XML 92 R119.htm IDEA: XBRL DOCUMENT v2.4.0.8
Schedule III - Real Estate and Accumulated Depreciation (Details) (USD $)
In Thousands, unless otherwise specified
Dec. 31, 2013
Dec. 31, 2012
Jan. 01, 2012
Jan. 02, 2011
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land $ 108,348      
Original Buildings and Improvements 1,483,464      
Costs Capitalized Subsequent to Acquisition 343,744      
Land and Improvements 86,949      
Building and Improvements 1,810,612      
Land Held for Development 27,192      
Development and Construction in Progress 10,803      
Total 1,935,556 1,840,306 1,805,434 1,596,338
Accumulated Depreciation 266,848 217,428 174,055 138,813
Book Value of Mortgaged Properties 1,240,011      
Broward Transition Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 3,682      
Broward Transition Center | Deerfield Beach, FL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 4,085      
Original Buildings and Improvements 15,441      
Costs Capitalized Subsequent to Acquisition 18,039      
Land and Improvements 4,085      
Building and Improvements 33,480      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 37,565      
Book Value of Mortgaged Properties 33,883      
D. Ray James Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 5,028      
D. Ray James Correctional Facility | Folkston, GA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,229      
Original Buildings and Improvements 55,961      
Costs Capitalized Subsequent to Acquisition 12,821      
Land and Improvements 1,346      
Building and Improvements 68,421      
Land Held for Development 243      
Development and Construction in Progress 0      
Total 70,010      
Book Value of Mortgaged Properties 64,982      
D. Ray James Detention Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 2,168      
D. Ray James Detention Facility | Folkston, GA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 291      
Original Buildings and Improvements 30,399      
Costs Capitalized Subsequent to Acquisition 4,097      
Land and Improvements 291      
Building and Improvements 34,497      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 34,788      
Book Value of Mortgaged Properties 32,620      
LaSalle Detention Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 7,977      
LaSalle Detention Facility | Jena, LA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 856      
Original Buildings and Improvements 51,623      
Costs Capitalized Subsequent to Acquisition 2,879      
Land and Improvements 342      
Building and Improvements 54,493      
Land Held for Development 514      
Development and Construction in Progress 9      
Total 55,358      
Book Value of Mortgaged Properties 47,381      
Moshannon Valley Correctional Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 5,131      
Moshannon Valley Correctional Center | Philipsburg, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,107      
Original Buildings and Improvements 65,160      
Costs Capitalized Subsequent to Acquisition 6,997      
Land and Improvements 1,386      
Building and Improvements 71,516      
Land Held for Development 86      
Development and Construction in Progress 275      
Total 73,263      
Book Value of Mortgaged Properties 68,132      
North Lake Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 4,473      
North Lake Correctional Facility | Baldwin, MI
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 66      
Original Buildings and Improvements 36,727      
Costs Capitalized Subsequent to Acquisition 50,798      
Land and Improvements 66      
Building and Improvements 87,525      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 87,591      
Book Value of Mortgaged Properties 83,118      
Queens Detention Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 6,559      
Queens Detention Facility | Jamaica, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 2,237      
Original Buildings and Improvements 19,847      
Costs Capitalized Subsequent to Acquisition 329      
Land and Improvements 2,237      
Building and Improvements 20,176      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 22,413      
Book Value of Mortgaged Properties 0      
Riverbend Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 4,191      
Riverbend Correctional Facility | Milledgeville, GA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 72,932      
Costs Capitalized Subsequent to Acquisition 91      
Land and Improvements 25      
Building and Improvements 72,998      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 73,023      
Book Value of Mortgaged Properties 68,832      
Rivers Correctional Institution
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 15,849      
Rivers Correctional Institution | Winton, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 875      
Original Buildings and Improvements 60,328      
Costs Capitalized Subsequent to Acquisition 1,684      
Land and Improvements 1,194      
Building and Improvements 61,543      
Land Held for Development 149      
Development and Construction in Progress 0      
Total 62,886      
Book Value of Mortgaged Properties 47,037      
Robert A. Deyton Detention Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 4,989      
Robert A. Deyton Detention Facility | Lovejoy, GA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 8,163      
Costs Capitalized Subsequent to Acquisition 9,863      
Land and Improvements 15      
Building and Improvements 18,012      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 18,027      
Book Value of Mortgaged Properties 0      
Big Spring Correctional Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 10,499      
Big Spring Correctional Center | Big Spring, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 530      
Original Buildings and Improvements 83,160      
Costs Capitalized Subsequent to Acquisition 3,452      
Land and Improvements 556      
Building and Improvements 85,590      
Land Held for Development 0      
Development and Construction in Progress 996      
Total 87,142      
Book Value of Mortgaged Properties 0      
Great Plains Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 5,983      
Great Plains Correctional Facility | Hinton, OK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 463      
Original Buildings and Improvements 76,580      
Costs Capitalized Subsequent to Acquisition 3,227      
Land and Improvements 463      
Building and Improvements 79,030      
Land Held for Development 0      
Development and Construction in Progress 777      
Total 80,270      
Book Value of Mortgaged Properties 74,287      
Joe Corley Detention Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 1,395      
Joe Corley Detention Facility | Conroe, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 470      
Original Buildings and Improvements 64,813      
Costs Capitalized Subsequent to Acquisition 716      
Land and Improvements 470      
