CONTINGENCIES, COMMITMENTS, AND GUARANTEES
12 Months Ended
Dec. 31, 2020
Commitments and Contingencies Disclosure [Abstract]  
CONTINGENCIES, COMMITMENTS, AND GUARANTEES CONTINGENCIES, COMMITMENTS, AND GUARANTEES
General Litigation Matters
The Registrants are involved in various matters being litigated and regulatory matters. The ultimate outcome of such pending or potential litigation or regulatory matters against each Registrant and any subsidiaries cannot be determined at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on such Registrant's financial statements.
The Registrants believe the pending legal challenges discussed below have no merit; however, the ultimate outcome of these matters cannot be determined at this time.
Southern Company
In January 2017, a securities class action complaint was filed in the U.S. District Court for the Northern District of Georgia by Monroe County Employees' Retirement System on behalf of all persons who purchased shares of Southern Company's common stock between April 25, 2012 and October 30, 2013, as subsequently amended. The amended complaint named as defendants Southern Company, certain of its current and former officers, and certain former Mississippi Power officers and alleged that the defendants made materially false and misleading statements regarding the Kemper County energy facility in violation of certain provisions under the Securities Exchange Act of 1934, as amended. The complaint sought, among other things, compensatory damages and litigation costs and attorneys' fees. In 2018, the court issued an order dismissing certain claims against certain officers of Southern Company and Mississippi Power and dismissing the allegations related to a number of the statements that plaintiffs challenged as being false or misleading. In 2018, the court denied the defendants' motion for reconsideration and also denied a motion to certify the issue for interlocutory appeal. In 2019, the court certified the plaintiffs' proposed class and entered an order staying all deadlines in the case pending mediation. In the third quarter 2020, the parties reached a settlement and the plaintiffs filed a stipulation of settlement and motion for preliminary approval to resolve the case on a class-wide basis, which the court granted on October 1, 2020. On January 14, 2021, the court granted final approval of the settlement. The settlement amount was paid entirely through existing insurance policies and did not have a material impact on Southern Company's financial statements. This matter is now concluded.
In February 2017, Jean Vineyard and Judy Mesirov each filed a shareholder derivative lawsuit in the U.S. District Court for the Northern District of Georgia. Each of these lawsuits names as defendants Southern Company, certain of its directors, certain of its current and former officers, and certain former Mississippi Power officers. In 2017, these two shareholder derivative lawsuits were consolidated in the U.S. District Court for the Northern District of Georgia. The complaints allege that the defendants caused Southern Company to make false or misleading statements regarding the Kemper County energy facility cost and schedule. Further, the complaints allege that the defendants were unjustly enriched and caused the waste of corporate assets and also allege that the individual defendants violated their fiduciary duties.
In May 2017, Helen E. Piper Survivor's Trust filed a shareholder derivative lawsuit in the Superior Court of Gwinnett County, Georgia that names as defendants Southern Company, certain of its directors, certain of its current and former officers, and certain
former Mississippi Power officers. The complaint alleges that the individual defendants, among other things, breached their fiduciary duties in connection with schedule delays and cost overruns associated with the construction of the Kemper County energy facility. The complaint further alleges that the individual defendants authorized or failed to correct false and misleading statements regarding the Kemper County energy facility schedule and cost and failed to implement necessary internal controls to prevent harm to Southern Company. In August 2019, the court granted a motion filed by the plaintiff in July 2019 to substitute a new named plaintiff, Martin J. Kobuck, in place of Helen E. Piper Survivor's Trust.
The plaintiffs in each of these cases seek to recover, on behalf of Southern Company, unspecified actual damages and, on each plaintiff's own behalf, attorneys' fees and costs in bringing the lawsuit, as well as certain changes to Southern Company's corporate governance and internal processes. In 2018, the court in each case entered an order staying each lawsuit until 30 days after the resolution of any dispositive motions or any settlement, whichever is earlier, in the securities class action. In September 2020, the plaintiffs in each case filed a status report noting the settlement of the securities class action and informing the court that the parties had scheduled mediation, which occurred on November 12, 2020. The parties in each case did not reach settlement but continue to explore possible resolution. Each case is stayed while the parties discuss potential resolution.
