ecoware and bonus to be paid in case of surplus production.

The summaries below describe the material terms of the EPC Contracts and the form of O&M Agreements; however it does not purport to be complete and is qualified in its entirety by reference to the full version of the agreements attached as exhibits to this Form 20-F.

Engineering Procurement and Construction Contract

Each EPC Contract governs the construction, assembly, installation, testing and commissioning of a photovoltaic system (a “System”) by Ecoware, on behalf of Ellomay PV One. The Systems are to be located in Marche, in the municipalities of Cingoli and Senigallia, Italy. Pursuant to each EPC Contract, Ecoware is required to supply a System consisting of a power plant of 734.40kWp, to transfer the land right (diritto di superficie) on the area where the System is to be built and to provide all the services necessary to bring the System into operation. Eco ware is also required to provide warranty service, as further detailed below. Transfer of ownership of the System in favour of Ellomay PV One is to occur upon issuance of the “Provisional Acceptance Certificate” described below.

The EPC Contract includes certain representations and warranties made by Ecoware. Inter alia, Ecoware represents that it is a leading company in the construction of photovoltaic systems, that it has the expertise to perform the works  undertaken in the EPC Contracts and, that there are no technical, geological, hydraulic, legal or administrative obstacles regarding the commencement of the work, and that Ecoware is not aware of facts or circumstances that could prejudice the formation or validity of applicable permits or the transfer of registration thereof to Ellomay PV One, or of impediments that could compromise authorizations for constructi on of the grid infrastructure. Ecoware also represents that the designated area for the System is free from encumbrances and that there are no third-party claims regarding rights in the land.
 
 
24

 

The aggregate consideration payable to Ecoware for the supply of each System and performance of the works, under each of the two EPC Contracts is approximately 2.25 million Euros (the “Consideration”). Payment of the Consideration is conditioned upon the achievement of certain milestones, as follows:

Payment Milestone 1: An amount of approximately 0.5 million Euros is payable upon the occurrence of all of the following: (i) completion of preliminary procedures and formalities, such as procedures for building permits and other applicable permits; (ii) transfer of the land rights to Ellomay PV One; (iii) time to connection to the grid is estimated by Ecoware to be within 120 days, and (iv) delivery of a guarantee covering Ecoware’s obligations under the EPC Contract company, issued by Kerself S.P.A. (Ecoware’s parent company), under which Kerself agrees to indemnify Ellomay PV One against losses and damages incurred up to an amount equal to the Consideration (which guarantee must be effective until the issuance of a “Final Acceptance Certificate” described below).

Payment Milestone 2: An amount of approximately 0.25 million Euros is payable upon the occurrence of all of the following: (i) satisfactory outcome of the technical inspection of the System and issuance of the “Technical Acceptance Certificate” described below, (ii) all the conditions precedent to Payment Milestone 1 are still met, and (iii) the estimated time for connecting to the grid is still 120 days from Payment Milestone 1; (iv) execution of the O&M Agreement.

Payment Milestone 3: The balance of approximately 1.5 million Euros is payable upon the occurrence of all of the following: (i) satisfactory outcome of the inspection of the System’s operations, and issuance of the “Provisional Acceptance Certificate”, (ii) all conditions precedent to Payment Milestones 1 and 2 are still met, and (iii) delivery by Ecoware of a warranty bond equal to 15% of the Consideration issued by an insurance company with S&P A-rating (such bond to be released upon issuance of the Final Acceptance Certificate, provided that Ecoware procures the insurance bond required under the O&M Agreement).

The EPC Contract provides for adjustments to the Consideration if changes are made to the scope of work subsequent to execution of the agreement. To the extent that such changes are required by law, Ecoware must bear additional costs of up to 4% of the Consideration. Other costs are subject to the agreement of the parties on the basis of market rates.

Acceptance testing for the System consists principally of: (i) a technical inspection prior to operation, successful completion of which results in the issuance of the “Technical Acceptance Certificate”; (ii) a test that verifies the actual performance of the System, successful completion of which results in the issuance of the “Provisional Acceptance Certificate”; and (iii) two “reassessment” tests, conducted 12 and 24 months respectively after the Provisional Acceptance Certificate in order to further test the System’s performance once the System has been put into operation. The “Final Acceptance Certificate” is to be issued by Ellomay PV One when the following conditions have b een met: (i) the above reassessment tests have been successfully completed, (ii) Ecoware has paid any related performance liquidated damages, (iii) the incentive agreement with GSE and the incentive are in force, and the related certificate attesting this has been issued; (iv) all the obligations related to the regulation of access to the grids have been fulfilled; and (v) the O&M Agreement guarantee is in place.
 
 
25

 
 
Ellomay PV One contemplates obtaining from a financial institution (“Financing Entity”) one or more credit lines, on a leasing or project finance basis. If necessary, Ecoware is required to enter into a direct agreement with the Financing Entity together with Ellomay PV One.

Ecoware’s main obligations under the EPC Contract include: engineering, supply of apparatus, assembly and installation of the System, civil works, assisting with securing the land use rights, maintaining effective custody of the area, delivery of relevant documentation, supply of deliverables that meet world-class standards and in accordance with applicable laws, securing all applicable permits (operational and building permits) required for the implementation and functioning of the System and transferring them to Ellomay PV One, connecting the System to the national grid in accordance with the project implementation schedule, and clearance of the area after completion of the works. Ecoware undertakes to provide an Insurance Bo nd equal to up to 15% of the Consideration for the 2-year warranty period and agrees to “cross default” clauses if the financing covers more than one EPC contract. The estimated time frame for completion of the EPC Project is 120 days from Payment Milestone 1.
 
Pursuant to the EPC Contract, Ecoware warrants the performance of the System, and certain defects in the plans of the System, for a period of 24 months following issuance of the Provisional Acceptance Certificate. Efficiency of the photovoltaic modules shall be guaranteed by the manufacturer for 20 years following the issuance of the Provisional Acceptance Certificate, provided that the cumulative deterioration of the photovoltaic modules does not exceed, for the first 10 years, 10% and for the first 20 years, overall, 20%.

Each party may terminate the EPC Contract if the other party is in breach of certain obligations, as further set forth in the contract. If termination is attributable to Ecoware, Ecoware must pay to Ellomay PV One a termination penalty equal to 10% of the value of the remaining works. If termination is due to Ellomay PV One’s failure to perform its payment obligations, Ecoware or a third party indicated by Ecoware can take possession and ownership of the System by reimbursing the amounts paid thus far by Ellomay PV One, less a penalty equal to approximately 300,000 euros (400 euros per kWp) for each plant. In addition, Ellomay PV One can terminate the contract at any time, provided it pays to Ecoware the consideration for work performed as at such time, plus a 10% indemnity. However, no such indemnity is required if Ellomay PV One terminates the contract due to a change in applicable laws or a “Force Majeure” (as defined in the EPC Contract) that renders realization of the System impossible and leads to revocation of the necessary authorizations. Termination causes and consequences are further detailed in the EPC Contract.

The EPC Contract provides for liquidated damages (calculated on a per day basis) payable by Ecoware (i) in the event of a delay in the 120-day grid connection period, or (ii) if the performance ratio of the System is lower than a specified benchmark. In addition, if the contemplated government incentive is not granted to Ellomay PV One, the Consideration will be reduced, as detailed in the EPC Contract.
 
 
26

 
 
Technical disputes between the parties are to be resolved by an expert, while other disputes are subject to arbitration in Milan, in accordance with the National Arbitration Chamber of Milan’s Rules of International Arbitration.

In addition to the EPC Contract, Ellomay PV One and Ecoware entered into a side agreement, whereby the panels required for the construction of the photovoltaic plants will be purchased by Ellomay PV One directly from a Chinese supplier of such panels, on the basis of the representations and assurances by Ecoware that the panels meet the specifications of the EPC Project. The panels will then be transferred to Ecoware. The above-mentioned consideration for the EPC Contract includes the price of the panels. Under this side agreement, Ecoware bears the responsibility of taking delivery of the panels, insuring, storing and installing them for the benefit of Ellomay PV One.

Operation and Maintenance Agreement
 
As mentioned above, each EPC Contract contemplates the execution of an O&M Agreement, in respect of each System to be supplied. The O&M Agreement to be executed will be substantially in the form attached as an appendix to the EPC Contract.

The O&M Agreement sets out the terms under which Ecoware is to operate and maintain a System once it becomes operational, i.e. starting from the Provisional Acceptance Certificate described in the EPC Contract and for a period of 20 years thereafter. The O&M Agreement is automatically extended for successive two (2) year periods, unless one party notifies the other party of its intention not to renew the agreement at least 6 months before the anticipated date of expiry of the term.

A technical adviser, appointed by Ellomay PV One and/or the Financing Entity, is responsible for monitoring the performance of the Services (the “Technical Adviser”).

The annual consideration for the operating and maintenance services shall be approximately 30,000 Euros per plant (linked in accordance with the Italian inflation rate on consumer prices for workers' families), and paid in advance on a quarterly basis. The fee is fixed and Ecoware is not entitled to request an increase in the price due to the occurrence of unforeseen circumstances, however, the O&M Agreement provides for a bonus if the annual performance benchmarks of the System guaranteed by Ecoware are exceeded, and on the other hand Ecoware owes a penalty to Ellomay PV One if the System’s performance is below these benchmarks (without prejudice to Ellomay PV One’s entitlement to compensation for further damages tha t it may have incurred). The penalties and bonuses start to apply only upon the issuance of the Final Acceptance Certificate, i.e. two (2) years after the System is operational.

Additional charges apply for certain services that are outside the ordinary course of operations and maintenance and are approved by the Financing Entity and the Technical Adviser. Modifications to the scope of services (which can occur either at Ellomay PV One’s request with the prior approval of the Financing Entity and the Technical Adviser, or if Ecoware deems that changes are necessary or appropriate to improve the quality, efficiency or safety of the System, its facilities or its supplies) are also subject to price changes. Moreover, changes to the scope of services due to a change in applicable laws can also involve a price increase, subject to the approval of the Financing Entity and the Technical Adviser, and provided that the prices take into account Ecoware’s official rates and do not exceed the cost of the additional work or supplies.
 
 
27

 

Ecoware’s obligations under the O&M Agreement include, inter alia, the duty to diligently perform the operation and maintenance services in compliance with the applicable law and permits in a workmanlike manner and using the most advanced technologies, to contract for adequate insurance with Ellomay PV One and the Financing Entity as additional insured parties (parties to negotiate who’s to bear insurance costs), to guarantee the availability of spare parts and replenish the inventory as needed, and to assist Ellomay PV One and the Financing Entity in dealing with the authorities (including GSE and ENEL) by providing the necessary i nformation required by such authorities. Ecoware represents and warrants, inter alia, that it holds the necessary permits and authorizations, and that it has the necessary skills and experience to perform the services contemplated by the agreement.

Ecoware is required to provide an insurance bond, satisfactory to both Ecoware and the Financing Entity, for an amount equal to 15% of the annual applicable price (the “O&M Guarantee”), to be renewed annually.

Pursuant to the O&M Agreement, Ecoware grants an irrevocable, royalty-free license to the creations, plans, specifications, drawings, procedures, methods, products and/or inventions prepared or developed by Ecoware pursuant to the O&M Agreement, for use in the System. This license is not transferable, except in conjunction with all of the rights and obligations of Ellomay PV One under this agreement or in relation with the System.

As with the EPC Contract, the O&M Agreement contemplates the financing of the planning, realization, operation and maintenance of the System by a Financing Entity, and states that adaptations may need to be made to the O&M Agreement in consideration of the terms agreed to with such Financing Entity and that Ecoware undertakes to enter into such agreement with the Financing Entity, if necessary, within 15 days of the Financing Entity’s or Ellomay PV One’s request to that effect.

The O&M Agreement is terminated automatically, subject to the Financing Entity’s consent, if the EPC Contract is terminated for any reason. Each party may terminate the O&M Agreement if the other is in breach of any of its obligations, which breach remains uncured for 30 days following written notice thereof. Ellomay PV One may terminate only after obtaining approval from the Financing Entity. Termination of the agreement by Ellomay PV One due to certain breaches by Ecoware (such as Ecoware’s failure to enter into an agreement with the Financing Entity, to deliver or replace the O&M Guarantee, to issue the Final Acceptance Certificate or to comply with the spare parts guarantee, or in the event that the maximu m amount of liquidated damages is exceeded, a subcontractor has been engaged without the Financing Entity’s consent, Ecoware’s operating permits have been revoked, or Ecoware’s insurance expires), entitle Ellomay PV One to liquidated damages equal to 50% of the applicable price for the relevant year, without prejudice to other damages that Ellomay PV One may incur. In the event of termination by Ecoware due to a breach of Ellomay PV One, Ellomay PV One must pay Ecoware an amount corresponding to 100% of the applicable price for the relevant year.

The agreement is automatically terminated if Ecoware is liquidated or becomes bankrupt or insolvent, and on other similar grounds.

In addition to termination due to breach, either party can withdraw from the O&M Agreement at the 10-year anniversary thereof, by sending a 6-month prior written notice to the other party. Either party may also terminate the agreement at any time, by giving a 12-month prior written notice to the other party. However, in the case of withdrawal by Ellomay PV One, Ellomay PV One must pay Ecoware an amount equal to the price for the relevant year, except in certain cases detailed in the O&M Agreement. Additional termination provisions exist with respect to termination due to ongoing circumstances of “force majeure” as defined in the Agreement.
 
 
28

 

Ecoware may not assign the O&M Agreement without the prior written consent of Ellomay PV One. Ellomay PV One is authorized to assign the agreement to the Financing Entity or any person appointed by the Financing Entity. If such assignment is by means of a line of business assignment, Ecoware may not withdraw from the agreement. In addition, the O&M Agreement stipulates that all receivables arising from this agreement are assigned or pledged to the Financing Entity as a security for the loan agreement with such entity.

The O&M Agreement, like the EPC Contract, is governed and construed in accordance with Italian law. Disputes are generally subject to arbitration in Milan, although certain disputes may be resolved, at the request of one party, by a technical expert.

In addition to the O&M fee, Ellomay PV One will also be making annual payments to the owners of the land, pursuant to the land use rights agreements.
 
Photovoltaic Industry Background

Electric power accounts for a growing share of overall energy use. While a majority of the world’s current electricity supply is generated from fossil fuels such as coal, oil and natural gas, these traditional energy sources face a number of challenges including rising prices, security concerns over dependence on imports from a limited number of countries, and growing environmental concerns over the climate change risks associated with power generation using fossil fuels. As a result of these and other challenges facing traditional energy sources, governments, businesses and consumers are increasingly supporting the development of alternative energy sources, including solar energy.

Solar energy is one of the most direct and unlimited energy sources. It is the underlying energy source for renewable fuel sources, including biomass fuels and hydroelectric energy. By extracting energy directly from the sun and converting it into an immediately usable form, either as heat or electricity, intermediate steps are eliminated.

The most common ways that solar energy can be converted into usable forms of energy are either through the photovoltaic effect (generating electricity from photons) or by generating heat (solar thermal energy).

Global trends in the industry

According to EPIA (European Photovoltaic Industry Association) the solar power market has grown significantly in the past decade. Despite the rapid growth, solar energy constitutes only a small fraction of the world’s energy output and therefore may have significant growth potential. In 2013, According to EPIA, the global photovoltaic annual installations could reach between 12-22 GW as a function of amount of incentives that are in place, such as Feed-in Tariffs (FiT), further explained in “Item 4.B: Government Regulations - Regulatory Framework of EPC Project”.
 
 
29

 
 
Anatomy of a Solar Power System

Solar power systems convert the energy in sunlight directly into electrical energy within solar cells based on the photovoltaic effect. Multiple solar cells, which produce DC power, are electrically interconnected into solar panels. A typical solar panel may have several dozens of individual solar cells. Multiple solar panels are electrically wired together and are electrically wired to an inverter, which converts the power from DC to AC and interconnects with the utility grid.

Solar Electric Cells. Solar electric cells convert light energy into electricity at the atomic level. The conversion efficiency of a solar electric cell is defined as the ratio of the sunlight energy that hits the cell divided by the electrical energy that is produced by the cell. The earliest solar electric devices converted about 1%-2% of sunlight energy into electric energy. Current solar electric devices convert 5%-25% of light energy into electric energy (the overall efficiency for solar panels is lower than solar cells because of the panel frame and gaps between solar cells), and current mass produced panel systems are substantially less expe nsive than earlier systems. Effort in the industry is currently being directed towards the development of new solar cell technology to reduce per watt costs and increase area efficiencies.

Solar Panels. Solar electric panels are composed of multiple solar cells, along with the necessary internal wiring, aluminum and glass framework, and external electrical connections.

Inverters. Inverters convert the DC power from solar panels to the AC power used in buildings. Grid-tie inverters synchronize to utility voltage and frequency and only operate when utility power is stable (in the case of a power failure these grid-tie inverters shut down to safeguard utility personnel from possible harm during repairs). Inverters also operate to maximize the power extracted from the solar panels, regulating the voltage and current output of the solar array based on sun intensity.

Monitoring. There are two basic approaches to access information on the performance of a solar power system. The most accurate and reliable approach is to collect the solar power performance data locally from the inverter with a hard-wired connection and then transmit that data via the internet to a centralized database. Data on the performance of a system can then be accessed from any device with a web browser, including personal computers and cell phones. As an alternative to web-based remote monitoring, most commercial inverters have a digital display on the inverter itself that shows performance data and can also display this data on a nearby p ersonal computer with a hard-wired or wireless connection.

Solar Power Benefits

The direct conversion of light into energy offers the following benefits compared to conventional energy sources:
 
 
Economic - An increase in solar power generation will reduce dependence on fossil fuels. Worldwide demand for electricity is expected to nearly double by 2025, according to the U.S. Department of Energy. Additionally, according to International Energy Agency, over 60% of the world’s electricity is generated from fossil fuels such as coal, natural gas and oil. The combination of declining finite fossil fuel energy resources and increasing energy demand is depleting natural resources as well as driving up electricity costs, underscoring the need for reliable renewable energy production. Solar power systems are renewable energy sources that rely on the sun as an energy source and do not require a fossil fuel supply. As such, they are well positioned to offer a sustainable long-term alternative means of power generation. Once a solar power system is instal led, the cost of generating electricity is fixed over the lifespan of the system. There are no risks that fuel prices will escalate or fuel shortages will develop, although cash paybacks for systems range depending on the level of incentives, electric rates, annualized sun intensity and installation costs.
 
 
30

 
 
 
Convenience - Solar power systems can be installed on a wide range of sites, including small residential roofs, the ground, covered parking structures and large industrial buildings. Most solar power systems also have few, if any, moving parts and are generally guaranteed to operate for 25 years resulting, we believe, in low maintenance and operating costs and reliability compared to other forms of power generation
 
 
Environmental - Solar power is one of the cleanest electric generation sources, capable of generating electricity without air or water emissions, noise, vibration, habitat impact or waste generation. In particular, solar power does not generate greenhouse gases that contribute to global climate change or other air pollutants, as power generation based on fossil fuel combustion does, and does not generate radioactive or other wastes as nuclear power and coal combustion do. It is anticipated that greenhouse gas regulation will increase the costs and constrain the development of fossil fuel based electric generation and increase the attractiveness of solar power as a renewable electricity source.
 
 
Security - Producing solar power improves energy security both on an international level (by reducing fossil energy purchases from hostile countries) and a local level (by reducing power strains on local electrical transmission and distribution systems).

These benefits have impacted our decision to enter into the solar photovoltaic market. We believe escalating fuel costs, environmental concerns and energy security make it likely that the demand for solar power production will continue to grow. Many countries, including Italy, have put incentive programs in place that directly spur the installation of grid-tied solar power systems. For further information please see "Item 4.B: Government Regulations - Regulatory Framework of EPC Project".
 
However, there are several risk factors associated with the photovoltaic market. See “Item 3.D: Risk Factors - Risks Relating to the EPC Project and our entry into the Italian photovoltaic solar plants market”.

Competition

As further detailed in “Item 4.B: Governmental Regulations - Regulatory Framework of EPC Project”, currently, the Italian governmental agencies are willing to purchase the power production of photovoltaic plants in Italy, up to a maximum of 1200 MWp (to date, such cap has not been achieved, however according to a published estimate of GSE, the cap will be achieved in July 2010), and once a power plant is connected to the national grid, the feed-in-tariff is granted for a period of 20 years. Thus, our competitors are mostly other entities that seek land and contractors to construct new power plants on their behalf, should we also wish to construct additional plants. The market for solar energy is intensely competitive and rapidly evolving, and many of our competitors who strive to construct new solar power plants have established more prominent market positions and are more experienced in this field. Our competitors in this market include Infinity Solar, Origis Energy and Foresight Group. If we fail to attract and retain ongoing relationships with solar plants developers, we will be unable to reach additional agreements for the development and operation of additional solar plants, should we wish to do so.
 
 
31

 
 
Business Activities Prior to the HP Transaction

The following is a description of the business conducted by us prior to the closing of the HP Transaction. Please note that the information below reflects our business in the wide and super-wide format digital printing market, only up to the date of closing of the HP Transaction:

Prior to the closing of the HP Transaction, we were a leading supplier of wide format and super-wide format digital printing systems worldwide.  We developed, manufactured, sold and serviced digital color printers for the printing of large images such as billboards, posters and banners, point of purchase displays, exhibition and trade show displays, as well as decorations and backdrops for construction scaffolding covers, showrooms, television and film studios, museums and exhibits.  We also supplied our customers with ink and solvent products for use with wide format and super-wide format digital printers.

We conducted the research and development activities related to printing equipment and ink at our facility in Lod, Israel, which we ceased leasing following the HP Transaction.  We had worldwide marketing, sales and service subsidiaries or divisions in Europe, North America, South America, Asia Pacific and the Middle East and Africa regions.

We offered several lines of printers in the wide and super-wide format categories which were either solvent-ink based or UV-ink based.  In the solvent-ink based printers market we offered the NUR Fresco series and the NUR Tango.  In the UV-ink based printers market, we offered the NUR Tempo series and the NUR Expedio series.  These printers are sometimes referred to collectively herein as “our printers.”

We also sold specialized ink products for use with our printers.  The ink products previously sold by us to our customers for use with the NUR Fresco, NUR Ultima, NUR Salsa, NUR Blueboard, NUR Tempo, NUR Expedio and NUR Tango printers were resistant to water and ultraviolet rays and were well suited for indoor and outdoor use.

We sold our printers and related products primarily to commercial digital printers, design and service firms, screen printers, commercial photo labs, outdoor media companies and trade shops.  As of the consummation of the HP Transaction, our printers were installed in more than 800 sites throughout Europe, North and South America, Africa and Asia.

Industry Background

The market for printed applications requiring wide format and super-wide format printing expanded during the last few years during which we were active in such market.  Wide format and super-wide format printing applications include billboards, flags, posters and banners, special event and trade show displays, point of purchase displays, fleet graphics, decorations and backdrops.  For example, the retail, automotive, restaurant, travel and gasoline industries used outdoor advertising to promote their products in numerous locations including roadside billboards and posters displayed on streets and buildings, as well as the outside of buses, vans, trucks and trains, so-called vehicular graphics.  Wide form at and super-wide format prints could also be found in theaters as stage decorations, in museums and exhibitions as backdrops or displays and on construction sites as building site coverings.  Prior to the introduction of digital printing systems, wide format and super-wide format short-run prints were produced either by hand painting, which is relatively slow and expensive, and produces lesser quality images, or by screen or offset printing, both of which are relatively expensive and time consuming processes.
 
 
32

 

Traditional Wide Format and Super-wide Format Printing Methods

Conventional methods of wide format and super-wide format printing have included hand painting, screen printing and offset printing.  Generally, producing wide format and super-wide format color prints by traditional methods in relatively short runs (i.e., a few copies to a few hundred copies), depending on the application, has either been relatively slow and expensive or of limited quality. Because of the inherent limitations of the traditional wide format and super-wide format printing methods, quality wide format and super-wide format prints produced by these methods are generally limited to long runs of identical prints, designed and prepared well in advance or, in the case of hand painting, to single print applications .  As a result, traditional methods of producing wide format and super-wide format prints have not provided timely and economic solutions for the needs of the short run printing market.

Hand Painting.  Hand painting involves either the projection of an image onto a substrate, which is then drawn onto the substrate and subsequently painted by hand, or the spraying of paint onto material covered by a template that has been cut to the desired shape.  The process of hand painting is an alternative mainly in developing countries where labor costs are significantly lower and where the significantly lower image quality is tolerated by the local market.

Screen Printing.  The screen-printing process is distinguished by its ability to print finely detailed images on practically any surface, including paper, plastics, metals and three-dimensional surfaces. However, the process requires significant set-up time and investment in materials before the image can be sent to press.  This cost constrains the minimum number of copies the screen printer can produce economically.  As screen-printing is a highly labor-intensive process, it is best suited for run lengths between 50 to 400 copies. Hence, this is a market in which we believe our digital printers can be highly competiti ve.

Offset Printing.  Offset color printing generally produces very high quality images compared to hand painting or screen-printing.  However, because of the complex steps involved in offset color printing, each printing job, whether small or large, involves substantial set-up time and costs. In addition, much like hand painting and screen-printing, alterations and customizations are not economically feasible unless the entire offset color printing process is repeated.  Another drawback is that the variety of substrate materials and widths suitable for use with offset printing machinery is limited. In general, offset colo r printing is best suited for long print runs.
 
 
33

 
 
Wide Format and Super-wide Format Digital Printing

The introduction of digital printing has aided in the transformation of the wide format and super-wide format printing industry by lowering set-up costs, shortening turnaround time and reducing labor requirements. Digital printing involves the production of hard-copy images and text from digital data that is either generated on a computer at the printing site or originated by a customer on the customer’s computer system.  The digital data is then transferred directly from an electronic pre-press or desktop publishing system to the digital printer.  During our operations in the digital printing business, there were several digital printing technologies available, including electrostatic, piezo drop-on-demand, thermal transfer and continuous inkjet printing.

Electrostatic Printing.  Electrostatic printing is a non-impact printing technique that employs an array of metal styli, selectively pulsed to a high potential to generate a charged latent image on dielectric-coated paper, which is then toned to develop the latent image into a visible image.  The achievable printing resolution is up to 400 dots per square inch.  The main drawback of the technology is the need for special and expensive substrates and toners. This requirement increases the cost of consumables considerably.

Piezo Drop-On-Demand Inkjet Printing.  Drop-on-demand technology involves the intermittent firing of ink drops when needed on the substrate. It provides high resolution and enables use of a variety of inks for home, office and industrial use.  To address the needs of the wide format market for images with higher resolutions compared to those of other digital printing methods, for use with shorter viewing distances, we utilize drop-on-demand inkjet technology in our printers.

Thermal Transfer Printing.  Thermal transfer printing is a contact printing technology that employs arrays of heated needles and pressure to melt and transfer wax based inks from a carrier roll onto a restricted variety of substrates.  Like electrostatic printing, thermal transfer printing requires relatively expensive consumables.

Continuous Inkjet Printing.  Continuous inkjet printing technology involves the continuous flow of electrically conductive ink within a closed loop that is deflected onto a specific location on a sheet of paper or other medium.  The ink is separated into uniform micro-drops and the micro-drops are electronically directed to be printed onto a selected area of the medium.  Continuous inkjet printing technology allows for high-speed printing and produces images with good resolutions sufficient for viewing from distances of beyond five feet. Continuous inkjet printers also produce multiple copies with consistent color qual ity.  The cost of equipment using continuous inkjet printing technology is relatively high in comparison to printers using electrostatic technology.  However, the cost of the output produced with continuous inkjet printers is lower than that of electrostatic printers.

Products

Our revenues were derived primarily from the sale and service of our printers and the sale of ink and solvent products used with our printers.  See “Item 5.A: Geographic Breakdown of Revenues” for more information on the breakdown of revenues by category of activity and into geographic markets.  As previously mentioned, all products detailed herein have been sold to HP in connection with the HP Transaction and are no longer manufactured, sold or serviced by us.
 
 
34

 
 
Printers

UV-Ink Based Roll-Fed Printers

NUR Expedio™ Series

The NUR Expedio Series included NUR Expedio 5000, a 5-meter/16-feet super-wide inkjet production printer, NUR Expedio™ Revolution, a billboard printer using a special billboard ink, NUR Expedio™ 3200, a 3.2 meter, UV roll-to-roll printer, NUR Expedio™ Inspiration, a 3.2 meter, wide-format inkjet production printer with the ability to print on both flexible and rigid materials when combined with the NUR Expedio™ 3200 / Expedio Inspiration Flatbed Module, a flatbed add-on module for the NUR Expedio 3200 and the NUR Expedio Inspiration wide-format UV-inkjet production printers.

UV-Flatbed Digital Printers

NUR Tempo Series

The NUR Tempo Series included the NUR Tempo, able to print on almost any type of substrate, NUR Tempo L, a mid-range, four-color flatbed printer, NUR Tempo II, a flatbed wide-format inkjet printer and NUR Tempo Q, a high quality printer with increased printing capacity.

Solvent-ink based Digital Printers

NUR Fresco™ Series

The NUR Fresco Series included NUR Fresco, a printer that used piezo drop-on-demand inkjet technology, NUR Fresco HiQ 8C, a printer based on a previous model printer which was modified to print using eight-color mode instead of the standard four-color mode, NUR Fresco X-Press 100, a printer that extended the productivity and versatility of the NUR Fresco photorealistic production printers to accommodate long print runs and high volume production environments, NUR Fresco II series, a series that replaced the NUR Fresco HiQ models and NUR Fresco III, a printer with higher speeds and productivity.

NUR Tango

The NUR Tango printer was manufactured by a third party under an exclusive OEM agreement and provided high production speeds and additional Color Activator (dryer) and switch-able Ink system for direct or indirect solvent dye sublimation printing.  The OEM agreement was terminated prior to the consummation of the HP Transaction.

Our Printers - General

Our printers required little operator supervision, enabling one operator to run several machines at once. While the operators had to be specifically trained in the operation of our printers, unlike conventional methods such as offset printing, no special color mixing skills are required.
 
 
35

 

As compared to traditional methods of wide format and super-wide format printing, our printers could significantly reduce the set-up and operating costs associated with each print job.  Both the number of personnel and the number of skilled personal that were required for the operation of our printers were lower than in traditional methods of wide-format and super-wide format printing.  These advantages made wide format and super-wide format short-run color printing significantly more economical than is possible using traditional printing methods.  Additionally, the relatively quick turnaround for the printed product enabled our printers to produce more output in a given period, thereby further lowering the costs of labor per print.

Unlike hand painting, screen or offset printing, the layout can be viewed through the pre-press workstation prior to printing, permitting last minute fine-tuning.  By running a single copy of the print, corrections of text, enhancements of images, and additions of color can all be accomplished with minimal time, effort and cost.  Additionally, since the format can readily be changed, our printers allowed the end-user to make each print in the run different, with little time, effort, or additional cost.  For example, if so desired, different languages, graphics and text could be added to each print in a run.

As of the end of fiscal 2007, the retail prices of our printers generally ranged from $120,000 to $450,000 per machine.

Consumables

Inks

The NUR Tempo and NUR Expedio printers use specialized UV-curable inks.  The ink used was resistant to water and ultraviolet rays, making it fairly durable and thus well suited for outdoor conditions.  The NUR Tempo, through the utilization of the ink, can print on almost an unlimited variety of substrates. The NUR Expedio also prints on a variety of media.  The ink we sold enabled the output of the NUR Tempo and NUR Expedio to be used both for indoor and outdoor advertising without additional lamination.

The NUR Fresco and NUR Ultima printers use specialized all-in-one solvent-pigment based ink designed for the needs of the wide format and super-wide format market and suited for drop-on-demand technology printers.  This ink was developed to ensure color-real, long lasting, color consistent, weather resistant prints.  The NUR Blueboard printers that were in our installed base as of the consummation of the HP Transaction, use specialized solvent-based pigmented ink designed for the needs of billboard application.  The ink is resistant to water and ultraviolet rays, making it fairly durable and thus well suited for outdoor conditions.

We manufactured ink in our plant in Ashkelon, Israel, and our ink research and development activities were located in Lod, Israel.

Sales and Marketing

We distributed and sold our products directly and through the following wholly owned subsidiaries: NUR Europe (which was sold to HP), NUR America, NUR Asia Pacific, NUR DO Brazil (which was sold to HP) and NUR Japan (which was sold to HP).
 
 
36

 
 
Our marketing activities included participating in relevant tradeshows worldwide, advertising in trade publications, marketing directly to a target base, as well as publishing our own newsletters, participating in services and industry forums and maintaining an Internet site.

In addition, we worked to develop, market and sell a wide range of advanced ink products, all of which are designed to work with our previously existing range of printers.

The Israeli Government, through the Fund for the Encouragement of Marketing Activities of the Ministry of Industry, Trade and Labor (the “Marketing Fund”), awarded participation grants for marketing expenses incurred overseas.  During 2007 and 2008 we did not receive grants from the Marketing Fund and we were not eligible to receive such grants.  Under the terms of grants awarded to us in prior years by the Marketing Fund, we were obligated to pay a royalty of 3-4% of the export added value to the Marketing Fund until 100%-150% of the grants received in prior years had been repaid.  In connection with a dispute with the Ministry of Industry, Trade and Labor, we withheld payments owed to the M arketing Fund.  In February 2006, as part of the OCS Settlement Agreement described below, the District Court in Jerusalem approved a settlement between us and the Ministry of Industry, Trade and Labor in connection with our outstanding debt to the Marketing Fund.  Under the terms of the approved settlement, we were required to make aggregate payments of approximately $0.78 million to the Marketing Fund over a three-year period.  The liability to the Marketing Fund was fully paid during 2008.  For more details regarding the settlement agreement see “Item 8.A: Legal Proceedings.”

Production and Sources of Supply

We manufactured and assembled our printers at a single, large manufacturing facility located in the Telrad Campus in Lod, Israel.

Full system integration, acceptance and quality control testing of the printers were conducted by our employees at the manufacturing facility.  Product quality control tests and inspections were performed at various steps throughout the manufacturing process, and each product was subject to a final test prior to delivery.  As previously mentioned, NUR Tango printers were manufactured by a third party under an exclusive OEM agreement which was terminated prior to the sale of our business to HP.

During the conduct of our business, we were able to obtain adequate supplies of the components necessary to produce our printers and did not have any material problems with our subcontractors.  The prices of our principal components did not materially change during 2007 and such portion of 2008 in which we still conducted our business (January – February).

We manufactured ink products at our plant in Ashkelon, Israel.  The ink for use with the NUR Blueboard was manufactured by a third party, exclusively for us and under our brand name.  Some of the ink products for use with the NUR Tempo and NUR Expedio were also manufactured for us by a third party under our previously-owned brand name.
 
 
37

 

Service and Support

Installation, post sale customer support and warranty services of our products were provided by us and our subsidiaries NUR America, NUR Europe (which was sold to HP), NUR Italy, NUR UK, NUR Asia Pacific, NUR DO Brazil (which was sold to HP) and NUR Japan (which was sold to HP).  In most cases, our warranty to our direct customers and distributors covered defects in our printers for a period of six to twelve months after installation.  We were also committed to maintaining sufficient spare parts and materials necessary for the operation of our printers for a certain period after cessation of the manufacturing of such printers.

Research and Development

Our research and development center, which up until the sale of our business to HP engaged over 50 employees, was focused on developing new products, enhancing the quality and performance relative to price of our existing products, reducing manufacturing costs, upgrading and expanding our product line through the development of additional features and improving functionality in response to market demand.

Total net research and development expenses were approximately $5.8 million, $7.0 million and $1.9 million in the years ended December 31, 2006, 2007 and 2008, respectively.

Research and development expenses were composed principally of salaries for employees, the hiring of subcontractors, prototype material costs and depreciation of printers and capital investment in infrastructure for software and electronic designs.

Between 1997 and 2003, NUR Media Solutions, our subsidiary and NUR Europe, our former subsidiary (sold to HP), received three research and development grants in the aggregate amount of approximately EUR 2.4 million from local authorities in Belgium.  The obligation to pay royalties from the sales of products developed with these grants was retained by NUR Media Solutions in connection with the HP Transaction and we undertook to release NUR Europe from its obligations, if any, pursuant to these grants.  These grants are subject to certain terms and conditions pursuant to agreements entered into between the subsidiaries and the local authorities in Belgium.  Under the terms of the grants, the subsidiaries have an obligation to pay royalties at the higher of a certain minimum annual amount or at a rate of 4% on the sales of products developed with funds provided by the local authorities in Belgium, up to an amount equal to the research and development grants received in connection with such products, linked to the Euro.  The commencement of the royalty payments to the local authorities in Belgium is contingent upon such subsidiaries generating sales from products developed under these grants.  The grants are not repayable in the event that the subsidiaries decide to cease the research and development activities or the exploitation of the products developed under these grants and all know- how and results of the research and development are transferred to the local authorities.  In the event that such subsidiaries decide to cease exploitation of the products developed under these grants a notification thereof should be given to the local authorities in Belgium.  Our subsi diaries ceased the research and development activities and the exploitation of certain products for which grants were received but did not submit notification to the local authorities and instead continued to pay royalties, with a total of EUR 0.659 million remitted through 2005.  During the years ended December 31, 2006, 2007 and 2008, our subsidiaries did not pay any royalties to the local Belgian authorities, other than the settlement amount paid on December 2, 2008 as noted below.
 
 
38

 
 
During November 2008 NUR Media Solutions reached a settlement with the Belgian authorities by which the authorities waived the repayment of a portion of the grants and, in return, we paid back on December 2, 2008 a total of EUR 0.390 million as full and final settlement.

In the past, we received grants from the Government of Israel, through the Office of the Chief Scientist (the “OCS”), for the development of our systems and products.  The terms of the grants prohibit the manufacture of products developed with government grants outside of Israel without the prior consent of the OCS.  These restrictions do not bar exports from Israel of products developed with such technologies.  In addition, the know-how and the technology developed pursuant to these grants may not be transferred to third parties or out of Israel without the approval of the OCS.  The approval of th e OCS, if granted, generally subjects us to additional financial obligations.  These restrictions do not terminate following repayment of the grants.  Other than with respect to the MAGNET and Magneton projects described below, we have not received research and development grants from the OCS since 2001. The OCS awards grants of up to 50% (and in certain circumstances up to 66%) of a project’s approved expenditures in return for royalties.  Under the terms of previously granted funding, royalties were payable generally at a rate of 2% to 3% on sales of products developed from the funded project up to 100% to 150% of the dollar value of the original grant.  During 2001, we made royalty payments of $0.2 million in respect of such grants to the OCS.   In February 2005, we filed a claim with the District Court in Jerusalem against the OCS for a declaratory judgment denying an alleged liability for unpaid royalties to the OCS of approximately $0.8 milli on and for the recovery of approximately $0.27 million that was previously paid to the OCS.  In February 2006, the court approved a settlement between us and the OCS (the “OCS Settlement Agreement”).  Under the terms of the OCS Settlement Agreement, we were required to make aggregate payments of approximately $0.6 to the OCS over a three-year period.  We also agreed to make payments equal to 5% of our operating income in order to accelerate the repayment of the agreed upon royalties.  The amounts required to be paid by us pursuant to the OCS Settlement Agreement were fully repaid by us during 2008.

In addition to the OCS grants described above, following our participation in a research and development consortium of industrial companies and academic institution within the framework of the MAGNET program of the OCS, we worked on an ink technology project with the Technion – The Israel Institute of Technology, which received the approval of the Mini-MAGNET (or Magneton) committee of the OCS.  The Magneton is designated to support knowledge-transfer relationships between industry and academic institutions.  Under the terms of the Magneton program, the OCS contributes 66% of the OCS-approved program research budget.  No royalties are payable to the OCS with respect to this funding, however, the te rms of our agreement with the Technion required us to pay royalties to the Technion on the proceeds from sales of products resulting from this project when such sales commenced.  The terms of the program prohibit both the manufacture of products using technology developed in the context of the program outside of Israel and the transfer of technology developed under the program, without the prior written consent of the OCS.   Such consent may require the refund of the grants awarded.  We have not received any monies relating to the Magneton project, as a majority of the monies due to us in connection with grants were applied against our debt to the OCS pursuant to the OCS Settlement Agreement.

All of the intellectual property used in our business was sold to HP in connection with the HP Transaction, including intellectual property developed with the assistance of the OCS.
 
 
39

 

HP has approached the OCS and requested to transfer the technology and manufacturing of products developed with the assistance of the OCS outside of Israel.  Pursuant to the terms of the Asset Purchase Agreement, we may be required to reimburse HP, out of the amounts deposited in the escrow account, for payments made to the OCS in connection with such transfer of manufacturing.  HP demanded the release of amounts from the escrow funds in connection with payments it made to the OCS in this respect. For further information see “Item 5: Operating and Financial Review and Prospects – Overview”.

Competition

Prior to the consummation of the sale of our business to HP, the principal competitive factors that affected the sales of our products were their performance relative to price, productivity and throughput; product features and technology; quality, reliability, cost of operation and consumables; the quality and costs of training, support and service and our ability to be flexible in adapting to customers’ applications of our products.  Other competitive factors included the ability to provide access to product financing, our reputation and the customers’ confidence that we would continually develop new products and product accessories that would help them maintain and grow their business.

Our main competitors in the roll-fed arena were EFI/VUTEk, Hewlett-Packard/Scitex Vision and Gandi Innovations.  These companies introduced products that directly compete with the NUR Fresco and NUR Expedio printers. In the market for flatbed printers utilizing UV-curable ink, the main competitors were Durst Phototechnik, Inca Digital Printers, Hewlett-Packard/Scitex Vision, Leggett & Platt (Spuhl), Gandi Innovations and EFI/VUTEk.  These companies introduced products that compete with the NUR Tempo.  There was also a growing number of manufacturers in the Asia Pacific region (especially China and Korea) that began developing, manufacturing and selling inexpensive printers.  In the years pr ior to the sale of our business to HP, these manufacturers have started to penetrate the international market.

Trade Secrets, Patents and Proprietary Rights

Prior to the sale of our business to HP, we relied on a combination of trade secrets, licenses and patents, together with non-disclosure and confidentiality agreements, to establish and protect our proprietary rights in our products and intellectual property.  We cannot provide any assurance that our existing or previously owned patents will not be challenged, invalidated, or circumvented.  There can be no assurance that third parties will not assert infringement claims against us or HP in the future, in connection with intellectual property we sold to HP.  The cost of responding to such assertions, regardless of their validity, could be significant. In addition, such claims may be found to be valid and could result in awards against us or HP, which could have a material effect on our results or on the amounts to be released to us from the escrow account in connection with the HP Transaction.

We believe that our success was less dependent upon the legal protection afforded by patent and other proprietary rights than on the knowledge, ability, experience and technological expertise of our employees and our key suppliers.  It was our policy to have employees sign confidentiality agreements, and to have third parties sign non-disclosure agreements.  Although we take and have in the past taken precautionary measures to maintain our trade secrets, no assurance can be given that others have not acquired equivalent trade secrets or otherwise gained access to or disclosed our proprietary technology.
 
 
40

 

Insurance

Following the consummation of the sale of our business to HP, we terminated all business related insurance policies and obtained new reduced coverage and certain run-off insurance policies. We believe that the insurance coverage is adequate and appropriate in light of our current business and the circumstances resulting from the HP Transaction. The company has not yet determined the scope of its insurance coverage with relation to the EPC Project once the photovoltaic plants will be fully operational.

Government Regulations

Investment Company Act of 1940

Regulation under the Investment Company Act governs almost every aspect of a registered investment company’s operations and can be very onerous.  The Investment Company Act, among other things, limits an investment company’s capital structure, borrowing practices and transactions between an investment company and its affiliates, and restricts the issuance of traditional options, warrants and incentive compensation arrangements, imposes requirements concerning the composition of an investment company’s board of directors and requires shareholder approval of certain policy changes.  In addition, contracts made in violation of the Investment Company Act are void.

An investment company organized outside of the United States is not permitted to register under the Investment Company Act without an order from the SEC permitting it to register and, prior to being permitted to register, it is not permitted to publicly offer or promote its securities in the United States.

As a result of the sale of our business to HP, we could fall within the definition of an “investment company” under the Investment Company Act, if we invest more than 40% of our assets in “investment securities”, as defined in the Investment Company Act.  Investments in majority owned securities are not “investment securities” for purposes of this definition. Unless we limit the nature of our investments to cash and cash equivalents (which are generally not “investment securities”) and succeed in making strategic “controlling” investments, we may be deemed to be an “investment company.”  We do not believe that our engagement in the EPC Project would result in our being deemed to be an “investment company”, as we shall control the Project via a wholly-owned subsidiary. If we were deemed to be an “investment company,” we would not be permitted to register under the Investment Company Act without an order from the SEC permitting us to register because we are incorporated outside of the United States and, prior to being permitted to register, we would not be permitted to publicly offer or promote our securities in the United States. Even if we were permitted to register, it would subject us to additional commitments and regulatory compliance.  Investments in cash and cash equivalents might not be as favorable to us as other investments we might make if we were not potentially subject to regulation under the Investment Company Act.  We seek to conduct our operations, including by way of investing our cash and cash equivalents, to the extent possible, so as not to become subject to regulation under the Invest ment Company Act. In addition, because we are actively engaged in exploring and considering strategic investments and business opportunities, and in fact have entered the Italian photovoltaic power plants market through a controlling investment, we do not believe that we are currently engaged in “investment company” activities or business.
 
 
41

 

Shell Company Status

Following the consummation of the HP Transaction, we ceased conducting any operating activity and substantially all of our assets consisted of cash and cash equivalents.  Accordingly, we may have been deemed to be a “shell company,” defined by Rule 12b-2 promulgated under the Securities Exchange Act of 1934 as (1) a company that has no or nominal operations; and (2) either: (i) no or nominal assets; (ii) assets consisting solely of cash and cash equivalents; or (iii) assets consisting of any amount of cash and cash equivalents and nominal other assets.

Our characterization as a “shell company” subjected us to various restrictions and requirements under the U.S. Securities Laws.  In the event we consummated a transaction that causes us to cease being a “shell company,” we were required to file a report on Form 20-F within four business days of the closing of such transaction.  The Form 20-F is required to include full disclosure with respect to the acquired business and our post-transaction status.

We believe that the EPC Project causes us to cease being a “shell company” and thus are filing this 20-F report.
 
During the period in which we are deemed to be a “shell company” and for a period of sixty days following the filing of this Form 20-F reflecting the change in our status as described above, we may not use any Form S-8 we have on file in order to enable the issuance of our shares and the resale of such shares by our employees.  In addition, the provisions of Rule 144 promulgated under the Securities Exchange Act of 1934 may not be used for resale of shares issued by us at the time we were deemed to be a “shell company” for as long as we are deemed to be a shell company and for a period of one-year thereafter.  These restrictions may limit our ability to compensate our employees and attract new key personnel and may also restrict our ability to raise capital via the private placement of our shares.
 
Regulatory Framework of EPC Project

The regulatory framework surrounding the EPC Project consists of legislation at the Italian national and local level. Relevant European legislation has been incorporated into Italian legislation, as described below.

National Legislation

(i)           Construction Authorizations

Construction of the photovoltaic power plants is subject to receipt of appropriate construction authorizations, pursuant to Legislative Decree no.380 of 2001 (“Decree 380”), and Legislative Decree 29 December 2003 no. 387 (“Decree 387”), the latter of which implements European Directive no. 77 of 2001 on the promotion of electricity produced from renewable energy sources in the internal electricity market.
 
 
42

 
 
Decree 387 aims to promote renewable energies, inter alia by simplifying the procedures required to start constructions. In particular, it regulates the so-called Autorizzazione Unica (AU) in relation to renewable energy plants. The AU is an authorization issued by the Region in which the construction is to take place, or by other local competent authorities, and which joins together all permits, authorizations and opinions that would otherwise be necessary to begin construction (such as, building licenses, landscape authorizations, permits for the interconnection facilities, etc.). The only authorization not included in the AU is the environmental impact assessment (valutazione di impatto ambientale, VIA, see below), which needs to be obtained before the AU procedure is started. The AU is issued following a procedure called Conferenza di Servizi in which all relevant entities and authorities participate. Such procedure is expected to be completed within 180 days of the filing of the relevant application, but such term is not mandatory and cannot entirely be relied upon.

Decree 380, which is the general law on building administrative procedures, provides another track for obtaining the construction permit. Pursuant to this decree, the construction authorization can be obtained through a permesso di costruire (“Building Permit”), which is an express authorization granted by the competent municipality. Upon positive outcome of the municipality’s review, the Building Permit is granted. Works must start, under penalty of forfeiture of the Building Permit, within one y ear following the date of issuance, and must be completed within the following three years.

Decree 380 also provides the so-called Dichiarazione di inizio attività (DIA) procedure. DIA is a self-certification process whereby the applicant declares that the project in question complies with all relevant requirements and conditions. The competent authority can deny the authorization within 30 days of receipt of DIA; should such a denial not be issued within such term - which is mandatory - the authorization shall be deemed granted and the applicant is allowed to start the works. The DIA procedure can b e used in relation to plants whose power is lower than 20 kW, but each Region is entitled to increase such threshold. However, a Ministerial Decree dated 19 February 2007 (the “Nuovo Conto Energia”) has established that when specific permits are required (such as for environmental, urban, historical-cultural reasons) the DIA route cannot be pursued. Since the expected power output of our photovoltaic power plants exceeds 20kw, and since other permits are required, the DIA is not available for the EPC Project.

The EPC Project relies on two Building Permits, that have already been issued.
 
 (ii)           Connection to the National Grid
 
The procedures for the connection to the national grid are provided by the Authority for Electric Energy and Gas (AEEG). Currently, the procedure to be followed for the connection is regulated by the AEEG Resolution no. 99 of 2008 (Testo Integrato delle Connessioni Attive, so-called “TICA”) which replaces previous legislation. According to TICA, an application for connection must be filed with the competent local grid operator, after which the latter notifies the appl icant the estimated time for connection (the “STMC”). The STMC shall be accepted within 45 days of issuance. However, in order for the authorization to the connection to become definitive, all relevant authorization procedures (such as easements, ministerial nulla osta, etc.) must be successfully completed.
 
There are three alternative modalities to sell electricity:
 
 
by way of sale on the electricity market (Italian Power Exchange IPEX), the so called “Borsa Elettrica”;
 
through bilateral contracts with wholesale dealers;
 
via the so-called “Dedicated Withdrawal System” introduced by AEEG Resolution no. 280/07 and subsequent amendments. This is the most common way of selling, as it affords direct and quick negotiations with the national energy handler (GSE), which will in turn deal with energy buyers on the market. Ellomay envisages to sell electricity though this method.
 
 
43

 
 
Regional Regulation Applicable to the Marche Region

Marche Regional Law no. 7 of 2004 requires certain types of projects to be subjected to an Environmental Impact Assessment (the “VIA Procedure”) and states that the VIA Procedure is expressly excluded for photovoltaic plants whose surface is less than 5000 m2 (unless such plants are not listed as national protected areas pursuant to law no. 394 of December 6th 1991). Specific provisions prevent constructors from avoiding su ch limits by building various plants with a surface of less than 5.000 m2.

In addition, Regional Law no. 7 of 2004 has been amended by Law no. 99 of 2009, which specifies that the VIA Procedure is expressly excluded for plants with a nominal power lower than 1 MW. In the case of the EPC Project, the target nominal power for each power plant is less than 1MW, such that the EPC Project is expected to be exempt from the VIA Procedure.

The incentive tariff system for photovoltaic plants

The Italian government also promotes renewable energies by providing certain incentives. The Nuovo Conto Energia has granted fixed feed-in tariffs for a period of 20 years from the date the plant is connected to the grid. Such fixed feed-in tariffs are to be added to the producer’s revenues for the energy fed into the grid.
 
According to the Nuovo Conto Energia, the overall cap not to be exceeded (in the aggregate, from all solar power plants connected to the national grid) in order to benefit from the incentives under the Nuovo Conto Energia, is 1200 MWp.  However, the incentive will still be granted to plants that get connected to the grid (namely “entrata in esercizio”) within 14 months following the achievement of the 1200 MWp cap. To date, such cap (1200 MWp) has not been achieved, however according to a published estimate of GSE, it will be achieved in Jul y 2010.
 
Current tariffs apply to plants that started operation on or before December 31, 2008. For plants that commence operation between January 1, 2009 and December 31, 2010, the feed-in tariff is reduced by 2% for each calendar year following 2008. The tariff for 2010 is equal to 0,345/kWh. If our power plants become operational only after December 31, 2010, a different feed-in tariff will apply. We do not currently know what the amount of such tariff will be. However, the EPC Contract provides that if Ecoware will be unsuccessful in operating the plants before December 31, 2010 and the tariff will decrease in 2011, the consideration to be paid under the EPC Contract shall be reduced to compensate Ellomay for such loss, according to a predetermined formula.

The feed-in tariff is payable by GSE upon the grant of an incentive agreement between the producer and GSE. Notwithstanding the foregoing, the first payment of the feed-in-tariff to the producer is made retroactively, 6 months following connection to the national grid.
 
 
44

 
 
Other Renewable Energy Incentives

Legislative Decree no. 79 of 1999 implements the so-called “priority of dispatch” principle to the marketing of renewable energies, which means that the demand for electricity must be first satisfied by renewable energies.

In other words, in light of the increasing demand of energy, the sale of the total output of power plants fuelled by renewable sources is required by law, and the government must buy power from solar power plants that wish to sell to it, before it can buy the remainder of its power needs from fossil fuel energy resources.

C.           Organizational Structure

Prior to the consummation of the HP Transaction, we operated our business through wholly-owned subsidiaries that conducted sales and marketing activities in pre-defined geographical regions.

As part of the HP Transaction, we sold our holdings in three wholly owned subsidiaries (NUR Europe, NUR Japan and NUR Do Brazil) to several of HP’s subsidiaries.  Following the consummation of the HP Transaction, we wholly own, directly and indirectly, several subsidiaries that are currently inactive and we are in the process of dissolving, or have already arranged for the dissolution of, a number of such inactive subsidiaries.

For the purposes of the EPC Project, we will operate our photovoltaic activities in Italy through our Italian subsidiary, Ellomay PV One, that shall be wholly-owned by a subsidiary of Ellomay to be incorporated in Luxemburg.

D.           Property, Plants and Equipment

Prior to the consummation of the HP Transaction, our production facilities were located in Lod, Israel and Ashkelon, Israel and our main office was located in Lod, Israel.  We also leased additional premises (offices, demo centers and storage spaces) in Europe, the United States, Asia Pacific and Japan.  Following the consummation of the HP Transaction, most of our operating and capital lease commitments were assumed by HP or its subsidiaries or terminated. We have retained a lease of premises of our US subsidiary, NUR America, which is fully sub-leased to a third party.

Our office space of approximately 280 square feet is located in Tel Aviv, Israel. This lease expires in April 2013 and we have an option to extend it until April 2016.  We sub-lease a small part of our office space to a company controlled by Mr. Shlomo Nehama, at the same price per square meter as in our lease. This sub-lease agreement was approved by our Board of Directors.

The Systems to be constructed under each EPC Contracts are to be located in Marche, in the municipalities of Cingoli and Senigallia, Italy. See “Item 4.B: Business Overview” above.
 
 
45

 


Not applicable.
 

Our discussion and analysis of our financial condition and results of operation are based upon our consolidated financial statements and accompanying notes, which have been prepared in accordance with United States generally accepted accounting principles. Our operating and financial review and prospects should be read in conjunction with our financial statements, accompanying notes thereto and other financial information appearing elsewhere in this report.

Overview

The sale of our wide-format printing business to Hewlett-Packard Company, and several of its subsidiaries, was consummated on February 29, 2008, the Closing Date of the HP transaction. The aggregate consideration in connection with the HP Transaction amounted to $122.6 million, of which $0.5 million was withheld in connection with NUR Europe's obligations with respect to government grants, and $14.5 million was deposited into an escrow account to secure the indemnification obligations of the Company and its remaining subsidiaries pursuant to the HP Transaction. The escrow funds, net of amounts distributed to HP in satisfaction of indemnification obligations, were to be released to the Company in two installments:  $9.5 million was to be released eighteen months following the Closing Date and $5 million was to be released twenty-four months following the Closing Date.

In August 2009, the Company received two officer’s certificates from HP requesting the release of funds in the aggregate amounts of approximately $8.1 million and Euro 2.4 million from the escrow funds. The claims included in the officer’s certificates mainly refer to payments HP made to the Israeli Office of the Chief Scientist (the “OCS”), in connection with the transfer of technology claimed to have been developed with OCS funding, claims made by suppliers and alleged non-compliance with different environmental and safety regulations.  The Company replied and objected to the claims made in the two Officer's Certificates on October 21, 2009 declining the vast majority of HP's claims (the Company has agr eed to release an amount of approximately $0.3 million out of the escrow funds).

An additional officer’s certificate was sent by HP in January 2010 in which HP claims additional losses in the aggregate amount of approximately $2.9 million in connection with further issues relating to non-compliance with safety regulations. With respect to the last Officer's Certificate, the Company rejects the claims made in the Officer's Certificate. The Company holds the position that since the due date for submitting an Officer's Certificate has passed, HP cannot attempt to raise new claims against the escrow funds.

At this stage it is premature to estimate the outcome and scope of indemnification to be paid to HP, if any, and therefore the escrow funds were not recorded as a receivable and were excluded from the calculation of the capital gain.
 
 
46

 
 
    Following the closing of the HP Transaction, we ceased conducting any operating activity and substantially all of our assets consist of cash and cash equivalents.
 
           On March 4, 2010, we signed the EPC Contracts with an Italian contractor for the construction and operation of two photovoltaic plants to be located in Italy. See “Item 4.A: Information on Ellomay – History and Development of  Ellomay” for more information.
 
In addition, our current plan of operation is to continue to identify and evaluate additional suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise, and we may also consider making additional investments is the photovoltaic market.

Therefore, the data presented in our consolidated financial statements and in our discussion below are not indicative of our future operating results or financial position.

A.           Operating Results

General

Prior to the consummation of the HP Transaction, we were a world leader in the market for the sale of wide format and super-wide format digital printing systems.  We developed, manufactured, sold and serviced digital, inkjet color printing systems for on-demand, production, wide format and super-wide format printing.  We also supplied ink products that are consumable products for the operation of our printers.

Our total revenues amounted to $85.6 million in the year ended December 31, 2007 and amounted to $11.4 million during January and February 2008, prior to the consummation of the HP Transaction.

The decrease in revenues in 2008 was primarily due to the cessation of our wide-format printing business at the end of February 2008, upon the sale of our business to HP.

Up until the consummation of the HP Transaction on February 29, 2008:

 
Our revenues were derived from the sale of our printers and from the sale of ink products, spare parts and related services.

 
Cost of sales of printers and related materials included materials, labor, overhead, and other direct or allocated costs involved in the manufacture, warehousing, delivery, support, and maintenance of products.

 
Research and development expenses comprised primarily of labor costs, materials consumed and payments to subcontractors, consultants and others. Research and development expenses were carried to the statement of operations as incurred.

 
Sales and marketing expenses comprised primarily of salaries and commissions, advertising and promotion costs, trade shows and other marketing activities.
 
 
47

 
 
Our net income for the year ended December 31, 2008 was $87 million. Our net loss for the years ended December 31, 2007 and 2009 was $6.4 million and $1 million, respectively.

The net income for the year ended December 31, 2008, was primarily due to the consideration from the HP Transaction.

Critical Accounting Policies and Estimates

Our discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which have been prepared in accordance with United States generally accepted accounting principles.  For additional information regarding our significant accounting policies please refer to Note 2 of our consolidated financial statements as of December 31, 2009 included in this report. While all the accounting policies impact the financial statements, certain policies may be viewed to be critical.  These policies are most important for the fair portrayal of our financial condition and results of operations and are those that require our management to make difficult, subjective and co mplex judgments, estimates and assumptions, based upon information available at the time that they are made, historical experience and various other factors that are believed to be reasonable under the circumstances.  These estimates, judgments and assumptions can affect the reported amounts of assets and liabilities as of the date of the financial statements, as well as the reported amounts of revenues and expenses during the periods presented.  Actual results could differ from these estimates.

In many cases, the accounting treatment of a particular transaction is specifically dictated by United States generally accepted accounting principles and does not require management’s judgment in its application.  There are also areas in which management’s judgment in selecting among available alternatives would not produce a materially different result.

Our management believes that the significant accounting policies which affected management’s more significant judgments and estimates used in the preparation of our consolidated financial statements and which are, following the sale of our business to HP as described above, the most critical to aid in fully understanding and evaluating our reported financial results include those in respect to income tax and litigation. During the period prior to the sale of our business to HP, the most critical accounting policies in our management’s view include those with respect to: revenue recognition, allowance for doubtful accounts, inventory valuation, income taxes, litigation and stock-based compensation.

Income Taxes

On January 1, 2007, we adopted ASC 740 “Income Taxes” (formerly FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes").  The guidance contains a two-step approach to recognizing and measuring uncertain tax positions accounted for in accordance with ASC 740.   The first step is to evaluate the tax position taken or expected to be taken in a tax return by determining if the weight of available evidence indicates that it is more likely than not that, on an evaluation of the technical merits, the tax position will be sustained on audit, including resolution of any related appeals or litigation processes. The second step is to measure the tax benefit as the largest amount that is mor e than 50% likely to be realized upon ultimate settlement.   We accrue interest and penalties related to unrecognized tax benefits in the provision for income tax.
 
 
48

 

Although we believe we have adequately reserved for our uncertain tax positions, no assurance can be given that the final tax outcome of these matters will not be different.  We adjust these reserves in light of changing facts and circumstances, such as the closing of a tax audit or the refinement of an estimate.  To the extent that the final tax outcome of these matters is different than the amounts recorded, such differences will impact the provision for income taxes in the period in which such determination is made.  The provision for income taxes includes the impact of reserve provisions and changes to reserves that are considered appropriate, as well as the related interest.

Litigation

Our management accrues liabilities related to litigation brought against us when the amount or a range of the potential loss can be estimated and it is probable that a loss will be incurred.  In determining whether liabilities should be recorded for pending litigation claims, we assess the allegations made and the likelihood that we will successfully defend ourselves.  When we believe that it is probable that we will not prevail in a particular matter, we then estimate the amount of the liability based in part on advice of legal counsel.  As litigation progresses, we continue to assess our potential liability and revise our estimates accordingly. Such revisions in our estimates could materially impact ou r results of operations and financial position. Estimates of litigation liability affect our other accounts payable and accrued expenses line item in our consolidated balance sheet and our general and administrative expense line item in our statement of operations.
 
Stock-Based Compensation

We account for equity-based compensation in accordance with ASC 718 "Compensation - Stock Compensation". Under the fair value recognition provisions of this statement, stock-based compensation cost is measured at the grant date based on the fair value of the award and is recognized as an expense over the requisite service periods.  Determining the fair value of stock-based awards at the grant date requires the exercise of judgment, including the amount of stock-based awards that are expected to be forfeited. If actual results differ from these estimates, equity-based compensation expense and our results of operations could be impacted.  We estimate the fair value of employee stock options using a Black-Scholes Mer ton valuation model.  The fair value of an award is affected by our stock price on the date of grant as well as other assumptions including the estimated volatility of our stock price over the term of the awards and the estimated period of time that we expect employees to hold their stock options.  The risk-free interest rate assumption is based upon United States treasury interest rates appropriate for the expected life of the awards.  We use the historical volatility of our publicly traded stock options in order to estimate future stock price trends.  In order to determine the estimated period of time that we expect employees to hold their stock options, we have used historical behavioral patterns rates of employee groups by job classification.  Our expected dividend rate is zero since we do not currently pay cash dividends on our ordinary shares and do not anticipate doing so in the foreseeable future.
 
 
49

 

Revenue Recognition

During the periods covered by the consolidated financial statements prior to the consummation of the HP Transaction, we generated revenues from the sale of printers, inks and consumable products and from servicing our products.  We generated revenues from the sale of our products directly to end-users and indirectly through independent distributors.  Revenues from these independent distributors were deferred until our products were installed in their customers’ premises, provided that all other revenue recognition criteria were met.

Revenues from printer sales were recognized in accordance with ASC 605 “Revenue Recognition” upon installation, provided that the collection of the resulting receivable was probable, persuasive evidence of an arrangement existed, no significant obligations in respect of installation remained and the price was fixed or determinable. We did not grant a right of return.

When a sale involved multiple elements, such as sales of printers that included a right to receive specified upgrades or an extended warranty agreement, the entire fee from the arrangement was evaluated under ASC 605-25, “Multiple-Element Arrangements.”  In such arrangements, we accounted for the separate elements as different units of accounting, provided that the delivered element had value to the customer on a stand-alone basis and that there was objective and reliable evidence of the fair value of the undelivered element.  In cases where there was no objective and reliable evidence of the fair value of the undelivered element, we accounted for the total arrangement as one unit of accounting. & #160;As such, we recognized revenue for the arrangement only when all revenue recognition criteria had been met for the undelivered element.

We considered all arrangements with payment terms extending beyond the standard payment terms not to be fixed or determinable. If the fee was not fixed or determinable, revenue was recognized as payments became due from the customer, provided that all other revenue recognition criteria had been met.

Revenues from ink and other consumable products were generally recognized upon shipment, assuming all other revenue recognition criteria had been met.

Revenues from services were comprised of maintenance and support arrangements. Revenues from maintenance and support arrangements were recognized on a straight-line basis over the term of the arrangement.

In cases where we accepted a trade-in of an old printer as part of a sale of a new printer, the fair value of the old printer was recorded as revenue, provided that such value could be determined. If such value could not be determined, the old printer was recorded at a zero value.  The amount of revenues recognized for the transaction equaled the fair value of the old printer plus any monetary consideration received.

We followed very specific and detailed guidelines, several of which are discussed above, in measuring revenue; however, certain judgments affect the application of our revenue recognition policy.
 
 
50

 

Our revenue recognition policy took into consideration the creditworthiness and past transaction history of each customer in determining the probability of collection as a criterion of revenue recognition. This determination required the exercise of judgment, which affected our revenue recognition.  If we determined that collection of a fee was not probable, we deferred the revenue recognition.

Allowance for Doubtful Accounts

We maintained an allowance for doubtful accounts for estimated losses resulting from the inability of our customers to make required payments.  Our management periodically performed evaluations of the composition of accounts receivable and expected credit trends, established an allowance for doubtful accounts on the basis of an aging key and in respect of specific balances whose collection was considered to be in doubt and charged-off receivables deemed uncollectible.  The past due status of accounts receivable was determined primarily based upon contractual terms.  Our customers included commercial printing companies, sign printers, screen printers, billboard and media companies, professional photo labs , and digital printing service providers.  Among our customers, there were small and medium size businesses, which were sensitive to adverse changes in the market.  Such adverse changes included declines in demand for services offered by customers and their inability to obtain financing.  As part of the HP Transaction, all of our accounts receivable were acquired by HP.

Inventory Valuation

At each balance sheet date, we evaluated our inventory balance for excess quantities and obsolescence.  This evaluation included an analysis of sales levels by product line and projections of future demand.  In addition, we wrote off inventories that were considered obsolete.  Remaining inventory balances were adjusted to the lower of cost or market value. As part of the HP Transaction, all of our inventory balances were acquired by HP.

Geographic Breakdown of Revenues

Prior to the consummation of the HP Transaction, we sold our products and services throughout the world.  Revenues are generally attributed to the location of the sale of the product or service to the end-user.  The tables below shows the breakdown of revenues by categories of activities and into geographic markets in the years ended December 31, 2007 and 2008.  As previously noted, the results for the year ended December 31, 2008 reflect only two months of operations conducted by us prior to the consummation of the HP Transaction.

   
Year Ended December 31,
 
REGION
 
2007
   
2008
 
     (In thousands of U.S. dollars)  
             
Asia
  $ 10,811     $ 664  
America
    26,452       3,157  
Europe, Middle East & Africa
    48,344       7,589  
Total Revenues
  $ 85,607     $ 11,410  
 
 
51

 
 
   
Year Ended December 31,
 
CATEGORY
 
2007
   
2008
 
     
(In thousands of U.S. dollars)
 
Printers and Spare Parts
  $ 53,592     $ 6,606  
Ink
    26,636       3,962  
Services
    5,379       842  
Total Revenues
  $ 85,607     $ 11,410  
 
Results of Operations

Year Ended December 31, 2009 Compared with Year Ended December 31, 2008

Revenues.  Revenues from product sales and services were $0 in the year ended December 31, 2009, compared to approximately $11.4 million in the year ended December 31, 2008.

Revenues-products.  Revenues from sales of products were $0 in the year ended December 31, 2009, compared to approximately $10.6 million in the year ended December 31, 2008.

Revenues-services.  Revenues from services rendered were $0 in the year ended December 31, 2009, compared to approximately $0.8 in the year ended December 31, 2008.

Cost of revenues.  The cost of revenues was $0 in the year ended December 31, 2009, compared to approximately $11 million in the year ended December 31, 2008.

Cost of revenues-products.  Total cost of revenues-products was $0 in the year ended December 31, 2009, compared to approximately $8.1 million in the year ended December 31, 2008.

Cost of revenues-services.  Cost of revenues-services was $0 in the year ended December 31, 2009, compared to approximately $2.9 million in the year ended December 31, 2008.

Each of the above-noted decreases in revenues and cost of revenues for the compared periods was due to the cessation of our wide-format printing business at the end of February 2008 upon the sale of our business to HP, and our lack of operations since such date.

Gross Profit.  Gross Profit was $0 in the year ended December 31, 2009, compared to approximately $0.4 million in the year ended December 31, 2008. The gross profit as a percentage of revenues was 0% in the year ended December 31, 2009, compared to 3.6% in the year ended December 31, 2008. The reduction in the gross margin is attributable to the cessation of our wide-format printing business at the end of February 2008 upon the sale of our business to HP, and our lack of operations since such date.  The low gross profit in 2008 is attributable to the fact that there were only two months of operational activity during this year. Based on our experience in the years prior to the consummation of the HP Transaction, a large portion of our revenue was generated during the third month of each quarter, while the expenses were more evenly spread throughout the quarter.  As we only operated our business during the first two months of 2008, a higher percentage of expenses and a lower gross margin compared with a full quarter (or a year) of activity are reflected. Employee compensation costs related to the HP Transaction also reduced the gross margin. 
 
 
52

 

Expenses. Research and development costs were $0 in the year ended December 31, 2009 compared to approximately $1.9 million in the year ended December 31, 2008. Selling and marketing expenses were $0 in the year ended December 31, 2009, compared to approximately $3.1 million in the year ended December 31, 2008. The decrease in research and development expenses and sales and marketing expenses was attributable to the cessation of our wide-format printing business at the end of February 2008 upon the sale of our business to HP, and our lack of operations since such date.

General and administrative expenses were approximately $2.2 million for the year ended December 31, 2009, compared to approximately $9.8 million for the year ended December 31, 2008. The decrease was mainly attributable to the cessation of our wide-format printing business at the end of February 2008 upon sale of our business to HP, and our lack of operations since such date, and to the fact that expenses related to the sale of our printing business, especially compensation and termination costs to our employees, were included in the year ended December 31, 2008.
 
Doubtful accounts expenses were $0 million for the year ended December 31, 2009, compared to $0.4 million for the year ended December 31, 2008.  The decrease was mainly attributable to the cessation of our wide format printing business at the end of February 2008 upon the sale of our business to HP, and our lack of operations since such date.

Financial income decreased to approximately $1.3 million in the year ended December 31, 2009, compared to approximately $7.6 million in the year ended December 31, 2008. This decrease was primarily due to the fact that amortization of the deferred interest in the amount of approximately $ 7.3 million following the full repayment of our loans in accordance with the provisions of Statement of Accounting Standards Codification ("ASC") 470 "Debt" was included as financial income in the year ended December 31, 2008.

Taxes. Taxes on income were approximately $0.1 million in the year ended December 31, 2009, compared to taxes on income of approximately $1.0 million in the year ended December 31, 2008. The decrease in taxes on income was mainly was attributable to the cessation of our wide-format printing business at the end of February 2008 upon the sale of our business to HP, and our lack of operations since such date.

Year Ended December 31, 2008 Compared with Year Ended December 31, 2007

Revenues.  Revenues from product sales and services were approximately $11.4 million in the year ended December 31, 2008, compared to approximately $85.6 million in the year ended December 31, 2007.

Revenues-products.  Revenues from sales of products were approximately $10.6 million (or 92.6% or total revenues) in the year ended December 31, 2008, compared to approximately $80.2 million (or 93.7% of total revenues) in the year ended December 31, 2007.

Revenues-services.  Revenues from services rendered were approximately $0.8 million (or 7.4% of total revenues) in the year ended December 31, 2008, compared to approximately $5.4 million (or 6.3% of total revenues) in the year ended December 31, 2007.
 
 
53

 

Cost of revenues.  The cost of revenues was approximately $11 million (or 96.2% of total revenues) in the year ended December 31, 2008, compared to $56.5 million (or 66% of total revenues) in the year ended December 31, 2007.

Cost of revenues-products.  Total cost of revenues-products was approximately $8.1 million (or 71.2% of total revenues) in the year ended December 31, 2008, compared to $47.7 million (or 55.7% of total revenues) in the year ended December 31, 2007. The cost of revenue in 2008 included approximately $0.2 million of inventory write off compared with approximately $1.2 million of inventory write off in 2007.

Cost of revenues-services.  Cost of revenues-services was approximately $2.9 million (or 25% of total revenues) in the year ended December 31, 2008, compared to $8.8 million (or 10.2% of total revenues) in the year ended December 31, 2007.

Each of the above-noted decreases in revenues and cost of revenues for the compared periods was due the cessation of our wide-format printing business at the end of February 2008 upon the sale of our business to HP. With respect to the increase in the cost of revenues percentage compared with the year ended December 31, 2007, please see our discussion under “Gross Profit” below.

Gross Profit.  Gross Profit was approximately $0.4 million (or 3.8% of total revenues) in the year ended December 31, 2008, compared to $29.1 million (or 34% of total revenues) in the year ended December 31, 2007.

The reduction in the gross margin is mainly attributable to the fact that only two months of activity are reflected in the report for 2008.  Based on our experience in the years prior to the consummation of the HP Transaction, a large portion of our revenue was generated during the third month of each quarter, while the expenses were more evenly spread throughout the quarter.  Accordingly, as we only operated our business during the first two months of 2008, a higher percentage of expenses and a lower gross margin compared with a full quarter (or year) of activity are reflected.  Employee compensation costs related to the HP Transaction also reduced the gross margin.

Expenses. Net research and development costs were approximately $1.9 million in the year ended December 31, 2008, compared to $7.0 million ($7.4 million less $0.4 million of grants received) in the year ended December 31, 2007.  The decrease in research and development costs was mainly attributable to the cessation of our wide format printing business at the end of February 2008 upon the sale of our business to HP.

Selling and marketing expenses were approximately $3.1 million in the year ended December 31, 2008, compared to approximately $13.8 million in the year ended December 31, 2007. The decrease in sales and marketing expenses was mainly attributable to the cessation of our wide format printing business at the end of February 2008 upon the sale of our business to HP.

General and administrative expenses were approximately $9.8 million for the year ended December 31, 2008, compared to approximately $11.1 million for the year ended December 31, 2007. The decrease in general and administrative expenses of approximately $1.3 million was mainly attributable to the sale of our business to HP at the end of February 2008, offset by compensation expenses attributable to such sale, including the acceleration of the remaining unrecognized compensation costs of outstanding options in the approximate amount of $2.2 million and an approximate amount of $1.6 million paid in excess of the fair value of the options repurchased.
 
 
54

 
 
Doubtful accounts expenses were $0.4 million for the year ended December 31, 2008, compared to $0.9 million for the year ended December 31, 2007.  The decrease in doubtful accounts expenses was mainly attributable to the cessation of our wide format printing business at the end of February 2008 upon the sale of our business to HP.

Amortization of other intangible assets was $0 for the year ended December 31, 2008, compared to $0.04 million for the year ended December 31, 2007. The decrease in amortization expenses is due the fact that the intangible assets were fully depreciated as of December 31, 2007.

Financial income was $7.6 million in the year ended December 31, 2008, compared to $1.7 million financial expenses in the year ended December 31, 2007.  The change in financial income (expenses) was primarily due to the amortization of the deferred interest following the full repayment of our loans in accordance with the provisions of ASC 470 "Debt". In addition, interest payments in the amounts of $0.5 million and $1.5 million for 2008 and 2007, respectively, were recorded as a reduction of the carrying amount of the debt (accrued interest) instead of interest expenses in the statement of operations in accordance with the provisions of ASC 470 "Debt".
 
Taxes. Taxes on income were $1.0 million in the year ended December 31, 2008, as compared to taxes on income of $0.8 million in the year ended December 31, 2007. The increase was not significant.

Impact of Inflation, Devaluation and Fluctuation of Currencies

Prior to the consummation of the HP Transaction, most of our sales were in U.S. dollars and in Euro.  In addition, a substantial portion of costs were incurred outside of Israel in U.S. dollars or were paid in U.S. dollars, Euro or in New Israeli Shekels (“NIS”) linked to the exchange rate of the U.S. dollar.  Costs not effectively denominated in U.S. dollars are translated to U.S. dollars when recorded, at prevailing exchange rates for the purposes of our consolidated financial statements, and were increased if the rate of inflation in Israel exceeds the devaluation of the Israeli currency against the U.S. dollar, if the timing of such devaluations were to lag considerably behind inflation or if there is a devaluation of the U.S. dollar against the Israeli currency not fully offset by price deflation.  Consequently, we were affected by changes in the prevailing NIS/U.S. dollar exchange rate.

In addition, our sales of products and services in Europe, as well as purchases of components, were dominated by the Euro.  The existence of a balance of Euro based assets which were mostly derived from sale of products and service over Euro based liabilities which are mostly related to purchase of components, exposed us to financial losses deriving from a potential devaluation of the U.S. dollar against the Euro.  In order to reduce such exposure to the Euro, we offset balances of Euro based assets by taking loans in Euro.

The consideration received from HP upon consummation of the HP Transaction was denominated in U.S. dollars and has since been deposited in U.S. dollar denominated accounts. We currently conduct our business in Israel and a significant portion of our expenses is in NIS.  We therefore are affected by changes in the prevailing NIS/U.S. dollar exchange rate.  We cannot predict the rate of revaluation/devaluation of the New Israeli Shekel against the U.S. dollar in the future, and whether these changes will have a material adverse effect on our finances and operations.
 
 
55

 
 
Following the signature of the EPC Contract with an Italian contractor, for the design, supply, construction, assembly and commissioning of a two photovoltaic plants in Italy, and in anticipation of related agreements which may need to be signed with other Europe-based third parties, we expect to be affected by the U.S. dollar exchange rate to the Euro.  Our investment in the photovoltaic market in Italy will be denominated in Euro, and due to the fluctuations in the exchange rates in recent years, we cannot at this time anticipate what impact the prevailing exchange rate will have on our future investments.

The tables below set forth the annual and semi annual rates of devaluation (or revaluation) of the NIS against the U.S. dollar and of the U.S. dollar against the Euro.

   
Year ended December 31,
 
   
2009
   
2008
   
2007
 
                   
Revaluation of the NIS against the U.S. dollar
    0.7 %     1.1 %     9.0 %
                         
Revaluation (Devaluation) of the Euro against the U.S. dollar
    3.5 %     (5.3 ) %     11.7 %

The annual rate of inflation in Israel was 3.4% in the year ended December 31, 2007, increased to 3.8% in the year ended December 31, 2008 and to 3.9% in the year ended December 31, 2009.

The representative dollar exchange rate was NIS 3.775 for one U.S. dollar on December 31, 2009, NIS 3.802 for one U.S. dollar on December 31, 2008 and NIS 3.846 for one U.S. dollar on December 31, 2007.

The average exchange rates for converting the New Israeli Shekel to U.S. dollars during the years ended December 31, 2007, 2008 and 2009 were 4.1081, 3.5878 and 3.9326 NIS for one U.S. dollar, respectively. The exchange rate as of February 15, 2010 was NIS 3.752 for one U.S. dollar.

Following the HP Transaction, we believe that the currency of the primary economic environment in which the Company operates is the U.S. dollar ("dollar"). Thus, the dollar is the reporting and functional currency of the Company and its remaining subsidiaries. Therefore, transactions and balances that are denominated in dollars are presented at their original amounts. Non-dollar transactions and balances have been remeasured to dollars in accordance with ASC 830 "Foreign Currency Matters". All foreign currency transaction gains and losses are reflected in the statements of operations as financial income or expenses, as appropriate. Prior to the HP Transaction, for certain subsidiaries the functional currency was determined to be thei r local currency. For those subsidiaries, assets and liabilities were translated at year-end exchange rates and statement of operations items were translated at average exchange rates prevailing during the year. Such translation adjustments were recorded as a separate component of accumulated other comprehensive loss in shareholders' equity (deficiency).
 
 
56

 
 
B.           Liquidity and Capital Resources

We have incurred operating losses prior to the HP transaction. Following the consummation of the HP Transaction and the payment of some related liabilities (including repayment of our short and long-term debt), as of February 15, 2010 we hold approximately $74.9 million in cash and cash equivalents.  Following the transaction for the construction and operation of a two photovoltaic plants in Italy as detailed in item 4, we may consider making additional investments in this Italian market. The Company is also continuing to identify and evaluate other suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise . Although we now hold the consideration received from HP in connection with the sale of our business, we may need additional funds if we seek to acquire certain new businesses and operations.  If we are unable to raise funds through public or private financing of debt or equity, we will be unable to fund certain business combinations that could ultimately improve our financial results.  We cannot ensure that additional financing will be available on commercially reasonable terms or at all. We currently have no commitments for additional financing, however we intend to finance the majority of the EPC Project by bank loans.

Our management believes that the existing cash balance is sufficient for our present requirements.

Prior to the consummation of the HP Transaction, we funded our operations primarily through the private sale of our equity securities and commercial bank loans.

We currently invest our excess cash in cash and cash equivalents that are highly liquid.

At December 31, 2009 we had approximately $75.3 million of cash and cash equivalents compared with $76 million cash, cash equivalents and short term deposits at December 31, 2008 and $4.3 million at December 31, 2007.

As of December 31, 2009, we did not have material commitments for capital expenditures.

Operating activities

In the year ended December 31, 2009, we had a net loss of $1 million. Net cash used in operating activities was approximately $1.2 million.

In the year ended December 31, 2008, we had a net income of $87 million.  Net cash used in operating activities was approximately $9.2 million.  Most of our assets were sold to HP and the cash generated from the sale was reflected in our net cash provided from investment activities.

In the year ended December 31, 2007, we had a net loss of $6.4 million. Net cash used in operating activities was approximately $4.1 million. The main changes in our working capital were: (i) an increase of approximately $4.7 million in trade accounts receivable due mainly to increased level of sales towards the end of the year and reduced focus on collections as our finance personnel world-wide were engaged in the transaction with HP; (ii) an increase of approximately $1.8 million in other accounts receivable, mainly VAT receivable due to the increased level of materials purchasing; (iii) an increase of approximately $4.5 million in inventories due to the increased production levels; and (iv) an increase of approximately $9.8 millio n in trade payables due mainly to increased production levels and delays in payments beyond the agreed-upon payment terms.
 
 
57

 

Following the consummation of the HP Transaction and until the recent execution of the transaction for the construction and operation of two photovoltaic plants in Italy as detailed in Item 4, we had ceased conducting any operating activity.  Currently substantially all of our assets consist of cash and cash equivalents.  In addition to our recent entry into the Italian photovoltaic market, we conduct activities which attempt to locate business opportunities and strategic alternatives and activities relating to the investment of our funds. We cannot at this point predict whether following the consummation of other business transactions, in addition to the Italian photovoltaic transaction just consummated, we will have sufficient working capital in order to fund our operations.

Investing activities

Net cash provided by investing activities was approximately $49.5 million in the year ended December 31, 2009, primarily due to proceeds from short term deposits that were invested in cash equivalents.

Net cash provided by investing activities was approximately $54.6 million in the year ended December 31, 2008, primarily due to proceeds from the HP Transaction.

Net cash used in investing activities was approximately $1.2 million in the year ended December 31, 2007, primarily due to investments in our IT infrastructure and in equipment for our ink plant to support the increased quantities manufactured.

Financing activities

Net cash provided by financing activities in the year ended December 31, 2009 was $0.

Net cash used in financing activities in the year ended December 31, 2008 was approximately $22.2 million, deriving primarily from the repayment of short-and long-term loans and the repurchase of employee stock options.

Net cash provided by financing activities in the year ended December 31, 2007 was approximately $4.6 million, deriving primarily from the issuance of shares and warrants in the aggregate net amount of $6.1 million offset by the payment of long-term debt, including interest on restructured debt, in the amount of $1.6 million.

In the beginning of 2007 we raised $6.3 million through the private placement of 11,734,950 of our ordinary shares to various investors at a price of $0.54 per share. The investors also received warrants to purchase additional 3,520,485 ordinary shares at an exercise price of $0.65 per share, exercisable for a period of five years following the closing of the private placement. The private placement included two stages, an initial closing resulting in gross proceeds in the amount of $3.8 million in January 2007 and a follow-on investment resulting in gross proceeds of $2.5 million in February 2007. In connection with the private placement, we paid our adviser, Meitav Underwriting Ltd., a cash fee of $0.25 million.
 
 
58

 

Prior to the consummation of the HP Transaction, we maintained long and short-term credit facilities, excluding accrued interest on restructured debt and a note from a related party, in an aggregate amount of approximately $22.0 million as of December 31, 2007.  During 2007, we did not make any principal payments on our long-term loans. As previously noted, interest payments in the amounts of $0.5 million and $1.5 million for 2008 and 2007, respectively, were recorded as a reduction of the carrying amount of the accrued interest in accordance with the provisions of ASC 470 "Debt".