Building and Improvements 65,530      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 66,000      
Book Value of Mortgaged Properties 64,605      
Karnes Correctional Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 4,655      
Karnes Correctional Center | Karnes City, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 937      
Original Buildings and Improvements 24,825      
Costs Capitalized Subsequent to Acquisition 1,633      
Land and Improvements 912      
Building and Improvements 26,197      
Land Held for Development 176      
Development and Construction in Progress 110      
Total 27,395      
Book Value of Mortgaged Properties 22,740      
Karnes County Civil Detention Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 1,289      
Karnes County Civil Detention Center | Karnes City, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 29,052      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 29,052      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 29,052      
Book Value of Mortgaged Properties 27,763      
Lawton Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 15,356      
Lawton Correctional Facility | Lawton, OK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,012      
Original Buildings and Improvements 96,637      
Costs Capitalized Subsequent to Acquisition 852      
Land and Improvements 1,040      
Building and Improvements 97,460      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 98,500      
Book Value of Mortgaged Properties 83,144      
Rio Grande Detention Center
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 9,102      
Rio Grande Detention Center | Laredo, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 8,365      
Original Buildings and Improvements 81,178      
Costs Capitalized Subsequent to Acquisition 1,019      
Land and Improvements 6,266      
Building and Improvements 82,198      
Land Held for Development 2,099      
Development and Construction in Progress 0      
Total 90,563      
Book Value of Mortgaged Properties 81,461      
South Texas Detention Complex
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 6,719      
South Texas Detention Complex | Pearsall, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 437      
Original Buildings and Improvements 31,405      
Costs Capitalized Subsequent to Acquisition 4,785      
Land and Improvements 437      
Building and Improvements 36,190      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 36,627      
Book Value of Mortgaged Properties 0      
Val Verde Correctional Facility
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Accumulated Depreciation 10,709      
Val Verde Correctional Facility | Del Rio, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 21      
Original Buildings and Improvements 56,009      
Costs Capitalized Subsequent to Acquisition 626      
Land and Improvements 16      
Building and Improvements 56,635      
Land Held for Development 5      
Development and Construction in Progress 0      
Total 56,656      
Book Value of Mortgaged Properties 45,947      
Adelanto Detention Facility | Adelanto, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 8,005      
Original Buildings and Improvements 113,255      
Costs Capitalized Subsequent to Acquisition 806      
Land and Improvements 8,277      
Building and Improvements 113,290      
Land Held for Development 0      
Development and Construction in Progress 500      
Total 122,067      
Accumulated Depreciation 4,631      
Book Value of Mortgaged Properties 117,436      
Aurora/ICE Processing Center | Aurora, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 4,590      
Original Buildings and Improvements 15,200      
Costs Capitalized Subsequent to Acquisition 71,965      
Land and Improvements 4,271      
Building and Improvements 86,174      
Land Held for Development 1,310      
Development and Construction in Progress 0      
Total 91,755      
Accumulated Depreciation 8,298      
Book Value of Mortgaged Properties 83,457      
Central Valley MCCF | Mc Farland, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,055      
Original Buildings and Improvements 28,133      
Costs Capitalized Subsequent to Acquisition 2,247      
Land and Improvements 905      
Building and Improvements 30,283      
Land Held for Development 211      
Development and Construction in Progress 36      
Total 31,435      
Accumulated Depreciation 4,987      
Book Value of Mortgaged Properties 26,448      
Desert View MCCF | Adelanto, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,245      
Original Buildings and Improvements 27,943      
Costs Capitalized Subsequent to Acquisition 4,034      
Land and Improvements 1,245      
Building and Improvements 31,977      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 33,222      
Accumulated Depreciation 5,119      
Book Value of Mortgaged Properties 28,103      
Golden State MCCF | Mc Farland, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,264      
Original Buildings and Improvements 27,924      
Costs Capitalized Subsequent to Acquisition 2,088      
Land and Improvements 1,073      
Building and Improvements 29,931      
Land Held for Development 253      
Development and Construction in Progress 20      
Total 31,277      
Accumulated Depreciation 4,931      
Book Value of Mortgaged Properties 26,346      
Guadalupe County Correctional Facility | Santa Rosa, NM
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 181      
Original Buildings and Improvements 29,732      
Costs Capitalized Subsequent to Acquisition 456      
Land and Improvements 27      
Building and Improvements 29,894      
Land Held for Development 154      
Development and Construction in Progress 295      
Total 30,370      
Accumulated Depreciation 8,835      
Book Value of Mortgaged Properties 21,535      
Hudson Correctional Facility | Hudson, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 11,140      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 4,591      
Land and Improvements 7,372      
Building and Improvements 3,991      
Land Held for Development 3,920      
Development and Construction in Progress 448      
Total 15,731      
Accumulated Depreciation 1,997      
Book Value of Mortgaged Properties 0      
Lea County Correctional Facility | Hobbs, NM
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 347      
Original Buildings and Improvements 67,933      
Costs Capitalized Subsequent to Acquisition 979      
Land and Improvements 0      
Building and Improvements 68,359      
Land Held for Development 347      
Development and Construction in Progress 553      
Total 69,259      
Accumulated Depreciation 11,900      
Book Value of Mortgaged Properties 57,359      
Leo Chesney CCF | Live Oak, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 535      
Costs Capitalized Subsequent to Acquisition 249      
Land and Improvements 0      