Georgia Power
In 2011, plaintiffs filed a putative class action against Georgia Power in the Superior Court of Fulton County, Georgia alleging that Georgia Power's collection in rates of amounts for municipal franchise fees (which fees are paid to municipalities) exceeded the amounts allowed in orders of the Georgia PSC and alleging certain state law claims. This case has been ruled upon and appealed numerous times over the last several years. In one recent appeal, the Georgia Supreme Court remanded the case and noted that the trial court could refer the matter to the Georgia PSC to interpret its tariffs. Following a motion by Georgia Power, in February 2019, the Superior Court of Fulton County ordered the parties to submit petitions to the Georgia PSC for a declaratory ruling and also conditionally certified the proposed class. In March 2019, Georgia Power and the plaintiffs filed petitions with the Georgia PSC seeking confirmation of the proper application of the municipal franchise fee schedule pursuant to the Georgia PSC's orders. Also in March 2019, Georgia Power appealed the class certification decision to the Georgia Court of Appeals. In October 2019, the Georgia PSC issued an order that found Georgia Power has appropriately implemented the municipal franchise fee schedule. On March 11, 2020, the Georgia Court of Appeals vacated the Superior Court of Fulton County's February 2019 order granting conditional class certification and remanded the case to the Superior Court of Fulton County for further proceedings. In September 2020, the plaintiffs and Georgia Power each filed motions for summary judgment and the plaintiffs renewed their motion for class certification. The amount of any possible losses cannot be estimated at this time because, among other factors, it is unknown whether a class will be certified, the ultimate composition of any class, and whether any losses would be subject to recovery from any municipalities.
On July 29, 2020, a group of individual plaintiffs filed a complaint in the Superior Court of Fulton County, Georgia against Georgia Power alleging that releases from Plant Scherer have impacted groundwater, surface water, and air, resulting in alleged personal injuries and property damage. The plaintiffs seek an unspecified amount of monetary damages including punitive damages, a medical monitoring fund, and injunctive relief. In September 2020, Georgia Power filed a motion to dismiss. The amount of any possible losses cannot be estimated at this time.
Mississippi Power
In 2018, Ray C. Turnage and 10 other individual plaintiffs filed a putative class action complaint against Mississippi Power and the three then-serving members of the Mississippi PSC in the U.S. District Court for the Southern District of Mississippi. Mississippi Power received Mississippi PSC approval in 2013 to charge a mirror CWIP rate premised upon including in its rate base pre-construction and construction costs for the Kemper IGCC prior to placing the Kemper IGCC into service. The Mississippi Supreme Court reversed that approval and ordered Mississippi Power to refund the amounts paid by customers under the previously-approved mirror CWIP rate. The plaintiffs allege that the initial approval process, and the amount approved, were improper. They also allege that Mississippi Power underpaid customers by up to $23.5 million in the refund process by applying an incorrect interest rate. The plaintiffs seek to recover, on behalf of themselves and their putative class, actual damages, punitive damages, pre-judgment interest, post-judgment interest, attorney's fees, and costs. In response to Mississippi Power and the Mississippi PSC each filing a motion to dismiss, the plaintiffs filed an amended complaint in March 2019. The amended complaint included four additional plaintiffs and additional claims for gross negligence, reckless conduct, and intentional wrongdoing. Mississippi Power and the Mississippi PSC each filed a motion to dismiss the amended complaint, which occurred on May 26, 2020 and March 27, 2020, respectively. Also on March 27, 2020, the plaintiffs filed a motion seeking to name the new members of the Mississippi PSC, the Mississippi Development Authority, and Southern Company as additional defendants and add a cause of action against all defendants based on a dormant commerce clause theory under the U.S. Constitution. On July 28, 2020, the plaintiffs filed a motion for leave to file a third amended complaint, which included the same federal claims as the
proposed second amended complaint, as well as several additional state law claims based on the allegation that Mississippi Power failed to disclose the annual percentage rate of interest applicable to refunds. On November 10, 2020, the court denied each of the plaintiffs' pending motions and entered final judgment in favor of Mississippi Power. On January 22, 2021, the court denied further motions by the plaintiffs to vacate the judgment and to file a revised second amended complaint. An adverse outcome in this proceeding could have a material impact on Mississippi Power's financial statements.