Upon consummation of the HP Transaction, we repaid our short-term debt to banks in the amount of $9.8 million and, in early April 2008, we fully repaid our long-term debt to banks in the amount of $12.1 million. We were released from all outstanding guarantees during the period following the consummation of the HP Transaction. Following the repayment of the loans and the release from the guarantees, the Banks terminated the floating liens and the securities given by our subsidiaries were terminated.  In addition, in May 2008 the subordinated notes that were assigned by the Banks to the Fortissimo Entities (as defined in “Item 7.A: Major Shareholders”) were cancelled effective March 30, 2008.  As a resu lt of the repayment of our long-term and short-term loans, as of December 31, 2008, we had no outstanding debt to any bank or other lending financial institution.

As of December 31, 2009, our total current assets amounted to approximately $76.2 million, out of which $75.3 million was in cash and cash equivalents, compared with total current liabilities of approximately $1 million.

As of December 31, 2008, our total current assets amounted to approximately $78 million, out of which $76 million was in cash, cash equivalents and short-term deposits, compared with total current liabilities of approximately $2 million.

The decrease in our cash balance is mainly attributable to our current general and administrative expenses.

As of December 31, 2007, our total current assets amounted to approximately $44.6 million, out of which $4.3 million was in cash and cash equivalents, compared with total current liabilities of approximately $49.6 million. The main reason for the difference between the current liabilities and the current assets is the classification of the note to related parties in the short-term liabilities. The note was valid through November 2008 and it was due to expire without payment unless we entered into liquidation procedures prior to the termination of the note. As stated above, the note was cancelled in May 2008, effective as of March 30, 2008.

Outstanding Warrants

As of February 15, 2010, there are outstanding warrants to purchase a total of 40,234,771 ordinary shares of the Company, all of which are currently exercisable.  Of such warrants (i) 3,000,000 (all of which are currently held, in equal parts, by Kanir and Mr. Nehama) were originally issued to Dan Purjes in connection with a voting trust agreement and voting agreement and are exercisable at $0.75 per share no later than April 2010; (ii) 25,714,286 (of which 11,462,157 are currently held by Kanir and 10,067,172 are currently held by Nechama Investments) were originally issued to investors participating in our private placement in August 2005 and are exercisable at $0.40 per share no later than October 2010, (iii) 8,000,000 ( of which 846,905 are currently held by Bonstar Investments Ltd., a limited partner in Kanir, and 4,236,766 are currently held by Mr. Nehama) were originally issued to Bank Hapoalim, Bank Leumi and Discount Bank in September 2005 in connection with a debt restructuring agreement and are exercisable at $0.35 per share no later than December 2010, and (iv) 3,520,485 were granted to the investors participating in our private placement in January and February 2007 discussed above (under the caption “Financing Activities) and are exercisable at $0.65 per share no later than January or February 2012.
 
 
59

 

C.           Research and Development, Patents and Licenses

Our research and development center, which prior to the consummation of the HP Transaction engaged 54 employees, was focused on developing new products, enhancing the quality and performance relative to price of our existing products, reducing manufacturing costs, upgrading and expanding our product line through the development of additional features and improving functionality in response to market demand.

All of our research and development activities were conducted at our headquarters facility in Lod, Israel.

Net research and development expenses were approximately $7.0 million, $1.9 million and $0 in the years ended December 31, 2007, 2008 and 2009, respectively.  We did not receive royalty-bearing grants in 2007, and 2008.  We received non royalty bearing grants in the amount of $0.5 million in 2007. We did not receive non royalty bearing grants in 2008.

Following the consummation of the HP Transaction, we ceased to engage in any research and development activities.

D.           Trend Information

Following the consummation of the sale of our business to HP, we are no longer active in the wide-format printing industry and are subject to certain restrictions with respect to future operations in this field.  On March 4, 2010 we entered into a transaction for the construction and operation of two photovoltaic plants in Italy as detailed in Item 4, and we may consider a further investment in this market in the future. Our current plan of operation is to identify and evaluate additional suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or othe rwise.  We may also consider making additional investments is the photovoltaic market. While we are actively exploring strategic transactions and opportunities, we have not targeted any particular industry or specific business within an industry in which to pursue such opportunities, apart from the Italian photovoltaic market into which we have just entered.  There is no assurance that any of these alternatives will be pursued or, if one is pursued, the timing thereof, the terms on which it would occur, the type of industry that will be involved and the success of such activity.  Therefore, our financial data reported in this report is not necessarily indicative of our future operating results or financial position.

Our business and revenue growth from the transaction in the Italian photovoltaic market depends, among other factors, on seasonality. Revenue tends to be lower in the winter, primarily because of adverse weather conditions. The growth of our solar business in Italy is affected significantly by government subsidies and economic incentives. See “Item 3. Key Information - D. Risk Factors - Risks Relating to the EPC Project and our entry into the Italian photovoltaic market”. Our ability to leverage the investment in this market, may affect the profitability of the transaction.
 
 
60

 

E.           Off-Balance Sheet Arrangements

We are not a party to any material off-balance sheet arrangements.  In addition we have no unconsolidated special purpose financing or partnership entities that are likely to create material contingent obligations.

F.           Contractual obligations

As of the HP Transaction Closing Date, most of the operating and capital lease commitments were assumed by HP (see Note 7a to our consolidated financial statements included in this report on Form 20-F).  We have retained a lease of premises of our US subsidiary, NUR America, which is fully sub-leased to a third party.

The following table of our material contractual obligations as of December 31, 2009, summarizes the aggregate effect that these obligations are expected to have on our cash flows in the periods indicated:

   
Payments due by period
(in thousands of U.S. dollars)
 
Contractual Obligations*
 
Total
   
Less than 1 year
   
1 – 3 years
   
3 – 5 years
   
more than
5 years
 
Long-term rent obligations (1)
  $ 713     $ 363     $ 139     $ 129     $ 82  
Uncertain tax positions (3)
    4,644       -       -       -       4,644  
Other long-term liabilities including Accrued Severance Pay  (2) (4)
    710       -       -       -       710  
 
Total
    6,067       363       139       129       5,436  
______________________
*
For contractual obligations related to our investment in the Italian photovoltaic market, please refer to Item 4.
(1)
Includes lease agreement of our subsidiary NUR America, which was not assumed by HP in connection with the HP transaction. The premises are being sub leased. Prepaid rent until April 15, 2011 of our Tel Aviv Office is not included.
(2)
Accrued severance pay relates to obligations to our Israeli employees as required under Israeli labor law. These obligations, among others, are payable, upon termination, retirement or death of the respective employee.
(3)
Uncertain income tax positions under ASC 740 “Income Taxes” (formally FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes") are due upon settlement and we are unable to reasonably estimate the ultimate amount or timing of settlement. See Note 10b of the accompanying Notes to our Consolidated Financial Statements as of December 31, 2009 included in this annual report on Form 20-F for the year ended December 31, 2009, for further information regarding the Company’s liability under FIN 48.
(4)
These consist mainly of (i) additional compensation to former employees in connection with the HP Transaction in the amount of $450 thousands and (ii) our undertaking to HP in connection with the amounts required to fully fund the severance pay to our former employees who have transferred to HP in the amount of $237 thousands (we will only be required to pay these severance pay related funds if and when the employment of such employees with HP entities is terminated by the HP entities).
 
 
61

 
 

A.           Directors and Senior Management

The following table sets forth certain information with respect to our directors and senior management, as of March 4, 2010:

Name
Age
Position with Ellomay
     
Shlomo Nehama(1)(2)
54
Chairman of the Board of Directors
Ran Fridrich(1)(2)
57
Director and Chief Executive Officer
Hemi Raphael(2)
58
Director
Anita Leviant(2)
55
Director
Oded Akselrod(3)
63
Director
Alon Lumbroso(3)(4)
53
Director
Barry Ben-Zeev(1)(3)(4)
57
Director
Kalia Weintraub
31
Chief Financial Officer
Eran Goren
50
Head of Investments
Eran Zupnik
41
EVP of Business Development
______________________
(1)
Member of Ellomay’s Stock Option and Compensation Committee.
(2)
Elected pursuant to the Shareholders Agreement, dated as of March 24, 2008, between S. Nechama Investments (2008) Ltd. and Kanir Joint Investments (2005) Limited Partnership (See “Item 7.A. Major Shareholders”).
(3)
Member of Ellomay’s Audit Committee.
(4)
External Director.
 
The address of each of our executive officers and directors is c/o Ellomay Capital Ltd., 9 Rothschild Boulevard, 2nd floor, Tel Aviv 66881, Israel.
 
Shlomo Nehama has served as a director and Chairman of the Board of Ellomay since March 2008. From 1998 to 2007, Mr. Nehama served as the Chairman of the Board of Bank Hapoalim B.M., one of Israel’s largest banks. In 1997, together with the late Ted Arison, he organized a group of American and Israeli investors who purchased Bank Hapoalim from the State of Israel. From 1992 to 2006, Mr. Nehama served as the Chief Executive Officer of Arison Investments. From 1982 to 1992, Mr. Nehama was a partner and joint managing director of Eshed Engineers, a management consulting firm. He also serves as a director in several philanthropic academic institu tions, on a voluntary basis. Mr. Nehama is a graduate of the Technion - Institute of Technology in Haifa, Israel, where he earned a degree in Industrial Management and Engineering. Mr. Nehama received an honorary doctorate from the Technion for his contribution to the strengthening of the Israeli economy.

Ran Fridrich has served as a director of Ellomay since March 2008, as our interim chief executive officer since January 2009, and as our chief executive officer since December 2009. Mr. Fridrich is the co-founder and executive director of Oristan, Investment Manager, an investment manager of CDO Equity and Mezzanine Funds and a Distress Fund, established in June 2004. In addition, Mr. Fridrich is a consultant to Capstone Investments, CDO Repackage Program, since January 2005. In January 2001 Mr. Fridrich founded the Proprietary Investment Advisory in Israel, an entity focused on fixed income securities, CDO investments and credit default swap trans actions, and served as its investment advisor through January 2004. Prior to that, Mr. Fridrich served as the chief executive officer of two packaging and printing Israeli companies, Lito Ziv, a public company, from 1999 until 2001 and Mirkam Packaging Ltd. from 1983 until 1999. Mr. Fridrich also serves as a director of Cargal Ltd. since September 2002. Mr. Fridrich is a graduate of the Senior Executive Program of Tel Aviv University.
 
 
62

 

Hemi Raphael has served as a director of Ellomay since June 2006. Mr. Raphael is an entrepreneur and a businessman involved in various real estate and financial investments. Mr. Raphael also serves as a director of Cargal Ltd. since May 2004. Prior thereto, from 1984 to 1994, Mr. Raphael was a partner at the law firm of Goldberg Raphael & Co. Mr. Raphael holds an LLB degree from the School of Law at the Hebrew University of Jerusalem and he is a member of the Israeli Bar Association and the California Bar Association.

Anita Leviant has served as a director of Ellomay since March 2008. Ms. Leviant heads LA Global Consulting, a practice specializing in consulting and leading global and financial projects and cross border transactions. For a period of twenty years, until 2005, Ms. Leviant held several senior positions with Hapoalim Banking group including EVP Deputy Head of Hapoalim Europe and Global Private Banking and EVP General Global Counsel of the group, and served as a director in the overseas subsidiaries of Bank Hapoalim. Prior to that, Ms. Leviant was an associate in GAFNI & CO. Law Offices in Tel Aviv where she specialized in Liquidation, Receivershi p and Commercial Law and was also a Research Assistant to the Law School Dean in the Tel Aviv University specialized in Private International Law. Ms. Leviant holds a LL.B degree from Tel Aviv University Law School and is a member of both the Israeli and the New York State Bars. Ms. Leviant currently serves as Deputy Chairman of the Israel-British Chamber of Commerce, Chairman of the Capital Markets Committee and is a Co-Founder and Head of the Advisory Board of the Center for Arbitration and Dispute Resolutions Ltd.

Oded Akselrod has served as a director of Ellomay since February 2002.  Mr. Akselrod serves a business advisor to corporations and investment funds in Israel.  Mr. Akselrod was the general manager of the Investment Corp. of United Mizrahi Bank Ltd., a wholly owned subsidiary of United Mizrahi Bank Ltd. that was merged into United Mizrahi Bank Ltd. on October 2004. Prior to joining the Investment Corp. of United Mizrahi Bank, from 1 994 to 1997, Mr. Akselrod held the position of general manager of Apex-Leumi Partners Ltd. as well as Investment Advisor of Israel Growth Fund. Prior thereto, from 1991 to 1994, Mr. Akselrod served as general manager of Leumi & Co. Investment Bankers Ltd. Mr. Akselrod began his career in various managerial positions in the Bank Leumi Group including: member of the management team of Bank Leumi, deputy head of the international division, head of the commercial lending department of the banking division, member of all credit committees at the Bank, assistant to Bank Leumi's CEO and head of the international lending division of Bank Leumi Trust Company of New York. Mr. Akselrod holds a Bachelor's degree in Agriculture Economics from Hebrew University, Jerusalem and an MBA degree from Tel Aviv University.   Mr. Akselrod is also a director of Gadish Global Ltd., Gadish Investments in Provident Funds Ltd., Gadish Global Financial Services (2007) Ltd., Geva Dor Investments Ltd., Shalag Industries Ltd., Psagot Investment House Ltd. and Psagot Securities Ltd.

Alon Lumbroso has served as an external director of Ellomay since November 2006. Mr. Lumbroso serves as the Chief Executive Officer of Larotec Ltd. since the end of 2005. Mr. Lumbroso previously served as Chief Executive Officer of Mindguard Ltd., from 2003 to 2004. From 2000 to 2003, Mr. Lumbroso served as the managing director of the European subsidiary of Creo, Inc. Prior to that, Mr. Lumbroso served in a various executive positions, including VP Operations, VP Marketing and managing director of the Asian Pacific subsidiary of Scitex Corporation. In his positions with Scitex Corporation and Creo, Mr. Lumbroso was responsible for sales, marketing and service of prepress and digital printing equipment, including wide format digital printers. Mr. Lumbroso serves as the Chairman of Bioexplorers Ltd. and as a director of Larotec Ltd. Mr. Lumbroso holds an MBA from Bar Ilan University and a B.Sc. in Industrial Engineering from Tel-Aviv University. Mr. Lumbroso qualifies as an external director according to the Companies Law.
 
 
63

 
 
Barry Ben-Zeev has served as an external director of Ellomay since December 30, 3009. Mr. Ben-Zeev is a business strategic consultant. From 1978 to 2008 Mr. Ben-Zeev served in various positions with Bank Hapoalim, one of the largest Israeli banks. During 2008 he served as the bank’s Deputy CEO and as its CFO, in charge of the financial division. From 2001 to 2007 he served as the bank’s Deputy CEO in charge first of the private international banking division and then of the client asset management division. Mr. Ben-Zeev has served on the board of many companies, including as a director on the board of the Israeli Stock Exchange in 2006- 2007. He currently serves as a director of Partner Communications Ltd. and Kali Equity Markets. Mr. Ben-Zeev holds an MBA from Tel-Aviv University specializing in financing, and a BA in Economics from Tel-Aviv University. Mr. Ben-Zeev qualifies as an external director according to the Companies Law.

Kalia Weintraub has served as our chief financial officer since January 2009.  Prior to her appointment as our chief financial officer, Ms. Weintraub served as our corporate controller from January 2007 and was responsible, among her other duties, for the preparation of all financial reports.  Prior to joining Ellomay, she worked as a certified public accountant in the AABS High-Tech practice division of the Israeli accounting firm of Kost Forer Gabbay & Kasierer, an affiliate of the international public accounting firm Ernst & Young, from 2005 through 2007 and in the audit division of the Israeli accounting firm of Brightman Almagor Zohar, an affiliate of the international public accounting firm Deloitte, from 2003 to 2004.  Ms. Weintraub holds a B.A. in Economics and Accounting and an M.B.A. from the Tel Aviv University and is licensed as a CPA in Israel.

Eran Zupnik has served as our EVP of Business Development since November 2008.  Prior to joining Ellomay, Eran was a mergers and acquisitions lawyer in New York with Skadden Arps Slate Meagher & Flom LLP, one of the world’s leading law firms.  At Skadden, Eran led and advised US and International clients in more than 150 cross-border merger and acquisition transactions as well as securities offerings.  Prior to Skadden, Eran was a consultant with the business advisory services group of PricewaterhouseCoopers LLP in Boston.  Eran received his LLB and BA in Business Administration from the College of Management in Israel.  He was admitted to both the New York and Israeli bar and is also a certified public accountant.

Eran Goren has served as Head of Investments since April 2008. He oversees new investments and the strategic development of Ellomay. Prior to this role, Mr. Goren was Managing Partner and Co-Founder of Capstone Finance, a structured finance origination and management boutique. Previous to founding Capstone, he served as the Head of Global Capital Markets in Leumi & Co. Investment House where he was responsible for the establishment and development of the strategic alliance with Jefferies Broadview, the US Technology Growth Investment Bank. Prior to that, Mr. Goren was the founder and CEO of the Nessuah Zannex group, a leading Israeli Brokerage & Investment Banking group.
 
 
64

 

Lauri A. Hanover served as an external director from November2003 until her term of office ended on November 26, 2009. At the annual general meeting of shareholders held on December 30, 2009, Barry Ben-Zeev was elected as an external director in her place.

Mr. Yosef Zylberberg, our former Interim Chief Executive Officer and Chief Financial Officer, ceased serving in such positions on December 31, 2008.

There are no family relationships among any of the directors or members of senior management named above.

 B.           Compensation

Salaries, fees, commissions and bonuses paid with respect to all of our directors and senior management as a group in the fiscal year ended December 31, 2009 was approximately $0.7 million, and an amount of approximately $0.4 million was related to pension, retirement and other similar benefits. These figures do not include the compensation of Messrs. Shlomo Nehama, Ran Fridrich and Hemi Raphael, all of whom are members of our Board are currently compensated pursuant to the Management Services Agreement (see “Item 10.C: Material Contracts”) and have, in connection with such Agreement, waived their right to receive the compensation, including options, paid to our directors. In addition, Mr. Fridrich, who first served as ou r Interim Chief Executive Officer and is now our Chief Executive Officer, agreed to serve without compensation or other benefits.

Other than options granted to members of our Board of Directors, and the grant of options to one of our senior employees we did not grant any options to purchase ordinary shares in 2009. See “Item 6.E. Share Ownership”.

In connection with the HP Transaction in 2008, our Board approved the acceleration of the vesting of all outstanding employee stock options, including all stock options held by members of senior management and the repurchase, of the then-currently outstanding employee stock options to purchase approximately 9.9 million ordinary shares of the Company. The aggregate consideration for such employee stock options is expected to be up to $3.8 million. Of the total, approximately $3.1 million were paid during July 2008 and an additional payment, up to the aggregate amount, will be calculated after all HP Transaction related issues and other financial aspects of the Company are known and verified and will be paid following the release to th e Company of the funds deposited in the indemnity escrow account in connection with the HP Transaction.  This repurchase resolution did not apply to options held by our non-employee directors.  Following the payment of $3.1 million, all repurchased stock options were cancelled and the number of shares reserved for issuance under our 2000 stock option plan was reduced accordingly.  Any outstanding employee stock option that was not repurchased, was terminated pursuant to its terms following the termination of employment of the vast majority of our employees in connection with the consummation of the HP Transaction.

In connection with the HP Transaction, our Board also approved the payment of transaction bonuses to certain employees, including members of senior management, in the aggregate amount of approximately $0.7 million and established that, subject to the aforementioned determination and verification of all HP Transaction related issues and other financial aspects of the Company, additional bonuses may be paid to certain employees, based on criteria, amounts and percentages pre-determined by our Board.
 
 
65

 

In December 2008, following the approval of our Audit Committee, Board of Directors and shareholders, we entered into a management services agreement with Kanir and with Meisaf Blue & White Holdings Ltd. (“Meisaf”), a private company controlled by Shlomo Nehama, effective as of March 31, 2008, the date of appointment of Messrs. Fridrich and Nehama as members of our Board.  In consideration for the performance of the management services and the board services under the terms of the management services agreement, we agreed to pay Kanir and Meisaf, in equal parts and quarterly payments, an aggregate annual services fee in the amount of $250,000 plus value added tax pursuant to applicable law.  Messrs. Nehama, Fridrich and Raphael waived any right to additional remuneration for their service as members of our board of directors. For more information see “Item 10.C: Material Contracts.”

As approved by our shareholders, we pay our non-executive directors (Anita Leviant, Oded Akselrod, Alon Lumbroso, and Barry Ben-Zeev who replaced Lauri Hanover in December 2009) remuneration for their services as directors.  The remuneration paid in 2008 and 2009 includes an annual payment of $8,000 and additional payments of $500 per meeting and $250 per committee meeting.  At our annual general meeting of shareholders held on December 30, 2009, our shareholders approved that from thereon our current and future directors would be paid an annual fee of NIS 47,750 (equivalent to approximately $12,730) and an attendance fee of NIS 1,690 (equivalent to approximately $450) per meeting (board or committee). According t o the Israeli Companies Regulations (Rules for Compensation and Expenses of External Directors), 5760-2000, which we apply to all our non-executive directors, the directors are entitled to 60% of the meeting fee if the meeting was held by teleconference and not in person, and 50% of the meeting fee if resolutions were approved in writing, without convening.

Each of these non-executive directors (Anita Leviant, Oded Akselrod, Alon Lumbroso and Barry Ben-Zeev who replaced Lauri A. Hanover in December 2009) also receives an annual grant of options to purchase 10,000 ordinary shares under the terms and conditions set forth in Ellomay’s 1998 Non-Employee Director Share Option Plan as more fully described below.

In 1998, we adopted the 1998 Non-Employee Director Share Option Plan (the “1998 Plan”) to provide for grants of options to purchase ordinary shares to non-employee directors of Ellomay. The 1998 Plan, as amended, is administered, subject to Board approval, by the Non-Employee Director Share Option Committee. An aggregate amount of not more than 750,000 ordinary shares is reserved for grants under the 1998 Plan. The original expiration date of the 1998 Plan pursuant to its terms was December 8, 2008 (10 years after adoption).  At the General Meeting of our shareholders, held on January 31, 2008, the term of the 1998 Plan was extended and as a result it will expire on December 8, 2018, unless earlier terminated by the Board.

Under the 1998 Plan, each non-employee director that served on the 1998 “Grant Date,” as defined below, automatically received an option to purchase 10,000 ordinary shares on such Grant Date and will receive an option to purchase an additional 10,000 ordinary shares on each subsequent Grant Date thereafter, provided that he or she is a non-employee director on the Grant Date and has remained a non-employee director for the entire period since the previous Grant Date.  The “Grant Date” means, with respect to 1998, October 26, 1998, and with respect to each subsequent year, August 1 of such year.  Directors first elected or appointed after the 1998 Grant Date, will automatically receive on su ch director’s first day as a director an option to purchase up to 10,000 ordinary shares prorated based on the number of full months of service between the prior Grant Date and the next Grant Date.  Each such non-employee director would also automatically receive, as of each subsequent Grant Date, an option to purchase 10,000 ordinary shares provided that he or she is a non-employee director on the Grant Date and has served as a non-employee director for the entire period since the previous Grant Date.
 
 
66

 

The exercise price of the option shares under the 1998 Plan is 100% of the fair market of such ordinary shares at the applicable Grant Date.  The fair market value means, as of any date, the average closing bid and sale prices of the ordinary shares for the date in question as furnished by the National Association of Securities Dealers, Inc. through Nasdaq or any similar organization if Nasdaq is no longer reporting such information, or such other market on which the ordinary shares are then traded, or if not then traded, as determined in good faith (using customary valuation methods) by resolution of the members of the Board of Directors of Ellomay, based on the best information available to it.  The exercise pri ce is required to be paid in cash.

The term of each option granted under the 1998 Plan is 10 years from the applicable date of grant.  All options granted vest immediately upon the date of grant.

The options granted would be subject to restrictions on transfer, sale or hypothecation.  All options and ordinary shares issuable upon the exercise of options granted to the non-employee directors of Ellomay could be withheld until the payment of taxes due with respect to the grant and exercise (if any) of such options.

C.           Board Practices

According to the provisions of our Second Amended and Restated Articles (the “Articles”) and the Companies Law, the board of directors convenes in accordance with the Company’s requirements, and is required to convene at least once every three months. Furthermore, the Companies Law provides that the board of directors may also pass resolutions without actually convening, provided that all the directors entitled to participate in the discussion and vote on a matter that is brought for resolution agree not to convene for discussion of the matter.

Officers serve at the discretion of the Board or until their successors are appointed.

Terms of Directors

Our Board currently consists of seven members, including two external directors. Unless otherwise prescribed by resolution adopted at a General Meeting of shareholders, the Board shall consist of not less than four (4) nor more than eight (8) directors (including the external directors). Except for our two external directors, the members of our Board are elected annually at our annual shareholders’ meeting and remain in office until the next annual shareholders’ meeting, unless the director has previously resigned, vacated his office, or was removed in accordance with the Articles.  The last annual meeting was held on December 30, 2009.  In addition, the Board may elect additional members to the Board, to serve until the next shareholders’ meeting, so long as the number of directors on the Board does not exceed the maximum number established according to the Articles.
 
 
67

 

The members of our Board do not receive any additional remuneration upon termination of their services as directors.

External Directors

We are subject to the provisions of the Companies Law, which requires that we, as a public company, have at least two external directors.

Under the Companies Law, a person may not be appointed as an external director if he or his relative, partner, employer or any entity under his control has or had during the two years preceding the date of appointment any affiliation with the company, any entity controlling the company or any entity controlled by the company or by this controlling entity.  The term affiliation includes: an employment relationship, a business or professional relationship maintained on a regular basis, control, and service as an office holder. No person can serve as an external director if the person’s position or other business creates, or may create, conflicts of interest with the person’s responsibilities as an external directo r, or if the person is an employee of the Israel Securities Authority or of an Israeli stock exchange.  Until the lapse of two years from termination of office, a company may not engage an external director to serve as an office holder and cannot employ or receive services from that person, either directly or indirectly, including through a corporation controlled by that person. Regulations promulgated under Israeli law set the minimum and maximum compensation that may be paid to statutory external directors.

Under the Companies Law, external directors must be elected by a majority vote at a shareholders’ meeting, provided that either: (i) the majority of shares voted at the meeting, including at least one-third of the shares of non-controlling shareholders voted at the meeting, vote in favor of the election; or (ii) the total number of shares voted against the election of the external director does not exceed one percent of the aggregate voting rights in the company.  The initial term of an external director is three years, which term may be extended for an additional three-year period.  Each committee of a company’s board of directors must include at least one external director, and all external directors must serve on the audit committee.  Our external directors are currently Alon Lumbroso and Barry Ben-Zeev.

Under the Companies Law an external director cannot be dismissed from office unless: (i) the board of directors determines that the external director no longer meets the statutory requirements for holding the office, or that the external director is in breach of the external director’s fiduciary duties and the shareholders vote, by the same majority required for the appointment, to remove the external director after the external director has been given the opportunity to present his or her position; (ii) a court determines, upon a request of a director or a shareholder, that the external director no longer meets the statutory requirements of an external director or that the external director is in breach of his or her fiduciary duties to the company; or (iii) a court determines, upon a request of the company or a director, shareholder or creditor of the company, that the external director is unable to fulfill his or her duty or has been convicted of specified crimes.
 
 
68

 

The Companies Law requires that at least one of the external directors have “Accounting and Financial Expertise” and the other external directors have “Professional Competence.”  Under the regulations, a director having accounting and financial expertise is a person who, due to his or her education, experience and talents is highly skilled in respect of, and understands, business-accounting matters and financial reports in a manner that enables him or her to understand in depth the Company’s financial statements and to stimulate discussion regarding the manner in which the financial data is presented.  Under the regulations, a director having professional competence is a person who ha s an academic degree in either economics, business administration, accounting, law or public administration or an academic degree in an area relevant to the Company’s business, or has at least five years experience in a senior position in the business management of a corporation with a substantial scope of business, in a senior position in the public service or a senior position in the field of the Company’s main business.  Our board of directors determined that Barry Ben-Zeev is an accounting and financial expert and that Alon Lumbroso has professional competence.
 
Our Board further determined that at least two directors out of the whole Board shall be required to have accounting and financial expertise pursuant to the requirements of the Companies Law.  Accordingly, our Board determined that Shlomo Nehama shall be designated as the additional accounting and financial expert.

Alternate Directors

The Articles provide that, subject to the Board’s approval, a director may appoint an individual, by written notice to us, to serve as an alternate director.  The following persons may not be appointed nor serve as an alternate director: (i) a person not qualified to be appointed as a director, (ii) an actual director, or (iii) another alternate director.  Any alternate director shall have all of the rights and obligations of the director appointing him or her, except the power to appoint an alternate (unless the instrument appointing him or her expressly provides otherwise).  The alternate director may not act at any meeting at which the director appointing him or her is present.  Unless the appointing director limits the time period or scope of any such appointment, such appointment is effective for all purposes and for an indefinite time, but will expire upon the expiration of the appointing director’s term.  There are currently no alternate directors.

Duties of Office Holders and Approval of Certain Transactions Under the Israeli Companies Law

The Companies Law codifies the duty of care and fiduciary duties that an office holder has to our company.  An “office holder” is defined under the Companies Law as a director, general manager, chief business manager, vice general manager, other manager directly subordinate to the general manager and any other person assuming the responsibilities of any of the foregoing positions without regard to such person’s title.  The duty of care requires an office holder to act at a level of care that a reasonable office holder in the same position would employ under the same circumstances.  This includes the duty to utilize reasonable means to obtain (i) information regarding the appropriateness of a given action brought for his or her approval or performed by the office holder by virtue of his or her position and (ii) all other information of importance pertaining to the foregoing actions.  The duty of loyalty includes avoiding any conflict of interest between the office holder’s position in the company and his or her personal affairs or other positions, avoiding any competition with the company, avoiding exploiting any business opportunity of the company in order to receive personal gain for himself or herself or for others, and disclosing to the company any information or documents relating to the company’s affairs which the office holder has received due to his or her position as such.  Each person identified as a director or member of our senior management in the first table in the section, is an office holder.
 
 
69

 

The Companies Law requires that an office holder of a company promptly disclose to the company’s board of directors any personal interest that he or she may have, and all related material information known to him in connection with any existing or proposed transaction by the company. This disclosure must be made by the office holder, whether orally or in writing, no later than the first meeting of the company’s board of directors which discusses the particular transaction. An office holder is deemed to have a “personal interest” if he, certain members of his family, or a corporation in which he or any one of those family members is a 5% or greater shareholder or exercises or has the right to exercise control, has an interest in a transaction with the company. An “Extraordinary Transaction” is defined as a transaction - other than in the ordinary course of business, not on market terms, or that is likely to have a material impact on the company’s profitability, assets or liabilities.

In the case of a transaction that is not an Extraordinary Transaction, after the Office Holder complies with the above disclosure requirements, only board approval is required. The transaction must not be adverse to the company’s interests. In the case of an Extraordinary Transaction, the company’s audit committee and board of directors, and, under certain circumstances, the shareholders of the company, must approve the transaction, in addition to any approval stipulated by the articles. An office holder who has a personal interest in a matter that is considered at a meeting of the board of directors or the audit committee may not be present at this meeting or vote on this matter, unless a majority of the members of the b oard of directors or audit committee, respectively, have a personal interest in the matter, in which case they may all be present and vote. In the event a majority of the members of the board of directors have a personal interest in a matter, such matter must be also approved by the shareholders of the company.

Committees of the Board of Directors

Audit Committee

Under the Companies Law, the Audit Committee must be comprised of at least three members of the Board, including the external directors.  Audit Committee members may not be employees or regular service providers of the company, or controlling shareholders and their relatives.

Ellomay’s Audit Committee, acting pursuant to a written charter, currently consists of Alon Lumbroso, Barry Ben-Zeev and Oded Akselrod.  Approval by the Audit Committee and thereafter by the Board is required for (i) proposed extraordinary transactions to which Ellomay intends to be a party in which an office holder has a direct or indirect personal interest, (ii) actions or arrangements which may otherwise be deemed to constitute a breach of fiduciary duty or of the duty of care of an office holder to Ellomay, (iii) arrangements with directors as to their terms of office, compensation, compensation for other positions held with the company, including the provision of indemnification or an undertaking to indemnify and the procurement of insurance,  (iv) indemnification and insurance of office holders, other than directors, (v) an extraordinary transaction of the company in which a “controlling shareholder,” that is, a shareholder holding the ability to direct the actions of the company, other than by virtue of being a director or holding a position with the company, including a shareholder holding twenty five percent or more of the voting rights of the company if there is no other shareholder holding over fifty percent of the voting rights of the company, has a personal interest, (vi) an arrangement with a controlling shareholder or its relative (if such a relative is also an office holder) concerning the terms of his or her employment with the company, (vii) certain private placements of the company’s shares and (viii) compensation and scope of work of the independent auditor. Arrangements with directors as to the terms of their service or compensation also require shareholder approval. In ce rtain circumstances, some of the matters referred to above may also require shareholder approval.
 
 
70

 

The Audit Committee may not approve an action or transaction with a controlling shareholder or with an office holder unless at the time of approval two external directors are serving as members of the Audit Committee and at least one participated in the meeting at which the action or transaction was approved.

The Audit Committee provides assistance to the Board of Directors in fulfilling its legal and fiduciary obligations in matters involving our accounting, auditing, financial reporting, internal control and legal compliance functions by approving the services performed by our independent accountants and reviewing their reports regarding our accounting practices and systems of internal accounting controls. Under the Sarbanes-Oxley Act of 2002, the Audit Committee is also responsible for the appointment, compensation, retention and oversight of our independent accountants and takes those actions as it deems necessary to satisfy itself that the accountants are independent of management. Under the Companies Law, the appointment of independ ent auditors requires the approval of the shareholders of the Company, accordingly, the appointment of the independent auditors is approved and recommended to the shareholders by the Audit Committee and ratified by the shareholders. Furthermore, pursuant to the Articles, the shareholders have the authority to determine the compensation of the independent auditors (or empower the Board to establish their remuneration), the compensation is approved following a recommendation of the Audit Committee. Under the Companies Law, the Audit Committee also is required to monitor deficiencies in the administration of a company, including by consulting with the internal auditor or independent accountants and suggesting methods of correction of such deficiencies to the Board, and to review and approve related party transactions.

The Audit Committee has discussed with the independent registered public accounting firm the matters covered by Statement on Auditing Standards No. 61, as well as their independence, and was satisfied as to the independent registered public accounting firm’s compliance with said standards.

Stock Option and Compensation Committee

Under the Companies Law, the Board may appoint committees and delegate certain duties to such committees. At lease one of the members of such committees is required to be one of the external directors of the company.

The Companies Law provides that the Board is entitled to delegate to Board committees its power, among other things, to allocate shares or securities convertible into shares of Ellomay relating to employees incentive plans, and employment or salary agreements between Ellomay and its employees, provided, that any such grant is subject to a detailed plan approved by the Board. The Board is also entitled to delegate to the general manager or person recommended by the general manager the Board’s authority to issue ordinary shares issuable upon exercise or conversion of Ellomay’s securities.

In March 1998, Ellomay established a Stock Option and Compensation Committee to administer Ellomay’s stock option plans, other than the 1998 Non-Employee Director Share Option Plan. The Stock Option and Compensation Committee is charged with administering and overseeing the allocation and distribution of stock options under the approved stock option plans of Ellomay and approval of Ellomay’s executive officers’ annual compensation. All arrangements as to compensation of office holders who are not directors also require the approval of the Board. The Stock Option and Compensation Committee is presently composed of three members: Shlomo Nehama, Ran Fridrich and Barry Ben-Zeev.
 
 
71

 

Non-Employee Director Share Option Plan Committee

In February 1999, Ellomay established a committee to administer the Ellomay’s 1998 Non-Employee Director Share Option Plan (the “NEDSOP Committee”). The NEDSOP Committee is charged with administering and overseeing the allocation and distribution of stock options under the 1998 Non-Employee Director Share Option Plan. The Companies Law provides that the Board is not entitled to delegate to Board committees its power, among other things, to allocate shares or securities convertible into shares of Ellomay, except for allocation of shares or securities convertible into shares of Ellomay relating to employees incentive plans, and employment or salary agreements between Ellomay and its employees. Additionally, pursuant t o the Companies Law, the terms of service (including the grant of options) of all directors also require shareholder approval. Accordingly, the NEDSOP Committee recommendations are subject to the approval of the Board and the shareholders.

Indemnification and Exculpation of Executive Officers and Directors

Consistent with the provisions of the Companies Law, our Articles include provisions permitting us to procure insurance coverage for our directors and officers, exempt them from certain liabilities and indemnify them, to the maximum extent permitted by law.

Indemnification

The Companies Law provides that a company may indemnify an Office Holder against: (a) a financial liability imposed on him in favor of another person by any judgment concerning an act preformed in his capacity as an office holder; (b) reasonable litigation expenses, including attorneys’ fees, expended by the office holder or charged to him by a court relating to an act preformed in his capacity as an office holder in connection with: (i) proceedings the company institutes against him or instituted on its behalf or by another person; (ii) a criminal charge from which he was acquitted; (iii) a criminal charge in which he was convicted for a criminal offence that does not require proof of criminal thought; and (iv) an investigatio n or a proceeding instituted against him by an authority competent to administrate such an investigation or proceeding that ended without the filing of an indictment against the office holder and, either without any financial obligation imposed on the office holder in lieu of criminal proceedings; or with financial obligation imposed on him in lieu of criminal proceedings, in a crime which does not require proof of criminal thought. The Companies Law also authorizes a company to undertake in advance to indemnify an office holder with respect to events specified above, provided that, with respect to indemnification under sub-section (a) above, the undertaking: (i) is limited to events which the board of directors determines can be anticipated, based on the activity of the company at the time the undertaking is given; (ii) is limited in amount or criteria determined by the board of directors to be reasonable for the circumstances; and (iii) specifies the abovementioned events, amounts or criteria.
 
 
72

 

At the annual shareholders meeting held on October 27, 2005, our shareholders authorized us to enter into indemnification agreements with each of our current and future directors and officers. At the annual shareholders meeting held on December 30, 2009, a number of amendments to the indemnification agreements were approved. Ellomay shall, subject to the provisions of the indemnification agreement, indemnify each director and officer for future obligations or expenses imposed on them in consequence of an act done in their capacity as directors or officers of Ellomay (or of any other entity in which Ellomay holds shares or has interests and in which they serve as officers or directors at Ellomay’s request), as follows:
 
 
monetary liabilities imposed on, or incurred by, the director or officer for the benefit of another person pursuant to a judgment, including a judgment given in settlement or a court approved arbitrator’s award;
 
 
reasonable litigation expenses including legal fees, incurred by a director or officer in consequence of an investigation or proceeding filed or conducted against a director or officer by an authority that is authorized to file or conduct such investigation or proceeding, and that has ended without filing an indictment against, or imposing of a financial obligation in lieu of a criminal proceeding on, such director or officer, or that ended without filing an indictment against such director or officer but with imposing a financial obligation on such director or officer in lieu of a criminal proceeding in respect of an offense that does not require the proof of criminal thought;
 
 
reasonable litigation expenses, including legal fees, incurred by a director or officer or which a director or officer is ordered to pay by a court, in proceedings filed against such director or officer by Ellomay or on its behalf or by another person, or in a criminal charge of which he or she is acquitted, or in a criminal charge of which such director or officer is convicted of an offence that does not require proof of criminal thought; and
 
 
any other liability and/or litigation expense (including legal fees), which, according to the applicable law and Ellomay’s Amended and Restated Articles of Association, each as shall be in effect from time to time, Ellomay could indemnify a director or officer.

The indemnification undertaking is limited to certain categories of events and the aggregate indemnification amount that Ellomay shall pay (in addition to sums payable by insurance companies) for monetary liabilities imposed on, or incurred by, the director or officer pursuant to all the indemnification undertakings issued by Ellomay to its directors and officers, may not exceed an amount equal to the higher of: (i) fifty percent (50%) of the net equity of Ellomay at the time of indemnification, as reflected on its most recent financial statements at such time, or (ii) the annual revenue of Ellomay in the year prior to the time of indemnification.

In such indemnification agreements, Ellomay also undertakes to (i) produce collateral, security, bond or any other guarantee that the director or officer may be required to produce as a result of any interim legal procedure (other than criminal procedures involving the proof of criminal thought), all up to the maximum indemnification amount set forth above; and (ii) to maintain a liability insurance policy with a reputable insurer to the extent permitted by the Companies Law, for all directors and officers of Ellomay, in a total amount of not less than US$10M during the period the recipient of the indemnity undertaking serves as a member of Ellomay’s board of directors and for a period of seven years thereafter.
 
 
73

 

We have entered into indemnification agreements with directors and officers providing for indemnification under certain circumstances for acts and omissions which may not be covered (or not be covered in full) by any directors’ and officers’ liability insurance. With respect to our directors, Shlomo Nehama, Ran Fridrich and Hemi Raphael, special shareholder approval was sought and received, as they are deemed to be “controlling shareholders”. Any future director of the company shall also receive such indemnification agreement. Such indemnification agreement, as amended, appears as part of the proxy statement in our current report on Form 6-K as filed with the SEC on November 24, 2009.

Exemption

Under the Companies Law, an Israeli company may not exempt an office holder from liability for a breach of his duty of loyalty, but may exculpate in advance an office holder from his liability to the company, in whole or in part, for a breach of his duty of care, provided that in no event shall the office holder be exempt from any liability for damages caused as a result of a breach of his duty of care to the company in the event of a “distribution” (as defined in the Companies Law). Our Articles authorize us to exculpate any director or officer from liability to us to the extent permitted by law.

The Companies Law provides that a company may not exculpate or indemnify an office holder nor enter into an insurance contract which would provide coverage for liability incurred as a result of any of the following: (a) a breach by the office holder of his or her duty of loyalty (however, a company may insure against such breach if the office holder acted in good faith and had a reasonable basis to assume that the act would not harm the company); (b) a breach by the office holder of his or her duty of care if the breach was done intentionally or recklessly, unless made in negligence only; (c) any act of omission done with the intent to derive an illegal personal benefit; or (d) any fine or monetary penalty levied against the office h older.
 
At the annual shareholders meeting held on October 27, 2004, Ellomay’s shareholders authorized the Company to exculpate its directors and officers in advance from liability to Ellomay, in whole or in part, for a breach of the duty of care.  The form of exemption letter was approved at the annual shareholders meeting held on October 27, 2005 and amendments were approved at the annual shareholders meeting held on December 30, 2009. We have extended such exemption letters to all our directors and some officers. With respect to our directors, Shlomo Nehama, Ran Fridrich and Hemi Raphael, special shareholder approval was sought and received, as they are deemed to be “controlling shareholders”. Any future direct or of the company shall also receive such exemption letter. The amended form of exemption letter appears as part of the proxy statement in our current report on Form 6-K as filed with the SEC on November 24, 2009.

Insurance

Under the Companies Law, a company may obtain insurance for any of its office holders for: (a) a breach of his duty of care to the company or to another person; (b) a breach of his duty of loyalty to the company provided that the office holder acted in good faith and had reasonable cause to assume that his act would not prejudice the company’s interests; or (c) a financial liability imposed upon him in favor of another person concerning an act preformed by him or her in his/her capacity as an office holder.
 
 
74

 

As stated above, in the indemnification agreements between Ellomay and its directors and officers, Ellomay has undertaken to maintain a liability insurance policy with a reputable insurer to the extent permitted by the Companies Law, for all directors and officers of Ellomay, in a total amount of not less than US$10M during the period the recipient of the indemnity undertaking serves as a member of Ellomay’s board of directors and for a period of seven years thereafter.

We have obtained directors’ and officers’ liability insurance covering our directors and officers. In our January 2008 general meeting of shareholders, our shareholders also approved the procurement of a “run-off” directors’ and officers’ liability insurance policy covering our directors and officers for events that occurred prior and up to the closing of the HP Transaction.

Internal Auditor 

Under the Companies Law, our Board is also required to appoint an internal auditor proposed by the Audit Committee. The role of the internal auditor is to examine, among other things, whether our activities comply with the law and orderly business procedure. The internal auditor may not be an interested party or officer holder, or a relative of any interested party or office holder, and may not be a member of our independent auditor firm. The Companies Law defines the term “interested party” to include a person who holds 5% or more of the company’s outstanding share capital or voting rights, a person who has the right to appoint one or more dire ctors or the general manager, or any person who serves as a director or as the general manager. Mr. Doron Cohen of Fahn, Kanne & Co., an Israeli accounting firm, serves as our internal auditor.

D.           Employees

As of December 31, 2009, we had 6 employees and independent contractors compared to 9 employees and independent contractors as of December 31, 2008 and 330 as of December 31, 2007. All of our employees and independent contractors, as of December 31, 2009, were in management, finance and administration and all were located in Israel.

In connection with and following the consummation of the HP Transaction on February 29, 2008, approximately 80% of our employees world-wide were rolled over to various HP related entities. At that time, we terminated the employment of a majority of the other employees, including the majority of our senior management. The employees who were terminated were eligible to termination related severance and/or notice periods ranging between one and six months. In connection with such terminations, we recorded as of the HP Transaction Closing Date severance-related expenses in the approximate amount of $2.8 million.

All of our employees who have access to confidential information are required to sign a non-disclosure agreement covering all of our confidential information that they might possess or to which they might have access.

We believe our relations with employees are satisfactory. We have never experienced a strike or work stoppage. We believe our future success will depend, in part, on our ability to continue to attract, retain, motivate and develop highly qualified personnel.
 
 
75

 

Israeli law generally requires the payment of severance pay equal to one month’s salary for each year of employment upon the termination of employment.

Our liability for future severance pay with respect to employees in Israel, which are not pursuant section 14 of the Severance Pay Law -1963, is calculated pursuant to Israeli severance pay law based on the most recent salary of each employee multiplied by the number of years of employment, as employees are entitled to one month’s salary for each year of employment, or a portion thereof. Every month we make payments equal to 8.33% of the employee’s salary, to various managers’ insurance policies or similar financial instruments. We record as an expense the increase in the severance liability, net of earnings (losses) from the managers’ insurance policy. Our liability is partially provided by such monthly depos its and any unfunded amounts (due to increase in the employee’s salary over time, or losses incurred by the insurance policy fund that invests our deposits) would be paid from operating funds and are covered by a provision we record.

            With respect to agreements with employees in Israel, pursuant to section 14 of the Severance Pay Law -1963, our contributions for severance pay are instead of our severance liability. Upon fulfillment of our obligation to make a monthly contribution to the managers’ insurance policies or similar financial instruments in the amount of 8.33% of the employee’s monthly salary, no additional payments must later be made to the employee on account of severance pay upon termination of the employment relationship. Further, the amounts deposited on behalf of such obligation are not stated in the balance sheet, as the Company is released from any further obligat ion towards the employee once they have been deposited.
 
Our employees are usually provided with an additional contribution toward their retirement that amounts to 10% of wages, of which the employee and the employer each contribute half. Furthermore, Israeli employees and employers are required to pay predetermined sums to the National Insurance Institute, which is similar to the United States Social Security Administration, and additional sums towards compulsory health insurance.

E.           Share Ownership

Beneficial Ownership of Executive Officers and Directors

The following table sets forth certain information regarding the beneficial ownership of Ellomay’s ordinary shares as of February 15, 2010, of (i) each director of Ellomay and (ii) each member of senior management of Ellomay. All of the information with respect to beneficial ownership of the ordinary shares is given to the best of Ellomay’s knowledge and has been furnished in part by the respective directors and member of senior management.
 
 
76

 

Name of Beneficial Owner
 
Number of Shares
Beneficially Held (1)
   
Percent of Class
 
             
Shlomo Nehama(2)                                         
    41,668,422       45.1 %
Ran Fridrich(3)                                         
    -       -  
Hemi Raphael (3)                                         
    -       -  
Anita Leviant(4)                                         
    *       *  
Alon Lumbroso(4)                                         
    *       *  
Oded Akselrod(4)                                         
    *       *  
Barry Ben-Zeev(4)                                         
    *       *  
Eran Zupnik(4)                                         
    *       *  
Eran Goren                                         
    -       -  
Kalia Weintraub                                         
    -       -  

______________________________
* Less than one percent of the outstanding ordinary shares

(1)
As used in this table, “beneficial ownership” means the sole or shared power to vote or direct the voting or to dispose or direct the disposition of any security. For purposes of this table, a person is deemed to be the beneficial owner of securities that can be acquired within 60 days from February 15, 2010 through the exercise of any option or warrant. Ordinary shares subject to options or warrants that are currently exercisable or exercisable within 60 days are deemed outstanding for computing the ownership percentage of the person holding such options or warrants, but are not deemed outstanding for computing the ownership percentage of any other person. The amounts and percentages are based upon 73,786,428 ordinary shares outstanding as of February 15, 2010.
 
(2)
According to information provided by the holders, the 41,668,422 ordinary shares beneficially owned by Mr. Nehama consist of: (i) 22,661,551 ordinary shares and currently exercisable warrants to purchase 12,857,144 ordinary shares held by S. Nechama Investments (2008) Ltd., an Israeli company (“Nechama Investments”), which together constitute approximately 40.1% of the outstanding ordinary shares and (ii) 412,961 ordinary shares and currently exercisable warrants to purchase 5,736,766 ordinary shares held directly by Mr. Nehama, which together constitute approximately 7.7% of the outstanding ordinary shares. Mr. Nehama, who is our Chairman of the Board and a director nominee, as the sole officer, director and shareholder of Nechama Investments, may be deemed to indirectly beneficially own any ordinary shares beneficially owned by Ne chama Investments, which constitute (together with his shares and warrants) approximately 45.1% of the outstanding ordinary shares. By virtue of the 2008 Shareholders Agreement between Nechama Investments and Kanir (see “Item 7.A. Major Shareholders”), Mr. Nehama, Nechama Investments, Kanir and Messrs. Raphael and Fridrich may be deemed to be members of a group that holds shared voting power with respect to 45,735,389 ordinary shares and currently exercisable warrants to purchase 27,214,286 ordinary shares, which together constitute approximately 72.2% of the outstanding ordinary shares, and holds shared dispositive power with respect to 36,967,000 ordinary shares, which constitute 50.1% of the outstanding ordinary shares. Accordingly, Mr. Nehama may be deemed to beneficially own approximately 74.1% of the outstanding ordinary shares. Mr. Nehama and Nechama Investments both disclaim beneficial ownership of the ordinary shares beneficially owned by Kanir.
 
(3)
By virtue of their positions as sole shareholders and directors of Kanir Investments Ltd. (“Kanir Ltd.”), the general partner in Kanir Joint Investments (2005) Limited Partnership (“Kanir”), and limited partners in Kanir, Hemi Raphael and Ran Fridrich may be deemed to indirectly beneficially own the ordinary shares and ordinary shares underlying warrants beneficially owned by Kanir. Messrs. Raphael and Fridrich disclaim beneficial ownership of such shares. Kanir owns 37,430,980 shares including currently exercisable warrants to purchase 14,357,142 ordinary shares. Please see footnote (2) with respect to the 2008 Shareholders Agreement. Kanir Ltd., Kanir and Messrs. Raphael and Fridrich all disclaim beneficial ownership of the shares held by Nechama Investments.
 
(4)
 
Most directors and some officers also have outstanding options, many of which are currently exercisable. The directors and senior management of Ellomay currently hold, in the aggregate, options exercisable into 1,513,630 ordinary shares, 742,833 of which are currently exercisable or that shall be exercisable within 60 days from February 15, 2010.
 
 
77

 
 
Our directors currently hold, in the aggregate, options exercisable into 192,530 ordinary shares. The 192,530 options have a weighted average exercise price of approximately $0.61 per share and have expiration dates until 2019.  Under the 1998 Plan, Oded Akselrod, one of the members of our Board, was granted options to purchase 10,000 ordinary shares on December 30, 2004, August 1, 2005, August 1, 2006, August 1, 2007, August 1, 2008 and August 1, 2009.  Anita Leviant, one of the members of our Board, was granted options to purchase 13,333 shares on August 1, 2008 and was also granted options to purchase 10,000 shares on August 1, 2009.  Lauri A. Hanover, who was one of our external directors until Novem ber 26, 2009, was granted options to purchase 6,667 shares on November 18, 2003 and was also granted options to purchase 10,000 ordinary shares on December 30, 2004, August 1, 2005, August 1, 2006, August 1, 2007, August 1, 2008 and August 1, 2009.  Her options expired on February 26, 2010. Alon Lumbroso, another external director, was granted 6,667 options on November 27, 2006 and was also granted options to purchase 10,000 ordinary shares on August 1, 2007, August 1, 2008 and August 1, 2009.  Barry Ben-Zeev, our external director who was appointed on December 30, 2009, was granted 5,863 options on the date of his appointment. The exercise price for the underlying shares of such options is the “Fair Market Value” (as defined in the 1998 Plan) of the ordinary shares of Ellomay at the date of grant. The options expire 10 years after their grant date.

Only one of our officers currently holds options to purchase our ordinary shares. Eran Zupnik, EVP of Business Development, was granted on January 4, 2009, 1,320,527 options to purchase ordinary shares, at an exercise price of $0.86 (subject to adjustment upon the final outcome concerning the release of the escrow funds from the HP Transaction). 16.67% of the options vested 6 months after the grant date, with a further 8.33% vesting at the end of every three-month period after that. In case of termination of the employment relationship with such officer, for whatever reason except termination for cause (as such term is defined in the 2000 Stock Option Plan described below) the officer will be able to exercise, within three months, no t only those options that have already vested, but also a part of the next vesting portion, according to the part of the three-month period during which the employment relationship existed. The options will expire 10 years after their grant date. Additionally, such officer was granted the entitlement to receive 1.125% of any securities (shares, warrants or options) Ellomay shall issue in the future, under the same terms and conditions of the issuance (however, the vesting schedule of the additional options shall in any event be 1/12 at the end of every three month period). As a result of the issuance of options to directors in 2009 (as detailed above), Eran Zupnik received an additional 500 options to purchase ordinary shares on August 1, 2009 and 73 options to purchase ordinary shares on December 30, 2009, at an exercise price identical to that of the directors (“Fair Market Value” as defined in the 1998 Plan of the ordinary shares of Ellomay at the date of each grant). The options were issued p ursuant to the 2000 Stock Option Plan.

Outstanding Options

Immediately prior to the consummation of the HP Transaction, there were outstanding options to purchase 10,079,400 of our ordinary shares that were granted to our employees. In connection with the HP Transaction, the vesting of all such employee options was accelerated and all became immediately exercisable upon consummation of the sale of our business to HP on February 29, 2008. As more fully described herein, 9,893,550 of such options were thereafter purchased by us and cancelled in July 2008.  Any options not repurchased (due to their relatively high exercise price) were canceled during 2008 pursuant to their terms and the terms of the 2000 Stock Option Plan.
 
 
78

 

The options granted to directors under the 1998 Plan are not subject to vesting requirements and have an exercise price ranging from $0.31 to $1.86 per share, with various expiration dates. For more details, see Note 14 to our consolidated financial statements as of December 31, 2008, incorporated by reference to our Annual Report on Form 20-F for the year ended December 31, 2008.

1995 Israel Stock Option Plan

In 1995, we adopted the 1995 Israel Stock Option Plan (the “1995 Plan”), which provides for grants of stock options to our employees and consultants. Options to purchase an aggregate of 500,000 ordinary shares were originally available for grant under the 1995 Plan, as amended, including service options for future services, options for performance, and options to consultants for service or performance.

At the annual shareholders meeting held on November 18, 2003, our shareholders approved the Board’s resolution to terminate the 1995 Plan and to increase the number of ordinary shares authorized for issuance under our 2000 Stock Option Plan (as amended) in the aggregate amount that was outstanding for grant under the 1995 Plan as of July 15, 2003, thereby increasing the number of ordinary shares authorized for issuance under our 2000 Stock Option Plan by 33,261. At the annual shareholders meeting held on October 27, 2005, our shareholders approved an increase in the number of ordinary shares authorized for issuance under the 2000 Stock Option Plan by the number of ordinary shares underlying options cancelled under the 1995 Plan .

As of February 15, 2010, there are no outstanding options under the 1995 Plan.

1997 Stock Option Plan

In 1997, we adopted the 1997 Stock Option Plan (the “1997 Plan”), which provides for grants of stock options to our employees, directors and consultants. Options to purchase an aggregate of 2,200,000 ordinary shares were originally available for grant under the 1997 Stock Option Plan, as amended.

At the annual shareholders meeting held on November 18, 2003, our shareholders approved the Board’s resolution to terminate the 1997 Plan and to increase the number of ordinary shares authorized for issuance under our 2000 Stock Option Plan in the aggregate amount that was outstanding for grant under the 1997 Plan as of July 15, 2003, thereby increasing the number of ordinary shares authorized for issuance under our 2000 Stock Option Plan by 464,329. At the annual shareholders meeting held on October 27, 2005, our shareholders approved an increase in the number of ordinary shares authorized for issuance under the 2000 Stock Option Plan by the number of ordinary shares underlying options cancelled under the 1997 Plan.

As of February 15, 2010, there are no outstanding options under the 1997 Plan.

1998 Non-Employee Director Share Option Plan

For discussion of the 1998 Non-Employee Director Share Option Plan see “Item 6.B: Compensation.”
 
 
79

 
 
As of February 15, 2010, there are 192,530 outstanding options and 473,303 ordinary shares available for future grants under the 1998 Non-Employee Director Share Option Plan.

2000 Stock Option Plan

In 2000, we adopted the 2000 Stock Option Plan (the “2000 Plan”) to provide for grants of service and non-employee options to purchase ordinary shares to our officers, employees, directors and consultants. The 2000 Plan provides that it may be administered by the Board, or by a committee appointed by the Board, and is currently administered by the Stock Option and Compensation Committee subject to Board approval.

At the annual shareholders meetings held on November 18, 2003 and October 27, 2004, our shareholders approved increases in the number of ordinary shares authorized for issuance under the 2000 Plan (as amended) to 2,997,590. At the annual shareholders meeting held on October 27, 2005, our shareholders approved an additional increase in the number of ordinary shares authorized for issuance under the 2000 Plan (as amended) by 14,500,000, from 2,997,590 to 17,497,590 and by the number of ordinary shares underlying options surrendered (except in the case of surrender for the exercise into shares) or which cease to be exercisable under the 1995 Plan and the 1997 Plan. As of March 15, 2009, the additional number of ordinary shares underlyin g options cancelled under the 1995 Plan and the 1997 Plan increased the number of ordinary shares authorized for issuance under the 2000 Plan by 227,000 from 17,497,590 to 17,724,590. Section 12 of the 2000 Plan provided originally that the 2000 Plan will expire on August 31, 2008, unless previously terminated or extended by the Board. At our Board meeting held on June 23, 2008, our Board resolved to amend Section 12 of the 2000 Plan to extend its term until August 31, 2018.

Our Board has broad discretion to determine the persons entitled to receive options under the 2000 Plan, the terms and conditions on which options are granted, and the number of ordinary shares subject thereto. Our Board delegated to our management its authority to issue ordinary shares issuable upon exercise of options under the 2000 Plan. The exercise price of the options under the 2000 Plan is determined by our Stock Option and Compensation Committee, provided, however, that the exercise price of any option granted shall not be less than eighty percent (80%) of the stock value at the date of grant of such options. The stock value at any time is equal to the then current fair market value of our ordinary shares. For purposes of the 2000 Plan (as amended), the fair market value means, as of any date, the last reported closing price of the ordinary shares on such principal securities exchange on the most recent prior date on which a sale of the ordinary shares took place.

Our Stock Option and Compensation Committee determines the term of each option granted under the 2000 Plan, including the vesting period; provided, however, that the term of an option shall not be for more than 10 years. Upon termination of employment, all unvested options lapse, and generally within three months from such termination all vested but not-exercised options shall lapse.

The options granted are subject to restrictions on transfer, sale or hypothecation. Options and ordinary shares issuable upon the exercise of options granted to our Israeli employees are held in a trust until the payment of all taxes due with respect to the grant and exercise (if any) of such options.
 
 
80

 
 
We have elected the benefits available under the “capital gains” alternative of Section 102 of the Israeli Tax Ordinance. Pursuant to this election, capital gains derived by employees arising from the sale of shares acquired as a result of the exercise of options granted to them under Section 102, will be subject to a flat capital gains tax rate of 25% (instead of the gains being taxed as salary income at the employee’s marginal tax rate). However, as a result of this election, we will no longer be allowed to claim as an expense for tax purposes the amounts credited to such employees as a benefit when the related capital gains tax is payable by them, as we were previously entitled to do. We may change its election f rom time to time, as permitted by the Tax Ordinance. There are various conditions that must be met in order to qualify for these benefits, including registration of the options in the name of a trustee (the “Trustee”) for each of the employees who is granted options. Each option, and any ordinary shares acquired upon the exercise of the option, must be held by the Trustee for a period commencing on the date of grant and ending no earlier than 24 months after the date of grant.
 
Changes in Options Following Consummation of the HP Transaction
 
In connection with the HP Transaction, our Board of Directors approved the immediate acceleration of all outstanding employee stock options that were outstanding as of the date of execution of the Asset Purchase Agreement. Our Board of Directors further approved the offer to employees who hold outstanding stock options with exercise prices below $1.00 to repurchase their outstanding stock options, subject to and following the fulfillment of all regulatory requirements. The employees received offers from us, setting forth the consideration offered for such options. The employees were generally offered a choice between two methods of payment.

The first method entails receipt, subject to and following fulfillment of regulatory requirements, of 75% of the consideration and receipt of up to 25% of the consideration following release of the monies deposited in escrow in connection with the HP Transaction. The exact amount of the second payment, if any, will be determined based on the net cash generated by us from our remaining assets and liabilities based on the criteria set forth by our Board and such amount will bear interest equal to the interest rate applicable to the monies deposited in the escrow account in connection with the HP Transaction commencing March 1, 2008. The second method entails receipt, subject to and following fulfillment of regulatory requirements, of 9 0% of the consideration without entitlement to any additional payment in the future.

Under both payment methods, all outstanding options were to terminate immediately upon receipt of the first (or in the case of the second method, only) payment.

The offer to repurchase options was made to employees holding an aggregate of options to purchase approximately 9.9 million of our ordinary shares and the aggregate purchase price is up to approximately $3.8 million.

Based on the election of the employees between the two methods of payment described herein, on July 2008 we paid approximately $3.1 million in consideration for the options resulting in the immediate cancellation of options to repurchase 9,893,550 of our ordinary shares. The remainder, in the amount of up to $0.7 million, will be paid subject to the terms of the first method of payment set forth above.

Pursuant to the terms of our option plans, all options that were not repurchased expired 90 days following the termination of employment of the employees holding such options.

As of February 15, 2010, there are 1,321,100 outstanding options under the 2000 Plan. As a result of the repurchase and cancellation of the options set forth above, the number of additional ordinary shares available for issuance under the 2000 Plan, as of February 15, 2010, is 5,950,928.
 
 
81

 
 

A.           Major Shareholders

The following table sets forth information regarding the beneficial ownership of our ordinary shares as of February 15, 2010, by each person known by us to be the beneficial owner of more than 5% of our ordinary shares. Each of our shareholders has identical voting rights with respect to its shares. All of the information with respect to beneficial ownership of the ordinary shares is given to the best of our knowledge.

   
Ordinary Shares
Beneficially Owned(1)
   
Percentage of Ordinary Shares Beneficially Owned
 
             
Shlomo Nehama (2)(4)                                                        
    41,668,422       45.1 %
Kanir Joint Investments (2005) Limited Partnership (“Kanir”) (3)(4)(5)
    37,430,980       42.5 %
Zohar Zisapel                                                        
    5,359,708       7.3 %
Weiss Asset Management LP (6)                                                        
    3,708,704       5.0 %
___________________________
(1)
As used in this table, “beneficial ownership” means the sole or shared power to vote or direct the voting or to dispose or direct the disposition of any security as determined pursuant to Rule 13d-3 promulgated under the U.S. Securities Exchange Act of 1934, as amended.  For purposes of this table, a person is deemed to be the beneficial owner of securities that can be acquired within 60 days from February 15, 2010 through the exercise of any option or warrant. Ordinary shares subject to options or warrants that are currently exercisable or exercisable within 60 days are deemed outstanding for computing the ownership percentage of the person holding such options or warrants, but are not deemed outstanding for computing the ownership percentage of any other person. The amounts and percentages are based on a total of 73,786,428 ordinary shares outstanding as of February 15, 2010.
 
(2)
According to information provided by the holders, the 41,668,422 ordinary shares beneficially owned by Mr. Nehama consist of: (i) 22,661,551 ordinary shares and currently exercisable warrants to purchase 12,857,144 ordinary shares held by S. Nechama Investments (2008) Ltd., an Israeli company (“Nechama Investments”), which together constitute approximately 40.1% of the outstanding ordinary shares and (ii) 412,961 ordinary shares and currently exercisable warrants to purchase 5,736,766 ordinary shares held directly by Mr. Nehama, which together constitute approximately 7.7% of the outstanding ordinary shares. Mr. Nehama, who is our Chairman of the Board and a director nominee, as the sole officer, director and shareholder of Nechama Investments, may be deemed to indirectly beneficially own any ordinary shares beneficially owned by Ne chama Investments, which constitute (together with his shares and warrants) approximately 45.1% of the outstanding ordinary shares.
 
(3)
According to information provided by the holder, Kanir is an Israeli limited partnership. The holdings of Kanir include currently exercisable warrants to purchase 14,357,142 ordinary shares. Kanir Investments Ltd. (“Kanir Ltd.”), in its capacity as the general partner of Kanir, has the voting and dispositive power over the ordinary shares directly beneficially owned by Kanir. As a result, Kanir Ltd. may be deemed to indirectly beneficially own the ordinary shares beneficially owned by Kanir. Messrs. Hemi Raphael and Ran Fridrich, who are members of our Board of Directors and director nominees, are the sole shareholders and directors of Kanir Ltd.  As a result, they may be deemed to indirectly beneficially own the ordinary shares beneficially owned by Kanir.  Kanir Ltd. and Messrs. Raphael and Fridrich disclaim be neficial ownership of such ordinary shares.
 
 
82

 
 
(4)
In March 2008, Nechama Investments and Kanir entered into a shareholders agreement that included, among other things, agreements as to the voting of the Ellomay shares held by the parties and as to the disposition of certain of the Ellomay shares held by the parties (the “2008 Shareholders Agreement”). By virtue of the 2008 Shareholders Agreement, Mr. Nehama, Nechama Investments, Kanir, Kanir Ltd., and Messrs. Raphael and Fridrich may be deemed to be members of a group that holds shared voting power with respect to 45,735,389 ordinary shares and currently exercisable warrants to purchase 27,214,286 ordinary shares, which together constitute approximately 72.2% of the outstanding ordinary shares, and holds shared dispositive power with respect to 36,967,000 ordinary shares, which constitute 50.1% of the outstanding ordinary shares.&# 160; Accordingly, Mr. Nehama may be deemed to beneficially own approximately 74.1% of the outstanding ordinary shares.  Each of Mr. Nehama and Nechama Investments disclaims beneficial ownership of the ordinary shares beneficially owned by Kanir.  Each of Kanir, Kanir Ltd. and Messrs. Raphael and Fridrich disclaims beneficial ownership of the ordinary shares beneficially owned by Nechama Investments.  A copy of the 2008 Shareholders Agreement was filed with the Securities and Exchange Commission on March 31, 2008 as Exhibit 14 to an amendment to a Schedule 13D.
 
 (5)
Bonstar, an Israeli company, currently holds warrants to purchase 846,905 ordinary shares, which constitute approximately 1.1% of the outstanding ordinary shares. Bonstar is a limited partner of Kanir and assisted Kanir in the financing of the purchase of some of its ordinary shares. Accordingly, Bonstar may be deemed to be a member of a group with Kanir and its affiliates, although there are no agreements between Bonstar and either of such persons and entities with respect to the ordinary shares beneficially owned by each of them. Mr. Joseph Mor and Mr. Ishay Mor are the sole shareholders of Bonstar and Mr. Joseph Mor serves as the sole director of Bonstar. Messrs. Joseph Mor and Ishay also hold, through a company jointly held by them, 1,750,000 ordinary shares, which constitute approximately 2.4% of the outstanding ordinary shares. By virtue of their control over Bonstar and the other company, Messrs. Joseph Mor and Ishay Mor may be deemed to indirectly beneficially own the 2,596,905 ordinary shares beneficially owned by Bonstar and by the other company, which constitute approximately 3.5% of the ordinary shares. Each of Bonstar and Messrs. Joseph Mor and Ishay Mor disclaims beneficial ownership of the ordinary shares beneficially owned by Kanir and Nechama Investments.
 
(6)
According to information provided by the holder, Weiss Asset Management LP, a Delaware limited partnership, beneficially owns 3,708,704 ordinary shares, which include 2,410,658 shares beneficially owned by a private investment partnership Brookdale International Partners, LP (“BIP”) and 1,298,046 shares beneficially owned by a private investment company Brookdale Global Opportunity Fund (“BGO”).  Weiss Asset Management LP is the investment manager to both BIP and BGO.  Andrew M. Weiss, Ph.D., a US citizen, is the managing member of the general partner of Weiss Asset Management LP, and thus may be deemed to beneficially 3,708,704 ordinary shares. Dr. Weiss and Weiss Asset Management LP disclaim beneficial ownership except to the extent of their respective pecuniary interest therein.

Significant Changes in the Ownership of Major Shareholders

In January and February 2007, we closed a private placement with certain investors. Old Lane Funds1, that participated in the private placement, became the beneficial owners of 4,814,815 ordinary shares (including 1,111,111 ordinary shares issuable upon exercise of warrants), or 6.4% of our outstanding ordinary shares, however in December 2009 Old Lane sold its ordinary shares (but not its warrants) to Weiss Asset Management LP (for private investment entities it manages), and thus ceased to be a major shareholder of Ellomay.

As a result of the private placement in the beginning of 2007, Bank Leumi Le Israel B.M. ceased to be a major shareholder of Ellomay.
 

1
 
According to information provided by the holders, the Old Lane Funds include Old Lane Luxemburg Master Fund S.a.r.l, a private company registered in Luxemburg, and its shareholders: Old Lane Cayman Master Fund L.P., a limited partnership registered in the Cayman Islands, Old Lane HMA Master Fund, L.P., a limited partnership registered in the Cayman Islands and Old Lane U.S. Master Fund L.P., a limited partnership registered in Delaware, USA.
 
 
83

 

In February 2008, Kanir purchased, in a series of private transactions, additional Ellomay shares and warrants. The sellers in such private transactions included, among others, Dan and Edna Purjes, and entities they control or are affiliated with. Certain of the securities purchased by Kanir were subsequently transferred to Shlomo Nehama. The Purjes’s beneficial ownership interest decreased from 16.51% to 12.51% as of May 2007 as a result of the private placement in early 2007 and, pursuant to information provided by Mr. Purjes, as a result of the sale of shares and warrants on February 2008, he and his affiliates no longer beneficially owned any Ellomay ordinary shares or warrants immediately following the sale. We have no cur rent information of Mr. Purjes’ holdings, if any.

In March and April 2008, Kanir, Shlomo Nehama and Nechama Investments purchased additional Ellomay shares and warrants in a series of private transactions, including (i) all of the shares and a majority of the warrants held by the Fortissimo Entities2, decreasing the percentage of ordinary shares beneficially owned by the Fortissimo Entities to 5.4%, (ii) a majority of the warrants held by Bank Hapoalim B.M., decreasing the percentage of ordinary shares beneficially owned by Bank Hapoalim B.M. from 6.3% to less than one percent, and (iii) shares held by certain of the entities affiliated with Meitav Investment House Ltd. (the “Meitav Entit ies”), decreasing the percentage of ordinary shares beneficially owned by the Meitav Entities from 6.34% to less than five percent.

In September 2008, warrants to purchase 240,000 ordinary shares, at an exercise price of $0.52 per share, were exercised by Bank Hapoalim B.M. (140,000) and Bank Leumi Le Israel B.M (100,000).  In October 2008, warrants to purchase 825,923 ordinary shares at an exercise price of $0.34 per share, held equally by Kanir and Shlomo Nehama, were exercised.

In May 2009, Kanir and Nechama Investments purchased the remaining warrants held by the Fortissimo Entities. Following such sale, on May 11, 2009, the Fortissimo Entities filed a Schedule 13D/A report declaring that they no longer beneficially owned old Ellomay securities.

As above-mentioned, in December 2009, Weiss Asset Management LP purchased (for private investment entities it manages) 3,703,704 ordinary shares from the Old Lane Funds and an additional 1,700 ordinary shares, and became major shareholders of Ellomay, holding 5.0% of our ordinary shares.

Record Holders

Based on a review of the information provided to us by our transfer agent and major shareholders, as of March 4, 2010, there were 56* record holders of ordinary shares, of which 26 represented United States* record holders holding approximately 40.7% (of which approximately 39.9% are held by the Depository Trust Company) of our outstanding ordinary shares.
______________________
*           Including the Depository Trust Company.
 

2
According to information provided by the holders, the “Fortissimo Entities” consist of Fortissimo Capital Fund GP, LP (“FFC-GP”), Fortissimo Capital Fund (Israel), LP (“FFC-Israel”); Fortissimo Capital Fund (Israel-DP), LP (“FFC-Israel-DP”); and Fortissimo Capital Fund, LP (“FFC Cayman”). FFC-GP and FFC Cayman are limited partnerships incorporated in the Cayman Islands. FFC-Israel and FFC-Israel-DP are limited partnerships incorporated in Israel. FFC-GP is the general partner of each of FFC-Israel, FFC-Israel-DP and FFC Cayman, which invest together in the framework of parallel private equity funds.
 
 
84

 
 
2008 Shareholders Agreement

Pursuant to public filings made and information provided by Kanir and Nechama Investments and their affiliates, on March 24, 2008, Kanir and Nechama Investments entered into a shareholders agreement (the “2008 Shareholders Agreement”) with respect to their holdings of Ellomay. The following summary is based on public filings made by the parties to the 2008 Shareholders Agreement, which include a more detailed description of the 2008 Shareholders Agreement and a copy of such agreement.

The parties to the 2008 Shareholders Agreement agreed to vote all their Ellomay ordinary shares as provided in the 2008 Shareholders Agreement. Where the 2008 Shareholders Agreement is silent as to a matter brought before the shareholders of Ellomay, the parties will agree in advance as to how they will vote. In the event that the parties do not reach an agreement regarding any such matter, they will vote all of their ordinary shares against such matter. In addition, the parties agreed to use their best efforts to amend our articles to require that, if so requested by at least two of our directors, certain matters will require the approval of a simple majority of the outstanding ordinary shares, such as related party transactions and any material change in Ellomay’s scope of business. At our annual shareholders meeting held on December 30, 2008, our shareholders approved the adoption of our Second Amended and Restated Articles, as requested by Kanir and Nechama Investments and that includes, among other things, the revisions contemplated in the 2008 Shareholders Agreement. For more information, see “Item 10B: Memorandum of Association and Second Amended and Restated Articles.”

The parties to the 2008 Shareholders Agreement further agreed to use their best efforts to ensure that the composition of our Board will be in accordance with the agreements set forth therein.

The 2008 Shareholders Agreement also contains certain agreements with respect to the ordinary shares held by each party that constitute, from time to time, 25.05% of the outstanding ordinary shares and, in the aggregate, 50.1% of the outstanding ordinary shares (these shares are defined in the 2008 Shareholders Agreement as the “Restricted Shares”), including a lock-up period, right of first refusal, tag along and a buy/sell notice mechanism.

The parties to the 2008 Shareholders Agreement agreed not to enter into any additional voting or similar agreements with any other shareholders of Ellomay during the term of the 2008 Shareholders Agreement, which will be in effect so long as (i) the parties hold more than 50% of the outstanding ordinary shares of Ellomay or (ii) each of the parties holds all of its Restricted Shares (unless the lending bank of the parties to the agreement forecloses on its pledge on the Restricted Shares of either party, causing the immediate termination of the 2008 Shareholders Agreement).

Encumbrances Placed on Ellomay’s Securities

 Pursuant to public filings made and information provided by Kanir and Nechama Investments and their affiliates, on March 27, 2007, each of Kanir and Nechama Investments entered into a separate five-year loan agreement with Israel Discount Bank Ltd. in order to finance the purchase of Ellomay ordinary shares and warrants to purchase ordinary shares. As collateral for the loans, Israel Discount Bank Ltd. received a first-priority pledge over 19,020,872 ordinary shares and warrants to purchase 2,027,426 ordinary shares, or, in the aggregate, 27.8% of the outstanding ordinary shares, held by Kanir and over 19,021,547 ordinary shares, or 25.8% of the outstanding ordinary shares, held b y Nechama Investments. A default of either of Kanir and Nechama Investments under their agreements with Israel Discount Bank Ltd. could cause a foreclosure with respect to the ordinary shares of Ellomay subject to the pledge to such bank, which could result in a change of control of Ellomay.
 
 
85

 
 
B.           Related Party Transactions

On December 30, 2008, following the approval of our Audit Committee, Board of Directors and shareholders, we entered into a management services agreement with Kanir and Meisaf, effective as of March 31, 2008, the date of appointment of Messrs. Fridrich and Nehama as members of our Board.  In consideration of the performance of the management services and the board services under the terms of the management services agreement we agreed to pay Kanir and Meisaf, in equal parts in and quarterly payments, an aggregate annual services fee in the amount of $250,000 plus value added tax pursuant to applicable law. The management services agreement was initially in effect until the earlier of: (i) the second anniversary of the effec tive date of the Agreement (March 31, 2010) or (ii) the termination of service of either of the Kanir and Nechama Investments affiliates on our Board of Directors. However, our Audit Committee, Board of Directors and finally the shareholders, at the annual meeting of shareholders held on December 30, 2009, approved an extension to the management services agreement, so that it shall remain in effect until the earlier of: (i) March 31, 2011, or (ii) the termination of service of either of the Kanir and Nechama Investments affiliates on our Board of Directors.

For a further discussion of transactions and balances with related parties see “Item 10.C: Material Contracts” and Note 8 to our consolidated financial statements, which are included as a part of this report.

C.           Interests of Experts and Counsel

Not Applicable.
 

A.           Consolidated Statements and Other Financial Information.

Consolidated Statements

Our consolidated financial statements are set forth in Item 18.

Export Sales

See “Item 5: Operating and Financial Review and Prospects” under the caption “Geographic Breakdown of Revenues” for certain details of export sales for the last three fiscal years.

Legal Proceedings

We are a party to various legal proceedings incident to our business prior to the HP Transaction. Pursuant to the terms of the Asset Purchase Agreement with HP, a majority of the litigation we are party to was not assumed by HP or any of its subsidiaries and we continue to be responsible for the management and outcome of such litigation. In addition, we undertook to continue to be responsible for the management and outcome of the outstanding litigation involving NUR Europe, one of our previously wholly-owned subsidiaries that was acquired by HP.
 
 
86

 
 
Except as noted below, there are no material legal proceedings pending or, to our knowledge, threatened against us or our subsidiaries, and we are not involved in any legal proceedings that our management believes, individually or in the aggregate, would have a material adverse effect on our business, financial condition or operating results.

The US dollar amounts presented below are based on applicable conversion rates in effect as of December 31, 2009.

During 2002, two end-users, Jiaxing Dapeng Advertising Limited Company and Guangzhou Junhao Printing Limited Company, filed separate lawsuits in China against subsidiaries of the Company alleging bad quality of products and seeking reimbursement in aggregate amount of $0.586 million. The local court ruled that the subsidiaries should reimburse the clients with the aggregate amounts of $0.472 million. One of subsidiaries is in the process of liquidation and has no assets in China and the other is no longer active in China and based on advice received from legal counsel the judgment against it cannot be enforced in Hong Kong. The clients may file a suit in Hong Kong but have not done so to date. Based on the management’s estimate and the opinion of our legal counsel, it is less than likely that the subsidiaries will be required to pay the amount claimed.

In September 2003, we filed a suit in the Magistrate Court of Tel Aviv, Israel against R.R. Graphics Ltd., a former distributor in Israel, for the collection of unpaid invoices totaling approximately $0.42 million. In February 2004, R.R. Graphics filed a statement of defense denying our claims and it also filed a counter-claim for alleged damages caused to it by us in the amount of approximately $0.21 million. We believe that the counter-claim that was filed by R.R. Graphics is without merit and that a loss in not probable.

In December 2003, Imagens Digitais Ltda., a client of NUR Do Brazil Ltda., filed a suit against NUR Do Brazil Ltda. and NUR America in Brazil, alleging that a machine purchased by it failed to perform. Imagens is seeking reimbursement of the purchase price paid by it in the amount of approximately $0.29 million. In January 2010 the court dismissed the suit. The court's ruling may still be subject to an appeal by Imagens Digitais Ltda.

In February 2007 a claim was filed against us and one of our former officers by a person claiming to have been an agent of the company in West Africa for commissions on sales of printers. The claim is for 3 million NIS ($0.79 million). We filed a statement of defense denying all claims, both with respect to the causes of action and with respect to the factual allegations in the claim. Based on management estimation and the opinion of its legal counsel no provision was recorded with respect to this claim.

In May 2007, a former managing director of NUR Europe filed a lawsuit against the Company and two of its subsidiaries claiming his resignation was for just cause due to demotion and therefore should be deemed as a termination of his employment by the subsidiary. The Company denied all the claims made by the former employee. The ruling in favor of the company was deemed final in March 2009 when the official time for appeal passed.
 
 
87

 
 
During 2008, a former employee of a subsidiary filed a lawsuit against the Company in the amount of approximately $ 0.32 million alleging the Company did not provide him with the appropriate amount of time to exercise his stock options following the termination of the applicable blackout period. The Company and the former employee were negotiating a settlement proposal by which the Company undertook to pay an amount of approximately $0.03 million and this amount was to be considered as the gross, exhaustive and final consideration paid to the former e mployee.  Although the parties did not arrive to a settlement the former employee chose on the hearing of April 3, 2009 to withdraw his claim. The former employee has a right to re-launch his claim in this matter.

We may from time to time become a party to various legal proceedings in the ordinary course of our business.
 
Dividends

We do not anticipate that we will pay any cash dividend on our ordinary shares in the foreseeable future. Dividends, if any, will be paid in New Israeli Shekel. Dividends paid to shareholders outside Israel will be converted to U.S. dollars, on the basis of the exchange rate prevailing at the date of payment.

B.           Significant Changes

Except as otherwise disclosed in this report, no significant changes have occurred since December 31, 2009.
 

A.           Offer and Listing Details

Stock Price History

The prices set forth below are high and low closing market prices for the ordinary shares of Ellomay as reported by the Nasdaq Capital Market or the Pink Sheets, as applicable, for the fiscal year ended December 31 of each year indicated below, for each fiscal quarter indicated below, and for each month for the last six-month period. Such quotations reflect inter-dealer prices, without retail markup, markdown, or commission and may not necessarily represent actual transactions. Our ordinary shares are currently quoted in the over-the-counter market in the “Pink Sheets” under the symbol “EMYCF.PK.”

Year
 
High (US)
   
Low (US)
 
2005                                                                                                             
  $ 0.83     $ 0.18  
2006                                                                                                             
    0.84       0.50  
2007                                                                                                             
    0.84       0.43  
2008                                                                                                             
    0.75       0.47  
2009                                                                                                             
    0.66       0.45  
 
 
88

 
 
 
2008
           
First Quarter                                                                                                             
  $ 0.75     $ 0.60  
Second Quarter                                                                                                             
    0.71       0.53  
Third Quarter                                                                                                             
    0.65       0.47  
Fourth Quarter                                                                                                             
    0.70       0.50  

2009
           
First Quarter                                                                                                             
  $ 0.64     $ 0.46  
Second Quarter                                                                                                             
    0.59       0.49  
Third Quarter                                                                                                             
    0.55       0.45  
Fourth Quarter                                                                                                             
    0.66       0.47  
 
2010
           
First Quarter (until March 9)                                                                                                             
  $ 0.70     $ 0.58  
 
Most Recent Six Months
           
March 2010 (until March 9)
 
$
0.70
   
$
0.58
 
February 2010
   
0.62
     
0.58
 
January 2010
   
0.65
     
0.62
 
December 2009
   
0.66
     
0.50
 
November 2009
   
0.50
     
0.50
 
October 2009
   
0.52
     
0.47
 
September 2009
   
0.49
     
0.47
 

On March 3, 2010, the last reported sale price of our ordinary shares was $0.68 per share.

On March 9, 2010, the last reported sale price of our ordinary shares was $0.58 per share.

As a result of the removal of our ordinary shares from quotation on the Nasdaq Capital Market, our ordinary shares are not regularly covered by securities analysts and the media and the liquidity of our ordinary shares is very limited. Such limited liquidity could result in lower prices for our ordinary shares than might otherwise prevail and in larger spreads between the bid and asked prices for our ordinary shares.  Additionally, certain investors will not purchase securities that are quoted on the pink sheets, which could materially impair our ability to raise funds through the issuance of our ordinary shares in the securities markets.

B.           Plan of Distribution

Not Applicable.

C.           Markets

Our ordinary shares are currently quoted in the over-the-counter market in the “Pink Sheets” under the symbol “EMYCF.PK.”
 
 
89

 

Our ordinary shares were traded on the Nasdaq National Market between October 1995 and July 2003. Our ordinary shares were traded on the Nasdaq Capital Market between July 2003 and May 2005.

D.           Selling Shareholders

Not Applicable.

E.           Dilution

Not Applicable.

F.           Expenses of the Issue

Not Applicable.
 

A.           Share Capital
 
At December 31 of 2007, 2008 and 2009 our authorized share capital was 170,000,000 ordinary shares.
 
Our issued and outstanding share capital was 72,710,505 ordinary shares as of December 31, 2007, and 73,786,428 ordinary shares as of December 31, 2008 and until the date of this report.
 
All of our issued ordinary shares are fully paid. The par value of each of our ordinary shares is 1 NIS.
 