Building and Improvements 784      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 784      
Accumulated Depreciation 516      
Book Value of Mortgaged Properties 0      
McFarland CCF | Mc Farland, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 914      
Original Buildings and Improvements 9,019      
Costs Capitalized Subsequent to Acquisition 4,032      
Land and Improvements 876      
Building and Improvements 12,903      
Land Held for Development 183      
Development and Construction in Progress 3      
Total 13,965      
Accumulated Depreciation 2,014      
Book Value of Mortgaged Properties 0      
Mesa Verde CCF | Bakersfield, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 2,237      
Original Buildings and Improvements 13,714      
Costs Capitalized Subsequent to Acquisition 303      
Land and Improvements 2,237      
Building and Improvements 14,018      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 16,255      
Accumulated Depreciation 2,099      
Book Value of Mortgaged Properties 0      
Northwest Detention Center | Tacoma, WA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 3,916      
Original Buildings and Improvements 39,000      
Costs Capitalized Subsequent to Acquisition 48,390      
Land and Improvements 3,920      
Building and Improvements 85,382      
Land Held for Development 2,004      
Development and Construction in Progress 0      
Total 91,306      
Accumulated Depreciation 11,792      
Book Value of Mortgaged Properties 0      
Western Region Detention Facility | San Diego, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 28,071      
Costs Capitalized Subsequent to Acquisition 629      
Land and Improvements 0      
Building and Improvements 28,679      
Land Held for Development 0      
Development and Construction in Progress 21      
Total 28,700      
Accumulated Depreciation 25,828      
Book Value of Mortgaged Properties 0      
High Plains Correctional Facility | Brush, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 350      
Original Buildings and Improvements 2,830      
Costs Capitalized Subsequent to Acquisition (2,376)      
Land and Improvements 350      
Building and Improvements 454      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 804      
Accumulated Depreciation 459      
Book Value of Mortgaged Properties 0      
Delaney Hall | Newark, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 3,759      
Original Buildings and Improvements 22,502      
Costs Capitalized Subsequent to Acquisition 12,970      
Land and Improvements 3,759      
Building and Improvements 35,472      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 39,231      
Accumulated Depreciation 5,836      
Book Value of Mortgaged Properties 33,395      
Alexandria Transfer Center | Alexandria, LA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 4,538      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 0      
Land Held for Development 0      
Development and Construction in Progress 4,538      
Total 4,538      
Accumulated Depreciation 0      
Book Value of Mortgaged Properties 0      
Allen Correctional Center | Kinder, LA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 28      
Costs Capitalized Subsequent to Acquisition 392      
Land and Improvements 2      
Building and Improvements 418      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 420      
Accumulated Depreciation 148      
Book Value of Mortgaged Properties 0      
Central Texas Detention Facility | San Antonio, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 3,876      
Land and Improvements 0      
Building and Improvements 3,876      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 3,876      
Accumulated Depreciation 1,603      
Book Value of Mortgaged Properties 0      
Lockhart Work Program Facilities | Lockhart, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 73      
Costs Capitalized Subsequent to Acquisition 147      
Land and Improvements 0      
Building and Improvements 220      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 220      
Accumulated Depreciation 213      
Book Value of Mortgaged Properties 0      
Lawrenceville Correctional Center | Lawrenceville, VA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 717      
Land and Improvements 0      
Building and Improvements 717      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 717      
Accumulated Depreciation 686      
Book Value of Mortgaged Properties 0      
Arizona State Prison- Florence West | Florence, AZ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 320      
Original Buildings and Improvements 9,317      
Costs Capitalized Subsequent to Acquisition 987      
Land and Improvements 320      
Building and Improvements 10,303      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 10,623      
Accumulated Depreciation 5,476      
Book Value of Mortgaged Properties 0      
Arizona State Prison- Phoenix West | Phoenix, AZ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 7,919      
Costs Capitalized Subsequent to Acquisition 433      
Land and Improvements 0      
Building and Improvements 8,351      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 8,351      
Accumulated Depreciation 3,775      
Book Value of Mortgaged Properties 0      
Central Arizona Correctional Facility | Florence, AZ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 396      
Costs Capitalized Subsequent to Acquisition 1,146      
Land and Improvements 0      
Building and Improvements 1,534      
Land Held for Development 0      
Development and Construction in Progress 8      
Total 1,542      
Accumulated Depreciation 809      
Book Value of Mortgaged Properties 0      
New Castle Correctional Facility | New Castle, IN
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 22,142      
Land and Improvements 0      
Building and Improvements 22,142      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 22,142      
Accumulated Depreciation 3,766      
Book Value of Mortgaged Properties 0      
Plainfield Indiana STOP Facility | Plainfield, IN
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 5      
Land and Improvements 0      
Building and Improvements 5      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 5      
Accumulated Depreciation 3      
Book Value of Mortgaged Properties 0      
South Bay Correctional Facility | South Bay, FL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 2,953      
Land and Improvements 0      
Building and Improvements 2,953      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 2,953      
Accumulated Depreciation 2,744      
Book Value of Mortgaged Properties 0      
Cleveland Correctional Center | Cleveland, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 61      
Land and Improvements 0      
Building and Improvements 61      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 61      
Accumulated Depreciation 61      
Book Value of Mortgaged Properties 0      