See "Other Matters – Mississippi Power – Kemper County Energy Facility" herein for additional information.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations governing the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and the natural gas distribution utilities conduct studies to determine the extent of any required cleanup and have recognized the estimated costs to clean up known impacted sites in the financial statements. A liability for environmental remediation costs is recognized only when a loss is determined to be probable and reasonably estimable and is reduced as expenditures are incurred. The traditional electric operating companies and the natural gas distribution utilities in Illinois and Georgia have each received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental remediation costs through regulatory mechanisms. Any difference between the liabilities accrued and costs recovered through rates is deferred as a regulatory asset or liability. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies. At December 31, 2020 and 2019, Alabama Power did not have environmental remediation liabilities and Mississippi Power's balance was immaterial.
Georgia Power has been designated or identified as a potentially responsible party at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act, and assessment and potential cleanup of such sites is expected. For 2020, 2019, and 2018, Georgia Power recovered approximately $12 million, $2 million, and $2 million, respectively, through the ECCR tariff for environmental remediation.
In December 2019, Mississippi Power entered into an agreement with the Mississippi Commission on Environmental Quality related to groundwater conditions arising from the closed ash pond at Plant Watson. Mississippi Power will complete an assessment and remediation consistent with the requirements of the agreement and the CCR Rule. It is anticipated that corrective action will be needed; however, an estimate of remedial costs will not be available until further site assessment is completed. Mississippi Power expects to recover the retail portion of remedial costs through the ECO Plan and the wholesale portion through MRA rates.
Southern Company Gas is subject to environmental remediation liabilities associated with 40 former MGP sites in four different states. Southern Company Gas' accrued environmental remediation liability at December 31, 2020 and 2019 was based on the estimated cost of environmental investigation and remediation associated with these sites.
At December 31, 2020 and 2019, the environmental remediation liability and the balance of under recovered environmental remediation costs were reflected in the balance sheets as follows:
Southern CompanyGeorgia
Power
Southern Company Gas
(in millions)
December 31, 2020:
Environmental remediation liability:
Other current liabilities$44 $15 $29 
Accrued environmental remediation216 — 216 
Under recovered environmental remediation costs:
Other regulatory assets, current$46 $12 $34 
Other regulatory assets, deferred265 29 236 
December 31, 2019:
Environmental remediation liability:
Other current liabilities$51 $15 $36 
Accrued environmental remediation234 — 233 
Under recovered environmental remediation costs:
Other regulatory assets, current$49 $12 $37 
Other regulatory assets, deferred300 40 260 
The ultimate outcome of these matters cannot be determined at this time; however, as a result of the regulatory treatment for environmental remediation expenses described above, the final disposition of these matters is not expected to have a material impact on the financial statements of the applicable Registrants.
Nuclear Fuel Disposal Costs
Acting through the DOE and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with Alabama Power and Georgia Power that required the DOE to dispose of spent nuclear fuel generated at Plants Farley, Hatch, and Vogtle Units 1 and 2 beginning no later than January 31, 1998. The DOE has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel. Consequently, Alabama Power and Georgia Power pursued and continue to pursue legal remedies against the U.S. government for its partial breach of contract.
In 2014, Alabama Power and Georgia Power filed lawsuits against the U.S. government for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January 1, 2011 through December 31, 2013. The damage period was subsequently extended to December 31, 2014. On June 12, 2019, the Court of Federal Claims granted Alabama Power's and Georgia Power's motion for summary judgment on damages not disputed by the U.S. government, awarding those undisputed damages to Alabama Power and Georgia Power. However, those undisputed damages are not collectible and no amounts will be recognized in the financial statements until the court enters final judgment on the remaining damages.
In 2017, Alabama Power and Georgia Power filed additional lawsuits against the U.S. government in the Court of Federal Claims for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January 1, 2015 through December 31, 2017. On August 13, 2020, Alabama Power and Georgia Power filed amended complaints in each of the lawsuits adding damages from January 1, 2018 to December 31, 2019 to the claim period.