For information regarding outstanding warrants to purchase ordinary shares, see “Item 5.B: Liquidity and Capital Resources - Outstanding Warrants". For information relating to options exercisable for ordinary shares, see the description of our share incentive plans in “Item 6.E: Share Ownership”.
 
 
90

 
 
On January 30, 2007 and February 12, 2007, in connection with a private placement of our ordinary shares approved by our Board of Directors, we issued to various investors 7,105,320 and 4,629,630 ordinary shares, respectively, at $ 0.54 per share. We received from these investments proceeds in the amount of $ 6.1 million, net of issuance expenses in the amount of $ 0.25 million. We also issued to the investors warrants to purchase up to 2,131,596 and 1,388,889 ordinary shares, respectively, at an exercise price of $ 0.65 per share. The warrants are exercisable for five years from the closing date of the private placement. The securities offered in the private placement may not be offered or sold in the United Stat es absent registration, or an applicable exemption from registration. We agreed to use its best efforts to file a registration statement registering all the private placement related ordinary shares (both those purchased and those issuable upon exercise of the warrants) prior to July 1, 2007. In the event that we either failed to file a registration statement prior to July 1, 2007, or if such registration statement loses its effectiveness thereafter, we committed to the payment of partial damages in cash equal to 1% of the aggregate purchase price paid by the investors for each month of default, subject to an overall limit of up to 24 months of partial liquidated damages.  On June 29, 2007, we filed a registration statement for the resale of certain ordinary shares and ordinary shares underlying warrants held by several of our shareholders, including the shares and shares underlying warrants issued in January and February 2007. The regis tration statement became effective on August 3, 2007, temporarily lost its effectiveness on October 1, 2007 and regained such effectiveness on June 30, 2008.
 
In May 2007, we issued 66,666 ordinary shares, pursuant to the exercise of options granted to a former employee under our 2000 Stock Option Plan, at an exercise price of $0.39 per share. In October 2007, we issued 333,334 ordinary shares, pursuant to the exercise of options granted to a former employees under our 2000 Stock Option Plan, at an exercise price of $0.39 per share. In November 2007, we issued we issued 15,000 ordinary shares, pursuant to the exercise of options granted to a former employee of one of the company's subsidiaries under our 2000 Stock Option Plan, at an exercise price of $0.37 per share. In November 2007, we issued 10,000 and 11,669 ordinary shares, pursuant to the exercise of options granted to former employe es under our 2000 Stock Option Plan, at exercise prices of $0.48 and 0.33 per share, respectively. In December 2007, we issued 15,000 ordinary shares, pursuant to the exercise of options granted to a former employee of one of the Company's subsidiaries under our 2000 Stock Option Plan, at an exercise price of $0.72 per share.
 
In January 2008, we issued 10,000 ordinary shares, pursuant to the exercise of options granted to one of our directors under our 1998 Non-Employee Director Share Option Plan, at an exercise price of $0.31 per share.
 
In September 2008, we issued 240,000 ordinary shares, due to the exercise of 140,000 warrants by Bank Hapoalim B.M. and 100,000 warrants by Bank Leumi Le Israel B.M., at an exercise price of $0.52 per share.  The warrants were issued to these banks in March 2003 in connection with the amendment of the covenants governing the rescheduling of our long-term debts. In October 2008, we issued 825,923 ordinary shares in equal parts to Kanir and Shlomo Nehama, due to the exercise of warrants purchased from other shareholders, at an exercise price of $0.34 per share. In year 2009 we did not issue any ordinary shares.
 
For information relating to options exercisable for ordinary shares, see the description of our option plans in “Item 6.E: Share Ownership”. For information relating to warrants exercisable for ordinary shares, see “Item 5.B:  Liquidity and Capital Resources- Outstanding Warrants”.
 
B.           Memorandum of Association and Second Amended and Restated Articles

Set forth below is a brief description of certain provisions contained in the Memorandum of Association, the Second Amended and Restated Articles, adopted by our shareholders at our general meeting held on December 30, 2008, as well as certain statutory provisions of Israeli law. The Memorandum of Association and the Articles are incorporated by reference herein. The description of certain provisions does not purport to be a complete summary of these provisions and is qualified in its entirety by reference to such exhibits.
 
 
91

 
 
Authorized Share Capital

The authorized share capital of Ellomay is one hundred seventy million (170,000,000) New Israeli Shekels, divided into one hundred and seventy million ordinary shares, NIS 1.00 par value per share.

Due to the fact that we were incorporated prior to 1999, the year the Companies Law was enacted, a special majority of 75% of the shares voting on the matter is required in order to amend our Memorandum, which includes changes to our capital structure, such as an increase in our authorized capital.

At our annual general meeting held on December 30, 2008, our shareholders resolved to effect a reverse share split of our ordinary shares (on the effective date to be determined by our Board) where each ten ordinary shares will be consolidated into one single ordinary share of NIS 10.00 nominal value, such that our registered share capital will be divided into 17,000,000 ordinary shares. Our shareholders further resolved that all fractional shares which are one-half share or more will be increased to the next higher whole number of shares and all fractional shares which are less than one-half share will be decreased to the next lower whole number of shares and to authorize our Board to determine the timing of the reverse share split and also to determine not to implement the reverse share split, all based on our Board’s judgment of our best interests.  As time had elapsed without the reverse share split taking place, our shareholders ratified and approved such resolution at the annual general meeting held on December 30, 2009. Such reverse split will be executed only upon the consummation of a significant business combination.

As more fully described in the proxy statements sent to our shareholders prior to the December 30, 2008 and December 30, 2009 meetings, the purpose of the reverse share split is to enable us to meet the minimum bid price initial listing requirement of the NASDAQ Global Market.  As long as we were deemed to be a “shell company” we couldn’t list our shares on the NASDAQ Global Market. Our current intention is to implement the reverse share split prior to the closing of a significant additional business combination and to attempt to list our shares on the NASDAQ Global Market in conjunction with the closing of such business combination.  Subsequently to the publication of our proxy statement in Dece mber 2008, the NASDAQ issued new listing requirements, reducing the minimum bid price from $5.00 to $4.00 in all NASDAQ markets.  We cannot predict if and when our ordinary shares will begin trading on the NASDAQ Global Market or any other NASDAQ market and cannot assure you that following the reverse share split the market price per each of our ordinary shares will either exceed or remain in excess of the $4.00 per share minimum bid price as required to meet the initial listing requirements for the NASDAQ Global Market.  In addition, we cannot predict whether, or assure you that, we will otherwise meet the initial listing requirements and thereafter the continued listing requirements of the NASDAQ Global Market.
 
 
92

 

Purpose and Objective

We are a public company registered under the Companies Law as Ellomay Capital Ltd., registration number 52-003986-8. Pursuant to Article 3.1 of our Articles, our objective is to undertake any lawful activity, including any objective set forth in our Memorandum of Association. Pursuant to Article 3.2 of our Articles, our purpose is to operate in accordance with commercial considerations with the intentions of generating profits. In addition, we may contribute reasonable amounts for any suitable purpose even if such contributions do not fall within our business considerations. The Board may determine the amounts of the contributions, the purpose for which the contribution is to be made, and the recipients of any such contribution.

Board of Directors

Under the Companies Law, the Board is authorized to set our strategy and supervise the performance of the duties and actions of our chief executive officer. Our Board may not delegate to a committee of the Board or the chief executive officer the right to decide on certain of the authorities vested in it, including determination of our strategy, distributions, certain issuances of securities and approval of financial reports. The powers conferred upon the Board are vested in the Board as a collective body and not in each one or more of the directors individually. Unless otherwise set forth in a resolution of the shareholders, the Board shall consist of not less than four (4) nor more than eight (8) directors (including any external d irectors whose appointment is mandated under the Companies Law).

The directors are elected annually at a general meeting of shareholders and remain in office until the next annual meeting at which time they retire, unless their office is previously vacated as provided in the Articles. A retiring director may be reelected. If no directors are elected at the annual meeting, all of the retiring directors remain in office pending their replacement at a general meeting. Holders of the ordinary shares do not have cumulative voting rights in the election of directors. Consequently, the holders of ordinary shares in the aggregate conferring more than 50% of the voting power, represented in person or by proxy, will have the power to elect all the directors. Pursuant to the Companies Law, publicly traded co mpanies must appoint at least two external directors to serve on their Board of Directors and Audit Committee.  For further information concerning external directors see “Item 6.C: Board Practices.”

The Companies Law codifies the fiduciary duties that an office holder has to a company. An office holder’s fiduciary duties consist of a Duty of Loyalty and a Duty of Care. For more information concerning these duties, the approval process of certain transactions and other board practices see “Item 6.C: Board Practices.”
 
Under the Companies Law, all arrangements with regard to the compensation of office holders who are not directors require the approval of the board of directors. Arrangements regarding the compensation of directors require audit committee, board and shareholder approval. Borrowing powers exercisable by the directors are not specifically outlined in the Company’s Articles.

No person shall be disqualified to serve as a director by reason of his not holding shares in Ellomay. Additionally, there is no age limit for the retirement of directors.
 
 
93

 

Chairman of the Board

Our Articles provide that our Chairman of the Board shall have no casting vote, unless (i) the Chairman of the Board is then Mr. Shlomo Nehama and (ii) Nechama Investments, together with any Affiliates (as defined in our Articles) thereof, then holds at least 25.05% of our outstanding shares. Our Articles further provide that, notwithstanding the foregoing, in case Mr. Shlomo Nehama elects to exercise his casting vote in respect of a specific resolution brought before the Board (the “Triggering Resolution”), then (a) prior to such exercise, Nechama Investments shall be required to trigger the “Buy Me Buy You” mechanism set forth in Section ý6 of the 2008 Shareholders Agreement as an Offering Party (as def ined in the 2008 Shareholders Agreement), whereby the Triggering Resolution will be pending until the consummation of the sale of the Restricted Shares (as defined in the 2008 Shareholders Agreement) of one party to the 2008 Shareholders Agreement to the other party of the 2008 Shareholders Agreement in accordance with such “Buy Me Buy You” mechanism; and (b) in the event that three (3) directors of our so require, the Triggering Resolution shall be conditioned upon the approval of our General Meeting pursuant to Article 25.1 of the Articles (requiring a special majority of 50.1% of the outstanding shares). Upon a transfer of the Restricted Shares by Kanir to third party in accordance with the terms of the 2008 Shareholders Agreement, the casting vote of the Chairman of the Board shall expire.
 
Rights of Shareholders

No preemptive rights are granted to holders of ordinary shares under the Articles or the Companies Law. Each ordinary share is entitled to one vote on all matters to be voted on by shareholders, including the election of directors. Non-residents of Israel may freely hold and trade the ordinary shares pursuant to general and specific permits issued under Israel’s Currency Control Law, 1978. Neither the Memorandum of Association nor the Articles make any distinction between residents and non-residents of Israel with respect to the ownership of ordinary shares. The Memorandum of Association, the Articles and Israeli law do not make any distinction between residents and non-residents of Israel with respect to the voting rights rela ted thereto.

An annual meeting of shareholders must be held once in every calendar year at such time (within a period of not more than fifteen months after the last preceding annual meeting) and at such place as may be determined by the Board. The Board may, at any time, convene Extraordinary General Meetings of shareholders, and shall be obligated to do so upon receipt of a requisition in writing of (i) two directors or one quarter of the directors holding office; and/or (ii) one or more shareholders holding at least 5% of the issued capital and at least 1% of the voting rights in the Company; and/or (iii) one or more shareholders holding at least 5% of the voting rights in the Company. A requisition must detail the objects for which the meeting must be convened and shall be signed by the persons requisitioning it and sent to the Company’s registered office. Where the Board of Directors is required to convene a special meeting, it shall do so within 21 days of the requisition being submitted. Prior to any general meeting a written notice thereof shall be made public as required by Israeli law. The Articles provided that we shall not be required to deliver notice to each shareholder, except as may be specifically required by Israeli law. The Articles further provide that a notice by us of a general meeting that is published in one international wire service shall be deemed to have been duly given on the date of such publication.

Two or more members present in person or by proxy and holding shares conferring in the aggregate more than 25% of the total voting power attached to our shares shall constitute a quorum at general meetings. If a meeting is adjourned due to the lack of a quorum (and provided that it was not convened due to the requisition of certain shareholders), any two shareholders, present in person or by proxy at the subsequent adjourned meeting, will constitute a quorum. Unless provided otherwise by the terms of issue of the shares, no member shall be entitled to be present or vote at a general meeting (or to be counted as part of the quorum) unless all amounts due as of the date designated for same general meeting with respect to his shares wer e paid. A resolution shall be deemed adopted if the requisite quorum is present and the resolution is supported by members present, in person or by proxy, vested with more than fifty percent (50%) of the total voting power attached to the shares whose holders were present, in person or by proxy, at such meeting and voted thereon, or such other percentage required by law or set forth in the Articles from time to time.
 
 
94

 

On March 24, 2008, in connection with the purchase of a controlling interest of our ordinary shares, Nechama Investments and Kanir entered into a shareholders agreement. Under the agreement, both parties agreed to vote all the Company’s shares held by them as provided in the agreement and, where the agreement is silent, as the parties shall agree prior to any meeting of the Company’s shareholders. In addition, the agreement provides that in the event the parties do not reach an agreement regarding certain resolution proposed to the Company’s shareholders meeting, the parties shall vote all of their shares against such proposed resolution. For further information with respect to the shareholders agreement, see “ ;Item 7.A.: Major Shareholders” under the caption “2008 Shareholders Agreement.”
 
Following the adoption of the Second Amended and Restated Articles at our general meeting of shareholders held on December 30, 2008, Article 25.5 provides that for so long as the 2008 Shareholders Agreement is in effect, at the written request of any two directors with respect to any proposed action or transaction (including certain related party transactions, any amendments to our Memorandum of Association or Articles, any merger or consolidation of the Company, any material change in the scope of our business, the voluntary liquidation or dissolution of the Company, approval of annual budget or business plan and material deviations therefrom and any change in signatory rights on behalf of the Company), such action or transaction shall require the approval of our general meeting by a resolution supported by members present, in person or by proxy, vested with at least 50.1% of our outstanding shares, or by such higher approval threshold as may be required by Israeli law.
 
Changing Rights Attached to Shares
 
According to our Articles, in order to change the rights attached to any class of shares, unless otherwise provided by the terms of the class, such change must be adopted by a general meeting of the shareholders and by a separate general meeting of the holders of the affected class with a majority of the voting power participating in such meeting. The provisions of the Articles relating to General Meetings of our shareholders shall apply, mutatis mutandis, to any separate General Meeting of the holders of the shares of a specific class; provided, however, that the requisite quorum at any such separate General Meeting shall be one or more members present in person or by proxy and holding not less than thirty three and one third percen t (33 1/3%) of the issued shares of such class.

Pursuant to the Companies Law, the quorum requirement for General Meetings and for separate General Meetings for holders of a specific class may be satisfied with the presence of at least two members present in person or by proxy and holding not less than 25% of the outstanding shares, or the shares of such class, as the case may be.
 
 
95

 

Dividends and Liquidation Rights
 
Our Board of Directors is authorized to declare dividends, subject to applicable law. Dividends may be paid only out of profits and other surplus, as defined in the Companies Law, as of the end of the most recent financial statements or as accrued over a period of two years, whichever is higher. Alternatively, if we do not have sufficient profits or other surplus, then permission to effect a distribution can be granted by order of an Israeli court. In any event, a distribution is permitted only if there is no reasonable concern that the dividend will prevent us from satisfying our existing and foreseeable obligations as they become due. 
 
Upon recommendation by the Board, dividends may be paid, in whole or in part, by the distribution of certain of our specific assets and/or by the distribution of shares and/or debentures of Ellomay and/or of any other company, or in any combination of such manners. Subject to special or restricted rights conferred upon the holders of shares as to dividends, if any, the dividends shall be distributed in accordance with our paid-up capital attributable to the shares for which the dividend has been declared. Our obligation to pay dividends or any other amount in respect of shares may be set-off against any indebtedness, however arising, liquidated or non-liquidated, of the person entitled to receive the dividend. Any dividend unclaimed within the period of seven years from the date stipulated for its payment shall be forfeited and returned to us, unless otherwise directed by the Board. In the event of the winding up of Ellomay, then, after satisfaction of liabilities to creditors and subject to provisions of any applicable law and to any special or restricted rights attached to a share, our assets in excess of our liabilities will be distributed among the shareholders in proportion to the paid-up capital attributable to the shares in respect of which the distribution is being made. Dividend and liquidation right may be affected by the grant of preferential dividends or distribution rights to the holders of a class of shares with preferential rights that may be authorized in the future.

Redemption Provisions

We may, subject to any applicable law, issue redeemable securities and then redeem them.

Certain Transactions with Controlling Persons

No provision in the Articles discriminates against an existing or prospective holder of securities, as a result of such shareholder owning a substantial amount of shares.  However, the Companies Law extends the disclosure requirements applicable to Office Holder as described in “Item 6.C: Board Practices,” to a controlling shareholder in a public company. The Companies Law defines a controlling shareholder the shareholder who can direct the activities of the company, including a person who holds 25% or more of the voting rights at the company’s general meeting, provided there is no other person that holds more than 50% of the voting rights in the company. If two or more shareholders are interested parties in the same transaction, their shareholdings are combined for the purposes of calculating percentages. If two or more shareholders are parties to a voting agreement, their interests are also generally combined for the purposes of calculating percentages. Extraordinary transactions between a public company and a controlling shareholder or a controlling shareholder’s relative, extraordinary transactions in which a controlling shareholder has a personal interest but which are between a public company and another entity, and the entering into agreements with the controlling shareholder, or his relative if such relative is an Office Holder, in connection with their terms of compensation, all require the approval of the audit committee, the board of directors and the shareholders. If required, shareholder approval must include at least one-third of the shareholders who have no personal interest in the transaction and are present and voting at the meeting. Alternatively, the total shareholdings of the disinte rested shareholders who vote against the transaction must not represent more than one percent of the voting rights in the company.
 
 
96

 

Under the Companies Regulations (Relief from Related Party Transactions), 2000, promulgated under the Companies Law (the “Relief Regulations”), certain extraordinary transactions between a company and its controlling shareholder(s), certain undertakings of a company to its directors in connection with their terms of service and certain transactions between a company and its controlling shareholder(s) or their relatives in their capacity as Office Holders of the company may be approved, if the conditions set forth in such regulations are met, without the requirement to obtain shareholder approval.  The Relief Regulations require that the company’s audit committee and board of directors determine that the co nditions set forth in the Relief Regulations are met.  One of the alternative conditions for approving an extraordinary transaction with a controlling shareholder is that such transaction only benefits the company.  Another available condition is that the transaction is in the ordinary course of business, on market terms, and does not harm the company.  The foregoing relief will not apply if one or more shareholders holding at least 1% of the issued and outstanding share capital of the company or of the company’s voting rights objects to the use by the company of such relief, provided that such objection is submitted to the company in writing not later than fourteen (14) days from the date in which companies such as our company reported the adoption of the resolution pursuant to the Relief Regulations to its shareholders.  If such objection is duly and timely submitted, then the transaction or compensation arrangement will require shareholders’ approval as detailed above.

Anti-takeover Provisions; Mergers and Acquisitions under Israeli Law
 
The Companies Law permits merger transactions with the approval of each party’s board of directors and generally requires shareholder approval, as well. Under a recent amendment to the Companies Law, a merger with a wholly owned subsidiary does not require approval of the surviving company’s shareholders. A merger does not require approval of the surviving company’s shareholders if (i) the merger does not require amending the surviving company’s memorandum of association or articles and (ii) the surviving company does not issue more than 20% of its voting power in connection with the merger and pursuant to the issuance no shareholder would become a controlling shareholder. Shareholder approval of the surviving co mpany would nevertheless be required if the other party to the merger, or a person holding more than 25% of the outstanding voting shares or means of appointing the board of directors of the other party to the merger, holds any shares of the surviving company. In accordance with the Companies Law, our Articles provide that a merger may be approved at a shareholders meeting by a majority of the voting power represented at the meeting, in person or by proxy, and voting on that resolution. The Companies Law provides that in determining whether the required majority has approved the merger, shares held by the other party to the merger, any person holding at least 25% of the outstanding voting shares or means of appointing the board of directors of the other party to the merger, or the relatives or companies controlled by these persons, are excluded from the vote. As described above, our Articles currently provide, under certain circumstances, including a merger of the Company, that two directors may require that , in addition to the majority prescribed by the Companies Law, a merger be approved by a resolution supported by shareholders present, in person or by proxy, vested with at least 50.1% of our outstanding shares.
 
 
97

 

Under the Companies Law, a merging company must inform its creditors of the proposed merger. Any creditor of a party to the merger may seek a court order blocking the merger, if there is a reasonable concern that the surviving company will not be able to satisfy all of the obligations of the parties to the merger. Moreover, a merger may not be completed until at least 50 days have passed from the time that a merger proposal was filed with the Israeli Registrar of Companies and 30 days have passed from the shareholder approval of the merger in each merging company.

The Companies Law provides that an acquisition of shares in a public company must be made by means of a tender offer if as a result of the acquisition the purchaser would become a 25% or greater shareholder of the company. This rule does not apply if there is already another 25% or greater shareholder of the company. Similarly, the Companies Law provides that an acquisition of shares in a public company must be made by means of a tender offer if as a result of the acquisition the purchaser would hold greater than a 45% interest in the company, unless there is another shareholder holding more than a 45% interest in the company. These requirements do not apply if, in general, the acquisition (1) was made in a private placement that rec eived shareholder approval, (2) was from a 25% or greater shareholder of the company which resulted in the acquiror becoming a 25% or greater shareholder of the company, or (3) was from a shareholder holding more than a 45% interest in the company which resulted in the acquiror becoming a holder of more than a 45% interest in the company.
 
If, as a result of an acquisition of shares, the acquiror will hold more than 90% of a company’s outstanding shares, the acquisition must be made by means of a tender offer for all of the outstanding shares. If less than 5% of the outstanding shares are not tendered in the tender offer, all the shares that the acquiror offered to purchase will be transferred to the acquirer. The Companies Law provides for appraisal rights if any shareholder files a request in court within three months following the consummation of a full tender offer. If more than 5% of the outstanding shares are not tendered in the tender offer, then the acquiror may not acquire shares in the tender offer that will cause his shareholding to exceed 90% of the o utstanding shares.
 
Regulations under the Companies Law provide that the Companies Law’s tender offer rules do not apply to a company whose shares are publicly traded outside of Israel, if pursuant to the applicable foreign securities laws and stock exchange rules there is a restriction on the acquisition of any level of control of the company, or if the acquisition of any level of control of the company requires the purchaser to make a tender offer to the public shareholders.

Duties of Shareholders

Under the Companies Law, a shareholder has a duty to act in good faith towards the company and other shareholders and to refrain from abusing his or her power in the company including, among other things, when voting in a general meeting of shareholders or in a class meeting on the following matters:
 
 
any amendment to the articles;
 
 
an increase in the company’s authorized share capital;
 
 
a merger; or
 
 
approval of related party transactions that require shareholder approval.
 
 
98

 

A shareholder has a general duty to refrain from depriving any other shareholder of their rights as a shareholder. In addition, any controlling shareholder, any shareholder who knows that it possesses the power to determine the outcome of a shareholder vote and any shareholder who has the power to appoint or prevent the appointment of an office holder in the company is under a duty to act with fairness towards the company. The Companies Law does not describe the substance of this duty of loyalty.

C.           Material Contracts

Asset Purchase Agreement with Hewlett-Packard Company
 
On December 9, 2007, we entered into an Asset Purchase Agreement with HP, whereby HP agreed to acquire, directly or through its subsidiaries, substantially all of our assets and business for a cash consideration of $117.5 million and to assume substantially all our business related liabilities. The shares of three of our wholly-owned subsidiaries, NUR Europe, NUR Japan and NUR Do Brazil were also included in the assets HP agreed to acquire. The purchase price was subject to upward or downward adjustment based on the net debt (bank debt less cash balances) of us and our subsidiaries as of the closing date.
 
The Asset Purchase Agreement includes representations and warranties made by us for the benefit of HP, with respect to our structure and various aspects of the business (including environmental and intellectual property issues), which generally survive for a period of eighteen months following the closing of the transaction or, with respect to representations and warranties made by us as to authorization and enforceability, the expiration of the applicable statute of limitations.
 
The assets and liabilities connected to our business that were not assumed by HP include, among other things, cash balances held by us and our subsidiaries that were not purchased by HP, short and long term bank credit and loans, all costs incurred in respect to the HP Transaction including severance liabilities, rights and obligations in respect to employees not transferred to HP, rights and obligations related to outstanding litigation, claims and disputes; intercompany balances, all tax benefits and obligations with the exception of such benefits and obligations relating to continuing operations from the closing date, assets and obligations in respect of certain government-supported research and development projects and obligation s due to or from shareholders.
 
We agreed to indemnify HP against damages or losses arising from, among others, any breach or inaccuracy of the representations and warranties, any assets or liabilities that were not assumed by HP and certain environmental matters. Our indemnification liability pursuant to the Asset Purchase Agreement is subject to certain customary minimal amount limitations and is also generally limited to amounts deposited in an indemnity escrow ($9.5 million deposited for a period of 18 months and $5 million deposited for a period of 24 months). However, we agreed that claims for indemnity relating to certain liabilities, including, among others, fraud, willing and intentional breach of warranties, liabilities arising in connection with assets or liabilities that were not purchased by HP, failure to comply with certain restrictive covenants, and environmental issues, will not be limited to the amounts deposited in escrow.
 
 
99

 
 
The Asset Purchase Agreement also contains ongoing covenants on our part, such as undertakings with respect to confidential information and non-solicitation and non-compete restrictions.

On the APA Closing Date (February 29, 2008), the sale of our business to HP was finalized. The base purchase price pursuant to the Asset Purchase Agreement is $117.5 million. The purchase price was subject to upward or downward adjustment based on the net debt (bank debt less cash balances) of the Company and its subsidiaries that were not purchased by HP as of the APA Closing Date.  The purchase price adjustment on such date was approximately $4 million, increasing the total consideration under the Asset Purchase Agreement from $117.5 million to $121.5 million. Following the APA Closing Date, the parties reached a mutual resolution to assign NUR Europe’s facilities and related capital lease to a third party. Therefor e, we were entitled to additional net proceeds (after deduction of HP’s expenses in connection with such capital lease and other expenses that were to be borne by us pursuant to the Asset Purchase Agreement) in the amount of $1.1 million as additional consideration for NUR Europe’s shares, increasing the aggregate consideration in connection with the HP Transaction to $122.6 million.
 
Of the total consideration:
 
 
$103.9 million was transferred to us on the APA Closing Date.
 
 
$1.6 million was withheld by HP until final calculation of the net debt as of the APA Closing Date. Based on the final net debt calculation we were entitled only to an amount of $1.504 million, which was transferred to us on July 30, 2008.
 
 
$1.5 million was withheld by HP until the resolution of NUR Europe’s obligations with respect to its capital lease and Government grants. Of the $1.5 million withheld, an amount of $1 million was transferred to us on December 2, 2008 as a result of the assignment of NUR Europe’s facilities and related capital lease to a third party.  The $0.5 million withheld in connection with NUR Europe’s obligations with respect to the government grants is still being held by HP.
 
 
Of the additional proceeds in the amount of $1.1 million related to NUR Europe’s facilities, a total amount of $0.4 million was transferred to us on December 18, 2008 and an additional amount of approximately $0.7 million was transferred to us on March 13, 2009.
 
 
The remaining $14.5 million was deposited into an escrow account to secure the indemnity obligations of the Company and its remaining subsidiaries. The escrow funds, net of amounts distributed to HP in satisfaction of indemnity obligations, were to be distributed to us in two installments: $9.5 million was to be released to us eighteen months following the APA Closing Date and $5 million was to be released to us twenty-four months following the APA Closing Date. However, in August 2009 and January 2010, HP submitted claims requesting the release of amounts from the escrow funds to HP. For details see “Item 5.A: Operating and Financial Review and Prospects - Overview”.
 
 
100

 
 
The foregoing description of the Asset Purchase Agreement is only a summary and does not purport to be complete and is qualified by reference to the full text of the Asset Purchase Agreement filed by us as Exhibit 4.7 in Item 19.
 
For details with respect to additional consequences of the HP Transaction see “Item 6.B: Compensation,” “Item 6.D: Employees” and “Item 5.B: Liquidity and Capital Resources.”
 
Management Services Agreement with Kanir and Meisaf
 
At the annual shareholders meeting held on December 30, 2008, our shareholders approved the terms of a management services agreement among us, Kanir and Meisaf, effective as of March 31, 2008 (the “Management Agreement”).

The Management Agreement provides, among other things, that Meisaf and Kanir, through their employees, officers and directors, will assist us in connection with the process of identifying and evaluating opportunities to acquire operations, otherwise provide us with management services and advise and provide assistance to our management concerning our affairs and business.  It is further agreed that the management services will be provided primarily by Messrs. Nehama, Fridrich and Raphael.

In addition, the Management Agreement notes that Kanir’s and Meisaf’s representatives on our Board of Directors, Messrs. Nehama, Fridrich and Raphael, or other affiliates of such entities, serve and will continue to serve on our Board of Directors.  In providing the Board services, the directors and the Chairman of the Board will be subject to any and all fiduciary and other duties applicable to them under law and under our Articles and they are required to dedicate as much time as reasonably necessary for the proper performance of such services.

In consideration of the performance of the management services and the Board services, we have agreed to pay to Meisaf and Kanir, in equal parts, an aggregate annual fee in the amount of $250,000, to be paid on a quarterly basis.  Meisaf and Kanir will also be entitled to receive reimbursement for reasonable out-of-pocket business expenses borne by them in connection with the provision of the services, as customary in the Company.  In connection with the Management Agreement, the Board representatives of Kanir and Mr. Nehama waived any director fees and options to purchase our ordinary shares they may be entitled to as a result of their service on our Board of Directors.

The Management Agreement was initially in effect until the earlier of: (i) the second anniversary of the effective date of the Agreement (March 31, 2010) or (ii) the termination of service of either of the Kanir and Nechama Investments affiliates on our Board of Directors.  However, our Audit Committee, Board of Directors and finally the shareholders, at the annual meeting of shareholders held on December 30, 2009, approved an extension to the Management Agreement, so that it shall remain in effect until the earlier of: (i) March 31, 2011, or (ii) the termination of service of either of the Kanir and Nechama Investments affiliates on our Board of Directors.  Any revision or amendment of the Management Agreement, o r extension of its term, will require the approvals set forth under applicable law and our Articles.
 
 
101

 

D.           Exchange Controls

Dividends, if any, paid by us to the holders of our ordinary shares, and any amounts payable upon our dissolution, liquidation or winding up, as well as the proceeds of any sale in Israel of our ordinary shares to an Israeli resident, may be paid in non-Israeli currency. If these amounts are paid in Israeli currency, they may be converted into U.S. dollars at the rate of exchange prevailing at the time of conversion. However, legislation remains in effect pursuant to which currency controls can be imposed by administrative action at any time.
 
          The State of Israel does not restrict in any way the ownership or voting of ordinary shares of Israeli entities by non-residents of Israel, except with respect to subjects of countries that are in a state of war with Israel.
 
E.           Taxation

Israeli Taxation and Investment Programs

The following is a summary of the material Israeli tax consequences, Israeli foreign exchange regulations and certain Israeli government programs as they relate to our shareholders and us. To the extent that the discussion is based on new tax or other legislation that has not been subject to judicial or administrative interpretation, there can be no assurance that the views expressed in the discussion will be accepted by the tax or other authorities in question. The discussion is not intended, and should not be construed, as legal or professional tax advice and is not exhaustive of all possible tax considerations.

General Corporate Tax Structure

Israeli companies are generally subject to company tax on their taxable income. The applicable rate is 29% in 2007, 27% in 2008, 26% in 2009, 25% in 2010, and scheduled to decline to 24% in 2011, 23% in 2012, 22% in 2013, 21% in 2014, 20% in 2015 and 18% in 2016 and thereafter.

Law for the Encouragement of Industry (Taxes), 5729-1969

Prior to the HP Transaction, we were qualified as an industrial company within the definition of the Law for the Encouragement of Industry (Taxes), 5729-1969, or the Industry Encouragement Law, which provides several tax benefits for industrial companies. An industrial company is defined as a company resident in Israel, at least 90% of the income of which in a given tax year (determined in Israeli currency, exclusive of income from specified government loans, capital gains, interest and dividends) is derived from an industrial enterprise owned by it. An industrial enterprise is defined as an enterprise whose major activity in a given tax year is industrial production activity.

Under the Industry Encouragement Law, industrial companies are entitled to a number of corporate tax benefits, including:
 
 
deduction of purchase of know-how and patents over an eight-year period for tax purposes; and
 
 
the right to elect, under specified conditions, to file a consolidated tax return with additional related Israeli industrial companies and an industrial holding company.
 
 
102

 
 
Under some tax laws and regulations, an industrial enterprise may be eligible for special depreciation rates for machinery, equipment and buildings. These rates differ based on various factors, including the date the operations begin and the number of work shifts. An industrial company owning an approved enterprise may choose between these special depreciation rates and the depreciation rates available to the approved enterprise.

Eligibility for benefits under the Industry Encouragement Law is not subject to receipt of prior approval from any governmental authority.

Capital Gains Tax on Sales of Our Ordinary Shares

Israeli law generally imposes a capital gains tax on the sale of any capital assets by residents of Israel, as defined for Israeli tax purposes, and on the sale of assets located in Israel, including shares in Israeli companies, by both residents and non-residents of Israel, unless a specific exemption is available or unless a tax treaty between Israel and the shareholder’s country of residence provides otherwise. The law distinguishes between real gain and inflationary surplus. The inflationary surplus is a portion of the total capital gain, which is equivalent to the increase of the relevant asset’s purchase price, which is attributable to the increase in the Israeli consumer price index between the date of purchase and the date of sale. The real gain is the excess of the total capital gain over the inflationary surplus.

Taxation of Israeli Residents

The tax rate applicable to capital gains derived from the sale of shares, whether listed on a stock market or not, is 20% for Israeli individuals, unless such shareholder claims a deduction for financing expenses in connection with such shares, in which case the gain will generally be taxed at a rate of 25%. Additionally, if such shareholder is considered a “significant shareholder” at any time during the 12-month period preceding such sale (i.e., such shareholder holds directly or indirectly, including jointly with others, at least 10% of any means of control in the company) the tax rate will be 25%. Israeli companies are subject to the corporate tax rate on capital gains derived from the sale of shares, unless such comp anies were not subject to the Adjustments Law (or certain regulations) at the time of publication of the aforementioned amendment to the Tax Ordinance, in which case the applicable tax rate is 25%. However, different tax rates may apply to dealers in securities and shareholders who acquired their shares prior to an initial public offering.

Taxation of Non-Israeli Residents

Non-Israeli residents are generally exempt from Israeli capital gains tax on any gains derived from the sale of shares of Israeli companies publicly traded on a recognized stock market outside of Israel, provided such shareholders did not acquire their shares prior to the issuer’s initial public offering and that the gains did not derive from a permanent establishment of such shareholders in Israel and that such shareholders are not subject to the Inflationary Adjustments Law. However, non-Israeli corporations will not be entitled to such exemption if an Israeli resident (i) has a controlling interest of 25% or more in such non-Israeli corporation, or (ii) is the beneficiary or is entitled to 25% or more of the revenues or prof its of such non-Israeli corporation, whether directly or indirectly.
 
 
103

 

In addition, the sale, exchange or disposition of our ordinary shares by a shareholder who is a U.S. resident (for purposes of the U.S.-Israel Tax Treaty) holding ordinary shares as a capital asset is also exempt from Israeli capital gains tax under the U.S.-Israel Tax Treaty unless either (i) the shareholder holds, directly or indirectly, shares representing 10% or more of our voting power during any part of the 12-month period preceding such sale or (ii) the capital gains arising from such sale are attributable to a permanent establishment of the shareholder located in Israel. If the above conditions are not met, the U.S. resident would be subject to Israeli tax, to the extent applicable; however, under the U.S.-Israel Tax Treaty, the gain would be treated as foreign source income for United States foreign tax credit purposes and such U.S. resident would be permitted to claim a credit for such taxes against the United States income tax imposed on such sale, exchange or disposition, subject to the limitations under the United States federal income tax laws applicable to foreign tax credits.

U.S. Tax Considerations Regarding Ordinary Shares

The following is a general summary of the material United States federal income tax consequences relating to the acquisition, ownership and disposition of our ordinary shares by an investor that holds those shares as capital assets within the meaning of Section 1221 of the Internal Revenue Code of 1986, as amended (the “Code”). The summary is based on the tax laws of the United States, and existing final, temporary and proposed Treasury Regulations, Revenue Rulings and judicial decisions, as in effect on the date hereof, all of which are subject to prospective and retroactive changes, and to differing interpretations. The summary does not purport to address all federal income tax consequences that may be relevant to parti cular investors, and does not take into account the specific circumstances of any particular investors, some of which (such as tax-exempt entities, banks and financial institutions, insurance companies, real estate investment trusts, regulated investment companies, broker-dealers, traders in securities that elect to use a mark-to-market method of accounting for their securities holdings, investors liable for alternative minimum tax, investors that own or are treated as owning 10% or more of our voting stock, investors that hold ordinary shares as part of a straddle, hedge, conversion transaction or other integrated transaction, U.S. expatriates and investors whose functional currency is not the U.S. dollar) may be subject to special tax rules. ACCORDINGLY, PERSONS CONSIDERING THE PURCHASE OF ORDINARY SHARES SHOULD CONSULT THEIR OWN TAX ADVISORS CONCERNING THE APPLICATION OF UNITED STATES FEDERAL INCOME TAX LAWS, AS WELL AS THE LAWS OF ANY STATE, LOCAL OR FOREIGN TAXING JURISDICTION, TO THEIR PARTICULAR SITUA TIONS.

For purposes of this discussion, a “U.S. Holder” is any beneficial owner of shares of our ordinary shares that, for U.S. federal income tax purposes, is:

 
(1)
an individual citizen or resident of the United States,
 
 
(2)
a corporation or other entity taxable as a corporation for U.S. federal income tax purposes organized in or under the laws of the United States or any political subdivision thereof,
 
 
(3)
an estate the income of which is subject to U.S. federal income tax without regard to its source, or
 
 
(4)
a trust, if such trust was in existence on August 20, 1996 and has validly elected to be treated as a U.S. person for U.S. federal income tax purposes, or if (a) a court within the U.S. can exercise primary supervision over its administration and (b) one or more U.S. persons have the authority to control all of the substantial decisions of such trust.
 
 
104

 
 
If a partnership (including for this purpose any entity treated as a partnership for U.S. tax purposes) is a beneficial owner of shares of our ordinary shares, the U.S. tax treatment of a partner in the partnership will generally depend on the status of the partner and the activities of the partnership.  A holder of shares of our ordinary shares that is a partnership and partners in such partnership should consult their individual tax advisors about the U.S. federal income tax consequences of holding and disposing of shares of our ordinary shares.

A “Non-U.S. Holder” is any beneficial owner of our ordinary shares that is not a U.S. Holder and is not a partnership (or its partners).

Taxation of U.S. Holders

Distributions on Ordinary Shares.  Subject to the discussion in “Passive Foreign Investment Companies” below, distributions made by us with respect to ordinary shares generally will constitute dividends for federal income tax purposes and will be taxable to a U.S. Holder as a dividend to the extent of our undistributed current or accumulated earnings and profits (as determined for United States federal income tax purposes). Distributions in excess of our current and accumulated earnings and profits will be treated first as a nontaxable return of capital reducing the U.S. Holder’s tax basis in the ordinary shares, thus in creasing the amount of any gain (or reducing the amount of any loss) which might be realized by such Holder upon the sale or exchange of such ordinary shares. Any such distributions in excess of the U.S. Holder’s tax basis in the ordinary shares will be treated as capital gain to the U.S. Holder and will be either long term or short term capital gain depending upon the U.S. Holder’s federal income tax holding period for the ordinary shares. Dividends paid by us generally will not be eligible for the dividends received deduction available to certain United States corporate shareholders under Code Sections 243 and 245. If you are a noncorporate U.S. Holder, dividends paid to you in taxable years beginning before January 1, 2011, will be taxable to you at a maximum rate of 15% provided that you hold ordinary shares for more than 60 days during the 120-day period beginning 60 days before the ex-dividend date and meet other holding period requirements.

A dividend paid in New Israeli Shekel will be included in gross income in a U.S. dollar amount based on the Israeli NIS/U.S. dollar exchange rate in effect on the date the dividend is included in the income of the U.S. Holder, regardless of whether the payment, in fact, is converted into U.S. dollars.  Generally, any gain or loss resulting from currency exchange fluctuations during the period from the date the dividend payment is included in the gross income of a U.S. Holder through the date that payment is converted into U.S. dollars (or otherwise disposed of) will be treated as U.S. source ordinary income or loss and will not be eligible for the special tax rate applicable to qualified dividend income.

Subject to certain conditions and limitations, any Israeli withholding tax imposed upon distributions which constitute dividends under United States income tax law will be eligible for credit against a U.S. Holder’s federal income tax liability. Alternatively, a U.S. Holder may claim a deduction for such amount, but only for a year in which a U.S. Holder elects to do so with respect to all foreign income taxes. The overall limitation on foreign taxes eligible for credit is calculated separately with respect to specific classes of income. For this purpose, dividends distributed with respect to our ordinary shares will generally constitute “passive income.”
 
 
105

 

Sale or Exchange of Ordinary Shares.  Subject to the discussion in “Passive Foreign Investment Companies” below, a U.S. Holder of ordinary shares generally will recognize capital gain or loss upon the sale or exchange of the ordinary shares measured by the difference between the amount realized and the U.S. Holder’s tax basis in the ordinary shares. Gain or loss will be computed separately for each block of shares sold (shares acquired separately at different times and prices). The deductibility of capital losses is restricted and generally may only be used to reduce capital gains to the extent thereof. However, individu al taxpayers generally may deduct annually $3,000 of capital losses in excess of their capital gains.

Passive Foreign Investment Company.  A foreign corporation generally will be treated as a “passive foreign investment company” (“PFIC”) if, after applying certain “look-through” rules, either (i) 75% or more of its gross income is passive income or (ii) 50% or more of the average value of its assets is attributable to assets that produce or are held to produce passive income. Passive income for this purpose generally includes dividends, interest, rents, royalties and gains from securities and commodities transactions. The look-through rules require a foreign corporation that owns at least 25%, by value, of the stock of another corporation to treat a proportionate amount of assets and income as held or received directly by the foreign corporation.  We must make a separate determination each year as to whether we are a PFIC.  As a result, our PFIC status may change.  The determination of whether or not we are a PFIC depends on the composition of our income and assets, including goodwill, from time to time.

Following the consummation of the HP Transaction, our assets mainly consist of cash and cash equivalents producing passive income. Since our assets and income in 2009 exceeded the PFIC specified levels, we have not met the requirements set forth in Section 1298(b)(3) of the Internal Revenue Code, providing an exception from the PFIC status for a “change of business” situation for our 2008 taxable year.   Since PFIC shares are subject to the PFIC rules even in future years in which we are no longer a PFIC, therefore, our ordinary shares will be PFIC shares with respect to any U.S. shareholder that held our shares in 2008 and 2009.  The determination of our PFIC status in 2010 (for shareholders that acquire our ordinary shares in 2010) depends on the type of assets we hold during the year and the income derived from such assets, we cannot determine as of yet whether or not we will be a PFIC for the 2010 tax year.

U.S. Holders who own our ordinary shares during the taxable year in which we are a PFIC generally will be subject to increased U.S. tax liabilities and reporting requirements for that taxable year and all succeeding years, regardless of whether we continue to meet the income or asset test for PFIC status, although shareholder elections may apply in certain circumstances.  U.S. Holders should consult their own tax advisors regarding our status as a PFIC and the consequences of investment in a PFIC.

If we are a PFIC for any taxable year during which you hold ordinary shares, you will be subject to special tax rules with respect to any “excess distribution” that you receive and any gain you realize from a sale or other disposition (including a pledge) of the ordinary shares, unless you make a “mark-to-market” election as discussed below.  Distributions you receive in a taxable year that are greater than 125% of the average annual distributions you received during the shorter of the three preceding taxable years or your holding period for the ordinary shares will be treated as an excess distribution.  Under these special tax rules:
 
 
106

 

 
(1)
the excess distribution or gain will be allocated ratably over your holding period for the ordinary shares,
 
 
(2)
the amount allocated to the current taxable year, and any taxable year prior to the first taxable year in which we were a PFIC, will be treated as ordinary income, and
 
 
(3)
the amount allocated to each other year will be subject to tax at the highest tax rate in effect for that year and the interest charge generally applicable to underpayments of tax will be imposed on the resulting tax attributable to each such year.
 
The tax liability for amounts allocated to years prior to the year of disposition or “excess distribution” cannot be offset by any net operating losses, and gains (but not losses) realized on the sale of the ordinary shares cannot be treated as capital, even if you hold the ordinary shares as capital assets.

You may not avoid taxation under the rules described above by making a “qualified electing fund” election to include your share of our income on a current basis because we do not presently intend to prepare or provide information necessary to make such election.

Alternatively, a U.S. Holder of “marketable stock” in a PFIC may make a mark-to-market election for stock of a PFIC to elect out of the tax treatment discussed three paragraphs above.  If you make a mark-to-market election for the ordinary shares, you will include in income each year an amount equal to the excess, if any, of the fair market value of the ordinary shares as of the close of your taxable year over your adjusted basis in such ordinary shares.  You are allowed a deduction for the excess, if any, of the adjusted basis of the ordinary shares over their fair market value as of the close of the taxable year.  However, deductions are allowable only to the extent of any net mark-to-marke t gains on the stock included in your income for prior taxable years.  Amounts included in your income under a mark-to-market election, as well as gain on the actual sale or other disposition of the ordinary shares, are treated as ordinary income.  Ordinary loss treatment also applies to the deductible portion of any mark-to-market loss on the ordinary shares, as well as to any loss realized on the actual sale or disposition of the ordinary shares, to the extent that the amount of such loss does not exceed the net mark-to-market gains previously included for such ordinary shares.  Your basis in the ordinary shares will be adjusted to reflect any such income or loss amounts.  The tax rules that apply to distributions by corporations which are not passive foreign investment companies generally would apply to distributions by us.

The mark-to-market election is available only for stock which is regularly traded on a national securities exchange that is registered with the Securities and Exchange Commission or on Nasdaq, or an exchange or market that the U.S. Secretary of the Treasury determines has rules sufficient to ensure that the market price represents a legitimate and sound fair market value.  Our ordinary shares are currently quoted on the over-the-counter market in the “Pink Sheets.” As a result of our shares trading on the over-the-counter-market, the mark-to-market election may not be available to you.

Please consult your tax advisor as to the availability of the mark-to-market election, and the tax ramifications of such election (including the special rules that may apply to the gain realized in the year of the election).
 
 
107

 

Dividends paid by a PFIC (or by a company that was a PFIC in the year preceding the dividend) are not “qualified dividend income” for purposes of the preferential tax rate on dividends discussed above.

Special limitations may apply to use of foreign tax credits arising in connection with distributions on PFIC shares as to which you should consult your tax advisor.

If you hold ordinary shares in any year in which we are a PFIC, you would be required to file Internal Revenue Service Form 8621 regarding distributions received on the ordinary shares and any gain realized on the disposition of the ordinary shares.

Taxation of Non-U.S. Holders

Distributions on Ordinary Shares.  Distributions made with respect to our ordinary shares to non-U.S. Holders who are not engaged in the conduct of a trade or business within the United States will be subject to United States withholding tax only if 25% or more of our gross income (from all sources for the three-year period ending with the close of the taxable year preceding the declaration of the distribution) was effectively connected with our conduct of a trade or business in the United States. We do not anticipate engaging in the conduct of a trade or business within the United States, except through subsidiaries. However, if the 25% threshold for such period is exceeded, a portion of any distribution paid by us to a non-U.S. Holder could be subject to federal income tax withholding at the rate of 30%; the portion of the distribution that could be subject to withholding would correspond to the portion of our gross income for the period that is effectively connected to its conduct of a trade or business within the United States.

Sale or Exchange of Ordinary Shares.  A non-U.S. Holder will not be subject to United States federal income tax on any gain realized upon the sale or exchange of ordinary shares unless (i) the gain is effectively connected with a trade or business in the United States of the non-U.S. Holder, or (ii) the non-U.S. Holder is an individual who was present in the United States for 183 days or more in the taxable year of the disposition and other conditions exist.

United States Business.  Dividends and gains that are effectively connected with a Non-U.S. Holder’s conduct of a trade or business in the United States generally will be subject to tax in the same manner as they would be for U.S. Holder.  Effectively connected dividends and gains received by a corporate Non-U.S. Holder may also be subject to an additional branch profits tax at a 30% rate or a lower tax treaty rate.

Backup Withholding and Information Reporting

In general, information reporting requirements will apply to dividends in respect of our ordinary shares or the proceeds received on the sale, exchange or redemption of our ordinary shares paid within the United States (and in certain cases, outside the United States) to U.S. Holders other than certain exempt recipients, such as corporations, and  backup withholding tax may apply to such amounts if the U.S. Holder fails to provide an accurate taxpayer identification number or to report interest and dividends required to be shown on its U.S. federal income tax returns.  The amount of any backup withholding from a payment to a U.S. Holder will be allowed as credit against the U.S. Holder’s U.S. federal income tax liability provided that the appropriate returns are filed.
 
A Non-U.S. Holder generally may eliminate the requirement for information reporting and backup withholding by providing certification of its foreign status to the payor, under penalties of perjury, on IRS Form W-8BEN.
 
 
108

 

F.           Dividends and paying agents

For information regarding dividend restrictions, see “Item 10.B Memorandum and Articles of Association – Dividends and Liquidation Rights”. See also “Item 10.E: Taxation of U.S. Holders”. In the event we were to declare a dividend, we anticipate that our transfer agent, Continental Stock Transfer and Trust, would serve as paying agent.

G.           Statement by experts
 
The consolidated financial statements of Ellomay Capital Ltd. at December 31, 2009 and 2008, and for each of the three years in the period ended December 31, 2009, included in this annual report, have been audited by Kost Forer Gabbay & Kasierer, a Member of Ernst & Young Global, independent registered public accounting firm, as set forth in their report thereon included elsewhere herein, and are included in reliance upon such report given on the authority of such firm as experts in accounting and auditing.
 
H.           Documents on display

Any statement in this report about any of our contracts or other documents is not necessarily complete. If the contract or document is filed as an exhibit to this report or any of our annual reports or to a registration statement or other documents filed by us, the contract or document is deemed to modify the description contained in this report. You must review the exhibits themselves for a complete description of the contract or document.

You may review a copy of our filings with the SEC, including exhibits and schedules, and obtain copies of such materials at the SEC’s public reference room at Room 1024, Judiciary Plaza, 450 Fifth Street, N.W, Washington, D.C. 20549. You may also obtain copies of such materials from the Public Reference Room of the SEC, Room 1580, 100 Street, N.E., Washington, D.C. 20549, at proscribed rates. You may call the SEC at 1-800-SEC-0330 for further information on the public reference room. The SEC maintains an Internet site (http://www.sec.gov) that contains reports, proxy and information statements and other information regarding registrants that file electronically with the SEC.

These SEC filings are also available to the public from commercial document retrieval services.

I.           Subsidiary Information

Not applicable.
 
 
109

 


Market risks relating to our operations result primarily from weak economic conditions in the markets in which we sell our products and from changes in exchange rates or in interest rates.

Inflation, Deflation and Fluctuation of Currencies

See “Item 5.A: Impact of Inflation, Deflation and Fluctuation of Currencies.”

Interest Rate

As we did not have any outstanding long-term or short-term bank loans during the year ended December 31, 2009, we are not exposed to interest rate variation on liabilities.

Following the consummation of the HP Transaction in February 29, 2008, most of our assets are cash and short-term U.S. dollar-denominated deposits with a U.S. bank. We carefully monitor the banking institutions that we use with respect to their exposure to the current financial market situation. Other than that, the major market risk is currently the potential decline in the U.S. monetary interest rate that would impact our results of operations.

We do not otherwise believe the disclosure required by Item 11 of this report to be material to us.
 

Not Applicable.

PART II
 

Not Applicable.


For the current terms of our Articles, following the adoption of our Second Amended and Restated Articles at our annual general meeting held on December 30, 2008, see “Item 10.B: Memorandum of Association and Second Amended and Restated Articles.”  This Item is otherwise not applicable to us.

(a) Disclosure Controls and Procedures

Our principal executive officer and principal financial officer evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended) as of the end of the period covered by this annual report. Such disclosure controls and procedures are designed to ensure that information required to be disclosed by us is accumulated and communicated to the appropriate management, including the principal executive officer and principal financial officer, on a basis that permits timely decisions regarding timely disclosure. Based on that evaluation, such principal executive officer and principal financial officer concluded that our disclosure controls and procedures were effective as of the end of the period covered by this annual report.
 
 
110

 

In order to provide reasonable assurance that the information required to be disclosed by the Company in reports filed under the Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms our chief executive officer and chief financial officer performed several actions intended to assure the correctness of the information disclosed, including personal discussions with employees involved in the recording, processing and summarizing of information required to be disclosed.
 
(b) Management’s Annual Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is defined in Rule 13a-15(f) promulgated under the Securities Exchange Act of 1934 as a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles and includes those policies and procedures that:
 
(i)
pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the company;
 
(ii)
provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and
 
(iii)
provide reasonable assurance regarding prevention or timely protection of unauthorized acquisition, use or disposition of the company’s assets that could have a material effect on the financial statements.
 
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

The Company’s management assessed the effectiveness of the Company’s internal control over financial reporting as of December 31, 2009. In making this assessment, the Company’s management used the criteria in Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
 
 
111

 
 
Based on this assessment, our Chief Executive Officer and Chief Financial Officer have concluded that, as of December 31, 2009, our internal control over financial reporting is effective based on those criteria.

This annual report does not include an attestation report of the company’s registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the company’s registered public accounting firm pursuant to temporary rules of the SEC that permit the company to provide only management’s report in this annual report.

(c) Changes in Internal Control over Financial Reporting

There were no changes in our internal control over financial reporting that occurred during the year ended December 31, 2009 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.



In February 2010, our Board determined that it has at least one Audit Committee financial expert, as defined in Item 16A of Form 20-F, serving on the Audit Committee. Barry Ben-Zeev has been designated as the Audit Committee financial expert and was also determined to be “independent” under the applicable SEC and Nasdaq regulations. For additional information regarding Barry Ben-Zeev’s financial experience, see “Item 6: Directors and Senior Management.”


Our Audit Committee and Board have adopted a code of ethics, as defined in Item 16B of Form 20-F, that applies to our chief executive officer, chief financial officer and any other person bearing the title of vice president or higher in the Finance Department of Ellomay and its subsidiaries. A copy of the code of ethics has been filed as an exhibit to our annual report on Form 20-F for the year ended December 31, 2003.

There are no material modifications to, or waivers from, the provisions of the code of ethics that are required to be disclosed.


Fees paid to the Independent Registered Public Accounting Firm

Our principal accountants for the years 2008 and 2009 were Kost Forer Gabbay & Kasierer, a member of Ernst & Young Global.

The following table sets forth, for each of the years indicated, the fees paid to our independent registered public accounting firm.
 
 
112

 

   
2008
   
2009
 
             
Audit Fees(1)
  $ 79     $ 78  
Audit-Related Fees
    -          
Tax Fees(2)
  $ 177     $ 29  
All Other Fees
    -          
Total
  $ 256     $ 107  
______________________
(1)
Professional services rendered by our independent registered public accounting firm for the audit of our annual financial statements or services that are normally provided by the accountants in connection with statutory and regulatory filings or engagements.
(2)
Professional services rendered by our independent registered public accounting firm for international and local tax compliance and tax advice services.

Audit Committee’s pre-approval policies and procedures

Our Audit Committee nominates and engages our registered public accounting firm to audit our financial statements. See also the description under the heading in “Item 6.C: Board Practices.” In July 2003, our Audit Committee also adopted a policy requiring management to obtain the Audit Committee’s approval before engaging our independent auditors worldwide to provide any other audit or permitted non-audit services to us. Pursuant to this policy, which is designed to assure that such engagements do not impair the independence of our auditors, the Audit Committee pre-approves annually a catalog of specific audit and non-audit services in the categories audit service, audit-related service and tax services that may be performed by our auditors.


Not Applicable.


Not Applicable.


Not Applicable.


Not Applicable.
 
PART III


Not Applicable.
 

See Financial Statements included at the end of this report.
 
 
113

 
 

Number
 
Description
     
1.1
 
Memorandum of Association of the Registrant (translated from Hebrew)(1)
1.2
 
Second Amended and Restated Articles of the Registrant(2)
2.1
 
Specimen Certificate for ordinary shares(3)
2.2
 
Form of Warrant Agreement, dated April 17, 2005 between the Registrant and Dan Purjes(4)
2.3
 
Form of Registration Rights Agreement, dated March 7, 2005, between the Registrant and Dan Purjes(5)
2.4
 
Form of Warrant Agreement, dated October 31, 2005, among the Registrant and certain investors(6)
2.5
 
Form of Registration Rights Agreement, dated September 12, 2005, among the Registrant, certain investors, Bank Hapoalim, Bank Leumi and Israel Discount Bank(6)
2.6
 
Form of Warrant Agreement, dated December 8, 2005, between the Registrant and Bank Hapoalim B.M.(6)
2.7
 
Form of Warrant Agreement, dated December 8, 2005, between the Registrant and Bank Leumi le-Israel B.M.(6)
2.8
 
Form of Warrant Agreement, dated December 8, 2005, between the Registrant and Israel Discount Bank Ltd.(6)
2.9
 
Form of Subscription Agreement, between the Registrant and certain investors, executed in connection with a private placement completed in January and February 2007(7)
2.10
 
Form of Warrant Agreement, between the Registrant and certain investors, executed in connection with a private placement completed in January and February 2007 (7)
4.1
 
1995 Israel Stock Option Plan (previously referred to in Company filings as the 1995 Flexible Stock Incentive Plan or the 1995 Stock Option / Stock Purchase Plan)(2)
4.2
 
Amendment to the 1995 Israel Stock Option Plan(8)
4.3
 
1997 Stock Option Plan(9)
4.4
 
1998 Non-Employee Directors Share Option Plan(7)
4.5
 
2000 Stock Option Plan(7)
4.6
 
Form of Indemnification Agreement and Form of Exemption Letter between the Registrant and its officers and directors(10)
4.7
 
Asset Purchase Agreement, dated December 9, 2007, between the Registrant and Hewlett-Packard Company(11)
4.8
 
Management Services Agreement, by and among the Registrant, Kanir Joint Investments (2005) Limited Partnership and Meisaf Blue & White Holdings Ltd., effective as of March 31, 2008(12)
4.9
 
Form of Offer to Repurchase Employee Stock Options, dated April 2, 2008(13)
4.10
 
Engineering Procurement & Construction Contract for the Construction of a Photovoltaic System in Cingoli, between Ellomay PV One S.R.L. and Ecoware S.P.A., dated March 4, 2010
 
 
114

 
 
Number   Description
     
4.11
 
Engineering Procurement & Construction Contract for the Construction of a Photovoltaic System in Senigallia, between Ellomay PV One S.R.L. and Ecoware S.P.A., dated March 4, 2010
4.12
 
Side Agreement, between Ellomay PV One S.R.L. and Ecoware S.P.A., dated March 5, 2010
11
 
Code of Ethics(14)
12.1
 
Certification of Principal Executive Officer required by Rule 13a-14(a) and Rule 15d-14(a) (Section 302 Certification)
12.2
 
Certification of Principal Financial Officer required by Rule 13a-14(a) and Rule 15d-14(a) (Section 302 Certification)
13
 
Certification of Principal Executive Officer and Principal Financial Officer required by Rule 13a-14(b) and Rule 15d-14(b) (Section 906 Certification)
14.1
 
Consent of Kost Forer Gabbay & Kasierer
14.2
 
Consent of BDO Limited
8
 
List of Subsidiaries of the Registrant (Not Applicable)
_____________________________________
 
(1)
Previously filed with the Registrant’s Form 20-F for the year ended December 31, 2007 and incorporated by reference herein.
(2)
Previously filed with the Registrant’s Form 20-F for the year ended December 31, 2008 and incorporated by reference herein.
(3)
Previously filed with the Registrant’s Form F-1 (File No. 33-93160) and incorporated by reference herein.
(4)
Previously filed with the Registrant’s Form 6-K dated February 6, 2005 and incorporated by reference herein.
(5)
Previously filed with the Registrant’s Form 20-F for the year ended December 31, 2004 and incorporated by reference herein.
(6)
Previously filed with the Registrant’s Form 6-K dated October 14, 2005 and incorporated by reference herein.
(7)
Previously filed with the Registrant’s Form 20-F for the year ended December 31, 2006 and incorporated by reference herein.
(8)
Previously filed with the Registrant’s Form F-1 (File No. 333-66103) and incorporated by reference herein.
(9)
Previously filed with the Registrant’s Form 6-K dated October 14, 1997 and incorporated by reference herein.
(10)
Previously filed with the Registrant’s Form 6-K dated November 24, 2009 and incorporated by reference herein.
(11)
Previously filed with the Registrant’s Form 6-K dated January 3, 2008 and incorporated by reference herein.
(12)
Previously filed with the Registrant’s Form 6-K dated December 1, 2008 and incorporated by reference herein.
(13)
Previously filed with the Registrant’s Form CB dated April 3, 2008 and incorporated by reference herein.
(14)
Previously filed with the Registrant’s Form 20-F for the year ended December 31, 2003 and incorporated by reference herein.
 
 
115

 
 
SIGNATURES
 
The registrant hereby certifies that it meets all of the requirements for filing on Form 20-F and that it has duly caused and authorized the undersigned to sign this report on its behalf.
 
 
Ellomay Capital Ltd.
 
       
 
By:
/s/ Ran Fridrich  
   
Ran Fridrich
 
   
Chief Executive Officer
 
 
Dated: March 10, 2010
 
 
116

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
CONSOLIDATED FINANCIAL STATEMENTS
 
AS OF DECEMBER 31, 2009
 
IN U. S. DOLLARS
 
INDEX


 
 
 

 
 

 
REGISTERED PUBLIC ACCOUNTING FIRM
 
To the Shareholders and Board of Directors of
ELLOMAY CAPITAL LTD.
 
We have audited the accompanying consolidated balance sheets of Ellomay Capital Ltd. ("the Company") and its subsidiaries as of December 31, 2008 and 2009 and the related consolidated statements of income (operations), changes in shareholders' equity (deficiency) and cash flows for each of the three years in the period ended December 31, 2009. These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on these financial statements based on our audits. We did not audit the financial statements of a consolidated subsidiary, whose revenues constitute 8% of total consolidated revenues for the year ended December 31, 2007. Those financial statements were audited by another auditor, whose report has been furnished to us, and our opinion, insofar as it relates to amounts in cluded for this subsidiary, is based solely on the report of the other auditor.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company's internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statemen ts, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits and the report of the other auditor provide a reasonable basis for our opinion.

In our opinion, based on our audits and the report of the other auditor, the consolidated financial statements referred to above present fairly, in all material respects, the consolidated financial position of the Company and its subsidiaries at December 31, 2008 and 2009 and the consolidated results of their operations and their cash flows for each of the three years in the period ended December 31, 2009, in conformity with U.S. generally accepted accounting principles.

As discussed in Note 2i to the consolidated financial statements, the Company adopted the provisions of Statement of Accounting Standards Codification ("ASC") 740-10, Income Taxes (formerly, Financial Accounting Standards Board Interpretation No. 48, "Accounting for Uncertainty in Income Taxes"), on January 1, 2007.
 
Tel-Aviv, Israel
KOST FORER GABBAY & KASIERER
March 10, 2010
A Member of Ernst & Young Global
 
 
F - 2

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
U.S. dollars in thousands


   
December 31,
 
   
2008
   
2009
 
ASSETS
           
             
CURRENT ASSETS:
           
Cash and cash equivalents
  $ 26,979     $ 75,280  
Short term deposits
    49,000       -  
Other accounts receivable and prepaid expenses (Note 3)
    2,151       944  
                 
Total current assets
    78,130       76,224  
                 
OTHER ASSETS
    102       67  
                 
PROPERTY AND EQUIPMENT, NET (Note 4)
    -       141  
                 
Total assets
  $ 78,232     $ 76,432  

The accompanying notes are an integral part of the consolidated financial statements.
 
 
F - 3

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES

CONSOLIDATED BALANCE SHEETS

U.S. dollars in thousands (except share and per share data)
 
   
December 31,
 
   
2008
   
2009
 
             
LIABILITIES AND SHAREHOLDERS' EQUITY
           
             
CURRENT LIABILITIES:
           
Trade payables
    37       44  
Other accounts payable and accrued expenses (Note 5)
    1,974       1,006  
                 
Total current liabilities
    2,011       1,050  
                 
OTHER LONG TERM LIABILITIES (Note 6, Note 10b)
    5,292       5,354  
                 
COMMITMENTS AND CONTINGENT LIABILITIES (Note 7)
               
                 
SHAREHOLDERS' EQUITY (Note 9):
               
Share capital -
               
Ordinary shares of NIS 1 par value:
               
Authorized: 170,000,000 at December 31, 2008 and 2009; Issued and outstanding: 73,786,428 at December 31, 2008 and 2009
    16,820       16,820  
Additional paid-in capital
    72,289       72,358  
Accumulated deficit
    (18,180 )     (19,150 )
                 
Total shareholders' equity
    70,929       70,028  
                 
Total liabilities and shareholders' equity
  $ 78,232     $ 76,432  
 
The accompanying notes are an integral part of the consolidated financial statements.

 
F - 4

 

CONSOLIDATED STATEMENTS OF INCOME (OPERATIONS)

U.S. dollars in thousands (except share and per share data)


   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
Revenues (Note 12):
                 
Products
  $ 80,228     $ 10,568     $ -  
Services
    5,379       842       -  
                         
Total revenues
    85,607       11,410       -  
                         
Cost of revenues:
                       
Products (a)
    46,549       7,927       -  
Inventory write-off
    1,169       197       -  
                         
      47,718       8,124       -  
Services
    8,759       2,862       -  
                         
Total cost of revenues
    56,477       10,986       -  
                         
Gross profit
    29,130       424       -  
                         
Operating expenses:
                       
Research and development, net (Note 13a)
    7,046       1,942       -  
Selling and marketing
    13,815       3,075       -  
Doubtful accounts expenses
    942       368       -  
General and administrative
    11,171       9,830       2,194  
                         
Total operating expenses
    32,974       15,215       2,194  
                         
Operating loss
    (3,844 )     (14,791 )     (2,194 )
Gain on sale of Company's business, net
    -       95,137       -  
Financial income (expenses), net (Note 13b)
    (1,738 )     7,596       1,329  
                         
(Loss) income before taxes on income
    (5,582 )     87,942       (865 )
Taxes on income (Note 10d)
    838       966       105  
                         
Net (loss) income
  $ (6,420 )   $ 86,976     $ (970 )
                         
Basic (loss) earnings per share
  $ (0.09 )   $ 1.19     $ (0.01 )
Diluted (loss) earnings per share
  $ (0.09 )   $ 1.01     $ (0.01 )
                         
Weighted average number of shares used for computing basic (loss) earnings per share
    71,537,501       72,972,565       73,786,428  
Weighted average number of shares used for computing diluted (loss) earnings per share
    71,537,501       86,102,748       73,786,428  
 
(a)
Includes rent expenses charged by a related party totaling $ 372, $ 62 and $ 0 for the years ended December 31, 2007, 2008 and 2009, respectively.
 
The accompanying notes are an integral part of the consolidated financial statements.

 
F - 5

 
 

STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY (DEFICIENCY)

U.S. dollars in thousands (except share data)
 
   
Number of
Ordinary
Shares
outstanding
   
Share
capital
   
Additional
paid-in
capital
   
Accumulated
other
comprehensive
income (loss)
   
Accumulated
deficit
   
Total
comprehensive
income (loss)
   
Total
shareholders'
equity
 (deficiency)
 
                                           
Balance as of January 1, 2007
    60,523,886     $ 13,635     $ 61,956     $ (475 )   $ (96,119 )     -     $ (21,003 )
                                                         
Issuance of shares and warrants, net
    11,734,950       2,774       3,303       -       -       -       6,077  
Stock - based compensation
    -       -       1,003       -       -       -       1,003  
Exercise of stock options
    451,669       113       66       -       -       -       179  
Cumulative effect adjustment upon adoption of ASC 740
    -       -       -       -       (2,617 )     -       (2,617 )
Comprehensive loss:
                                                       
Net loss
    -       -       -       -       (6,420 )   $ (6,420 )     (6,420 )
Foreign currency translation adjustments
    -       -       -       602       -       602       602  
Total comprehensive loss
                                          $ (5,818 )        
                                                         
Balance as of December 31, 2007
    72,710,505       16,522       66,328       127       (105,156 )             (22,179 )
 
The accompanying notes are an integral part of the consolidated financial statements.

 
F - 6

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES

STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY (DEFICIENCY)

U.S. dollars in thousands (except share data)
 
   
Number of
               
Accumulated
                   
   
Ordinary
         
Additional
   
other
         
Total
   
Total
 
   
Shares
   
Share
   
paid-in
   
comprehensive
   
Accumulated
   
comprehensive
   
shareholders'
 
   
outstanding
   
capital
   
capital
   
income
   
deficit
   
income
   
equity
 
                                           
Balance as of January 1, 2008
    72,710,505       16,522       66,328       127       (105,156 )           (22,179 )
                                                       
Stock - based compensation
    -       -       2,196       -       -       -       2,196  
Exercise of warrants
    1,065,923       295       215       -       -       -       510  
Exercise of stock options
    10,000       3       1       -       -       -       4  
Repurchase of employee stock options
    -       -       (1,451 )     -       -       -       (1,451 )
Cancellation of a subordinated note to related parties
    -       -       5,000       -       -       -       5,000  
Comprehensive income:
                                                       
Net income
    -       -       -       -       86,976     $ 86,976       86,976  
Realization of foreign currency translation, net
                            (127 )             (127 )     (127 )
Total comprehensive income
                                          $ 86,849          
                                                         
Balance as of December 31, 2008
    73,786,428       16,820       72,289       -       (18,180 )             70,929  
                                                         
Stock - based compensation
    -       -       69       -       -               69  
Net loss
    -       -       -       -       (970 )             (970 )
Balance as of December 31, 2009
    73,786,428     $ 16,820     $ 72,358     $ -     $ (19,150 )           $ 70,028  
 
The accompanying notes are an integral part of the consolidated financial statements.
 
 
F - 7

 
 
 
CONSOLIDATED STATEMENTS OF CASH FLOWS

U.S. dollars in thousands

   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
Cash flows used in operating activities:
                 
                   
Net income (loss)
  $ (6,420 )   $ 86,976     $ (970 )
Adjustments to reconcile net income (loss) to net cash used in operating activities:
                       
Gain from sale of Company's business
    -       (95,137)       -  
Depreciation and amortization
    1,387       256       11  
Amortization of other intangible assets
    42       -       -  
Stock – based compensation
    1,003       2,196       69  
Foreign currency translation loss (gain) on inter company balances with foreign subsidiaries
    (453 )     109       -  
Currency fluctuation of long-term debt
    115       24       -  
Amortization of accrued interest on restructured debt
    -       (7,335 )     -  
Accrued severance pay, net
    14       (405 )     -  
Decrease (increase) in trade receivables, net
    (4,661 )     4,812       -  
Decrease (increase) in other accounts receivable and prepaid expenses
    (1,831 )     1,103       513  
Increase in inventories
    (4,478 )     (2,768 )     -  
    Write-off of inventories
    1,169       197       -  
Decrease(increase) in other assets
    (111 )     (26 )     36  
    Increase in trade payables
    9,833       2,192       7  
Increase (decrease) in deferred revenues
    170       718       -  
Decrease in other accounts payable and accrued expenses
    (726 )     (3,735 )     (968 )
Increase in other long-term liability
    811       1,661       61  
                         
Net cash used in operating activities
    (4,136 )     (9,162 )     (1,241 )
                         
Cash flows used in investing activities:
                       
                         
Proceeds from (investment in) restricted cash
    (29 )     146       -  
Investment in short-term bank deposit
    -       (49,000 )     -  
Proceeds from short term bank deposits
                    49,000  
Purchase of property and equipment
    (1,170 )     (148 )     (152 )
Proceeds from sale of the Company's business, net (Note 1b)
    -       103,554       694  
                         
Net cash provided by (used in) investing activities
    (1,199 )     54,552       49,542  
 
The accompanying notes are an integral part of the consolidated financial statements.
 
 
F - 8

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS

U.S. dollars in thousands
 
   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
Cash flows from financing activities:
                 
                   
Proceeds from issuance of shares and warrants, net
    6,077       -       -  
Proceeds from exercise of options and warrants
    179       514       -  
Repurchase of employee stock option
    -       (1,451 )     -  
Short-term bank credit and short-term loans, net
    (66 )     (8,960 )     -  
Payment of long-term loans, including interest on restructured debt
    (1,608 )     (12,344 )     -  
                         
Net cash provided by (used in) financing activities
    4,582       (22,241 )     -  
                         
Effect of exchange rate changes on cash and cash equivalents
    187       (472 )     -  
                         
Increase (decrease) in cash and cash equivalents
    (566 )     22,677       48,301  
Cash and cash equivalents at the beginning of the year
    4,868       4,302       26,979  
                         
Cash and cash equivalents at the end of the year
  $ 4,302     $ 26,979     $ 75,280  

  (1 )
Supplemental disclosure of cash flows activities:
                 
     
Cash paid during the year for:
                 
                         
     
Interest
  $ 1,524     $ 527     $ -  
                               
     
Taxes
  $ 96     $ -     $ -  
                               
  (2 )
     Supplemental disclosure of non-cash investing activities:
                       
                               
     
Transfer of equipment from inventory to property, plant and equipment
  $ 227     $ 443     $ -  
                               
     
Proceeds to be received from HP (see Note 1b)
  $ -     $ 1,183     $ -  

The accompanying notes are an integral part of the consolidated financial statements.
 
 
F - 9

 

 
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)

NOTE 1:-
GENERAL

 
a.
Ellomay Capital Ltd. (the "Company") (formerly: NUR Macroprinters Ltd.), an Israeli Company, is a shell company whose current plan of operations is to identify and evaluate suitable business opportunities and strategic alternatives, including through the acquisition of all or part of an existing business, pursuing business combinations or otherwise. Refer to Note 14, Subsequent event, for transaction entered into in February 2010. Until February 29, 2008, the Company and its subsidiaries (collectively, the "Group") developed, manufactured, sold and provided support services for digital wide format and super-wide format printing systems for on-demand, short-run printing as well as related consumable products.

 
Until February 29, 2008, the Company operated through wholly-owned subsidiaries for sales, support services and marketing of the Company's products in their country or region of domicile, some of which were sold to HP. Such entities include NUR Europe S.A. ("NUR Europe") in Belgium (sold to HP), NUR America, Inc. ("NUR America") in the U.S. (dissolved in 2008), NUR Asia Pacific Limited ("NUR Asia Pacific") in Hong Kong, NUR Do Brazil Ltda. ("NUR Brazil") in Brazil (sold to HP) and NUR Japan Ltd. ("NUR Japan") in Japan (sold to HP). As of December 31, 2009 the Company wholly owns, directly and indirectly, several subsidiaries that are currently inactive, most of which are already in the process of being dissolved.

 
b.
On February 29, 2008 (the "Closing Date"), the sale of the Company's business to HP (the "HP Transaction") was finalized. The aggregate consideration in connection with the HP Transaction amounted to $ 122,600. Of the total consideration, an amount of $ 500 withheld in connection with NUR Europe's obligations with respect to the government grants, and $ 14,500 was deposited into an escrow account to secure the indemnity obligations of the Company and its remaining subsidiaries. The escrow funds, net of amounts distributed to HP in satisfaction of indemnity obligations, were to be distributed to the Company in two installments: $ 9,500 was to be distributed eighteen months following the Closing Date and $ 5,000 was to be distributed twenty-four months following the Closing Date.

 
In August 2009, the Company received two officer’s certificates from HP requesting the release of funds in the aggregate amounts of approximately $8,100 and Euro 2.4 million from the escrow funds. The claims included in the officer’s certificates mainly refer to payments HP made to the Israeli Office of the Chief Scientist (the “OCS”), in connection with the transfer of technology claimed to have been developed with OCS funding, claims made by suppliers and alleged non-compliance with different environmental and safety regulations.  The Company replied and objected to the claims made in the two Officer's Certificates on October 21, 2009 declining the vast majority of HP's claims (the Company has agreed to release an amount of approximately $300 out of the escrow funds).

 
An additional officer’s certificate was sent by HP in January 2010 in which HP claims additional losses in the aggregate amount of approximately $2,900 in connection with further issues relating to non-compliance with safety regulations. With respect to the last Officer's Certificate, the Company rejects the claims made in the Officer's Certificate. The Company is of the position that since the due date for submitting an Officer's Certificate has passed, HP cannot attempt to raise new claims against the Escrow Funds.

 
At this stage it is premature to estimate the outcome and scope of indemnification to be paid to HP, if any, and therefore the escrow funds were not recorded as a receivable and were excluded from the calculation of the capital gain.
 
 
F - 10

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 1:-
GENERAL (Cont.)

 
As part of the Agreement, the Company agreed to change its corporate name. The Company's name was changed to Ellomay Capital Ltd. in April 2008. In addition, the Company agreed not to solicit any former employees who were transferred to HP or to engage in any business engaged directly in the same business as conducted by the Company at closing, both for a period of three years following the Closing Date.

 
In connection with the HP Transaction, the Company's Board of Directors approved the acceleration of the vesting of all outstanding employee stock options following the Closing Date and the repurchase, subject to the fulfillment of regulatory requirements, of the then outstanding employee stock options, representing, in the aggregate, rights to purchase approximately 9.9 million ordinary shares of the Company. The aggregate consideration for such employee stock options was approximately $ 3,800. Of the total aggregate consideration, approximately $ 3,100 was paid in July 2008 and an additional payment, up to the aggregate amount, will be calculated after all HP Transaction related issues and other financial aspects of the Company are known and verified and will be paid following the release of the funds deposited in escrow. The Company recorded an accrual in the amount of $ 414 with respect to its futu re liability, which is included within other long term liabilities.

 
Upon closing of the HP Transaction, the acceleration resulted in full recognition of the remaining unrecognized compensation costs of $ 2,187. The repurchase was accounted for as a settlement in accordance ASC 718 "Compensation - Stock Compensation" and the amount paid in excess of the fair value of the options repurchased was recognized as additional compensation cost of $1,610 in the statements of income (operations).

 
In connection with the HP Transaction, the Company's Board of Directors also approved the payment of transaction bonuses to certain employees in the aggregate amount of approximately $ 700 and established that, subject to the aforementioned determination and verification of all transaction related issues and other financial aspects of the Company, additional bonuses may be paid to certain employees, based on criteria, amounts and percentages pre-determined by the Board. The amount of $ 700 was paid during 2008 and was recorded as expense. In addition, the Company recorded a liability for the additional transaction bonuses in the amount of $ 35.

 
As a result of the HP Transaction and the cessation of virtually all operations, a majority of the Company's employees that have not transferred to HP, including the majority of the Company's senior management, have been terminated by the Company. In connection with such terminations, the Company recorded severance-related expenses in 2008 in the approximate amount of $ 2,800.

 
In March 2008, following the consummation of the HP Transaction, the Company fully repaid its short-term debt to its lender banks (the "Banks") in the amount of $9,800. In April 2008, it fully repaid outstanding long-term debt to its banks in the amount of $12,100. In May 2008, a $ 5,000 subordinated note due to a related party was cancelled effective as of March 30, 2008. In connection with the cancellation of the subordinated note, the Company recognized a capital contribution of $ 5,000. Upon full repayment of the loans, the Company recognized the remaining balance of accrued interest on restructured debt as financial income of approximately $ 7,335.

 
F - 11

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 1:-
GENERAL (Cont.)

 
As the Company did not acquire a new operating business during the year ended December 31, 2009, the results of operations prior to the consummation of the sale of the business to HP are not reported as "discontinued operations" in the consolidated financial statements in accordance with ASC 360 "Property, Plant, and Equipment".

 
Following the consummation of the HP Transaction, the Company's primary asset is cash and cash equivalents and therefore, the sole source of income is the interest that such deposits earn. (See Note 14, Subsequent events)

NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES

The consolidated financial statements have been prepared according to United States generally accepted accounting principles, as follows:

 
a.
Use of estimates:

 
The preparation of financial statements in conformity with U.S. generally accepted accounting principles requires management to make estimates, judgments and assumptions. The Company's management believes that the estimates, judgments and assumptions used are reasonable based upon information available at the time they are made. These estimates, judgments and assumptions can affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the dates of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from these estimates.

 
b.
Financial statements in U.S. dollars:
 
Following the HP Transaction, the Company's management believes that the currency of the primary economic environment in which the Company operates is the U.S. dollar ("dollar"). Thus, the dollar is the reporting and functional currency of the Company and its remaining subsidiaries.

Therefore, transactions and balances that are denominated in dollars are presented at their original amounts. Non-dollar transactions and balances have been remeasured to dollars in accordance with ASC 830 "Foreign Currency Matters".

All foreign currency transaction gains and losses are reflected in the statements of income (operations) as financial income or expenses, as appropriate.

Prior to the HP Transaction, for certain subsidiaries the functional currency was determined to be their local currency. For those subsidiaries, assets and liabilities were translated at year-end exchange rates and statement of income (operations) items were translated at average exchange rates prevailing during the year. Such translation adjustments were recorded as a separate component of accumulated other comprehensive loss in shareholders' equity (deficiency).
 
 
c.
Principles of consolidation:
 
The consolidated financial statements include the accounts of the Company and its wholly- owned subsidiaries. Intercompany transactions and balances, including profit from intercompany sales not yet realized outside the Group, have been eliminated upon consolidation.
 
 
F - 12

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)

 
d.
Cash equivalents:
 
Cash equivalents are short-term highly liquid investments that are readily convertible to cash with original maturities of three months or less at the date acquired.
 
 
e.
Short-term deposits:
 
Bank deposits with maturities of more than three months but less than one year are included in short-term deposits. Such short-term deposits are stated at cost which approximates market values.
 
 
f.
Reclassifications:
 
Certain amounts in prior years' financial statements have been reclassified to conform to the current year's presentation.

 
g.
Property and equipment, net:
 
Property and equipment were stated at cost, net of accumulated depreciation. Depreciation was calculated using the straight-line method over the estimated useful lives of the assets at the following annual rates:
 
 
%
   
Office furniture and equipment
6 - 33
Leasehold improvements
Over the shorter of the term of
the lease or the useful life

 
h.
Impairment of long-lived assets:
 
The Group's long-lived assets were reviewed for impairment in accordance with ASC 360 "Property, Plant, and Equipment". Whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. Recoverability of assets held for use is measured by a comparison of the carrying amount of an asset to the future undiscounted cash flows expected to be generated by the assets. If such assets are considered to be impaired, the impairment to be recognized is measured by the amount by which the carrying amount of the assets exceeds the fair value of the assets. During 2007, 2008 and 2009, no impairment losses were identified.

 
i.
Income taxes:
 
The Company accounts for income taxes in accordance with ASC 740 "Income Taxes". ASC 740 prescribes the use of the liability method whereby deferred tax assets and liability account balances are determined based on differences between the financial reporting and tax bases of assets and liabilities and are measured using the enacted tax rates and laws that will be in effect when the differences are expected to reverse. The Company provides a valuation allowance, if necessary, to reduce deferred tax assets to amounts more likely than not to be realized. Deferred tax liabilities and assets are classified as current or non current based on the classification of the related asset or liability for financial reporting, or according to the expected reversal dates of the specific temporary differences if not related to an asset or liability f or financial reporting.

 
 
F - 13

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)
 
 
 
On January 1, 2007, the Company adopted ASC 740 “Income Taxes” (formerly FASB Interpretation No. 48, "Accounting for Uncertainty in Income Taxes"). The guidance contains a two-step approach to recognizing and measuring uncertain tax positions accounted for in accordance with ASC 740. The first step is to evaluate the tax position taken or expected to be taken in a tax return by determining if the weight of available evidence indicates that it is more likely than not that, on an evaluation of the technical merits, the tax position will be sustained on audit, including resolution of any related appeals or litigation processes. The second step is to measure the tax benefit as the largest amount that is more than 50% likely to be realized upon ultimate settlement. The Company accrues interest and penalties related to unrecognized tax benefits in it s provision for income tax.
 
Upon adoption on January 1, 2007, the Group recorded $ 2,617 to accumulated deficit for uncertain tax positions which, if recognized, would affect the effective tax rate. This amount includes accrued interest expenses and penalties related to the unrecognized tax benefit as of that date.
 
 
j.
Concentrations of credit risk:
 
Financial instruments that potentially subject the Group to concentrations of credit risk consist principally of cash and cash equivalents and short-term deposits.

The majority of the Group's cash and cash equivalents are invested in U.S. dollar instruments with major banks in Israel and United States. Such deposits in the United States may be in excess of insured limits and are not insured in other jurisdictions. However, management believes that such financial institutions are financially sound, and accordingly, low credit risk exists with respect to these investments.

The Group has no off-balance-sheet concentration of credit risk.
 
 
k.
Severance pay:
 
The Company's liability for severance pay with respect to employees in Israel, which are not pursuant section 14 of the Severance Pay Law -1963, is calculated pursuant to Israeli severance pay law based on the most recent salary of each employee multiplied by the number of years of employment, as of the balance sheet date. Employees are entitled to one month’s salary for each year of employment, or a portion thereof. Every month the Company makes payments equal to 8.33% of the employee’s salary, to various managers’ insurance policies or similar financial instruments. The Company records as an expense the increase in the severance liability, net of earnings (losses) from the the managers’ insurance policy. The Company's liability is partially provided by such monthly deposits and any unfunded amounts (due to i ncrease in the employee’s salary over time, or losses incurred by the insurance policy fund that invests our deposits) would be paid from operating funds and are covered by a provision the Company records.