Reeves County Detention Complex R1/R2 | Pecos, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 1,187      
Land and Improvements 0      
Building and Improvements 911      
Land Held for Development 0      
Development and Construction in Progress 276      
Total 1,187      
Accumulated Depreciation 386      
Book Value of Mortgaged Properties 0      
Reeves County Detention Complex R3 | Pecos, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 4,056      
Land and Improvements 0      
Building and Improvements 3,950      
Land Held for Development 0      
Development and Construction in Progress 106      
Total 4,056      
Accumulated Depreciation 2,696      
Book Value of Mortgaged Properties 0      
Northeast New Mexico Detention Facility | Clayton, NM
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 102      
Land and Improvements 0      
Building and Improvements 102      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 102      
Accumulated Depreciation 94      
Book Value of Mortgaged Properties 0      
Beaumont Transitional Treatment Center | Beaumont, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 105      
Original Buildings and Improvements 560      
Costs Capitalized Subsequent to Acquisition 311      
Land and Improvements 105      
Building and Improvements 871      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 976      
Accumulated Depreciation 134      
Book Value of Mortgaged Properties 0      
Bronx Community Re-entry Center | Bronx, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 154      
Costs Capitalized Subsequent to Acquisition 555      
Land and Improvements 0      
Building and Improvements 662      
Land Held for Development 0      
Development and Construction in Progress 47      
Total 709      
Accumulated Depreciation 651      
Book Value of Mortgaged Properties 0      
Cordova Center | Anchorage, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 235      
Original Buildings and Improvements 3,225      
Costs Capitalized Subsequent to Acquisition 3,623      
Land and Improvements 235      
Building and Improvements 6,848      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 7,083      
Accumulated Depreciation 516      
Book Value of Mortgaged Properties 0      
El Monte Center | El Monte, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 47      
Costs Capitalized Subsequent to Acquisition 278      
Land and Improvements 0      
Building and Improvements 325      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 325      
Accumulated Depreciation 132      
Book Value of Mortgaged Properties 0      
Grossman Center | Leavenworth, KS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 24      
Costs Capitalized Subsequent to Acquisition 30      
Land and Improvements 0      
Building and Improvements 55      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 55      
Accumulated Depreciation 31      
Book Value of Mortgaged Properties 0      
Las Vegas Community Correctional Center | Las Vegas, NV
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 520      
Original Buildings and Improvements 1,580      
Costs Capitalized Subsequent to Acquisition 176      
Land and Improvements 520      
Building and Improvements 1,756      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 2,276      
Accumulated Depreciation 153      
Book Value of Mortgaged Properties 0      
Leidel Comprehensive Sanction Center | Houston, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 3,210      
Original Buildings and Improvements 710      
Costs Capitalized Subsequent to Acquisition 375      
Land and Improvements 3,210      
Building and Improvements 1,085      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 4,295      
Accumulated Depreciation 131      
Book Value of Mortgaged Properties 0      
Marvin Gardens Center | Los Angeles, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 50      
Costs Capitalized Subsequent to Acquisition 148      
Land and Improvements 0      
Building and Improvements 198      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 198      
Accumulated Depreciation 100      
Book Value of Mortgaged Properties 0      
McCabe Center | Austin, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 350      
Original Buildings and Improvements 510      
Costs Capitalized Subsequent to Acquisition 540      
Land and Improvements 350      
Building and Improvements 1,038      
Land Held for Development 0      
Development and Construction in Progress 12      
Total 1,400      
Accumulated Depreciation 191      
Book Value of Mortgaged Properties 0      
Mid Valley House | Edinburg, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 2      
Costs Capitalized Subsequent to Acquisition 111      
Land and Improvements 0      
Building and Improvements 33      
Land Held for Development 0      
Development and Construction in Progress 79      
Total 112      
Accumulated Depreciation 33      
Book Value of Mortgaged Properties 0      
Midtown Center | Anchorage, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 130      
Original Buildings and Improvements 220      
Costs Capitalized Subsequent to Acquisition 124      
Land and Improvements 130      
Building and Improvements 344      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 474      
Accumulated Depreciation 41      
Book Value of Mortgaged Properties 0      
Northstar Center | Fairbanks, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 12      
Costs Capitalized Subsequent to Acquisition 31      
Land and Improvements 0      
Building and Improvements 43      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 43      
Accumulated Depreciation 43      
Book Value of Mortgaged Properties 0      
Oakland Center | Oakland, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 970      
Original Buildings and Improvements 250      
Costs Capitalized Subsequent to Acquisition 51      
Land and Improvements 970      
Building and Improvements 301      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,271      
Accumulated Depreciation 54      
Book Value of Mortgaged Properties 0      
Parkview Center | Anchorage, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 160      
Original Buildings and Improvements 1,480      
Costs Capitalized Subsequent to Acquisition 216      
Land and Improvements 160      
Building and Improvements 1,618      
Land Held for Development 0      
Development and Construction in Progress 77      
Total 1,855      
Accumulated Depreciation 286      
Book Value of Mortgaged Properties 0      
Reality House | Brownsville, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 140      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 3,135      
Land and Improvements 487      
Building and Improvements 2,788      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 3,275      
Accumulated Depreciation 154      