The outstanding claims for the period January 1, 2011 through December 31, 2019 total $110 million and $132 million for Alabama Power and Georgia Power (based on its ownership interests), respectively. Damages will continue to accumulate until the issue is resolved, the U.S. government disposes of Alabama Power's and Georgia Power's spent nuclear fuel pursuant to its contractual obligations, or alternative storage is otherwise provided. No amounts have been recognized in the financial statements as of December 31, 2020 for any potential recoveries from the pending lawsuits.
The final outcome of these matters cannot be determined at this time. However, Alabama Power and Georgia Power expect to credit any recoveries for the benefit of customers in accordance with direction from their respective PSC; therefore, no material impact on Southern Company's, Alabama Power's, or Georgia Power's net income is expected.
On-site dry spent fuel storage facilities are operational at all three plants and can be expanded to accommodate spent fuel through the expected life of each plant.
Nuclear Insurance
Under the Price-Anderson Amendments Act (Act), Alabama Power and Georgia Power maintain agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at the companies' nuclear power plants. The Act provides funds up to $13.8 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $450 million by American Nuclear Insurers (ANI), with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. A company could be assessed up to $138 million per incident for each licensed reactor it operates but not more than an aggregate of $20 million per incident to be paid in a calendar year for each reactor. Such maximum assessment, excluding any applicable state premium taxes, for Alabama Power and Georgia Power, based on its ownership and buyback interests in all licensed reactors, is $275 million and $267 million, respectively, per incident, but not more than an aggregate of $41 million and $40 million, respectively, to be paid for each incident in any one year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years. The next scheduled adjustment is due no later than November 1, 2023. See Note 5 under "Joint Ownership Agreements" for additional information on joint ownership agreements.
Alabama Power and Georgia Power are members of Nuclear Electric Insurance Limited (NEIL), a mutual insurer established to provide property damage insurance in an amount up to $1.5 billion for members' operating nuclear generating facilities. Additionally, both companies have NEIL policies that currently provide decontamination, excess property insurance, and premature decommissioning coverage up to $1.25 billion for nuclear losses and policies providing coverage up to $750 million for non-nuclear losses in excess of the $1.5 billion primary coverage.
NEIL also covers the additional costs that would be incurred in obtaining replacement power during a prolonged accidental outage at a member's nuclear plant. Members can purchase this coverage, subject to a deductible waiting period of up to 26 weeks, with a maximum per occurrence per unit limit of $490 million. After the deductible period, weekly indemnity payments would be received until either the unit is operational or until the limit is exhausted. Alabama Power and Georgia Power each purchase limits based on the projected full cost of replacement power, subject to ownership limitations, and have each elected a 12-week deductible waiting period for each nuclear plant.
A builders' risk property insurance policy has been purchased from NEIL for the construction of Plant Vogtle Units 3 and 4. This policy provides the Vogtle Owners up to $2.75 billion for accidental property damage occurring during construction.
Under each of the NEIL policies, members are subject to assessments each year if losses exceed the accumulated funds available to the insurer. The maximum annual assessments for Alabama Power and Georgia Power as of December 31, 2020 under the NEIL policies would be $56 million and $84 million, respectively.
Claims resulting from terrorist acts and cyber events are covered under both the ANI and NEIL policies (subject to normal policy limits). The maximum aggregate that NEIL will pay for all claims resulting from terrorist acts and cyber events in any 12-month period is $3.2 billion each, plus such additional amounts NEIL can recover through reinsurance, indemnity, or other sources.
For all on-site property damage insurance policies for commercial nuclear power plants, the NRC requires that the proceeds of such policies shall be dedicated first for the sole purpose of placing the reactor in a safe and stable condition after an accident. Any remaining proceeds are to be applied next toward the costs of decontamination and debris removal operations ordered by the NRC, and any further remaining proceeds are to be paid either to the applicable company or to its debt trustees as may be appropriate under the policies and applicable trust indentures. In the event of a loss, the amount of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered from customers, would be borne by Alabama Power or Georgia Power, as applicable, and could have a material effect on Southern Company's, Alabama Power's, and Georgia Power's financial condition and results of operations.