With respect to agreements with employees in Israel, pursuant to section 14 of the Severance Pay Law -1963, the Company's contributions for severance pay are instead of its severance liability. Upon fulfillment of the Company's obligation to make a monthly contribution to the managers’ insurance policies or similar financial instruments in the amount of 8.33% of the employee’s monthly salary, no additional payments must later be made to the employee regarding the matter of severance pay upon termination of the employment relationship. Further, the amounts deposited on behalf of such obligation are not stated in the balance sheet, as the Company is released from any further obligation towards the employee once they have been deposited.

 
F - 14

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)
 
 
 
Severance expenses for the years ended December 31, 2007, 2008 and 2009 amounted to approximately $ 905, $ 2,900 and $ 43, respectively. The severance expenses for the year ended December 31, 2008 are mainly attributed to the termination of certain of our employees and of a majority of our senior management in connection with the HP Transaction.
 
 
l.
Fair value of financial instruments:
 
 
 
The carrying amounts of cash and cash equivalents, short-term deposits, and other accounts payable approximate their fair value, due to the short-term maturity of such instruments.
 
 
m.
Basic and diluted earnings (loss) per share:
 
Basic earnings (loss) per share is computed based on the weighted average number of Ordinary shares outstanding during each year. Diluted earnings (loss) per share is computed based on the weighted average number of Ordinary shares outstanding during the year plus dilutive potential Ordinary shares considered outstanding during the year, in accordance with ASC 260, "Earnings Per Share".

The total weighted average number of options and warrants excluded from the calculations of diluted earnings (loss) per share was 54,749,478, 7,393,004 and 41,718,840 for the years ended December 31, 2007, 2008 and 2009, respectively.
 
 
n.
Fair value measurements
 
The Company measures their cash equivalents and short term deposits at fair value. Fair value is an exit price, representing the amount that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants. As such, fair value is a market-based measurement that should be determined based on assumptions that market participants would use in pricing an asset or a liability. A three-tier fair value hierarchy is established as a basis for considering such assumptions and for inputs used in the valuation methodologies in measuring fair value:

Level 1 - Observable inputs that reflect quoted prices (unadjusted) for identical assets or liabilities in active markets.
Level 2 - Include other inputs that are directly or indirectly observable in the marketplace.
Level 3 - Unobservable inputs which are supported by little or no market activity.

The fair value hierarchy also requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value.
 
 
F - 15

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)
 
 
 
Cash equivalents and short-term deposits are classified within level 2. This is because the Company values their cash equivalents and short term deposits using alternative pricing sources and models utilizing market observable inputs.

 
o.
Accounting for stock-based compensation:
 
The Company accounts for stock-based compensation in accordance with ASC 718 "Compensation - Stock Compensation". ASC 718 requires companies to estimate the fair value of equity-based payment awards on the date of grant using an option-pricing model. The value of the portion of the award that is ultimately expected to vest is recognized as an expense over the requisite service periods in the Company's consolidated statements of income (operations).

The Company recognizes compensation expenses for the value of its awards granted based on the straight line method over the requisite service period of each of the awards, net of estimated forfeitures. ASC 718 requires forfeitures to be estimated at the time of grant and revised, if necessary, in subsequent periods if actual forfeitures differ from those estimates. Estimated forfeitures are based on actual historical pre-vesting forfeitures.

The Company selected the Black-Scholes-Merton option pricing model as the most appropriate fair value method for its stock-options awards and values restricted stock based on the market value of the underlying shares at the date of grant. The option-pricing model requires a number of assumptions, of which the most significant are the expected stock price volatility and the expected option term.

Expected volatility was calculated based upon actual historical stock price movements. The expected term of options granted is based upon historical experience and represents the period of time that options granted are expected to be outstanding. The risk-free interest rate is based on the yield from U.S. treasury bonds with an equivalent term. The Company has historically not paid dividends and has no foreseeable plans to pay dividends.

The fair value for options granted in 2007, 2008 and 2009 is estimated at the date of grant using the Black-Scholes option pricing model with the following weighted average assumptions:
 
   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
                   
Dividend yield
    0 %     0 %     0 %
Expected volatility
    1.07       0.8       0.5  
Risk-free interest
    4.41 %     2.76 %     1.14 %
Expected life (in years)
    3.5       2       3  

 
F - 16

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)

 
p.
Revenue recognition:
 
Prior to the consummation of the HP Transaction, the Company generated revenues from the sale of its printers, inks and consumable products and from services to its products. The Company generated revenues from sale of its products directly to end-users and indirectly through independent distributors.

Revenues from printer sales were recognized in accordance with ASC 605 "Revenue Recognition" upon installation, provided that the collection of the resulting receivable was probable, there was persuasive evidence of an arrangement, no significant obligations in respect of installation remained and the price was fixed or determinable. The Company did not grant a right of return.

Revenues from selling these products to independent distributors were deferred until the Company's products were installed in their customers' premises, provided that all other revenue recognition criteria were met.

When a sale involved multiple elements, such as sales of printers that include a right to receive specified upgrades or an extended warranty agreement, the entire fee from the arrangement was evaluated under ASC 605-25, "Multiple-Element Arrangements". In such arrangements, the Company accounted for the separate elements as different units of accounting, provided that the delivered element had value to the customer on a standalone basis and there was objective and reliable evidence of the fair value of the undelivered element. In cases where there was no objective and reliable evidence of the fair value of the undelivered element, the Company accounted for the total arrangement as one unit of accounting. As such, the Company recognized revenue for the arrangement only when all revenue recognition criteria were met for the undelivered element.

The Company considered all arrangements with payment terms extending beyond the standard payment terms not to be fixed or determinable. If the fee was not fixed or determinable, revenue was recognized as payments become due from the customer, provided that all other revenue recognition criteria have been met.

Revenues from ink and other consumable products were generally recognized upon shipment assuming all other revenue recognition criteria were met.

Revenues from services were comprised of maintenance and support arrangements. Revenues from maintenance and support arrangements were recognized on a straight-line basis over the term of the arrangement.

In cases where the Company traded-in old printers as part of sales of new printers, the fair value of the old printer was recorded as revenue, provided that such value could be determined. If such value could not be determined the old printers were recorded at zero value. The amount of revenues recognized for the transaction equaled the fair value of the old printer plus any monetary consideration received.

Deferred revenues included amounts received from customers for which revenue has not yet been recognized.

 
 
F - 17

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 2:-
SIGNIFICANT ACCOUNTING POLICIES (Cont.)

 
q.
Research and development costs, net:
 
Research and development costs were charged to the statement of operations as incurred, net of grants received.
 
NOTE 3:-
OTHER ACCOUNTS RECEIVABLE AND PREPAID EXPENSES


   
December 31,
 
   
2008
   
2009
 
             
Government authorities
  $ 311     $ 147  
Interest receivable
    567       99  
Proceeds to be received from HP
    1,183       500  
Prepaid expenses
    33       108  
Other
    57       90  
                 
    $ 2,151     $ 944  
 
NOTE 4:-
PROPERTY AND EQUIPMENT, NET
 
Composition of property and equipment was as follows:
 
   
December 31,
2009
 
Cost:
     
Office furniture and equipment
  $ 99  
Leasehold improvements
    53  
         
      152  
Accumulated depreciation
    11  
         
Property, plant and equipment, net
  $ 141  
 
NOTE 5:-
OTHER ACCOUNTS PAYABLE AND ACCRUED EXPENSES
 
   
December 31,
 
   
2008
   
2009
 
             
Employees and payroll accruals
  $ 532     $ 119  
Government authorities
    82       -  
Professional services
    107       99  
Provision for legal claims
    180       33  
Accrued expenses
    1,073       755  
                 
    $ 1,974     $ 1,006  

 
 
F - 18

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)

NOTE 6:-
OTHER LONG-TERM LIABILITIES

   
December 31,
 
   
2008
   
2009
 
             
Unrecognized tax benefits (refer to Note 10b)
  $ 4,584     $ 4,644  
Other long-term liabilities
    708       710  
                 
    $ 5,292     $ 5,354  
 
NOTE 7:-          COMMITMENTS AND CONTINGENT LIABILITIES

 
a.
Operating and capital lease commitments:
 
Prior to the HP Transaction, the Company and most of its subsidiaries rented their facilities under various operating lease agreements.

Following HP Transaction, most of the operating and capital lease commitments were assumed by HP (see Note 1b).  The Company has retained a lease of premises of its former US subsidiary, NUR America, which is fully sub-leased to a third party. In respect to our leased office space in Tel Aviv, the Company has the option to extend the lease until 2016.

The following table summarizes the remaining annual rental commitments as of the periods indicated under non-cancelable operating leases and sub-lease arrangements with initial or remaining terms of more than one year, reflecting the terms that were in effect as of December 31, 2009:
 
Year ended December 31,
 
Operating lease
   
Sub-lease
   
Total
 
                   
2010
  $ 363     $ (428 )   $ (65 )
2011
    75       (35 )     40  
2012
    64       -       64  
2013
    64       -       64  
2014 and thereafter
    147       -       147  
                         
Total minimum lease payments (proceeds) 
  $ 713     $ (463 )   $ 250  
 
 
 
Total rental lease expenses (income), net for the years ended December 31, 2007, 2008 and 2009 were $ 1,691, $ 282 and $ (24), respectively.

Total sub-lease income for the years ended December 31, 2007, 2008 and 2009 was $ 378, $ 416 and $ 428, respectively.

Total vehicle lease expenses for the years ended December 31, 2007, 2008 and 2009 were $ 1,524, $ 254 and $ 0, respectively.
 
 
F - 19

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)

NOTE 7:-          COMMITMENTS AND CONTINGENT LIABILITIES (Cont.)

 
b.
Litigation:
 
 
1.
During 2008, a former employee of a subsidiary filed a lawsuit against the Company in the amount of $ 322.5 alleging the Company did not provide him with the appropriate amount of time to exercise his stock options following the termination of the applicable blackout period. The Company and the former employee were negotiating a settlement proposal by which the Company undertook to pay an amount of approximately $ 33 and this amount was to be considered as the gross, exhaustive and final consideration paid to the former employee. A provision was recorded in the amount offered. Although the parties did not arrive to a settlement, the former employee chose on the hearing of April 3, 2009 to withdraw his claim. The former employee has a right to re-launch his claim in this matter.
 
 
2.
During 2002, an end-user filed a lawsuit in China against a subsidiary alleging bad quality of products. The court ruled that the subsidiary should reimburse the client with the amount of $ 186. Following an appeal filed by the subsidiary, the court ruled in September 2003 in favor of the end-user. The subsidiary is in the process of liquidation and has no assets; therefore the plaintiff has no remedy against the subsidiary.
 
The customer may elect to start new proceedings against another subsidiary operating in Hong Kong. However, to date, the customer has not filed any claim in Hong Kong. Based on management's estimation and the opinion of its legal counsel, it is less than likely that the second subsidiary will be required to pay the amount ruled against the subsidiary in China. Therefore, no provision was recorded with respect to this claim.

 
3.
During 2002, a client filed a lawsuit in China against a subsidiary seeking reimbursement in the amount of $ 400 alleging bad quality of products. In July 2005, the court ruled that the subsidiary is to reimburse the client an amount of $ 286. The subsidiary no longer operates in China and under current law the ruling in China is not enforceable in Hong Kong. The subsidiary notified the customer in March 2006 that it intends to vigorously defend its claims if submitted to court in Hong Kong. To date, the customer has not filed any claim in Hong Kong. Based on management's estimation and the opinion of its legal counsel, it is less than likely that the subsidiary will be required to pay the amount ruled against it in China. Therefore, no provision was recorded with respect to this claim.

 
4.
In September 2003, the Company filed a lawsuit against a former distributor of the Company, for the collection of unpaid invoices in the amount of $ 420. In February 2004, the former distributor filed a statement of defense denying the Company's claims and it also filed a counter-claim for alleged damages caused to it by the Company in the amount of $ 210. Based on the opinion of its legal counsel, management believes that the counter-claim that was filed by the former distributor is without merit and that a loss is not probable. Therefore, a provision was not recorded with respect to this claim.

 
5.
In December 2003, a client of a subsidiary filed a lawsuit alleging that a machine purchased by it failed to perform. The customer is seeking reimbursement of the purchase price paid by it in the amount of $ 290. In January 2010 the court dismissed the suit. The court's ruling may still be subject to an appeal by the client.
 
 
F - 20

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)

NOTE 7:-          COMMITMENTS AND CONTINGENT LIABILITIES (Cont.)

 
6.
In May 2007, a former managing director of a subsidiary filed a lawsuit against the Company and two of its subsidiaries claiming his resignation was for just cause due to demotion and therefore should be deemed as a termination of his employment by the subsidiary. The Company denied all the claims made by the former employee. The ruling in favor of the Company was deemed final in March 2009 when the official time for appeal passed.

 
7.
In February 2007, a claim was filed against the Company and one of its former officers by a person claiming to have been an agent of the Company in West Africa for commissions on sales of printers. The claim is for NIS 3,000 thousand ($ 795). The Company filed a statement of defense denying all claims, both with respect to the causes of action and with respect to the factual allegations in the claim. Based on management's estimation and the opinion of its legal counsel, no provision was recorded with respect to this claim.

 
8.
From time to time, the Company is party to other various legal proceedings, claims and litigation that arise in the normal course of business. It is the opinion of management that the ultimate outcome of these matters will not have a material adverse effect on the Company's financial position, results of operations or cash flows.

 
9.
The Company has an outstanding indemnification obligation pursuant to the terms of the Asset Purchase Agreement with HP (see Note 1b)
 
NOTE 8:-
TRANSACTIONS AND BALANCES WITH RELATED PARTIES

On December 30, 2008, the Company's shareholders approved the terms of a management services agreement entered into among the Company, Kanir Joint Investments (2005) Limited Partnership ("Kanir") and Meisaf Blue & White Holdings Ltd. ("Meisaf"), a company controlled by the Company's chairman of the board and controlling shareholder,  effective as of March 31, 2008 (the "Management Agreement"). According to the Management Agreement, Kanir and Meisaf, through their employees, officers and directors, provide assistance to the Company in all aspects of the new operations process, including but not limited to, any activities to be conducted in connection with identification and evaluation of the business opportunities, the negotiations and the integration and management of any new operations and including discussions with the Company's  management to assist and advise them on such matters and on any matters concerning the Company's affairs and business. In consideration of the performance of the management services and the board services pursuant to the Management Agreement, the Company agreed to pay Kanir and Meisaf an aggregate annual management services fee in the amount $ 250.

 
F - 21

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 9:-
SHAREHOLDERS' EQUITY (DEFICIENCY)

 
a.
The Ordinary shares of the Company were traded until May 2005 on the Nasdaq Capital Market. From May 19, 2005, the Company's Ordinary shares have been quoted over-the-counter in the "pink sheets".
 
On April 17, 2005, the Company's shareholders approved an increase of the Company's authorized Ordinary shares to 120,000,000 and an additional increase to 170,000,000 was approved on October 27, 2005.
 
 
b.
Shareholders' rights:
 
Ordinary shares confer upon their holders voting rights, the right to receive dividends and the right to share in excess assets upon liquidation of the Company.
 
 
c.
On March 31, 2008 the principal shareholders, the Fortissimo entities, completed the sale of all of the shares and a majority of the warrants held by them to Kanir Joint Investments (2005) Limited Partnership, which was also previously a controlling shareholder of the Company and to S. Nechama Investments (2008) Ltd., which became a controlling shareholder of the Company as a result of the purchase from the Fortissimo entities and from several other shareholders.

 
d.
Stock Option Plans:

 
1.
In December 1998, the Company's shareholders approved the non-employee director stock option plan (the "1998 plan") according to which 250,000 options are available for grant with an exercise price of the average of the closing bid and sale price at the issuance date. Each option granted is vested immediately and expires after 10 years. Generally, the Company grants options under the plan with an exercise price equal to the market price of the underlying shares on the date of grant. In January 2008 the Company's board of directors extended the 1998 Plan by an additional 10 years and the current expiration date of the 2000 Plan is December 8, 2018.
 
In August 2000, the Company's board of directors adopted the 2000 Stock Option Plan (the "2000 Plan"). According to the 2000 Plan, 2,000,000 options may be granted to officers, directors, employees and consultants of the Company and its subsidiaries. The Options usually vest over a three or four-year period. The exercise price of the options under the 2000 Plan is determined to be not less than 80% of the fair market value of the Company's Ordinary shares at the time of grant, and they usually expire after 10 years from the date of grant. In June 2008 the Company's board of directors extended the 2000 Plan by an additional 10 years and the current expiration date of the 2000 Plan is August 31, 2018. Generally, the Company granted options under the plan with an exercise price equal to the market price of the underlying shares on the d ate of grant.

Following increases in options reserved for issuance under the Company's 1998 and 2000 Plans, the Company reserved for issuance 750,000 and 17,724,590 Ordinary shares, respectively. As of December 31, 2009, 192,530 options are outstanding and 473,303 Ordinary shares are available for future grants under the 1998 Plan and 1,321,100 options are outstanding and 5,950,928 Ordinary shares are available for future grants under the 2000 Plan (the number of Ordinary shares available for issuance under the 2000 Plan was reduced by the number of Ordinary shares underlying options repurchased by the Company as more fully detailed in Note 1b). Options that are cancelled or forfeited before expiration become available for future grant.

 
F - 22

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 9:-
SHAREHOLDERS' DEFICIENCY (Cont.)
 
 
 
During 2008, in connection with the HP Transaction (see Note 1b), the Board of Directors approved the acceleration of the vesting of all outstanding employee stock options following the Closing Date and the repurchase, subject to the fulfillment of regulatory requirements, of the then outstanding employee stock options to purchase approximately 9.9 million Ordinary shares of the Company. The repurchase was completed in July 2008.

Any options not repurchased (due to their relatively high exercise price) were canceled during 2008 pursuant to their terms and the terms of the 2000 Plan.

During 2007, 2008 and 2009, the Company granted to directors 30,000, 43,333 and 45,863 options, respectively.

During 2009 the Company granted to one of its senior employee 1,321,100 options. There were no other grants during 2009.

As of December 31, 2009, the Company had approximately $ 123 of unrecognized compensation expense related to non-vested stock options awards, expected to be recognized over 2 years.
 
 
2.
A summary of the Company's employee and director share option activity through December 31, 2009 for the Plans is as follows:

   
Options outstanding
and exercisable
 
   
Number
of options
   
Weighted average exercise price
 
Balance as of January 1, 2007
    11,852,064     $ 0.60  
Options granted
    1,490,000     $ 0.59  
Options exercised
    (451,669 )   $ 0.40  
Options forfeited or expired
    (2,662,194 )   $ 0.81  
Balance as of December 31, 2007
    10,228,201     $ 0.54  
Options granted
    43,333     $ 0.50  
Options exercised
    (10,000 )   $ 0.31  
Options repurchased
    (9,893,550 )   $ 0.52  
    Options forfeited or expired
    (221,317 )   $ 1.50  
Balance as of December 31, 2008
    146,667     $ 0.65  
Options granted
    1,366,963     $ 0.85  
Balance as of December 31, 2009
    1,513,630     $ 0.83  
Exercisable as of December 31, 2009
    632,747     $ 0.78  
Exercisable as of December 31, 2008
    146,667     $ 0.65  

As of December 31, 2009, 632,747 options were outstanding and expected to vest.

 
F - 23

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 9:-
SHAREHOLDERS' DEFICIENCY (Cont.)

   
Year ended
December 31, 2009
 
   
Options
   
Aggregate intrinsic value (in thousands)
 
             
Outstanding as of January 1, 2009
    146,667     $ *) 9  
Granted
    1,366,963     $ 6  
                 
Outstanding as of December 31, 2009
    1513,630     $ ***) 20  
Exercisable as of December 31, 2009
    632,747     $ **) 20  

 
*)
Represents intrinsic value of 63,333 options that are in-the-money as of December 31, 2008. The remaining 83,334 options are out of the money as of December 31, 2008 and their intrinsic value was considered as zero.
 
 
**)
Represents intrinsic value of 140,042 options that are in-the-money as of December 31, 2009. The remaining 492,705 options are out of the money as of December 31, 2009 and their intrinsic value was considered as zero.

 
***) 
Represents intrinsic value of 140,500 options that are in-the-money as of December 31, 2009. The remaining 1,373,130 options are out of the money as of December 31, 2009 and their intrinsic value was considered as zero.
 
 
3.
The options outstanding as of December 31, 2009 have been separated into ranges of exercise price, as follows:
 
Outstanding
 
           
Weighted
       
Range of
         
average
remaining
   
Weighted
average
 
exercise
   
Options
   
contractual
   
exercise
 
price
   
outstanding
   
life
   
price
 
           
Years
       
                     
  $0.31-0.50       103,833       8.4     $ 0.45  
  $0.58-0.73       62,603       7.43     $ 0.63  
  $0.86-0.92       1,340,527       8.96     $ 0.86  
  $1.63-1.86       6,667       3.88     $ 1.86  
                             
          1,513,630             $ 0.83  

 
The weighted average remaining contractual term of options exercisable as of December 31, 2009 is 8.58 years.

 
F - 24

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)

NOTE 9:-
SHAREHOLDERS' DEFICIENCY (Cont.)

 
4.
All options granted during 2007, 2008 and 2009 were granted with exercise price equal or higher than the market price on the date of grant. Weighted average fair values and exercise price of options on dates of grant are as follows:

   
Equal market price
 
   
2007
   
2008
   
2009
 
                   
Weighted average exercise prices
  $ 0.59     $ 0.50     $ 0.85  
Weighted average fair value on grant date
  $ 0.41     $ 0.22     $ 0.14  
 
 
5. 
The Company's outstanding warrants as of December 31, 2009, are as follows:
 
Issuance date
 
Number of warrants issued
   
Exercise price
per share
   
Warrants exercisable
 
Expiration date
                     
April 2005
    3,000,000     $ 0.75       3,000,000  
April 2010
October 2005
    25,714,286     $ 0.40       25,714,286  
October 2010
December 2005
    8,000,000     $ 0.35       8,000,000  
December 2010
January 2007
    2,131,596     $ 0.65       2,131,596  
January 2012
February 2007
    1,388,889     $ 0.65       1,388,889  
February 2012
                           
      40,234,771               40,234,771    
 
 
 
In September 2008, warrants to purchase 240,000 ordinary shares, at an exercise price of $ 0.52 per share, were exercised. In October 2008, warrants to purchase 825,923 ordinary shares at an exercise price of $0.34 per share, held equally by Kanir and Shlomo Nehama, were exercised.  These exercises resulted in the receipt by us of aggregate consideration in the amount of $ 510.
 
 
6. 
Dividends:
 
In the event that cash dividends are declared in the future, such dividends will be paid in NIS. A dividend paid to shareholders outside Israel will be converted into dollars, on the basis of the exchange rate prevailing at the date of payment. The Company does not intend to pay cash dividends in the foreseeable future.
 
NOTE 10:-
TAXES ON INCOME

 
a.
Israeli taxation:
 
Corporate tax structure:
 
Taxable income of Israeli companies is subject to tax at the rate of, 29% in 2007, 27% in 2008, 26% in 2009, 25% in 2010, 24% in 2011, 23% in 2012, 22% in 2013, 21% in 2014, 20% in 2015 and 18% in 2016 and thereafter.

 
F - 25

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 10:-
TAXES ON INCOME (Cont.)

 
b.
Uncertain tax positions:
 
As of December 31, 2009, the total amount of unrecognized tax benefits was $ 4,644 which, if recognized, would affect the effective tax rates in future periods. Included in that amount are cumulative accrued interest and penalties in respect to uncertain tax positions of $ 1,026 at December 31, 2009, of which $ 60 for interest and penalties expenses were recorded during 2009.
 
A reconciliation of the beginning and ending amount of unrecognized tax benefits is as follows:
 
   
2008
   
2009
 
             
    Beginning balance
  $ 3,618     $ 4,584  
    Additions for prior year tax positions
    318       60  
    Additions for current year tax position
    648       -  
                 
Ending balance
  $ 4,584     $ 4,644  

 
 
The amount of income taxes paid by the Group is subject to ongoing audit by federal, state and foreign tax authorities, which often results in proposed assessments. Management performs a comprehensive review of its global tax positions on an annual basis and accrues amounts for contingent tax liabilities. Based on these reviews, the result of discussions and resolutions of matters with certain tax authorities and the closure of tax years subject to tax audit, reserves are adjusted as necessary. However, future results may include favorable or unfavorable adjustments to estimated tax liabilities in the period the assessments are determined or resolved. Additionally, the jurisdictions in which earnings and/or deductions are realized may differ from current expectations used as a basis for the above estimates. The Company does not expect that any tax audit would be completed within the next twelve months; therefore , the Company does not anticipate any significant impact on its unrecognized tax benefit balance in 2009. The Company has tax assessments that are considered to be final up to 2002.
 
 
F - 26

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 10:-
TAXES ON INCOME (Cont.)

 
c.
Theoretical tax expenses:
 
Statutory rate applied to corporations in Israel and the actual tax expense, is as follows:

   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
                   
(Loss) income before taxes on income
  $ (5,582 )   $ 87,942     $ (865 )
                         
Statutory tax rate
    29 %     27 %     26 %
                         
Theoretical tax expense (benefit)
  $ (1,619 )   $ 23,744     $ (225 )
Increase (decrease) in taxes:
                       
Approved enterprise
    1,225       490       -  
Income subject to reduced tax rate
    226       (920 )     26  
Permanent differences
    1,168       (17,500 )     24  
Foreign exchange differences
    180       1,279       (20 )
Utilization of carryforward losses for which valuation allowance was provided
    (1,327 )     (10,294 )     -  
Deferred taxes on losses, reserves and allowances for which a valuation allowance was provided
    985       4,167       300  
                         
Actual tax expense
  $ 838     $ 966     $ 105  
                         
Basic net Income (loss) per share amount of the tax benefit resulting from "Approved Enterprise" status
    *)  -       -       -  
Diluted net Income (loss) per share amount of the tax benefit resulting from "Approved Enterprise" status
    *)  -       -       -  

*)       Less than $ 0.01

 
d.
Taxes on income included in the statements of income (operations):

   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
Current:
                 
Domestic
  $ 434     $ 130     $ 60  
Foreign
    404       836       45  
                         
    $ 838     $ 966     $ 105  
 
 
F - 27

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 10:-
TAXES ON INCOME (Cont.)

 
e.
Deferred income taxes:
 
Deferred income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes. Significant components of the Group's deferred tax assets are as follows:
 
   
December 31,
 
   
2008
   
2009
 
Deferred tax asset:
           
Net operating losses and deductions carryforward
  $ 23,825     $ 22,179  
Stock-based compensation
    587       -  
Others
    158       -  
                 
Deferred tax assets before valuation allowance
    24,571       22,179  
Valuation allowance (1)
    (24,571 )     (22,179 )
                 
Net deferred tax assets
  $ -     $ -  

 
(1)
The Group has provided valuation allowances in respect of deferred tax assets resulting from tax losses carryforward and other temporary differences. Management currently believes that since the Company has a history of losses it is more likely than not that the deferred tax regarding all losses carryforward will not be utilized in the foreseeable future.
 
The net change in the valuation allowance in the year ended 31 December, 2009 in the amount of approximately $2,392 was mainly as a result of the change in the Israeli tax rate in future years.
 
 
f.
Carryforward tax losses and deductions:
 
As of December 31, 2009, Ellomay Capital Ltd. had available carryforward tax losses and deductions aggregating to approximately $ 31,000, which have no expiration date.

NUR Asia Pacific had available carryforward losses as of December 31, 2009 aggregating to approximately $ 2,000, which have no expiration date.

NUR Media Solutions had available carryforward losses as of December 31, 2009 aggregating to approximately $ 6,000, which have no expiration date.

Additional carryforward losses of NUR America and NUR Salsa, which are located in the U.S, amount to approximately $ 33,000. Utilization of U.S. net operating losses may be subject to substantial annual limitation due to the "change in ownership provision of the Internal Revenue Code of 1986" and similar state provisions.  As NUR America and NUR Salsa were dissolved during 2008, once their 2008 tax assessments are deemed final, the remaining unutilized carryforward losses will expire.

 
F - 28

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 10:-
TAXES ON INCOME (Cont.)

 
g.
(Loss) income before taxes on income consists of the following:

   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
                   
Domestic
  $ (8,747 )   $ 86,697     $ (742 )
Foreign
    3,165       1,245       (123 )
                         
    $ (5,582 )   $ 87,942     $ (865 )
 
NOTE 11:-
EARNINGS PER SHARE
 
The following table sets forth the computation of basic and diluted earnings per share:

   
Years ended December 31,
 
   
2007
   
2008
   
2009
 
                   
Net  (loss) income
  $ (6,420 )   $ 86,976     $ (970 )
                         
Weighted average Ordinary shares outstanding
    71,537,501       72,972,565       73,786,428  
                         
Dilutive effect:
                       
Employee stock options and warrants
    -       13,783,971       -  
                         
Diluted weighted average Ordinary shares outstanding
    -       86,102,748       73,786,428  
                         
Basic earnings (loss) per share
  $ (0.09 )   $ 1.19     $ (0.01 )
                         
Diluted earnings (loss) per share
  $ (0.09 )   $ 1.01     $ (0.01 )
 
NOTE 12:-
MAJOR CUSTOMERS AND GEOGRAPHIC INFORMATION

 
a.
Summary information about geographic areas:
 
The Company manages its business on the basis of one reportable segment. Refer to Note 1a for a description of the Company's business. The following data is presented in accordance with ASC 280, "Segment Reporting". Total revenues are attributed to geographical areas based on location of end customers.
 
 
F - 29

 
 
ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 12:-
MAJOR CUSTOMERS AND GEOGRAPHIC INFORMATION (Cont.)
 
 
 
The following table presents total revenues for the years ended December 31, 2007, 2008 and 2009 and long-lived assets as of December 31, 2008 and 2009:

   
2007
   
2008
   
2009
 
   
Total
   
Total
   
Long-lived
   
Total
   
Long-lived
 
   
revenues
   
revenues
   
assets
   
revenues
   
assets
 
                               
Asia
  $ 10,811     $ 664     $ -     $ -     $ -  
Europe and Middle East
    48,344       7,589       -       -       141  
America
    26,452       3,157       -       -       -  
                                         
    $ 85,607     $ 11,410     $ -     $ -     $ 141  

 
b.
Product lines:
 
Total revenues from external customers distributed on the basis of the Company's product lines are as follows:
 
   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
                   
Printers and spare parts
  $ 53,592     $ 6,606     $ -  
Ink
    26,636       3,962       -  
Services
    5,379       842       -  
                         
    $ 85,607     $ 11,410     $ -  
 
 
c.
Major customer data as a percentage of total revenues:
 
The Group did not have any major customers that represented 10% or more of the consolidated revenues for 2007, 2008 and 2009.
 
NOTE 13:-
SELECTED STATEMENTS OF INCOME (OPERATIONS) DATA
 
 
a.
Research and development, net:
 
   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
                   
      Research and development expenses
  $ 7,425     $ 1,942     $ -  
      Less – participation of the government in research and development projects
    379       -       -  
                         
    $ 7,046     $ 1,942     $ -  
 
 
F - 30

 

ELLOMAY CAPITAL LTD. AND ITS SUBSIDIARIES
 
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

U.S. dollars in thousands (except share and per share data)
 
NOTE 13:-
SELECTED STATEMENTS OF INCOME (OPERATIONS) DATA (Cont.)
 
 
a.
Financial expenses, net:
 
   
Year ended December 31,
 
   
2007
   
2008
   
2009
 
Expenses:
                 
Interest on short-term bank credit and other charges
  $ (512 )   $ (610 )   $ (9 )
Interest on long-term loans
    (54 )     -       -  
Foreign currency loss
    (9,329 )     (3,278 )     (123 )
                         
      (9,895 )     (3,888 )     (132 )
Income:
                       
Interest on bank deposits and other
    36       1,808       1,314  
Interest on restructured debt (see Note 1b)
    -       7,335       -  
Foreign currency gain
    8,121       2,341       147  
                         
      8,157       11,484       1,461  
                         
    $ (1,738 )   $ 7,596     $ 1,329  
 
NOTE 14:-
SUBSEQUENT EVENTS

On March 4, 2010, the Company signed two Engineering Procurement & Construction Contracts with an Italian contractor, for the design, supply, construction, assembly and commissioning of two photovoltaic plants approximately 750KWp each, to be located in Italy, for an aggregate cost of approximately 4.5 million Euros. Additional ancillary expenses are expected to amount to approximately 0.2 million Euros. Following the commissioning of the two photovoltaic plants, it is intended that the contractor shall operate and maintain the two photovoltaic power plants, for an annual fee, and an annual fee shall be paid to the owners of the land under the land rights use agreements.

F - 31
 



 
 
 
 
 
 
 
 


EX-4.10 2 exhibit_4-10.htm EXHIBIT 4.10 exhibit_4-10.htm


 
Exhibit 4.10
 
Engineering Procurement & Construction Contract
 
for the construction of a photovoltaic system

 
 
between
 
 
ECOWARE S.p.A
 
As Contractor
 
 
And
 
 
ELLOMAY PV ONE SRL
 
As Principal
 
 
 

 
 
Engineering Procurement & Construction Contract
 
With this contract
 
 
ELLOMAY PV ONE S.r.l., with its registered offices located in Galleria Borromeo, 3, VAT Registration Number and Tax Code 04459950285, entered in the Companies Register of Padova at no. 391298 represented by Mr. Ran Fridrich in his capacity as Sole Director (hereinafter known as “Principal”);
 
and
 
ECOWARE S.p.A, with its registered offices at Via Nona Strada, 9, 35129 Padua, VAT Registration Number and Tax Code Number 03571330277, entered in the Companies Register in Padua at number 03571330277, represented by Ing. Leopoldo Franceschini, born in Padua on 7th September 1947, in his capacity of legal representative (hereinafter known as the “Contractor”);
 
(hereinafter known individually as a “Party” and jointly as the "Parties")
 
Whereas:
 
(A)  
The Principal is a company operating in the sector of the development and operational management of photovoltaic systems;
 
(B)  
The Contractor is a company operating in the construction of photovoltaic systems and has the expertise to perform the Works, as defined below, in accordance with the terms and conditions set out under this Contract;
 
(C) 
NOVALTEK Servizi S.r.l. with registered office in Monterado (Ancona), Via Cerasi no. 18, tax code 02379340421, is a company operating as the developer of photovoltaic systems (the “Developer”). Upon endorsing this Contract, the Developer undertakes to co-operate with the Parties hereto and support the Contractor to ensure the proper performance of this Contract in relation to the transfer of the Building Permit, the STMC, and all permits in connection therewith, and of the Land Use Rights.
 
(D)
The Principal intends to proceed with the construction and operation of one photovoltaic system in the province of Macerata, Italy, in the Municipality of Cingoli, made up of 3060 modules made of monochristalline, with generators having respectively a capacity equivalent to 734,40 kWp (hereinafter known as the "System");
 
 
Page 2 of 38

 
 
(E)
In relation to the System, the Developer has filed the following authorisations and requests:
 
 
(i)
the Building Permit, as defined below, was issued by the competent municipal offices in Cingoli (Macerata), on 24 September 2009 (prot. no. 142);
 
 
(ii)
application to ENEL, as defined below, for connection to the national electricity grid, pursuant to the Electrical Energy and Gas Authority Resolution No. 99/08, by means of a communication dated 12 August 2009; ENEL has transmitted the STMC, as defined below, on 13 October 2009 (no. T0026157) and the Developer has formally accepted the STMC proposed by ENEL for the connection to the national electricity grid of the System, by means of its letter of acceptance dated 12 November 2009.
 
 
(iii)
ENEL has communicated notice of end of the authorization process pursuant to Regional Law 19/1988 and subsequent amendments with letter dated 8 January 2010;
 
(F)
Sunex 3 S.r.l., a company wholly owned by Contractor, with registered offices in Via Nona Strada 9, 35129 Padua, Italy, VAT Registration Number and Tax Code Number 06085820964 (“Sunex 3”) has signed a definitive Land Use Right contract, enclosed hereto as Annex 1, with the owner of the Area, as defined below. Contractor undertakes to cause Sunex 3, pursuant to article 1381 of the Civil Code, to assign to the Principal the rights and obligations arising under the Land Use Right, as provided under Article 4.2 a) (ii). The Parties have agreed that, to share the costs related to the tax liabilities arising in connection with such assignment, a sum equal to Euro 10,000.00 (ten thousand) shall be deducted from Payment Milestone 1, as defined below;
 
(G)
In order to build the System, the Principal needs a partner with high expertise and standing in the construction of photovoltaic systems to be appointed for the planning, construction, operation and connection of the “turn key” system (as defined below), and the Contractor is a leading company operating, inter alia, in said field;
 
(H)
On 2 December 2009, the Parties entered into a framework agreement, regulating the general understanding on which their partnership should be based.
 
(I)
On 22 January 2010, the Parties entered into an agreement (the “Option Agreement”), enclosed hereto as Annex 18, whereby the Principal was provided with an option right to purchase the shares of Sunex 3, in accordance with the terms and conditions of the Option Agreement and on execution of which the Principal paid a deposit equal to Euro 50,000.00 (fifty thousand), half of which shall be deducted from  Payment Milestone 1, as defined below.
 
(J)
The Principal is planning to appoint a financial institution (the “Financing Entity”), which will grant to the Principal, on a leasing or project finance basis, two credit lines, the first named “Base Line” for financing of project’s costs, and the other named “VAT Line” to finance VAT on such costs (the “Financing“);
 
 
Page 3 of 38

 
 
(K)
The Contractor has confirmed the feasibility and economic convenience of the solution for the connection proposed by ENEL with the STMC referred to under point E (ii) above;
 
(L)
In the light of the above, the Contractor decided to enter into this Contract, and undertook (i) to carry out all the activities and services provided herein; and (ii) to guarantee, pursuant to article 1381 of the Civil Code, the proper fulfilment of all the obligations and activities to be performed and carried out by the Developer;
 
(M)
The Principal is willing to entrust the Contractor also with the operation and maintenance of the System through execution of an ad hoc operation and maintenance agreement (the “O&M Agreement”), which shall be executed, as soon as it is feasible and in any case as a condition precedent to Payment Milestone 2,  substantially in the form of Annex 17.
 
NOW THEREFORE the Parties agree as follows:
 
Article 1 – Recitals, annexes and previous agreements
 
1.1 The recitals and annexes to this contract (hereinafter known as the “Contract” or “EPC Contract”) shall represent an integral and substantial part of the same.
 
1.2 This Contract replaces and fully supersedes any previous agreement entered into between the Parties, either written or oral, on the matters outlined here below.
 
Article 2 – Definitions and Interpretation
 
2.1 In addition to any other words and expressions defined in this Contract, the terms used in this Contract, where they start with a capital letter, shall have the following meanings:
 
·  
AEEG: means the Electrical Energy and Gas Authority incorporated pursuant to the Law No. 481 dated 14th November 1995;
 
·  
Applicable Law: means each and every law, regulation, measure, ruling, decree (including the Decree Law) or deed having a binding nature in Italy and issued by every state body and judicial and/or administrative authority, which is in force on the date in which this Contract is entered into or which comes into force thereafter;
 
·  
Applicable Permits: means each and every license, authorization, certification, filing, recording, permit, affidavit (including the denuncia di inizio attività, the autorizzazione unica or permesso di costruire) or other approval with and/or of any competent authorities that is required by Applicable Law for the construction and connection to the grid (including the comunicazione conclusione iter autorizzativo issued by Enel pursuant to Regional Law 19/1988 as subsequently amended) and admission, to the Incentiv es of the System including, without limitation, those required by Applicable Law in zoning, building, environmental, landscaping, planning and/or archaeological matters;
 
 
Page 4 of 38

 
 
·  
Area: means the area in the plan referred to in Annex 2 to this Contract, in which the System shall be built;
 
·  
Building Permit: means the construction authorisation (“Permesso di costruire”) provided for by Presidential Decree 6 June 2001 no. 380;
 
·  
Civil Code: means the Italian Civil Code, introduced with the Royal Decree Law No. 2, dated 16th March 1942, and all subsequent amendments and/or integrations thereto;
 
·  
Commencement of Operation: means the commencement of operation (i.e. entrata in esercizio) of the System pursuant to Article 2(g) of the Ministerial Decree 19 February 2007;
 
·  
Communication of the Executive Project’s Approval: with reference to the System, shall have the meaning set out in the Article 8.3 below;
 
·  
Completion Date shall have the meaning indicated in Article 9.1;
 
·  
Confidential Information: means the information, data, notes, records, agreements, documents, in whatsoever form drawn up, provided by one of the Parties to the other or, in any case, obtained from one of the Parties and connected with the execution of this Contract and, in particular, the Technical Specifications, including, without any limits  whatsoever, any technical and contractual documentation inherent in the Works and their object, as well as any document of a commercial or financial nature, data relating to prices and technical knowledge, models, formulas, industrial processes, records, photographs, drawings, contractual conditions, software, programmes and models and any other intellectual  property concerning the Party making the communication or, in any case, to wh om said data refer, with the exception of any information already made available to the public;
 
·  
Consideration: means, with reference to the System, the all inclusive, invariable, sum that the Principal shall pay to the Contractor to perform the Works with respect to the System as per Article 4.1 of this Contract;
 
·  
Construction Health and Safety Coordinator (coordinatore in materia di sicurezza e salute durante la realizzazione): means the individual appointed by the Principal pursuant to Article 7 below, who has been entrusted with the duties related to this role pursuant to Article 92 of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations;
 
·  
Contract: means this Contract, including all the Annexes and all amendments hereto as mutually agreed by the Parties;
 
·  
Contractor’s Parent Company: means Kerself S.p.A., a company incorporated under the laws of Italy, with its registered office at Via della Tecnica 8, Prato di Correggio, registration with the Registro delle Imprese of 01777890359, Fiscal Code and Vat No. 01777890359;
 
·  
Delay Liquidated Damages means the damages referred to in Article 9.3;
 
·  
Decree: means the Decree Law dated 19th February 2007 no. 25336 issued by the Economic Development Minister and whose object is the “Criteria and methods to encourage the production of electrical energy by means of solar photovoltaic conversion in implementation of Article 7 of the Legislative Decree Law No. 387, dated 29th December 2003” (Criteri e modalità per incentivare la produzione di energia elettrica mediante conversione fotovoltaica della fonte solare, in attuazione dell'articolo 7 del decreto legislativo 2 9 dicembre 2003, n. 387), and subsequent amendments and/or integrations thereto;
 
 
Page 5 of 38

 
 
·  
Definitive Project: means,  the “Progetto Definitivo”, i.e. the project drawings to construct the Works and the relative annexes, a copy of which is attached hereto, as Annex 4;
 
·  
Design Health and Safety Coordinator (coordinatore in materia di sicurezza e salute durante la progettazione): means the individual appointed by the Principal pursuant to Article 7, who shall draft the PSC and who has been entrusted with the duties related to this role pursuant to Article 91 of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations;
 
·  
Discount: has the meaning indicated in Article 9.7 hereof;
 
·  
Discretional Variations: has the meaning indicated in Article 10.2 (b) hereof;
 
·  
ENEL: means Enel Distribuzione S.p.A.;
 
·  
Equipment: means the Contractor’s equipment and components to carry out the Works listed in Annex 3 of this Contract;
 
·  
Executive Project: means  the “Progetto Esecutivo”, i.e. the project drawings prepared and delivered by the Contractor prior to the commencement of the Works pursuant to Article 8, in compliance with the Technical Specifications and with the Decree Law provisions;
 
·  
Expert: means the arbitrator appointed for the solution of technical and related matters in accordance with Article 24.2;
 
·  
FAC: means the Final Acceptance Certificate, i.e. the certificate that shall be issued by Principal in compliance with the outline set forth in Annex 16 acknowledging the positive outcome of the conditions mentioned in art. 12;
 
·  
Financing: means the project loan that may be arranged by the Principal, in compliance with recital H above;
 
·  
Financing Entity: means the financing institution or any other equity partner identified by the Principal which could grant the Financing to the Principal;
 
·  
First Reassessment Test: means the First Reassessment Test of the MGPR to be performed pursuant to Article 12.6.
 
·  
Force Majeure: has the meaning indicated in Article 11;
 
·  
GSE: means the Gestore dei Servizi Elettrici - GSE S.p.A., i.e. the entity appointed to implement the incentive tariff regime foreseen by the Decree Law;
 
·  
Health and Safety Coordinators: means the Construction Health and Safety Coordinator jointly with the Design Health and Safety Coordinator;
 
·  
IAC: means the Incentive Acceptance Certificate, i.e. the certificate that shall be issued by the Principal in accordance with the outline set forth in Annex 15, after the release of the TAC and PAC, acknowledging that the System has been admitted to the Incentive scheme and that the agreement with GSE has been entered into;
 
 
Page 6 of 38

 
 
·  
Incentive: means the incentive to the tariff for the production and delivery of power to the national electricity grid through a solar power plant, in accordance with the Ministerial Decree of 19 February 2007 and the Resolution No. 90 of 11 April 2007 of AEEG;
 
·  
Incentive Agreement: (“Convenzione con GSE”) means the agreement between the Principal and GSE in order to obtain the Incentive;
 
·  
Interconnection Agreement means the agreement to be entered into between the Principal and the national electricity grid operator which provides the terms and conditions for the connection to the national grid.
 
·  
Land Use Rights are the rights in rem (“diritto di superficie”) referred to in Recital F, to be acquired by the Principal over the Area, pursuant to Article 3.2 (a).
 
·  
Mechanical Completion: means the completion of all Mechanical Works of the System;
 
·  
Mechanical Works: means, with reference to the System, all the mechanical and electrical works. It includes (a) supply and installation of the following equipment: inverters, photovoltaic modules and DC installation, mains, pits, cabling, electrical boxes and protection devices, internal connections and interconnections with external installations, weather station, low voltage installation, civil engineering, medium voltage installation (including transformation, protection equipment and utility interconnection equipment, security and monitoring systems); and (b) the static test of structures (collaudo statico) according to the Applicable Law. For the avoidance of doubt, the Mechanical Works do not comprise the physical construction of the connection line to the national electricity grid;
 
·  
Minimum Guaranteed Performance Ratio (or MGPR): means the minimum performance ratio guaranteed by the Contractor pursuant to the Annex 9 and in accordance with the methodology used for the measurement of the System performance according to the standard CEI EN 61724 (CEI 82-15) as described in the same Annex 9;
 
·  
Necessary Variations: has the meaning indicated in Article 10.2  (a) below;
 
·  
O&M Agreement: means the operation and maintenance agreement referred to in Recital (M) above;
 
·  
Operational Inspection: means, with reference to the System, the verification process carried out by the Contractor according to the Technical Specifications,  the Applicable Laws, and the MGPR which shall be carried out by the Parties in accordance with Annex 10 and article 12 below in order to achieve the PAC;
 
·  
PAC: means the Provisional Acceptance Certificate, i.e. the certificate that shall be issued by Principal in compliance with the outline set forth in Annex 14 acknowledging the positive outcome of the Operational Inspection;
 
·  
Parent Company Guarantee: means the guarantee, consistent with the form set forth in Annex 5, whose maximum amount is equal to the amount of the Consideration to be issued by the Contractor’s Parent Company in favour of the Principal, in compliance with Article 4.2, as guarantee for the obligations undertaken by the Contractor under this Contract.
 
·  
Payment Milestones: means the milestones for the payment of the Consideration as set out in Article 4 of this Contract;
 
 
Page 7 of 38

 
 
·  
Performance Liquidated Damages: means the damages referred to in Article 13.2;
 
·  
POS: means the operative safety plan (i.e. Piano Operativo di Sicurezza) to be drawn up by the Contractor, with reference to the System, in compliance with the CSP, in accordance with Article 89, paragraph 1, letter h) of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations thereto, as possibly amended in agreement with the Health and Safety Coordinators;
 
·  
Power Purchase Agreement (or PPA): means the agreement that the Principal will enter into with the energy company of its choice for the sale of the produced electricity;
 
·  
Project Implementation Schedule (or PIS): means the schedule for the implementation of the construction of the System, which is attached as Annex 7 as may be updated, from time to time, in agreement between the Parties;
 
·  
PSC: means the coordination and safety plan drawn up by the Design Health and Safety Coordinator during the planning phase, pursuant to Article 100 of Legislative Decree Law No. 81/2008, which must include, inter alia, an estimate for the safety costs, as eventually altered  by the Construction Health and Safety Coordinator during the performance phase while the Works are carried out;
 
·  
Reassessment Tests: means jointly the First Reassessment Test and the Second Reassessment Test of the MGPR will be performed pursuant to Article 12.6.
 
·  
Second Reassessment Test: means the Second Reassessment Test of the MGPR to be performed pursuant to Article 12.6.
 
·  
Service Order: means the orders given during the execution of the Works;
 
·  
Site Manager: means the individual appointed by the Contractor, who shall work with the Works Manager throughout the performance of the Works;
 
·  
Start of Works: has, with reference to the System, the meaning indicated in Article 8.4 herebelow;
 
·  
STMC: means the minimum technical solution for connection referred to in the AEEG Resolution no. 99/08 and subsequent amendments;
 
·  
System: means the photovoltaic system in the Municipality of  Cingoli (MC) made up of 3060 modules made of monochristalline, with a generator that has a capacity equivalent to 734,40 kWp, and, for the avoidance of doubt, shall include all the items, such as without limitation, cables, modules, inverters, structures, cabins, etc, that are finalised at the functioning of the plant;
 
·  
TAC: means the Technical Acceptance Certificate, i.e. the certificate that shall be issued by Principal in accordance with the outline set forth in Annex 11 following the Technical Inspection;
 
·  
Technical Consultant: means the consultant appointed by the Principal and/or the Financing Entity, who has been appointed to monitor the progress of the Works;
 
·  
Technical Inspection: means the inspection procedure that the Principal shall carry out pursuant to Annex 10 and in accordance with Article 12 in order to verify that the Mechanical Completion complies with the Technical Specifications, Applicable Laws and rules of the trade, and to achieve the TAC;
 
 
Page 8 of 38

 
 
·  
Technical Specifications: means the documentation, referred to in Annex 6 of this Contract, in which the technical specifications on the basis of which the Contractor shall perform the Executive Project and Works to reach the MGPR are indicated;
 
·  
Variations: mean, jointly, the Discretional and Necessary Variations;
 
·  
Warranty Bond: means the insurance bond on first demand equal to 15 % (fifteen per cent) of the Consideration, issued by a first-class insurance company which has been attributed, at least a S&P A-rating or which, in any case, satisfies the Principal and the Financing Entity;
 
·  
Warranty Period: means the period of 2 (two) years starting from execution of the PAC.
 
·  
Working Day: means every day except for Fridays, Saturdays, Sundays and public or bank holidays;
 
·  
Works: means the activities that have been performed or are to be performed by the Contractor for the System pursuant to this Contact, as better described in Article 3 hereof;
 
·  
Works Manager: means the “Responsabile Lavori”, i.e. the individual appointed by the Principal, in compliance with the Law No. 81/2008, who shall perform the site management duties foreseen by the Applicable Law and/or listed in this Contract;
 
2.2. The following interpretation provisions shall be applied to this Contract, unless otherwise provided for:
 
(a)
the articles’ headings are merely indicated for the sake of convenience of reference and cannot be used for the interpretation of the terms contained in this Contract;
 
(b)
reference to sections, articles and annexes shall be understood as being made, unless otherwise indicated, to the sections, articles and annexes contained in this Contract;
 
(c)
unless explicitly indicated in this Contract,
 
 
(i)
any reference to this Contract shall be a reference to the Contract, as validly revised, integrated or amended and
 
 
(ii)
any reference made to any other agreement or document shall imply reference to that agreement or document, as validly revised, integrated or amended;
 
(d)
unless otherwise explicitly indicated, the words and definitions, used in the singular form shall have the same meaning, mutatis mutandis, even when used in the plural form and vice versa;
 
(e)
the terms, "herein", "therein" and synonyms in this Contract refer to the entire Contract and not to particular articles in this Contract, unless explicitly provided in this sense, just as the terms “below” or “above” indicate the part below or above in this Contract, with reference to the point in which said terms have been used;
 
(f)
the word “included” and the expression “in particular” shall always be considered to be followed by the expressions “without limitations” or “not limited to” even if not effectively followed by said expressions;
 
(g)
every reference to each individual shall also refer to his legitimate successors and assignees;
 
 
Page 9 of 38

 
 
(h)
if, on the basis of this Contract, an activity must be performed, a communication sent or a term expires on a day other than a Working Day, said activity shall then be performed, the communication be sent or the relative term expire on the Working Day falling immediately after.
 
Article 3 – Object and Description of the Works
 
3.1 With this Contract, the Principal has entrusted “turn key” the Contractor, who accepts, with the construction of the Executive Project and the performance of all the Works in a world class manufacturing way and in compliance with the Technical Specifications and Applicable Laws. The Contractor is also entrusted, inter alia, with (i) obtaining of all the Applicable Permits required for the construction and the functioning of the System, (ii) the realisation of all the necessary Works required for the integral construction of the System in accordance with the terms and conditions set forth by this Contract, (iii) the connection of the System to the national electricity grid in compliance with the Project Implementation Schedule, and (iv) the assistance in obtaining the Incentive.
 
3.2 In particular, and without limitation, the following activities must be understood as having been included in the invariable Consideration referred to in Article 4:
 
(a)  
Land Use Right (diritto di superficie): the Contractor undertakes to cause Sunex 3 to appoint the Principal as party of the Land Use Right referred to in Recital (F) above, so that the Principal will be able to validly hold the Land Use Right (diritto di superficie) over the Area, pursuant to Article 4.2 (a). All activities related to any cadastral parcelling (frazionamento) which may be necessary in relation to any plot of land involved by the System shall be carried out by the Contractor;
 
(b)  
Transfer in favour of the Principal of the Applicable Permits, including the STMC and the Building Permit submitted by the Developer. In particular, the Contractor undertakes to cause the Developer to perform any required activity or prepare any needed document for the successful transfer of the Building Permit in favour of the Principal, pursuant to Article 4.2, including delivery to the competent Municipality Technical Offices of the variations to the Building Permit, if any;
 
(c)  
Engineering: including the performance, for the System, of the Executive Project in compliance with the Technical Specifications and their amendment as required in order to obtain the Principal’s final, written approval, including, without limitation, the System “as-built” documentation, the electrical single wire and multi-wire diagrams, Technical Specifications, components and operation and maintenance manuals;
 
(d)  
Civil Works: including, for the System, the construction of entries, digging work for the electrical underground cabling, if any, foundations, enclosures and constructions necessary to house the inverters and transformers, fencing, in accordance with the Executive Project and the Technical Specifications and supplying, on his own initiative and expense, the materials, vehicles or any other component and labour necessary. Construction of all the provisional Works, including those located outside the Area (signage, even luminous, placards, crush barriers aimed at defining or limiting the paths of pedestrians and vehicles, in compliance with the traffic and viability provisions), as well as the preparation of the equipment aimed at guaranteeing, for the entire duration of the Works, in comp liance with the provisions on safety and health on the workplace and what is contained and has been prescribed in the PSC. Construction of site offices for the Works Manager and the Design Health and Safety Coordinator. Construction of the utilities required for the supply of water, gas, electricity, drainage into the sewers, as well as the provision of suitable offices for the Design Health and Safety Coordinator. Payment of all the charges for the consumption of water, gas, electricity and drainage into the sewers, as described above. Building of barriers or provisional protection for the Works and wherever the safety provisions require them;
 
 
Page 10 of 38

 
 
(e)  
Supply of the electro-mechanical apparatus: including supply, installation and start up of the photovoltaic modules, mounting structures, inverters, module boards and electrical connection in direct and alternating current into the national electricity grid, transformation box, interface module boards, supervision and control system, monitoring system, video surveillance and weather station.
 
(f)  
Assembly and installation: the supply and installation, including the use of labour, of all the materials, accessories and secondary components that might be required for the correct and safe operation and management of the System. Maintenance and operative capacity of the site for the entire duration of the Works;
 
(g)  
Constant inspection and planning of the states of progress concerning the Works.
 
(h)  
Grid connection civil works: the timely construction of all the civil works required by ENEL with reference to the STMC, for the purposes of the System’s connection to the grid (merely by way of an example, the construction of the area/cable line and delivery box). The works may include the intervention of ENEL.
 
(i)  
Delivery to the Principal of all the necessary documentation, on issue of the System’s PAC and as a condition for the issue of the FAC, to be drawn up in compliance with the Applicable Law and in order to obtain the Incentive;
 
(j)  
Post-STMC activities: relations with the competent authorities (such as, inter alia, ENEL) and the individuals appointed by the latter for the System’s connection to the grid shall be directly managed by the Contractor, who must constantly monitor ENEL’s activities and those of the other individuals, soliciting them, when necessary, with the means deemed to be most expedient, in order to facilitate and, in any case, make such connection to the national electricity grid possible within the Completion Date established by the Project Implementation Schedule. Furthermore, the Contractor shall carry out all activities and formalities aimed at obtaining the Incentive Agreement, the Interconnection Agreement and the PPA (as th e case may be), and to prompt the Principal for proper action in connection therewith, when necessary.
 
(k)  
Custody of the Area: maintenance, protection, monitoring, security service, custody and conservation of the Area and of the equipment erected or stored therein until the issuance of the relevant PAC. The protection and security systems and procedures will be in line with the best practice and the minimum standard requested by the insurers. The Contractor shall be the keeper of the Works, as well as of all the materials and equipment to be used during the execution of the Works and must, therefore, adopt the necessary measures aimed at avoiding any losses, damages and thefts, as well as providing, at its own initiative and expense, for the replacement of what has been damaged or removed until the issue of the PAC and the System’s delivery to the Principal.
 
(l)  
Clearance of the Area: removal of all tools and materials that are not necessary during the Warranty Period within the first twenty (20) Working Days after the signing of the PAC; cleaning of the Area, including the restoration of the surrounding areas and roads, in order to leave the System in the condition necessary for its proper operation and maintenance. Removal and transport to the authorised public dumps, of all waste materials that cannot be re-used, with final delivery, to the Principal, of the certification of its disposal, in compliance with the Applicable Law.
 
3.3 The Contractor shall perform, more generally, any other activities that might be necessary to duly perform the Contract, to achieve the standards of world class manufacturing, and MGPR.
 
 
Page 11 of 38

 
 
3.4 In addition, the Contractor shall file, at its expense, any documents and applications necessary to apply for and obtain the Applicable Permits on a timely basis, or in the event that the Applicable Law requires that such Applicable Permits be filed by the Principal, the Contractor hereby undertakes to fully cooperate in good faith with the Principal in interacting with the public authorities and carry out all the activities to obtain them, as soon as possible, and in any case within the terms set out by the Applicable Law and the POS.
 
3.5 It is understood that the planning, construction, any inspection and the subsequent management of the System may be financed by the Financing Entity in compliance with the project financing or leasing outline, and that this shall require this Contract’s co-ordination with the terms set forth in the financing agreement, by means of entering into a direct agreement with the Financing Entity (the “Direct Agreement”). Therefore, the Parties mutually undertake to enter into the Direct Agreement, if necessary.
 
Article 4 – Consideration, Terms of Payment and Guarantees
 
4.1 The Principal shall pay the Contractor the Consideration of Euro 3,050.00 per kWp (three thousand fifty) for the System, plus VAT, in compliance with the following terms and conditions.
 
4.2 The Consideration shall be paid to the Contractor in accordance with the following Payment Milestones:
 
 
a) Payment Milestone 1: payment of Euro 680.00 per kWp (six hundreds eighty), with deduction of Euro 10,000.00 (ten thousand) referred to in Recital (F) and of the deposit equal to Euro 25,000.00 (twenty five thousand) referred to in Recital (I), shall become due by the Principal on occurrence of all the following events:
 
 
i.
completion of the Building Permit and all Applicable Permits (excluding the Incentive) procedure, including submission of the variations, if any, consequent to the planning and Equipment amendments, and the performance of the provisions established by the competent municipal technical offices to which the Building Permit might be subject to;
 
 
ii.
transfer to the Principal or a third company indicated by the Principal of the relevant Land Use Rights, by way of assignment of the definitive Land Use Right contract or by any other way as the Principal may require;
 
 
iii.
connection of the System to the grid is reasonably estimated by the Contractor, by way of  a statement drafted in accordance with Annex 13 to take place within 120 (hundred and twenty) days;
 
 
iv.
delivery of the Parent Company Guarantee in compliance with the last paragraph of this Article 4.2, letter a).
 
 
Page 12 of 38

 
 
Promptly after payment of the relevant invoice, and in any case within 45 days of receipt thereof by the Principal, the Contractor shall provide evidence to the Principal that the Building Permit as well as the STMC (and of any Applicable Permit already obtained) have been successfully transferred to the Principal.
 
The Contractor undertakes to deliver to the Principal, the Parent Company Guarantee within 7 (seven) Working Days of execution of this Contract, and in any case before having received the payment. The Parent Company Guarantee will be issued for the due performance of the Works, as well as for the due performance by the Contractor of any and all the obligations undertaken under this Contract, including, but not limited to, (i) the obtaining of a valid title of Land Use Right over the land where the System shall be built and developed in accordance to Article 3 above; (ii) the obtaining of all the Applicable Permits required for the construction, connection and the functioning of the System; (iii) the transfer of the Building Permit in favour of the Principal; (iv) the admission to the Incentives; and (v) any and all payment obligations arising in connection herewith. The Parent Company Guarantee will be issued in the form under Annex 5, for an amount equal to the Consideration. From the execution date by the Principal of the PAC, the Parent Company Guarantee must also guarantee the precise and prompt performance of the obligations undertaken by the Contractor, pursuant to the O&M Agreement, as well as the punctual performance of all the payment obligations, borne by the Contractor under the O&M Contract. The Parent Company Guarantee shall be finally released upon issuance of the FAC.
 
 
(b) Payment Milestone 2: subject to the provisions of art. 12.1 hereof, payment of Euro 340.00 per kWp (three hundreds forty) shall become due on occurrence of all the following events:
 
 
(i)
satisfactory outcome of the Technical Inspection and the relevant issuance of the TAC;
 
 
(ii)
all conditions precedent to Payment Milestone 1 are in place and valid;
 
 
(iii)
the Contractor can still reasonably estimate connection of the System within 120 (hundred and twenty) days of Payment Milestone 1;
 
 
(iv)
execution of the O&M Agreement.
 
 
(c) Payment Milestone 3: subject to the provisions of art. 12.2 hereof, payment of Euro 2,030.00 per kWp (two thousand thirty) shall become due on occurrence of all the following events:
 
 
(v)
satisfactory outcome of the Operational Inspection and issuance of the PAC;
 
 
(vi)
all conditions precedent to Payment Milestones 1 and 2 are in place and valid;
 
 
(vii)
delivery by the Contractor to the Principal of the Warranty Bond, provided that the Warranty Bond shall become effective on payment of Payment Milestone 3 by the Principal.
 
 
Page 13 of 38

 
 
The Contractor shall deliver to the Principal the Warranty Bond, amounting to 15% (fifteen per cent) of the Consideration, to guarantee the due performance of any and all the obligations undertaken by the Contractor under the EPC Contract at the moment of PAC. The Warranty Bond shall be definitively released upon issuance of the FAC, provided that the insurance bond under the O&M contract is issued by the Contractor.
 
4.3 Once the Contractor believes that any of the Payment Milestones set out under Article 4.2 has been achieved, it shall so notify the Principal in writing. Within 5 (five) Working Days from receipt of the notice, the Principal shall inspect the Works and verify that the relevant Payment Milestone has been achieved. In the event of objection, the Principal shall indicate to the Contractor the works pending performance for that Payment Milestone. In the event that no objection is raised in writing by the Principal within such term, the relevant Payment Milestone shall be deemed approved.
 
Payment shall be made within 5 (five) Working Days of the date of receipt by the Principal of the invoice in relation to Payment Milestone 1 and within 15 (fifteen) Working Days in relation to other Payment Milestones. The relevant invoice may not be issued prior to confirmation under the preceding paragraph, and prior to issuance of the TAC with regard to Payment Milestone 2 and prior to issuance of the PAC with regard to Payment Milestone 3, as set forth in detail under Article 12.
 
The Parties agree that the payments of the Payment Milestone, for which the Principal shall issue a wire transfer confirmation, shall constitute mere advance payments and not the single lots in which the Parties intended dividing up the Works, with the exclusion, therefore, of the provision contained in the second paragraph of Article 1666 of the Civil Code.
 
4.4 The Parties agree and accept that the Consideration provided in the Contract is fixed and cannot be amended, save as provided in Article 10 of the Contract. Accordingly, the Parties have agreed to exclude the applicability of the Civil Code and every other provision that would entitle the Contractor to obtain a price review in the Contract in order to construct the Works. Save for art. 10 hereof, the risk related to the events referred to in Article 1664 of the Civil Code (burdensomeness or difficulty in performance: i.e. due to an increase of the cost of works and/or materials, or particular performance difficulties due to geological, hydraulic, etc.) and Article 1467 of the Civil Code is fully and expressly undertaken by the Contractor.
 
4.5 It is understood that, in the case of delay in payment of at least 30 days, the Principal must pay the Contractor interest on arrears as provided for by Legislative Decree 231/2002.
 
Article 5 – Representations and warranties of the Contractor
 
5.1 The Contractor represents and warrants that he has visited the Area, that the same is suitable for the System’s construction in a world class manufacturing way and in compliance with the Technical Specifications and the Applicable Law and has already checked the absence of obstacles of a technical and/or geological and/or hydraulic and/or legal and/or administrative nature with reference to the commencement of the Works. Any and all designs, engineering and project specifications produced and delivered by the Contractor shall be prepared and signed by a duly certified engineer and are appropriate to fully accomplish the purpose of this Contract. Therefore, any approval or acknowledgement by the Principal of the technical designs and documentation shall not release the Contractor from its duties, warranties and liabilities as to the exact delivery of the System and performance of the Works.
 
 
Page 14 of 38

 
 
5.2 The Contractor represents and warrants that at the time of execution hereof he, also through the Developer, holds a valid Building Permit, accepted STMC and Enel’s comunicazione di conclusione iter autorizzativo in relation to the System and that it is unaware of any facts or circumstances, of any kind whatsoever that might prejudice the formation or validity of any System’s Applicable Permits, or the transfer or registration thereof in favour of the Principal. The Area, object of the final building right agreement regarding the Land Use Rights, are free from any encumbrances or burden and there are no third parties (apart from the lawful owners) who can claim any right in relation to such lands, nor prevent the acquisition by the Principal of the Area free from a ny encumbrances or burden.
 
5.3 The Contractor also represents and warrants to the Principal, with reference to the “turn key” nature of this Contract, to be the only Party liable to the Principal concerning the Works’ complete construction in a world class manufacturing way, undertaking, thus, all liability towards the Principal with reference to all the activities whose performance is entrusted to sub-contractors, pursuant to this Contract.
 
5.4 The Contractor expresses his consent, as of the date hereof, to the assignment and/or pledge in favour of the Financing Entity (or any third parties appointed by the latter) by the Principal of his receivables deriving from this Contract and shall provide his cooperation in the performance of all the formalities and shall provide any further consent, necessary or expedient, required as to the assignment and/or pledge's formation.
 
5.5 The Contractor guarantees to dedicate to the System, at all times, the adequate number of workers and to timely and completely pay all wages, insurance fees and public charges, social securities, etc. for the workers on the sites.
 
5.6 There are no impediments, to Contractor's knowledge that could compromise in some way the obtaining of the authorizations for the construction of the grid infrastructure necessary to connect the System to the grid.
 
Article 6 – The Principal’s duties
 
6.1 The Principal shall undertake to make available in the construction site the areas necessary to allocate the Contractor's site offices and warehouses as well as to store the materials.
 
6.2 The obligations of the Principal shall be those that are established in this Contract and those resulting from the Applicable Law, including, in particular, and without prejudice to the Contractor’s obligations under Article 3, the following:
 
(a)  
to timely comply with its payment obligations under this Contract;
 
(b)  
to promptly sign with Enel Distribuzione S.p.A. the Interconnection Agreement for the System, upon being prompted by the Contractor;
 
(c)  
to promptly sign with GSE the Incentive Agreement for the System upon being prompted by the Contractor;
 
 
Page 15 of 38

 
 
(d)  
to promptly sign with the energy company of its choice the PPA upon being prompted by the Contractor;
 
(e)  
to co-operate, in good faith, with the Contractor in relation to the Contractor's performance of this Contract.
 
Article 7– Works management, Safety Coordination and Costs, Site Rules
 
7.1 Pursuant to Article 89 of the Legislative Decree 81/2008, the Principal shall appoint a Design Health and Safety Coordinator for the planning phase. The Design Health and Safety Coordinator shall be in charge, during the planning phase, of all the obligations and responsibilities pursuant to the Applicable Laws regarding Health and Safety in the workplace. All the fees and expenses relating to said appointment, including his/her consideration shall be borne by the Principal. Pursuant to Article 89 of Legislative decree 81/2008, the Principal shall also appoint a Construction Health and Safety Coordinator for the Executive Project phase, who shall be in charge of all the obligations and responsibilities pursuant to the Applicable Laws regarding health and safety in the workplace. The Principal, pursuant the Article 89 of Legislative Decree 81/2008, shall delegate to a professional duly qualified the duties of supervision and coordination of the manner and timing of the Works (the “Works Manager”, i.e. the Responsabile dei Lavori). All the fees and expenses relating to the Works Manager  and the  Health and Safety Coordinators, including their considerations, shall be borne by the Principal.
 
7.2 In order to allow the Contractor to draw up the Piano Operativo di Sicurezza (the POS) the Principal, pursuant to Article 100 Para 1 of the Legislative Decree 81/2008, through the Design Health and Safety Coordinator, must deliver the Piano di Sicurezza e Coordinamento (the PSC) to the Contractor, at least 30 days before the Start of Works. The Contractor shall deliver to the Principal, at least 20 Working Days before the Start of Works the POS, which shall include any integrations related to the specific risks deriving from the execution of the works pursuant to Article 100, Para 1 of the Legislative Decree no. 81/2008 and to the terms set out in Annex 7 thereto. The POS and its amendment are an integral part of this Contract and the Contractor undertakes to comply with them as well as with any statutory provisions and regulations in force, and shall be held directly and autonomously liable in the case of any breach of the same.
 
7.3 The Works Manager, who in any case shall not have the Principal’s contractual powers of representation, shall supervise the Works to be performed in compliance with the contractual provisions and the law, the terms set out therein and, when the performance is carried out by sub-contractors, he must ensure the coordination between the individual works. In particular, without prejudice to the above, the Works Manager shall be responsible for the following:
 
(a)  
Represent the Principal on site during the performance of this Contract;
 
(b)  
Check compliance with the Project Implementation Schedule and, in the case of delay with reference to the latter, agree upon a new programme aimed at guaranteeing compliance with the dates established for the System’s final delivery;
 
(c)  
Monitor the site;
 
 
Page 16 of 38

 
 
(d)  
Check the effective coordination among the subcontractors, under the Contractor’s liability;
 
(e)  
Draw up the reports relative to the beginning and end of the Works, any suspensions and anything else that might concern the site Works;
 
(f)  
Check the partial and final advance payments;
 
(g)  
Analyse the costs indicated by the Contractor in the case of Discretional Variations;
 
(h)  
Ensure the execution of  the Technical Inspection, the Operational Inspection, the Reassessment Tests, and the delivery of the Works;
 
(i)  
Check that the Contractor’s performance of the Works takes place in compliance with all the provisions of this Contract, of the Applicable Law and the Technical Specifications, and in a world class manufacturing way. In particular, the Works Manager shall:
 
(i)  
impart the technical directions required to guarantee the Contractor’s compliance concerning the Works’ performance conditions and, where necessary, formulate the relative remarks and/or objections and propose Variations;
 
(ii)  
validate the Technical Inspection and the Operational Inspection for the Principal’s approval;
 
(iii)  
supply the Contractor with clarification and/or supplementary technical explanations concerning the projects’ specific elements and/or technical descriptions necessary to carry on the Works;
 
(iv)  
order the amendments, which are necessary for technical reasons, related to specific elements of the Works that do not impair the substance and nature of the Works and that do not constitute Discretional Variations;
 
(v)  
approve the drawings prepared by the Contractor with reference to their compliance with the Technical Specifications and the Executive Project approved by the Principal.
 
 
Page 17 of 38

 
 
7.4 Within 5 (five) Working Days of the Communication of the Executive Project’s approval, the Contractor shall inform the Principal in writing about the Site Manager’s name, who must have the technical expertise and professionalism necessary to perform his appointment according to this Contract. In particular, in order to ensure the correct performance of the Contractor’s obligations under this Contract and the Applicable Law, the Site Manager must:
 
(a)  
cooperate with the Works Manager, the engineer appointed to draw up and sign the Executive Project and with the Health and Safety Coordinators; and
 
(b)  
observe all the requirements and observations imparted by the above persons in the case they spot any inconsistency between the Works and the Applicable Laws.
 
7.5 Any instruction, request, integration or order from the Works Manager, the Health and Safety Coordinators and/or the Safety Coordinator shall be communicated to the Contractor in writing by means of specific Service Orders which must be progressively numbered and delivered to the Site Manager in two copies, one of which must be returned, duly signed, by the Contractor in receipt thereof. The Contractor shall not be entitled to refuse to perform the orders received, save for his right to draw up, in writing, his own remarks or reservations on signing the Service Orders which must, in any case, take place, on penalty of forfeiture, within 5 (five) Working Days of receipt of the Service Orders.
 
7.6 The Health and Safety Coordinators, the Works Manager, the Technical Consultant and/or the individuals indicated by the Principal shall be entitled to enter the site, at any time whatsoever, and to carry on the verifications that, at their unquestionable judgement, would be necessary.
 
7.7 The personnel employed by the Contractor to carry out the Works must be experienced and of a sufficient number in respect of the obligations undertaken by the Contractor. The Principal shall be entitled to require the immediate removal from the site of the personnel’s members who, at his unquestionable judgement, do not offer sufficient guarantees for the timely performance and quality of the Works and/or whose conduct might prejudice the System and its performance. The Contractor’s personnel, operating where the work is carried out, must be equipped with an identity badge.
 
7.8 The Contractor undertakes to comply with all the obligations derived from the Applicable Law’s provisions regarding labour and social security, including the general, health rules on the work place, the provisions on accident prevention on the work place, the obligatory insurance for accidents in the work place and professional illnesses, social security for involuntary unemployment, invalidity or old age, tuberculosis and other professional illnesses, the protection of workers in the case of a contract with particular reference to the Legislative Decree Law No. 81/2008 and to any other provisions in force or which might arise during the Works aimed at protecting the workers. Furthermore, the Contractor shall grant his personnel an economic and juridical status in compliance with the applicable labour collective agreements, a nd shall provide, upon the Principal’s written request, suitable documentation constituting evidence of the appropriate economic and juridical status and holding the Principal harmless from any claim raised by his consultants and/or employees.
 
7.9  Pursuant to Article 26, paragraph 5 of Legislative Decree no. 81/2008, Annex 8 contains specific indications of the costs relating to safety in the Area, which is included in the Consideration, which the Contractor is obliged to draw up with accuracy and precision.
 
7.10 The Parties agree that the prevailing language for any correspondence between them in relation to the entire execution of this Contract, including correspondence, testings and inspections shall be the English language.
 
 
Page 18 of 38

 
 
Article 8 – Performance of the Works
 
8.1 The Contractor shall deliver to the Principal, within 20 (twenty) Working Days of the date on which this Contract is executed, two copies of the Executive Project for the System, one on paper and one using editable software, for the Principal’s approval.
 
8.2 Within 10 (ten) days from the Executive Project’s delivery date to the Principal, pursuant to Article 8.1 foregoing hereto, the Principal shall provide the Contractor with its consent or remarks and/or proposals for amendment and integration which are necessary in order to bring into line the Executive Project with the Decree Law and the Technical Specifications. The Contractor shall undertake, at its own expense and without this constituting a reason for requesting any variations to the Consideration, to amend the Executive Project in compliance with the Principal’s proposals. The amended/integrated Executive Project shall be delivered to the Principal within the following 10 (ten) Working Days, in order to obtain the Principal’s approval, provided that in the following 10 (ten) days the Principal shall communica te its decision to the Contractor.
 
8.3 Once the Executive Project has been approved by the Principal, the latter shall provide the Contractor with a written communication (the “Communication of the Executive Project’s Approval”), and the Parties shall meet within 7 (seven) days of the Contractor’s receipt of said communication, in order to proceed with the delivery of the Area to the Contractor. On delivery of the Area, as a condition to allow the Start of Works, the Contractor shall provide the Principal with evidence that it has entered into the insurances provided under Article 15, in accordance with the terms thereof.
 
8.4 After delivery of the Area, the Contractor shall set up the site and commence the Start of Works for the System.
 
Article 9 – Completion Date and Delay Liquidated Damages
 
9.1 The Contractor undertakes to achieve Mechanical Completion and connection of the System to the grid (i.e. Commencement of Operation) within 120 (one hundred and twenty) days of the date Payment Milestone 1 shall be paid in accordance with the Contract (“Completion Date”). The Parties agree that in the case of delay by the Principal in the payment of the invoices in accordance with the terms set out in Article 4.3, provided that the procedure of inspection of the Works set out therein has been complied with, the Completion Date shall be postponed by a period of time equal to the days of delay in the relevant payment, save for any other remedy provided in this Contract.
 
9.2 In the case of an envisaged delay in respect of the date referred to in Article 9.1, the Contractor shall within 7 (seven) Working Days from the relevant date, deliver to the Principal a written delay recovery plan, specifying the relevant terms and procedures aimed at safeguarding, inasmuch as possible, the punctual achievement of the Completion Date. For the avoidance of doubt the submission of such recovery plan to the Principal shall not relieve the Contractor from any of its obligations under this Contract.
 
9.3 In the case of failure to comply with the date set forth in Article 9.1, the Principal shall be entitled to apply Delay Liquidated Damages equal to Euro 1.2/kWp (one point two)  per day of delay up to a maximum amount of 5% (five percent) of the Consideration, save for any greater damages and all further compensation in the case of termination pursuant to Article 20.1 (b). The Contractor acknowledges that the above amounts are a genuine pre-estimate of the Principal’s losses in the event of delays in the Completion Date.
 
 
Page 19 of 38

 
 
9.4 During the first 90 (ninety) days of delay, the Principal shall offset the Delay Liquidated Damages against the Consideration, which shall accordingly be reduced. As from the 91st (ninety-first) day of delay, the Principal shall be entitled to the payment of the Delay Liquidated Damages accrued until such time (i.e., for the avoidance of doubt, during the first 90 days Delay Liquidated Damages). Further Delay Liquidated Damages shall be payable on a monthly basis upon receipt by the Contractor of the Principal’s payment notice.
 
9.5 Without prejudice to the above, the Principal shall also be entitled (in its absolute discretion) to offset the Delay Liquidated Damages against any monies due, or to become due, to Contractor.
 
9.6 The payment shall not release the Contractor from its obligation to complete the Works or from any other duty, obligation or responsibility under the Contract.
 
9.7 In the event that the 2010 Incentive foreseen by the Decree is not awarded to the System, the Contractor shall be liable to grant to Principal a discount equal to the loss of profit discounted to present (“Discount”). The Parties agree that every 1 (one) cent reduction in the tariff shall result in the Consideration being reduced by Euro 100.00 per kWp (one hundred), on a pro-rata basis. The Discount shall become payable by the Contractor 30 days after it becomes clear that the System is not admitted to the 2010 Incentive foreseen by the Decree.
 
9.8 The Contractor explicitly waives any right to offset the amounts due to the Principal by way of Discount or Delay Liquidated Damages, pursuant to this Article 9, or pursuant to Article 20.1 against any amount that the Contractor might claim against the Principal. The Contractor acknowledges and considers that the Discount and the Delay Liquidated Damages are suitable to the Consideration and the prejudice that each delay might cause the Principal, and waives any claim or action aimed at obtaining a reduction of such Delay Liquidated Damages or Discounts.
 
Article 10 – Variations
 
10.1 The Contractor undertakes to perform any Variations to the Works, which are required both for the execution of the Works according to the best quality standards as well as if requested by the Principal.
 
10.2 In particular, for the purposes of this Contract, the Variations considered shall be the following:
 
(a)  
Variations required for the correct fulfilment of the Works in a world class manufacturing way and in compliance with the Technical Specifications and the Applicable Law, pursuant to Article 1660 of the Civil Code (“Necessary Variations”);
 
(b)  
Variations requested by the Principal during the performance of the Works, or alternatively, proposed by the Contractor and accepted in writing by the Principal and/or the Financing Entity, subject to the favourable opinion of the Technical Consultant (“Discretional Variations”).
 
 
Page 20 of 38

 
 
10.3 In the case of Necessary Variations, the Contractor shall, if at any time whatsoever whilst the Works are being performed the necessity of any kind of quantitative and/or qualitative amendments concerning the same is found, to immediately inform the Principal in writing, indicating the type of Variations proposed with an indication of the relative quantity, materials and price per unit as well as the construction times required for said intervention. It is understood that no Necessary Variation may be performed without the prior consent to do so by the Principal and the Financing Entity (which shall base its consent on the Technical Consultant’s prior positive opinion). Similarly, in the case of Discretional Variations, the Contractor, with the document proposing the same or within 10 (ten) Working Days in the case that the Variations have been proposed by the Principal, shall send to the Principal and to the Technical Consultant a communication setting out the relative quantity, materials, unit prices, construction times connected with said Variations and the relevant higher costs, if any, provided that in any case no Discretional Variation can be performed without the Principal and Financing Entity’s prior written consent, also with regard to the Variations’ cost.
 
10.4 It is understood and agreed between the Parties that: (i) the costs related to the Discretional Variations requested by the Principal, once agreed between the Parties in accordance with the above provisions, shall be added to the Consideration and paid according to the terms of Article 4 above; and (ii) the costs related to the Necessary Variations, provided that they do not exceed 4% (four per cent) of the Consideration, shall be entirely borne by the Contractor. The increase in the Consideration possibly due by the Principal shall not exceed an amount equal to the reasonable costs incurred by the Contractor in relation to the System in order to comply with the Applicable Law.
 
10.5 The determination of the Variation’s value for the purposes of paying for the additional costs and the application of Article 10.4 above, shall take place in compliance with the following criteria:
 
(a)  
on the basis of the unit prices in the “Construction Work Price Information” published by the Chamber of Commerce of Padua;
 
(b)  
the activities that cannot be evaluated according to the above criterion must be agreed on the basis of the market prices applicable to the Works, object of the Contract, as agreed in writing between the Parties.
 
10.6 In the case of delay of the Works due to the necessity to carry out any Discretional Variations and Necessary Variations due to a change in the Applicable Law, the Parties accept that the Project Implementation Schedule shall be modified in agreement between the Parties. This extension must be at least equal to the period agreed between the Parties to be necessary to perform the Variations.
 
10.7 The Contractor waives the termination right foreseen by article 1660 of the Civil Code. Furthermore, Article 1661 of the Civil Code shall not apply to the Discretional Variations requested by the Principal.
 
 
Page 21 of 38

 
 
Article 11 – Force Majeure
 
11.1 Force Majeure shall imply any unforeseeable event, fact or circumstances which cannot be directly attributed to the Party invoking it, which is impossible to prevent by employing ordinary diligence and such as to make impossible, objectively and absolutely and either totally or partially, the performance of any of the obligations under this Contract, provided that said events, acts, facts or circumstances:
 
(a)  
are outside the control, either direct or indirect, of the Party invoking them;
 
(b)  
could not have been avoided by employing the normal diligence requested by the nature of the activities performed by such Party; and
 
(c)  
have been invoked by the same as Force Majeure events (“Force Majeure”).
 
11.2 Merely by way of an example, without limitation and on condition that they satisfy the requirements listed in Article 11.1 above, the Parties mutually acknowledge that the following events constitute causes of Force Majeure:
 
(a)
general and category and national and local strikes (other than the Contractor’s corporate strikes);
 
(b)
wars or any other hostile acts, including terrorist attacks,  revolts, uprisings and other civil disorder;
 
(c)
blockages or embargoes, even of a financial nature;
 
(d)
exceptional, adverse natural phenomena, including lightning, whirlwinds, earthquakes, fires, floods, overflows, floods, drought, adverse weather conditions that impede the performance of the Works and which cannot be foreseen on the basis of weather forecast data for the current period, meteorites and volcanic eruptions;
 
(e)
explosions, radiation and chemical contamination.
 
11.3 The Contractor acknowledges and accepts that the following events do not constitute Force Majeure:
 
(a)  
non-obtainment, revocation or non-renewal of any permit required to perform the Works and construction of the Systems, for facts attributable to the Contractor; and
 
(b)  
any delays in the delivery of supplies and materials by the suppliers.
 
11.4 Each Party shall immediately inform the other one, in writing, about the occurrence of a Force Majeure event that shall hinder his obligations and, in any case, within 48 (forty-eight) hours from becoming aware of the same, indicating the possible impact that said event might have upon the Project Implementation Schedule. The Party concerned shall also promptly inform the other one when said Force Majeure cause ceases.  In the case of no or delayed communication as to the existence of the end of a Force Majeure cause, the Party in breach of his obligations shall be liable for the damage sustained by the other Party, which could have been avoided or limited, in the case of the timely receipt of the relevant communication.
 
 
Page 22 of 38

 
 
11.5 The Contractor acknowledges and accepts that he shall not be entitled to request any increase in the Consideration or different compensation in relation to the Force Majeure event, except for the costs sustained to adopt the measures referred to in Article 11.7. Subject to the Principal and Financing Entity’s approval (which shall employ the Technical Consultant’s positive prior opinion), the terms established in the Project Implementation Schedule for the Works’ performance will be extended, further to the Contractor’s written request, for a period equivalent to the duration of the Force Majeure even and for the time required to put together the Equipment and stores of materials that have eventually been damaged.
 