Book Value of Mortgaged Properties 0      
Southeast Texas Transitional Center | Houston, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 910      
Original Buildings and Improvements 3,210      
Costs Capitalized Subsequent to Acquisition 1,204      
Land and Improvements 912      
Building and Improvements 4,089      
Land Held for Development 0      
Development and Construction in Progress 324      
Total 5,325      
Accumulated Depreciation 535      
Book Value of Mortgaged Properties 0      
Salt Lake City Center | Salt Lake City, UT
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 4      
Costs Capitalized Subsequent to Acquisition 45      
Land and Improvements 0      
Building and Improvements 34      
Land Held for Development 0      
Development and Construction in Progress 15      
Total 49      
Accumulated Depreciation 18      
Book Value of Mortgaged Properties 0      
Seaside Center | Nome, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 44      
Land and Improvements 0      
Building and Improvements 44      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 44      
Accumulated Depreciation 44      
Book Value of Mortgaged Properties 0      
Taylor Street Center | San Francisco, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 3,230      
Original Buildings and Improvements 900      
Costs Capitalized Subsequent to Acquisition 2,892      
Land and Improvements 3,230      
Building and Improvements 3,781      
Land Held for Development 0      
Development and Construction in Progress 11      
Total 7,022      
Accumulated Depreciation 432      
Book Value of Mortgaged Properties 0      
Tundra Center | Bethel, AK
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 20      
Original Buildings and Improvements 1,190      
Costs Capitalized Subsequent to Acquisition 558      
Land and Improvements 79      
Building and Improvements 1,689      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,768      
Accumulated Depreciation 476      
Book Value of Mortgaged Properties 0      
Abraxas Academy | Morgantown, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 4,220      
Original Buildings and Improvements 14,120      
Costs Capitalized Subsequent to Acquisition 339      
Land and Improvements 4,220      
Building and Improvements 14,459      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 18,679      
Accumulated Depreciation 1,244      
Book Value of Mortgaged Properties 0      
Abraxas I | Marienville, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 990      
Original Buildings and Improvements 7,600      
Costs Capitalized Subsequent to Acquisition 631      
Land and Improvements 1,023      
Building and Improvements 7,993      
Land Held for Development 0      
Development and Construction in Progress 205      
Total 9,221      
Accumulated Depreciation 859      
Book Value of Mortgaged Properties 0      
Abraxas Ohio | Shelby, OH
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,160      
Original Buildings and Improvements 2,900      
Costs Capitalized Subsequent to Acquisition 453      
Land and Improvements 1,160      
Building and Improvements 3,353      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 4,513      
Accumulated Depreciation 393      
Book Value of Mortgaged Properties 0      
Abraxas Youth Center | South Mountain, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 36      
Costs Capitalized Subsequent to Acquisition 164      
Land and Improvements 0      
Building and Improvements 201      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 201      
Accumulated Depreciation 148      
Book Value of Mortgaged Properties 0      
DuPage Interventions | Hinsdale, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 2,110      
Original Buildings and Improvements 1,190      
Costs Capitalized Subsequent to Acquisition 181      
Land and Improvements 2,110      
Building and Improvements 1,355      
Land Held for Development 0      
Development and Construction in Progress 16      
Total 3,481      
Accumulated Depreciation 159      
Book Value of Mortgaged Properties 0      
Erie Residential Programs | Erie, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 150      
Original Buildings and Improvements 350      
Costs Capitalized Subsequent to Acquisition 400      
Land and Improvements 150      
Building and Improvements 750      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 900      
Accumulated Depreciation 122      
Book Value of Mortgaged Properties 0      
Hector Garza Center | San Antonio, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 1,590      
Original Buildings and Improvements 3,540      
Costs Capitalized Subsequent to Acquisition 42      
Land and Improvements 1,590      
Building and Improvements 3,582      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 5,172      
Accumulated Depreciation 361      
Book Value of Mortgaged Properties 0      
Leadership Development Program
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Book Value of Mortgaged Properties 0      
Leadership Development Program | South Mountain, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 25      
Costs Capitalized Subsequent to Acquisition 283      
Land and Improvements 0      
Building and Improvements 306      
Land Held for Development 0      
Development and Construction in Progress 1      
Total 307      
Accumulated Depreciation 226      
Southern Peaks Regional Treatment Center | Canon City, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 2,850      
Original Buildings and Improvements 11,350      
Costs Capitalized Subsequent to Acquisition 151      
Land and Improvements 2,850      
Building and Improvements 11,402      
Land Held for Development 0      
Development and Construction in Progress 99      
Total 14,351      
Accumulated Depreciation 1,127      
Book Value of Mortgaged Properties 0      
Southwood Interventions | Chicago, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 870      
Original Buildings and Improvements 6,310      
Costs Capitalized Subsequent to Acquisition 511      
Land and Improvements 870      
Building and Improvements 6,821      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 7,691      
Accumulated Depreciation 810      
Book Value of Mortgaged Properties 0      
Woodridge Interventions | Woodridge, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 5,160      
Original Buildings and Improvements 4,330      
Costs Capitalized Subsequent to Acquisition 456      
Land and Improvements 5,245      
Building and Improvements 4,702      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 9,947      
Accumulated Depreciation 538      
Book Value of Mortgaged Properties 0      
Contact Interventions | Wauconda, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 719      
Original Buildings and Improvements 1,110      
Costs Capitalized Subsequent to Acquisition (640)      
Land and Improvements 699      
