Environmental Reserve
3 Months Ended
Sep. 28, 2014
Environmental Remediation Obligations [Abstract]  
Environmental Reserve

Environmental Reserve

In 1995, we recorded a provision of $3 million for estimated costs to remediate an environmental contamination site at our Milwaukee facility. The site was contaminated by a solvent spill, which occurred in 1985, from a former above ground solvent storage tank located on the east side of the facility. The reserve was originally established based on third party estimates to adequately cover the cost for active remediation of the contamination. Due to changing technology and related costs associated with active remediation of the contamination, an updated analysis and estimate was obtained during fiscal 2010. As a result of this analysis, the reserve was reduced by approximately $1.1 million, to $1.5 million in 2010, to reflect the revised monitoring and remediation cost estimate. From 1995 through September 28, 2014, costs of approximately $479,000 have been incurred related to the installation of monitoring wells on the property and ongoing monitoring costs. We continue to monitor and evaluate the site with the use of these groundwater monitoring wells. An environmental consultant samples these wells one or two times a year to determine the status of the contamination and the potential for remediation of the contamination by natural attenuation, the dissipation of the contamination over time to concentrations below applicable standards. If such sampling evidences a sufficient degree of and trend toward natural attenuation of the contamination at the site, we may be able to obtain a closure letter from the regulatory authorities resolving the issue without the need for active remediation. If a sufficient degree and trend toward natural attenuation is not evidenced by sampling, a more active form of remediation beyond natural attenuation may be required. The sampling has not yet satisfied all of the requirements for closure by natural attenuation. As a result, sampling continues and the reserve remains at an amount to reflect the estimated cost of active remediation. The reserve is not measured on a discounted basis. We believe, based on findings-to-date and known environmental regulations, that the remaining environmental reserve of $1.4 million at September 28, 2014, is adequate.