11.6 Should the aforementioned Force Majeure events continue, uninterruptedly, for a period of more than 90 (ninety) natural, consecutive days, or for more than 120 (one hundred and twenty) natural, non-consecutive days, as accumulated during the period of time in which this Contract is in force, the Principal shall be entitled to terminate this Contract.
 
11.7 In any case, the Parties shall use their best endeavours to reduce the consequence of the Force Majeure event and shall do what they can to re-establish normal conditions and mitigate any damages eventually sustained by the other Party.
 
Article 12 – Inspection of the Works for payment purposes
 
12.1 Payment Milestone 2 - Technical Inspection – TAC. Once the Mechanical Works are completed, the Contractor shall deliver to the Principal the notice of Mechanical Completion. This notice shall imply the suitability of the System, to be prepared and tested for connection to the national electricity grid except for the physical construction of the connection line to the national electricity grid. Within 10 (ten) Working Days from the Principal having received said communication, the Parties, together with the Works Manager and the Site Manager, as well as the Technical Consultant appointed by the Principal and/or the Financing Entity, shall start the Technical Inspection, in accordance with the procedure provided for in Annex 10, in order to verify that the Works have been carried out in accordance with the Technical Specifications, the Applicable Laws and in a world class manufacturing way. If the Technical Inspection is concluded in a positive way, the Principal shall sign the Technical Acceptance Certificate substantially in the form attached in Annex 11. Should the Technical Inspection not be passed, the Contractor shall remedy any defects found within a reasonable timeframe which shall be agreed by the Parties. Following the signing of the Technical Acceptance Certificate, the Contractor shall be entitled to issue the relevant invoice.
 
12.2 Payment Milestone 3 - Operational Inspection - PAC. Upon Commencement of Operation the Contractor will issue the Commencement of Operation notice as described in Annex 12 to the Principal. Within the shortest possible delay provided that the System has been continuously producing energy for a minimum period of 5 (five) consecutive calendar days with a maximum interruption of 2 (two) blank hours, the Parties, with the collaboration of the Works Manager and the Site Manager, as well as the Technical Consultant appointed by the Principal and/or the Financing Entity, shall begin the Operational Inspection according to the procedure described in Annex 10, and in the presence of the Technical Consultant. In order to start the Operational Inspection, the Contractor must provide all the technical documentation required by the Principal and the Technical Consultant, the “as built” drawings of the Works, the instruction manuals and system maintenance documents. It is understood that the responsibility for all Operational Inspection activity shall be borne by the Principal. During the Operational Inspection, the Principal shall check if (i) the Works have been carried out in a world class manufacturing way and if (ii) they abide by the Technical Specifications and Applicable Law, and (iii) if the System performs in accordance with the MGPR. Upon receipt of the Technical Consultants’ commissioning report and a satisfactory evaluation by the Principal and the Financing Entity hereof the Principal shall issue the PAC substantially in the form attached in Annex 14 and will attach the commissioning report of the Technical Consultants hereto. Should the Operational Inspection not be passed, the Contractor shall remedy any defects found within a reasonable timeframe which shall be agreed by the Parties. Specifically in case of non compliance of the System with the MGPR the Principal shall grant the Contractor, in writing, a period of no more than 25 (twenty-five) Working Days from the relative communication, within which the Contractor must remedy said defects and/or carry out any necessary action to achieve a positive result of the Operational Inspection. Following the signing of the Provisional Acceptance Certificate, the Contractor shall be entitled to issue the relevant invoice.
 
 
Page 23 of 38

 
 
If the PAC has been passed with certain minor finish work still pending execution, the Principal shall sign the Provisional Acceptance Certificate, provided that the pending minor finish works (the Punch List Works) are listed in an attached document signed by the Parties (the Punch List), and that a period of up to thirty (30) days, or the different period agreed upon by the Parties on the basis of the general accepted commercial practice, is set therein for completion of the Punch List Works.  Contractor shall use its best efforts to carry on the Punch List Works so as to minimize any interference with the operation of the relevant System and so as to minimize any reduction in performance or availability of the re levant System.
 
If, at the conclusion of the time period specified in the Punch List, the Punch List Works have not been performed by the Contractor, the Principal, without prejudice to any other rights it may have hereunder in respect of such not completed Punch List Works, shall give notice to the Contractor and the Contractor shall perform such Punch List Works within fifteen (15) days from receipt of the notice.  Should the Contractor fail to do so, the Principal shall be free to perform such works directly or through third parties, and shall have the right to (a) deduct the related direct costs and expenses (duly documented in writing) from the Consideration, or (b) to enforce the Parent Company Guarantee for the amount of said direct costs and expenses.
 
12.3 Transfer of ownership of the System in favour of the Principal shall occur on issuance of the Provisional Acceptance Certificate.
 
12.4 On issuance of the Provisional Acceptance Certificate, the Contractor must make the O&M Agreement operative in relation to the accepted System.
 
12.5 Incentive Acceptance Certificate. The Principal shall issue the IAC as per Annex 15 after having confirmed that all the following conditions have taken place:
 
(a)  
Power Purchase Agreement is in force with reference to the collection of the electrical energy produced by the System;
 
(b)  
Incentive Agreement is entered into with GSE in compliance with the terms foreseen in Article 5, paragraph 4, of the Decree Law, together with all the documents foreseen by the AEEG Resolution 90/07 and the Principal has been informed about the System’s admission to the incentive tariff foreseen by the Decree Law.
 
 
Page 24 of 38

 
 
12.6 Reassessment Tests. The First Reassessment Test of the MGPR shall be performed, in accordance with the procedure described in Annex 10, 12 (twelve) months after the PAC. The Second Reassessment Test of the MGPR shall be performed 24 (twenty four) months after the PAC.

The Contractor shall notify the Principal when the System is ready to be tested and both Parties will agree a date to carry out the Reassessment Tests for the corresponding annual period (such a date will not be later than the fifteen (15) working days following expiry of the 12 month period following the start of the Warranty Period or the date of the end of the Warranty Period as appropriate).
 
The First and the Second Reassessment Test of the System shall be subject to the Technical Consultant’s consent.
 
12.7 Final Acceptance Certificate. The Principal, with the prior written consent of the Technical Adviser and of the Financing Entity, shall issue the Final Acceptance Certificate as per Annex 16 upon the satisfaction of the following conditions,
 
·  
the System has passed successfully the First and Second Reassessment Test and/or any related Performance Liquidated Damages have been paid by the Contractor.
 
·  
the IAC has been issued;
 
·  
agreement with the GSE and the Incentive are in force with reference to the collection of the electrical energy produced by the System;
 
·  
all the obligations related to the regulation of access to the grids have been fulfilled;
 
·  
the O&M guarantee foreseen under the O&M Agreement is in place.
 
Article 13 – Warranties for Defects and Materials
 
13.1 The Contractor shall warrant the System’s performances in compliance with the Technical Specifications and the MGPR as foreseen in Annexes 6 and 9 for the period of 24 (twenty four) months after the issue of the PAC. The Contractor shall undertake, in any case, to promptly remedy the System’s lower performance after having received from the Principal a written communication regarding the unsatisfying performance.
 
13.2 Penalties. If the effective performance ratio disclosed by the PAC test and/or the First Reassessment Test and/or the Second Reassessment Test is less than the MGPR, the Contractor shall pay to the Principal Performance Liquidated Damages equal to Euro 7.5 per kWp (seven point five), per each percentage point which is lower than the value indicated in the MGPR. It is understood that the total amount of Performance Liquidated Damages, shall be no more than 1% (one per cent) of the Consideration. Performance Liquidated Damages shall be payable at the end of the month in which the relevant test was held.
 
 
Page 25 of 38

 
 
13.3 Without prejudice to the above, the Contractor shall provide the Principal with a guarantee for any defects concerning the Executive Project and the Works in accordance with Article 1667 and 1669 of the Civil Code. The terms of said guarantee will come into force from the date of issuance of the PAC, in accordance with Article 12 above, for a period of 24 (twenty four) months. The terms to give notice with reference to defects are ruled by Articles 1667 and 1669 of the civil code. Accordingly, the Contractor shall during such time:
 
(a)           replace, repair and/or adjust any defective Equipment;
 
(b)           guarantee availability of spare parts.
 
13.4 In addition to the above, the Contractor must also provide the following specific guarantees with regard to the photovoltaic modules:
 
(a)  
Install a guaranteed potential by means of the issue of "flash test" certification of the modules.  The power effectively installed must reach the quantity established in the relative manuals, in compliance with the Technical Specifications. Otherwise, the Contractor shall be obliged to replace the faulty modules and/or install additional modules in order to reach the nominal power as described in Recital D;
 
(b)  
A photovoltaic module efficiency guarantee for a minimum period of twenty years after the issue of the PAC, provided that the cumulative deterioration of the photovoltaic modules does not exceed, for the first 10 (ten) years, 10% (ten percent) and for the first 20 (twenty) years, overall, 20% (twenty percent). The relevant guarantee’s extension in compliance with the terms of the law has already been taken into consideration in calculating the MGPR.
 
Said guarantees must be accompanied by the modules’ producer’s counter-security, of which the Principal shall be entitled to choose to be the direct beneficiary, since the Contractor shall, in any case, be held jointly liable with said producer.
 
Article 14 – Assignment, Subcontracting and Sub-supply
 
14.1 The Contractor shall not be entitled to assign, either totally or partially, the Contract; however, the Contractor may be entitled to subcontract the performance of any portion of the Works to third parties, subject to the Principal’s prior written consent.
 
14.2 In the case of subcontracting, it is understood that the Contractor shall be totally and unconditionally liable to the Principal with reference to the complete, precise and punctual performance of the Contract, including with reference to the totality of the subcontracted works and the supplies and also with reference to compliance with the provisions relative to remuneration and social security and the Works meeting the requirements established by this Contract.
 
14.3 In any case, each of the subcontractors shall abide by and comply with the provisions set forth in the PSC and the POS, since the Contractor shall be held directly liable to the Principal in relation to this compliance.
 
 
Page 26 of 38

 
 
14.4 The Principal shall be entitled to assign this Contract any third company indicated by the Principal, and the Contractor expressly consents as from now to such assignment.
 
Article 15 – Insurance
 
15.1 The Contractor, without prejudice to his own responsibilities, shall, at his own total expenses, enter into the following insurance policies with first-class insurance companies, with an S&P rating of no less than A- or equivalent or, in any case, that satisfies the Principal and the Financing Entity, if appointed, and maintain them operative for the entire period in which this Contract is in force. Said insurance policies must be submitted beforehand to the Principal and the Financing Entity, if appointed, for their approval:
 
(a)  
Industrial accidents insurance in favour of the Contractor’s employees and/or any workers who are not the Contractor’s employees;
 
(b)  
employers’ liability, with a minimum limit of no less than Euro 5,000,000.00 per event and 2,000,000.00 per person;
 
(c)  
Insurance to cover third party civil liability, with a minimum limit per event of no less than Euro 5,000,000.00; the Principal and the Financing Entity, albeit maintaining the qualification of “third party”, they must be inserted as “additional party insured” and there must be an explicit clause waiving the party’s insured recovery against the Principal, the Financing Entity and their employees and consultants;
 
(d)  
Insurance to cover professional civil liability, with a minimum limit per event of no less than Euro 2,500,000.00;
 
(e)  
Insurance to cover vehicle civil liability, for all owned vehicles and/or in use, which must be provided with the mandatory insurance policy as foreseen by the Law No. 990/69 and subsequent amendments and integration, for a minimum limit of no less than Euro 5,000,000.00 per accident;
 
(f)  
“All risks Property Damage”, including theft, insurance, to cover all the goods and assets, including the main cabins, equipment and machinery used during the Works’ construction, with the sum insured equivalent to the value incurred by replacing the same.
 
 
Page 27 of 38

 
 
15.2 The Contractor, without prejudice to his own responsibilities shall, at his own total expenses, enter into the following insurance policies, with first-class insurance companies, with an S&P rating of no less than A- or equivalent or, in any case, which satisfy the Principal and the Financing Entity, if appointed, and maintain them operative for the entire period in which this Contract is in force. Said insurance policies must be submitted beforehand to the Principal and the Financing Entity, if appointed, for their approval:
 
(a)
E.A.R. “Erection All Risks” policy to cover the damages derived from the damage to total or partial destruction of the Works, which might occur while the Works are carried out. The cover shall also provide for cover for extended maintenance for a period of 24 months, the supply warranty, the section of third party civil liability (including the crossed liability between the participants and the works) and the advanced loss of profit section. The sum insured for the Works shall be equivalent to the Contract’s value, whilst the civil liability upper limit shall be no less than Euro 5,000,000.00 per accident;
 
(b)
transport policy to cover the material damages and aimed at the assets required to construct the Works, including the advanced loss of profit section. The cover shall run from the place of departure anywhere in the world until arrival care off the site where the works are performed.
 
15.3 The insurance policies provided under paragraphs 15.1 and 15.2 shall as include the Financing Entity, if appointed, the Principal, and any other subcontractor among the insured parties. The Principal shall be entitled, at his own unquestionable judgement, to enter into other covers or policies in integration of and/or besides those foreseen by this Article 15, simply informing the Contractor of the same beforehand.
 
15.4 The Contractor acknowledges that the insurance cover referred to in Articles 15.1 and 15.2 may be object of encumbrance in favour of the Financing Entity. In this respect, the Contractor agrees that the Principle, at its discretion, may require that the insurance company issues an endorsement letter in favour of the Financing Entity, for the case that a Financing Entity is appointed. In addition the Contractor agrees to use reasonable endeavours to achieve any requirements of the Financing Entity relating to security over the insurance policies.
 
15.5 In any case, the amounts exceeding the upper limits and the indemnity limits insured, as well as the amounts corresponding to any type of excess liability relative to any policy shall be charged to the Contractor.
 
15.6 The Contractor shall be responsible for losses exceeding the insured limits and for policy deductibles. He shall also hold the Principal and the Financing Entity harmless from any claims for compensation for damages, liabilities, costs and expenses derived, directly or indirectly, from events covered by the insurance policies but which, for any reason whatsoever, are not compensated or by events that are not covered by the policies themselves.
 
15.7 It is understood between the Parties that the Principal shall, in any case, be free to commence legal proceedings against the Contractor to seek compensation of all the eventual and further damages that might result as not being covered by any policy and which can be ascribed to the Contractor by virtue of this Contract.
 
15.8 The Contractor shall deliver executed copy the aforementioned policies and evidence of the payment of the premiums for the entire duration of the relative period insured promptly after execution of this Contract and in any case within the terms foreseen in Article 8.3 and hereby undertakes not to make any changes to the policies without the Principal’s prior authorisation to do so. The Contractor shall also undertake to check that sub-contractors underwrite, for the entire duration of the Works, suitable insurance cover in compliance with Articles 15.1 and 15.2 above, charged to the Contractor himself.
 
 
Page 28 of 38

 
 
Article 16 – Performance Suspension
 
16.1 The Principal, by means of the Works Manager, shall be entitled to suspend the Contract, either totally or partially, at any time whatsoever and on more than one occasion, by providing the Contractor with written communication of the suspension sent by registered mail with return receipt. Said suspension cannot, in any case, exceed, as a whole, the overall duration of 45 (forty-five) calendar days.
 
16.2 The Contractor shall be entitled to receive a refund for the costs and expenses sustained due to suspension, which shall be provisionally defined (in order to permit continuation of the Works) by the Works Manager, except for the Parties being entitled to object the Works Manager’s decision pursuant to Article 24.  The Parties shall undertake, in any case, to provisionally apply the Works Manager’s decision.
 
16.3 In the case of suspension arising pursuant to this Article, the Parties have accepted that the Project Implementation Schedule may be amended in agreement between the Parties. This extension must be at least equal to the period of suspension.
 
Article 17 - Unilateral Termination by the Principal
 
17.1 The Principal shall be entitled, at any time whatsoever, to unilaterally terminate the Contract, informing the Contractor by means of notice sent by registered mail with return receipt.
 
17.2 In the case of the Principal’s exercising the unilateral termination right referred to in the previous paragraph and save for Article 17.4 here below, the Principal shall pay the Contractor, in addition to the Consideration for the Works, performed up until that time, an indemnity equal to 10% (ten per cent) of the value of the outstanding Works.
 
17.3 The Contractor shall withhold any advance payment on the Consideration made by the Principal in compliance with the Payment Milestones, save for the Contractor’s right to claim payment of any further amounts due to the Contractor for all the Works that have been carried out until receipt of the termination notice.
 
17.4 The Principal shall be entitled to terminate the Contract pursuant to the above, should the Applicable Law change or should a Force Majeure event occur which renders the construction of the System impossible and leads to the revocation of any Applicable Permit. However, in this case and in derogation to what has been foreseen in Article 17.2, the Contractor shall only be entitled to payment of the consideration due for the Works carried out until the delivery of the termination notice, excluding any indemnity for the part of the Works that have not been performed.
 
17.5 Should the Principal terminate the Contract, it shall promptly return the Parent Company Guarantee to the Contractor.
 
 
Page 29 of 38

 
 
Article 18 – Termination attributable to the Contractor
 
18.1 The Principal shall be entitled to terminate the Contract pursuant to Article 1456 of the Civil Code (clausola risolutiva espressa), by giving notice to the Contractor no later than 30 (thirty) calendar days of the Principal becoming aware of any of the following circumstances:
 
(a)  
non-delivery of the Parent Company Guarantee and all the insurance policies to the Principal within the terms foreseen in Article 15 of this Contract and in compliance with the condition foreseen therein, or the Contractor’s breach of its obligation of maintaining the Parent Company Guarantee and the insurance policies in force, at its own expense, in compliance with the terms and conditions foreseen in this Contract;
 
(b)  
any of the representations or warranties provided in Article 5 is imprecise, untrue or misleading;
 
(c)  
the Building Permit, the STMC, and any other Applicable Permit already obtained are not transferred to the Principal pursuant to art. 4.2.(a);
 
(d)  
cancellation or revocation of a Building Permit, STMC, or any Applicable Permit for reasons attributable to the Contractor;
 
(e)  
the circumstances provided under Article 11.6 occur;
 
(f)  
non-admission to the 2010 Incentive or in any case non entry into force of the Incentive Agreement;
 
(g)  
the Contractor has exceeded the maximum limit of Liquidated Damages and/or Penalties foreseen pursuant to Articles 9 and 13;
 
(h)  
failure to pass the Operational Inspection and consequent non-issue of the PAC;
 
(i)  
failure to release the Warranty Bond upon issuance of the PAC
 
(j)  
failure to pass the Reassessment Tests;
 
(k)  
failure to satisfy the condition in Article 12.7 and consequent non-issue of the FAC within 24 months from the issuance of the PAC
 
 
Page 30 of 38

 
 
18.2 The Principal shall be entitled to send the Contractor notice to perform within the terms of no less than 30 (thirty) calendar days from receipt of the relevant notice (or any longer terms that are considered to be appropriate by the Principal in relation to the circumstances), pursuant to Article 1454 of the Civil Code in all events of the Contractor’s breach, other than those referred to in Article 18.1 above, of his obligations, pursuant to this Contract.  Should the Contractor not perform within such terms, the Principal shall be entitled to declare the Contract terminated.
 
18.3 The Contract shall be terminated pursuant to Article 81 of the Italian Bankruptcy Law (R.D. 267/1942 as amended and/or integrated from time to time), if the Contractor becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against it, compounds with its creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under Applicable Law) has a similar effect to any of these act or events, unless the Principal consents to continuation of the Contract.
 
Article 19 - Termination attributable to the Principal
 
19.1 In the case of the Principal’s breach of its obligations pursuant to this Contract, the Contractor shall be entitled to send the Principal and the Financing Entity, if appointed, notice to perform within the terms of 30 (thirty) calendar days of receipt of such notice, pursuant to Article 1454 of the Civil Code. The Contractor acknowledges and accepts that termination of the Contract due to facts attributable to the Principal cannot, in any case whatsoever, be declared or requested unless notice demanding performance is sent to the Principal, with the Financing Entity in copy, pursuant to this Article.
 
19.2 The Contract shall be terminated pursuant to Article 81 of the Italian Bankruptcy Law (R.D. 267/1942 as amended and/or integrated from time to time), if the Principal becomes bankrupt or insolvent, goes in liquidation, has a receiving or administration order made against it, compounds with its creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under Applicable Law) has a similar effect to any of these act or events, unless the Contractor consents to continuation of the Contract.
 
Article 20 – Termination Consequences
 
20.1 In the case of termination of the Contract attributable to the Contractor, in any of the events foreseen by the Applicable Law or by this Contract, the Principal shall be entitled to receive from the Contractor, save for any further damages, payment of a termination penalty equal to 10% (ten percent) of the value of the remaining Works, to be determined in the value of the Consideration less the amounts of the Payment Milestones become due on the time of termination. The Principal shall also be entitled to receive from the Contractor the refund of the amounts corresponding to the balance of the payments which have not been up to that time allocated to the subsequent Works.
 
Without prejudice to the above, the Principal shall also be entitled to:
 
(a)
prepare a report of completed Works setting forth the value thereof, in which case, upon termination, without prejudice to any provisions of this Contract, the Principal shall have the right to:
 
i.  
keep the completed Works, in which case the Contractor shall promptly abandon the Area and transfer the ownership of any completed Works if not already transferred; or alternatively,
 
 
Page 31 of 38

 
 
ii.  
reject the Works, in which case the Contractor shall dismantle the Works bearing the relevant costs and expenses and return to the Principal any payment of the Consideration received, plus interest in accordance with Article 1224 of the Italian Civil Code.
 
(b)
quantify the amount of any and all penalties, Delay Liquidated Damages, Discounts, etc, owed by the Contractor to the Principal, in which case the Principal shall prepare a statement of amounts due to the Principal less any amounts due to the Contractor under this Contract; the statement of amounts outstanding shall be sent to the Contractor which shall send its observations to the Principal within ten (10) days. Failure to send observations within such ten-day period shall be deemed consent to the statement of amounts due to the Principal. Payment of the amounts indicated in the previous paragraph shall be made within 7 (seven) calendar days of receipt of the above-mentioned statement, and the Principal shall be entitled to enforce the Parent Company Guarantee and/or the Warranty Bond to recover any such amounts. In the event that the Contractor disputes the statement of the Principal within ten (10) days, and the Parties fail to reach an amicable settlement, the dispute shall be settled in accordance with Article 24 hereof. As soon as Contractor pays the amount due, Principal shall return the Parent Company Guarantee and the Warranty Bond. On the contrary, where Contractor fails to pay the amount due pursuant to the above statement, Principal shall be entitled to enforce the Parent Company Guarantee and/or the Warranty Bond;
 
(c)
have the Area vacated by the Contractor, at his own expenses, from all the material, equipment and machinery belonging to him and from any rubble, debris and rubbish within 15 (fifteen) days of termination.
 
20.2 In the case of termination attributable to the Principal, the Principal shall take definitive delivery of the Works that have been constructd up to the time of termination and the Contractor shall be entitled to withhold any payment made by the Principal in compliance with the Payment Milestones pursuant to Article 4, save for the Contractor’s right to claim  payment of any further amounts due to the Contractor for all the Works that have been carried out until receipt of the termination notice and for any further damages. On the Principal’s request, the Contractor shall vacate the Area and the site from all the materials, equipment and machinery that belongs to him at the Principal’s expenses and provide for the removal of any rubble, debris and rubbish.
 
20.3 Without prejudice to the above, in the case of termination due to failure by the Principal to perform its payment obligations pursuant to Article 4, provided that the Contractor has fulfilled all its obligations under this Contract,  the Contractor or any third party indicated by the Contractor shall be entitled to be transferred, by way of a line of business transfer, the Applicable Permits and the Building Right and to keep the Works, by paying to the Principal an amount equal to the percentage of the Consideration already paid by the Principal, upon deduction of an amount equal to Euro 400.00 per kWp (four hundred). It is understood that the in the case of exercise of such right the Contractor shall not be entitled to any other claim towards the Principal and hereby waives any such claim. It is understood that should a Financing Entity have been appointed at the time of termination, this Article 20.3 shall not be applicable.
 
 
Page 32 of 38

 
 
20.4 Furthermore, in the event of termination attributable to the Principal, the Principal shall immediately return to the Contractor the Parent Company Guarantee and the Warranty Bond.
 
Article 21 – Confidentiality Obligation
 
21.1 Each Party declares that:
 
(a)
the Confidential Information, in any form in which it comes to the knowledge of the Parties, shall not be disclosed, in any case whatsoever, either totally or partially, to any third parties except where, further to termination of the Contract, the Contractor shall have to be replaced with another individual or entity in order to complete the System, in which case the Confidential Information may be disclosed to the individual appointed to the complete the Works object of this Contract;
 
(b)
said Confidential Information shall not be used for any purposes that is not solely and exclusively related to (i) the performance of this Contract or (ii) the drafting of a prospectus addressed to a fund of the System.
 
21.2 The Confidential Information may only be disclosed to the Parties' shareholders, the directors, executives, employees or consultants employed by the Party receiving the Confidential Information, and the Technical Consultant and the Financing Entity.
 
21.3 Neither of the Parties shall be entitled to make any declarations or announcements to third parties, the press or, in general, to the media, in relation to the Contract, without having received the other Party’s prior, written authorisation, with the exception of the disclosure required by the Applicable Law or by the law applicable to the Principal or to the Principal’s group.
 
21.4 The provisions contained in this Article 21 shall be effective from the date on which this Contract is entered into or from the date of the first communication of said Confidential Information and shall remain in force even after expiry of this Contract.
 
Article 22 – Miscellaneous
 
22.1 This Contract cannot be amended or integrated, in any way whatsoever, unless by means of a written agreement between the Parties.
 
22.2 The Contractor is aware that the Financing represents a priority for the Principal and represents that the project (including both the EPC and O&M Agreement) is at the time of execution technically and legally bankable. In particular, the Contractor is aware that the Financing Entity may require: (i) a Warranty Bond after PAC, in the form of an autonomous and first demand insurance bond covering 15% (fifteen per cent) of the Consideration; (ii) cross default clauses in the event that the Financing covers more than one EPC contract. The Contractor shall encounter such expectations, provided that they are reasonable and substantially in line with the banking standards practiced at the date of execution hereof. In addition, the Contractor shall provide all good faith cooperation as to obtain the Financing in the case that banking standards practiced at the time Financing is negotiated are substantially different from banking standards practiced at the date of execution hereof.
 
 
Page 33 of 38

 
 
22.3 The Parties declare that in the future they are willing to enter into other EPC contracts in relation to other plants (“New Contracts”) and agree that the New Contracts shall be regulated, mutatis mutandis, in accordance with the terms and conditions of this Contract, save as otherwise agreed.
 
22.4 The Principal shall promptly refund to the Contractor any amount reimbursed  by ENEL to the Principal in relation to the infrastructure works carried out by the Contractor outside the Area to connect the System to the grid.
 
22.5 In the case that any provision contained in this Contract is declared invalid on the basis of the Applicable Law by a judge or a board of arbitration, this shall not entail the entire Contract being void, it being understood that the Parties shall promptly meet in order to replace the invalid provision with another one which respects, as much as possible, its meaning.
 
22.6 The Contractor shall not assign the receivables derived from this Contract to any third parties without the Principal’s prior written consent, it being understood that the term, “third parties”, also implies the companies belonging to the same group as the Contractor.
 
22.7 Any communication requested or consented in relation to this Contract must be made in writing and must be (i) delivered by hand, (ii) sent by  registered mail with return receipt, or (iii) sent by fax.  Any communication shall be considered as having been received (i) if delivered by hand, on its delivery to the addressee Party, (ii) if sent by registered mail with return receipt, on the date indicated in said notice, and (iii) if sent by fax, on receipt of confirmation of sending provided by the fax transmitting it. All communications shall be sent to the following addresses:
 
- if addressed to the Principal:
 
 
Ellomay PV One Srl
 
 
Address: Galleria Borromeo, 3, 35137, Padova (Italy)
 
 
Fax no:
 
 
Ranf@ellomay.com: eranz@ellomay.com
 
or any other address, also of third companies, that may be indicated from time to time by the Principal.
 
 
Page 34 of 38

 
 
- if addressed to the Contractor:
 
 
Ecoware S.p.A.
 
 
 
Address:
Via Nona Strada, 9, I-35129 Padua, Italy
 
 
Attention:
Ing. Leopoldo Franceschini
 
 
Fax no.:
+39 049 738 76 38
 
 
E-mail: 
L.Franceschini@ecoware.eu, I.Bovo@ecoware.eu
 
22.8 The risk related to the event referred to in Article 1664 of the Civil Code has been fully and knowingly undertaken by the Contractor. The risk relative to the event referred to in Articles 1660 and following of the Civil Code shall be attributed to the Contractor within the limits agreed in Article 10 of the Contract.
 
Article 23 - Technical Consultant
 
23.1 The Technical Consultant shall act in the interests of the successful outcome of the System in his capacity of technical adviser in the exclusive interests of the Principal and/or the Financing Entity. The Technical Consultant shall have access to the Works, the Area the project documentation and the one relating to the Works’ performance.
 
23.2 The Technical Consultant shall be entitled to employ third parties to perform his duties provided that, in this instance, he shall procure that said employees comply with the rules in force on site and given by the Contractor or Works Manager.
 
Article 24 – Technical Dispute and Arbitration
 
24.1 The Parties undertake to amicably resolve any dispute arising out of or in connection with the interpretation, validity, performance and termination of this Contract.
 
24.2 In case of any technical dispute between the Parties in any matter relating inter alia to the achievement of a Payment Milestone, the extension of the Project Implementation Schedule, the Commencement of Operation (entrata in esercizio), the Technical Inspection, Operational Inspection, the First Reassessment Test and the Second Reassessment Test, the Variation procedure or any change in Applicable Law, the Parties can mutually agree to request the appointment of a technical expert (the "Expert") to settle the dispute. The proposal for the appointment of the Expert shall state in detail the technical question and include a list of at least three persons proposed f or the appointment as Expert. The Parties agree to meet and discuss on the appointment of the Expert during the following ten (10) Working Days after receipt of the request. In the case that the Expert is not appointed by the Parties within fifteen (15) Working Days after the request, the Expert shall be appointed by the Chairman of the bar of the Engineers of Milan (Ordine degli Ingegneri di Milano) upon request of either Party. The Expert shall finally determine the technical matter in accordance with the provisions of this Contract, acting as arbitrator pursuant to Article 1349 of the Italian Civil Code. The Expert shall deliver its determination to the Parties in writing, including an explanation of the underlying reasons, within thirty (30) calendar days after the acceptance of the mandate. The Expert's determination shall (in the absence of patent error or unfairness) be final and binding upon the Parties. The costs of the determination, includin g fees and expenses of the Expert, shall be borne as determined by the Expert.
 
 
Page 35 of 38

 
 
24.3 Without prejudice to Article 24.2 above, in all the other cases where an amicable solution to the disputes cannot be reached, the settlement of said disputes shall be referred to a Board of Arbitration formed of 3 (three) arbitrators, 1 (one) of whom who shall act as the President, in accordance with the National Arbitration Chamber of Milan’s Rules of International Arbitration, which the Parties have declared that they are aware of and fully accept.
 
24.4 The Board, which shall sit in Milan, shall decide under the procedure and law within 4 (four) months of it being formed. The award shall become immediately enforceable. The award’s registration costs shall be borne by the unprevailing Party.
 
*** *** ***
 
Signed by
 
on this date [] 4/3/2010
 
on this date []
/s/  Ran Fridrich
/s/  Leopoldo Franceschini
_____________________________
 
_____________________________
Mr. Ran Fridrich\
 
Ing. Leopoldo Franceschini
The Principal, Ellomay PV One S.r.l.
The Contractor, Ecoware S.p.A.
 
 
Page 36 of 38

 
 
DEVELOPER’S ENDORSEMENT
 
The Developer hereby endorses this Contract and in so doing undertakes to cooperate with the Parties hereto and support the Contractor to ensure the proper performance of this Contract in relation to the transfer of the Building Permit, STMC and of the Land Use Rights.
 
 
/s/ Novaltek Servizi S.r.l.
_____________________________
 
Ing. Giuseppe Politi
 
The Developer, Novaltek Servizi S.r.l.
 
 
Page 37 of 38

 
 
Annexes
 
Annex 1:
Executed Land Rights Contract
Annex 2:
Area Map
Annex 3:
Equipment
Annex 4:
Definitive Project
Annex 5:
Parent Company Guarantee
Annex 6:
Technical Specifications
Annex 7:
Project Implementation Schedule
Annex 8:
Safety Costs
Annex 9:
Minimum Guaranteed Performance Ratio
Annex 10:
Testing Procedures
Annex 11:
Technical Acceptance Certificate model
Annex 12:
Commencement of Operation notice model
Annex 13:
Statement on estimate of Connection of Plant
Annex 14:
Provisional Acceptance Certificate model
Annex 15:
Incentive Acceptance Certificate model
Annex 16:
Final Acceptance Certificate model
Annex 17:
Model of O&M Agreement
Annex 18:
Option Agreement
 
 
Page 38 of 38

 
 
Annex 1 [Land Rights Contract]
 
[Translated from Italian]
 
 Inventory no. 41.573      Register number 15.248
 
LAND RIGHT CONTRACT IN RELATION TO THE CONSTRUCTION AND OPERATION
OF A PHOTOVOLTAIC PLANT
 
ITALIAN REPUBLIC
 
Year two thousand and ten, twenty seventh day of January
 
27th of January 2010
 
In Fano, in my office located in Bruno Buozzi Avenue no.33.
 
Before me, Ms. ANNUNZIATA MORICO, Notary in Fano, registered on the Pesaro and Urbino Register of Notaries
 
have personally appeared Mr. and Ms.
 
DEL BIANCO CARLO, born in Cingoli, on 2nd July 1952, Fiscal Code. DLB CRL 52L02 C704N,
LAMPA MARIA TERESA, born in Filottrano, on 18th April 1959, Fiscal Code LMP MTR 59D58 D597B,
 
Both residing in Cingoli, Frazione Cervidone no. 39, married with communion of assets, hereinafter referred to as the "Grantors";
 
CESARIN FRANCESCO, born in Piove di Sacco on 20th October 1973, resident in Correzzola in Via Vanezza No 21, Fiscal Code CSR FNC 73R20 G693W, who attends not on his own behalf, but on behalf the limited liability company with sole shareholder "SUNEX 3 S.R.L.", with registered offices in Padua,  Zona Industriale, in Via Nona Strada n.9, share capital Euro 10.000 (ten thousand) fully paid-up, registered at the Companies Registration Office of Padua, with tax code number, VAT registration number and business identification number  06085820964,
 
Duly appointed as attested by the power of attorney authenticated by Mr. Giorgio Fassanelli, Notary in Padua, on 25th January 2010, index number 73660, that the attorney declares is valid and has not been revoked and that the original is enclosed hereto under the letter "A", hereinafter also referred to as the "Grantee".
 
The persons before me, whose personal identity, qualification and authorisation for signature I, the notary, am certain,  request that I receive this deed with which the parties agree and conclude as follows.
 
Art. 1- Definitions
 
Unless otherwise specified, the definitions reported herebelow will have the meaning attributed to them as follows, independently of the singular or plural use:
 
"Authorisations": any concession, authorisation, licence and / or nulla osta required to proceed with the construction, operation and maintenance of the plant, including all the concessions and necessary agreements with the National Agency for Energy or any another company, and the GSE (Power Supply Company) for the sale of the energy produced by the Plant;
 
 
1

 
 
"Rental Fees": the amount indicated in art. 5. A;
 
"Final Contract": the present final land right contract signed by the Parties;
 
"Consideration": the Rental Fees plus the Indemnity for Damages;
 
"Land Right": the Land Right constituted in favour of the Grantee with the present Final Contract;
 
"Financing": the credit line and more generally the financing granted by the Financing Entity to the Grantee or to any other entity indicated by the latter appointed in accordance with the modalities agreed between them which is required for the construction, testing, operation, management and maintenance of the Plant;
 
"Financing Entity": the company or the companies and/or the private and / or public institutes that grant the financing;
 
"GSE": Provider of the electric services - GSE Inc.;
 
"Plant": the photovoltaic Plant to be realised, including the accessories which, by way of example include the transformer station, the  long-distance overhead power lines and the underground power lines ;
 
"Indemnity for Damages ": the amount indicated in art. 5. E;
 
"Plot": the land identified by the Grantee on which the Plant will be built and managed, registered on the Land Register of the Municipality of Cingoli on Sheet 6 with the Maps 81-34 7-34 9-351-353-3 55 of Ha. 02.4 4.66, with R.D. Euro 90,09 and R.A. Euro 133,57.
 
Art.2- Object of the contract
 
A. Mr. DEL BIANCO CARLO grants  the Grantee, who accepts and purchases the right to build and operate, in accordance with art. 952 of the Civil Code  the terms and conditions set out in this contract and  the authorisations, the Plant  on the Plot located in the town of Cingoli, which remains in his ownership, identified and registered as follows:
 
- Agricultural land, in one sole  plot, total surface area equal to one hectare, thirty eight acres and seventy one centiares (Ha. 01.38.71), included in the "normal agricultural" zone, according to the current town planning regulations.
 
Registered on the Land Register of the Cingoli Municipality on Sheet 6 with the Maps:
 
- 81 of Ha. 00.90.40;
 
- 347 (ex-63/b) of Ha. 00.33.80;
 
- 355 (ex-64/th) of Ha. 00.14.51;
 
With a  total Ha surface of  01.38.71, land revenue Euro 54.36 and agricultural revenue Euro 77.18.
 
Borders: as described in the following letter B), other properties owned by the grantor from several sides, save others.
 
With the purposes of  cadastral continuity and transcriptions it is specified that the cadastral details of the divided parcels derive from subdivision no. 243584.1/2009 submitted to the qualified Territory Agency on 30th November 2009, Protocol no. MC0243584.
 
 
2

 
 
This land was purchased with a sales deed received by Mr. Gino Picchietti, Notary in Jesi, on 10 December 1975, index number 79906, recorded in Jesi on 28th December 1975 at No. 1802 and registered in Macerata on 30th December 1975 under no. 7678 on the Special Register .
 
B. Mr. DEL BIANCO CARLO and Ms. LAMPA MARIA TERESA, each for their own undivided rights of ownership in communion of assets , grant to the Grantee, who accepts and purchases, the right to build and operate, in accordance with art. 952 of the Civil Code, at the terms and conditions set out in this contract and in the authorisations, the Plant on the Plot located in the town of Cingoli, which remains in his ownership, identified and registered as follows:
 
- agricultural land, in one plot, total surface area of one hectare, six acres and twenty five centiares (Ha. 01.06.25), included in the "normal agricultural" zone, according to the current town planning regulations.
 
Registered on the Land Register of the Municipality of Cingoli on Sheet 6 with the Maps:
 
- 349 (ex-88/b) of Ha. 00.29.29;
 
- 351 (ex-83/b) of Ha. 00.74.75;
 
- 353 (ex-111/b) of Ha. 00.02.21;
 
With a total Ha surface. 01.06.25, with R.D. Euro 35.19 and R.A. Euro 56.39.
 
Borders: as described in the previous letter A), owned by  Del Bianco Carlo, other property owned by  both grantors.
 
With the purposes of cadastral continuity and transcriptions it is specified that the cadastral data of the divided parcels derive from the above-mentioned subdivision no. 243584.1/2009..
 
Such land was purchased by the Grantors as per Map 349 from the sales deed received by Mr.Pier Luigi Ginesi Notary in Cingoli on 7th January ì 1986, index number 20744, registered in Macerata on January  17th 1986 as No. 511 and transcribed in Macerata on 17th January 1986 as  No. 650 on the specific register; as to Map 351 from the sales deed received by Mr. Gianferro Pacifico, Notary in Macerata, on 20th November 2007, index No 85659 transcribed in Macerata on 10 December 2007 to No 12130 specific register.; as to Map 353 in view of the sale deed received by Mr. Pier Luigi Gin esi, Notary in Cingoli, on 9 March 1996, index number 37050, transcribed in Macerata on 12th March 1996 as No. 1867 on the specific register. -
 
C. The Grantors  are aware of the technical characteristics of the Plant and declare that they have been informed of how the Plant itself shall be operated and of the operative standards normally required to manage such Plants.
 
The Plant will be realised and operated on the Plot and will include all the long-distance power lines and telephone lines which are necessary for, among other things, the connection of the Plant to the conversion groups and to the transformers as well as  the connection point to the Provider’s network of the national electricity grid, and also the related stations and the measurement groups , as well as other technical devices if necessary.
 
The Parties expressly agree that the Grantee will have the right to determine, at its own discretion,  access and the most opportune management, also from an economic point of view, of the underground line of wires and will be allowed to protect the Plant permanently with fencing.
 
 
3

 
 
D. The Grantors, Mr. DI BIANCO CARLO, in relation to the part of the Plot according to art. 2 letter A), and both Grantors, Mr. DEL BIANCO CARLO and Ms. LAMPA MARIA TERESA, in relation to the part of the Plot according to art. 2 letter B) declare and guarantee:
 
(a) that they are the exclusive owners of the Plot, as specified above;
 
(b) that they are freely able to dispose of it;
 
(c) that the Plot is free of bond constraints, charges, easement, mortgages, privileges and / or taxes in any way able to bind or  jeopardise the construction, the testing, the putting into service as well as the management and the maintenance of the Plant; it is not the object of any proceedings of a civil, administrative or criminal nature nor are there any judicial, executive or conservative measures in force that could jeopardise either wholly or in part the sole and exclusive ownership or possession of the Plot with the purpose of carrying out the project. There are no circumstances that could limit or jeopardise the construction, the testing, the putting into service or the management and the maintenance of the Plant; it is not the object of a loan for use agreement, rent or tenant farming agreement; it is free of const ructions, buildings, trees and plantations that could obstruct the construction and the functioning of the Plant (here included, by way of example only, any object that can darken the solar light panel of the Plant) and the activities carried out have always been realised in accordance with law and rules both at a national and a  European level, with particular reference to the environmental and landscape provisions; the Grantors declare that an aqueduct easement  in favour of  government property belonging to the Marche Region exists, as reported on the original Map 83 on Sheet 6, as constituted with a certified deed signed by Mr. Claudio Alessandrini Calisti, ex Notary in Macerata, dated 25th June 1987, index number 39887, transcribed in Macerata on 6th July 1987 as No. 5089 on the special registry, but the same is of no interest to Map 351 deriving from Map 83 and object of this deed;
 
(d) that they are  well aware of the use to which the Plot  is destined and that they approve it without reserve or any exception and also  declare and guarantee that the Plot and the subsoil (as is visible and to their knowledge) is free of piping,  sluices or any other equipment which is  generally incompatible  or even only prejudicial or limitative to the use for which 1it will be destined.
 
Art. 3 - Delivery of the Plot
 
A.  The Grantee shall start the construction works for  the Plant, in the manner and in the terms that they consider to be the most appropriate for its own organizational and production demands.
 
Legal possession and material availability of the Plot is delivered on this day in favour of the Grantee, for all the useful and onerous effects.
 
B. At the date of the start of works the Plot will be free from any cultivations, plantations and/or trees that could obstruct the construction and / or the function of the Plant, it being understood that  the Grantee will be able to proceed, at its own discretion, with the removal of  above-mentioned if necessary.
 
C. It remains understood that no other indemnity or compensation shall be due other than the indemnity for damages provided in art. 5.E for the restoration or compensation of damages to cultivations, plantations and / or trees located on the Plot, which are destroyed, damaged, removed or cut off by the Grantee to allow the construction and / or the function of the Plant.
 
D. The Grantee discharges and exonerates the Grantors from any civil and criminal liability for damages to third parties (persons and / or things) of any title that may arise from the construction of the Plant and from its subsequent operation and maintenance.
 
 
4

 
 
Art. 4 - Ownership, rights and easements
 
A. The Parties declare that the Plant as well as any other assets that the Grantee holds on the Plot shall remain ownership of the latter and shall not become part of the Plot.
 
B. The Grantors accept that the Plant as well as all the Grantee’s assets  that the latter may place on the Plot may be the object of a guarantee in favour of a Financing Entity or third parties. Vice versa, the Grantors undertake, for the whole duration of this contract, to maintain the Plot free from bonds, constraints, charges, easements, mortgages, privileges and/or taxes of any kind.
 
C. The Grantors undertake to grant and to constitute on other lands that they own and which are adjacent to the Plot, easements for long-distance power lines, cable ducts, overground power lines (and also underground lines), access and passage by all means, including mechanical, as well as any other charge, burden or easement that may be required to operate and maintain the Plant. For this purpose, the Grantors undertake to attend to and execute any authenticated document or deed required in order to allow the regular constitution of any such easements and the related deed shall be transcribed at the relevant Registry at the Grantee’s expense.
 
Art. 5 - Consideration
 
A. For all legal purposes the Parties declare, in lieu of affidavit, in accordance with Presidential Decree no. 445/2000 and made aware by myself, the Notary, of the criminal liabilities in case of false declaration, as well as aware of the powers of verification of the Financial Administration and of the applicable administrative sanctions in case of omitted, incomplete or false indication of data, as follows:
 
- the Grantee, as compensation for the concession of the building lease, undertakes to pay  the Grantors, according to the methods and the terms indicated hereafter, for the whole duration of the building contract, an annual Rental fee equal to Euro 2500.00 (two thousand five hundred and zero zero) per hectare of the Plot, and therefore for an annual total of Euro 6124.00 (six thousand one hundred and twenty-four  zero zero) as agreed.
 
B. The Parties establish that the Rental fee will have to be paid to the Grantors in a single anticipated instalment by 1st December of each year in the following way:
 
-  Euro 3467.75 (three thousand four hundred and sixty-seven point seventy-five) in favour of Mr. CARLO DEL BIANCO, by means of bank transfer to current account no .03 / 01/54621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621), as indicated by the grantor;
 
- Euro 2656.25 (two thousand six hundred and fifty-six point twenty-five) in favour of Mr. DEL BIANCO CARLO and Ms. LAMPA MARIA TERESA by means of bank transfer to current account No. 03/01/54621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621), as indicated by the Grantors.
 
C. The Rental Fee will be reassessed each year according to the percentage of 100 % (hundred percent) of the ISTAT index of the consumer prices of the families of workers and employees, with reference to the stipulated month.
 
 
5

 
 
For the current year of the signature date of this present building contract, the Rental Fee to be paid for the period between the date of signature of this document and December 31st is equal to Euro 6124.00 (six thousand one hundred and twenty-four point zero zero) that the Grantee undertakes to pay within and no later than ten days after signing this Contract via a bank transfer according to the following:
 
- Euro 3467.75 (three thousand four hundred and sixty-seven point sixty-five) in favour of Mr. DEL BIANCO CARLO via bank transfer to current account no. 03 / 01/54621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621), as indicated by the grantor;
 
- Euro 2656.25 (two thousand six hundred and fifty–six point twenty-five) in favour of Mr. DEL BIANCO CARLO and Ms. LAMPA MARIA TERESA via a bank transfer to current account No. 03/01/54 621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621), as indicated by the Grantors.
 
The Parties expressly agree that the bank documentation on which the bank transfer shall be shown, shall be considered as proof with full effect of the completed payment of the compensation for the Rental fee.
 
The grantors expressly renounce the registration of the legal mortgage, expressly exonerating the competent conservative of the Land Registry from any liability.
 
D. The Parties recognise that the realisation of the Plant will inevitably compromise the fertility of the Plot. Therefore the Grantee corresponds to the Grantors, by way of compensation damages, the flat rate sum determined in total as Euro 25,720.80 (twenty-five thousand seven hundred and twenty point eighty).
 
Such sum is paid on today’s date in one single solution payment in the following way:
 
- Euro 14,564.55 (fourteen thousand five hundred and sixty-four point fifty-five) in favour of Mr. DEL BIANCO CARLO via bank transfer to current account no. 03 / 01/54621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621), as indicated by the grantor;
 
 -   Euro 11,156.25 (eleven thousand one hundred and fifty–six point twenty-five) in favour of Mr. DEL BIANCO CARLO and Ms. LAMPA MARIA TERESA, by means of bank transfer to current account no. 03 / 01/54621 opened at the Filottrano Credit Bank, (IBAN IT22A0854968860000030154621).
 
E. The compensation is understood to be an all inclusive amount, including the right of the Grantees to the constitution of the easement as indicated in art. 4. C, except for the right of the Grantors to the compensation provided by the laws regarding Telephone Easement and of Long-distance power lines, while the grantors have no right to obtain further amounts.
 
It is understood that each tax, fee, contribution, expense and other charges pertaining to the property of the area of the Plot, when due, will be the responsibility of the Grantors.
 
The amounts mentioned above are understood as negotiated even in relation to possible modifications of the regulating plan, for which the Grantors will not have the right to obtain any increase in the Rental fee or any compensation indemnity.
 
The present constitution of the building lease has been concluded without any mediation expense in accordance with article no. 1754 from the Civil code.
 
Art. 6 - Obligations of the grantors
 
A. The Grantors do not have the right to make any modification or works on the Plot, or on the neighbouring lands of which they may be in possession that are theoretically fit to reduce the power and the efficiency  of the Plant, unless such modifications or works are authorised beforehand in writing by the Grantee.
 
The Grantors particularly undertake:
 
- not to carry out excavations and/or works that could compromise the safety of the Plant;
 
 
6

 
 
- not to plant trees with high trunks and not to build manufactured products of any kind that could compromise the function of the Plant;
 
- not to place underground pipes and/or other objects or manufactured products in the zone occupied by the long-distance power line, without previous agreement with the Grantee party.
 
B. The Grantors shall undertake to notify the Grantee of any circumstances known to them that could damage the Plant, to jeopardize or limit the functionality of it.
 
Article 7 - Duration
 
A. This present document is valid and binding upon the parties starting from today. The building right will last for twenty-one (21) years from today and will end on 31st of December of the twenty-first year after that date.
 
Before the contract expires, as stated  in the first paragraph, the Grantee shall have the right to unilaterally extend the contract period for a further four (4) years ( "Extension"), indicating their intention to the Grantors - who undertake to grant the extension from then on - by registered letter with return receipt and with a period of prior notice of at least twelve (12) months before the date of termination of the contract originally and/or subsequently provided.
 
The Charge for the grant of the building lease, in the updated contract, should be understood as equal to the amount of the last annuity increased by 20%, to be re-evaluated annually according to the ISTAT indexes. The grantor is obligated from then on to accept such extension to the specified conditions.
 
B. In the hypothetical cases stated in the subsequent articles 8.C and 8.D (resolution
 
due to the Grantee’s fault), as well as the normal expiry of the Contract or following the withdrawal operation under the successive art. 8A, within a maximum period of six (6) months from the termination of the Building Contract, the Grantee will proceed at its own expense to the removal of the Plant or any other operations carried out on the Plot.
 
In order to guarantee the removal of the Plant or any other work carried out on the Plot, the Grantee agrees to release within five (5) days from the date of the start of works a surety policy the amount of which shall conform to the amount required by the Company authorizing the project.
 
In order to guarantee the payment of the compensation indicated in art. 5.A, the Grantee agrees to pay the sum of Euro 6124.00 (six thousand one hundred and twenty-four point zero zero), no later than 30th June, 2010, an annuity equal to the charge in the manner agreed as mentioned above in Article 5 B, as agreed between the parties.
 
The Grantors will forfeit that amount if the Grantee has not paid the Charge within the period referred to in art. 5.B and the Grantors have sent to the Grantee a written notice via registered mail with a return receipt with a declaration of default to comply with the term of ten (10) days from its receipt by the Grantee.
 
Such amount  shall be deducted from the amount due as the last Rental fee payable on the twentieth year.
 
Article 8 - Withdrawal and cancellation
 
A. The Grantee will have the right to withdraw at any time and at its sole discretion from the Building Contract with a notice period of ninety (90) days by means of a simple written notice, without the implication that any compensation is due to the grantor by way of indemnity or damages in addition to the payment of the charge for the duration of the notice.
 
 
7

 
 
B. The Grantee will have the right to declare the contract cancelled with immediate effect by means of written notice to the Grantors due to the fault of the latter, if the Grantors, in violation of their own obligations under the previous art.6.A, undertake building works and/or introduce crops or plantations on the Plot, on the property or on adjoining properties of which they may be in possession that are theoretically capable of reducing the power and effectiveness of the Plant or if the Grantors consider said  acts likely to permanently affect the  power and effectiveness of the Plant.
 
C. If the payment of the Charge is delayed for a period exceeding six (6) months, the Grantors will be entitled to send to the Grantee, by registered letter with return receipt, a warning to comply within a period of thirty (30) days.
 
The Grantors will be entitled to terminate this present Building Contract if the Grantee has not fulfilled its own obligations within thirty (30) days after receiving the formal notice. In the case that the Grantors are entitled to request the termination of this present Contract due to non-fulfilment of the Grantee and have the intention to exercise such right, the Grantors shall undertake to communicate this intention in writing to the Grantee and, even pursuant to and by effect of Article 1411 of the Civil Code, to the potential Financing Entity  whose name and address has been notified in writing by the Grantee to the Grantors. Within 60 (sixty) days of receipt of the above-mentioned notice, the Financing Entity will have the right (I) to designate a third party who will take over from the Grantee in this present Contract or (ii) to inform the Grantors of its intention to directly cancel, or via the Grantee, the non-fulfilment of which the right to request the resolution is founded. In such cases, the Grantors may only request the termination of this present Contract in court and only if the causes of non-fulfilment from the Grantee, on which the right to request termination is based, will not be el iminated within 60 (sixty) days from the takeover of the third party or, as appropriate, upon receipt by the Grantors of the notice from the Financing Entity. The Financing Entity will also have the right to appoint a third party who will take over from the Grantee even when, although the latter has fulfilled its obligations under this present Contract, the Financing Entity notifies the Grantee of its intention to declare the forfeiture of the benefit of the term according to Article 1186 of the Civil Code or to terminate for non-fulfilment or cancel the fina ncing contract.
 
D. This present contract is deemed to be automatically terminated if one of the Parties outside  the cases expressly covered by the previous articles 8B and 8C, becomes a serious breach of its contractual obligations and does not adequately remedy the same within a reasonable time, or within thirty (30) days of the receipt of the notice communication of the other Party.
 
E. In case of cancellation of the building contract by the Grantee due to the fault of the Grantors (resolution under Articles. 8B and 8D, the Grantee shall have the right to decide whether to proceed with the removal of the Plant or of any other work carried out on the Plot, except the direct or indirect right of compensation for damages,.
 
If the Grantee decides to remove the Plant, the Grantors shall be obliged to reimburse the Grantee for all costs and expenses incurred in such removal and restoration, apart form the right to compensation for additional damages.
 
Art.9 - Assignment of the building contract to third parties
 
A. The Grantors may assign this present contract to third parties, by giving written notice to the Grantee with at least ten (10) days of notice, provided that the third party undertakes in writing to abide by the contents of the Building Contract.
 
In case of sale and/or transfer of the Plot from the part of the Grantors, the latter are  bound to oblige the third party to sign the following clause:
 
 
8

 
 
"The buyer/transferee shall substitute the vendor in all obligations under the building contract concluded on the 27th January 2010 with an deed received by the Notary Annunziata Morico, index number. [41573] and undertakes to comply with everything in it. "
 
In the absence of such express statement and signature of the vendor/transferee party, the Grantors will have to compensate the Grantee for any damage or prejudice that would result from this omission. In order to enable verification of compliance with this present agreement, the Grantor must send the Grantee a copy of the sale/transfer contract which will be signed by the third party.
 
B. The Grantee will have the right to dispose of this building contract at any time in the favour of a third party, by giving written notice to the Grantors within thirty (30) days, provided that the third party undertakes in writing to respect the contents of the Building Contract. The Grantee may also assign the Building Contract to more third parties as part of a total or partial disposal of the ownership of the Plant or its management. The Gra ntors must undertake to allow the transfer of the Building Contract, by giving their own consent in order to register the transfer on the Land Registry and make all the statements that may be required. The transfer will be effective in relation to the Grantors starting from the moment in which the the Grantors are informed of the transfer . From that moment on, the Grantee will be released from its obligations in relation to the Grantors, who shall immediately declare their intention to  release the Grantee in the event of non-fulfilment by the third transferee.
 
C. Should this agreement be transferred to third parties through a transfer of part of the company, the Grantors shall renounce, from that moment,  the right to terminate the contract under Article 2558, 2nd paragraph of the Civil Code.
 
Art.10 - Town planning situation
 
Pursuant to and by effect of article 30 of the Presidential Decree dated June 6th 2001 no.380 and subsequently extended and amended,  the land use certificate is attached to this present document under letter "B",  related to the land subject of this present document, issued by the Municipality of Cingoli on December the 2nd 2009, protocol no.16654.
 
The Grantors declare that from the date of issue of the above-mentioned certificate until now there have been no modifications to the town planning regulations of the above-mentioned Municipality.
 
The Grantors also declare that there are no farmers settled on the land subject of this present document, or bordering the same land being entitled to an agrarian pre-emption under existing legislation.
 
Art.11 – Applicable Law. Sole jurisdiction
 
This present contract is governed by Italian law. All disputes arising from this Contract shall be the exclusive competence of the Macerata jurisdiction.
 
Art.12 - Communications
 
Unless otherwise stated by the specific clauses in the Building Contract, any communication between the parties shall be made by registered letter with return receipt, or by fax or email, with confirmation of receipt at the addresses indicated in the epigraph to this present document .
 
Communication by fax or email shall be deemed complete only when accompanied by a confirmation receipt.
 
 
9

 
 
13 - Final clauses
 
A. This present building contract completely covers the will of Parties related to the relationship they have established. .Therefore  any previous agreement or understanding, verbal or written, possibly exchanged between them and concerning the same report must be understood as cancelled and/or revoked.
 
B. Notwithstanding any stipulation in the foregoing regulations, whatever their nature, it will only be valid if made in writing and after the signature date of the building contract.
 
C. The fact that one of the Parties does not exercise at any time its rights that are acknowledged by one or more clauses of the building contract cannot be considered as a renunciation to such rights nor will it obstruct the latter to successively expect timely and thorough implementation.
 
D. If one of the clauses of the building contract should be declared invalid or inefficient by the competent jurisdiction, the same clause will continue in full effect for the part not affected by it.
 
E. Legal fees and taxes are the responsibility of the Grantee Party .
 
F. Each Party undertakes to process the data of the other party in respect of the Legislative Decree 196/2003. The Parties also undertake to maintain and ensure that its own staff, directors, employees and consultants maintain the strictest secrecy and confidentiality on this present document, but it is understood that no party shall be deemed in violation of this undertaking when making a communication that is required by law, made under a procedure provided by this present document or necessary for its execution.
 
The Grantors acknowledge and accept that the Grantee party can show this present contract and any related document to any potential financing bank or potential transfer.
 
Art.14 – General Terms
 
Pursuant to and by effect of articles 1341 and 1342 from the Civil Code, the Grantors expressly state that they agree to the following regulations:
 
Article 3, paragraphs A), B) and C) (Delivery of Plot);
 
Article 4, (Property, property rights and easement);
 
Article 5 letter A) (Charge), letter A) (Indemnity for Damages Compensation);
 
Article 7 paragraph A) (Duration and the Right of Extension);
 
Article 8 letter A) (Withdrawal of the Grantee), letter B) (Express Termination Clause), letter A) (Consequences of the Resolution);
 
Article 9 (Assignment of the Building Contract to third parties);
 
Article 11 (Jurisdiction).
 
The parties exonerate me, the Notary, from the reading of the Annexes and declare that they are perfectly aware of them.
 
I, the Notary, received this present document and I read it to the persons before me that approved it and together with me, the Notary, sign it at  fifteen minutes past five in the afternoon (.17: 15).
 
This deed is typed by a person I trust and consists of four sheets on eleven pages, and the present twelfth page ends here.
 
Signed
Del Bianco Carlo
Lampa Maria Teresa,
Francesco Cesarini,
Annunziata Morico, Notary.
 
 
10

 
 
  Annex 2

  Area Map

  [omitted]



  Annex 3

  Equipment

  [omitted]



  Annex 4

  Definitive Project

  [omitted]
 
 
 

 
 
ANNEX 5
 
FORM OF PARENT COMPANY GUARANTEE
 
Dear Sirs,
 
Further to our recent discussions and in compliance with the provisions of the Contract (as defined below), we herewith submit to you a parent company guarantee to be executed by way of exchange of commercial letters pursuant to Article 1.1 letter a), Part Two, of the Tariff under Presidential Decree 26 April 1986, no. 131 and in accordance with the terms and conditions specified below between:
 
- Kerself Spa, a joint stock company organised and existing under the laws of Italy and having its registered office at Via della Tecnica 8, Prato di Correggio, registration with the Registro delle Imprese of 01777890359, Fiscal Code and Vat No. 01777890359, corporate capital of [l] (the Guarantor); and
 
- ELLOMAY PV ONE S.r.l., with its registered offices located in Galleria Borromeo, 3, VAT Registration Number and Tax Code 04459950285, entered in the Companies Register of Padova under no. 391298 represented by Mr. Ran Fridrich in his capacity of Sole Director (hereinafter known as “Principal”).
 
WHEREAS:
 
(A)
By an agreement dated [l] 2010 (the Contract, which term includes all amendments to variations of or supplements to it from time to time in force) the Principal has agreed to engage Ecoware S.p.A. (the Contractor) for the design, supply, construction, assembly and start-up of a photovoltaic plant to be located in the Municipality of Cingoli (Macerata, Italy). Unless the context otherwise requires, words and expressions defined in the Contract have the same meaning when used in this Guarantee, as defined below.
 
(B)
According to the Contract, Contractors shall procure the delivery to Principal of a parent company guarantee in the form of this guarantee (“Guarantee”) within 7 (seven) Working Days of execution of the Contract and in any case before having received the first payment milestone.
 
(C)
The Guarantor has agreed to guarantee the due performance of the Contract by the Contractor.
 
(D)
The Guarantor is the Contractor’s Parent Company, as defined in the Contract.
 
IT IS AGREED as follows:
 
1.
The Guarantor:
 
 
(a)
guarantees to the Principal, as primary obligor and not as surety, the due and punctual performance by the Contractor of each and all of the obligations, warranties, duties and undertakings of the Contractor under the Contract when such obligations, duties and undertakings shall become due and performable according to the terms of such Contract;
 
 
(b)
agrees, in addition to its obligations set out in clause 1(a) above, to indemnify the Principal against all losses, damages, costs and/or expenses which the Principal may incur by reason of any breach by the Contractor of its obligations, warranties, duties and undertakings under the Contract save that this shall not be construed as imposing greater or different obligations or liabilities on the Guarantor than are imposed on the Contractor under the Contract; and
 
 
 

 
 
 
(c)
agrees to indemnify the Principal on demand against any loss or liability suffered by it if any obligation guaranteed by the Guarantor is or becomes unenforceable, invalid or illegal as if the obligation guaranteed had not been unenforceable, invalid or illegal provided that the Guarantor's liability shall be no greater than the Contractor's liability would have been if the obligation guaranteed had not become unenforceable, invalid or illegal.
 
2.
The liability of the Guarantor under this Guarantee shall not be reduced or discharged by any act, omission or other thing whereby (in absence of this provision) the liability of the Guarantor under this Guarantee would or might be reduced or discharged in whole or in part as a consequence of:
 
 
(a)
any amendment to the obligations undertaken by the Contractor whether, by way of any addendum or variation referred to in clause 3 below, any suspension of the Works, extension of the time or otherwise; or
 
 
(b)
amendment to, or any variation, waiver or release of, (any part of) the Contract or any security or other guarantee in respect thereof; or
 
 
(c)
the termination of the Contract under the Contract attributable to the Contractor; or
 
 
(d)
any legal limitation, incapacity or other circumstances relating to the Contractor or any other person; or
 
 
(e)
the dissolution, amalgamation, change in status, function, control or ownership, insolvency, liquidation or the appointment of an administrator or receiver of the Contractor or any other person.
 
3.
In the event of change in control or ownership of the Contractor, the Guarantee shall remain in full force and effect. In the event of change in control or ownership of the Contractor, the Guarantor shall promptly notify to the Principal the name of the new controlling person or owner of the Contractor.
 
4.
The Guarantor by this Guarantee authorises the Contractor and the Principal to make any addendum, variation or amendment to the Contract, the due and punctual performance of which addendum and variation shall be likewise guaranteed by the Guarantor in accordance with the terms of this Guarantee.
 
5.
This Guarantee shall be a primary obligation of the Guarantor to perform or to take whatever steps may be necessary to procure the performance of the obligations of the Contractor under the Contract which have been breached, to assume jointly and severally with the Contractor all rights and obligations of the Contractor under the Contract and to pay the Principal from time to time any and all sums of money which the Contractor is at any time liable to pay to the Principal under the Contract; accordingly the Principal shall not be obliged before enforcing this Guarantor Guarantee to take any action in any court or arbitral proceedings against the Contractor, to make demand or any claim against the Contractor, to enforce any other security held by it in respect of the obligations of the Contractor under the Contract or to exercise, levy or enforce any distress, or other process of execution against the Contractor.
 
6.
The maximum amount (importo massimo garantito) guaranteed by the Guarantor under this Guarantee shall be equal to the Consideration.
 
7.
This Guarantee shall be effective upon delivery and shall expire 7 (seven) days following the FAC (the “Expiry Date”). Upon the Expiry Date, this Guarantee must be returned to us for cancellation.
 
8.
Until all amounts which may be or become payable under the Contract or this Guarantee have been irrevocably paid in full, the Guarantor shall not, as a result of this Guarantee or any payment or performance under this Guarantee, be subrogated to any right or security of the Principal or claim or prove in competition with the Principal against the Contractor or any person or demand or accept repayment of any monies or claim any right of contribution, set-off or indemnity and any sums received by the Guarantor or the amount of any set-off exercised by the Guarantor in breach of this provision shall be held by the Guarantor in trust for and shall be promptly paid to the Principal.
 
 
 

 
 
9.
The Guarantor shall not hold any security from the Contractor in respect of this Guarantee and any such security which is held in breach of this provision shall be held by the Guarantor in trust for and shall promptly be transferred to the Principal.
 
10.
Each payment to be made by the Guarantor under this Guarantee shall be made in Euro, without any set off or counterclaim and free and clear of all deductions or withholdings of any kind whatsoever or howsoever arising.  If any deduction or withholding must be made by law (including double taxation treaties) the Guarantor will pay that additional amount which is necessary to ensure that the Principal receives on the due date a net amount equal to the full amount which it would have received if the payment had been made without the deduction or withholding.  The Guarantor shall promptly deliver to the Principal any receipts, certificates or other proof evidencing the amounts paid or payable in respect of any such deduction or withholding.
 
11.
The Guarantor shall have 5 (five) Working Days from the date of demand to make payment in full to the Principal of any amount due under this Guarantee. The Guarantor shall pay interest on any amount due under this Guarantee from the date which is 5 (five) Working Days from the date of demand until the date of payment in full (as well after as before any judgment) calculated on a daily basis at the six months Euribor plus 3 (three) percentage points.
 
12.
The Guarantor will reimburse the Principal for all legal and other costs (including non-recoverable VAT) incurred by the Principal in connection with the enforcement of this Guarantee.
 
13.
Any settlement or discharge between the Principal and the Contractor or the Guarantor shall be conditional upon no order to refund by virtue of any provision of any enactment relating to bankruptcy, insolvency or liquidation being issued by a competent court, in which case the Principal shall be entitled to recover from the Guarantor as if such settlement or discharge had not occurred.
 
14.
The Guarantor warrants that this Guarantee is its legally binding obligation, enforceable in accordance with its terms, and that all necessary consents and authorisations for the giving and implementation of this Guarantee have been obtained.
 
15.
The Guarantor warrants and undertakes to the Principal that it shall take all necessary action directly or indirectly to perform the obligations expressed to be assumed by it or contemplated by this Guarantee and to implement the provisions of this Guarantee.
 
16.
The Guarantor warrants and confirms to the Principal that it has not entered into this Guarantee in reliance upon, nor has it been induced to enter into this Guarantee by any representation, warranty or undertaking made by or on behalf of the Principal (whether express or implied and whether under statute or otherwise) which is not set out in this Guarantee.
 
17.
The Guarantor acknowledges and consents, also for the purposes of Article 1407 of the Italian Civil Code, that the Principal shall be entitled by notice in writing to the Guarantor to assign this Guarantee at any time in connection with an assignment of the Contract in accordance with the provisions of the Contract, to the Financing Entity.
 
18.
Any notice hereunder shall be duly given when delivered in writing by hand (in the case of personal delivery) or by registered letter with advice of receipt (Raccomandata A.R.), or by express courier  to the Guarantor or by facsimile, provided an original of such facsimile is also received by us within three (3) Working Days and sent by one of the aforementioned notice methods and shall be duly signed by an authorised representative of the Principal.
 
 
 

 
 
19.
No delay or omission of the Principal in exercising any right, power or privilege under this Guarantee shall impair or be construed as a waiver of such right, power or privilege nor shall any single or partial exercise of any such right, power or privilege preclude any further exercise of such right, power or privilege or the exercise of any other right, power or privilege.
 
20.
Without prejudice to Article 1419 (nullità parziale) of the Italian Civil Code, if - at any time - any provision of this Guarantee is or becomes illegal, invalid or unenforceable, neither the legality, validity nor enforceability of the remaining provisions of this Guarantee will in any way be affected or impaired thereby.
 
21.
The Guarantor shall pay all stamp duties and taxes, if any, to which the execution and delivery of this Guarantee may be subject and shall indemnify the Principal against any and all liabilities with respect to or arising from any delay or omission to pay any such duties and taxes.
 
22.
This Guarantee implies, where necessary, a waiver, among other things, to the benefits, rights and exceptions under Articles 1247, 1939, 1945, 1953, 1955 and 1957 of the Civil Code.
 
23.
This Guarantee shall be governed by and construed in accordance with Italian law. The courts of Milan, Italy, shall have exclusive jurisdiction of all matters arising out of or in connection with this Guarantee.
 
24.
Notices or demands given under this Guarantee shall be sent to the following addresses:
 
(a)           If to the Principal
 
 
ELLOMAY PV ONE S.r.l.
 
Attention: Mr Ran Fridrich
 
Galleria Borromeo, 3
 
35137 Padova (Italy)
 
Telephone: +972-3-7971111
 
Fax: +972 972-3-7971122
 
(b)           If to the Guarantor:

 
[Guarantor]
 
Attention: l
 
Telephone: l
 
Fax: l
 
***
 
If you agree with the above terms and conditions, please send us by registered mail with return receipt or by express courier or deliver by hand a duly executed letter of acceptance incorporating the full text of this proposal.

Yours faithfully,

___________________________
for and on behalf of the Guarantor
 
For acceptance

___________________________
for and on behalf of the Principal
 
 
 

 
 
  Annex 6

  Technical Specifications

  [omitted]


  Annex 7

  Project Implementation Schedule

  [omitted]
 
 
 

 
 
Annex 8:  Safety Costs
 
The System’s safety costs estimate is the following:

 a)
-
-
-
-
Site preparation:
Site enclosures;
Roads and escape routes;
Delimitation of internal site areas;
Sign boards.
2.800 + VAT
 b)
-
-
-
Preventive and protective measures and IPD:
courses;
meetings;
IPD.
3.000 + VAT
 c)
-
-
Grounded systems and protection against atmospheric charges:
Grounding for the cranes and hoisting systems;
Electrified site premises.
1.600 + VAT
 d)
-
-
-
-
Collective protection means and services:
Fire extinguishers;
First-aid equipment;
First-aid station;
Collection points.
2.500  + VAT
 e)
-
-
Procedures contained in the CSP:
Goods movement on site.
Internal logistics organisation.
1.900 + VAT
 f)
Coordination measures relative to the common use of fieldwork, equipment, infrastructure and collective protection means and services.
30.000 + VAT
 
Total costs:
41.800 + VAT
 
The costs have been estimated by the Contractor in compliance with the legislation in force on safety.  The costs  shall, in any case, be object of inspection by the Health and Safety Coordinator in the drawing up of the CSP.

 
 

 
 
Annex 9: Minimum Guaranteed Performance Ratio (MGPR)
 
The Parties have agreed a Minimum Guaranteed Performance Ratio MGPR equal to 78%.
 
Performance ratio algorithms.
 
The performance ratio (PR) is defined according to the standard CEI EN 61724 (CEI 82-15) as:
 
 
PR
Y r
Y f
(1)
Yf  is the final PV system yield, that is the net AC energy output divided by the nominal  DC. power of the installed PV System. It represents the number of hours that the PV System would need to operate at its rated power to produce that amount of energy. The value for Yf  is calculated by equation 2:
 
E
Pn
Y f
     [kWh / kWp] (2) 
where:
Yf  = final PV System yield
E   = System net AC energy output in kWh
Pn = System nominal power in kWp
 
Yr is the reference yield that is the total in-plane irradiance H divided by the PV’s reference irradiance G. It represents the equivalent number of hours necessary for the array to receive the reference irradiance. If  G  equals 1 kW/m2 , then Yr is the number of peak sun-hours. The Yr defines the solar radiation resource for the PV system. It is a function of the location, orientation of the PV array, and month-to-month and year-to-year weather variability. The value for Yr is calculated by equation 3:
 
H
G
Y r
[(kWh/m2) / (kW/m2)]   (3) 
 
where:
 
Yr = reference yield
H = total plan of array irradiance in kWh/m2
G  = reference irradiance (usually 1 kW/m2)

The performance ratio (PR) calculated by the equation (1) is Yf  divided by Yr. By normalizing with respect to irradiance, it quantifies the overall effect of losses on the rated output due to inverter efficiency and wiring mismatch, and other losses when converting from DC to AC power; PV module temperature; incomplete use of irradian ce by reflection from the module front surface; soiling or snow; system down-time and component failure.
 
 
 

 
 
1. Measurement of effective performance ratio
 
On the base of the above assumptions, the effective performance ratio (PReff))  is calculated as follows:
 
PReff  = (Eeff * G )/ (Pn * f * H )
 
Where:
 
Eeff :
is the production of electric energy (in kWh) measured at the point established by the GSE at low voltage

G:
is the standard irradiance value, meaning the value representing the instantaneous power of the solar radiation which hits a orthogonal plane surface in standard conditions, equal to 1000 W/ m2

Pn :
is the nominal peak power (in kW) of the System in standard conditions STC

f:
is a correction factor due to the panels performance degradation equal to (1- 0,0008 * Nmonths) where Nmonths is the “number of months” from the opening of the worksite

H:
is the value of the irradiation in (kWh/m2) measured under the measurement operational conditions mentioned below

For the avoidance of doubts, whenever throughout the Contract, reference to the Performance Ratio of the System is made, it is clear to all Parties that the PReff  is meant.
 
2. Measurement operational conditions

 
Ø
Utilized instruments: N. 2 class II pyranometers
 
Ø
The exact position of the pyranometers will be decided in the Executive Project.
 
Ø
Measurements performed with the pyranometers will be recorded every 10 minutes
 
Ø
Every hour an average irradiation value will be calculated as follows:
 
(a)    Hi (kWh/m2) at the ith hour

 
Ø
Hourly average irradiation less than 600 Wh/m2 will be discarded
 
Ø
At the end of each period the total irradiation will be calculated as follows:
 
(b)    H = ∑ Hi  where “i” is a value from 1 to (24 * n)
 
3. Stopping periods
 
During the course of the measurement, stopping periods not attributable to the Contractor responsibilities (i.e. stopping periods due to theft, vandalism, Force Majeure events, non-availability of monitoring system, power outage of the national electricity grid, wilful misconduct or gross negligence of the Owner) will be excluded from the calculation of the PReff .

 
 

 

4. Minimum Guaranteed Performance Ratio (MGPR)
 
The Minimum Guaranteed Performance Ratio (MGPR) will be a function of two parameters:

 
Ø
type of system: fixed or tracker

 
Ø
type of measurement: over one year periodicity or over different time span

For one year periodicity measurement the Minimum Guaranteed Performance Ratio (MGPR) will be:

MGPR_fixed    = xx for fixed systems

MGPR_tracker  = yy for tracker systems
 
For different time duration measurement, the Minimum Guaranteed Performance Ratio (MGPR_short-term) will be corrected through a corrective Factor (Ftemp) depending on the ambient temperature.

The following condition will have to be satisfied:

 
Ø
for one year periodicity measurements:
 
PReff  ≥ MGPR

 
Ø
for different time duration measurements:
 
PReff  ≥ MGPR_short-term

where:

MGPR_short-term  = MGPR * Ftemp
 
The methodology to calculate the temperature corrective factor is below described.
 
5. Correction of Minimum Guaranteed Performance Ratio
 
The methodology of correction is based on standard CEI 82-25.
 
This measurement consists in the verification of the following conditions when in presence of irradiation superior to 600 W/m²:

Pdc > 0,85 * Pn  * I / ISTC
 
Pac > 0,9 * Pdc
 
that is:
 
Pac > 0,765 * Pn * I / ISTC
 
 
 

 
 
Where:
 
Pdc:
is the DC power (in kW) measured at the PV generator output, with a precision better than ±  2%;
 
Pac :
is the AC power (in kW) measured at the LV inverter output, with a precision better than ± 2%;
 
Pn :
is the nominal power (in kW) of the System;
 
I :
is the instantaneous irradiance on the module plane (in W/m2), with a precision better than ± 3%; ;
 
ISTC :
is the irradiance in standard conditions, equal to 1000 W/m2.
 
If during the course of these measurements, a panel temperature reading superior to 40°C is taken on the back of the panel itself, it is allowed to apply a temperature related correction to the power reading itself.

In such a case the following formula will be used to calculate a theoretical AC power at the LV inverter output, corrected by temperature factor:

Pdc_corr > (1 – Ptpv - 0,08) * Pn * I / ISTC

Pac_corr > 0,9 * Pdc_corr
 
where Ptpv indicates the thermal losses of the photovoltaic generator (derived from the panel technical data), while other generator related losses – optics, resistive, diode related, matching errors/defects – are typically taken to be equal to 8%.

Ptpv can be determined, if the Tcel (temperature of the photovoltaic cells) is known, using the following formula:

Ptpv = (Tcel - 25) * y /100

or, if Tamb (ambient temperature) is known, using:

Ptpv = [Tamb - 25 + (NOCT - 20) * I / 800] * y /100

where:

y:
is the power temperature coefficient (the parameter supplied by the panel manufacturer , for crystalline silicon panels is typically equal to 0,4 - 0,5%/°C);

NOCT: is the nominal module work temperature; it is a parameter supplied by the panel manufacturer, typically equal to  40-50°C);
 
I:
is the instantaneous irradiance on the panel plane (in W/m2);
    
Tamb: is the ambient temperature;

Tcel:
is the temperature of the cells in a photovoltaic panel; can be measured with a thermorestrictive sensor (PT100) attached to the back of the panel.
 
 
 

 
 
Measurement operational conditions

 
Ø
Measurements performed with the pyranometers will be recorded every 10 minutes
 
 
Ø
Every hour an average irradiation value will be calculated as follows:
     
Hi (Wh/m2) at the ith hour
 
 
Ø
Hourly average irradiation less than 600 Wh/m2 will be discarded
 
 
Ø
The ambient temperature will be measured at a point which will be judged to be representative of the conditions of the entire plant and will be measured with a calibrated instrument with a margin of error inferior to 0,5oC
 
 
Ø
For a measurement of the output AC power a Classe 1 instrument will be used

Measurement results

The temperature corrective factor (Ftemp)  will be calculated as follows:

Ftemp = Pac_corr  / Pac  = 0,9 (1 – Ptpv -0,08) / 0,765

For the avoidance of doubt, the temperature corrective factor will be applied only for short-term PReff measurement and only for the timeframe per day in which the panel temperature exceeds 40° C.

 
 

 

Annex 10: Testing Procedures
 
This document aims to describe the regulatory requirements and references to which the Contractor must adhere. The document contains the list of checks, tests and measurements to be performed for testing and commissioning, as well as the criteria for acceptance by the Principal of the PV plant (hereinafter referred to as "plant").
 
The tests consist of:
 
 
a)
Verification of materials, components and equipment;
 
 
b)
Checks and tests during the work on materials, components and equipment;
 
 
c)
Tests for the commissioning and system performance evaluation:
 
 
1.
Technical Inspection (Static Test - without interconnection );
 
 
2.
Testing of Grid Connection;
 
 
3.
Testing of the plant with interconnection;
 
 
4.
GSE Acceptance Test;
 
 
d)
Provisional Acceptance Test (PAC);
 
 
e)
First Reassessment Test;
 
 
f)
Second Reassessment  Test (FAC).
 
For all the definitions, we refer to the glossary set out in the technical specifications attached to the contract documents.
 
 
pag. 1 di 12

 
 
1
MATERIALS CERTIFICATES
 
General
 
For each material, component and equipment must be provided conformity certificates of conformity and compliance with relevant rules and the origin and warranties certificates.
 
PV Module
 
The photovoltaic modules must be accompanied with the certificate of approval according to CEI EN 61215 (photovoltaic modules in crystalline silicon) and CEI EN 61730-1 and 61730-2.
 
The photovoltaic modules must be accompanied with a statement of the values of NOCT and of  power/temperature coefficient.
 
The certificates must be issued by laboratories accredited for specific tests required to verify the modules, in accordance with UNI CEI EN ISO / IEC 17025. These laboratories should be accredited EA (European Accreditation Agreement) or must have established mutual recognition agreements with EA.
 
Structures
 
The metal structures (steel) supporting the photovoltaic modules shall be accompanied with the certificate according to UNI EN ISO 1461 (coatings for hot-dip galvanizing).
 
Energy Meters
 
The meter in low voltage it is installed by ENEL itself, the one in medium voltage it is certify.
 
Protections equipment for connection to the grid
 
Protection Interface (PI) and the general protection (PG) must be approved and comply with the requirements in CEI 0-16 ed.2.
 
 
pag. 2 di 12

 
 
Precast
 
The prefabricated electrical delivery station (“cabina di consegna”) shall be accompanied with the certificate of inspection taking into account the requirements of the Guide for connections to the electricity Grid of ENEL (ed. December 2008).
 
2
TESTS
 
2.1
Technical Inspection (Static Test - without interconnection)
 
After each test session a report must be prepared. Before each test session, the Contractor shall deliver the documentation specified in the Technical Specifications .
 
If a test session shows anomalies or non-compliance, Contractor will identify and correct issues to begin a new session of tests.
 
The works are accepted only if they fully meet the Executive Project, as required in respect of materials installed, the method of execution and the general requirements.
 
In the presence of the Contractor and the Principal, the technician responsible for testing will perform  the controls and tests listed below.
 
Physical inspection of the plant
 
 
>
Verification of the mounting structures – The Parties will verify the number of installations in comparison with the Executive Project.
 
 
>
Controller verification – Parties will verify the number of controllers installed in, comparison with the Executive Project.
 
 
>
Network interface verification – The Parties will verify the number of the power inverters and transformers in comparison with the Executive Project.
 
 
>
Device and accessory verification – The Parties  will verify the number of devices and accessories, in comparison with the Executive Project (perimetral defences, weather station, box shelter, etc.)
 
 
pag. 3 di 12

 
 
 
>
Placement of structures, electrical stations and electrical lines
 
 
>
PV modules orientation
 
 
>
Tilt Angle
 
 
>
Devices verification – Parties will verify the number of Inverters, transformers, Grid Interfaces and accessories in comparison with Executive Project
 
Civil  Works
 
 
>
Foundations (alignment, cracks, surface deterioration, etc.).
 
 
>
Integrity of  conduits and manholes
 
 
>
Protection against insects and rodents
 
Structures
 
 
>
Basements (alignment, cracks, surface deterioration, etc.).
 
 
>
Check of  profiles mounting
 
 
>
Integrity of the profiles
 
 
>
Co-planarity of the modules with structures
 
 
>
Bolting corresponding to the Executive Project
 
 
>
Tightening torque of bolts corresponding to the Executive Project
 
PV Modules
 
 
>
Documentation verification – The Parties will check the presence of appropriate documentation for each cluster of PV modules and each string as well as its correspondence with installed PV modules, their codes and declared flash test power output.
 
 
>
Nominal and real  power check – The Parties  will check the sum of the nominal power peaks of the installed modules which have to match with the GSE declaration. The effective installed power has to match the nominal power declared to the GSE, with a tolerance of ± 3%.
 
 
>
Plant checks – the Parties will random select 20 modules from the documentation and will verify the effective presence of those panels in the installed PV clusters as declared in the documentation.
 
 
pag. 4 di 12

 
 
 
>
Mechanical Integrity (faults, fractures or incomplete assembly)
 
 
>
Wiring.
 
 
>
Module connection box protection degree (IP)
 
Electrical Equipment
 
 
>
Placement
 
 
>
Mechanical Integrity (faults, fractures or incomplete assembly)
 
 
>
Outdoor wiring
 
Degree of protection of the components assembled
 
 
>
Check protection degree for all the plant components
 
 
>
Proper sealing of cable glands
 
 
>
Proper application of protective measures against insects and rodents
 
Checking of  electrical connections
 
 
>
Wiring and cables labels according to the cables table
 
 
>
Proper LV cables connection
 
 
>
Inverter connection according to CEI 0-16
 
 
>
Proper MV cables connection
 
Verification of Switching and Protection devices
 
 
>
Inspection of LV protection devices (switches, fuses,  etc )
 
 
>
Test of  LV devices
 
 
>
Inspection of MV protection devices (switches, fuses,  etc )
 
 
>
Test of  MV devices
 
 
>
Check  of over-voltage discharges
 
 
>
Proper installation and wiring of any blocking diodes
 
Grounding  system verification
 
 
>
Proper implementation and electrical continuity  of grounding connections of all metal parts
 
 
>
Proper implementation and electrical continuity of grounding connections for over-voltage discharges
 
 
>
Proper implementation and electrical continuity of grounding connections of all the support structures
 
 
pag. 5 di 12

 
 
PV string tests
 
 
>
Modules serial number and electrical parameter meeting with the list of materials
 
 
>
Measurement of string open circuit voltage, performed at string parallel boards output
 
 
>
Measurement of string short circuit current, performed on DC parallel boards output
 
 
>
String Electrical Insulation Test by sample.
 