All retrospective assessments, whether generated for liability, property, or replacement power, may be subject to applicable state premium taxes.
Other Matters
Southern Company
As discussed in Note 1 under "Leveraged Leases," a subsidiary of Southern Holdings has four leveraged lease agreements, two domestic and two international. The ability of the lessees to make required payments to the Southern Holdings subsidiary is dependent on the operational performance of the assets.
Since 2017, the financial and operational performance of one of the domestic lessees and the associated generation assets raised significant concerns about the short-term ability of the generation assets to produce cash flows sufficient to support ongoing operations and the lessee's contractual obligations and its ability to make the remaining semi-annual lease payments through the end of the lease term in 2047. In addition, following the expiration of the existing power offtake agreement in 2032, the lessee also is exposed to remarketing risk, which encompasses the price and availability of alternative sources of generation.
In connection with the 2019 annual impairment analysis, Southern Company revised the estimated cash flows to be received under the leveraged lease, which resulted in an impairment charge of $17 million ($13 million after tax) recorded in the fourth quarter 2019. During the second quarter 2020, Southern Company received the latest annual forecasts of natural gas prices and considered the significant decline in forecasted prices to be an indicator of potential impairment that required an interim impairment assessment. Accordingly, consistent with prior impairment analyses, Southern Company evaluated the recoverability of the lease receivable and the expected residual value of the generation assets under various natural gas price scenarios to estimate the cash flows expected to be received from remarketing the generation assets following the expiration of the existing PPA and the residual value of the generation assets at the end of the lease. Based on the current forecasts of energy prices in the years following the expiration of the existing PPA, Southern Company concluded that it is no longer probable that any of the associated rental payments will be received, because it is no longer probable the generation assets will be successfully remarketed and continue to operate after that date. During the second quarter 2020, Southern Company revised the estimated cash flows to be received under the leveraged lease to reflect this conclusion, which resulted in a full impairment of the lease investment and a pre-tax charge to earnings of $154 million ($74 million after tax).
All required lease payments through December 31, 2020 have been paid in full. If any future lease payments due prior to the expiration of the associated PPA are not paid in full, the Southern Holdings subsidiary may be unable to make its corresponding payment to the holders of the underlying non-recourse debt related to the generation assets. Failure to make the required payment to the debtholders could represent an event of default that would give the debtholders the right to foreclose on, and take ownership of, the generation assets, in effect terminating the lease. As the remaining amount of the lease investment was charged against earnings in the second quarter 2020, termination would not be expected to result in additional charges. Southern Company will continue to monitor the operational performance of the underlying assets and evaluate the ability of the lessee to continue to make the required lease payments and meet its obligations associated with a future closure or retirement of the generation assets and associated properties, including the dry ash landfill.
During the fourth quarter 2020, Southern Company management initiated steps to sell the investment in its other domestic leveraged lease and reclassified the investment as held for sale. In connection with the annual impairment analysis of this investment, Southern Company management concluded that the estimated residual value of the generation assets should be reduced due to significant uncertainty as to whether the related natural gas generation assets will continue to operate at the end of the lease term in 2040 and recorded the resulting impairment charge. An additional charge was recorded to further reduce the related investment in the leveraged lease to its estimated fair value, less costs to sell. The pre-tax charges to earnings in the fourth quarter 2020 totaled $52 million ($31 million after tax). See Note 15 under "Assets Held for Sale" for additional information.
The leveraged lease agreements for the two international projects include lessee purchase options related to the leased assets, which consist of nine gas distribution networks and two district heating systems in the Netherlands. The lessee has communicated its intent to exercise the first purchase option in 2022. The purchase options for the remaining ten assets are exercisable on various dates through 2028 with at least one year's notice. The exercise of these purchase options is not expected to result in any gain or loss.