Building and Improvements 490      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,189      
Accumulated Depreciation 43      
Book Value of Mortgaged Properties 0      
Abraxas III | Pittsburgh, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 86      
Original Buildings and Improvements 290      
Costs Capitalized Subsequent to Acquisition (176)      
Land and Improvements 85      
Building and Improvements 115      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 200      
Accumulated Depreciation 18      
Book Value of Mortgaged Properties 0      
Northglenn DRC | Northglenn, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 21      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 21      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 21      
Accumulated Depreciation 20      
Book Value of Mortgaged Properties 0      
Aurora DRC | Aurora, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 21      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 21      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 21      
Accumulated Depreciation 17      
Book Value of Mortgaged Properties 0      
Denver DRC | Denver, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 43      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 43      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 43      
Accumulated Depreciation 22      
Book Value of Mortgaged Properties 0      
Elizabeth CRC | Elizabeth, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 26      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 26      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 26      
Accumulated Depreciation 26      
Book Value of Mortgaged Properties 0      
Guilford Co. TECS | Greensboro, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 21      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 21      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 21      
Accumulated Depreciation 13      
Book Value of Mortgaged Properties 0      
Mecklenburg Co. TECS | Charlotte, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 26      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 26      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 26      
Accumulated Depreciation 10      
Book Value of Mortgaged Properties 0      
Randolph Co. TECS | Asheboro, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 6      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 6      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 6      
Accumulated Depreciation 4      
Book Value of Mortgaged Properties 0      
Santa Ana CDCR | Santa Ana, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 113      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 113      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 113      
Accumulated Depreciation 19      
Book Value of Mortgaged Properties 0      
Los Angeles CDCR | Pamona, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 44      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 44      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 44      
Accumulated Depreciation 3      
Book Value of Mortgaged Properties 0      
Tulare Co DRC | Visalia, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 9      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 9      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 9      
Accumulated Depreciation 9      
Book Value of Mortgaged Properties 0      
Merced DRC | Merced, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 18      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 18      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 18      
Accumulated Depreciation 18      
Book Value of Mortgaged Properties 0      
Kern County DRC | Bakersfield, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 23      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 23      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 23      
Accumulated Depreciation 16      
Book Value of Mortgaged Properties 0      
San Diego DRC | San Diego, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 30      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 30      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 30      
Accumulated Depreciation 30      
Book Value of Mortgaged Properties 0      
Orange DRC | Santa Ana, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 72      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 72      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 72      
Accumulated Depreciation 33      
Book Value of Mortgaged Properties 0      
Luzerne EM | Wilkes Barre, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 20      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 20      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 20      
Accumulated Depreciation 19      
Book Value of Mortgaged Properties 0      
Atlantic City CRC | Atlantic City, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 10      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 10      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 10      
Accumulated Depreciation 4      
Book Value of Mortgaged Properties 0      
Perth Amboy CRC | Perth Amboy, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 19      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 19      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 19      
Accumulated Depreciation 19      
Book Value of Mortgaged Properties 0      
Neptune CRC | Neptune, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 16      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 16      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 16      
Accumulated Depreciation 14      
Book Value of Mortgaged Properties 0      
Luzerne DRC | Wilkes Barre, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 110      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 110      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 110      
Accumulated Depreciation 110      
Book Value of Mortgaged Properties 0      
Sedgwick DRC | Wichita, KS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 23      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 23      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 23      
Accumulated Depreciation 23      
Book Value of Mortgaged Properties 0      
Shreveport DRC | Shreveport, LA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 44      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 44      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 44      
Accumulated Depreciation 12      
Book Value of Mortgaged Properties 0      
Chicago West Grand SRC | Chicago, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 22      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 22      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 22      
Accumulated Depreciation 22      
Book Value of Mortgaged Properties 0      