Instrumentation
 
The test equipment shown below, accompanied by valid certificates of calibration, is made available by the Contractor.
 
 
>
Torque wrench, if necessary
 
 
>
Multimeter
 
 
>
Ohm-meter
 
 
>
1000V-DC Generator
 
 
>
Calibrators
 
 
>
Current clamp (DC and AC )
 
2.2
Testing of Grid Connection
 
If a test session shows anomalies or non-compliance, Contractor will identify and correct issues to begin a new session of tests.
 
After the testing ENEL will issue a report attesting to the successful outcome of the audits, and proceed to closing of IMS in the cabin of Delivery.
 
Measurement of grounding system resistance
 
In order to proceed with testing the Contractor must have measured the value of grounding resistance. The Contractor must verify that the result complies with the  CEI 11-1 and CEI 11-37 rules and the Enel technical standards.
 
 
pag. 6 di 12

 
 
2.3
Testing with interconnection
 
After checking with the staff of the electricity supplier the circuit wiring diagrams, equipment status and the protection devices functionality , the plant will be put in operation by closing of medium voltage switches.
 
Start Up Test
 
The tests will be performed separately on each inverter and progressively throughout the plant.
 
 
>
Checking the connection of the inverter for each phase
 
 
>
Verification of the level of input voltage to the inverter
 
 
>
Start Up of inverters and check out the settings of the control system and protection devices
 
 
>
Checking the insulation on the DC side and the setting of the protection devices
 
 
>
Test inverter in different operating conditions provided by the control system (power on, power off, no Grid, etc.).
 
 
>
Verifying the proper operation of the interface device and associated organs of disconnection from the Grid
 
 
>
Verifying the correct operation of the photovoltaic plant
 
Protection devices calibration
 
 
>
Verifying the compliance with the requirements and standards
 
 
>
Verifying and regulation of action levels of equipment and protection devices
 
Alarms and Alert Devices
 
 
>
Verifying of compliance with the requirements
 
 
>
Checking the correct operation of alarms and alert devices
 
Electricity metering devices
 
 
>
Verification of the functionality of measuring devices (meters and indicators)
 
 
pag. 7 di 12

 
 
Monitoring and Data Acquisition
 
Equipment of the monitoring system must be calibrated and certified by an independent certification body
 
 
>
Checking of the weather station and all the sensors installed
 
 
>
Verification of measurement parameters for all the sensors installed
 
 
>
Testing of communications with inverters
 
 
>
Verification of all acquired signals and their proper display and storage
 
 
>
Verifying of proper operation of UPS
 
Telemonitoring
 
 
>
Verification of the transmission system
 
 
>
Verification of data processing software
 
Power  Consumption
 
 
>
Measure of inverter power consumption in stand-by mode
 
 
>
Measure of power consumption of auxiliary services, and system monitoring
 
Security system and video surveillance
 
 
>
Checking of the fence and anti-intrusion system
 
 
>
Verification of internal sensors in every substation and Technical room
 
 
>
Verification of mechanical anti-theft system of photovoltaic modules
 
 
>
Verification of the video-surveillance system
 
 
pag. 8 di 12

 
 
3
GSE TEST
 
As provided in Annex 1 of Decree 19 February 2007, there shall occur simultaneously the following two conditions for each inverter:
 
a)
Pcc > 0.85 × Pn om × 
I
 
ISTC
 
 
b)
Pca > 0.9 × Pcc
 
where:
 
 
Pcc = Measured Power (W) at the inverters input, with accuracy greater than ±2%
 
 
Pca = Measured Power (W) at the inverters output, with accuracy greater than ±2%.
 
The measures are valid for solar radiation on the surface of the modules greater than 600W/m².
 
If during the test the measured back module temperature is greater than 40 °C a temperature correction is permitted.
 
In this case the condition a) above becomes:
 
a’)
Pcc > (1 – Ptpv – 0.08) × Pn om × 
I
 
ISTC
 
 
 
Ptpv = PV Generator thermal losses, while all the other PV losses (optical, resistive drop on diodes, coupling faults) are typically taken equal to 8%.
 
Note:
 
thermal losses Ptpv, with the  cells temperature measure TC, can be determined: 
Ptpv  = (TC   25) ×  
γ
100
 
Or, with the ambient temperature measure Ta and NOCT value, we have:
 
Ptpv  = [Ta  25 + (NOCT 20) ×  
I
] × 
γ
 
800
100
 
 
 
pag. 9 di 12

 
 
4
PROVISIONAL  ACCEPTANCE TEST (PAC)
 
Provisional acceptance tests consists on verifying the system performance over a minimum period of 5 (five) consecutive calendar days.
 
Test Conditions
 
Before proceeding with the provisional acceptance test, all the previous test, as the static test, the grid connection test, the PV plant test with interconnection and the GSE test, must have successfully completed.
 
If the GSE acceptance test had not yet been successfully carried out, it will be performed as part of the provisional acceptance test.
 
During the testing period, the availability of the PV generator, Monitoring and Data Acquisition System and Electrical Meters included, should be 100%.
 
In case of unavailability, for reasons not attributable to the Contractor, the testing period shall be extended for the time required for completion.
 
In case of unavailability, failure, or malfunction, which may cause irregularities in the operation or risks the safety of the plant and / or personnel, for reasons attributable to the Contractor, the provisional acceptance tests should be fully repeated.
 
In case the provisional acceptance tests result is negative, the same should be fully repeated.
 
After the positive result of the test, a report must be prepared as indicated in the EPC contract annex.
 
Testing Tool and measurement procedure
 
The test equipment required, accompanied by valid certificates of calibration, is made available by the Contractor.
 
The Principal, or a person authorized by him, with the Contractor will have access to the plant, and Monitoring and Data Acquisition system at any time of the test to verify the proper operation and consistency of source data.
 
If there are subfields with different tilt and azimuth angles, one from the other, a pyranometer for each subfield will be positioned.
 
 
pag. 10 di 12

 
 
Measurement  of each pyranometer will be acquired by a central computing unit (PLC) together with the instantaneous Energy (ECA) measured by the GSE meter located immediately at the inverter output.
 
The module temperature will also be measured with a separate temperature sensor mounted on its back, one for each subfield.
 
Precise measurements of radiation, power and temperature are performed every 10 (ten) minutes.
 
The result of the Provisional Acceptance Test will be positive if the following condition is achieved:
 
PReff  ≥ MGPR
 
The value of PReff will be calculated according to the procedure described in the Annex 9.
 
5
FIRST AND SECOND REASSESSMENT TEST
 
In order to verify system performance during the First and Second  Reassessment Test, the continuous recording of meteorological data and PV plant Energy production is necessary.
 
Test Conditions
 
During the Contract Year, must be guaranteed an out of service of the monitoring and data acquisition system of up to 120 hours per year, or an availability of valid data of at least 98.6% of the total theoretical data storable in the Year.
 
Any unavailability of PV Plant, due to reasons not attributable  to the Contractor (Grid stop period, outages, lightning, theft, vandalism or other events of Force Majeure in general), or agreed with the Principal shall be deducted from the calculation.
 
System Performance measurement
 
The PR will be calculated as the average value on an annual basis according to the procedure of the annex 9.
 
 
pag. 11 di 12

 
 
5.1
First Reassessment  Test
 
After 12 months from the issuance of the Provisional Acceptance Certificate, a review of PV Plant Performance will be performed by the Test Technician with the Contractor and the Principal, and at the presence of the Technical Advisor.
 
The Effective Performance Ratio PReff value will be calculated according to the procedure of annex 9 and compared with the MGPR (Minimum Guaranteed Performance Ratio).
 
The test result will be positive if the following condition will be achieved:
 
PReff ≥ MGPR
 
5.2
Second Reassessment  Test
 
After 24 months from the issuance of the Provisional Acceptance Certificate, a review of PV Plant Performance will be performed by the Test Technician with the Contractor and the Principal, and at the presence of the Technical Advisor.
 
The Effective Performance Ratio PReff value will be calculated according to the procedure of annex 9 and compared with the MGPR (Minimum Guaranteed Performance Ratio).
 
The test result will be positive if the following condition will be achieved:
 
PReff  ≥ MGPR
 
 
pag. 12 di 12

 
 
ANNEX 11
 
TECHNICAL ACCEPTANCE CERTIFICATE MODEL
 
[ on the Principal’s headed paper ]

To the Contractor and Site Manager
 
Ecoware S.p.A.
Att. Ing. Leopoldo Franceschini
Via Nona Strada, 9
I-35129 Padova, Italy
 
Object:
EPC Contract entered into between [] (the Principal) and Ecoware S.p.A. (the Contractor) on [] for the planning and construction of [] photovoltaic System in the Province of [] (the Contract with reference EPC_EO_Projectname_nbr_YYYYMMDD)
 
Dear Ing. Franceschini,
 
except where otherwise required by the context or defined diversely, the words and expressions established in the Contract shall have the same meaning as when they are used in this certificate.

The undersigned hereby declares the following:
 
(a)
the System’s correspondence in compliance with the Final Project documentation;

(b)
to have checked the existence of the System’s conformity declaration in a worldclass manufacturing way, pursuant to the Law  46/90, executed by the Contractor

(c)
the System’s nominal power results as being equivalent to [] kW, constituting the nominal power of the modules making up the photovoltaic System;

(d)
the test conducted on Annex 13 ( Technical Inspection) results positive.

(e)
All the following tests have been positive:
 
 
(a)
electrical continuity and connection among the modules (electrical continuity among the various points of the strings circuits and among the eventual strings parallel and the inlet of the inverter and the power control);
 
 
(b)
grounding surge protector (electrical continuity of the ground circuit, starting from the discharger up to the mass and external mass connected)
 
 
(c)
insulation of the electrical circuit of the mass (adequate insulation resistance of the plant prescribed on the normative CEI 64-8/6);
 
(f)
All the tests have been carried out in compliance with what has been foreseen by the law in force and, in particular, by the legislation specified in the M.D. dated 19thFebruary 2003 and subsequent amendments and integration thereto, as well as in compliance with the test procedures in force with the Technical Consultants appointed by the Principal and/or Financing Entity.Everything that has been set forth above is true.
 
 

 
 
Further to your Mechanical Completion notice dated [] relative to the [] System, it is hereby certified, pursuant to and by effect of Art.12.1 of the Contract that the Payment Milestone 2 corresponding to [] (in words Euro []) described in the aforementioned notice has been effectively completed in compliance with the Technical Specification and the Project Implementation Schedule.
 
Yours faithfully,
 

Date : []                                                                                     By []
 
 
 

 
 
ANNEX 12
 
COMMENCEMENT OF OPERATIONS NOTICE MODEL
 
[on the Contractor’s headed paper ]
 
To the Principal, Work Manager, Technical Consultants of Principal and/or Financing Entity

[]
Attention of Mr. []
Address []
[]
 
Object:
EPC Contract entered into between [] (the Principal) and Ecoware S.p.A. (the Contractor) on [] for the planning and construction of [] photovoltaic System in the Province of [] (the Contract with reference EPC_EO_Projectname_nbr_YYYYMMDD)
 
Dear Mr. [],
 
Except where otherwise required by the context or defined diversely, the words and expressions established in the Contract shall have the same meaning as when they are used in this communication.

We wish to inform you, pursuant to and by effect of 12.2 of the Contract that with reference to the [] System, the Commencement of Operation has been fulfilled on today’s date, as can be seen from the attached documentation.

With reference to the System, it his hereby declared the System is connected to the national electricity grid and that the System and Contractor are ready for the start of the Operational Inspection and subsequently the tests, inspections and effective performance ratio calculations.
 
Yours faithfully,
 
Date : []                                                                          & #160;        Ing. Leopoldo Franceschini 
Ecoware S.p.A.
 
 
 

 
 
ANNEX 13

STATEMENT ON ESTIMATE OF CONNECTION
 
ECOWARE LETTERHEAD

To
ELLOMAY PV ONE S.r.l.,
Galleria Borromeo, 3
35137 Padova
Italy
Attention of Mr Ran Fridrich
 
Dear Sirs

Re: Estimate of connection – EPC Contract EE_Del Bianco executed on [●]

We hereby confirm that we reasonably estimate that the above plant will be connected in 120 (one hundred twenty) days from the date Payment Milestone 1 shall be paid in accordance with Art. 4 of the Contract.
 
Yours faithfully
 
On [●]

Signed by [●]
____________________

On behalf Ecoware S.p.a.

 
 

 
 
ANNEX 14
 
PROVISIONAL ACCEPTANCE CERTIFICATE MODEL
 
[ on the Principal’s headed paper ]

To the Contractor and Site Manager
 
Ecoware S.p.A.
Att. Ing. Leopoldo Franceschini
Via Nona Strada, 9
I-35129 Padova, Italy
 
Object:
EPC Contract entered into between [●] (the Principal) and Ecoware S.p.A. (the Contractor) on [●] for the planning and construction of [●] photovoltaic System in the Province of [●] (the Contract with reference EPC_EO_Projectname_nbr_YYYYMMDD)
 
Dear Ing. Franceschini,
 
except where otherwise required by the context or defined diversely, the words and expressions established in the Contract shall have the same meaning as when they are used in this certificate.

The undersigned hereby declares the following:
 
·
the System’s correspondence in compliance with the Final Project documentation;

·
to have checked the existence of the System’s conformity declaration in a worldclass manufacturing way, pursuant to the Law  46/90, executed by the Contractor

·
the System’s nominal power results as being equivalent to [●] kW, constituting the nominal power of the modules making up the photovoltaic System;

·
the test conducted on Annex 10 with respect to Operational Inspection results positive.

·
Has calculated the short term effective performance ratio of the System for a period of 5 consecutive days of continuous power production and has positively evaluated this effective performance ratio against the MGPR.
 
·
All the following tests have been positive:
 
 
(a)
electrical continuity and connection among the modules (electrical continuity among the various points of the strings circuits and among the eventual strings parallel and the inlet of the inverter and the power control);
 
 
(b)
grounding surge protector (electrical continuity of the ground circuit, starting from the discharger up to the mass and external mass connected; insulation of the electrical circuit of the mass (adequate insulation resistance of the plant prescribed on the normative CEI 64-8/6);

 
 

 
 
·
All the tests have been carried out in compliance with what has been foreseen by the law in force and, in particular, by the legislation specified in the M.D. dated 19th February 2003 and subsequent amendments and integration thereto, as well as in compliance with the test procedures in force with the Technical Consultants appointed by the Principal and/or Financing Entity.
 
·
Everything that has been set forth above is true.
 
Further to your Commencement of Operation notice dated [●] relative to the [●] System, it is hereby certified, pursuant to and by effect of Art.12.2 of the Contract that the Payment Milestone 5 corresponding to [●] (in words Euro [●]) described in the aforementioned notice has been effectively completed in compliance with the Technical Specification and the Project Implementation Schedule.
 
Yours faithfully,
 
Date : [●]                                                                                    By [●]
 
 
 

 
 
ANNEX 15
 
INCENTIVE ACCEPTANCE CERTIFICATE MODEL
 
[ on the Principal’s headed paper ]

To the Contractor
 
Ecoware S.p.A.
Att. Ing. Leopoldo Franceschini
Via Nona Strada, 9
I-35129 Padova, Italy
 
Object:
EPC Contract entered into between [●] (the Principal) and Ecoware S.p.A. (the Contractor) on [●] for the planning and construction of [●] photovoltaic System in the Province of [●] (the Contract with reference EPC_EO_Projectname_nbr_YYYYMMDD)
 
Dear Ing. Franceschini,
 
except where otherwise required by the context or defined diversely, the words and expressions established in the Contract shall have the same meaning as when they are used in this certificate.

The undersigned hereby declares the following:

 
·
It has stepped into the Power Purchase Agreement

 
·
It has successfully entered into the Incentive Agreeement with GSE.
 
Yours faithfully,
 
Date : [●]                                                                                     By [●]
 
 
 

 
 
ANNEX 16
 
FINAL ACCEPTANCE CERTIFCATE MODEL
 
[ on the Principal’s headed paper ]

To the Contractor
 
Ecoware S.p.A.
Att. Ing. Leopoldo Franceschini
Via Nona Strada, 9
I-35129 Padova, Italy
 
Object:
EPC Contract entered into between [●] (the Principal) and Ecoware S.p.A. (the Contractor) on [●] for the planning and construction of [●] photovoltaic System in the Province of [●] (the Contract with reference EPC_EO_Projectname_nbr_YYYYMMDD)
 
Dear Ing. Franceschini,
 
except where otherwise required by the context or defined diversely, the words and expressions established in the Contract shall have the same meaning as when they are used in this certificate.

Through this document, it is hereby certified, pursuant to and by effect of the aforementioned Contract, the acceptance of the [] System, on the basis of checking that all the conditions foreseen in Art. 12.7 of the Contract, to have the Acceptance Certificate issued, have effectively taken place in relation to said System, inasmuch as:

(a)
The  System passed the relevant Technical and Operational Inspection procedures successfully, in compliance with the Principal’s favourable opinion and the latter issued  the Provisional Acceptance Certificate (further to the Technical Consultant’s positive opinion);
 
(b)
the System has been connected in parallel with the national electricity grid;
 
(c)
all the meters have been installed in order to calculate the energy produced and transferred or exchanged on the national electricity grid;
 
(d)
The Power Purchase Agreement and Incentive Agreement with GSE have been executed and the relevant Incentive Acceptance Certificate has been issued by the Principal;
 
(e)
all the obligations relative to the regulation of access to the national electricity grid result as having been accomplished;
 
(f)
The System has passed successfully the First and Second Reassessment Test or all related penalties and damage liquidations  have been fulfilled by the Contractor
 
Yours faithfully,
 
Date : [●]                                                                                   By [●]

 
 

 
 
ANNEX 17
 
 
OPERATIONS & MAINTENANCE AGREEMENT
 
[               ]
 
ECOWARE S.p.A
 
s Contractor
 
And
 
[…]
 
As Principal
 
 
 

 

 
OPERATION & MAINTENANCE AGREEMENT
 
With this contract
 
[SPV], with its registered offices located in [●], VAT Registration Number and Tax Code [●], entered in the Companies Register of [●] under No. [●] represented by Mr. [●] in his capacity of [●] (hereinafter known as “Principal”);
 
and
 
Ecoware S.p.A, with its registered offices located in Nona Strada, 9, 35129 Padua, VAT Registration Number and Tax Code Number 03571330277, entered in the Companies Register in Padua at number 03571330277, represented by Ing. Leopoldo Franceschini, born in Padua on 7th September 1947, in his capacity of legal representative (hereinafter known as the “Contractor”);
 
(hereinafter known individually as a “Party” and jointly as the "Parties")
 
Whereas:
 
(A)
the Contractor and the Principal have executed on [l] a turnkey construction contract (the EPC Contract) pursuant to which the Principal contracted out to the Contractor the design, supply, construction, installation and start-up of the System (as defined below).
 
(B)
in order to raise part of the financial resources for the construction and operation of the System (as defined below), the Principal will enter into a facility agreement with some financial institutions (the Financing Entity).
 
(C)
the Contractor and the Principal both desire to enter into an agreement pursuant to which the Contractor will provide the Principal with certain operation and maintenance services in relation to the System (as defined below) as better described in this Agreement.
 
NOW THEREFORE, THE CONTRACTOR AND THE PRINCIPAL AGREE as follows:
 
1.             Recitals, Annexes And Definitions
 
1.1          The recitals and annexes to this contract shall represent an integral and substantial part of the same.
 
1.2          This Contract replaces and fully supersedes any previous agreement entered into between the Parties, either written or oral, on the matters outlined herebelow.
 
1.3
        Defined Terms
 
Unless otherwise indicated below, the terms herein indicated in capital letters shall have the same meaning as that defined in the EPC Contract:
 
Agreement means this contract together with the Annexes hereto.  In the event of a conflict between one or more of the contractual documents, this contract shall prevail on the Annexes.
 
Applicable Law means each and every law, regulation, measure, ruling, decree (including the Decree Law) or deed having a binding nature in Italy and issued by every state body and judicial and/or administrative authority, which is in force as at the date on which this Contract is entered into or which comes into force thereafter.
 
 
 

 
 
Applicable Permits means each and every license, authorization, certification, filing, recording, permit, affidavit (including the denuncia di inizio attività) or other approval with and/or of any competent authorities that is required by Applicable Law for the construction of the System, including, without limitation, those required by Applicable Law in zoning, building, environmental, landscaping, planning and/or archaeological matters.
 
Corrective Maintenance Services means the entirety of all services, supplies and work listed under Annex 2 that the Contractor must provide under this Agreement to correct incidents arising at the System or to remedy any anomaly in the operation of the System.
 
Direct Agreement shall have the meaning indicated in Article 8.8.
 
Duration means the period of time from the Effective Date until the Expiry Date.
 
Effective Date means the date on which the Provisional Acceptance Certificate is issued.
 
Effective System Output (SOeff) means the energy measured yearly at the GSE LV meter
 
Expert means the arbitrator appointed in accordance with Article 17.1.
 
Expiry Date means the date which falls 20 years after the Effective Date, unless terminated pursuant to Articles 12 and 13, or extended pursuant to Article 7.2.
 
EPC Contract has the meaning set forth in whereas (A) above.
 
Final Acceptance Certificate has the meaning given to this term under the EPC Contract.
 
Financing Entity has the meaning ascribed in whereas (B) above.
 
Force Majeure Event has the meaning set forth in Article 13.
 
Grid Operator means ENEL Distribuzione S.p.A or any other locally competent entity which carries out the activities of operation of the electrical grid.
 
GSE means Gestore dei Servizi Elettrici S.p.A..
 
Guaranteed Performance is the warranty provided by the Contractor to the Principal under Article 11 of this Agreement.
 
Minimum Guaranteed Performance Ratio (MGPR) has the meaning given to this term under the EPC Contract, and shall be as outlined in Annex 3.
 
Minimum Guaranteed System Output (MGSO) means the minimum energy output guaranteed by the Contractor pursuant to the Annex 4.
 
Non-Subscription Services means any maintenance, repair or other services relating to the System, which are requested by the Principal and provided by the Contractor and which are outside the scope of the Subscription Services.
 
O&M Guarantee means a first demand insurance bond issued by a first-class insurance company which has been attributed, at least an A-rating or which, in any case, satisfies the Principal and the Financing Entity, to be provided by the Contractor to the Principal in accordance with the provisions of Article 8.7 in order to guarantee the performance of its contractual obligations under the Agreement until the Expire Date.
 
 
 

 
 
Preventive Maintenance Services means the entirety of all services, supplies and work detailed in Annex 1 that the Contractor must provide under this Agreement for the attendance to incidents that might arise at the System, remote supervision of operation and full operational status thereof.
 
Price means the price for Subscription Services as defined in Article 6.1.
 
Service(s) includes the Subscription Services and the Non-Subscription Services, as the case may be.
 
Subscription Services means the Preventive Maintenance Services jointly with the Corrective Maintenance Services.
 
Subcontractor means the subcontractors to which the Contractor may subcontract all or a portion of the Services to be performed under this Agreement, and the suppliers of any materials and/or services necessary for the performance of the Services.
 
System means the photovoltaic system in the Municipality of  [●] made up of [●] panels made of [●], with a generator that has a capacity equivalent to [●] kWp.
 
Technical Adviser means the consultant appointed by the Principal and/or the Financing Entity, who has been appointed to monitor the performance of the Services;
 
Variation means any alteration and/or variation to the Services, the Price or any other provisions of this Agreement, in accordance with Article 5.
 
Working Days means every day except for Friday, Saturday, Sunday and public or bank holidays.
 
2.
PURPOSE - SUBSCRIPTION SERVICES
 
2.1
The purpose of this Agreement is the provision by the Contractor of all the activities necessary to operate and maintain the System, which shall include the Preventive Maintenance Services and the Corrective Maintenance Services, as set forth respectively in Annex 1  and Annex 2.
 
2.2
For the purposes of the supply of the Subscription Services, notwithstanding the actions that may be taken by the Principal, the Contractor is authorised by the Principal to be the technical representative to the Grid Operator and the equipment manufacturers.
 
2.3
In order to facilitate the continuous operation of the System, particularly during the hours of maximum solar radiation, the Contractor shall, to the extent possible, schedule and perform the Subscription Services with the purpose of reducing the impact of the work on the productivity of the System.
 
3.
NON-SUBSCRIPTION SERVICES
 
3.1
The Non-Subscription Services shall include: (A) the repairing or maintenance of any equipment of the System which was not within the Works under the EPC Contract; (B) the repairing or maintenance of any equipment beyond the Cabina di Consegna; (C) the repairing or maintenance of any equipment of the System due to the occurrence of a Force Majeure event; (D) the repairs to the System in the event of, or resulting from, any alterations or repairs to the System made by the Principal without the Contractor's prior written approval.
 
In the event that the Principal desires that the Contractor provides a Non-Subscription Service, the Principal, after having received the prior written consent of the Financing Entity and the Technical Adviser, shall submit to the Contractor a written request for such service.  The Contractor, if capable and licensed to provide the requested Non-Subscription Service, and provided that any and all the Applicable Permits necessary to provide such service are available, shall provide its offer containing the price and terms of the requested supply. In the event that the Principal does not approve in writing the Contractor’s offer within 10 Working Days, the offer shall be deemed to have been rejected.
 
 
 

 
 
4.
WARRANTIES AND REPRESENTATIONS
 
4.1
The Contractor undertakes to provide the Services, with the organisation of the necessary means and at its own risk (organizzazione dei mezzi necessari e con gestione a proprio rischio), workmanlike (a regola d'arte), correctly and with diligence, using the most advanced technologies and pursuant to the terms of this O&M Contract.
 
4.2
In particular, by means of the execution of the Services, the Contractor shall guarantee the perfect functioning of the System in compliance with the Technical Specifications (which are deemed as sufficient and exhaustive for the execution of the Subscription Services) and the Applicable Law. In particular, the Contractor shall not be entitled to raise any objection in relation to its obligations under this Contract regarding the characteristics of the System built by the Contractor and accepted by the Principal pursuant to the EPC Contract.
 
4.3
The Contractor represents and warrants to have (i) obtained all the necessary authorisations, licences and permits for the execution of the Services and (ii) complied with all the necessary authorisations, licences and permits for the execution of the Services.
 
4.4
The Contractor represents and warrants that its degree of skill, diligence, prudence and experience enables it to operate and maintain the System in accordance with the best industry standards and engineering practices, and that the Services will be performed in compliance with this Contract, the Contractor's operation and maintenance procedures, the Applicable Law and permits. In addition, the Contractor represents to have examined, analyzed and accepted the conditions of the Area and that the same is suitable for purposes of this Contract.
 
4.5
The Contractor, furthermore, represents and warrants to be the sole responsible vis-a-vis the Principal for the supply of the Services in compliance with the highest quality and quantity expected standards, therefore assuming any responsibility vis-a-vis the Principal itself for the supply of the Services which may be sub-contracted in accordance with this Contract.
 
4.6
By signing the Contract, the Contractor accepts total responsibility for having foreseen all difficulties and costs of successfully executing the Subscription Services. Therefore, the Consideration shall not be adjusted to take account of any unforeseen difficulties or costs by way of express derogation from article 1664, paragraph 1 and 2 of the Italian Civil Code.
 
5              VARIATION
 
5.1          Changes in the Services
 
Under no circumstances may the Parties make any changes to the Services, unless in accordance with this Article 5.
 
5.2          Variation upon request by the Principal
 
(a)
At any time, the Principal, with the prior written consent of the Financing Entity and the Technical Adviser, may propose a Variation by sending the Contractor a notice describing the nature and scope of the change. Upon receipt of such notice, the Contractor must send to the Principal, within a maximum period of ten (10) Working Days, a written communication that includes a complete proposal for the changes in the Price, or any other changes that may be necessary in connection with the changes proposed by the Principal.
 
 
 

 
 
(b)
If the Principal has not responded to such Contractor’s communication of changes within a period of ten (10) Working Days, the changes communicated by the Contractor to the Principal shall be deemed to have been rejected.
 
5.3          Variation upon request by the Contractor
 
The Contractor may, at any time during the performance of this Agreement, propose changes to the Services that it deems necessary or appropriate to improve the quality, efficiency or safety of the System or the facilities or supplies that make up the System. If the Principal has not responded to such Contractor’s communication of changes within a period of ten (10) Working Days, the changes communicated by the Contractor to the Principal shall be deemed to have been rejected.
 
5.4          Variation due to a change in the Applicable Law
 
The Parties acknowledge that a change in the Applicable Law affecting the Services and occurred after the date on which this Agreement is signed may entail the application of the procedure under this Article 5.
 
The Principal and the Contractor shall negotiate in good faith the effects that might occur as a result of the changes to be implemented due to a change in the Applicable Law.
 
The Parties agree that any change in the Price due to a variation under Articles 5.2, and/or 5.3 ashall be previously verified and approved by the Financing Entity and the Technical Adviser. The prices applicable to any change in the Services shall:
 
(i)       take into account the Contractor's official rates; and
 
(ii)       in no circumstances exceed the cost of the additional work or supplies arising therefrom.
 
6              CONSIDERATION AND METHOD OF PAYMENT
 
6.1           Price for the Subscription Services
 
The price for the Subscription Services which exclude the All Risk insurance to be paid by the Principal to the Contractor for each year of Duration will be equal to:
 
 Euro / kWp 25,60, plus VAT for the Subscription Services
 
 Euro / kWp 10,00 , plus VAT for the Inverters Maintainance Servicies and 20 years warranty extension
 
in accordance with Applicable Law (the Price). The Price will be adjusted annually on the basis of 100% of the inflation rate on consumer prices for workers' families (prezzi al consumo per le famiglie di operai ed impiegati), calculated by the Italian National Statistical Institute (Istat – Istituto Nazionale di Statistica). The Parties agree and accept that the Price is fixed and that it may not be amended without the prior written consent of the Financing Entity. Therefore, the Contractor expressly agrees to derogate to any provisions which may entitle the same to obtain the adjustment of the Consideration with the consequence that Articles 1664 1 and 2 paragraphs and 1467 of the Civil Code shall not apply to this Contract.
 
 
 

 
 
6.2           Price for the Non-Subscription Services
 
The price for the Non-Subscription Services to be paid by the Principal to the Contractor will be agreed from time to time in accordance with Article 3.2.
 
6.3           Payment of the Price for the Subscription Services
 
Payment of the Price shall be made quarterly in advance, and shall be made by the Principal to the Contractor by means of bank transfer to the account indicated thereto by the Contractor within fifteen (15) Working Days following the date of receipt of the relevant Contractor’s invoice. The Contractor shall send the invoices corresponding to such Price quarterly amount within five (5) Working Days before starting of the relevant quarter.
 
6.4           Payment of the price for the Non-Subscription Services
 
The Contractor will invoice the Principal for the Non-Subscription Services in accordance with the terms set forth in the Contractor’s offer, pursuant to Article 3.2.
 
6.5           Payment Delays
 
 
In the event of delays in payment by the Principal of any amount due to the Contractor under this Agreement, the Contractor shall be entitled to receive default interest to be calculated on a monthly basis on the unpaid amount at the rate as provided for by Legislative Decree 231/2002.  The Contractor shall be entitled to collect such default interest from the time of any delay in payment by the Principal, without any notice being required and without prejudice to any other right, penalty or compensation available under the Agreement or the Applicable Law.
 
7              TERM OF THE AGREEMENT
 
7.1
This Agreement comes into effect on the Effective Date and shall expire on the Expiry Date, save as provided in Articles 12 and 13 below.
 
7.2
The Parties acknowledge and agree that if neither Party gives the other written notice of non-renewal of this Agreement at least 6 (six) months before the Expiry Date (or any 2 year extension thereof), this Agreement shall be automatically extended for further 2 years periods.
 
7.3
It is however agreed that in the event that the EPC Contract is terminated for whatever reason this Agreement shall also be deemed terminated.
 
8.            OBLIGATIONS OF THE CONTRACTOR
 
8.1          Obligation to comply with Applicable Law and Applicable Permits
 
The Contractor shall comply with all of the obligations imposed by Applicable Law and Applicable Permits with particular reference to occupational and social security matters, occupational safety and health, and the prevention of occupational risks, and technical and environmental matters, and also with any other legislation that may be applicable to the Services, and shall comply with the requirements that may be imposed by the competent authorities..
 
8.2          Obligation of responsibility for employees and Subcontractors
 
The Contractor hereby undertakes to assign the human resources that are necessary at all times for full and timely compliance with the obligations assumed by it pursuant to this Agreement.
 
 
 

 
 
The employees hired by the Contractor and, if applicable, by the Subcontractors, must have the proper qualification, training and experience for the performance of the Services that is the subject of this Agreement.
 
The Contractor shall pay (or shall procure that the Subcontractors pay) any wages, social and insurance security required by law; should the Contractor not comply with the above mentioned provisions, the Principal shall be entitled to retain from the Price an amount equal to the amount due by the Contractor in relation to such obligations.
 
The Contractor shall indemnify, and hold the Principal harmless in connection with any claims, demands, or legal action undertaken by any of its Subcontractors, or that may arise from any instance of non-compliance on the part of the Subcontractors.
 
8.3           Prevention of occupational risks
 
The Contractor shall perform the Services in such a way as to ensure the safety and health of the workers at the worksites.  In particular, the Contractor shall adopt, maintain and supervise adequate procedures and measures required to ensure the health and safety of all the persons present in each of the Site (including its employees and those of its Subcontractors) and to implement the provisions of, but not limited to, the Decree 81/2008.
 
8.4           Licensing of intellectual and industrial property rights
 
The Contractor hereby grants to the Principal, as part of the Price and at no additional cost, an irrevocable licence, not transferable to third parties (except in conjunction with all of the rights and obligations of the Principal under this Agreement or in conjunction with all rights and obligations of the Principal in relation with the System), and free of any royalties, for the use in the System (and, therefore, on no other projects) of the creations, plans, specifications, drawings, procedures, methods, products, and/or inventions prepared or developed by the Contractor pursuant to the Agreement.  Subject, in any event, to the restrictions imposed by the intellectual or industrial property rights of third parties notified by the Contractor to the Principal.
 
8.5
Assistance with competent authorities
 
The Contractor shall assist the Financing Entity and the Principal in dealing with any competent authority (including, inter alia, GSE and ENEL) by providing all the necessary information required by such competent authorities regarding the System and the Services.
 
8.6
Repair and replacement obligations
 
The Contractor shall at any time for the Duration of the Agreement, (i) replace, repair and/or adjust any defective equipment or component of the System, and (ii) guarantee availability of spare parts.
 
8.7
O&M Guarantee
 
In order to secure all the Contractor's obligations under this Agreement, including, without limitation, the payment of default interests, penalties and warranties, the Contractor shall deliver to the Principal as a condition precedent to the issuance of the Final Acceptance Certificate in accordance with Article 12.7 of the EPC Contract, a first demand Insurance Bond for an amount equal to 15% of the Price applicable to the relevant year of duration of this Agreement, as adjusted pursuant to Article 6.1 above. Each Insurance Bond shall last one year from its effective date. The Contractor undertakes to deliver 30 Working Days before the expiry of any Insurance Bond a new Insurance Bond, at a the same terms a conditions which shall be effective starting from the expiry date of the preceding Insurance Bond.
 
 
 

 
 
8.8           Direct Agreement
 
It is understood that the planning, realization, as well as the operation and maintenance of the System may be financed by the Financing Entity in compliance Recital B above, and that this shall require this Agreement’s, as well as the EPC Contract’s co-ordination with the terms set forth in the financing agreement, by means of entering into a direct agreement with the Financing Entity (the “Direct Agreement”). Therefore, the Contractor undertakes to enter into the Direct Agreement, if necessary, within 15 days of the Financing Entity’s or Principal’s request.
 
9.             OBLIGATIONS OF THE PRINCIPAL
 
9.1
The obligations of the Principal shall be those that are established in this Agreement, those resulting from good faith and from the Applicable Law and regulations including, in particular, the following:
 
 
(i)   
to grant access to the System to the Contractor's personnel;
 
 
(ii)
to designate an individual, who shall be authorized to represent the Principal in the administration of this Agreement;
 
 
(iii)
to use the System within the scope contemplated in the technical provisions set out in the Annex 6 to the EPC Contract.
 
 
(iv)
not to make any alterations or repairs to any part of the System without the Contractor's prior written approval;
 
 
(v)
to timely comply with the payment obligations pursuant to Article 5.
            
10
INSURANCE [THIS CLAUSE IT IS SUBJECT TO DISCUSSION BETWEEN THE PARTIES’ INSURANCE ADVISORS]
 
10.1
The Contractor, shall enter into the following insurance policies with first-class insurance companies, with an S&P rating of no less than A- or equivalent or, in any case, that satisfies the Financing Entity, and maintain them operative for the entire Duration. The following insurance policies must be submitted to the Principal and the Financing Entity for their approval:
 
 
(a)
All Risks Property insurance on an "all risks" basis covering direct physical loss or damage to the System and associated property.
 
 
(b)
Industrial accidents insurance in favour of the Contractor’s employees and/or any workers who are not the Contractor’s employees;
 
 
(c)
Civil liability insurance for workers, with a limit of no less than Euro 5,000,000.00 per event and 2,000,000.00 per person;
 
 
(d)
Insurance to cover third party civil liability, with a limit per event of no less than Euro 5,000,000.00; the Principal and the Financing Entity, albeit maintaining the qualification of “third party”, must be inserted as “additional party insured” and there must be an explicit clause waiving the party’s insured recoupment against the Principal, the Financing Entity and their employees and consultants;
 
 
(e)
Insurance to cover professional civil liability, with an upper limit per event of no less than Euro 2,500,000.00;
 
 
(f)
Insurance to cover vehicle civil liability, for all owned vehicles and/or in use, which must be provided with the mandatory insurance policy as foreseen by the Law No. 990/69 and subsequent amendments and integration, for an upper limit of no less than Euro 5,000,000.00 per accident;
 
 
 

 
 
10.2
Said insurance policies must include Financing Entity, the Principal and any other subcontractor among the insured parties, and the Contractor shall send a copy to the Principal and the Financing Entities within 10 (ten) days of execution of the insurance policies.
 
10.3
The Principal shall be entitled, at its own discretion, to enter into other cover or policies in integration of and/or besides those foreseen by this Article 10 and shall inform the Contractor thereof.
 
10.4
The cost of the insurances policies foreseen by this Article 10 are not included in the Price.
 
11
GUARANTEED PERFORMANCE, PENALTIES, BONUS AND MANUFACTURER WARRANTY
 
11.1            Guaranteed Performance
 
 
From the PAC, the Contractor guarantees to the Principal that in each period of twelve (12) months and throughout the Duration, the System will achieve a guaranteed level of performance pursuant to Annex 4.
 
11.2           Penalties & Bonus
 
In each period of twelve (12) months and throughout the Duration the SOeff will be measured and compared with MGSO pursuant to Annex 5.
 
Penalties will be paid by the Contractor to the Principal pursuant to Annex 5, starting from issuance of FAC.
 
Bonus will be paid by the Principal to the Contractor pursuant to Annex 5, starting from issuance of FAC.
 
Each Party  will correspond to the other payment due in accordance with the above within two (2) months from the date in which the loss of production or the surplus income was verified, save for further damages that the Principal may have suffered and provided that the Contractor shall promptly remedy the underperformance of the System.
 
11.3           Manufacturer Warranty
 
Without prejudice to the defect warranty under the EPC Contract and for the obligation provided under Article 8.6 above, the Contractor warrants that the materials of the System will be warranted for the entire duration of this Agreement in accordance with the material’s manufacturer warranty.
 
12               TERMINATION, WITHDRAWAL AND/OR SUSPENSION OF THE AGREEMENT
 
12.1
Termination by the Principal
 
 
(a)
Termination of the Agreement pursuant to Article 1454 of the Italian Civil Code
      
If the Contractor fails to perform any of its obligations under this Agreement, which failure remains uncured for thirty (30) days following Contractor's receipt of written notice of such failure sent by the Principal pursuant to Article 1454 of the Italian Civil Code, the Principal will be entitled to terminate this Agreement pursuant to Article 1454 of the Italian Civil Code, provided that it is so authorised by the Financing Entity.
 
 
 

 
 
 
(b)
Termination of the Agreement pursuant to Article 1456 (clausola risolutiva espressa) of the Italian Civil Code.
 
Each of the following shall be an event which will determine the termination of this Agreement by the Principal pursuant to Article 1456 of the Italian Civil Code (clausola risolutiva espressa) provided that the Principal is so authorised by the Financing Entity:
 
 
(i)
the Contractor fails to enter into the Direct Agreement in accordance with Article 8.8;
 
 
(ii)
Non delivery or non replacement of the O&M Guarantee or ineffectiveness or invalidity of the O&M Guarantee;
 
 
(iii)
Non issuance of the FAC within the terms foreseen in the EPC Contract;
 
 
(iv)
In case any of the declarations and warranties foreseen in Article 4 is imprecise, untrue or misleading;
 
 
(v)
the guarantee to have spare parts available is, at any time, not complied with;
 
 
(vi)   
The maximum amount of liquidated damages is exceeded;
       
 
(vii)
in the case of subcontracting without the prior written consent of the Financing Entity;
 
 
(viii)
the System does not reach the guaranteed level of performance as indicated sub Annex 4;
 
 
(ix)
revocation of the Contractor's permits necessary to maintain and operate the Solar Park to the extent that such revocation is attributable or connected with any fault, omission or negligence of the Contractor;
 
 
(x)  
any of the insurances on Contractor's responsibility ceases to be effective.
      
(c)
Parties acknowledge and accept that the person of the Contractor has been considered necessary for the Agreement and therefore the Agreement will be terminated pursuant to Article 81 of the Italian Bankruptcy Law (R.D. 267/1942 as amended and/or integrated from time to time), if the Contractor becomes bankrupt or insolvent, goes in liquidation, has a receiving or administration order made against it, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these act or events, unless the Principal consents the Agreement continues to be effective
 
(d)
In case of termination of this Agreement pursuant to Articles 12.1 (a) and (b), the Principal shall be entitled to a liquidated damages (penale per risoluzione) equal to 50% of the Price of the relevant year, as adjusted pursuant to Article 5.1, save for further damages.
 
(e)
The Contractor must pay the above liquidated damages within thirty (30) calendar days from the termination.
 
12.3
Right of the Principal to withdraw
 
The Principal will have the right to withdraw from this Agreement on the date which falls ten years after the Effective Date, provided that it sends a six (6) months prior written notice to the Contractor.
 
The Principal will have the right to withdraw from this Agreement ad nutum provided that it gives twelve (12) months prior notice to the Contractor.  The Principal may pay to the Contractor, in lieu of the notice, 100% of the Price of the relevant year of Duration, as adjusted pursuant to Article 5.1. The indemnity in lieu of the notice shall be paid by the Principal to the Contractor within thirty (30) calendar days from the withdrawal.
 
 
 

 
 
In case of (i) a change in the Applicable Law that materially affects the performance of this Agreement by the Parties, (ii) EPC Contract termination or Principal´s withdrawal therefrom, and (iii) occurrence of the circumstances indicated in Article 1461 of the Italian Civil Code; and (iv) suspension of Services due to orders of jurisdictional authorities, the Principal shall be entitled to withdraw from the Contract by giving a prior written notice of 60 days from the occurrence of any of the events sub (i), (ii), (iii) or (iv). Therefore, the above provisions of this Article 12.3 shall not apply and the Contractor shall have the right to receive only the amounts for the Services duly documented and carried out in line with professional standards, until the time when the withdrawal becomes effective to the extent that the Serv ices are useful to the Principal
 
12.4         Termination by the Contractor
 
If the Principal fails to perform any of its obligations under this Contract, which failure remains uncured for 30 days following Principal’s receipt of written notice of such failure sent by the Contractor pursuant to Article 1454 of the Italian Civil Code, the Contractor will be entitled to terminate this Contract pursuant to Article 1454 of the Italian Civil Code. The Contractor acknowledges and accepts that termination of the Contract due to facts attributable to the Principal cannot, in any case whatsoever, be declared or requested unless notice demanding performance is sent to the Principal pursuant to this Article and in any case in compliance with the provisions set forth in the Direct Agreement.
 
It has been agreed between the Parties, pursuant to Article 1462 of the Italian Civil Code, that in the case of the Principal’s breach and pending a cure period, the Contractor shall not be entitled to refuse nor delay/suspend the performance of his contractual obligations and that any refusal by the Contractor shall be considered as being contrary to good faith, even in the light of the provision contained in the second paragraph of Article 1460 of the Italian Civil Code.
 
Following termination of the Contract for any of the reasons described above, as soon as the Contractor has paid off any amount due, the Principal shall return to the Contractor the O&M Guarantee delivered pursuant to Article 8.7.
 
Following termination of the Agreement for any of the reasons described above, the Principal shall pay to the Contractor 100% of the Price of the relevant year of Duration, as adjusted pursuant to Article 6.1.
 
The amounts resulting from the foregoing provisions shall be paid by the Principal to the Contractor within thirty (30) calendar days from the termination.
 
12.5
Termination Consequences
 
In the case of termination of the Contract, the Contractor undertakes:
 
1) to deliver to the Principal a copy of all the technical and operative documentation regarding the Services and contracts in force with suppliers, sub-suppliers and subcontractors;
 
2) within 30 days from the termination, deliver the Site/System to the Principal. Should the Contractor not comply with this obligation within the above mentioned term, then the Contractor shall pay to the Principal delay liquidated damages equal to [·] € for each day of delay;
 
 
 

 
 
3) within 30 days from the delivery of the Site, to clear, dismantle and remove from the Site of all materials, apparatus, excess of tools and machinery that it owns, with the exception of materials, apparatus and machinery owned by the Contractor that the Principal intends to purchase from the Contractor.
 
12.6           Right of the Contractor to withdraw
 
The Contractor will have the right to withdraw from this Agreement on the date which falls ten years after the Effective Date, provided that it sends a twelve (12) months prior written notice to the Principal.
 
13
Force Majeure
 
13.1
Force Majeure is any unforeseeable event, fact or circumstances which cannot be directly attributed to the Party invoking it, which is impossible to prevent by employing ordinary diligence and such as to make impossible, objectively and absolutely and either totally or partially, the performance of any of the obligations under this Contract, provided that said events, acts, facts or circumstances:
 
 
(a)
 are outside the control, either direct or indirect, of the Party invoking them;
          
 
(b)
have been invoked as Force Majeure events (hereinafter known as “Force Majeure”).
 
13.2
By way of an example, without limitation and on condition that they satisfy the requirements listed in Article 12.1 above, the Parties mutually acknowledge that the following events constitute events of Force Majeure:
 
 
(a)
general and category and national and local strikes (other than the Contractor’s corporate strikes);
 
 
(b)
wars or any other hostile acts, including terrorist attacks, sabotage, vandalism, theft, revolts, uprisings and other civil disorder;
 
 
(c)
blockages or embargoes, even of a financial nature;
 
 
(d)
exceptional, adverse natural phenomena, including lightning, whirlwinds, earthquakes, fires, floods, overflows, floods, drought, adverse weather conditions that impede the performance of the Services and which cannot be foreseen on the basis of weather forecast data for the current period, meteorites and volcanic eruptions;
 
 
(e)
explosions, radiation and chemical contamination.
 
13.3
The Contractor acknowledges and accepts that the following events do not constitute Force Majeure:
 
 
(a)
non-obtainment or non-renewal of any permit required to perform the Works and realization of the Systems, for facts attributable to the Contractor; and
 
 
(b)
any delays in the delivery of supplies and materials by the suppliers.
 
13.4
Each Party shall immediately inform the other one, in writing, about the occurrence of a Force Majeure event that shall hinder his obligations and, in any case, within 48 (forty-eight) hours from becoming aware of the same. The Party concerned shall also promptly inform the other Party when said Force Majeure cause ceases.
 
13.5
The Contractor acknowledges and accepts that it shall not be entitled to request any increase in the Price or different compensation in relation to the Force Majeure event, except for the costs sustained to adopt the measures referred to in Article 11.6.
 
13.6
The performance of the obligations delayed or made effectively impossible as a consequence of a Force Majeure event will be suspended during the period of duration of such event, without giving any indemnity right against the affected Party. In any case, the Parties shall use their best endeavours to reduce the consequence of the Force Majeure event and shall do what they can to re-establish normal conditions and mitigate any damages eventually sustained by the other Party.
 
 
 

 
 
13.7
In the event that the occurrence of a Force Majeure Event lasts for more than 60 (sixty) consecutive days, either of the Parties may withdraw from the Agreement, in which case the following shall apply:
 
(a)           the Contractor must:
 
 
(i)
end the performance of the Services in course and carry out any activity that is necessary for the protection and/or security of the System;
 
 
(ii)
send to the Principal all of the existing documents relating to the Services already performed at the time of withdrawal;
 
After withdrawal, as soon as the Contractor has paid any amount due to the Principal, the Principal shall return the O&M Guarantee and Parent Company Guarantee and shall only and exclusively pay to the Contractor the amounts for Services duly documented and carried out in line with professional standards  until the time when the withdrawal become effective to the extent that the Services are useful to the Principal.
 
14
Governing law and jurisdiction
 
14.1
Governing law
 
This Agreement shall be governed and construed in accordance with Italian law.
 
14.2
Good faith negotiations
 
In the event that any question, dispute, difference or claim arises out or is in connection with this Agreement, including any question regarding its existence, validity, performance or termination (a Dispute), which either Party has notified to the other, senior management personnel from both the Contractor and the Principal shall meet and diligently attempt in good faith to resolve the Dispute for a period of 15 calendar days following one Party's written request to the other Party for such a meeting.  If, however, either Party refuses or fails to so meet, or the Dispute is not resolved by negotiation, the sections below (Arbitration and Arbitrator Confidentiality Obligation) shall apply.
 
14.3
Arbitration
 
Any Dispute which cannot be settled by negotiation pursuant to the Article 15.2, shall be exclusively referred to and finally resolved by arbitration held under the rules of the Chamber of National and International Arbitration of Milan. The seat of the arbitration shall be Milan and the arbitration proceedings shall be in English.
 
The arbitration shall be conducted by a sole arbitrator, to be appointed by the Parties within 30 days from receipt of the above said Dispute's notice sent by one Party to the other, provided that the value of the Dispute does not exceed Euro 100.000,00 (one hundred thousand).  Should the value of the Dispute exceed such amount, or being undetermined, the Dispute shall be resolved by a panel of three arbitrators, appointed as follows.  The first arbitrator shall be appointed by the Party initiating the arbitration simultaneously with the notice of arbitration, the second arbitrator shall be appointed by the other Party within 15 days from the date of receipt of the notice of arbitration.  The third arbitrator, who shall act as Chairman of the arbitration panel, shall be jointly appointed by the Parties within 15 days after the appointment of the second arbitrator.  The arbitrators shall have a good command of the Italian and English language.  In the event of disagreement on the appointment of the sole arbitrator or the chairman of the arbitration panel, they shall be appointed by the Presidente of the Tribunale of  Milan upon request of the most diligent Party.  Each Party shall have the right to apply to such Presidente in the event that the other Party has not appointed its own arbitrator, or has not replaced him within 15 days.  The sole arbitrator or the arbitration panel appointed in accordance with the above rules shall decide in accordance with Italian law and the rules of the Italian Code of Civil Procedure, and shall issue the award within the term established by the law, unless extended by the Parties.  The sole arbitrator or the arbitration panel shall also decide on the expenses for the arbitration proceedings and legal expenses of the Parties. In the event that more than one arbitration proceeding were started in accordance with this Article, all such proceedings shall be joined to the first arbitral proceeding and, if necessary, the sole arbitrator shall be joined by two arbitrators appointed by the Parties.  In such event, the sole arbitrator or the arbitration panel shall have the right to issue partial awards in relation to certain issues in dispute between the Parties, if the arbitrators deem them ready for a separate decision.
 
 
 

 
 
14.4
Arbitrator Confidentiality Obligation
 
The Parties shall ensure that any arbitrator appointed to act under this Article 13 will agree to be bound to certain confidentiality obligations with respect to the terms of this Agreement and any information obtained during the course of the arbitration proceedings.
 
15
duvri
 
The Parties agree that as at the date of signing of this Contract, there are no interferences that may lead to the necessity of drafting the DUVRI, since the System has not been accepted by the Principal yet.
 
On the Effective Date the Principal shall draft, pursuant to article 26, paragraph 3, of Legislative Decree no. 81/2008 and on the basis of the information supplied to him by the Contractor, the DUVRI in which it will indicate the costs relating to the work’s safety pursuant to article 26, paragraph 5 of the Legislative Decree no. 81/2008.
 
In the event that any significant changes to the work processes should occur that may require the execution of the Services and/or the introduction of new risks is established, the Principal, on the basis of the information provided to him by the Contractor, undertakes to update the DUVRI prepared pursuant to paragraph above by carrying out, as quickly as possible, (taking into consideration the specific technical/operational reason which made the necessity to carry out the update arise), the necessary amendments.
 
The DUVRI updated by the Principal will fully replace the previous one, provided that (a) it has been approved in writing by the Parties and (b) the data certa as been placed on it in accordance with the modalities set out by the Applicable Law. The Contractor undertakes to collaborate, duly and actively, with the Principal in the drafting and updating of the DUVRI procedure and to provide him with all the information required from him from time to time.
 
16
Miscellaneous
 
16.1
Technical Dispute – The Expert
 
In case of any dispute between the Parties in relation to the Services, the Variations due to a change in the Applicable Law, Force Majeure, Guaranteed Performance, each Party shall have the right to request the appointment of a technical expert (the Expert) for the solution of the dispute. The proposal for the appointment of the Expert shall state in detail the technical question and include a list of at least three persons proposed for the appointment as Expert.  The Parties agree to meet and discuss on the appointment of the Expert during the following ten (10) Working Days after receipt of the request.  In case the Expert is not appointed by the Parties within fifteen (15) Working Days after the request, the Expert shall be appointed by the Chairman of the bar of the Engineers of Rome (Ordine degli Ingegneri di Roma) upon request of either Party.  The Expert shall finally determine the technical matter in accordance with the provisions of this Agreement, acting as arbitratore pursuant to Article 1349 of the Italian Civil Code.  The Expert shall deliver its determination to the Parties in writing, including an explanation of the underling reasons, within thirty (30) calendar days after the acceptance of the mandate.  The Expert's determination shall (in the absence of manifest error or unfairness) be final and binding upon the Parties.  The costs of the determination, including fees and expenses of the Expert, shall be borne as determined by the Expert.
 
 
 

 
 
16.2
Confidentiality
 
The Parties undertake not to reveal to third parties the contents of this Agreement and the Annexes hereto, the technical documentation, plans, information, procedures, patents and licences, or any other information that might be obtained or known arising from their contractual relationship or provided for the development of the System, unless such disclosure is necessary for the performance of this Agreement.
 
The foregoing shall not be deemed to apply with respect to public administrations, companies or investors related to the System that reasonably require information regarding this Agreement, provided that they have made confidentiality undertakings to the Party transmitting the information upon terms similar to those set forth herein.
 
16.3
Notices
 
Any notice, request, demand or other communication required or permitted under this Agreement shall be deemed to be properly given by the sender and received by the addressee if made in writing, in English, and if sent by certified mail, facsimile or telefax to the following address:
 
 
 (a)
To the Principal:
     
 SPV [l]
 
 Fax No. [l]
 
 To the attention of [l]
 
 
 (b)
To the Contractor:
 
 Ecoware Spa
 
 Via Nona Strada, 9
 
 35129 Padova
 
 Fax No. 049 7387638
 
 To the attention of [l]
 
The Parties may at any time change the address for notices by written notice setting forth the new address for notices.  The new address for notices shall only have contractual effect as from the date of receipt by the other Party of the written communication indicating the new address for notices.
 
16.4
Entire Agreement
 
This Agreement, inclusive of the Annexes hereto (each of which is incorporated herein by this reference) constitutes the entire agreement between the Parties in relation to the operation and maintenance of the System and supersedes all previous understanding, communications, representations, understandings (oral or written).
 
16.5
Partial Invalidity
 
Without prejudice to Article 1419 (nullità parziale) of the Italian Civil Code, if - at any time - any provision of this Agreement is or becomes illegal, invalid or unenforceable, neither the legality, validity nor enforceability of the remaining provisions of this Agreement will in any way be affected or impaired thereby.
 
 
 

 
 
16.6
Amendments
 
This Agreement may not be amended, supplemented or otherwise modified except by a written instrument specifically referring to this Agreement and signed by both Parties (and with the prior written consent of the Financing Entity).
 
16.7
No Waiver
 
Failure or delay by a Party to exercise any right or remedy under this Agreement shall not constitute a waiver thereof.  A waiver of default shall not operate as a waiver of any other default, a waiver of the provision itself, or of the same type of default on a future occasion.  No waiver shall be effective unless explicitly set forth in writing and executed by the Party making the waiver.  A waiver of a breach of any provision of this Agreement shall not operate or be construed as a waiver of any subsequent breach.
 
16.8
Successors and Assigns
 
This Agreement shall inure to the benefit of and shall be binding upon the Parties and their respective successors and permitted assigns.  Nothing in this Agreement, expressed or implied, is intended to confer any rights, remedies, obligations or liabilities under or by reason of this Agreement upon any person or entity other than the Parties.
 
16.9
Assignment of the Agreement and of receivables
 
Without prejudice to the provisions of this Agreement with respect to Subcontractors, the Contractor may not assign to third parties, in whole or in part, its rights or obligations under this Agreement, without the prior express written authorisation of the Principal.
 
The Contractor hereby consents in accordance with and for the purposes of Article 1407 of the Italian Civil Code that the Principal may assign the Agreement in favour of the Financing Entity or to any person appointed by the latter.
 
Should this Agreement be assigned to the Financing Entity or to any person appointed by the latter by means of a line of business assignment (cessione di ramo d'azienda), the Contractor waives to any right of withdrawal pursuant to Article 2558 of the Italian Civil Code.
 
The Principal shall be entitled to (and the Contractor hereby expressly agrees and accepts that the Principal does so) assign/pledge in favour of the Financing Entity, as a security for the Loan Agreement, inter alia, any receivable arising from this Contract. Therefore, the Contractor undertakes to cooperate for the performance of all the formalities and to provide any further consent, necessary or expedient to complete the assignment and/or pledge.
 
 
 

 
 
16.10
Language and documentation
 
All documentation, data, drawings, schedules, diagrams, specifications and details associated with the Services shall be provided by the Contractor to the Principal, and shall be properly referenced and compiled, in the English language except any documents that need to be filed with any Italian authority.
 
16.11
Privacy
 
The Contractor and the Principal represent to each other that they have complied and will timely comply with the obligations set forth by Applicable Law on personal data protection.
 
16.12
No double signature
 
The Contractor and the Principal acknowledge and agree that this Agreement has been freely negotiated between them and therefore the procedure of the "double signature" required by the provisions of Articles 1341 and 1342 of the Italian Civil Code shall not apply.
 
16.13
Sub-Contracting
 
The Contractor, with the prior written consent of the Principal and the Financing Entity, shall be allowed to sub-contract the Services, in which event the Contractor shall be personally and directly liable vis-à-vis the Principal for the acts and omissions, defaults and neglects of the Subcontractors and, in particular, for the services performed by the Subcontractors.  The act of subcontracting shall not release the Contractor from any obligation or liability vis-à-vis the Principal arising from this Agreement.
 
The Contractor shall also undertake to check that the Subcontractors have suitable insurance coverage in place
 
In case of subcontracting, the relevant subcontracts shall not conflict with all of the rights and powers enjoined by the Principal and the Financing Entity pursuant to this Contract and specifically the right of the Contractor to assign its rights under such contracts or the contracts themselves to the Principal.
 
The act of subcontracting shall not release the Contractor from any obligation or liability vis-à-vis the Principal and the Financing Entity arising from this Contract, in particular the Contractor shall keep the Principal and Financing Entity fully indemnified for any direct claim or action raised or made by any of the subcontractors, also pursuant to article 1676 Italian Civil Code.
 
16.14
Expenses and taxes
 
Each Party must bear the taxes arising from the execution of this Agreement in accordance with the provisions of the Applicable Law and exclusively assume the expenses incurred by it with respect to the negotiation, execution and performance of this Agreement, including those of its advisors.  The Parties represent to each other that the performance of the Services is subject to Value Added Tax (VAT).
 
16.15
Setoff of credits
 
The Contractor shall not be entitled to off-set its credits anyway arising towards the Principal, even if due and payable, with its debts arising from the Contract or otherwise towards the Principal itself.
 
The Principal is viceversa expressly entitled to off-set its credits anyway arising towards the Contractor with its debts arising from the Contract or otherwise towards the Contractor.
 
 
 

 
 
16.16
Reserved Discretions
 
The Parties acknowledge that the Agreement contains provisions in favour of the Financing Entity which will accept them in a separate deed in order to make them irrevocable.
 
 [PLACE], l 2010


                                                                                                                 
THE CONTRACTOR                                                                                                  
 
 
 

    
THE PRINCIPAL
 
 
 

 
 
Annexes
 
 Annex 1: Preventive Maintenance Services
 Annex 2: Corrective Maintenance Services
 Annex 3: Minimum Guaranteed Performance Ratio (MGPR)
 Annex 4: Minimum Guaranteed System Output (MGSO)
 Annex 5:      Bonus-Malus
 
 
 

 
 
Annex 1:    Preventive Maintenance Services
 
Services of the Contractor
 
As a general principle, the Preventive Maintenance Services are finalized to prevent any incident that might arise to the System, in order to maximise the availability, performance and System output, and to prolong its useful life.
 
1)
The Preventive Maintenance Services will include:
 
A.
Remote monitoring and diagnostic services that will include:
 
 
·
Data acquisition and storage of the performance data. The Contractor will install a data connection, through DSL, cellular communication or satellite connection, for the Principal to the inverter monitoring system for the purpose of relevant data gathering in the monitoring systems of the Principal.
 
 
·
The Contractor will also foresee in all measures to allow the Principal to connect through the same communication means to connect to the ENEL LV meter for the purpose of relevant data gathering in the monitoring systems of the Principal of such ENEL LV meter.
 
 
·
Data acquisition and storage of incident data to be used for the Corrective Maintenance Services
 
 
·
Video surveillance over the System and central room surveillance monitoring. Through the same communication means the Contractor will allow the Principal access to this video surveillance system and will allow the Principal all necessary client access to the video surveillance software.
 
 
·
Monthly report including the following items:
 
 
§
Actual System output vs expected System output
 
 
§
Alarms and incidents occurred over the period
 
 
§
Record of grid faults.
 
 
§
Solar radiation
 
B.
Management of routinely operations that the Contractor shall work out according the Reference schedule included in Annex 1:
 
2)
The Preventive Maintenance Services will include the following activities:
 
 
(a)
Visual inspection
 
 
i.
PV Generator (modules, frame, dirtiness, delamination, etc.).
 
 
ii.
Electrical installation (cables and visible cable layout, battery in series, generator junction boxes.
 
 
iii.
Control building with inverters.
 
 
iv.
Electrical cabinet and air-conditioning system (if any)
 
 
 

 
 
 
v.
Check of any glass breakage
 
 
vi.
Check of the tightness and condition of the terminals with cables connected to the panels
 
 
vii.
In the event that faults are detected in the watertight integrity of all parts of the System, the affected parts will be replaced and the terminals cleaned.  It is important to take care of the sealant of the terminal boxes using, depending on the case, new joints or a silicon sealant.
 
 
viii.
Check of transformer and LV / MV switchboards
 
 
(b)
Check of the condition of the structural supports and their foundations.
 
 
(c)
Check of the condition of electronic equipment: working of the inverters and controls, signaling lights, alarms, grounding system etc.
 
 
(d)
Maintenance of monitoring system
 
 
(e)
Maintenance of possible emergency batteries
 
 
(f)
Periodical calibration of pyranometers (according to pyranometers maintenance manual)
 
 
(g)
Cleaning of all photovoltaic panels in at least 3 occasions per year and additionally when there is an event that affects the output of the System
 
 
(h)
Cleaning and maintenance of the weather station
 
 
(i)
Pruning of branches of trees that shadow photovoltaic panels, inspection and maintenance of vegetation in general
 
 
(j)
Ordinary maintenance of fences, internal roads and buildings
 
 
(k)
Tidiness and environmental condition of the Area of the System
 
 
(l)
Analysis of hot points
 
Samples will be taken using thermographic cameras, within the first five years, in each installation, to thereby check correct functioning and possible hot points.
 
 
(m)
Maintenance of the structure
 
Maintenance of the structure that supports the photovoltaic modules shall basically be performed by means of visual inspection, check of correct inclination and orientation of trackers, searching for impacts, corrosion, condition of the protective paint, absence of water deposits etc.
 
 
(n)
replacement of worn components, providing the guarantee of replacement parts.
 
 
 

 
 
Reference actions and frequency of Preventive Maintenance Services
 
 
System Component / Activity
 
Frequency
 
Action
PV panels
 6M
Visual check, Corrective Maintenance Services if necessary
 12 M
Cleaning
 When  necessary
Hot Spot detection in case of leak of performances
Supporting structure
12M
Visual check. Corrective Maintenance Services if necessary
Mechanical parts (structures)
12M
Visual check. Corrective Maintenance Services if necessary
Inverters/transformers
(in the case that the 20 years
extension warranty is agreed)
 Frequency defined in components specifications
Preventive Maintenance Services (check of fans, etc..)
6M
Visual check. Corrective Maintenance Services if necessary
 Replacement of aged components when defects or unable to assure MGPR  and/or MGSO
every day by monitoring system
Checking the operating status
Proper operation and functioning
of the inverter conversion system
12M
Check of correct operation and functioning. Corrective Maintenance Services  if necessary
Electricity meter
12M
Checking integrity
Complete electrical cabling with electrical boxes (controller cabinets, protection devices, parallel string boxes, etc), grounding system
Frequency defined in components specifications (least once a year)
Preventive Maintenance Services
UPS systems
Frequency defined in components specifications
Preventive Maintenance Services
6M
Visual check. Corrective Maintenance Services if necessary
Video Camera surveillance system
 6M
Visual check. Corrective Maintenance Services if necessary
Monitoring system
12M
Visual check Corrective Maintenance Services if necessary
Meteo station including pyranometers
6M
Visual check. Corrective Maintenance Services if necessary
 Frequency defined in components specifications
Periodic Calibrations
Buildings, internal roads, fences, etc
12M
Visual check. Corrective Maintenance Services if necessary
Pruning of branches of trees that shadow photovoltaic modules, take care of vegetation in general
When necessary
Site drainage, Area tidiness andenvironmental condition
12M
Check of drainage channels and general site condition for any environmental factors. Corrective Maintenance Services if necessary.
 
The Contractor shall be solely responsible, at its own cost, for the procurement/sourcing of all equipment, utilities, services and resources required at the site in order to perform all Preventive Maintenance Services tasks, including, for the avoidance of doubt, water and other utility supply
 
 
 

 
 
Annex 2:    Corrective Maintenance Services
 
Services of the Contractor
 
For the duration of the contract the Operator will perform extraordinary maintenance of the PV plant. The Extraordinary maintenance includes any  activity required to repair faults and malfunctions of the plant, including the actions developed to repair and/or replacement of defective components and/or damaged.
 
The Corrective Maintenance Services will not include:
 
 
·
the repairing or maintenance of any equipment of the System which was not within the Works under the EPC Contract;
 
 
·
the repairing or maintenance of any equipment beyond the Cabina di Consegna;
 
 
·
the repairing or maintenance of any equipment of the System due to the occurrence of a Force Majeure event;
 
 
·
the repairing or maintenance of any equipment in the event of, or resulting from, any alterations or repairs to the System made by the Principal without the Contractor's prior written approval.
 
In the above case the repairing or maintenance of any equipment will be managed as Non-Subscription Services.
 
Under the Corrective Maintenance Services,  the O&M Contractor will proceed with the replacement of the broken down sub-component with another new or reconditioned sub-component of the same quality (Photovoltaic broken modules will be replaced with new parts only).
 
Corrective Maintenance Services will be carried out:
 
 
(i)
In the event of failure of equipment.
 
 
(ii)
During scheduled shutdown for major of overhauls or replacement of specific spare parts or devices, such as inverters/transformers.
 
 
(iii)
Following a specific request by the Principal, with reference to a specific fault.
 
 
(iv)
Following an action as result of the Preventive Maintenance Services.
 
Corrective Maintenance Services will consist of:
 
 
(i)
Analysis of the problem and notification of the necessary action and replacement.
 
 
(ii)
The removal or elimination of the defective equipment or parts, as well as their reconditioning and start up
 
 
(iii)
Transport of the corresponding replacement parts to their installation and assembly facilities and transport from those facilities to the System Area.
 
Within the framework of the repair of breakdowns, the Contractor is also authorised to fit equivalent replacement parts from other manufacturers. The replacement parts must be at least equivalent to the replaced parts from a technical point of view, and the efficiency and quality must meet the essential interests of the Principal (wide availability, MGPR and MGSO of the System).
 
 
 

 
 
When replacing PV modules only panels of same brand and model shall be used. In case of unavailability the replaced modules shall fit as much as possible with the range of electrical characteristics (especially current, power decay, and the temperature coefficient) specified for the panels in the string.
 
All activities of corrective maintenance must be carried out in accordance with the final  Project. In particular, if the Monitoring and Data Acquisition detects a fault in the plant or any significant decrease in the performance, the Operator shall promptly notify to the Principal of the problem by fax and / or by registered mail, reporting  when the problem occurred, the possible cause and the first steps that the Operator intends to take:
 
1.           within 24 (twenty-four) hours from the detection of performance significant reduction, inspect the equipment to check the extent of the failure or the cause of the malfunction;
 
2.           within 48 (forty eight) hours from the Plant inspection check the cause of the malfunction;
 
3.           within 48 (forty eight) hours of the discovery of the cause of failure starting of the service extraordinary maintenance required to restore full functionality of the plant.
 
Corrective Maintenance Services will also include the technical management that the Contractor shall supply to deal with accidents, incidents related to the electrical distributor and the use of the manufacturers' guarantees, supplying supporting technical data about incidents and diagnoses and carrying out technical representation with third parties. For the administrative and financial aspects of these processes, the Parties will act in a coordinated way with third parties, the Principal and/or the Financing Entity, sharing contractual information (insurance contracts, electricity supply contracts, manufacturers' guarantees) and other relevant communications with third parties, the Principal and/or Financing Entity.
 
 
 

 
 
 Annex 3:                         Minimum Guaranteed Performance Ratio (MGPR)
 
The Parties have agreed a Minimum Guaranteed Performance Ratio MGPR equal to 78%.
 
Performance ratio algorithms.
 
The performance ratio (PR) is defined according to the standard CEI EN 61724 (CEI 82-15) as:
 
 
PR
Y r
Y f
(1)
Yf  is the final PV system yield, that is the net AC energy output divided by the nominal  DC. power of the installed PV System. It represents the number of hours that the PV System would need to operate at its rated power to produce that amount of energy. The value for Yf  is calculated by equation 2:
 
E
Pn
Y f
     [kWh / kWp] (2) 
where:
Yf  = final PV System yield
E   = System net AC energy output in kWh
Pn = System nominal power in kWp
 
Yr is the reference yield that is the total in-plane irradiance H divided by the PV’s reference irradiance G. It represents the equivalent number of hours necessary for the array to receive the reference irradiance. If  G  equals 1 kW/m2 , then Yr is the number of peak sun-hours. The Yr defines the solar radiation resource for the PV system. It is a function of the location, orientation of the PV array, and month-to-month and year-to-year weather variability. The value for Yr is calculated by equation 3:
 
H
G
Y r
[(kWh/m2) / (kW/m2)]   (3) 
 
where:
 
Yr = reference yield
H = total plan of array irradiance in kWh/m2
G  = reference irradiance (usually 1 kW/m2)

The performance ratio (PR) calculated by the equation (1) is Yf  divided by Yr. By normalizing with respect to irradiance, it quantifies the overall effect of losses on the rated output due to inverter efficiency and wiring mismatch, and other losses when converting from DC to AC power; PV module temperature; incomplete use of irradian ce by reflection from the module front surface; soiling or snow; system down-time and component failure.
 
 
 

 
 
1. Measurement of effective performance ratio
 
On the base of the above assumptions, the effective performance ratio (PReff))  is calculated as follows:
 
PReff  = (Eeff * G )/ (Pn * f * H )
 
Where:
 
Eeff :
is the production of electric energy (in kWh) measured at the point established by the GSE at low voltage

G:
is the standard irradiance value, meaning the value representing the instantaneous power of the solar radiation which hits a orthogonal plane surface in standard conditions, equal to 1000 W/ m2

Pn :
is the nominal peak power (in kW) of the System in standard conditions STC

f:
is a correction factor due to the panels performance degradation equal to (1- 0,0008 * Nmonths) where Nmonths is the “number of months” from the opening of the worksite

H:
is the value of the irradiation in (kWh/m2) measured under the measurement operational conditions mentioned below

For the avoidance of doubts, whenever throughout the Contract, reference to the Performance Ratio of the System is made, it is clear to all Parties that the PReff  is meant.
 
2. Measurement operational conditions

 
Ø
Utilized instruments: N. 2 class II pyranometers
 
Ø
The exact position of the pyranometers will be decided in the Executive Project.
 
Ø
Measurements performed with the pyranometers will be recorded every 10 minutes
 
Ø
Every hour an average irradiation value will be calculated as follows:
 
(a)    Hi (kWh/m2) at the ith hour

 
Ø
Hourly average irradiation less than 600 Wh/m2 will be discarded
 
Ø
At the end of each period the total irradiation will be calculated as follows:
 
(b)    H = ∑ Hi  where “i” is a value from 1 to (24 * n)

3. Stopping periods
 
The following stopping periods will be excluded from the calculation of the PReff:
 
Ø
stopping periods due to theft, vandalism, Force Majeure events, power outage of the national electricity grid, or in case of wilful misconduct or gross negligence of the Principal;
 
Ø
stopping periods during which Non-Subscription Services are carried out pursuant to the O&M Contract;
 
Ø
stopping periods (not longer than 48 hours per year of equivalent irradiation at peak irradiance onto the surface of the Panels, being understood that beyond such value, stopping periods shall be included in the calculation of the PReff) during which Subscription Services are carried out pursuant to the O&M Contract.

 
 

 
 
Annex 4:                         Minimum Guaranteed System Output (MGSO)
 
The MGSO is calculated as follows

 MGSO = HTC * MGPR * PN
 
Where:

MGPR
is the Minimum Guaranteed Performance Ratio

HTC
is the irradiation as disclosed the long term yield calculations of the Technical Consultant of the Principal and/or Financing Entity on which the Parties agree.(kWh/kW)

PN
is the System nominal peak power in standard conditions STC, taking into account the panel degradation which is agreed between the Parties

Based on the long term yield calculations of the Technical Consultant of the Principal and/or Financing Entity, the Parties have agreed for the total Duration of 20 years of the current contract, on a Minimum Guaranteed System Output as detailed in the following table
 
Year
 
Yearly Degradation [%]
MGSO [kWh]
PAC
0
914.239,87
1
2
895.955,07
2
0,7
889.555,40
3
0,7
883.155,72
4
0,7
876.756,04
5
0,7
870.356,36
6
0,7
863.956,68
7
0,7
857.557,00
8
0,7
851.157,32
9
0,7
844.757,64
10
0,7
838.357,96
11
0,7
831.958,28
12
0,7
825.558,60
13
0,7
819.158,93
14
0,7
812.759,25
15
0,7
806.359,57
16
0,7
799.959,89
17
0,7
793.560,21
18
0,7
787.160,53
19
0,7
780.760,85
20
0,7
774.361,17
 
 
 

 
 
Annex 5:                         Bonus-Malus
 
Parties have agreed to a bonus–malus construction in which the effective System output SOEFF, measured at the GSE  LV meter is compared annually with the value of the Minimum Guaranteed System Output MGSO as determined between the Parties in Annex 4.
 
The bonus-malus percentage applies on the marginal revenue corresponding to the GSE Incentive Fare and Energy Selling Tariff (Minimum Guaranteed Prices) as following:
 
 
·
the bonus will be paid by the Principal to the Contractor starting from a surplus production greater than 3%
 
 
·
the penalties (malus) will be paid by the Contractor to the Principal starting from a loss of production greater than 3%.
 
The bonus-malus ranges as described in the table hereunder:
 
 
 

 
 
 
 X  =
SOEFF
MGSO
MGSO
 
BONUS
 
Percentage of the marginal revenue to be paid to the Contractor
Principal
X> 7,5%
 
75%
25%
5% < X ≤ 7,5%
 
50%
50%
3% ≤ X ≤ 5%
 
25%
75%
0 < X< 3%
 
0%
100%
 X  =
SOEFF
MGSO
MGSO
 
PENALTY
 
Percentage of the Loss of revenue paid by the Contractor
Principal
0 < X ≤ -3%
 
0%
100%
-3% ≤  X < -5%
 
50%
50%
X≤ -5%
 
100%
0%
 
 
 

 
 
ANNEX 18
 
Option Agreement

Between

Ecoware S.p.A., a company incorporated under the laws of Italy, with registered office at Nona Strada 9, I-35129 Padova (Italy), entered in the Companies Register in Padua at number 03571330277, represented by Mr. Leopoldo Franceschini, in his capacity as legal representative (“Ecoware”);
 
and

Ellomay Capital Ltd., a company incorporated under the laws of Israel, with registered office at 9 Rotschild Blv, Tel Aviv - Israel, represented by Mr. Ran Fridrich, in his capacity of CEO (“Ellomay”);

hereinafter collectively the “Parties”.
 
Whereas:

 
A.
On 2 December 2009 Ellomay and Ecoware entered into a non binding Termsheet for the development and construction of solar plants in Italy for a capacity of up to 10 MW.
 
 
B.
Ecoware, as contractor, and Ellomay, as principal, are negotiating an Engineering Procurement and Construction Agreement (EPC), as well as an Operation and Maintenance Agreement (O&M) in relation to the photovoltaic plants referred to in letter a).
 
 
C.
Pursuant to the Termsheet, Ecoware has proposed to Ellomay two plants located in the Marche Region named “Costantini” and “Del Bianco” (jointly referred to as Plants), and has submitted part of the documentation relating thereto to allow Ellomay to carry out the technical and legal due diligence.
 
 
D.
Ecoware represented the urgency of executing the building right (superficie) agreements in relation to the Plants.
 
 
E.
Pending Ellomay’s delivery of the technical and legal due diligence, negotiations between the Parties of the EPC and O&M contracts, as well as any other outstanding issue necessary to reach a final decision on the purchase of Del Bianco and Costantini Plants, the Parties have agreed to secure Ellomay exclusivity on such Plants until the deadline foreseen herein.
 
 
F.
Pending the activities referred to in the preceding paragraph, a special purpose company (SPV) shall enter into the definitive superficie contracts with the landowners of the lands where the Del Bianco and the Costantini Plants are located, at Ecoware’s earliest convenience. The SPV shall be alternatively, at Ellomay’s discretion,
 
 
(i)
a società a responsabilità limitata, with a share capital of Euro 10.000,00,  wholly paid up, 100% owned by Ecoware (EW-SPV); or,
 
 
(ii)
a società a responsabilità limitata, newly set up, with a share capital of Euro 10.000,00, wholly paid up, 100% owned by Ellomay or by a company belonging to the Ellomay group, which will be indicated by Ellomay in due course (Ellomay SPV).

 
1

 
 
THE ABOVE STATED THE PARTIES DECLARE AND AGREE AS FOLLOWS:

1
DEFINITIVE SUPERFICIE CONTRACTS ENTERED BY EW-SPV

1.1
In the case that the definitive superficie contracts are entered into by EW-SPV, subject to satisfactory due diligence on the Del Bianco and Costantini Plants, execution by EW-SPV of the superficie contract/s, and positive outcome of the negotiations referred to in recital e) hereof, Ecoware hereby grants to Ellomay the exclusive option right (Option) to purchase 100% of the EW-SPV quotas (EW-SPV Shares), provided that such right shall last until 28 February 2010 (Completion Deadline).
 
1.2
The EW-SPV Shares may be purchased by Ellomay on its behalf or on behalf of any third parties indicated by Ellomay at the time of Completion as defined below.
 
1.3
In order to secure the Option and within 5 working days of execution of this Agreement, Ellomay shall transfer to Ecoware Euro 50.000,00 (fifty thousand) (Deposit) by wire transfer to the following bank account: IT 298050462410000002038052 Banca Antonveneta agenzia di Cadoneghe.
 
1.4
Ecoware irrevocably undertakes to grant Ellomay the option to purchase the EW-SPV Shares free from inscriptions, transcriptions, burdens, mortgages or legal prejudices, fiscal privileges and partial rights of third persons, easements, encumbrances or pre-emption rights of third parties. Ecoware undertakes to hold Ellomay harmless of any onus, eviction, damage or breach of possession. In particular, at the time of Completion, Ecoware shall represent and warrant Ellomay, among others, that:
 
 
i.
EW-SPV is duly incorporated and existent, has full and unconditional use of its rights and has de facto and legal capacity to carry out its business activity;
 
 
ii.
Ecoware is in the full and free possession of the EW-SPV Shares and the same are free from pledges, liens, seizures, prejudicial registrations, or any other encumbrances, including compulsory encumbrances and there will be no third party’s claim on the EW-SPV Shares at the time of formal transfer thereof;
 
 
iii.
EW-SPV has been managed in the full compliance to any relevant legal and administrative law and, in particular, EW-SPV has fulfilled all its tax liabilities;
 
 
iv.
no legal, fiscal, administrative disputes or any other dispute exist that have arisen from any third party’s claim.
 
 
v.
EW-SPV’s accounting and corporate books are duly kept and, in accordance with the provisions of law, all tax-returns have been submitted, and all taxes have been duly paid;
 
vi.
EW-SPV has no employees;
 
 
vii.
EW-SPV has not entered into any agreement or undertaken any obligation, other than the ones arising out or in connection with the superficie agreements.
 
1.5
Furthermore, EW-SPV represents and warrants to Ecoware that it will be the full and exclusive grantee of the superficie rights on the Del Bianco and Costantini lands, as the case may be, the latter having been acquired through a notarial deed and that all taxes and duties, including the registration tax, relating to the Plants have been fully and promptly complied with and they will be paid until Completion, as defined below.
 
1.6
The consideration of the EW-SPV Shares has been agreed between the Parties and accepted as a whole to be equal to the EW-SPV Share’s nominal value and will be paid on Completion. All taxes and duties, including inter alia registration tax, notary fees and rental fees, relating to the Plants which have been paid until Completion, as defined below, will be refunded by Ellomay.
 
 
2

 
 
1.7
If this Agreement is terminated for any reason whatsoever, or the Parties fail to complete within the Completion Deadline, or Ellomay does not exercise the Option within the Completion Deadline, Ellomay shall be entitled to be refunded the Deposit from Ecoware by wire transfer to a bank account specified by Ellomay within 3 working days from Ellomay's demand to refund such deposit.
 
1.8
The Parties agree that Ellomay has no obligation to complete, being its decision to enter into the Completion within the Completion Deadline, subject to satisfactory outcome, at Ellomay’s discretion, of the due diligence and of the negotiations referred to in recital e) hereof.
 
1.9
The transfer of the EW-SPV Shares shall take place by means of a deed executed before a notary or a commercialista, designated by Ellomay (Completion). The cost and taxes of the Completion shall be borne by Ellomay.

2
DEFINITIVE SUPERFICIE CONTRACTS ENTERED BY ELLOMAY-SPV

2.1
In the case that the definitive superficie contracts are entered into by Ellomay SPV, should the Parties not enter for any reasons whatsoever into the EPC within 45 days of execution of this Agreement, Ecoware shall purchase 100% of Ellomay-SPV quotas (Ellomay-SPV Shares) within the following 15 days in accordance with the following terms.
 
2.2
The consideration of Ellomay-SPV Shares has been agreed between the Parties and accepted as a whole to be equal to Ellomay-SPV Share’s nominal value and shall be paid by Ecoware to Ellomay on execution of the Ellomay-SPV Shares transfer deed. Costs and taxes related to such transfer deed, as well as costs and taxes related to the incorporation of Ellomay-SPV, will be borne by Ecoware.
 
2.3
All taxes and duties, including inter alia registration tax, notary fees and rental fees, relating to the Plants which have been paid until Completion, as defined below, will be refunded by Ecoware.
  
3
MISCELLANEOUS

3.1
Any variation to this Agreement must be in writing and signed by both Parties.
 
3.2
This Agreement supersedes all previous written or oral agreements between the Parties in relation to the EW SPV Shares.
 
3.3
This Agreement shall be governed by the laws of Italy and the competent court will be exclusively the Court of Milan, Italy.
 
3.4
This Agreement is entered into in English and the Parties agree to exchange signatures via e-mail.

 
3

 
 
Read, confirmed and signed by on January 22, 2010
 
Ecoware S.p.A.
 