Mississippi Power
Kemper County Energy Facility
The Kemper County energy facility was designed to utilize IGCC technology with an expected output capacity of 582 MWs and to be fueled by locally mined lignite from a mine owned by Mississippi Power and situated adjacent to the Kemper County energy facility. In 2012, the Mississippi PSC issued an order confirming the CPCN originally approved by the Mississippi PSC in 2010 authorizing the acquisition, construction, and operation of the Kemper County energy facility. Mississippi Power placed the
combined cycle and the associated common facilities portion of the Kemper County energy facility in service in 2014 and dedicated them as Plant Ratcliffe in 2018.
In 2017, the Mississippi PSC issued an order directing Mississippi Power to pursue a settlement under which the Kemper County energy facility would be operated as a natural gas plant, rather than an IGCC plant, and address all issues associated with the Kemper County energy facility. Following this order, cost recovery of the gasifier portions was no longer probable and Mississippi Power recorded significant charges to income in 2017.
In 2018, the Mississippi PSC approved a settlement agreement for the Kemper County energy facility, which resolved all cost recovery issues, modified the CPCN to limit the Kemper County energy facility to natural gas combined cycle operation, and reduced retail customer rates by approximately $26.8 million annually based on a revenue requirement that included no recovery for costs associated with the gasifier portion of the Kemper County energy facility.
In 2018, 2019, and 2020, Mississippi Power recorded charges to income associated with abandonment and related closure costs and ongoing period costs, net of salvage proceeds, for the mine and gasifier-related assets at the Kemper County energy facility. These charges, including related tax impacts, totaled $37 million pre-tax ($68 million benefit after tax) in 2018, $24 million pre-tax and after tax in 2019, and $4 million pre-tax ($3 million after tax) in 2020. The pre-tax charges are included in other operations and maintenance expenses on the statements of income.
Dismantlement of the abandoned gasifier-related assets and site restoration activities are expected to be completed by 2026. Additional pre-tax period costs associated with dismantlement and site restoration activities, including related costs for compliance and safety, ARO accretion, and property taxes, net of salvage, are estimated to total $10 million to $20 million annually through 2025.
The Mississippi Power Rate Case Settlement Agreement eliminated separate rates associated with the Kemper County energy facility and included these costs in rates for PEP, ECO Plan, and ad valorem taxes, as applicable, effective with the revised rates in 2020. See Note 2 under "Mississippi Power – 2019 Base Rate Case" for additional information.
Lignite Mine and CO2 Pipeline Facilities
Mississippi Power owns the lignite mine and equipment and mineral reserves located around the Kemper County energy facility site. The mine started commercial operation in 2013. In connection with the Kemper County energy facility construction, Mississippi Power also constructed a pipeline for the transport of captured CO2.
In 2010, Mississippi Power executed a management fee contract with Liberty Fuels Company, LLC (Liberty Fuels), a wholly-owned subsidiary of The North American Coal Corporation, which developed, constructed, and is responsible for the mining operations through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. As a result of the abandonment of the Kemper IGCC, final mine reclamation began in 2018 and was substantially completed in 2020, with monitoring expected to continue through 2027. See Note 6 for additional information.
In December 2019, Mississippi Power transferred ownership of the CO2 pipeline to an unrelated gas pipeline company, with no resulting impact on income. In conjunction with the transfer of the CO2 pipeline, the parties agreed to enter into a 15-year firm transportation agreement, which became effective in December 2020, upon the conversion by the pipeline company of the CO2 pipeline to a natural gas pipeline to be used for the delivery of natural gas to Plant Ratcliffe. The agreement is treated as a finance lease for accounting purposes. See Note 9 for additional information.
Government Grants
In 2010, the DOE, through a cooperative agreement with SCS, agreed to fund $270 million of the Kemper County energy facility through the grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2. In 2016, additional DOE grants in the amount of $137 million were awarded to the Kemper County energy facility. In 2018, Mississippi Power filed with the DOE its request for property closeout certification under the contract related to the $387 million of total grants received. On September 3, 2020, Mississippi Power and Southern Company executed an agreement with the DOE completing Mississippi Power's request, which enabled Mississippi Power to proceed with full dismantlement of the abandoned gasifier-related assets and site restoration activities. The expected impact of the closeout agreement was accrued in 2019. In connection with the DOE closeout discussions, in April 2019, the Civil Division of the Department of Justice informed Southern Company and Mississippi Power of an investigation related to the grants received. The ultimate outcome of this matter cannot be determined at this time; however, it could have a material impact on Southern Company's and Mississippi Power's financial statements.
