Note 12 – Commitments and Contingencies

The Company’s Portland, Oregon manufacturing facility is located adjacent to the Willamette River. The Company has entered into a Voluntary Cleanup Agreement with the Oregon Department of Environmental Quality (“DEQ”) in which the Company agreed to conduct an investigation of whether, and to what extent, past or present operations at the Portland property may have released hazardous substances into the environment.

In December 2000, the U.S. Environmental Protection Agency (EPA) classified portions of the Willamette River bed known as the Portland Harbor, including the portion fronting the Company’s manufacturing facility, as a federal “National Priority List” or “Superfund” site due to sediment contamination (the “Portland Harbor Site”). The Company and more than 140 other parties, have received a “General Notice” of potential liability from the EPA relating to the Portland Harbor Site. The letter advised the Company that it may be liable for the costs of investigation and remediation (which liability may be joint and several with other potentially responsible parties) as well as for natural resource damages resulting from releases of hazardous substances to the site. At this time, ten private and public entities, including the Company (the “Lower Willamette Group” or “LWG”), have signed an Administrative Order on Consent (“AOC”) to perform a remedial investigation/feasibility study (“RI/FS”) of the Portland Harbor Site under EPA oversight, and several additional entities have not signed such consent, but are nevertheless contributing money to the effort. The EPA-mandated RI/FS is being conducted by the LWG and has cost over $110 million during a 14-year period. The Company has agreed to initially bear a percentage of the total costs incurred by the LWG in connection with the investigation. The Company’s aggregate expenditure has not been material during the 14-year period. Some or all of any such outlay may be recoverable from other responsible parties. EPA expects the investigation to continue until 2017.

 

Eighty-three parties, including the State of Oregon and the federal government, have entered into a non-judicial mediation process to try to allocate costs associated with the Portland Harbor site. Approximately 110 additional parties have signed tolling agreements related to such allocations. On April 23, 2009, the Company and the other AOC signatories filed suit against 69 other parties due to a possible limitations period for some such claims; Arkema Inc. et al v. A & C Foundry Products, Inc.et al, US District Court, District of Oregon, Case #3:09-cv-453-PK. All but 12 of these parties elected to sign tolling agreements and be dismissed without prejudice, and the case has now been stayed by the court, pending completion of the RI/FS. Although, as described below, the draft feasibility study has been submitted, the RI/FS will not be complete until the EPA approves it, which is not likely to occur until at least 2016.

A draft of the remedial investigation study was submitted to the EPA on October 27, 2009. The draft feasibility study was submitted to the EPA on March 30, 2012. The draft feasibility study evaluates several alternative cleanup approaches. The approaches submitted would take from 2 to 28 years with costs ranging from $169 million to $1.8 billion for cleanup of the entire Portland Harbor Site, depending primarily on the selected remedial action levels. The draft feasibility study suggests costs ranging from $9 million to $163 million for cleanup of the area of the Willamette River adjacent to the Company’s Portland, Oregon manufacturing facility, depending primarily on the selected remedial action level.

The draft feasibility study does not address responsibility for the costs of clean-up or allocate such costs among the potentially responsible parties, or define precise boundaries for the cleanup. Responsibility for funding and implementing the EPA’s selected cleanup will be determined after the issuance of the Record of Decision, currently scheduled by the EPA for 2017. Based on the investigation to date, the Company believes that it did not contribute in any material way to contamination in the river sediments or the damage of natural resources in the Portland Harbor Site and that the damage in the area of the Portland Harbor Site adjacent to its property precedes its ownership of the Portland, Oregon manufacturing facility. Because these environmental investigations are still underway, sufficient information is currently not available to determine the Company’s liability, if any, for the cost of any required remediation or restoration of the Portland Harbor Site or to estimate a range of potential loss. Based on the results of the pending investigations and future assessments of natural resource damages, the Company may be required to incur costs associated with additional phases of investigation or remedial action, and may be liable for damages to natural resources. In addition, the Company may be required to perform periodic maintenance dredging in order to continue to launch vessels from its launch ways in Portland, Oregon, on the Willamette River, and the river’s classification as a Superfund site could result in some limitations on future dredging and launch activities. Any of these matters could adversely affect the Company’s business and Consolidated Financial Statements, or the value of its Portland property.

The Company has also signed an Order on Consent with the DEQ to finalize the investigation of potential onsite sources of contamination that may have a release pathway to the Willamette River. Interim precautionary measures are also required in the order and the Company is currently discussing with the DEQ potential remedial actions which may be required. Our aggregate expenditure has not been material, however the Company could incur significant expenses for remediation. Some or all of any such outlay may be recoverable from other responsible parties.

On October 13, 2014, the Company disclosed that it received various complaints through its whistleblower hotline concerning alleged misconduct involving a senior employee at its Concarril manufacturing facility in Sahagun, Mexico. The Company retained outside counsel who conducted an independent investigation of the matter. In addition, the Company voluntarily contacted the United States Securities and Exchange Commission and the United States Department of Justice to advise both agencies that an independent investigation was underway, and has kept such agencies informed of the progress of the investigation. The investigation suggests that there were conflicts of interest in connection with procurement of supplies and materials at the Concarril facility, and inappropriate personal use of Company assets and resources. As a result of the investigation, the involved employee has left the Company. No information has been discovered to suggest that the misconduct involves the Company’s other operations, or executive officers or other senior managers, or that the misconduct had a material impact on the Company’s financial condition or results of operations.

 

From time to time, Greenbrier is involved as a defendant in litigation in the ordinary course of business, the outcome of which cannot be predicted with certainty. While the ultimate outcome of such legal proceedings cannot be determined at this time, management believes that the resolution of these actions will not have a material adverse effect on the Company’s Consolidated Financial Statements.

In accordance with customary business practices in Europe, the Company has $4.8 million in bank and third party warranty and performance guarantee facilities, all of which have been utilized as of November 30, 2014. To date no amounts have been drawn under these guarantee facilities.

As of November 30, 2014, the Mexican joint venture had $33.1 million of third party debt outstanding, for which the Company and its joint venture partner had each guaranteed approximately $29.0 million.

As of November 30, 2014, the Company had outstanding letters of credit aggregating $8.6 million associated with performance guarantees, facility leases and workers compensation insurance.

On July 18, 2014, the Company and Watco contributed its respective Repair operations to GBW, an unconsolidated 50/50 joint venture. The Company made a $10.0 million cash contribution at closing, a $2.5 million cash contribution in August 2014 and a $2.5 million cash contribution in November 2014. The Company is likely to make additional capital contributions or loans to GBW in the future. As of November 30, 2014, the Company had an account receivable of $21.0 million from GBW for the initial sale of inventory to GBW which may be converted into a note receivable during the year.