/s/ Leopoldo Franceschini
_____________________
Mr. Leopoldo Franceschini
(in his capacity of legal representative)
 
Ellomay Capital Ltd
 
/s/ Ran Fridrich 
___________________
Mr. Ran Fridrich 
(in his capacity of CEO)
 
4


 
 
EX-4.11 3 exhibit_4-11.htm EXHIBIT 4.11 exhibit_4-11.htm



Exhibit 4.11
 
 
Engineering Procurement & Construction Contract
 
for the construction of a photovoltaic system
 
 
between
 
 
ECOWARE S.p.A
 
As Contractor
 
 
And
 
 
ELLOMAY PV ONE SRL
 
As Principal
 
 
 

 
 
Engineering Procurement & Construction Contract
 
With this contract
 
ELLOMAY PV ONE S.r.l., with its registered offices located in Galleria Borromeo, 3, VAT Registration Number and Tax Code 04459950285, entered in the Companies Register of Padova at no. 391298, represented by Mr. Ran Fridrich in his capacity as Sole Director (hereinafter known as “Principal”);
 
and
 
ECOWARE S.p.A, with its registered offices at Via Nona Strada, 9, 35129 Padua, VAT Registration Number and Tax Code Number 03571330277, entered in the Companies Register in Padua at number 03571330277, represented by Ing. Leopoldo Franceschini, born in Padua on 7th September 1947, in his capacity of legal representative (hereinafter known as the “Contractor”);
 
(hereinafter known individually as a “Party” and jointly as the "Parties")
 
Whereas:
 
(A)  
The Principal is a company operating in the sector of the development and operational management of photovoltaic systems;
 
(B)  
The Contractor is a company operating in the construction of photovoltaic systems and has the expertise to perform the Works, as defined below, in accordance with the terms and conditions set out under this Contract;
 
(C)  
NOVALTEK Servizi S.r.l. with registered office in Monterado (Ancona), Via Cerasi no. 18, tax code 02379340421, is a company operating as the developer of photovoltaic systems (the “Developer”). Upon endorsing this Contract, the Developer undertakes to co-operate with the Parties hereto and support the Contractor to ensure the proper performance of this Contract in relation to the transfer of the Building Permit, the STMC, and all permits in connection therewith, and of the Land Use Rights.
 
(D)
The Principal intends to proceed with the construction and operation of one photovoltaic system in the province of Ancona, Italy, in the Municipality of Senigallia, made up of 3060 modules made of Monochristalline, with generators having respectively a capacity equivalent to 734,40 kWp (hereinafter known as the "System");
 
 
Page 2 of 39

 
 
(E)
In relation to the System, the Developer has filed the following authorisations and requests:
 
 
(i)
The Building Permit, as defined below, was issued by the competent municipal offices in Senigallia (Ancona), on 20 October 2009 (prot. 09/037527);
 
 
(ii)
Application to ENEL, as defined below, for connection to the national electricity grid, pursuant to the Electrical Energy and Gas Authority Resolution No. 99/08, by means of a communication dated 23 June 2009; ENEL has transmitted the STMC, as defined below, (preventive T0017809) on 14 August 2009 and the Developer has formally accepted the STMC proposed by ENEL for the connection to the national electricity grid of the System, by means of its letter of acceptance dated 22 September 2009.
 
 
(iii)
ENEL shall communicate notice of end of the authorization process pursuant to Regional Law 19/1988 and subsequent amendments by way of a letter that is expected on or around 20 March 2010;
 
(F)
Sunex 3 S.r.l., a company wholly owned by Contractor, with registered offices in Via Nona Strada 9, 35129 Padua, Italy, VAT Registration Number and Tax Code Number 06085820964 (“Sunex3”) has signed a definitive Land Use Right contract, enclosed hereto as Annex 1, with the owner of the Area, as defined below. Contractor undertakes to cause Sunex3, pursuant to article 1381 of the Civil Code, to assign to the Principal the rights and obligations arising under the Land Use Right, as provided under Article 4.2 a) (ii). The Parties have agreed that, to share the costs related to the tax liabilities arising in connection with such assignment, a sum equal to Euro 10,000.00 (ten thousand) shall be deducted from Payment Milestone 1, as defined below;
 
(G)
In order to realize the System, the Principal needs a partner with high expertise and standing in the construction of photovoltaic systems to be appointed for the planning, realization, operation and connection of the “turn key” system (as defined below), and the Contractor is a leading company operating, inter alia, in said field;
 
(H)
On 2 December 2009, the Parties entered into a framework agreement, regulating the general understanding on which their partnership should be based.
 
(I)
On 22 January 2010, the Parties entered into an agreement (the “Option Agreement”), enclosed hereto as Annex 18, whereby the Principal was provided with an option right to purchase the shares of Sunex 3, in accordance with the terms and conditions of the Option Agreement and on execution of which the Principal paid a deposit equal to Euro 50,000.00 (fifty thousand), half of which shall be deducted from Payment Milestone 1, as defined below.
 
(J)
The Principal is planning to appoint a financial institution (the “Financing Entity”), which will grant to the Principal, on a leasing or project finance basis, two credit lines, the first named “Base Line” for financing of project’s costs, and the other named “VAT Line” to finance VAT on such costs (the “Financing“);
 
 
Page 3 of 39

 
 
(K)
The Contractor has confirmed the feasibility and economic convenience of the solution for the connection proposed by ENEL with the STMC referred to under point E (ii) above;
 
(L)
In the light of the above, the Contractor decided to enter into this Contract, and undertook (i) to carry out all the activities and services provided herein; and (ii) to guarantee, pursuant to article 1381 of the Civil Code, the proper fulfilment of all the obligations and activities to be performed and carried out by the Developer;
 
(M)
The Principal is willing to entrust the Contractor also with the operation and maintenance of the System through execution of an ad hoc operation and maintenance agreement (the “O&M Agreement”), which shall be executed, as soon as it is feasible and in any case as a condition precedent to Payment Milestone 2,  substantially in the form of Annex 17.
  
NOW THEREFORE the Parties agree as follows:
 
Article 1 – Recitals, annexes and previous agreements
 
1.1 The recitals and annexes to this contract (hereinafter known as the “Contract” or “EPC Contract”) shall represent an integral and substantial part of the same.
 
1.2 This Contract replaces and fully supersedes any previous agreement entered into between the Parties, either written or oral, on the matters outlined here below.
 
Article 2 – Definitions and Interpretation
 
2.1 In addition to any other words and expressions defined in this Contract, the terms used in this Contract, where they start with a capital letter, shall have the following meanings:
 
·  
AEEG: means the Electrical Energy and Gas Authority incorporated pursuant to the Law No. 481 dated 14th November 1995;
 
·  
Applicable Law: means each and every law, regulation, measure, ruling, decree (including the Decree Law) or deed having a binding nature in Italy and issued by every state body and judicial and/or administrative authority, which is in force on the date in which this Contract is entered into or which comes into force thereafter;
 
·  
Applicable Permits: means each and every license, authorization, certification, filing, recording, permit, affidavit (including the denuncia di inizio attività, the autorizzazione unica or permesso di costruire) or other approval with and/or of any competent authorities that is required by Applicable Law for the construction and connection to the grid (including the comunicazione conclusione iter autorizzativo issued by Enel pursuant to Regional Law 19/1988 as subsequently amended) and admission to the Incentive s of the System including, without limitation, those required by Applicable Law in zoning, building, environmental, landscaping, planning and/or archaeological matters;
 
 
Page 4 of 39

 
 
·  
Area: means the area in the plan referred to in Annex 2 to this Contract, in which the System shall be built;
 
·  
Building Permit: means the construction authorisation (“Permesso di costruire”) provided for by Presidential Decree 6 June 2001 no. 380;
 
·  
Civil Code: means the Italian Civil Code, introduced with the Royal Decree Law No. 2, dated 16th March 1942, and all subsequent amendments and/or integrations thereto;
 
·  
Commencement of Operation: means the commencement of operation (i.e. entrata in esercizio) of the System pursuant to Article 2(g) of the Ministerial Decree 19 February 2007;
 
·  
Communication of the Executive Project’s Approval: with reference to the System, shall have the meaning set out in the Article 8.3 below;
 
·  
Completion Date shall have the meaning indicated in Article 9.1;
 
·  
Confidential Information: means the information, data, notes, records, agreements, documents, in whatsoever form drawn up, provided by one of the Parties to the other or, in any case, obtained from one of the Parties and connected with the execution of this Contract and, in particular, the Technical Specifications, including, without any limits  whatsoever, any technical and contractual documentation inherent in the Works and their object, as well as any document of a commercial or financial nature, data relating to prices and technical knowledge, models, formulas, industrial processes, records, photographs, drawings, contractual conditions, software, programmes and models and any other intellectual  property concerning the Party making the communication or, in any case, to wh om said data refer, with the exception of any information already made available to the public;
 
·  
Consideration: means, with reference to the System, the all inclusive, invariable, sum that the Principal shall pay to the Contractor to perform the Works with respect to the System as per Article 4.1 of this Contract;
 
·  
Construction Health and Safety Coordinator (coordinatore in materia di sicurezza e salute durante la realizzazione): means the individual appointed by the Principal pursuant to Article 7 below, who has been entrusted with the duties related to this role pursuant to Article 92 of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations;
 
·  
Contract: means this Contract, including all the Annexes and all amendments hereto as mutually agreed by the Parties;
 
·  
Contractor’s Parent Company: means Kerself S.p.A., a company incorporated under the laws of Italy, with its registered office at Via della Tecnica 8, Prato di Correggio, registration with the Registro delle Imprese of 01777890359, Fiscal Code and Vat No. 01777890359;
 
·  
Delay Liquidated Damages means the damages referred to in Article 9.3;
 
·  
Decree: means the Decree Law dated 19th February 2007 no. 25336 issued by the Economic Development Minister and whose object is the “Criteria and methods to encourage the production of electrical energy by means of solar photovoltaic conversion in implementation of Article 7 of the Legislative Decree Law No. 387, dated 29th December 2003” (Criteri e modalità per incentivare la produzione di energia elettrica mediante conversione fotovoltaica della fonte solare, in attuazione dell'articolo 7 del decreto legislativo 2 9 dicembre 2003, n. 387), and subsequent amendments and/or integrations thereto;
 
 
Page 5 of 39

 
 
·  
Definitive Project: means,  the “Progetto Definitivo”, i.e. the project drawings to realise the Works and the relative annexes, a copy of which is attached hereto, as Annex 4;
 
·  
Design Health and Safety Coordinator (coordinatore in materia di sicurezza e salute durante la progettazione): means the individual appointed by the Principal pursuant to Article 7, who shall draft the PSC and who has been entrusted with the duties related to this role pursuant to Article 91 of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations;
 
·  
Discount: has the meaning indicated in Article 9.7 hereof;
 
·  
Discretional Variations: has the meaning indicated in Article 10.2 (b) hereof;
 
·  
ENEL: means Enel Distribuzione S.p.A.;
 
·  
Equipment: means the Contractor’s equipment and components to carry out the Works listed in Annex 3 of this Contract;
 
·  
Executive Project: means  the “Progetto Esecutivo”, i.e. the project drawings prepared and delivered by the Contractor prior to the commencement of the Works pursuant to Article 8, in compliance with the Technical Specifications and with the Decree Law provisions;
 
·  
Expert: means the arbitrator appointed for the solution of technical and related matters in accordance with Article 24.2;
 
·  
FAC: means the Final Acceptance Certificate, i.e. the certificate that shall be issued by Principal in compliance with the outline set forth in Annex 16 acknowledging the positive outcome of the conditions mentioned in art. 12;
 
·  
Financing: means the project loan that may be arranged by the Principal, in compliance with recital H above;
 
·  
Financing Entity: means the financing institution or any other equity partner identified by the Principal which could grant the Financing to the Principal;
 
·  
First Reassessment Test: means the First Reassessment Test of the MGPR to be performed pursuant to Article 12.6.
 
·  
Force Majeure: has the meaning indicated in Article 11;
 
·  
GSE: means the Gestore dei Servizi Elettrici - GSE S.p.A., i.e. the entity appointed to implement the incentive tariff regime foreseen by the Decree Law;
 
·  
Health and Safety Coordinators: means the Construction Health and Safety Coordinator jointly with the Design Health and Safety Coordinator;
 
·  
IAC: means the Incentive Acceptance Certificate, i.e. the certificate that shall be issued by the Principal in accordance with the outline set forth in Annex 15, after the release of the TAC and PAC, acknowledging that the System has been admitted to the Incentive scheme and that the agreement with GSE has been entered into;
 
 
Page 6 of 39

 
 
·  
Incentive: means the incentive to the tariff for the production and delivery of power to the national electricity grid through a solar power plant, in accordance with the Ministerial Decree of 19 February 2007 and the Resolution No. 90 of 11 April 2007 of AEEG;
 
·  
Incentive Agreement: (“Convenzione con GSE”) means the agreement between the Principal and GSE in order to obtain the Incentive;
 
·  
Interconnection Agreement means the agreement to be entered into between the Principal and the national electricity grid operator which provides the terms and conditions for the connection to the national grid.
 
·  
Land Use Rights are the rights in rem (“diritto di superficie”) referred to in Recital F, to be acquired by the Principal over the Area, pursuant to Article 3.2 (a).
 
·  
Mechanical Completion: means the completion of all Mechanical Works of the System;
 
·  
Mechanical Works: means, with reference to the System, all the mechanical and electrical works. It includes (a) supply and installation of the following equipment: inverters, photovoltaic modules and DC installation, mains, pits, cabling, electrical boxes and protection devices, internal connections and interconnections with external installations, weather station, low voltage installation, civil engineering, medium voltage installation (including transformation, protection equipment and utility interconnection equipment, security and monitoring systems); and (b) the static test of structures (collaudo statico) according to the Applicable Law. For the avoidance of doubt, the Mechanical Works do not comprise the physical realization of the c onnection line to the national electricity grid;
 
·  
Minimum Guaranteed Performance Ratio (or MGPR): means the minimum performance ratio guaranteed by the Contractor pursuant to the Annex 9 and in accordance with the methodology used for the measurement of the System performance according to the standard CEI EN 61724 (CEI 82-15) as described in the same Annex 9;
 
·  
Necessary Variations: has the meaning indicated in Article 10.2  (a) below;
 
·  
O&M Agreement: means the operation and maintenance agreement referred to in Recital (M) above;
 
·  
Operational Inspection: means, with reference to the System, the verification process carried out by the Contractor according to the Technical Specifications,  the Applicable Laws, and the MGPR which shall be carried out by the Parties in accordance with Annex 10 and article 12 below in order to achieve the PAC;
 
·  
PAC: means the Provisional Acceptance Certificate, i.e. the certificate that shall be issued by Principal in compliance with the outline set forth in Annex 14 acknowledging the positive outcome of the Operational Inspection;
 
·  
Parent Company Guarantee: means the guarantee, consistent with the form set forth in Annex 5, whose maximum amount is equal to the amount of the Consideration to be issued by the Contractor’s Parent Company in favour of the Principal, in compliance with Article 4.2, as guarantee for the obligations undertaken by the Contractor under this Contract.
 
·  
Payment Milestones: means the milestones for the payment of the Consideration as set out in Article 4 of this Contract;
 
 
Page 7 of 39

 
 
·  
Performance Liquidated Damages: means the damages referred to in Article 13.2;
 
·  
POS: means the operative safety plan (i.e. Piano Operativo di Sicurezza) to be drawn up by the Contractor, with reference to the System, in compliance with the CSP, in accordance with Article 89, paragraph 1, letter h) of the Legislative Decree Law No. 81/2008 and subsequent amendments and integrations thereto, as possibly amended in agreement with the Health and Safety Coordinators;
 
·  
Power Purchase Agreement (or PPA): means the agreement that the Principal will enter into with the energy company of its choice for the sale of the produced electricity;
 
·  
Project Implementation Schedule (or PIS): means the schedule for the implementation of the construction of the System, which is attached as Annex 7 as may be updated, from time to time, in agreement between the Parties;
 
·  
PSC: means the coordination and safety plan drawn up by the Design Health and Safety Coordinator during the planning phase, pursuant to Article 100 of Legislative Decree Law No. 81/2008, which must include, inter alia, an estimate for the safety costs, as eventually altered  by the Construction Health and Safety Coordinator during the performance phase while the Works are carried out;
 
·  
Reassessment Tests: means jointly the First Reassessment Test and the Second Reassessment Test of the MGPR will be performed pursuant to Article 12.6.
 
·  
Second Reassessment Test: means the Second Reassessment Test of the MGPR to be performed pursuant to Article 12.6.
 
·  
Service Order: means the orders given during the execution of the Works;
 
·  
Site Manager: means the individual appointed by the Contractor, who shall work with the Works Manager throughout the performance of the Works;
 
·  
Start of Works: has, with reference to the System, the meaning indicated in Article 8.4 herebelow;
 
·  
STMC: means the minimum technical solution for connection referred to in the AEEG Resolution no. 99/08 and subsequent amendments;
 
·  
System: means the photovoltaic system in the Municipality of  Senigallia (AN) made up of 3060 modules made of monochristalline, with a generator that has a capacity equivalent to 734,40 kWp, and, for the avoidance of doubt, shall include all the items, such as without limitation, cables, modules, inverters, structures, cabins, etc, that are finalised at the functioning of the plant;
 
·  
TAC: means the Technical Acceptance Certificate, i.e. the certificate that shall be issued by Principal in accordance with the outline set forth in Annex 11 following the Technical Inspection;
 
·  
Technical Consultant: means the consultant appointed by the Principal and/or the Financing Entity, who has been appointed to monitor the progress of the Works;
 
·  
Technical Inspection: means the inspection procedure that the Principal shall carry out pursuant to Annex 10 and in accordance with Article 12 in order to verify that the Mechanical Completion complies with the Technical Specifications, Applicable Laws and rules of the trade, and to achieve the TAC;
 
 
Page 8 of 39

 
 
·  
Technical Specifications: means the documentation, referred to in Annex 6 of this Contract, in which the technical specifications on the basis of which the Contractor shall perform the Executive Project and Works to reach the MGPR are indicated;
 
·  
Variations: mean, jointly, the Discretional and Necessary Variations;
 
·  
Warranty Bond: means the insurance bond on first demand equal to 15 % (fifteen per cent) of the Consideration, issued by a first-class insurance company which has been attributed, at least a S&P A-rating or which, in any case, satisfies the Principal and the Financing Entity;
 
·  
Warranty Period: means the period of 2 (two) years starting from execution of the PAC.
 
·  
Working Day: means every day except for Fridays, Saturdays, Sundays and public or bank holidays;
 
·  
Works: means the activities that have been performed or are to be performed by the Contractor for the System pursuant to this Contact, as better described in Article 3 hereof;
 
·  
Works Manager: means the “Responsabile Lavori”, i.e. the individual appointed by the Principal, in compliance with the Law No. 81/2008, who shall perform the site management duties foreseen by the Applicable Law and/or listed in this Contract;
 
2.2. The following interpretation provisions shall be applied to this Contract, unless otherwise provided for:
 
(a)
the articles’ headings are merely indicated for the sake of convenience of reference and cannot be used for the interpretation of the terms contained in this Contract;
 
(b)
reference to sections, articles and annexes shall be understood as being made, unless otherwise indicated, to the sections, articles and annexes contained in this Contract;
 
(c)
unless explicitly indicated in this Contract,
 
 
(i)
any reference to this Contract shall be a reference to the Contract, as validly revised, integrated or amended and
 
 
(ii)
any reference made to any other agreement or document shall imply reference to that agreement or document, as validly revised, integrated or amended;
 
(d)
unless otherwise explicitly indicated, the words and definitions, used in the singular form shall have the same meaning, mutatis mutandis, even when used in the plural form and vice versa;
 
(e)
the terms, "herein", "therein" and synonyms in this Contract refer to the entire Contract and not to particular articles in this Contract, unless explicitly provided in this sense, just as the terms “below” or “above” indicate the part below or above in this Contract, with reference to the point in which said terms have been used;
 
(f)
the word “included” and the expression “in particular” shall always be considered to be followed by the expressions “without limitations” or “not limited to” even if not effectively followed by said expressions;
 
(g)
every reference to each individual shall also refer to his legitimate successors and assignees;
 
 
Page 9 of 39

 
 
(h)
if, on the basis of this Contract, an activity must be performed, a communication sent or a term expires on a day other than a Working Day, said activity shall then be performed, the communication be sent or the relative term expire on the Working Day falling immediately after.
 
Article 3 – Object and Description of the Works
 
3.1 With this Contract, the Principal has entrusted “turn key” the Contractor, who accepts, with the realization of the Executive Project and the performance of all the Works in a world class manufacturing way and in compliance with the Technical Specifications and Applicable Laws. The Contractor is also entrusted, inter alia, with (i) obtaining of all the Applicable Permits required for the construction and the functioning of the System, (ii) the realisation of all the necessary Works required for the integral construction of the System in accordance with the terms and conditions set forth by this Contract, (iii) the connection of the System to the national electricity grid in compliance with the Project Implementation Schedule, and (iv) the assistance in obtaining t he Incentive.
 
3.2 In particular, and without limitation, the following activities must be understood as having been included in the invariable Consideration referred to in Article 4:
 
(a)  
Land Use Right (diritto di superficie): the Contractor undertakes to cause Sunex3 to appoint the Principal as party of the final Land Use Right agreement(s) referred to in Recital (F) above, so that the Principal will be able to validly hold the Land Use Right (diritto di superficie) over the Area, pursuant to Article 4.2.(a). All activities related to any cadastral parcelling (frazionamento) which may be necessary in relation to any plot of land involved by the System shall be carried out by the Contractor;
 
(b)  
Transfer in favour of the Principal of the Applicable Permits, including the STMC and the Building Permit submitted by the Developer. In particular, the Contractor undertakes to cause the Developer to perform any required activity or prepare any needed document for the successful transfer of the Building Permit in favour of the Principal, pursuant to Article 4.2, including delivery to the competent Municipality Technical Offices of the variations to the Building Permit, if any;
 
(c)  
Engineering: including the performance, for the System, of the Executive Project in compliance with the Technical Specifications and their amendment as required in order to obtain the Principal’s final, written approval, including, without limitation, the System “as-built” documentation, the electrical single wire and multi-wire diagrams, Technical Specifications, components and operation and maintenance manuals;
 
(d)  
Civil Works: including, for the System, the realization of entries, digging work for the electrical underground cabling, if any, foundations, enclosures and constructions necessary to house the inverters and transformers, fencing, in accordance with the Executive Project and the Technical Specifications and supplying, on his own initiative and expense, the materials, vehicles or any other component and labour necessary. Realisation of all the provisional Works, including those located outside the Area (signage, even luminous, placards, crush barriers aimed at defining or limiting the paths of pedestrians and vehicles, in compliance with the traffic and viability provisions), as well as the preparation of the equipment aimed at guaranteeing, for the entire duration of the Works, in compli ance with the provisions on safety and health on the workplace and what is contained and has been prescribed in the PSC. Realisation of site offices for the Works Manager and the Design Health and Safety Coordinator. Realisation of the utilities required for the supply of water, gas, electricity, drainage into the sewers, as well as the provision of suitable offices for the Design Health and Safety Coordinator. Payment of all the charges for the consumption of water, gas, electricity and drainage into the sewers, as described above. Building of barriers or provisional protection for the Works and wherever the safety provisions require them;
 
 
Page 10 of 39

 
 
(e)  
Supply of the electro-mechanical apparatus: including supply, installation and start up of the photovoltaic modules, mounting structures, inverters, module boards and electrical connection in direct and alternating current into the national electricity grid, transformation box, interface module boards, supervision and control system, monitoring system, video surveillance and weather station.
 
(f)  
Assembly and installation: the supply and installation, including the use of labour, of all the materials, accessories and secondary components that might be required for the correct and safe operation and management of the System. Maintenance and operative capacity of the site for the entire duration of the Works;
 
(g)  
Constant inspection and planning of the states of progress concerning the Works.
 
(h)  
Grid connection civil works: the timely realisation of all the civil works required by ENEL with reference to the STMC, for the purposes of the System’s connection to the grid (merely by way of an example, the realisation of the area/cable line and delivery box). The works may include the intervention of ENEL.
 
(i)  
Delivery to the Principal of all the necessary documentation, on issue of the System’s PAC and as a condition for the issue of the FAC, to be drawn up in compliance with the Applicable Law and in order to obtain the Incentive;
 
(j)  
Post-STMC activities: relations with the competent authorities (such as, inter alia, ENEL) and the individuals appointed by the latter for the System’s connection to the grid shall be directly managed by the Contractor, who must constantly monitor ENEL’s activities and those of the other individuals, soliciting them, when necessary, with the means deemed to be most expedient, in order to facilitate and, in any case, make such connection to the national electricity grid possible within the Completion Date established by the Project Implementation Schedule. Furthermore, the Contractor shall carry out all activities and formalities aimed at obtaining the Incentive Agreement, the Interconnection Agreement and the PPA (as th e case may be), and to prompt the Principal for proper action in connection therewith, when necessary.
 
(k)  
Custody of the Area: maintenance, protection, monitoring, security service, custody and conservation of the Area and of the equipment erected or stored therein until the issuance of the relevant PAC. The protection and security systems and procedures will be in line with the best practice and the minimum standard requested by the insurers. The Contractor shall be the keeper of the Works, as well as all the materials and equipment to be used during the execution of the Works and must, therefore, adopt the necessary measures aimed at avoiding any losses, damages and thefts, as well as providing, at its own initiative and expense, for the replacement of what has been damaged or removed until the issue of the PAC and the System’s delivery to the Principal.
 
(l)  
Clearance of the Area: removal of all tools and materials that are not necessary during the Warranty Period within the first twenty (20) Working Days after the signing of the PAC; cleaning of the Area, including the restoration of the surrounding areas and roads, in order to leave the System in the condition necessary for its proper operation and maintenance. Removal and transport to the authorised public dumps, of all waste materials that cannot be re-used, with final delivery, to the Principal, of the certification of its disposal, in compliance with the Applicable Law.
 
 
Page 11 of 39

 
 
3.3 The Contractor shall perform, more generally, any other activities that might be necessary to duly perform the Contract, to achieve the standards of world class manufacturing, and MGPR.
 
3.4 In addition, the Contractor shall file, at its expense, any documents and applications necessary to apply for and obtain the Applicable Permits on a timely basis, or in the event that the Applicable Law requires that such Applicable Permits be filed by the Principal, the Contractor hereby undertakes to fully cooperate in good faith with the Principal in interacting with the public authorities and carry out all the activities to obtain them, as soon as possible, and in any case within the terms set out by the Applicable Law and the POS.
 
3.5 It is understood that the planning, realization, any inspection and the subsequent management of the System may be financed by the Financing Entity in compliance with the project financing or leasing outline, and that this shall require this Contract’s co-ordination with the terms set forth in the financing agreement, by means of entering into a direct agreement with the Financing Entity (the “Direct Agreement”). Therefore, the Parties mutually undertake to enter into the Direct Agreement, if necessary.
 
Article 4 – Consideration, Terms of Payment and Guarantees
 
4.1 The Principal shall pay the Contractor the Consideration of Euro 3,050.00 per kWp (three thousand fifty) for the System, plus VAT, in compliance with the following terms and conditions.
 
4.2 The Consideration shall be paid to the Contractor in accordance with the following Payment Milestones:
 
 
a) Payment Milestone 1: payment of Euro 680.00 per kWp (six hundreds eighty), with deduction of Euro 10,000.00 (ten thousand) referred to in Recital (F) and of the deposit equal to Euro 25,000.00 (twenty five thousand) referred to in Recital (I), shall become due by the Principal on occurrence of all the following events:
 
 
i.
completion of the Building Permit and all Applicable Permits (excluding the Incentive) procedure, including submission of the variations, if any, consequent to the planning and Equipment amendments, and the performance of the provisions established by the competent municipal technical offices to which the Building Permit might be subject to;
 
 
ii.
transfer to the Principal or a third company indicated by the Principal of the relevant Land Use Rights, by way of assignment of the definitive Land Use Right contract or by any other way as the Principal may require;
 
 
iii.
connection of the System to the grid is reasonably estimated by the Contractor, by way of  a statement drafted in accordance with Annex 13 to take place within 120 (hundred and twenty) days;
 
 
iv.
delivery of the Parent Company Guarantee in compliance with the last paragraph of this Article 4.2, letter a).
 
 
Page 12 of 39

 
 
Promptly after payment of the relevant invoice, and in any case within 45 days of receipt thereof by the Principal, the Contractor shall provide evidence to the Principal that the Building Permit as well as the STMC (and of any Applicable Permit already obtained) have been successfully transferred to the Principal.
 
The Contractor undertakes to deliver to the Principal, the Parent Company Guarantee within 7 (seven) Working Days of execution of this Contract, and in any case before having received the payment. The Parent Company Guarantee will be issued for the due performance of the Works, as well as for the due performance by the Contractor of any and all the obligations undertaken under this Contract, including, but not limited to, (i) the obtaining of a valid title of Land Use Right over the land where the System shall be built and developed in accordance to Article 3 above; (ii) the obtaining of all the Applicable Permits required for the realization, connection and the functioning of the System; (iii) the transfer of the Building Permit in favour of the Principal; (iv) the admission to the Incentives; and (v) any and all payment obligations arising in connection herewith. The Parent Company Guarantee will be issued in the form under Annex 5, for an amount equal to the Consideration. From the execution date by the Principal of the PAC, the Parent Company Guarantee must also guarantee the precise and prompt performance of the obligations undertaken by the Contractor, pursuant to the O&M Agreement, as well as the punctual performance of all the payment obligations, borne by the Contractor under the O&M Contract. The Parent Company Guarantee shall be finally released upon issuance of the FAC.
 
 
(b) Payment Milestone 2: subject to the provisions of art. 12.1 hereof, payment of Euro 340.00 per kWp (three hundreds forty) shall become due on occurrence of all the following events:
 
 
(i)
satisfactory outcome of the Technical Inspection and the relevant issuance of the TAC;
 
 
(ii)
all conditions precedent to Payment Milestone 1 are in place and valid;
 
 
(iii)
the Contractor can still reasonably estimate connection of the System within 120 (hundred and twenty) days of Payment Milestone 1;
 
 
(iv)
execution of the O&M Agreement.
 
 
(c) Payment Milestone 3: subject to the provisions of art. 12.2 hereof, payment of Euro 2,030.00 per kWp (two thousand thirty) shall become due on occurrence of all the following events:
 
 
(i)
satisfactory outcome of the Operational Inspection and issuance of the PAC;
 
 
(ii)
all conditions precedent to Payment Milestones 1 and 2 are in place and valid;
 
 
(iii)
delivery by the Contractor to the Principal of the Warranty Bond, provided that the Warranty Bond shall become effective on payment of Payment Milestone 3 by the Principal.
 
 
Page 13 of 39

 
 
The Contractor shall deliver to the Principal the Warranty Bond, amounting to 15% (fifteen per cent) of the Consideration, to guarantee the due performance of any and all the obligations undertaken by the Contractor under the EPC Contract at the moment of PAC. The Warranty Bond shall be definitively released upon issuance of the FAC, provided that the insurance bond under the O&M contract is issued by the Contractor.
 
4.3 Once the Contractor believes that any of the Payment Milestones set out under Article 4.2 has been achieved, it shall so notify the Principal in writing. Within 5 (five) Working Days from receipt of the notice, the Principal shall inspect the Works and verify that the relevant Payment Milestone has been achieved. In the event of objection, the Principal shall indicate to the Contractor the works pending performance for that Payment Milestone. In the event that no objection is raised in writing by the Principal within such term, the relevant Payment Milestone shall be deemed approved.
 
Payment shall be made within 5 (five) Working Days of the date of receipt by the Principal of the invoice in relation to Payment Milestone 1 and within 15 (fifteen) Working Days in relation to other Payment Milestones. The relevant invoice may not be issued prior to confirmation under the preceding paragraph, and prior to issuance of the TAC with regard to Payment Milestone 2 and prior to issuance of the PAC with regard to Payment Milestone 3, as set forth in detail under Article 12.
 
The Parties agree that the payments of the Payment Milestone, for which the Principal shall issue a wire transfer confirmation, shall constitute mere advance payments and not the single lots in which the Parties intended dividing up the Works, with the exclusion, therefore, of the provision contained in the second paragraph of Article 1666 of the Civil Code.
 
4.4 The Parties agree and accept that the Consideration provided in the Contract is fixed and cannot be amended, save as provided in Article 10 of the Contract. Accordingly, the Parties have agreed to exclude the applicability of the Civil Code and every other provision that would entitle the Contractor to obtain a price review in the Contract in order to realise the Works. Save for art. 10 hereof, the risk related to the events referred to in Article 1664 of the Civil Code (burdensomeness or difficulty in performance: i.e. due to an increase of the cost of works and/or materials, or particular performance difficulties due to geological, hydraulic, etc.) and Article 1467 of the Civil Code is fully and expressly undertaken by the Contractor.
 
4.5 It is understood that, in the case of delay in payment of at least 30 days, the Principal must pay the Contractor interest on arrears as provided for by Legislative Decree 231/2002.
 
Article 5 – Representations and warranties of the Contractor
 
5.1 The Contractor represents and warrants that he has visited the Area, that the same is suitable for the System’s realization in a world class manufacturing way and in compliance with the Technical Specifications and the Applicable Law and has already checked the absence of obstacles of a technical and/or geological and/or hydraulic and/or legal and/or administrative nature with reference to the commencement of the Works. Any and all designs, engineering and project specifications produced and delivered by the Contractor shall be prepared and signed by a duly certified engineer and are appropriate to fully accomplish the purpose of this Contract. Therefore, any approval or acknowledgement by the Principal of the technical designs and documentation shall not release the Contractor from its duties, warranties and liabilities as t o the exact delivery of the System and performance of the Works.
 
 
Page 14 of 39

 
 
5.2 The Contractor represents and warrants that at the time of execution hereof he, also through the Developer, holds a valid Building Permit and accepted STMC in relation to the System and that he is unaware of any facts or circumstances, of any kind whatsoever that might prejudice the formation or validity of any System’s Applicable Permits, or the transfer or registration thereof in favour of the Principal. The Area, object of the final building right agreement regarding the Land Use Rights, are free from any encumbrances or burden and there are no third parties (apart from the lawful owners) who can claim any right in relation to such lands, nor prevent the acquisition by the Principal of the Area free from any encumbrances or burden.
 
5.3 The Contractor also represents and warrants to the Principal, with reference to the “turn key” nature of this Contract, to be the only Party liable to the Principal concerning the Works’ complete realization in a world class manufacturing way, undertaking, thus, all liability towards the Principal with reference to all the activities whose performance is entrusted to sub-contractors, pursuant to this Contract.
 
5.4 The Contractor expresses his consent, as of the date hereof, to the assignment and/or pledge in favour of the Financing Entity (or any third parties appointed by the latter) by the Principal of his receivables deriving from this Contract and shall provide his cooperation in the performance of all the formalities and shall provide any further consent, necessary or expedient, required as to the assignment and/or pledge's formation.
 
5.5 The Contractor guarantees to dedicate to the System, at all times, the adequate number of workers and to timely and completely pay all wages, insurance fees and public charges, social securities, etc. for the workers on the sites.
 
5.6 There are no impediments, to Contractor's knowledge that could compromise in some way the obtaining of the authorizations for the construction of the grid infrastructure necessary to connect the System to the grid.
 
Article 6 – The Principal’s duties
 
6.1 The Principal shall undertake to make available in the construction site the areas necessary to allocate the Contractor's site offices and warehouses as well as to store the materials.
 
6.2 The obligations of the Principal shall be those that are established in this Contract and those resulting from the Applicable Law, including, in particular, and without prejudice to the Contractor’s obligations under Article 3, the following:
 
(a)  
to timely comply with its payment obligations under this Contract;
 
(b)  
to promptly sign with Enel Distribuzione S.p.A. the Interconnection Agreement for the System, upon being prompted by the Contractor;
 
 
Page 15 of 39

 
 
(c)  
to promptly sign with GSE the Incentive Agreement for the System upon being prompted by the Contractor;
 
(d)  
to promptly sign with the energy company of its choice the PPA upon being prompted by the Contractor;
 
(e)  
to co-operate, in good faith, with the Contractor in relation to the Contractor's performance of this Contract.
 
Article 7– Works management, Safety Coordination and Costs, Site Rules
 
7.1 Pursuant to Article 89 of the Legislative Decree 81/2008, the Principal shall appoint a Design Health and Safety Coordinator for the planning phase. The Design Health and Safety Coordinator shall be in charge, during the planning phase, of all the obligations and responsibilities pursuant to the Applicable Laws regarding Health and Safety in the workplace. All the fees and expenses relating to said appointment, including his/her consideration shall be borne by the Principal. Pursuant to Article 89 of Legislative decree 81/2008, the Principal shall also appoint a Construction Health and Safety Coordinator for the Executive Project phase, who shall be in charge of all the obligations and responsibilities pursuant to the Applicable Laws regarding health and safety in the workplace. The Principal, pursuant the Article 89 of Legislative Decree 81/2008, shall delegate to a professional duly qualified the duties of supervision and coordination of the manner and timing of the Works (the “Works Manager”, i.e. the Responsabile dei Lavori). All the fees and expenses relating to the Works Manager  and the  Health and Safety Coordinators, including their considerations, shall be borne by the Principal.
 
7.2 In order to allow the Contractor to draw up the Piano Operativo di Sicurezza (the POS) the Principal, pursuant to Article 100 Para 1 of the Legislative Decree 81/2008, through the Design Health and Safety Coordinator, must deliver the Piano di Sicurezza e Coordinamento (the PSC) to the Contractor, at least 30 days before the Start of Works. The Contractor shall deliver to the Principal, at least 20 Working Days before the Start of Works the POS, which shall include any integrations related to the specific risks deriving from the execution of the works pursuant to Article 100, Para 1 of the Legislative Decree no. 81/2008 and to the terms set out in Annex 7 thereto. The POS and its amendment are an integral part of this Contract and the Contractor undertakes to comply with them as well as with any statutory provisions and regulations in force, and shall be held directly and autonomously liable in the case of any breach of the same.
 
7.3 The Works Manager, who in any case shall not have the Principal’s contractual powers of representation, shall supervise the Works to be performed in compliance with the contractual provisions and the law, the terms set out therein and, when the performance is carried out by sub-contractors, he must ensure the coordination between the individual works. In particular, without prejudice to the above, the Works Manager shall be responsible for the following:
 
(a)  
Represent the Principal on site during the performance of this Contract;
 
(b)  
Check compliance with the Project Implementation Schedule and, in the case of delay with reference to the latter, agree upon a new programme aimed at guaranteeing compliance with the dates established for the System’s final delivery;
 
 
Page 16 of 39

 
 
(c)  
Monitor the site;
 
(d)  
Check the effective coordination among the subcontractors, under the Contractor’s liability;
 
(e)  
Draw up the reports relative to the beginning and end of the Works, any suspensions and anything else that might concern the site Works;
 
(f)  
Check the partial and final advance payments;
 
(g)  
Analyse the costs indicated by the Contractor in the case of Discretional Variations;
 
(h)  
Ensure the execution of  the Technical Inspection, the Operational Inspection, the Reassessment Tests, and the delivery of the Works;
 
(i)  
Check that the Contractor’s performance of the Works takes place in compliance with all the provisions of this Contract, of the Applicable Law and the Technical Specifications, and in a world class manufacturing way. In particular, the Works Manager shall:
 
(i)  
impart the technical directions required to guarantee the Contractor’s compliance concerning the Works’ performance conditions and, where necessary, formulate the relative remarks and/or objections and propose Variations;
 
(ii)  
validate the Technical Inspection and the Operational Inspection for the Principal’s approval;
 
(iii)  
supply the Contractor with clarification and/or supplementary technical explanations concerning the projects’ specific elements and/or technical descriptions necessary to carry on the Works;
 
(iv)  
order the amendments, which are necessary for technical reasons, related to specific elements of the Works that do not impair the substance and nature of the Works and that do not constitute Discretional Variations;
 
(v)  
approve the drawings prepared by the Contractor with reference to their compliance with the Technical Specifications and the Executive Project approved by the Principal.
 
 
Page 17 of 39

 
 
7.4 Within 5 (five) Working Days of the Communication of the Executive Project’s approval, the Contractor shall inform the Principal in writing about the Site Manager’s name, who must have the technical expertise and professionalism necessary to perform his appointment according to this Contract. In particular, in order to ensure the correct performance of the Contractor’s obligations under this Contract and the Applicable Law, the Site Manager must:
 
(a)  
cooperate with the Works Manager, the engineer appointed to draw up and sign the Executive Project and with the Health and Safety Coordinators; and
 
(b)  
observe all the requirements and observations imparted by the above persons in the case they spot any inconsistency between the Works and the Applicable Laws.
 
7.5 Any instruction, request, integration or order from the Works Manager, the Health and Safety Coordinators and/or the Safety Coordinator shall be communicated to the Contractor in writing by means of specific Service Orders which must be progressively numbered and delivered to the Site Manager in two copies, one of which must be returned, duly signed, by the Contractor in receipt thereof. The Contractor shall not be entitled to refuse to perform the orders received, save for his right to draw up, in writing, his own remarks or reservations on signing the Service Orders which must, in any case, take place, on penalty of forfeiture, within 5 (five) Working Days of receipt of the Service Orders.
 
7.6 The Health and Safety Coordinators, the Works Manager, the Technical Consultant and/or the individuals indicated by the Principal shall be entitled to enter the site, at any time whatsoever, and to carry on the verifications that, at their unquestionable judgement, would be necessary.
 
7.7 The personnel employed by the Contractor to carry out the Works must be experienced and of a sufficient number in respect of the obligations undertaken by the Contractor. The Principal shall be entitled to require the immediate removal from the site of the personnel’s members who, at his unquestionable judgement, do not offer sufficient guarantees for the timely performance and quality of the Works and/or whose conduct might prejudice the System and its performance. The Contractor’s personnel, operating where the work is carried out, must be equipped with an identity badge.
 
7.8 The Contractor undertakes to comply with all the obligations derived from the Applicable Law’s provisions regarding labour and social security, including the general, health rules on the work place, the provisions on accident prevention on the work place, the obligatory insurance for accidents in the work place and professional illnesses, social security for involuntary unemployment, invalidity or old age, tuberculosis and other professional illnesses, the protection of workers in the case of a contract with particular reference to the Legislative Decree Law No. 81/2008 and to any other provisions in force or which might arise during the Works aimed at protecting the workers. Furthermore, the Contractor shall grant his personnel an economic and juridical status in compliance with the applicable labour collective agreements, a nd shall provide, upon the Principal’s written request, suitable documentation constituting evidence of the appropriate economic and juridical status and holding the Principal harmless from any claim raised by his consultants and/or employees.
 
7.9  Pursuant to Article 26, paragraph 5 of Legislative Decree no. 81/2008, Annex 8 contains specific indications of the costs relating to safety in the Area, which is included in the Consideration, which the Contractor is obliged to draw up with accuracy and precision.
 
 
Page 18 of 39

 
 
7.10 The Parties agree that the prevailing language for any correspondence between them in relation to the entire execution of this Contract, including correspondence, testings and inspections shall be the English language.
 
Article 8 – Performance of the Works
 
8.1 The Contractor shall deliver to the Principal, within 20 (twenty) Working Days of the date on which this Contract is executed, two copies of the Executive Project for the System, one on paper and one using editable software, for the Principal’s approval.
 
8.2 Within 10 (ten) days from the Executive Project’s delivery date to the Principal, pursuant to Article 8.1 foregoing hereto, the Principal shall provide the Contractor with his consent or his remarks and/or proposals for amendment and integration which are necessary in order to bring into line the Executive Project with the Decree Law and the Technical Specifications. The Contractor shall undertake, at his own expense and without this constituting a reason for requesting any variations to the Consideration, to amend the Executive Project in compliance with the Principal’s proposals. The amended/integrated Executive Project shall be delivered to the Principal within the following 10 (ten) Working Days, in order to obtain his approval, provided that in the following 10 (ten) days the Principal shall communicate his decisio ns to the Contractor.
 
8.3 Once the Executive Project has been approved by the Principal, the latter shall provide the Contractor with a written communication (the “Communication of the Executive Project’s Approval”), and the Parties shall meet within 7 (seven) days of the Contractor’s receipt of said communication, in order to proceed with the delivery of the Area to the Contractor. On delivery of the Area, as a condition to allow the Start of Works, the Contractor shall provide the Principal with evidence that he has entered into the insurances provided under Article 15, in accordance with the terms thereof.
 
8.4 After delivery of the Area, the Contractor shall set up the site and commence the Start of Works for the System.
 
Article 9 – Completion Date and Delay Liquidated Damages
 
9.1 The Contractor undertakes to achieve Mechanical Completion and connection of the System to the grid (i.e. Commencement of Operation) within 120 (one hundred and twenty) days of the date Payment Milestone 1 shall be paid in accordance with the Contract (“Completion Date”). The Parties agree that in the case of delay by the Principal in the payment of the invoices in accordance with the terms set out in Article 4.3, provided that the procedure of inspection of the Works set out therein has been complied with, the Completion Date shall be postponed by a period of time equal to the days of delay in the relevant payment, save for any other remedy provided in this Contract.
 
9.2 In the case of an envisaged delay in respect of the date referred to in Article 9.1, the Contractor shall within 7 (seven) Working Days from the relevant date, deliver to the Principal a written delay recovery plan, specifying the relevant terms and procedures aimed at safeguarding, inasmuch as possible, the punctual achievement of the Completion Date. For the avoidance of doubt the submission of such recovery plan to the Principal shall not relieve the Contractor from any of its obligations under this Contract.
 
 
Page 19 of 39

 
 
9.3 In the case of failure to comply with the date set forth in Article 9.1, the Principal shall be entitled to apply Delay Liquidated Damages equal to Euro 1.2/kWp (one point two)  per day of delay up to a maximum amount of 5% (five percent) of the Consideration, save for any greater damages and all further compensation in the case of termination pursuant to Article 20.1 (b). The Contractor acknowledges that the above amounts are a genuine pre-estimate of the Principal’s losses in the event of delays in the Completion Date.
 
9.4 During the first 90 (ninety) days of delay, the Principal shall offset the Delay Liquidated Damages against the Consideration, which shall accordingly be reduced. As from the 91st (ninety-first) day of delay, the Principal shall be entitled to the payment of the Delay Liquidated Damages accrued until such time (i.e., for the avoidance of doubt, during the first 90 days Delay Liquidated Damages). Further Delay Liquidated Damages shall be payable on a monthly basis upon receipt by the Contractor of the Principal’s payment notice.
 
9.5 Without prejudice to the above, the Principal shall also be entitled (in its absolute discretion) to offset the Delay Liquidated Damages against any monies due, or to become due, to Contractor.
 
9.6 The payment shall not release the Contractor from its obligation to complete the Works or from any other duty, obligation or responsibility under the Contract.
 
9.7 In the event that the 2010 Incentive foreseen by the Decree is not awarded to the System, the Contractor shall be liable to grant to Principal a discount equal to the loss of profit discounted to present (“Discount”). The Parties agree that every 1 (one) cent reduction in the tariff shall result in the Consideration being reduced by Euro 100.00 per kWp (one hundred), on a pro-rata basis. The Discount shall become payable by the Contractor 30 days after it becomes clear that the System is not admitted to the 2010 Incentive foreseen by the Decree.
 
9.8 The Contractor explicitly waives any right to offset the amounts due to the Principal by way of Discount or Delay Liquidated Damages, pursuant to this Article 9, or pursuant to Article 20.1 against any amount that the Contractor might claim against the Principal. The Contractor acknowledges and considers that the Discount and the Delay Liquidated Damages are suitable to the Consideration and the prejudice that each delay might cause the Principal, and waives any claim or action aimed at obtaining a reduction of such Delay Liquidated Damages or Discounts.
 
Article 10 – Variations
 
10.1 The Contractor undertakes to perform any Variations to the Works, which are required both for the execution of the Works according to the best quality standards as well as if requested by the Principal.
 
10.2 In particular, for the purposes of this Contract, the Variations considered shall be the following:
 
(a)  
Variations required for the correct fulfilment of the Works in a world class manufacturing way and in compliance with the Technical Specifications and the Applicable Law, pursuant to Article 1660 of the Civil Code (“Necessary Variations”);
 
 
Page 20 of 39

 
 
(b)  
Variations requested by the Principal during the performance of the Works, or alternatively, proposed by the Contractor and accepted in writing by the Principal and/or the Financing Entity, subject to the favourable opinion of the Technical Consultant (“Discretional Variations”).
 
10.3 In the case of Necessary Variations, the Contractor shall, if at any time whatsoever whilst the Works are being performed the necessity of any kind of quantitative and/or qualitative amendments concerning the same is found, to immediately inform the Principal in writing, indicating the type of Variations proposed with an indication of the relative quantity, materials and price per unit as well as the realization times required for said intervention. It is understood that no Necessary Variation may be performed without the prior consent to do so by the Principal and the Financing Entity (which shall base its consent on the Technical Consultant’s prior positive opinion). Similarly, in the case of Discretional Variations, the Contractor, with the document proposing the same or within 10 (ten) Working Days in the case that the V ariations have been proposed by the Principal, shall send to the Principal and to the Technical Consultant a communication setting out the relative quantity, materials, unit prices, realization times connected with said Variations and the relevant higher costs, if any, provided that in any case no Discretional Variation can be performed without the Principal and Financing Entity’s prior written consent, also with regard to the Variations’ cost.
 
10.4 It is understood and agreed between the Parties that: (i) the costs related to the Discretional Variations requested by the Principal, once agreed between the Parties in accordance with the above provisions, shall be added to the Consideration and paid according to the terms of Article 4 above; and (ii) the costs related to the Necessary Variations, provided that they do not exceed 4% (four per cent) of the Consideration, shall be entirely borne by the Contractor. The increase in the Consideration possibly due by the Principal shall not exceed an amount equal to the reasonable costs incurred by the Contractor in relation to the System in order to comply with the Applicable Law.
 
10.5 The determination of the Variation’s value for the purposes of paying for the additional costs and the application of Article 10.4 above, shall take place in compliance with the following criteria:
 
(a)  
on the basis of the unit prices in the “Construction Work Price Information” published by the Chamber of Commerce of Padua;
 
(b)  
the activities that cannot be evaluated according to the above criterion must be agreed on the basis of the market prices applicable to the Works, object of the Contract, as agreed in writing between the Parties.
 
 
Page 21 of 39

 
 
10.6 In the case of delay of the Works due to the necessity to carry out any Discretional Variations and Necessary Variations due to a change in the Applicable Law, the Parties accept that the Project Implementation Schedule shall be modified in agreement between the Parties. This extension must be at least equal to the period agreed between the Parties to be necessary to perform the Variations.
 
10.7 The Contractor waives the termination right foreseen by article 1660 of the Civil Code. Furthermore, Article 1661 of the Civil Code shall not apply to the Discretional Variations requested by the Principal.
 
Article 11 – Force Majeure
 
11.1 Force Majeure shall imply any unforeseeable event, fact or circumstances which cannot be directly attributed to the Party invoking it, which is impossible to prevent by employing ordinary diligence and such as to make impossible, objectively and absolutely and either totally or partially, the performance of any of the obligations under this Contract, provided that said events, acts, facts or circumstances:
 
(a)  
are outside the control, either direct or indirect, of the Party invoking them;
 
(b)  
could not have been avoided by employing the normal diligence requested by the nature of the activities performed by such Party; and
 
(c)  
have been invoked by the same as Force Majeure events (“Force Majeure”).
 
11.2 Merely by way of an example, without limitation and on condition that they satisfy the requirements listed in Article 11.1 above, the Parties mutually acknowledge that the following events constitute causes of Force Majeure:
 
(a)
general and category and national and local strikes (other than the Contractor’s corporate strikes);
 
(b)
wars or any other hostile acts, including terrorist attacks,  revolts, uprisings and other civil disorder;
 
(c)
blockages or embargoes, even of a financial nature;
 
(d)
exceptional, adverse natural phenomena, including lightning, whirlwinds, earthquakes, fires, floods, overflows, floods, drought, adverse weather conditions that impede the performance of the Works and which cannot be foreseen on the basis of weather forecast data for the current period, meteorites and volcanic eruptions;
 
(e)
explosions, radiation and chemical contamination.
 
 
Page 22 of 39

 
 
11.3 The Contractor acknowledges and accepts that the following events do not constitute Force Majeure:
 
(a)  
non-obtainment, revocation or non-renewal of any permit required to perform the Works and realization of the Systems, for facts attributable to the Contractor; and
 
(b)  
any delays in the delivery of supplies and materials by the suppliers.
 
11.4 Each Party shall immediately inform the other one, in writing, about the occurrence of a Force Majeure event that shall hinder his obligations and, in any case, within 48 (forty-eight) hours from becoming aware of the same, indicating the possible impact that said event might have upon the Project Implementation Schedule. The Party concerned shall also promptly inform the other one when said Force Majeure cause ceases.  In the case of no or delayed communication as to the existence of the end of a Force Majeure cause, the Party in breach of his obligations shall be liable for the damage sustained by the other Party, which could have been avoided or limited, in the case of the timely receipt of the relevant communication.
 
11.5 The Contractor acknowledges and accepts that he shall not be entitled to request any increase in the Consideration or different compensation in relation to the Force Majeure event, except for the costs sustained to adopt the measures referred to in Article 11.7. Subject to the Principal and Financing Entity’s approval (which shall employ the Technical Consultant’s positive prior opinion), the terms established in the Project Implementation Schedule for the Works’ performance will be extended, further to the Contractor’s written request, for a period equivalent to the duration of the Force Majeure even and for the time required to put together the Equipment and stores of materials that have eventually been damaged.
 
11.6 Should the aforementioned Force Majeure events continue, uninterruptedly, for a period of more than 90 (ninety) natural, consecutive days, or for more than 120 (one hundred and twenty) natural, non-consecutive days, as accumulated during the period of time in which this Contract is in force, the Principal shall be entitled to terminate this Contract.
 
11.7 In any case, the Parties shall use their best endeavours to reduce the consequence of the Force Majeure event and shall do what they can to re-establish normal conditions and mitigate any damages eventually sustained by the other Party.
 
Article 12 – Inspection of the Works for payment purposes
 
12.1 Payment Milestone 2 - Technical Inspection – TAC. Once the Mechanical Works are completed, the Contractor shall deliver to the Principal the notice of Mechanical Completion. This notice shall imply the suitability of the System, to be prepared and tested for connection to the national electricity grid except for the physical realization of the connection line to the national electricity grid. Within 10 (ten) Working Days from the Principal having received said communication, the Parties, together with the Works Manager and the Site Manager, as well as the Technical Consultant appointed by the Principal and/or the Financing Entity, shall start the Technical Inspection, in accordance with the procedure provided for in Annex 10, in order to verify that the Works have been carried out in accordance with the Technical Specifications, the Applicable Laws and in a world class manufacturing way. If the Technical Inspection is concluded in a positive way, the Principal shall sign the Technical Acceptance Certificate substantially in the form attached in Annex 11. Should the Technical Inspection not be passed, the Contractor shall remedy any defects found within a reasonable timeframe which shall be agreed by the Parties. Following the signing of the Technical Acceptance Certificate, the Contractor shall be entitled to issue the relevant invoice.
 
 
Page 23 of 39

 
 
12.2 Payment Milestone 3 - Operational Inspection - PAC. Upon Commencement of Operation the Contractor will issue the Commencement of Operation notice as described in Annex 12 to the Principal. Within the shortest possible delay provided that the System has been continuously producing energy for a minimum period of 5 (five) consecutive calendar days with a maximum interruption of 2 (two) blank hours, the Parties, with the collaboration of the Works Manager and the Site Manager, as well as the Technical Consultant appointed by the Principal and/or the Financing Entity, shall begin the Operational Inspection according to the procedure described in Annex 10, and in the presence of the Technical Consultant. In order to start the Operational Inspection, the Contractor must provide all the technical documentation required by the Principal and the Technical Consultant, the “as built” drawings of the Works, the instruction manuals and system maintenance documents. It is understood that the responsibility for all Operational Inspection activity shall be borne by the Principal. During the Operational Inspection, the Principal shall check if (i) the Works have been carried out in a world class manufacturing way and if (ii) they abide by the Technical Specifications and Applicable Law, and (iii) if the System performs in accordance with the MGPR. Upon receipt of the Technical Consultants’ commissioning report and a satisfactory evaluation by the Principal and the Financing Entity hereof the Principal shall issue the PAC substantially in the form attached in Annex 14 and will attach the commissioning report of the Technical Consultants hereto. Should the Operational Inspection not be passed, the Contractor shall remedy any defects found within a reasonable timeframe which shall be agreed by the Parties. Specifically in case of non compliance of the System with the MGPR the Principal shall grant the Contractor, in writing, a period of no more than 25 (twenty-five) Working Days from the relative communication, within which the Contractor must remedy said defects and/or carry out any necessary action to achieve a positive result of the Operational Inspection. Following the signing of the Provisional Acceptance Certificate, the Contractor shall be entitled to issue the relevant invoice.

If the PAC has been passed with certain minor finish work still pending execution, the Principal shall sign the Provisional Acceptance Certificate, provided that the pending minor finish works (the Punch List Works) are listed in an attached document signed by the Parties (the Punch List), and that a period of up to thirty (30) days, or the different period agreed upon by the Parties on the basis of the general accepted commercial practice, is set therein for completion of the Punch List Works.  Contractor shall use its best efforts to carry on the Punch List Works so as to minimize any interference with the operation of the relevant System and so as to minimize any reduction in performance or availability of the re levant System.
 
If, at the conclusion of the time period specified in the Punch List, the Punch List Works have not been performed by the Contractor, the Principal, without prejudice to any other rights it may have hereunder in respect of such not completed Punch List Works, shall give notice to the Contractor and the Contractor shall perform such Punch List Works within fifteen (15) days from receipt of the notice.  Should the Contractor fail to do so, the Principal shall be free to perform such works directly or through third parties, and shall have the right to (a) deduct the related direct costs and expenses (duly documented in writing) from the Consideration, or (b) to enforce the Parent Company Guarantee for the amount of said direct costs and expenses.
 
12.3 Transfer of ownership of the System in favour of the Principal shall occur on issuance of the Provisional Acceptance Certificate.
 
12.4 On issuance of the Provisional Acceptance Certificate, the Contractor must make the O&M Agreement operative in relation to the accepted System.
 
 
Page 24 of 39

 
 
12.5 Incentive Acceptance Certificate. The Principal shall issue the IAC as per Annex 15 after having confirmed that all the following conditions have taken place:
 
(a)  
Power Purchase Agreement is in force with reference to the collection of the electrical energy produced by the System;
 
(b)  
Incentive Agreement is entered into with GSE in compliance with the terms foreseen in Article 5, paragraph 4, of the Decree Law, together with all the documents foreseen by the AEEG Resolution 90/07 and the Principal has been informed about the System’s admission to the incentive tariff foreseen by the Decree Law.
 
12.6 Reassessment Tests. The First Reassessment Test of the MGPR shall be performed, in accordance with the procedure described in Annex 10, 12 (twelve) months after the PAC. The Second Reassessment Test of the MGPR shall be performed 24 (twenty four) months after the PAC.

The Contractor shall notify the Principal when the System is ready to be tested and both Parties will agree a date to carry out the Reassessment Tests for the corresponding annual period (such a date will not be later than the fifteen (15) working days following expiry of the 12 month period following the start of the Warranty Period or the date of the end of the Warranty Period as appropriate).
 
The First and the Second Reassessment Test of the System shall be subject to the Technical Consultant’s consent.
 
12.7 Final Acceptance Certificate. The Principal, with the prior written consent of the Technical Adviser and of the Financing Entity, shall issue the Final Acceptance Certificate as per Annex 16 upon the satisfaction of the following conditions,
 
·  
the System has passed successfully the First and Second Reassessment Test and/or any related Performance Liquidated Damages have been paid by the Contractor.
 
·  
the IAC has been issued;
 
·  
agreement with the GSE and the Incentive are in force with reference to the collection of the electrical energy produced by the System;
 
·  
all the obligations related to the regulation of access to the grids have been fulfilled;
 
·  
the O&M guarantee foreseen under the O&M Agreement is in place.
 
Article 13 – Warranties for Defects and Materials
 
13.1 The Contractor shall warrant the System’s performances in compliance with the Technical Specifications and the MGPR as foreseen in Annexes 6 and 9 for the period of 24 (twenty four) months after the issue of the PAC. The Contractor shall undertake, in any case, to promptly remedy the System’s lower performance after having received from the Principal a written communication regarding the unsatisfying performance.
 
 
Page 25 of 39

 
 
13.2 Penalties. If the effective performance ratio disclosed by the PAC test and/or the First Reassessment Test and/or the Second Reassessment Test is less than the MGPR, the Contractor shall pay to the Principal Performance Liquidated Damages equal to Euro 7.5 per kWp (seven point five), per each percentage point which is lower than the value indicated in the MGPR. It is understood that the total amount of Performance Liquidated Damages, shall be no more than 1% (one per cent) of the Consideration. Performance Liquidated Damages shall be payable at the end of the month in which the relevant test was held.
 
13.3 Without prejudice to the above, the Contractor shall provide the Principal with a guarantee for any defects concerning the Executive Project and the Works in accordance with Article 1667 and 1669 of the Civil Code. The terms of said guarantee will come into force from the date of issuance of the PAC, in accordance with Article 12 above, for a period of 24 (twenty four) months. The terms to give notice with reference to defects are ruled by Articles 1667 and 1669 of the civil code. Accordingly, the Contractor shall during such time:
 
(a)           replace, repair and/or adjust any defective Equipment;
 
(b)           guarantee availability of spare parts.
 
13.4 In addition to the above, the Contractor must also provide the following specific guarantees with regard to the photovoltaic modules:
 
(a)  
Install a guaranteed potential by means of the issue of "flash test" certification of the modules.  The power effectively installed must reach the quantity established in the relative manuals, in compliance with the Technical Specifications. Otherwise, the Contractor shall be obliged to replace the faulty modules and/or install additional modules in order to reach the nominal power as described in Recital D;
 
(b)  
A photovoltaic module efficiency guarantee for a minimum period of twenty years after the issue of the PAC, provided that the cumulative deterioration of the photovoltaic modules does not exceed, for the first 10 (ten) years, 10% (ten percent) and for the first 20 (twenty) years, overall, 20% (twenty percent). The relevant guarantee’s extension in compliance with the terms of the law has already been taken into consideration in calculating the MGPR.
 
Said guarantees must be accompanied by the modules’ producer’s counter-security, of which the Principal shall be entitled to choose to be the direct beneficiary, since the Contractor shall, in any case, be held jointly liable with said producer.
 
 
Page 26 of 39

 
 
Article 14 – Assignment, Subcontracting and Sub-supply
 
14.1 The Contractor shall not be entitled to assign, either totally or partially, the Contract; however, the Contractor may be entitled to subcontract the performance of any portion of the Works to third parties, subject to the Principal’s prior written consent.
 
14.2 In the case of subcontracting, it is understood that the Contractor shall be totally and unconditionally liable to the Principal with reference to the complete, precise and punctual performance of the Contract, including with reference to the totality of the subcontracted works and the supplies and also with reference to compliance with the provisions relative to remuneration and social security and the Works meeting the requirements established by this Contract.
 
14.3 In any case, each of the subcontractors shall abide by and comply with the provisions set forth in the PSC and the POS, since the Contractor shall be held directly liable to the Principal in relation to this compliance.
 
14.4 The Principal shall be entitled to assign this Contract any third company indicated by the Principal, and the Contractor expressly consents as from now to such assignment.
 
Article 15 – Insurance
 
15.1 The Contractor, without prejudice to his own responsibilities, shall, at his own total expenses, enter into the following insurance policies with first-class insurance companies, with an S&P rating of no less than A- or equivalent or, in any case, that satisfies the Principal and the Financing Entity, if appointed, and maintain them operative for the entire period in which this Contract is in force. Said insurance policies must be submitted beforehand to the Principal and the Financing Entity, if appointed, for their approval:
 
(a)  
Industrial accidents insurance in favour of the Contractor’s employees and/or any workers who are not the Contractor’s employees;
 
(b)  
employers’ liability, with a minimum limit of no less than Euro 5,000,000.00 per event and 2,000,000.00 per person;
 
(c)  
Insurance to cover third party civil liability, with a minimum limit per event of no less than Euro 5,000,000.00; the Principal and the Financing Entity, albeit maintaining the qualification of “third party”, they must be inserted as “additional party insured” and there must be an explicit clause waiving the party’s insured recovery against the Principal, the Financing Entity and their employees and consultants;
 
(d)  
Insurance to cover professional civil liability, with a minimum limit per event of no less than Euro 2,500,000.00;
 
(e)  
Insurance to cover vehicle civil liability, for all owned vehicles and/or in use, which must be provided with the mandatory insurance policy as foreseen by the Law No. 990/69 and subsequent amendments and integration, for a minimum limit of no less than Euro 5,000,000.00 per accident;
 
 
Page 27 of 39

 
 
(f)  
“All risks Property Damage”, including theft, insurance, to cover all the goods and assets, including the main cabins, equipment and machinery used during the Works’ realization, with the sum insured equivalent to the value incurred by replacing the same.
 
15.2 The Contractor, without prejudice to his own responsibilities shall, at his own total expenses, enter into the following insurance policies, with first-class insurance companies, with an S&P rating of no less than A- or equivalent or, in any case, which satisfy the Principal and the Financing Entity, if appointed, and maintain them operative for the entire period in which this Contract is in force. Said insurance policies must be submitted beforehand to the Principal and the Financing Entity, if appointed, for their approval:
 
(a)
E.A.R. “Erection All Risks” policy to cover the damages derived from the damage to total or partial destruction of the Works, which might occur while the Works are carried out. The cover shall also provide for cover for extended maintenance for a period of 24 months, the supply warranty, the section of third party civil liability (including the crossed liability between the participants and the works) and the advanced loss of profit section. The sum insured for the Works shall be equivalent to the Contract’s value, whilst the civil liability upper limit shall be no less than Euro 5,000,000.00 per accident;
 
(b)
transport policy to cover the material damages and aimed at the assets required to realise the Works, including the advanced loss of profit section. The cover shall run from the place of departure anywhere in the world until arrival care off the site where the works are performed.
 
15.3 The insurance policies provided under paragraphs 15.1 and 15.2 shall as include the Financing Entity, if appointed, the Principal, and any other subcontractor among the insured parties. The Principal shall be entitled, at his own unquestionable judgement, to enter into other covers or policies in integration of and/or besides those foreseen by this Article 15, simply informing the Contractor of the same beforehand.
 
15.4 The Contractor acknowledges that the insurance cover referred to in Articles 15.1 and 15.2 may be object of encumbrance in favour of the Financing Entity. In this respect, the Contractor agrees that the Principle, at its discretion, may require that the insurance company issues an endorsement letter in favour of the Financing Entity, for the case that a Financing Entity is appointed. In addition the Contractor agrees to use reasonable endeavours to achieve any requirements of the Financing Entity relating to security over the insurance policies.
 
15.5 In any case, the amounts exceeding the upper limits and the indemnity limits insured, as well as the amounts corresponding to any type of excess liability relative to any policy shall be charged to the Contractor.
 
15.6 The Contractor shall be responsible for losses exceeding the insured limits and for policy deductibles. He shall also hold the Principal and the Financing Entity harmless from any claims for compensation for damages, liabilities, costs and expenses derived, directly or indirectly, from events covered by the insurance policies but which, for any reason whatsoever, are not compensated or by events that are not covered by the policies themselves.
 
 
Page 28 of 39

 
 
15.7 It is understood between the Parties that the Principal shall, in any case, be free to commence legal proceedings against the Contractor to seek compensation of all the eventual and further damages that might result as not being covered by any policy and which can be ascribed to the Contractor by virtue of this Contract.
 
15.8 The Contractor shall deliver executed copy the aforementioned policies and evidence of the payment of the premiums for the entire duration of the relative period insured promptly after execution of this Contract and in any case within the terms foreseen in Article 8.3 and hereby undertakes not to make any changes to the policies without the Principal’s prior authorisation to do so. The Contractor shall also undertake to check that sub-contractors underwrite, for the entire duration of the Works, suitable insurance cover in compliance with Articles 15.1 and 15.2 above, charged to the Contractor himself.
 
Article 16 – Performance Suspension
 
16.1 The Principal, by means of the Works Manager, shall be entitled to suspend the Contract, either totally or partially, at any time whatsoever and on more than one occasion, by providing the Contractor with written communication of the suspension sent by registered mail with return receipt. Said suspension cannot, in any case, exceed, as a whole, the overall duration of 45 (forty-five) calendar days.
 
16.2 The Contractor shall be entitled to receive a refund for the costs and expenses sustained due to suspension, which shall be provisionally defined (in order to permit continuation of the Works) by the Works Manager, except for the Parties being entitled to object the Works Manager’s decision pursuant to Article 24.  The Parties shall undertake, in any case, to provisionally apply the Works Manager’s decision.
 
16.3 In the case of suspension arising pursuant to this Article, the Parties have accepted that the Project Implementation Schedule may be amended in agreement between the Parties. This extension must be at least equal to the period of suspension.
 
Article 17 - Unilateral Termination by the Principal
 
17.1 The Principal shall be entitled, at any time whatsoever, to unilaterally terminate the Contract, informing the Contractor by means of notice sent by registered mail with return receipt.
 
17.2 In the case of the Principal’s exercising the unilateral termination right referred to in the previous paragraph and save for Article 17.4 here below, the Principal shall pay the Contractor, in addition to the Consideration for the Works, performed up until that time, an indemnity equal to 10% (ten per cent) of the value of the outstanding Works.
 
17.3 The Contractor shall withhold any advance payment on the Consideration made by the Principal in compliance with the Payment Milestones, save for the Contractor’s right to claim payment of any further amounts due to the Contractor for all the Works that have been carried out until receipt of the termination notice.
 
 
Page 29 of 39

 
 
17.4 The Principal shall be entitled to terminate the Contract pursuant to the above, should the Applicable Law change or should a Force Majeure event occur which renders the realization of the System impossible and leads to the revocation of any Applicable Permit. However, in this case and in derogation to what has been foreseen in Article 17.2, the Contractor shall only be entitled to payment of the consideration due for the Works carried out until the delivery of the termination notice, excluding any indemnity for the part of the Works that have not been performed.
 
17.5 Should the Principal terminate the Contract, it shall promptly return the Parent Company Guarantee to the Contractor.
 
Article 18 – Termination attributable to the Contractor
 
18.1 The Principal shall be entitled to terminate the Contract pursuant to Article 1456 of the Civil Code (clausola risolutiva espressa), by giving notice to the Contractor no later than 30 (thirty) calendar days of the Principal becoming aware of any of the following circumstances:
 
(a)  
non-delivery of the Parent Company Guarantee and all the insurance policies to the Principal within the terms foreseen in Article 15 of this Contract and in compliance with the condition foreseen therein, or the Contractor’s breach of its obligation of maintaining the Parent Company Guarantee and the insurance policies in force, at its own expense, in compliance with the terms and conditions foreseen in this Contract;
 
(b)  
any of the representations or warranties provided in Article 5 is imprecise, untrue or misleading;
 
(c)  
the Building Permit, the STMC, and any other Applicable Permit already obtained are not transferred to the Principal pursuant to art. 4.2.(a);
 
 
Page 30 of 39

 
 
(d)  
cancellation or revocation of a Building Permit, STMC, or any Applicable Permit for reasons attributable to the Contractor;
 
(e)  
the circumstances provided under Article 11.6 occur;
 
(f)  
non-admission to the 2010 Incentive or in any case non entry into force of the Incentive Agreement;
 
(g)  
the Contractor has exceeded the maximum limit of Liquidated Damages and/or Penalties foreseen pursuant to Articles 9 and 13;
 
(h)  
failure to pass the Operational Inspection and consequent non-issue of the PAC;
 
(i)  
failure to release the Warranty Bond upon issuance of the PAC
 
(j)  
failure to pass the Reassessment Tests;
 
(k)  
failure to satisfy the condition in Article 12.7 and consequent non-issue of the FAC within 24 months from the issuance of the PAC
 
18.2 The Principal shall be entitled to send the Contractor notice to perform within the terms of no less than 30 (thirty) calendar days from receipt of the relevant notice (or any longer terms that are considered to be appropriate by the Principal in relation to the circumstances), pursuant to Article 1454 of the Civil Code in all events of the Contractor’s breach, other than those referred to in Article 18.1 above, of his obligations, pursuant to this Contract.  Should the Contractor not perform within such terms, the Principal shall be entitled to declare the Contract terminated.
 
18.3 The Contract shall be terminated pursuant to Article 81 of the Italian Bankruptcy Law (R.D. 267/1942 as amended and/or integrated from time to time), if the Contractor becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against it, compounds with its creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under Applicable Law) has a similar effect to any of these act or events, unless the Principal consents to continuation of the Contract.
 
 
Page 31 of 39

 
 
Article 19 - Termination attributable to the Principal
 
19.1 In the case of the Principal’s breach of its obligations pursuant to this Contract, the Contractor shall be entitled to send the Principal and the Financing Entity, if appointed, notice to perform within the terms of 30 (thirty) calendar days of receipt of such notice, pursuant to Article 1454 of the Civil Code. The Contractor acknowledges and accepts that termination of the Contract due to facts attributable to the Principal cannot, in any case whatsoever, be declared or requested unless notice demanding performance is sent to the Principal, with the Financing Entity in copy, pursuant to this Article.
 
19.2 The Contract shall be terminated pursuant to Article 81 of the Italian Bankruptcy Law (R.D. 267/1942 as amended and/or integrated from time to time), if the Principal becomes bankrupt or insolvent, goes in liquidation, has a receiving or administration order made against it, compounds with its creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or if any act is done or event occurs which (under Applicable Law) has a similar effect to any of these act or events, unless the Contractor consents to continuation of the Contract.
 
 
Page 32 of 39

 
 
Article 20 – Termination Consequences
 
20.1 In the case of termination of the Contract attributable to the Contractor, in any of the events foreseen by the Applicable Law or by this Contract, the Principal shall be entitled to receive from the Contractor, save for any further damages, payment of a termination penalty equal to 10% (ten percent) of the value of the remaining Works, to be determined in the value of the Consideration less the amounts of the Payment Milestones become due on the time of termination. The Principal shall also be entitled to receive from the Contractor the refund of the amounts corresponding to the balance of the payments which have not been up to that time allocated to the subsequent Works.
 
Without prejudice to the above, the Principal shall also be entitled to:
 
(a)
prepare a report of completed Works setting forth the value thereof, in which case, upon termination, without prejudice to any provisions of this Contract, the Principal shall have the right to:
 
i.  
keep the completed Works, in which case the Contractor shall promptly abandon the Area and transfer the ownership of any completed Works if not already transferred; or alternatively,
 
ii.  
reject the Works, in which case the Contractor shall dismantle the Works bearing the relevant costs and expenses and return to the Principal any payment of the Consideration received, plus interest in accordance with Article 1224 of the Italian Civil Code.
 
(b)
quantify the amount of any and all penalties, Delay Liquidated Damages, Discounts, etc, owed by the Contractor to the Principal, in which case the Principal shall prepare a statement of amounts due to the Principal less any amounts due to the Contractor under this Contract; the statement of amounts outstanding shall be sent to the Contractor which shall send its observations to the Principal within ten (10) days. Failure to send observations within such ten-day period shall be deemed consent to the statement of amounts due to the Principal. Payment of the amounts indicated in the previous paragraph shall be made within 7 (seven) calendar days of receipt of the above-mentioned statement, and the Principal shall be entitled to enforce the Parent Company Guarantee and/or the Warranty Bond to recover any such amounts. In the event that the Contractor disputes the statement of the Principal within ten (10) days, and the Parties fail to reach an amicable settlement, the dispute shall be settled in accordance with Article 24 hereof. As soon as Contractor pays the amount due, Principal shall return the Parent Company Guarantee and the Warranty Bond. On the contrary, where Contractor fails to pay the amount due pursuant to the above statement, Principal shall be entitled to enforce the Parent Company Guarantee and/or the Warranty Bond;
 
(c)
have the Area vacated by the Contractor, at his own expenses, from all the material, equipment and machinery belonging to him and from any rubble, debris and rubbish within 15 (fifteen) days of termination.
 
 
Page 33 of 39

 
 
20.2 In the case of termination attributable to the Principal, the Principal shall take definitive delivery of the Works that have been realised up to the time of termination and the Contractor shall be entitled to withhold any payment made by the Principal in compliance with the Payment Milestones pursuant to Article 4, save for the Contractor’s right to claim  payment of any further amounts due to the Contractor for all the Works that have been carried out until receipt of the termination notice and for any further damages. On the Principal’s request, the Contractor shall vacate the Area and the site from all the materials, equipment and machinery that belongs to him at the Principal’s expenses and provide for the removal of any rubble, debris and rubbish.
 
20.3 Without prejudice to the above, in the case of termination due to failure by the Principal to perform its payment obligations pursuant to Article 4, provided that the Contractor has fulfilled all its obligations under this Contract,  the Contractor or any third party indicated by the Contractor shall be entitled to be transferred, by way of a line of business transfer, the Applicable Permits and the Building Right and to keep the Works, by paying to the Principal an amount equal to the percentage of the Consideration already paid by the Principal, upon deduction of an amount equal to Euro 400.00 per kWp (four hundred). It is understood that the in the case of exercise of such right the Contractor shall not be entitled to any other claim towards the Principal and hereby waives any such claim. It is understood that should a Financing Entity have been appointed at the time of termination, this Article 20.3 shall not be applicable.
 
20.4 Furthermore, in the event of termination attributable to the Principal, the Principal shall immediately return to the Contractor the Parent Company Guarantee and the Warranty Bond.
 
Article 21 – Confidentiality Obligation
 
21.1 Each Party declares that:
 
(a)
the Confidential Information, in any form in which it comes to the knowledge of the Parties, shall not be disclosed, in any case whatsoever, either totally or partially, to any third parties except where, further to termination of the Contract, the Contractor shall have to be replaced with another individual or entity in order to complete the System, in which case the Confidential Information may be disclosed to the individual appointed to the complete the Works object of this Contract;
 
(b)
said Confidential Information shall not be used for any purposes that is not solely and exclusively related to (i) the performance of this Contract or (ii) the drafting of a prospectus addressed to a fund of the System.
 
21.2 The Confidential Information may only be disclosed to the Parties' shareholders, the directors, executives, employees or consultants employed by the Party receiving the Confidential Information, and the Technical Consultant and the Financing Entity.
 
21.3 Neither of the Parties shall be entitled to make any declarations or announcements to third parties, the press or, in general, to the media, in relation to the Contract, without having received the other Party’s prior, written authorisation, with the exception of the disclosure required by the Applicable Law or by the law applicable to the Principal or to the Principal’s group.
 
 
Page 34 of 39

 
 
21.4 The provisions contained in this Article 21 shall be effective from the date on which this Contract is entered into or from the date of the first communication of said Confidential Information and shall remain in force even after expiry of this Contract.
 
Article 22 – Miscellaneous
 
22.1 This Contract cannot be amended or integrated, in any way whatsoever, unless by means of a written agreement between the Parties.
 
22.2 The Contractor is aware that the Financing represents a priority for the Principal and represents that the project (including both the EPC and O&M Agreement) is at the time of execution technically and legally bankable. In particular, the Contractor is aware that the Financing Entity may require: (i) a Warranty Bond after PAC, in the form of an autonomous and first demand insurance bond covering 15% (fifteen per cent) of the Consideration; (ii) cross default clauses in the event that the Financing covers more than one EPC contract. The Contractor shall encounter such expectations, provided that they are reasonable and substantially in line with the banking standards practiced at the date of execution hereof. In addition, the Contractor shall provide all good faith cooperation as to obtain the Financing in the case that banking standards practiced at the time Financing is negotiated are substantially different from banking standards practiced at the date of execution hereof.
 
22.3 The Parties declare that in the future they are willing to enter into other EPC contracts in relation to other plants (“New Contracts”) and agree that the New Contracts shall be regulated, mutatis mutandis, in accordance with the terms and conditions of this Contract, save as otherwise agreed.
 
22.4 The Principal shall promptly refund to the Contractor any amount reimbursed  by ENEL to the Principal in relation to the infrastructure works carried out by the Contractor outside the Area to connect the System to the grid.
 
22.5 In the case that any provision contained in this Contract is declared invalid on the basis of the Applicable Law by a judge or a board of arbitration, this shall not entail the entire Contract being void, it being understood that the Parties shall promptly meet in order to replace the invalid provision with another one which respects, as much as possible, its meaning.
 
22.6 The Contractor shall not assign the receivables derived from this Contract to any third parties without the Principal’s prior written consent, it being understood that the term, “third parties”, also implies the companies belonging to the same group as the Contractor.
 
22.7 Any communication requested or consented in relation to this Contract must be made in writing and must be (i) delivered by hand, (ii) sent by  registered mail with return receipt, or (iii) sent by fax.  Any communication shall be considered as having been received (i) if delivered by hand, on its delivery to the addressee Party, (ii) if sent by registered mail with return receipt, on the date indicated in said notice, and (iii) if sent by fax, on receipt of confirmation of sending provided by the fax transmitting it. All communications shall be sent to the following addresses:
 
 
Page 35 of 39

 
 
- if addressed to the Principal:
 
 
Ellomay PV One Srl
 
 
Address: Galleria Borromeo, 3, 35137, Padova (Italy)
 
 
Fax no:
 
 
Ranf@ellomay.com: eranz@ellomay.com
 
 
or any other address, also of third companies, that may be indicated from time to time by the Principal.
 
- if addressed to the Contractor:
 
 
Ecoware S.p.A.
 
 
 
Address:
 
Via Nona Strada, 9, I-35129 Padua, Italy
 
Attention:
 
Ing. Leopoldo Franceschini
 
Fax no.:
 
+39 049 738 76 38
 
E-mail:
L.Franceschini@ecoware.eu, I.Bovo@ecoware.eu
 
22.8 The risk related to the event referred to in Article 1664 of the Civil Code has been fully and knowingly undertaken by the Contractor. The risk relative to the event referred to in Articles 1660 and following of the Civil Code shall be attributed to the Contractor within the limits agreed in Article 10 of the Contract.
 
 
Page 36 of 39

 
 
Article 23 - Technical Consultant
 
23.1 The Technical Consultant shall act in the interests of the successful outcome of the System in his capacity of technical adviser in the exclusive interests of the Principal and/or the Financing Entity. The Technical Consultant shall have access to the Works, the Area the project documentation and the one relating to the Works’ performance.
 
23.2 The Technical Consultant shall be entitled to employ third parties to perform his duties provided that, in this instance, he shall procure that said employees comply with the rules in force on site and given by the Contractor or Works Manager.
 
Article 24 – Technical Dispute and Arbitration
 
24.1 The Parties undertake to amicably resolve any dispute arising out of or in connection with the interpretation, validity, performance and termination of this Contract.
 
24.2 In case of any technical dispute between the Parties in any matter relating inter alia to the achievement of a Payment Milestone, the extension of the Project Implementation Schedule, the Commencement of Operation (entrata in esercizio), the Technical Inspection, Operational Inspection, the First Reassessment Test and the Second Reassessment Test, the Variation procedure or any change in Applicable Law, the Parties can mutually agree to request the appointment of a technical expert (the "Expert") to settle the dispute. The proposal for the appointment of the Expert shall state in detail the technical question and include a list of at least three persons proposed f or the appointment as Expert. The Parties agree to meet and discuss on the appointment of the Expert during the following ten (10) Working Days after receipt of the request. In the case that the Expert is not appointed by the Parties within fifteen (15) Working Days after the request, the Expert shall be appointed by the Chairman of the bar of the Engineers of Milan (Ordine degli Ingegneri di Milano) upon request of either Party. The Expert shall finally determine the technical matter in accordance with the provisions of this Contract, acting as arbitrator pursuant to Article 1349 of the Italian Civil Code. The Expert shall deliver its determination to the Parties in writing, including an explanation of the underlying reasons, within thirty (30) calendar days after the acceptance of the mandate. The Expert's determination shall (in the absence of patent error or unfairness) be final and binding upon the Parties. The costs of the determination, includin g fees and expenses of the Expert, shall be borne as determined by the Expert.
 
24.3 Without prejudice to Article 24.2 above, in all the other cases where an amicable solution to the disputes cannot be reached, the settlement of said disputes shall be referred to a Board of Arbitration formed of 3 (three) arbitrators, 1 (one) of whom who shall act as the President, in accordance with the National Arbitration Chamber of Milan’s Rules of International Arbitration, which the Parties have declared that they are aware of and fully accept.
 
24.4 The Board, which shall sit in Milan, shall decide under the procedure and law within 4 (four) months of it being formed. The award shall become immediately enforceable. The award’s registration costs shall be borne by the unprevailing Party.
 
 
Page 37 of 39

 
 
Signed by
 
on this date 4/3/2010
 
on this date March [●]
/s/ Ran Fridrich
/s/ Leopoldo Franceschini
_____________________________
 
_____________________________
Mr. Ran Fridrich
 
Ing. Leopoldo Franceschini
The Principal, Ellomay PV One S.r.l.
The Contractor, Ecoware S.p.A.
 
 
DEVELOPER’S ENDORSEMENT
 
The Developer hereby endorses this Contract and in so doing undertakes to cooperate with the Parties hereto and support the Contractor to ensure the proper performance of this Contract in relation to the transfer of the Building Permit, STMC and of the Land Use Rights.
 
 
/s/ Novaltek Servizi s.r.l
_____________________________
 
Ing. Giuseppe Politi
 
The Developer, Novaltek Servizi S.r.l.
 
 
Page 38 of 39

 
 
Annexes
 
Annex 1:
Executed Land Rights Contract
 
Annex 2:
Area Map
 
Annex 3:
Equipment
 
Annex 4:
Definitive Project
 
Annex 5:
Parent Company Guarantee
 
Annex 6:
Technical Specifications
 
Annex 7:
Project Implementation Schedule
 
Annex 8:
Safety Costs
 
Annex 9:
Minimum Guaranteed Performance Ratio
 
Annex 10:
Testing Procedures
 
Annex 11:
Technical Acceptance Certificate model
 
Annex 12:
Commencement of Operation notice model
 
Annex 13:
Statement on estimate of Connection of Plant
 
Annex 14:
Provisional Acceptance Certificate model
 
Annex 15:
Incentive Acceptance Certificate model
 
Annex 16:
Final Acceptance Certificate model
 
Annex 17:
Model of O&M Agreement
 
Annex 18:
Option Agreement
 
 

 
Page 39 of 39

 
 
Annex 1  [Land Rights Contract]
 
[Translated from Italian]
 
Inventory no. 41.573  Register number 15.248
 
LAND RIGHT CONTRACT IN RELATION TO THE CONSTRUCTION AND OPERATION OF A PHOTOVOLTAIC PLANT
 
ITALIAN REPUBLIC
 
Year two thousand and ten, twenty seventh day of January
 
27th of January 2010
 
In Fano, in my office located in Bruno Buozzi Avenue no.33.
 