Decatur SRC | Decatur, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 28      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 28      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 28      
Accumulated Depreciation 28      
Book Value of Mortgaged Properties 0      
Philadelphia ISAP | Philadelphia, PA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 36      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 36      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 36      
Accumulated Depreciation 29      
Book Value of Mortgaged Properties 0      
Miami ISAP | Miami, FL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 82      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 82      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 82      
Accumulated Depreciation 63      
Book Value of Mortgaged Properties 0      
Orlando ISAP | Orlando, FL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 18      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 18      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 18      
Accumulated Depreciation 14      
Book Value of Mortgaged Properties 0      
Atlanta ISAP | Atlanta, GA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 54      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 54      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 54      
Accumulated Depreciation 41      
Book Value of Mortgaged Properties 0      
Charlotte ISAP | Charlotte, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 9      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 9      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 9      
Accumulated Depreciation 7      
Book Value of Mortgaged Properties 0      
New Orleans ISAP | New Orleans, LA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 8      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 8      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 8      
Accumulated Depreciation 6      
Book Value of Mortgaged Properties 0      
Washington DC ISAP | Fairfax, VA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 12      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 12      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 12      
Accumulated Depreciation 10      
Book Value of Mortgaged Properties 0      
Chicago ISAP | Chicago, IL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 25      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 25      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 25      
Accumulated Depreciation 19      
Book Value of Mortgaged Properties 0      
Detroit ISAP | Detroit, MI
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 18      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 18      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 18      
Accumulated Depreciation 14      
Book Value of Mortgaged Properties 0      
St Paul ISAP | Bloomington, MN
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 6      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 6      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 6      
Accumulated Depreciation 5      
Book Value of Mortgaged Properties 0      
Denver ISAP | Centennial, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 15      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 15      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 15      
Accumulated Depreciation 6      
Book Value of Mortgaged Properties 0      
San Francisco ISAP | San Francisco, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 92      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 92      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 92      
Accumulated Depreciation 71      
Book Value of Mortgaged Properties 0      
Salt Lake City ISAP | Murray, UT
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 7      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 7      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 7      
Accumulated Depreciation 6      
Book Value of Mortgaged Properties 0      
Seattle ISAP | Tukwila, WA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 40      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 40      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 40      
Accumulated Depreciation 31      
Book Value of Mortgaged Properties 0      
Bronx ISAP | Bronx, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 31      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 31      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 31      
Accumulated Depreciation 10      
Book Value of Mortgaged Properties 0      
Manhattan ISAP | New York, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 10      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 10      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 10      
Accumulated Depreciation 8      
Book Value of Mortgaged Properties 0      
Queens ISAP | Jamaica, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 39      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 39      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 39      
Accumulated Depreciation 30      
Book Value of Mortgaged Properties 0      
Boston ISAP | Burlington, MA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 13      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 13      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 13      
Accumulated Depreciation 10      
Book Value of Mortgaged Properties 0      
Buffalo ISAP | Buffalo, NY
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 34      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 34      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 34      
Accumulated Depreciation 26      
Book Value of Mortgaged Properties 0      
Newark ISAP | Newark, NJ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 30      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 30      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 30      
Accumulated Depreciation 23      
Book Value of Mortgaged Properties 0      
Los Angeles ISAP | Los Angeles, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 35      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 35      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 35      
Accumulated Depreciation 27      
Book Value of Mortgaged Properties 0      
San Bernadino ISAP | San Bernadino, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 42      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 42      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 42      
Accumulated Depreciation 27      
Book Value of Mortgaged Properties 0      
Dallas ISAP | Dallas TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 17      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 17      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 17      
Accumulated Depreciation 13      
Book Value of Mortgaged Properties 0      