Plant Daniel
In conjunction with Southern Company's sale of Gulf Power, NextEra Energy held back $75 million of the purchase price pending Mississippi Power and Gulf Power negotiating a mutually acceptable revised operating agreement for Plant Daniel. In addition, Mississippi Power and Gulf Power agreed to seek a restructuring of their 50% undivided ownership interests in Plant Daniel such that each of them would, after the restructuring, own 100% of a generating unit. In January 2019, Gulf Power provided notice to Mississippi Power that Gulf Power will retire its share of the generating capacity of Plant Daniel on January 15, 2024. Mississippi Power has the option to purchase Gulf Power's ownership interest for $1 on January 15, 2024, provided that Mississippi Power exercises the option no later than 120 days prior to that date. Mississippi Power is assessing the potential operational and economic effects of Gulf Power's notice. On April 24, 2020, Mississippi Power and Gulf Power amended the terms of their agreement to extend the deadline from May 1, 2020 to August 1, 2020 for Mississippi Power to notify Gulf Power of which generating unit it has selected for 100% ownership. The parties agreed not to select a specific unit by August 1, 2020 and are continuing negotiations on a mutually acceptable revised operating agreement. The impacts of operating the units on an individual basis continue to be evaluated by Mississippi Power and any transfer of ownership would be subject to approval by the FERC and the Mississippi PSC. The ultimate outcome of this matter cannot be determined at this time. See Note 15 under "Southern Company" for information regarding the sale of Gulf Power.
Southern Company Gas
PennEast Pipeline Project
In 2014, Southern Company Gas entered into a partnership in which it holds a 20% ownership interest in the PennEast Pipeline, an interstate pipeline company formed to develop and operate an approximate 118-mile natural gas pipeline between New Jersey and Pennsylvania. The expected initial transportation capacity of 1.0 Bcf per day is under long-term contracts, mainly with public utilities and other market-serving entities, such as electric generation companies, in New Jersey, Pennsylvania, and New York.
Expected project costs related to the PennEast Pipeline for Southern Company Gas total approximately $300 million, excluding financing costs. In 2018, the PennEast Pipeline received initial FERC approval. Work continues with state and federal agencies to obtain the required permits to begin construction. On February 20, 2020, the FERC approved a two-year extension for PennEast Pipeline to complete the project by January 19, 2022.
On January 30, 2020, PennEast Pipeline filed an amendment with the FERC to construct the pipeline project in two phases. The first phase would consist of 68 miles of pipe, constructed entirely within Pennsylvania, which is expected to be completed in late 2022. The second phase would include the remaining route in Pennsylvania and New Jersey and is targeted for completion in 2024. FERC approval of the amended plan is required prior to beginning the first phase.
In September 2019, an appellate court ruled that the PennEast Pipeline does not have federal eminent domain authority over lands in which a state has property rights interests. On February 18, 2020, PennEast Pipeline filed a petition for a writ of certiorari to seek U.S. Supreme Court review of the appellate court decision, which the U.S. Supreme Court granted on February 3, 2021.
The ultimate outcome of these matters cannot be determined at this time; however, any work delays, whether caused by judicial or regulatory action, abnormal weather, or other conditions, may result in additional cost or schedule modifications or, ultimately, in project cancellation, any of which could result in impairment of Southern Company Gas' PennEast Pipeline investment and could have a significant impact on Southern Company's financial statements and a material impact on Southern Company Gas' financial statements. Southern Company Gas evaluated its $91 million investment and determined there was no impairment as of December 31, 2020.
See Note 7 under "Southern Company Gas" for additional information.
Natural Gas Storage Facility
In 2019, Southern Company Gas recorded a pre-tax impairment charge of $91 million ($69 million after-tax) related to Jefferson Island. On December 1, 2020, Southern Company Gas completed the sale of this facility. See Note 15 under "Southern Company Gas – Sale of Natural Gas Storage Facility" for additional information.