Before me, Ms. ANNUNZIATA MORICO, Notary in Fano, registered on the Pesaro and Urbino Register of Notaries
 
have personally appeared Mr. and Ms.
 
COSTANTINI RAFFAELE, born in Senigallia, on 27 November 1966, resident in Senigallia, via Metauro, n. 8, Fiscal Code. CST RFL 66S27 I608Q, who declares to be married in separation of assets regime,
COSTANTINI LUIGI, born in Senigallia, on 9 August 1965, resident in Senigallia in via Rossini, 9, Fiscal Code CST LGU 65M09 I608C, who declares to be married in separation of assets regime, but personal owner of the asset;
CESARIN FRANCESCO, born in Piove di Sacco on 20th October 1973, resident in Correzzola in Via Vanezza No 21, Fiscal Code CSR FNC 73R20 G693W, who attends not on his own behalf, but on behalf the limited liability company with sole shareholder "SUNEX 3 S.R.L.", with registered offices in Padua,  Zona Industriale, in Via Nona Strada n.9, share capital Euro 10.000 (ten thousand) fully paid-up, registered at the Companies Registration Office of Padua, with tax code number, VAT registration number and business identification number  06085820964,
Duly appointed as attested by the power of attorney authenticated by Mr. Giorgio Fassanelli, Notary in Padua, on 25th January 2010, index number 73661, that the attorney declares is valid and has not been revoked and that the original is enclosed hereto under the letter "A", hereinafter also referred to as the "Grantee".
 
The persons before me, whose personal identity, qualification and authorisation for signature I, the notary, am certain,  request that I receive this deed with which the parties agree and conclude as follows.
 
Art. 1- Definitions
 
Unless otherwise specified, the definitions reported herebelow will have the meaning attributed to them as follows, independently of the singular or plural use:
 
"Authorisations": any concession, authorisation, licence and / or nulla osta required to proceed with the construction, operation and maintenance of the plant, including all the concessions and necessary agreements with the National Agency for Energy or any another company, and the GSE (Power Supply Company) for the sale of the energy produced by the Plant;
 
"Rental Fees": the amount indicated in art. 5. A;
 
 
1

 
 
"Final Contract": the present final land right contract signed by the Parties;
 
"Consideration": the Rental Fees plus the Indemnity for Damages;
 
"Land Right": the Land Right constituted in favour of the Grantee with the present Final Contract;
 
"Financing": the credit line and more generally the financing granted by the Financing Entity to the Grantee or to any other entity indicated by the latter appointed in accordance with the modalities agreed between them which is required for the construction, testing, operation, management and maintenance of the Plant;
 
"Financing Entity": the company or the companies and/or the private and / or public institutes that grant the financing;
 
"GSE": Provider of the electric services - GSE Inc.;
 
"Plant": the photovoltaic Plant to be realised, including the accessories which, by way of example include the transformer station, the  long-distance overhead power lines and the underground power lines;
 
"Indemnity for Damages ": the amount indicated in art. 5. E;
 
"Plot": the land identified by the Grantee on which the Plant will be built and managed, registered on the Land Register of the Municipality of Senigallia on Sheet 33, Map 54.
 
Art.2- Object of the contract
 
A. The Grantors, Mr COSTANTINI RAFFAELE and COSTANTINI LUIGI, grant  the Grantee, who accepts and purchases the right to build and operate, in accordance with art. 952 of the Civil Code  the terms and conditions set out in this contract and  the authorisations, the Plant  on the Plot located in the town of Senigallia, which is in their exclusive ownership, identified and registered as follows:
 
- Agricultural land, in one sole  plot, total surface area equal to two hectares, twentyfive acres and seventy six centiares (Ha. 02.25.76), included in the "agricultural" zone, according to the current town planning regulations, registered on the Land Register of the Senigallia Municipality on Sheet 54 (formerly 11/c), 02.25.76 hectares, land revenue Euro 99.11 and agricultural revenue Euro 104.94.
 
Borders: other properties owned by the grantors from two sides, Vecchi Attilio save others.
 
With the purposes of  cadastral continuity and transcriptions it is specified that the cadastral details of the divided parcels derive from subdivision no. 276295/2009 submitted to the competent Territory Agency on 31st December 2009, Protocol no. AN0276295.
 
This land became their ownership, in relation to a 2/4 percentage, by way of intestate inheritance from their father Mr Costantini Aldo, died on 20th August 1985, estate communication no. 3, vol. 255, registered in Senigallia and transcribed in Ancona on 5 September 1986, no. 8672 Special Registry and, in relation to the other 2/4,  by way of intestate inheritance from their mother Ms Piersantelli Lidia, died on 3rd June 2003, estate communication no. 57, vol. 343, registered in Senigallia and transcribed in Ancona on 12 January 2006 no. 52, Special Registry.
 
B. The Grantors  are aware of the technical characteristics of the Plant and declare that they have been informed of how the Plant itself shall be operated and of the operative standards normally required to manage such Plants.
 
 
2

 
 
The Plant will be realised and operated on the Plot and will include all the long-distance power lines and telephone lines which are necessary for, among other things, the connection of the Plant to the conversion groups and to the transformers as well as  the connection point to the Provider’s network of the national electricity grid, and also the related stations and the measurement groups , as well as other technical devices if necessary.
 
The Parties expressly agree that the Grantee will have the right to determine, at its own discretion,  access and the most opportune management, also from an economic point of view, of the underground line of wires (no deeper than 80 cm) and will be allowed to protect the Plant permanently with fencing.
 
C. The Grantors, Mr. COSTANTINI RAFFAELE and COSTANTINI LUIGI, declare and guarantee:
 
(a) that they are the exclusive owners of the Plot, as specified above;
 
(b) that they are freely able to dispose of it;
 
(c) that the Plot is free of bond constraints, charges, easement, mortgages, privileges and / or taxes in any way able to bind or  jeopardise the construction, the testing, the putting into service as well as the management and the maintenance of the Plant.
 
The Grantors also declare that they signed before Mr Rocco Cozza, notary in Senigallia on 8 November 2009, rep. no. 100429/16075, registered in Ancona on 23 November 2009 at no. 14765 Special Registry, a deed whereby they committed to remove the PV plant and procure that the sites are put to their original status after dismissal of the plant. The Grantee declares to be aware of said deed and accept it.
 
In particular, the grantee shall:
 
1)
disconnect the plant from the grid;
 
2)
remove all the panels and the sustaining structures, including any works on the land;
 
3)
remove all infrastructures (electric lines, machineries and electromechanical equipment, electric cabin, accesses, internal roads, fences, etc), including any works on the land;
 
4)
firstly, remove materials that can be re-used placing them in the stores; put the materials remaining fro demolition in ad hoc authorised dump, complying with applicable regulations in case of hazardous materials;
 
5)
restore the original agricultural land, also by cleaning and disposal of any leftover, such as metallic and cement bits or similar.
 
The Grantors also declare that the Plot is not the object of any proceedings of a civil, administrative or criminal nature nor are there any judicial, executive or conservative measures in force that could jeopardise either wholly or in part the sole and exclusive ownership or possession of the Plot with the purpose of carrying out the project. There are no circumstances that could limit or jeopardise the construction, the testing, the putting into service or the management and the maintenance of the Plant; it is not the object of a loan for use agreement, rent or tenant farming agreement; it is free of constructions, buildings, trees and plantations that could obstruct the construction and the functioning of the Plant (here included, by way of example only, any object that can darken the solar light panel of the Plant) and the activit ies carried out have always been realised in accordance with law and rules both at a national and a  European level, with particular reference to the environmental and landscape provisions;
 
 
3

 
 
(d) that they are  well aware of the use to which the Plot  is destined and that they approve it without reserve or any exception and also  declare and guarantee that the Plot and the subsoil (as is visible and to their knowledge) is free of piping,  sluices or any other equipment which is  generally incompatible  or even only prejudicial or limitative to the use for which 1it will be destined.
 
Art. 3 - Delivery of the Plot
 
A.  The Grantee shall start the construction works for  the Plant, in the manner and in the terms that they consider to be the most appropriate for its own organizational and production demands.
 
Legal possession and material availability of the Plot is delivered on this day in favour of the Grantee, for all the useful and onerous effects.
 
B. At the date of the start of works the Plot will be free from any cultivations, plantations and/or trees that could obstruct the construction and / or the function of the Plant, it being understood that  the Grantee will be able to proceed, at its own discretion, with the removal of  above-mentioned if necessary.
 
C. It remains understood that no other indemnity or compensation shall be due other than the indemnity for damages provided in art. 5.E for the restoration or compensation of damages to cultivations, plantations and / or trees located on the Plot, which are destroyed, damaged, removed or cut off by the Grantee to allow the construction and / or the function of the Plant.
 
D. The Grantee discharges and exonerates the Grantors from any civil and criminal liability for damages to third parties (persons and / or things) of any title that may arise from the construction of the Plant and from its subsequent operation and maintenance, as well as from the removal of the plant and of the access road.
 
Art. 4 - Ownership, rights and easements
 
A. The Parties declare that the Plant as well as any other assets that the Grantee holds on the Plot shall remain ownership of the latter and shall not become part of the Plot.
 
B. The Grantors accept that the Plant as well as all the Grantee’s assets  that the latter may place on the Plot may be the object of a guarantee in favour of a Financing Entity or third parties. Vice versa, the Grantors undertake, for the whole duration of this contract, to maintain the Plot free from bonds, constraints, charges, easements, mortgages, privileges and/or taxes of any kind.
 
C. The Grantors undertake to grant and to constitute on other lands that they own and which are adjacent to the Plot, in addition to the ones established in accordance with Article 4.D hereof, easements for long-distance power lines, cable ducts, overground power lines (and also underground lines), access and passage by all means, including mechanical, as well as any other charge, burden or easement that may be required to operate and maintain the Plant. For this purpose, the Grantors undertake to attend to and execute any authenticated document or deed required in order to allow the regular constitution of any such easements and the related deed shall be transcribed at the relevant Registry at the Grantee’s expense.
 
D. The Grantors, Mr. COSTANTINI RAFFAELE and COSTANTINI LUIGI, each for their individual right and together for the entire, set up:
 
- an access easement, with any means, for 5 (five) meters, on the plot owned by the Grantors and registered at Senigallia cadastral register at sheet 33, Map 52, Ha 00.03.24, in favour of the Plot.
 
 
4

 
 
- an electroduct easement in favour of the plant to be realised on the Plot on the plot owned by the grantors and registered at Senigallia cadastral register at sheet 33, Map 55, Ha 03.98.39, in accordance with the red lining in the plans enclosed hereto as Annex B.
 
The Grantors shall be entitled to enter the Plot, and the Grantee agrees, along the Plot’s border with Mr Attilio Vecchi’s property, for a space 5 (five) meters wide and for its entire length.
 
Art. 5 - Consideration
 
A. For all legal purposes the Parties declare, in lieu of affidavit, in accordance with Presidential Decree no. 445/2000 and made aware by myself, the Notary, of the criminal liabilities in case of false declaration, as well as aware of the powers of verification of the Financial Administration and of the applicable administrative sanctions in case of omitted, incomplete or false indication of data, as follows:
 
- the Grantee, as compensation for the concession of the building lease, undertakes to pay  the Grantors, according to the methods and the terms indicated hereafter, for the whole duration of the building contract, an annual Rental fee equal to Euro 5,488.00 (five thousand four hundred eighty eight).
 
B. The Parties establish that the Rental fee will have to be paid to the Grantors in a single anticipated instalment by 1st December of each year by way of wire transfer to the Grantors’ bank account  at FINECO THE NEW BANK no. 000003169369 (IBAN IT11 L030 1503 2000 0000 3169 369), as indicated by the grantors.
 
C. The Rental Fee will be reassessed each year according to the percentage of 100 % (hundred percent) of the ISTAT index of the consumer prices of the families of workers and employees, with reference to the stipulated month.
 
For the current year of the signature date of this present building contract, the Rental Fee to be paid for the period between the date of signature of this document and December 31st is equal to Euro 5,488.00 (five thousand four hundred eighty eight) that the Grantee undertakes to pay within and no later than ten days after signing this Contract via a bank transfer as above indicated.
 
The Parties expressly agree that the bank documentation on which the bank transfer shall be shown, shall be considered as proof with full effect of the completed payment of the compensation for the Rental fee.
 
No interests shall accrue on the above amounts.
 
Thus being regulated payment of the consideration, the grantors expressly renounce the registration of the legal mortgage, expressly exonerating the competent conservative of the Land Registry from any liability.
 
D. The Parties recognise that the realisation of the Plant will inevitably compromise the fertility of the Plot. Therefore the Grantee corresponds to the Grantors, by way of compensation damages, the flat rate sum determined in total as Euro 23,050.00 (twenty-three thousand and fifty, the “Indemnity for Damages”).
 
Such sum is paid on today’s date in one single solution payment on 28 January 2010 by way of wire transfer to the bank account above indicated:
 
E. The compensation is understood to be an all inclusive amount, including the right of the Grantees to the constitution of the easement as indicated in art. 4. D, except for the right of the Grantors to the compensation provided by the laws regarding Telephone Easement and of Long-distance power lines, while the grantors have no right to obtain further amounts.
 
 
5

 
 
It is understood that each tax, fee, contribution, expense and other charges pertaining to the property of the area of the Plot, when due, will be the responsibility of the Grantors.
 
The amounts mentioned above are understood as negotiated even in relation to possible modifications of the regulating plan, for which the Grantors will not have the right to obtain any increase in the Rental fee or any Indemnity for Damages.
 
The present constitution of the building lease has been concluded without any mediation expense in accordance with article no. 1754 from the Civil code.
 
Art. 6 - Obligations of the grantors
 
A. The Grantors do not have the right to make any modification or works on the Plot, or on the neighbouring lands of which they may be in possession that are theoretically fit to reduce the power and the efficiency  of the Plant, unless such modifications or works are authorised beforehand in writing by the Grantee.
 
The Grantors particularly undertake:
 
- not to carry out excavations and/or works that could compromise the safety of the Plant;
 
- not to plant trees with high trunks and not to build manufactured products of any kind that could compromise the function of the Plant;
 
- not to place underground pipes and/or other objects or manufactured products in the zone occupied by the long-distance power line, without previous agreement with the Grantee party.
 
B. The Grantors shall undertake to notify the Grantee of any circumstances known to them that could damage the Plant, to jeopardize or limit the functionality of it.
 
Article 7 - Duration
 
A. This present document is valid and binding upon the parties starting from today. The building right will last for twenty-one (21) years from today and will end on 27 January of the 2031 (“Initial Duration”).
 
Before the contract expires, as stated  in the first paragraph, the Grantee shall have the right to unilaterally extend the contract period for a further four (4) years ( "Extension"), indicating their intention to the Grantors - who undertake to grant the extension from then on - by registered letter with return receipt and with a period of prior notice of at least twelve (12) months before the date of termination of the contract originally and/or subsequently provided.
 
The Charge for the grant of the building lease, in the updated contract, should be understood as equal to the amount of the last annuity increased by 20%, to be re-evaluated annually according to the ISTAT indexes. The grantor is obligated from then on to accept such extension to the specified conditions.
 
B. In the hypothetical cases stated in the subsequent articles 8.C and 8.D (resolution due to the Grantee’s fault), as well as the normal expiry of the Contract or following the withdrawal operation under the successive art. 8A, within a maximum period of six (6) months from the termination of the Building Contract, the Grantee will proceed at its own expense to the removal of the Plant or any other operations carried out on the Plot as well as of the access road and electroduct.
 
 
6

 
 
In order to guarantee the removal of the Plant or any other work carried out on the Plot, the Grantee agrees to release within five (5) days from the date of the start of works a surety policy the amount of which shall conform to the amount required by the Company authorizing the project.
 
In order to guarantee the payment of the compensation indicated in art. 5.A, the Grantee agrees to pay the sum of Euro 5,488.00 (five thousand four hundred eighty eight), no later than 30th June, 2010, an annuity equal to the charge in the manner agreed as mentioned above in Article 5 B, as agreed between the parties.
 
The Grantors will forfeit that amount if the Grantee has not paid the Charge within the period referred to in art. 5.B and the Grantors have sent to the Grantee a written notice via registered mail with a return receipt with a declaration of default to comply with the term of ten (10) days from its receipt by the Grantee.
 
Such amount  shall be deducted from the amount due as the last Rental fee payable on the twentieth year (lat rental fee).
 
Article 8 - Withdrawal and cancellation
 
A. The Grantee will have the right to withdraw at any time and at its sole discretion from the Building Contract with a notice period of ninety (90) days by means of a simple written notice, without the implication that any compensation is due to the grantor by way of indemnity or damages in addition to the payment of the charge for the duration of the notice.
 
B. The Grantee will have the right to declare the contract cancelled with immediate effect by means of written notice to the Grantors due to the fault of the latter, if the Grantors, in violation of their own obligations under the previous art.6.A, undertake building works and/or introduce crops or plantations on the Plot, on the property or on adjoining properties of which they may be in possession that are theoretically capable of reducing the power and effectiveness of the Plant or if the Grantors consider said  acts likely to permanently affect the  power and effectiveness of the Plant.
 
C. If the payment of the Charge is delayed for a period exceeding six (6) months, the Grantors will be entitled to send to the Grantee, by registered letter with return receipt, a warning to comply within a period of thirty (30) days.
 
The Grantors will be entitled to terminate this present Building Contract if the Grantee has not fulfilled its own obligations within thirty (30) days after receiving the formal notice. In the case that the Grantors are entitled to request the termination of this present Contract due to non-fulfilment of the Grantee and have the intention to exercise such right, the Grantors shall undertake to communicate this intention in writing to the Grantee and, even pursuant to and by effect of Article 1411 of the Civil Code, to the potential Financing Entity  whose name and address has been notified in writing by the Grantee to the Grantors. Within 60 (sixty) days of receipt of the above-mentioned notice, the Financing Entity will have the right (I) to designate a third party who will take over from the Grantee in this present Contract or (ii) to inform the Grantors of its intention to directly cancel, or via the Grantee, the non-fulfilment of which the right to request the resolution is founded. In such cases, the Grantors may only request the termination of this present Contract in court and only if the causes of non-fulfilment from the Grantee, on which the right to request termination is based, will not be el iminated within 60 (sixty) days from the takeover of the third party or, as appropriate, upon receipt by the Grantors of the notice from the Financing Entity. The Financing Entity will also have the right to appoint a third party who will take over from the Grantee even when, although the latter has fulfilled its obligations under this present Contract, the Financing Entity notifies the Grantee of its intention to declare the forfeiture of the benefit of the term according to Article 1186 of the Civil Code or to terminate for non-fulfilment or cancel the fina ncing contract.
 
 
7

 
 
D. This present contract is deemed to be automatically terminated if one of the Parties outside  the cases expressly covered by the previous articles 8B and 8C, becomes a serious breach of its contractual obligations and does not adequately remedy the same within a reasonable time, or within thirty (30) days of the receipt of the notice communication of the other Party.
 
E. In case of cancellation of the building contract by the Grantee due to the fault of the Grantors (resolution under Articles. 8B and 8D, the Grantee shall have the right to decide whether to proceed with the removal of the Plant or of any other work carried out on the Plot, except the direct or indirect right of compensation for damages,.
 
If the Grantee decides to remove the Plant, the Grantors shall be obliged to reimburse the Grantee for all costs and expenses incurred in such removal and restoration, apart form the right to compensation for additional damages.
 
Art.9 - Assignment of the building contract to third parties
 
A. The Grantors may assign this present contract to third parties, by giving written notice to the Grantee with at least ten (10) days of notice, provided that the third party undertakes in writing to abide by the contents of the Building Contract.
 
In case of sale and/or transfer of the Plot from the part of the Grantors, the latter are  bound to oblige the third party to sign the following clause:
 
"The buyer/transferee shall substitute the vendor in all obligations under the building contract concluded on the 27th January 2010 with an deed received by the Notary Annunziata Morico, index number. [41575] and undertakes to comply with everything in it. "
 
In the absence of such express statement and signature of the vendor/transferee party, the Grantors will have to compensate the Grantee for any damage or prejudice that would result from this omission. In order to enable verification of compliance with this present agreement, the Grantor must send the Grantee a copy of the sale/transfer contract which will be signed by the third party.
 
B. The Grantee will have the right to dispose of this building contract at any time in the favour of a third party, by giving written notice to the Grantors within thirty (30) days, provided that the third party undertakes in writing to respect the contents of the Building Contract. The Grantee may also assign the Building Contract to more third parties as part of a total or partial disposal of the ownership of the Plant or its management. The Gra ntors must undertake to allow the transfer of the Building Contract, by giving their own consent in order to register the transfer on the Land Registry and make all the statements that may be required. The transfer will be effective in relation to the Grantors starting from the moment in which the the Grantors are informed of the transfer . From that moment on, the Grantee will be released from its obligations in relation to the Grantors, who shall immediately declare their intention to  release the Grantee in the event of non-fulfilment by the third transferee.
 
C. Should this agreement be transferred to third parties through a transfer of part of the company, the Grantors shall renounce, from that moment,  the right to terminate the contract under Article 2558, 2nd paragraph of the Civil Code.
 
Art.10 - Town planning situation
 
Pursuant to and by effect of article 30 of the Presidential Decree dated June 6th 2001 no.380 and subsequently extended and amended,  the land use certificate is attached to this present document under letter "C",  related to the land subject of this present document, issued by the Municipality of Senigallia on January the 25th 2010.
 
 
8

 
 
The Grantors declare that from the date of issue of the above-mentioned certificate until now there have been no modifications to the town planning regulations of the above-mentioned Municipality.
 
The Grantors also declare that there are no farmers settled on the land subject of this present document, or bordering the same land being entitled to an agrarian pre-emption under existing legislation.
 
Art.11 – Applicable Law. Sole jurisdiction
 
This present contract is governed by Italian law. All disputes arising from this Contract shall be the exclusive competence of the Ancona jurisdiction.
 
Art.12 - Communications
 
Unless otherwise stated by the specific clauses in the Building Contract, any communication between the parties shall be made by registered letter with return receipt, or by fax or email, with confirmation of receipt at the addresses indicated in the epigraph to this present document.
 
Communication by fax or email shall be deemed complete only when accompanied by a confirmation receipt.
 
13 - Final clauses
 
A. This present building contract completely covers the will of Parties related to the relationship they have established. .Therefore  any previous agreement or understanding, verbal or written, possibly exchanged between them and concerning the same report must be understood as cancelled and/or revoked.
 
B. Notwithstanding any stipulation in the foregoing regulations, whatever their nature, it will only be valid if made in writing and after the signature date of the building contract.
 
C. The fact that one of the Parties does not exercise at any time its rights that are acknowledged by one or more clauses of the building contract cannot be considered as a renunciation to such rights nor will it obstruct the latter to successively expect timely and thorough implementation.
 
D. If one of the clauses of the building contract should be declared invalid or inefficient by the competent jurisdiction, the same clause will continue in full effect for the part not affected by it.
 
E. Legal fees and taxes are the responsibility of the Grantee Party.
 
F. Each Party undertakes to process the data of the other party in respect of the Legislative Decree 196/2003. The Parties also undertake to maintain and ensure that its own staff, directors, employees and consultants maintain the strictest secrecy and confidentiality on this present document, but it is understood that no party shall be deemed in violation of this undertaking when making a communication that is required by law, made under a procedure provided by this present document or necessary for its execution.
 
The Grantors acknowledge and accept that the Grantee party can show this present contract and any related document to any potential financing bank or potential transfer.
 
 
9

 
 
Art.14 – General Terms
 
Pursuant to and by effect of articles 1341 and 1342 from the Civil Code, the Grantors expressly state that they agree to the following regulations:
 
Article 3, paragraphs A), B) and C) (Delivery of Plot);
 
Article 4, (Property, property rights and easement);
 
Article 5 letter A) (Charge), letter D) (Indemnity for Damages Compensation);
 
Article 7 paragraph A) (Duration and the Right of Extension);
 
Article 8 letter A) (Withdrawal of the Grantee), letter B) (Express Termination Clause), letter A) (Consequences of the Resolution);
 
Article 9 (Assignment of the Building Contract to third parties);
 
Article 11 (Jurisdiction).
 
The parties exonerate me, the Notary, from the reading of the Annexes and declare that they are perfectly aware of them.
 
I, the Notary, received this present document and I read it to the persons before me that approved it and together with me, the Notary, sign it at  fifteen minutes past ten (22: 15).
 
This deed is typed by a person I trust and consists of four sheets on eleven pages, and the present twelfth page ends here.
 
Signed
Costantini Raffaele, Luigi Costantini, Francesco Cesarin
Lampa Maria Teresa,
Francesco Cesarini,
Annunziata Morico, Notary.
 
 
10

 
 
Annexes 2 to 4 and 6 to 18 to EPC Contract - Senigallia

[See Annexes to Exhibit 4.10 with corresponding Annex numbers]
 
 
 

 
 
ANNEX 5
 
FORM OF PARENT COMPANY GUARANTEE
 
Dear Sirs,
 
Further to our recent discussions and in compliance with the provisions of the Contract (as defined below), we herewith submit to you a parent company guarantee to be executed by way of exchange of commercial letters pursuant to Article 1.1 letter a), Part Two, of the Tariff under Presidential Decree 26 April 1986, no. 131 and in accordance with the terms and conditions specified below between:
 
- Kerself Spa, a joint stock company organised and existing under the laws of Italy and having its registered office at Via della Tecnica 8, Prato di Correggio, registration with the Registro delle Imprese of 01777890359, Fiscal Code and Vat No. 01777890359, corporate capital of [l] (the Guarantor); and
 
- ELLOMAY PV ONE S.r.l., with its registered offices located in Galleria Borromeo, 3, VAT Registration Number and Tax Code 04459950285, entered in the Companies Register of Padova under no. 391298 represented by Mr. Ran Fridrich in his capacity of Sole Director (hereinafter known as “Principal”).
 
WHEREAS:
 
(A)
By an agreement dated [l] 2010 (the Contract, which term includes all amendments to variations of or supplements to it from time to time in force) the Principal has agreed to engage Ecoware S.p.A. (the Contractor) for the design, supply, construction, assembly and start-up of a photovoltaic plant to be located in the Municipality of Senigallia (Ancona, Italy). Unless the context otherwise requires, words and expressions defined in the Contract have the same meaning when used in this Guarantee, as defined below.
 
(B)
According to the Contract, Contractors shall procure the delivery to Principal of a parent company guarantee in the form of this guarantee (“Guarantee”) within 7 (seven) Working Days of execution of the Contract and in any case before having received the first payment milestone.
 
(C)
The Guarantor has agreed to guarantee the due performance of the Contract by the Contractor.
 
(D)
The Guarantor is the Contractor’s Parent Company, as defined in the Contract.
 
IT IS AGREED as follows:
 
1.
The Guarantor:
 
 
(a)
guarantees to the Principal, as primary obligor and not as surety, the due and punctual performance by the Contractor of each and all of the obligations, warranties, duties and undertakings of the Contractor under the Contract when such obligations, duties and undertakings shall become due and performable according to the terms of such Contract;
 
 
(b)
agrees, in addition to its obligations set out in clause 1(a) above, to indemnify the Principal against all losses, damages, costs and/or expenses which the Principal may incur by reason of any breach by the Contractor of its obligations, warranties, duties and undertakings under the Contract save that this shall not be construed as imposing greater or different obligations or liabilities on the Guarantor than are imposed on the Contractor under the Contract; and
 
 
 

 
 
 
(c)
agrees to indemnify the Principal on demand against any loss or liability suffered by it if any obligation guaranteed by the Guarantor is or becomes unenforceable, invalid or illegal as if the obligation guaranteed had not been unenforceable, invalid or illegal provided that the Guarantor's liability shall be no greater than the Contractor's liability would have been if the obligation guaranteed had not become unenforceable, invalid or illegal.
 
2.
The liability of the Guarantor under this Guarantee shall not be reduced or discharged by any act, omission or other thing whereby (in absence of this provision) the liability of the Guarantor under this Guarantee would or might be reduced or discharged in whole or in part as a consequence of:
 
 
(a)
any amendment to the obligations undertaken by the Contractor whether, by way of any addendum or variation referred to in clause 3 below, any suspension of the Works, extension of the time or otherwise; or
 
 
(b)
amendment to, or any variation, waiver or release of, (any part of) the Contract or any security or other guarantee in respect thereof; or
 
 
(c)
the termination of the Contract under the Contract attributable to the Contractor; or
 
 
(d)
any legal limitation, incapacity or other circumstances relating to the Contractor or any other person; or
 
 
(e)
the dissolution, amalgamation, change in status, function, control or ownership, insolvency, liquidation or the appointment of an administrator or receiver of the Contractor or any other person.
 
3.
In the event of change in control or ownership of the Contractor, the Guarantee shall remain in full force and effect. In the event of change in control or ownership of the Contractor, the Guarantor shall promptly notify to the Principal the name of the new controlling person or owner of the Contractor.
 
4.
The Guarantor by this Guarantee authorises the Contractor and the Principal to make any addendum, variation or amendment to the Contract, the due and punctual performance of which addendum and variation shall be likewise guaranteed by the Guarantor in accordance with the terms of this Guarantee.
 
5.
This Guarantee shall be a primary obligation of the Guarantor to perform or to take whatever steps may be necessary to procure the performance of the obligations of the Contractor under the Contract which have been breached, to assume jointly and severally with the Contractor all rights and obligations of the Contractor under the Contract and to pay the Principal from time to time any and all sums of money which the Contractor is at any time liable to pay to the Principal under the Contract; accordingly the Principal shall not be obliged before enforcing this Guarantor Guarantee to take any action in any court or arbitral proceedings against the Contractor, to make demand or any claim against the Contractor, to enforce any other security held by it in respect of the obligations of the Contractor under the Contract or to exercise, levy or enforce any distress, or other process of execution against the Contractor.
 
6.
The maximum amount (importo massimo garantito) guaranteed by the Guarantor under this Guarantee shall be equal to the Consideration.
 
7.
This Guarantee shall be effective upon delivery and shall expire 7 (seven) days following the FAC (the “Expiry Date”). Upon the Expiry Date, this Guarantee must be returned to us for cancellation.
 
8.
Until all amounts which may be or become payable under the Contract or this Guarantee have been irrevocably paid in full, the Guarantor shall not, as a result of this Guarantee or any payment or performance under this Guarantee, be subrogated to any right or security of the Principal or claim or prove in competition with the Principal against the Contractor or any person or demand or accept repayment of any monies or claim any right of contribution, set-off or indemnity and any sums received by the Guarantor or the amount of any set-off exercised by the Guarantor in breach of this provision shall be held by the Guarantor in trust for and shall be promptly paid to the Principal.
 
 
 

 
 
9.
The Guarantor shall not hold any security from the Contractor in respect of this Guarantee and any such security which is held in breach of this provision shall be held by the Guarantor in trust for and shall promptly be transferred to the Principal.
 
10.
Each payment to be made by the Guarantor under this Guarantee shall be made in Euro, without any set off or counterclaim and free and clear of all deductions or withholdings of any kind whatsoever or howsoever arising.  If any deduction or withholding must be made by law (including double taxation treaties) the Guarantor will pay that additional amount which is necessary to ensure that the Principal receives on the due date a net amount equal to the full amount which it would have received if the payment had been made without the deduction or withholding.  The Guarantor shall promptly deliver to the Principal any receipts, certificates or other proof evidencing the amounts paid or payable in respect of any such deduction or withholding.
 
11.
The Guarantor shall have 5 (five) Working Days from the date of demand to make payment in full to the Principal of any amount due under this Guarantee. The Guarantor shall pay interest on any amount due under this Guarantee from the date which is 5 (five) Working Days from the date of demand until the date of payment in full (as well after as before any judgment) calculated on a daily basis at the six months Euribor plus 3 (three) percentage points.
 
12.
The Guarantor will reimburse the Principal for all legal and other costs (including non-recoverable VAT) incurred by the Principal in connection with the enforcement of this Guarantee.
 
13.
Any settlement or discharge between the Principal and the Contractor or the Guarantor shall be conditional upon no order to refund by virtue of any provision of any enactment relating to bankruptcy, insolvency or liquidation being issued by a competent court, in which case the Principal shall be entitled to recover from the Guarantor as if such settlement or discharge had not occurred.
 
14.
The Guarantor warrants that this Guarantee is its legally binding obligation, enforceable in accordance with its terms, and that all necessary consents and authorisations for the giving and implementation of this Guarantee have been obtained.
 
15.
The Guarantor warrants and undertakes to the Principal that it shall take all necessary action directly or indirectly to perform the obligations expressed to be assumed by it or contemplated by this Guarantee and to implement the provisions of this Guarantee.
 
16.
The Guarantor warrants and confirms to the Principal that it has not entered into this Guarantee in reliance upon, nor has it been induced to enter into this Guarantee by any representation, warranty or undertaking made by or on behalf of the Principal (whether express or implied and whether under statute or otherwise) which is not set out in this Guarantee.
 
17.
The Guarantor acknowledges and consents, also for the purposes of Article 1407 of the Italian Civil Code, that the Principal shall be entitled by notice in writing to the Guarantor to assign this Guarantee at any time in connection with an assignment of the Contract in accordance with the provisions of the Contract, to the Financing Entity.
 
18.
Any notice hereunder shall be duly given when delivered in writing by hand (in the case of personal delivery) or by registered letter with advice of receipt (Raccomandata A.R.), or by express courier  to the Guarantor or by facsimile, provided an original of such facsimile is also received by us within three (3) Working Days and sent by one of the aforementioned notice methods and shall be duly signed by an authorised representative of the Principal.
 
 
 

 
 
19.
No delay or omission of the Principal in exercising any right, power or privilege under this Guarantee shall impair or be construed as a waiver of such right, power or privilege nor shall any single or partial exercise of any such right, power or privilege preclude any further exercise of such right, power or privilege or the exercise of any other right, power or privilege.
 
20.
Without prejudice to Article 1419 (nullità parziale) of the Italian Civil Code, if - at any time - any provision of this Guarantee is or becomes illegal, invalid or unenforceable, neither the legality, validity nor enforceability of the remaining provisions of this Guarantee will in any way be affected or impaired thereby.
 
21.
The Guarantor shall pay all stamp duties and taxes, if any, to which the execution and delivery of this Guarantee may be subject and shall indemnify the Principal against any and all liabilities with respect to or arising from any delay or omission to pay any such duties and taxes.
 
22.
This Guarantee implies, where necessary, a waiver, among other things, to the benefits, rights and exceptions under Articles 1247, 1939, 1945, 1953, 1955 and 1957 of the Civil Code.
 
23.
This Guarantee shall be governed by and construed in accordance with Italian law. The courts of Milan, Italy, shall have exclusive jurisdiction of all matters arising out of or in connection with this Guarantee.
 
24.
Notices or demands given under this Guarantee shall be sent to the following addresses:
 
(a)           If to the Principal
 
 
ELLOMAY PV ONE S.r.l.
 
Attention: Mr Ran Fridrich
 
Galleria Borromeo, 3
 
35137 Padova (Italy)
 
Telephone: +972-3-7971111
 
Fax: +972 972-3-7971122
 
(b)           If to the Guarantor:
 
 
[Guarantor]
 
Attention: l
 
Telephone: l
 
Fax: l
 
***
 
If you agree with the above terms and conditions, please send us by registered mail with return receipt or by express courier or deliver by hand a duly executed letter of acceptance incorporating the full text of this proposal.

Yours faithfully,

___________________________
for and on behalf of the Guarantor
 
 
For acceptance

___________________________
for and on behalf of the Principal

 



 
 
 

 
 



EX-4.12 4 exhibit_4-12.htm EXHIBIT 4.12 exhibit_4-12.htm


Exhibit 4.12
Agreement

This Agreement is entered into on 5 March 2010

between

Ellomay PV One s.r.l., a company incorporated under the laws of Italy, with registered office at Galleria Borromeo, 3, Fiscal Code no. 04459950285 represented by Mr. Ran Fridrich, in his capacity as Sole Director (“Ellomay”);
and

Ecoware S.p.A., a company incorporated under the laws of Italy, with registered office at Via Nona Strada 9, 35129 Padova (Italy), enrolled in the Padova Companies Register, at number 03571330277, represented by Mr. Leopoldo Franceschini, in his capacity as legal representative (“Ecoware”);

hereinafter collectively the “Parties”.

Whereas:

A.
On 4 March 2010 Ellomay, as principal, and Ecoware, as contractor, entered into two contracts for the supply, construction, installation and start-up of two photovoltaic systems of nominal power equal to approximately 750KWp, located in the Marche region, respectively in the municipalities of Cingoli and Senigallia (the EPC Contracts), at the price of Euro 3,050,000.00 per MWp (the EPC Price).

B.
Ecoware is ready to provide a Warranty Bond in the form of a bank bond, at the terms and conditions of this Agreement.

C.
Without prejudice to Ecoware’s obligations arising out of the EPC Contracts, including inter alia all delay liquidated damages, penalties, warranties, etc., the Parties have agreed that Ellomay will buy the panels required for the construction of the relevant photovoltaic systems (the Panels) directly from Ecoware’s panels supplier, namely the company C.E.E.G. Solar Science Technology Co. Ltd with registered offices in Hongqiao Rd, Shanghai, China (the Supplier), in accordance with the terms and conditions normally applied by the Supplier to Ecoware as per Annex 1, such as, inter alia:

 
(i)
price equal to Euro 1,350,000.00 per MWp (which includes any custom duties, taxes, levies, freight, as well as any other cost whatsoever, the Panels Price);
 
(ii)
terms of payment: 60 days from bill of lading date;
 
(iii)
deferred payment guaranteed by way of letter of credit substantially in the form attached hereto as Annex 2 to be issued simultaneously with making the order;
 
(iv)
delivery terms: CIF Venice port - Incoterms 2000.

The Panels will be supplied to Ecoware to allow the same to carry out its contractual obligations under the EPC Contracts.

D.
The Parties wish to take into account the above arrangements by entering into this Agreement, which shall be intended as an integration of the EPC Contracts.

E.
Recitals shall be an integral part of this Agreement.
 
 
 

 

 
F.
Words defined in the EPC Contracts shall have the same meaning attributed to them in the EPC Contracts when used in this Agreement, unless the context otherwise requires.

Now, therefore, the Parties agree as follows:

1.
OBJECT
 
1.1
Upon Ecoware’s instruction, Ellomay shall order and purchase from the Supplier the Panels in the quantity, quality and type indicated by Ecoware and provide the latter with copy of the purchase order. Ecoware shall bear all liabilities for the choice of the Supplier and of the Panels, pursuant to the EPC Contracts.

1.2
Ecoware shall procure that the Supplier apply to Ellomay the most favourable terms and conditions of supply applied in the past 6 (six) months by the Supplier to Ecoware, which shall in any case be in accordance with recital C.

1.3
Ecoware shall procure that the Supplier ships the Panels to the port of Venice, constantly liaising with the Supplier. Following arrival of the Panels to the port of Venice, Ecoware shall take care, at its own costs, of delivery of the Panels to Ecoware’s premises and/or to the Area, as the case may be, as well as of any formalities related therewith, including but not limited to customs clearance and payment of relevant levies, if any. In particular, Ecoware shall check compliance of the delivered Panels with the supply order on behalf of Ellomay and under its own responsibility.

1.4
The Parties agree that on issuance of PAC, as a condition precedent for payment of Payment Milestone 3, in addition to the ones set forth in the relevant EPC Contracts, Ellomay shall sell the relevant Panels to Ecoware, which shall buy, at the Panels Price (the Sale Transaction). Simultaneously, Ecoware shall transfer title to the System, including the Panels, to Ellomay, which shall buy, pursuant to Article 12.3 of the relevant EPC Contracts.

1.5
On issuance of the PAC, Ellomay shall be entitled to issue the relevant invoice in accordance with the above terms and the invoice shall be evidence that the Sale Transaction has effectively been completed (the Completion).

1.6
It is understood that title to the Panels shall remain with Ellomay until Completion, and shall thereupon be transferred to Ecoware and back to Ellomay immediately thereafter, in accordance with Article 1.4.

1.7
Ellomay shall be entitled, at its own discretion, to opt for one of the following payment modalities in relation to the Sale Transaction:

 
(i)
instruct Ecoware not to pay the Panels Price, in which event the amount of the Panels Price shall be deducted from Payment Milestone 3 under the relevant EPC Contracts;
 
(ii)
instruct Ecoware to pay Ellomay the Panels Price, in which event Ellomay shall pay Ecoware the entire EPC Price, in accordance with the EPC Contracts.

2.
ECOWARE’S OBLIGATIONS IN RELATION TO THE PANELS

2.1
Ecoware shall warrant that the Panels comply with all the terms and technical requirements provided under the EPC Contracts and the O&M Agreements and shall be liable for any loss and/or defect relating to the Panels, even if attributable to the Supplier’s fault, from the time of delivery of the Panels at the Port of Venice.
 
 
2

 
 
2.2
Ecoware shall be entitled to keep the Panels at its premises to carry out the assembling activities before delivery to the relevant Areas, as long as this may be reasonably required, and shall for such time keep them duly segregated from all other goods stored at its premises in such a way as to avoid any risk of confusion with goods that are not in the ownership of Ellomay. In addition, Ecoware shall label the Panels belonging to Ellomay with clear and well visible indication “Proprietà di di Ellomay PV One S.r.l.”. Ellomay shall be entitled, at any time and from time to time, to carry out inspections at Ecoware’s premises in order to verify compliance with the above.

2.3
Ellomay shall be entitled at any time to take possession of the Panels, in the event that Ecoware breaches the obligations entailed in Article 2.2, or materially breaches its obligations under the relevant EPC Contract and such breach is not cured by Ecoware within 7 (seven) working days from receipt of Ellomay’s written notice reporting the events giving rise to the breach.

2.4
Ecoware shall bear the risk of loss, theft and damages relating to the Panels from the time of delivery thereof at the Port of Venice until transfer of title of the System pursuant to the relevant EPC Contracts. The Panels will be covered by the full insurance policy package pursuant to article 15 of the relevant EPC Contracts, and Ellomay shall be included as beneficiary of said policies.

3.
WARRANTY BOND

3.1
Without prejudice to Article 22.2 of the EPC Contracts, Ecoware represents that, should Ellomay encounter difficulties as to obtain the Financing due to the provision by Ecoware of a Warranty Bond in the form of an insurance bond, Ecoware shall in a timely manner provide Ellomay with a Warranty Bond in the form of a one year renewable first demand and autonomous bank bond issued by a primary and leading financial institution covering at least 10% (ten per cent) of the EPC Contract’s Consideration.

4
MISCELLANEA

4.1
Any variation to this Agreement must be in writing and signed by both Parties.

4.2
Ellomay shall be entitled at any time to assign, either totally or partially, its rights and obligations arising hereof, on the other hand Ecoware shall not be entitled to assign this Agreement, neither totally nor partially, without Ellomay’s prior written consent.

4.3
This Agreement derogates and supersedes any conflicting provision of the EPC Contracts, which shall otherwise remain fully effective.

4.4
This Agreement shall be governed by the laws of Italy and any disputes arising in connection with this Agreement shall be resolved in accordance with the relevant provisions of the EPC Contracts.

4.5
This Agreement is entered into in English and the Parties agree to exchange signatures via fax or e-mail.

 
3

 

 
On behalf of Ecoware S.p.A.

/S/ Leopoldo Franceschini
Mr. Leopoldo Franceschini, in his capacity as legal representative


On behalf of Ellomay PV One S.r.l.

/S/ Ran Fridrich
Mr. Ran Fridrich, in his capacity as CEO
 
 
4

 
 
ANNEX 1

MODEL OF SUPPLY TERMS APPLIED BY THE SUPPLIER [omitted]


ANNEX 2

MODEL OF LETTER OF CREDIT [omitted]
 
5





EX-12.1 5 exhibit_12-1.htm EXHIBIT 12.1 exhibit_12-1.htm


Exhibit 12.1
 
Certification Pursuant to Rule 13a-14(a) or Rule 15d-14(a) of the Securities Exchange Act of 1934.
 
I,Ran Fridrich, certify that:
 
1.
I have reviewed this annual report on Form 20-F of Ellomay Capital Ltd.;
 
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the company as of, and for, the periods presented in this report;
 
4.
The company’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the company and have:
 
 
(a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the company, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
 
(b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
 
(c)
Evaluated the effectiveness of the company’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
 
(d)
Disclosed in this report any change in the company’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the company’s internal control over financial reporting.
 
5.
The company’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the company’s auditors and the audit committee of the company’s board of directors (or persons performing the equivalent functions):
 
 
(a)
All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the company’s ability to record, process, summarize and report financial information; and
 
 
(b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the company’s internal control over financial reporting.
 
Date: March 10, 2010
 
 
 
/s/ Ran Fridrich  
    Ran Fridrich   
    Chief Executive Officer  
       
 
 


 
EX-12.2 6 exhibit_12-2.htm EXHIBIT 12.2 exhibit_12-2.htm


Exhibit 12.2
 
Certification Pursuant to Rule 13a-14(a) or Rule 15d-14(a) of the Securities Exchange Act of 1934.
 
I, Kalia Weintraub, certify that:
 
1.
I have reviewed this annual report on Form 20-F of Ellomay Capital Ltd.;
 
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the company as of, and for, the periods presented in this report;
 
4.
The company’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the company and have:
 
 
(a)
Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the company, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
 
(b)
Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
 
(c)
Evaluated the effectiveness of the company’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
 
(d)
Disclosed in this report any change in the company’s internal control over financial reporting that occurred during the period covered by the annual report that has materially affected, or is reasonably likely to materially affect, the company’s internal control over financial reporting.
 
5.
The company’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the company’s auditors and the audit committee of the company’s board of directors (or persons performing the equivalent functions):
 
 
(a)
All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the company’s ability to record, process, summarize and report financial information; and
 
 
(b)
Any fraud, whether or not material, that involves management or other employees who have a significant role in the company’s internal control over financial reporting.
 
Date: March 10, 2010
 
 
 
/s/ Kalia Weintraub  
    Kalia Weintraub  
   
Chief Financial Officer
 
       
 
 


EX-13 7 exhibit_13.htm EXHIBIT 13 exhibit_13.htm


Exhibit 13

Certification Pursuant to Rule 13a-14(b) or Rule 15d-14(b) of the Securities Exchange Act of 1934.

In connection with the Annual Report on Form 20-F of Ellomay Capital Ltd. (the “Company”) for the year ended December 31, 2009 as filed with the Securities and Exchange Commission on the date hereof (the “Report”), the undersigned officers of the Company hereby certify, pursuant to 18 U.S.C. §1350, as adopted pursuant to §906 of the Sarbanes-Oxley Act of 2002, that:

A)
The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

B)
The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.

 
 
/s/ Ran Fridrich  
    Ran Fridrich   
    Chief Executive Officer  
       
 
 
 
/s/ Kalia Weintraub  
    Kalia Weintraub  
   
Chief Financial Officer
 
       
 
Date: March 10, 2010
 
 


EX-14.1 8 exhibit_14-1.htm EXHIBIT 14.1 exhibit_14-1.htm


 
Exhibit 14.1
 
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
 
We consent to the incorporation by reference in the Registration Statements on Form S-8 (File Nos. 333-102288 and 333-92491) pertaining to the Employee Stock Option plans of Ellomay Capital Ltd. (“the Company”) and Forms F-3 (File Nos. 333-144171, 333-115826, 333-114428, 333-47842 and 333-92493) of the Company and in the related Prospectuses of our report dated March 10, 2010, with respect to the consolidated financial statements of Ellomay Capital Ltd. and its subsidiaries included in this Annual Report on Form 20-F for the year ended December 31, 2009.
 
      /s/ Kost Forer Gabbay & Kasierer
KOST FORER GABBAY & KASIERER
    A Member of Ernst & Young Global
                                   
Tel Aviv, Israel
March 10, 2010
 



EX-14.2 9 exhibit_14-2.htm EXHIBIT 14.2 exhibit_14-2.htm


Exhibit 14.2

[BDO Limited Letterhead]

CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

We consent to the incorporation by reference in the Registration Statements on Form S-8 (File Nos. 333-102288 and 333-92491) pertaining to the Employee Stock Option plans of Ellomay Capital Ltd. (“the Company”) and Form F-3 (File Nos. 333-144171, 333-115826, 333-114428, 333-47842 and 333-92493) of the Company and in the related Prospectus of our report dated June 26, 2008 with respect to the financial statements of NUR Asia Pacific Limited included in the Annual Report on Form 20-F of Ellomay Capital Ltd. for the year ended December 31, 2009.
 
We take this opportunity to inform you that BDO McCabe Lo Limited changed its name to BDO Limited on May 1, 2009.
 
/s/ BDO Limited
__________________________
BDO Limited
Certified Public Accountants

March 10, 2010

 


GRAPHIC 10 img001.jpg begin 644 img001.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`0@!2`P$1``(1`0,1`?_$`&0``0$!`0$````````` M```````(!P8*`0$`````````````````````$``!!`(!`@4#!0`````````` M!`4&!P,(`A4)$Q17&9D!%]C76)A9V1$!`````````````````````/_:``P# M`0`"$0,1`#\`]_```````````````````````````````````````````&0W M3L'0FML603G8F[ZAH.$NK^EB;7,+ILJ&59%G*4KFYU>$4:02"&]\2]#M"EIC`+,C'BK6S'P4]-=TGG4?+*D4> M*ESY\.0)#]MC7?U%W[^5SND?F*`]MC7?U%W[^5SND?F*!W]7Z14S4$Z8[$B< MTV\=G^/=3\@WVAW!=]KP@JCJS.X,:KKE7W3LI/ZSD_A(G/)S3=2:%?DEG'$K M3^$JP8,V,*\````````````````````````````````````````````````` %```/_]D_ ` end GRAPHIC 11 img009.jpg begin 644 img009.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`+@!V`P$1``(1`0,1`?_$`&X``0$!`0`````````` M```````'!@H!`0$!`0$````````````````!`@0&$```!0,%`0`````````` M`````P0%!P(&"-98F`D9`1$!``(`!P`"`@,```````````$"$5&1$E(#$T%A MP2+P,8'_V@`,`P$``A$#$0`_`.UL>0=X``````````````````````````)I M*;5,+O;Z--"5]QK'UU4/*<]P>93B>Z)BM]3;]*)Q+5M:.V;2F>#')"\G.1J0 MTM?6[*""B"3BOJ0RHZ@Y/JLUB?WB9CZG#\23C\,=%ENY1-%P+%,VS%`<@VK6 MS*"&]FBS&V0X=N!-<%2UN,2.BRYKMRLG-M7,Q+:4K*,04-*<\T\XDWXK+I)K M)46T]SLI&%+6B/J9A)K$_P!Q":>=G7YL6PXXQPIH M@:]^[G;64VUR@\[.OS8MAQQCA31`>_=SMK)MKE!YV=?FQ;#CC'"FB`]^[G;6 M3;7*#SLZ_-BV''&.%-$![]W.VLFVN4'G9U^;%L..,<*:(#W[N=M9-M=G7YL6PXXQPIH@/?NYVUDVUR@\[.OS8MAQQCA M31`>_=SMK)MKE!YV=?FQ;#CC'"FB`]^[G;63;7*#SLZ_-BV''&.%-$![]W.V MLFVN4'G9U^;%L..,<*:(#W[N=M9-M=G M7YL6PXXQPIH@/?NYVUDVURA2VO%/%UDC&XH29L;8#:(9O!Y(N*[8C:X=CQ!& M-T7`E.8E"9]N*P4ENE6J]O*<^UVRNA4I2>5MR7[\J^?4Y7VC/IV3;?-K;H K^<9Q7;&&&$8+X,*``````````````````````````````````````#__V3\_ ` end GRAPHIC 12 ey_color.jpg begin 644 ey_color.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`=@&0`P$1``(1`0,1`?_$`,4``0`"`@(#`0`````` M```````&!P$%`P@"!`D*`0$``04!`0$`````````````!P$"!08(`PD$$``` M!@(!`@,#!0D*!Q`#```!`@,$!08`!Q$2""$3"3%!%%%A(C:V<9$R(Q46MWAY M@:'1%B'WPQYT\U:3/@X55T6Z: MBRZZ2*1/PU55"))D\`X`YU#%(7]T0S&:_<-!M6*[%ZB`;P.[ZDVB8"8/;U&SA_NW_(A\L7:>[+I;MYG?=XLFO[7:[8U5]U: MTG]Q%UNEBVL?I]_GM\;K(B8KNVT=`]4[M$78]/=BT]:?`JAS&'Y?`!'GQR/,6IU]^>,> M#)?ER732RVV;IXSY6V5YJSY11FO=TV.WER76V6QZQRQ]L\$QB*)>)WH-%0,P MLFJ(`FNH@9LT-SSX_$.A13,0./$>1#.A>WGRK_,IW1OMR],]+;YFTU\_ER:B MR_2XIKQK;?J9PXYBGG%]/BU;<^MNF=INF-5GPS3RMNMNN^J(F9JM.'[>+BZ` M%)F68Q!#`'**1UG[@!$`Y#A'RD>?^./CG<7;O^)'OKU#BLU7<#?-NV+1W4F< M6*E\=NIZTW#>.H=PCC^?)^ MVT\_3I[.:_ZO>1_NO=GJ?75_96X=-;\(B9^V?Z+5AZ;5X,I0BH&-:&)X>;\, M51;W<_CU_,6$1$.1\?;G;G0WR]]F.V.",/1/2^T:*WSN]KW+YGUYLOOWQ,^, MS%T-&U^^;UK^.MU63)6/"+J?=$T24A`*/@7@`\`\?F^8.>/')DPV8=-BMQ:? M';;9$4B++8B+8](K%O!B+8M\9NOF[XN0OL^3Q'Y?]WQS]%EMUMM+IYI]:1'X M>BMU*\/!Y9TM"KQ+:(2`3E^+?J"^=\CU!UD;IB1JB8/:'(*!S\OMSYB]WO MY?\`K3=IR;=V8V+!M.ANB>75;ARYM328_5&&R[V+9IQC_+,Q=PIP2KL_9O'@ MYV7%SZ32X<<1_?=$<\_&Z9\_^#WX>@7*<$GY(KDJLF(!RZ7;F;-P/X<]2 M[KR$2AP(<``CF;Z"^5#YB.Y\X[NDND=VRXLDTMS9<-VET]T<.,9M1[>&[Q\8 MOF7AKNN.F=LMNC6:O'=EB?TV\9IY<(JM:)[=[:\%,\O*QL2F/'4BF*K]?Y1# M\25)`I@X_P`OCY\[G[?_`,07>??+[,W7V[[-LNGNFV;\=DWZG4VQ,37DMMMC M!=3A7_-XM#U_>;9\$76[;I$5^^?N6Q$=O%+8F3-)N96:.`!R"C@K- M(Q^>1'H:!YHE^;S/'.Z.A/XE?EUZ;NQ7]7ZO>-_UUG+=/-D_;8KICROPXXOB M;)])OCZ4?[AW9ZLUO-9I8Q:?#\(X_;_R6C%4BJ0)2A%5^,9B40Z5B,TE%^?< M85U.M<1^?J^]GVV*S3]&])[1H8QQ^J,&&ZZ?C==?-]TW3XU\:M$ MUV^[WN5\QK-7FFOC'-,6_9PA+$R@0H``H>`#G\(P\%+P41$QA]P``9XZB;+<4WY+N2 MVV*UX>7T\)^B5]G&ZG'ZE<6+:M(K@*%?3K9PZ(;@K*/$'[DPE$`,`@W$Z:/( M_P"<,3V9R;W<^=/Y%,N''S>W-?.:4\?! ML^U]']2;U-O_`.=II]N?[[HY;?MGAX**L7<@]<'4;U2&11`1Z$WDJ;XI;Q#C MDK)N8B!!ZAY`3*G^YGS3[M?R^]0ZN<^U=E.FHTV2ET6:O7_Y+Z4F+:>$5\*PKA5OM_88@95*QRC[K\/4^NZ?SWQ?;CN] MS1[;%>,3CB^<>&/JG\&WZ3)VZZ1K%=+9EB*4F8R98^%>*70W;G:WY2&F)2,A MB%^D**/,@OP;W%*B":*9@]_TQR;>WO\`$+WGWF(U?<3>=HV+#=/YL5LSJ]1, M?"^RN'_S^IA]S[S;+@X;1I;L\QYW1RQ_7[EJPO;O36($5E'$G-+!P)BJJ_!M MQ-P'5^*;<+"43![U.?GSN;MQ_$W\NW2-UFKZUU.Z]2ZJ.68MON_;X8FD5B<6 MGFE]M?"+YX^=9:)N?=OJC6Q33Q9IL<_Z>,QZ?7'T+4A:75($P#$P,8S4)[%D MVQ#N/$!#@5U2G7\0'G\+CYL[CZ`^7CL5VMBV[H3I7:=NU%*3ELTEDY;OC=?= M;,U^/BT76;[O^YW3EU^JORVW>LS^$<$O```.`XXY'P#CC][)IQ61CLY+;+<= MD>$12(I]$<(8>;:3\9XLYZ*&`Q2`P&`P&`P&`P&`P&`P&`P&`P&`P&`P&`P& M`P&`P&`P&`P&`P&`P&`P&!PF.`','(AT@`CX^`@/R!GG=FPQ%W/='Y(K/_3% M*UGPI'GXO')9?S1=%W+$SY3,S/PY?)![#LBG5DYDY6>9@X#DI8]H?XR0.;@? MHE9MO,6`_P!W@,YY[H_-=V%[/V3;UEU#HHW#DYK=)II_=ZV^*W6ULP8>:ZE; M9MXQ7FCQ;+M?2^_[W,7;=I[_`&ZTFU;O/?B:%K^662. M42DE9Y,S5$O4)0!?=G)&^?.E\P_OE-^?CY@YNR][>O]/L&R9>%^WZ"^^<,VSXVSBTEV/#=?RS/YLD7QXUK,LK M@ZLZ!V&SFV+;;M5F\/=RQ$_7'-6;>,>41#>Q/;M2V'"DFO)S"X#RIYBQ63<_ M@/)3)-BE4.01'V"?GY\D+H'^)OY;NG;;,G6FKW;J'71-;O=SSI[*^D6Z?DK; M7ROFZ9CA+%Z[NQU-GQSI]NLPZ?#/A%L16/HFD46S"4FJ0*9"Q=?BF9B"`@J1 MFB=?D!Z@$7"A5%Q$!^4P\9W-V^^7OL7VNY+^W_2^S:#5VQ$>_BTV.=1-/";\ M]ULY+I^,W-*W'?\`?=VMIN.JSWV>=LWW3;3TI6E)]$J$I1]I0'PX]GNR:HB+ M:1;$1$>G!A)B)CEG])TE#W!B(B+>6/T^B[FN]60``]@!E:S2GD(CQX"/[@>(C]P`P`"`\\#SP(@/'CX@(@(>'O`0P,=91'CGQXY]@^P./$ M1XX`/'`P90A!*!SD()S%(3K,!.LY_P``A.H0ZCG]P!XC@1Z3N-2A6KI]+6:! MCF;&8C*Z^D!E4TF[L5F*H*F%$YP('@;@?#`S M(+V!4PI1B3%F`B8/BWQCNA(4.2@OLE^31],X=KTU ME9IJM5DOS6Q'A6-+A]K)S>EX2J(Q?EN%R\?YQ8P\9$N\_+_NG7F2,VY\^2M?3@R^EWVS;[^;:])BQY:?[E]L99F?6 MF3FMB8^%K>1%)J<$`!%5Z+9F)^"L1LFHY'V#R9TJ!W!A$?>)LW#HKY?.R'0- MT:GI+I?9=-N%MU?W/[7'?JYGA6;]5EB_47W32LS=DFL\?&LOR:[>]YW"9_>: MK/?9/]O/-MD?19;,6_=X<$F%(AO:'[X^'S`'R9,L66Q^F(MX4X<.'U48FZ+; MJ`#CV>SQ'G[_MXQR65B9B)F/7C^*_GNB:Q/\`3[/!D2%$.!`! M^[X^S[N5NCGF)F9K'I,Q^"DS,SS?W,\!][%L(>/L\0\?#GP^7P MP,_[W[_L^_@<:BJ27E@JJDF*QRI(^8H0GFJG`QB))=0AYBAP*(@4.1'@?DP( MM)7FHQ#59[(V>`:LV]C8T]9RI*LP30M4H[:,(VM+F\[I1G'K^0;I)MC""ICK MD#I^D'(1"S;RUG48G8,S,V1(K354"@$37`3"'`@`1R\]Q5-HB&]@>L)V0D>WS6T7L^YL&;-ND#Z$FHRS2 ML8T@GKEVFV=R*B%3=%4*?RR)G,G](0-R`:^R]P1(2UWFI-JNJZ=4_MR/W`I/ MUY)-)!^DH^L3!M5U&J3=59NMYD`)SN0.8H@IP4@B7D0CM9W_`&"SW/2T",#% M,(W:/;'.[U?B51VYD(B=9+:\*R@V:YS(MW$85"Y.`4.=,JJADB"'0`B`A7&J M]\['O*G8B\F'\>V)O76^T+3L:.CXMNW9R4K`4^NRT1\$"OQ#F-;LWTDJ?H34 M^GR`'$P!@1W7EMVU>*SV>V0LM;9Y-_W%[T9;+E([S19N*9`#ON!KB-M48II- MA@H]]&1*"(*AT"X20YY.`#@65!:!O4M$IM+G958QU`]Y-B[@X7I>.K'^4J.W MMDO)UBKG64<(%B".HZ03#R"B=)D!`(!!]P7S%:3US%'OIC02X;%*`BDY1\P!ZO'`M8H=("')AY'D>1$ M?$0\1\?9S@8Z"\]7'C\OS?)^_EEN.V+_`';HB[)Y3,16(](FE:$1$>$<3I+[ MP`?NY=2ETW1-)GQI3C]U58NOCPF60#C$1$>'XS/XDS5G*J&`P&`P&`P&`P&` MP&`P&`P&`P&`P&`P&`P&`P&`P,\#\@^'MP/76V-*(BH:4:'(I='S MHK%I50%)4_1/KO#E3!J;I6`Q@`2A@0VQ[XUC5XJ]S$A8169ZSMM9HUY"/CI) MXX@+1;UJRC`Q:Z!&I3+G=!<8U0QTO,332<@8Q@X,`!&+]W)4^AQ^_G2T18)5 M[V[5FN6>XQ[5%HW"3;6N(>S,0W@'CET5%PL+5@H"PK`B5,_`DW]UV5O9C<'*SX MZ1K,TA:GM\(=M-)-`;MGZ$::*;'1(<@E(=`A@#J*`X$2@7KY[2-$+/7SUZJ7 MU/MF,R*NW;APJ5JRN^_&K5J5110Q@9M6[WAX4[U&O[:.W7]^L]OXX&T[A?"2]4']4 M76GV.W=@6#9X>7G-X;7C8F,>/WTQZ><5#1:""!P![,2-GO[=E%H.%`(U,]<+ M+$*!.OD.H!'@!YP+(UCI2W,IGMVN,T=G#H47M)-INSP+@ZJDXSMLVEK5TIY8 M($4CCH1(U)TBL85N?-.4"\AR(!:.MNWVD:[K6E84@N[#*Z(JDE4Z/:),XH22 M+.=CF$9/.7#5D=&/5<2K./3(;J3,"8!R3@>1P+L9,6<:V(RCVC5BT3,J=-JR M;(M&Q#+K*.%C$;MR)I$,LX5,U@,!@5_:-L:MH\BG$7;9- M`ILHLV(]0CK7EZK"W"J2]GKY"*3M&9.EY&+(8[EI MB081,7'HG,#W,!@,!@, M!@8$>/E_P`1\?O8&.KYC``!R(B'''CP`"'X0"/&!ZZKQJ@HW15<(IJNE3(-4 MCJID4O M8]4DFU73!L#3;*[B7M(>=RL.PJS=\_T)H.)W2S=O)19-E9'DVRV.X1@'35NV\Y@ MV:JT(.M8JBACE<_1*7H\0]*5WA;$[_*5-HSAFL>EVB.=[M5Q0<.7S>X!-N(Y M!H*JJX(KPK=$@&\LR?F'/XB;CD,"*ZUV_L&V7GM':S,RD+#:G:A:]GW:.9L& M;9E)W1LGIM=E)(E\H[A@BT_.E^":"2@)@"P`(&Z2B`5-I/8=\L[7TXI*Q7"? MF']XCM[.;DY=2*Y1M"\51IM>,5G$4#)H21X]9(IDO,*($.7J#@<"*T=R[=4S ML]5>.W3M?_W^[_1,LZ<#G[A` M#X;U4O`/]D.DOWM=V3C[V!.-K_7[O/\`V>E7_P!%W`8'OT3_`&QZF_9MJ_:G M7N!%^WL?^E>F*'O'M(O_`-B-*X$:T:41JGIM"''!=J]Q'/[M5W?[/O8&*L41 MH>B^/^#ZHFU##]S\_.X$/#[^![CJ'E)ZE[T9PD<_F'2'J@4B1<-XIFXD5F[" M*O&D'\H]72:)JG29QC)`ZKA4P`1%,AC'$``1P+ZL_;K;]@)]WU;CE)\=S52KTJ]04PJ5U79"N5-O8F;&/2C?*)TD>M;0[*[$QS^=R4."@7 M`M5NV1;)E10232233212(0H<$103!-)(OAR":10X*'/`!@<_`![``/W`^?\` MAP,X#`8#`8'Y>?4J4T[L;NUNX[`[#N[+=\M28FM4AGL/7USM5:I$M'M(M.:^ M'@XQGK:PM2E9/YM9)9=-TH5=<@CP4?#`Z_6/6VN9Q]Z8O;CK[3EUT;`;7WO; M]ZWK6.SYUW9[A'-6ULA*<26G'\E!5QT@D^JE"?K(H*M$_*;&\.KJ$V!](?1U M1+M#67W8'2 MGN]MVD-I>M/78KN&GJ+':2U#"5^JVE78SIBC4'"<)1YBX.8.2.^'X93\IVJT M))@B8/IJ)@`^P<#Z-7#?G8'V6:%V#W<]F^LM+7=X6S5/3DT.H'S>OLY^2EWZ M4N2M.9]BQD67G1;$#/\`RTT%#"!0#PZ@P+@HG?UL1+NCT[VO[S[?H_7+V[^WU2&)3+CK.UV5A13*S)))IM*FUF5)B'"*#-!\\;1*3@SM9ST)D<=1R`5,3"$AJFT.\Z64*ZG>WW3X0EEUM,W M"I.JSNJ6?##VI%*.6J]"O+M_1V#8YK$A)=0RD4#IHV!!4>#\$ZPZM4WOU[M] MA=P>V.V*I]KFG9#96EZY$6&Z.5>X*82J2'Y92BC,XME,FU;Y[J4*:7(51,42 M%**:GTO#D0[N]T_<@W[5>V:]=P%MK*TZ]I-?BG*E0AGX%+(V>8>1\0RAD)=5 MMPE&DF'X%.[,ER#[7>YS;^U]GKZ\V+7=52+!QHBB;K&W:=DK. M_A*7(WYX(1.K;@O8`70>6=S!_P#:*#ALHEYK9,QS-DRF3,8/FQZ_FB5GE!TW MW05IH1*Q:TLA*+891%(OQ#>'L#@LS4)(Y^.0+!VV-Z$A$?HG?``>W`G]P[D* MKW\ZUHD18K.%0[/]7ZWHNXN^[8*RCEG'6*UH1D;+Q/;1%.TR%4=JNIQ'XNPI MM^M44!;M2`*JY2F#M3JWNB[G-V:V'9?:WVI4.%T?',%$-6,]P;%?4"X;*KT( M46;)>F4RKT^>B:E"NR-A1C_RB\3(MP4>"D^E@1-/U8=.C#0R=A39NVKB/49NSN4'0-0,:P9[+G(`[\KT:^W5K"=F?QBLD9!L1<\>@8Q#JBF0!$ MHCP`>&!\S;SZM%0U98^SR,V?KI2GP'E(4.A<"%`3E`W5@='74;I0[VQ,86P3=IL0N4#I"RCFIBE,FH'F#Y:@D" M]=37_N4DMC6"A[OTK3JU"1]::V&O;;UIL!Y::38'BT@1BO4W4+8J[7+/#V-H MB(N1ZTU4#(!R!^1`,",Q^R;H]W7JNN.IM4L'9.TN\;&F8Q%)N1LXN)E(4X)]*OX/(`(!2VEKU=;&;TUY&=M<_*O;QJ';$O-W\\0IR)23INZ<'53,J4PD4.)@X$<"#ZI77=57T_%G2Z[I8W< M[W%`99RLHX6,"<-W(II@998QU#`FF0"EY'Z)0``\`#`]:)\*92>.`Y]62Y<_ M/SMO8G/[N!S[`^H?=./CR'J*Z-X'D?#_`,P=L(>'R>`X#N)\83U-?X_MO#_T M71\"6[_^N/J+_J+TC^C>XK`WLI_MGE?V;2_VK=8'H:1^OW8)^HC;O^I=O>!7 M_;M_-'I=?ZG[A?L#/8'E0?J5V>_M`NX3[0]TV!YJ_5R4_:UQGZ3(3`\-L?4C MOW_6Z[QW"?R;U4O[(=)?H[LN!-]K_7[O/_9Z5?\`T7[1C`7< MFIN?_P";2YO9SX%M.O.?\>!&.WLIA=^F0/2;A'M&OXJB)3`"8?F7I8@"<>." M`8P#QSQSQX8$[T3H_825#[,GDS%DK;G35TW%9;I"3QE6%UWW7WBYABQC; ME;[);I]`GD,%O+?,H1*Y.6Q"K<@L`%4,7J#P"^6$3%Q?QHQL9'QQI1\XE908 M]FW9C(RKLJ1'`P/?$`$0$0\0YX'Y.?;Q]W M`S@,!@,!@,!@<*ZJ:"9UE5"I(I$.JLH,"56GN=[0&>T*GW$L>["_P"T]B:8[4)G3&N:S9].7AM+ M6G91Z'9X!I?)R^3G=M'M[N??AWJ] MPO<->=20,),/[8A3T-J3-4:,Y-6T;#<"FXBV5D7\I\,97:PW3$R13"F1P`>` M#XAVF]38-4[L6[`.W/M_>4-E3NY#?@W89G6<9`IUV4807P-7);$VL0W1C9OX M4)9V/G*%.4X-!`3"4HX''V6;GB&EL[^-D]T*]OM-@=@,S7R7!!DLTTY5 MHB41B8NB5=`K:OU&,2F&`@X49(D4>EDT#*G'S!`0CF]^P^^57M![4>[7M[%U M"=U/;CJVH7FT'AVPFDKW#R#1:\6@KELF0%):;K;V<>'\D_6=]&J.&ANH/*+@ M65VWL=1^H5V^[JG.XU^VHL[WU[==+T.(C)M!&89AVY4BHU]B\J#M\F*#XM=F MF#UUY"Q3$.BX,DH41,81";^E*PW=JW<'=-VQ6':IMW]OF@E:M#T#87F*O(J) ML\@520?4R&DEEW@-E(R"5(,G&).7#>-=I_BQ("G&!S^D8`;/VMZ@_="L4'*. MT.XR0J-=D!`#@I`U%>5?@D@KR(&0!M.,B@!?``2#Y.`#==X&Y8K?_=?-^FS? M;M$:3TW-:75N]XNLNI#-I[9M@?@U?U6G5"5LW7$045"N$R/W2R1!?/%6"K=) M1(`,80Z3>F[M_9K&:E_3*"_TW7TU2]BSUK;[TI[^+D9G=7^Q4"C1I7 M@IG$7#JSLIYZX;E4_` MX4+:N[%(=JH1U^;%UD9^<_+LP1L3S5F+!U)Q)555>0)Y*(B(`0O`?>6_=P^@ MNV3MAB]H?G/7/ZN*SKZ&;ZS8PT@P<*W0S6$;-*=5Z8S:JF/+RT57O`[Y*GM/9K>4;J-"4.C@RDC0"=H M3.4#13B46DW;X45@*9-$B93@"O44`_1-WO[&KR?;3.::V1W"PC+3&G M*Q6Y%E,2GN2\U#G.'XAU%VF]HD<)%$H+HI M'1/X''`Z1]GW]?*98W3I9929).4(->Z:,5=BV#`QW%?S'ZFW\=VW_`&*HV!*^X$1" MW>HP;W_^Q:D#_P!V]Q6!OI,1'P,1]_8A; M1^^S[?,"!=NW\T>EU_J?N%^P,]@>5!^I79[^T"[A/M#W38'FK]7)3]K7&?I, MA,#PVP(?F1W[^(?WN^W(/;[P+VN"(?N!@;+>S%[**>J3&QC-U)2+S4^CFS./ MCVZKQ\Z<+:]LA$4&[1L11=994P\%*4HB(^S`["V72]UN6Q.X)9-LC#U[:?:5 M3M/P%D>K)+-DK6*NUTI,CF,0.,F1O$-K:T54.)2E4`XD((F*;@+8J&B86`G* M-;)20=R5BJFA66AG*"72E`2$&#F"DI21!L='XPCQU(0)"DZE>DJ!A#IZAYP+ M9K52K5.K]?JE7AF,)7:K#LZ_7(IDETH0T)'MD6;.-8F.)UDFJ#9N0@!U#R!` MYYXP)"``'L\/9X!X```'```!X`&!G`8#`8#`8#`8#`8'"X;H.D%FSE)-=NX1 M5;KHJD`Z2R"Q#)K)*$,`E.FJF82F`?`0'C`Z^!VA]J8!P';9HL`#_P#%E+_\ M&\1'`#VA]J9@$![;-%B`^T/ZJZ5_X-@7;"5FNUJ`8U2NP41!5B+8%BHVO1,> MUCX5A&E(*96#.-:IILVS,$S"'ED(!>!'PP*/-V?]J!QY4[:M%*&Y$W4?5E+. M;J,/(FZC0XFZA'W\X$\::2TXP>4N18ZKUZS?ZW9GC]>O6U1@D7=&8JF6.HSJ M+A-D56O-CG<*&$C44BB)Q\/'`P^TAIJ3F[199#5.NWMBN\4X@[G..:?`K2UM MA7:;5)U$V20.Q%U-QSE-BB51%R91,P)$Y#Z(T/6L4M!: M\IE7HT&X?N91Q#U*"C:_&+RCSH^+DEF46V:MU7SH$B@HJ8HG.!0Y'PP(UL#1 M>EMKR,1+[/U-KG84K`\!"R-SIT#8WT64%/.`C)U*L72S=(%1Z@(4P%`WCQS@ M>RMI?4#FUPE[7U;KY6[5ELR9UVW&I\`%C@6<:FNC'-(B9*P*_CFK!%RH1%-( MY2ID.8```$<#;WK6VO-H13>"V31JE?H1H]3DFL1<:_%V.-;R*22J"3]!E+-G M3=)XFBN5\#^3",P\H$.CR_+^CQQX8%(U/M'[7Z+8&]KI^@-35ZQ,EE'$?+1M(@DG, M6X5.)U%XCJ9G3B5CF$?IMBI&\1\<"XK73*E>Z_)52[UF"M]9F$O)E8"S13*; MB)%(!ZBD>1\B@X;+@4WB'441*/B&!6^L^VOM^TP^=2FI]-:XUY*O6YFCF5JE M3B(B449G,!C,@DFS8KU-B)@#\210J7A^#@6E"5BN5LTRI7H*(A%+%-.[)8%( MJ/:L#S=A?IH)/IR6.V23-(2[Q)LF55PKU*G*F4!,(%#@.!*GU1&T.KNC7(1* MYO89&N/+:G&,R61U7VSHSYM!N)LJ(2*T2W>G%4CY/`XXKZF4G]K)Q:D?T9W%8&^DPXW-*%^3TV5P_P#53H,#7Z/+TWWL##Y.Q"VA M]YGV^?PX$![=OYG]+K_4_<+]@9[`\J#]2^SP/?\`_(%W"^'!A'PL'=.(^P!X M`/>(^&!:L%IK8-DA+,U;P9XI:-]19UNCB?.K%%DM>P-XC)A6Y/`XXKZF4G]K)D`F0<@'`CSQSQ]SD>`]H^P,#.`P&`P&`P&`P&`P&`P& M`P&`P&`P&`P&`P&`P&`P&`P&`P&`P&`P&`P&`P.@,1_>&T?^HKL?[7:;P*E[ M??Y'Z5O]A^W/T:4S`UNHOJCZ??ZSW<;_`$3W)X''%?4RD_M9+C^EK8F!S;!$ M`H7=/R(!_P#8KHWCD>.1_.'MAX*'RF'W!@61LW4M^V.[]0"J5R!7+(;$?Z#; M4QW,?L M4TY6K.]].5+3TQ!QR1HZ4BHJ!#824G(-)D55RBXDVM\,1,/(`4#(=7)NK@`N M&,I-;B)&/F64.Q">C:LPI+>P+(IJ3/YJQRY7;>%4?"4%3L1>$!8Q/P16$3"' MR!+>`]O`?>#Y_P"'`SP`>P.,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@, M!@,!@,!@,!@,!@,!@,!@,!@,#H#$?WAM'_J*['^U^F\"I.WP0%IZ5P MSDQAX\>1XY'WX'E@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,!@,! M@,!@,!@,!@,!@,!@,!@,#I76H>O'W'IJ7?6]FA.-NSJW1"-01B)M9U(P#RR: MM GRAPHIC 13 ellomay.jpg begin 644 ellomay.jpg M_]C_X``02D9)1@`!`0$`8`!@``#_X0`617AI9@``24DJ``@```````````#_ MVP!#``@&!@<&!0@'!P<)"0@*#!0-#`L+#!D2$P\4'1H?'AT:'!P@)"XG("(L M(QP<*#7J#A(6&AXB)BI*3E)66EYB9 MFJ*CI*6FIZBIJK*SM+6VM[BYNL+#Q,7&Q\C)RM+3U-76U]C9VN'BX^3EYN?H MZ>KQ\O/T]?;W^/GZ_\0`'P$``P$!`0$!`0$!`0````````$"`P0%!@<("0H+ M_\0`M1$``@$"!`0#!`<%!`0``0)W``$"`Q$$!2$Q!A)!40=A<1,B,H$(%$*1 MH;'!"2,S4O`58G+1"A8D-.$E\1<8&1HF)R@I*C4V-S@Y.D-$149'2$E*4U15 M5E=865IC9&5F9VAI:G-T=79W>'EZ@H.$A8:'B(F*DI.4E9:7F)F:HJ.DI::G MJ*FJLK.TM;:WN+FZPL/$Q<;'R,G*TM/4U=;7V-G:XN/DY>;GZ.GJ\O/T]?;W M^/GZ_]H`#`,!``(1`Q$`/P#W'%&*?BC%`#,48I^*,4`1D`#)P*9'+%*S".5' M*_>"MDCZUGZ_X?TW6;.4WULLKK$P1\D%>.HQ[UY_\%E_Y#7K^YY_[[I7U,I5 M&JBA;<]2;:HRQ`'J>*2.2.928I$<`X)5L@'TKEO'WA_3;SPWJ>H2VP-Y%`72 M8$A@5Z5F_!\?\4E<_P#7Z_\`Z`E%];![1JIR-'?8HQ3\48IFHS%&*?BC%`#, M48I^*,4`,Q1BGXHQ0`S%&*?BC%`#,48I^*,4`,Q1BGXHQ0`S%&*?BC%`$F*, M5)BJ6K:G;Z-I5SJ-T<0VZ%VQU/H![D\4";MJRR0!R<4@PPR""/45PGA>T;QI M9OKWB!O.BGD9;6PWD0PHIQG:/O,2.IJKXQTG_A#[-/$'AF5K)H956XM5O1-+U:+7O M"T6IQ+M6X@+%?[K8((_`@BO/?@H/^0W_`-L?_9Z'N1-IU8->?Y'<>-1_Q16L M?]>K_P`JYOX.C_BD;G_K]?\`]`2NG\:C_BB=9_Z]7_E7-_!P?\4C<_\`7Z__ M`*`E)[CE_'7H=_BDRN[&X9],\UYH^MWWCWQE)HNGW$MQ]JROBSH-EI=I8WEF)8GFE:.1 M?-9E;C.<$GGCM1T')+;<]=XQG(QZT@P1D$$>HKA](\,7'B3P_I\FN7=Q M'9_98U@L+:4HH4*,-(PY9CUQT'2N3UF*Y^%WBFSETR[N)M,N06>UD?.0#AE^ MO.0<9]:+CE6<5S-:'LIP!DD`>M``/(Q7(/X-?Q)']K\37=R\DGS)96\Q2&W! MZ*,?>;'5CWZ<5Q]I)>>`/B/;:+!>S7&E7;(!%,VF:IZW=7=GI,TMA;F>\.$A0#(W,0`6_P!D9R?85R\WPSL=1@:3 M5M2U"\U%QEKHS8"M_LIT`]J9I*4EI%7.UQ1BO+?A_K&I:7XNO?".H73W<41= M87FS74.H0#S2(IW`E4=05SC.!G@4KD*MS0 MYDMNAVF*,5YY\(KB&\T6\D>XGFOUEVRF65G^3JN`3P.OXU?\3Z!'K/B[2[>& MZNK=V1Y[TPW#KNB7`48!P"6.,CMFB^@*K>"FEN=IBC%1VEG#8VL=M;J5BC&% M#,6/KU.2?QJQBF;"XKB_BJLA\!7>SH)8BWTWBNVJKJ%A;ZII\]C=IO@G0HZ^ MQH9%2/-%Q[G`?#?1-#U;P9;37.FVL]Q'))'([H"Q(8D9_`BNL/@_PX>#HMD? MK$*X#2]*\3_#C5[C[+I\NL:-.NWN)M2TC1'BFAO-6U"='9FMXQL#GHHR1M49P.IP/6N(^'%GK M?A6>^74=`U`QW00AXE5MI7/4;NGS?I0]PF_WL';:YWGC8?\`%$ZS_P!>K_RK ME/A.LC>!-0$7^L-S*$^OEKC]:Z#QOI:'?Q&6Y\Q)@JL@#!1\W.1C%'4)/\`?)^1A_!;`U'6$;_6 M^5'Q^+9KV+%>=WGA;4O"_BYO$?AVV^UVL^1=V",%?#*_$B)'=LVZVM%;=Y(QA22.,@<` M>O/6J'Q,MM8\21VUCINA7SK;3,SS,JA6XP-O/([YXI=#&47[.8^)[+Q M#J_CFTURU\.7_P!FM3%M60*K/L;"MW1ZEK6L6>@Z5-J-\Q6"( M#.!DL3P`!ZDUS>CZKXB\7V8OK4P:-ILA(B*M,N/&?@V M:""VN+.Z6021PW2A2S+VX)&#DC.>M<[X2\0^(-%TB+09_"FHS75N2D+A=D94 MG(W,>!C/49ICG-\Z3^&QC^&H&MOC;.<>M>N:7]M_LRV.I>7]M, M8,PC&%#=P/ITI(6&TYHVZL\CT;/@3XKRZ:QVV%ZVQ<]-K\QG\&^7\Z]%T#&H M:OJ^L8RKS?8X#_TSBR"1]7+_`)5S7Q;\/R7^F6FJ6B9NK641''4JY`'Y-C\S M731H+>YC652T,DB860# MN.75K;W0MSITEQ)Y?FMY42MAE0WXTZQEC1M$$WF$*K16\ M9&3GCDCGB@"J?'_A8?\`,7B_!'_PIO\`PL+PM_T%5_[]/_\`$UZ8E5Q;IC(!)[>@H`SO^%@^%O^@JG_?I_P#XFG#Q]X6/_,7B_P"^&_PK M0N-/T>U6-I-,M,/(L8Q;KU8X':HI8=%M]3MK!M.MQ-<*S(1;KM^7J"<<&@"L M/'?A<_\`,9M_QR/Z4]?&_AENFM6G_?56+%=(OGNEM[&#_1IC"Y,"@%@!G'J. M<4]38G3X[VWTT2I(H94CB7=@_7%`$*^+_#S_`'=8M/\`OY4R>(]%D^YJEHW_ M`&U%+:7EK/I[7PLG@A5/,'F1J"RXSD`$]JET^^%\F\6=Q`A4,K3*HW`^F":` M)8M0LY_]5/M!\.Z@UCJ,\J7`0/M2(L,'IR/I6K'K,+3JC07$ M<;2M"DSH-C,"5QD'C)&!G&:GGTO3[F?S[BQMI9L8\R2%6;'U(H)GS6]TY2QU MP^.=1M/L%I>&".*&/:\BON\P@8& MT<8'?GZ>]:=%`&!+H][)>/?_`&IEF%TLJ0C;L*+\N"=NL? M:)LF#[-Y6%D923NSR`1D8]:U:*`*%W9%X;2*W1$2":-]HX`5>PI]];O<&UV8 M_=SK(V3V&?\`&KE%`&5J>ER:G=P`W#P01(_,>TEF8;>C`C&TM^=,DM+W^Q+6 M$JDMS;R1,1OP'",.<^I`S6Q10!#;2321;IX!"^?NA]WZU5U&*Y,]I/;0K,87 M8LA?;P5(Z_C6A10!GW<$]Y:VV8UCD6>.5T+9P%8$C/>JNKZ;=W=Q]HM&C6:* M$^2S]!(&5AGV."#[&MJB@#,TG36TT3Q\%&*;2.IPB@D^Y()J?3;:2UTFVMI, M>9'$$;!R,XJY10!G16'DL3M\X6HBZ\;MN*BT2VFL[9;>2R$`5!EA/YFY@ M,?A6M10!A?8+Z:);*2&..W6[,[3>9DL!*9``N.N<#GIS6[110`4444`%%%%` #'__9 ` end -----END PRIVACY-ENHANCED MESSAGE-----