Houston ISAP | Houston, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 21      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 21      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 21      
Accumulated Depreciation 16      
Book Value of Mortgaged Properties 0      
Phoenix ISAP | Phoenix, AZ
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 11      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 11      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 11      
Accumulated Depreciation 8      
Book Value of Mortgaged Properties 0      
San Antonio ISAP | San Antonio, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 7      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 7      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 7      
Accumulated Depreciation 6      
Book Value of Mortgaged Properties 0      
San Diego ISAP | San Diego, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 14      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 14      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 14      
Accumulated Depreciation 10      
Book Value of Mortgaged Properties 0      
Bakersfield ISAP | Bakersfield, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 16      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 16      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 16      
Accumulated Depreciation 9      
Book Value of Mortgaged Properties 0      
Arthur Gorrie Correctional Centre | Bisbane, Queensland AUS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 207      
Land and Improvements 0      
Building and Improvements 207      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 207      
Accumulated Depreciation 137      
Book Value of Mortgaged Properties 0      
Fulham Correctional Centre & Fulham Nalu Challenge Community Unit | West Sale, Victoria AUS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 1,426      
Land and Improvements 0      
Building and Improvements 1,426      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,426      
Accumulated Depreciation 824      
Book Value of Mortgaged Properties 0      
Junee Correctional Centre | Junee, New South Wales, AUS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 1,286      
Land and Improvements 0      
Building and Improvements 1,286      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,286      
Accumulated Depreciation 494      
Book Value of Mortgaged Properties 0      
Parklea Correctional Centre | Parklea, New South Wales, AUS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 1,102      
Land and Improvements 0      
Building and Improvements 1,102      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 1,102      
Accumulated Depreciation 517      
Book Value of Mortgaged Properties 0      
Dungavel House Immigration Removal Centre | Kidlington, England
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 62      
Land and Improvements 0      
Building and Improvements 62      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 62      
Accumulated Depreciation 18      
Book Value of Mortgaged Properties 0      
Harmondsworth Immigration Removal Centre | London, England
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 365      
Land and Improvements 0      
Building and Improvements 365      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 365      
Accumulated Depreciation 308      
Book Value of Mortgaged Properties 0      
Kutama-Simthumle Correctional Centre | Louis Trichardt, South Africa
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 193      
Land and Improvements 0      
Building and Improvements 193      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 193      
Accumulated Depreciation 132      
Book Value of Mortgaged Properties 0      
Corporate Headquarters | Boca Raton, FL
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 1,072      
Costs Capitalized Subsequent to Acquisition 7,191      
Land and Improvements 0      
Building and Improvements 8,227      
Land Held for Development 0      
Development and Construction in Progress 37      
Total 8,264      
Accumulated Depreciation 3,320      
Book Value of Mortgaged Properties 0      
Central Regional Office | San Antonio, TX
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 42      
Land and Improvements 0      
Building and Improvements 42      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 42      
Accumulated Depreciation 16      
Book Value of Mortgaged Properties 0      
Eastern Regional Office | Charlotte, NC
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 11      
Land and Improvements 0      
Building and Improvements 11      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 11      
Accumulated Depreciation 6      
Book Value of Mortgaged Properties 0      
Western Regional Office | Los Angeles, CA
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 22      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 22      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 22      
Accumulated Depreciation 22      
Book Value of Mortgaged Properties 0      
Boulder, CO Point II | Boulder, CO
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 629      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 629      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 629      
Accumulated Depreciation 390      
Book Value of Mortgaged Properties 0      
Sydney Office | Sydney, AUS
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 138      
Costs Capitalized Subsequent to Acquisition 0      
Land and Improvements 0      
Building and Improvements 138      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 138      
Accumulated Depreciation 72      
Book Value of Mortgaged Properties 0      
UK Office | Hurley, England
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 161      
Land and Improvements 0      
Building and Improvements 161      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 161      
Accumulated Depreciation 53      
Book Value of Mortgaged Properties 0      
Anderson, IN Call Center | Anderson, IN
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 0      
Original Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition 386      
Land and Improvements 0      
Building and Improvements 386      
Land Held for Development 0      
Development and Construction in Progress 0      
Total 386      
Accumulated Depreciation 92      
Book Value of Mortgaged Properties 0      
Miscellaneous Investments | Various
       
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Original Land 16,159      
Original Buildings and Improvements 4,515      
Costs Capitalized Subsequent to Acquisition 595      
Land and Improvements 778      
Building and Improvements 4,040      
Land Held for Development 15,538      
Development and Construction in Progress 909      
Total 21,265      
Accumulated Depreciation 1,752      
Book Value of Mortgaged Properties $ 0