Commitments
To supply a portion of the fuel requirements of the Southern Company system's electric generating plants, the Southern Company system has entered into various long-term commitments not recognized on the balance sheets for the procurement and delivery of fossil fuel and, for Alabama Power and Georgia Power, nuclear fuel. The majority of the Registrants' fuel expense for the periods presented was purchased under long-term commitments. Each Registrant expects that a substantial amount of its future fuel needs will continue to be purchased under long-term commitments.
Georgia Power has commitments, in the form of capacity purchases, regarding a portion of a 5% interest in the original cost of Plant Vogtle Units 1 and 2 owned by MEAG Power that are in effect until the later of the retirement of the plant or the latest stated maturity date of MEAG Power's bonds issued to finance such ownership interest. The payments for capacity are required whether or not any capacity is available. Portions of the capacity payments made to MEAG Power for its Plant Vogtle Units 1 and 2 investment relate to costs in excess of Georgia Power's allowed investment for ratemaking purposes. The present value of these portions at the time of the disallowance was written off. Generally, the cost of such capacity is included in purchased power in Southern Company's statements of income and in purchased power, non-affiliates in Georgia Power's statements of income. Georgia Power's capacity payments related to this commitment totaled $5 million, $6 million, and $8 million in 2020, 2019, and 2018, respectively. At December 31, 2020, Georgia Power's estimated long-term obligations related to this commitment totaled $49 million, consisting of $5 million for 2021, $4 million for 2022, $3 million annually for 2023 through 2025, and $31 million thereafter.
See Note 9 for information regarding PPAs accounted for as leases.
Southern Company Gas has commitments for pipeline charges, storage capacity, and gas supply, including charges recoverable through natural gas cost recovery mechanisms or, alternatively, billed to marketers selling retail natural gas, as well as demand charges associated with Southern Company Gas' wholesale gas services. Gas supply commitments include amounts for gas commodity purchases associated with Southern Company Gas' gas marketing services of 31 million mmBtu at floating gas prices calculated using forward natural gas prices at December 31, 2020 and valued at $72 million. Southern Company Gas provides guarantees to certain gas suppliers for certain of its subsidiaries in support of payment obligations. Southern Company Gas' expected future contractual obligations for pipeline charges, storage capacity, and gas supply that are not recognized on the balance sheets at December 31, 2020 were as follows:
Pipeline Charges, Storage Capacity, and Gas Supply
(in millions)
2021$719 
2022529 
2023441 
2024311 
2025285 
Thereafter1,035 
Total $3,320 
As a 50% equity investor in SNG, Southern Company Gas is required to make additional capital contributions as necessary pursuant to the terms of its operating agreement with SNG. SNG has $300 million of debt maturing in June 2021 that it anticipates refinancing. If SNG is unable to refinance or otherwise satisfy this debt obligation, Southern Company Gas has committed to fund up to $150 million as a contingent capital contribution. See Note 7 under "Southern Company Gas" for additional information.
Guarantees
SCS may enter into various types of wholesale energy and natural gas contracts acting as an agent for the traditional electric operating companies and Southern Power. Under these agreements, each of the traditional electric operating companies and Southern Power may be jointly and severally liable. Accordingly, Southern Company has entered into keep-well agreements with each of the traditional electric operating companies to ensure they will not subsidize or be responsible for any costs, losses, liabilities, or damages resulting from the inclusion of Southern Power as a contracting party under these agreements.
Alabama Power has guaranteed a $100 million principal amount long-term bank loan entered into by SEGCO in 2018. Georgia Power has agreed to reimburse Alabama Power for the portion of such obligation corresponding to Georgia Power's proportionate ownership of SEGCO's stock if Alabama Power is called upon to make such payment under its guarantee. At December 31, 2020, the capitalization of SEGCO consisted of $85 million of equity and $100 million of long-term debt that matures in November 2021, on which the annual interest requirement is derived from a variable rate index. In addition, SEGCO had short-term debt outstanding of $25 million. See Note 7 under "SEGCO" for additional information.
As discussed in Note 9, Alabama Power and Georgia Power have entered into certain residual value guarantees related to railcar leases.