Contingencies and Regulatory Matters
3 Months Ended
Mar. 31, 2017
Commitments and Contingencies Disclosure [Abstract]  
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
See Note 3 to the financial statements of the registrants in Item 8 of the Form 10-K for information relating to various lawsuits, other contingencies, and regulatory matters.
General Litigation Matters
Each registrant is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the business activities of Southern Company's subsidiaries are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has occurred throughout the U.S. This litigation has included claims for damages alleged to have been caused by CO2 and other emissions, CCR, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters.
The ultimate outcome of such pending or potential litigation against each registrant and any subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on such registrant's financial statements.
Southern Company
On January 20, 2017, a purported securities class action complaint was filed against Southern Company, certain of its officers, and certain of Mississippi Power's former officers in the U.S. District Court for the Northern District of Georgia, Atlanta Division, by Monroe County Employees' Retirement System on behalf of all persons who purchased shares of Southern Company's common stock between April 25, 2012 and October 29, 2013. The complaint alleges that Southern Company, certain of its officers, and certain of Mississippi Power's former officers made materially false and misleading statements regarding the Kemper IGCC in violation of certain provisions under the Securities Exchange Act of 1934, as amended. The complaint seeks, among other things, compensatory damages and litigation costs and attorneys' fees. Southern Company believes this legal challenge has no merit; however, an adverse outcome in this proceeding could have an impact on Southern Company's results of operations, financial condition, and liquidity. Southern Company will vigorously defend itself in this matter, and the ultimate outcome of this matter cannot be determined at this time.
On February 27, 2017, Jean Vineyard filed a shareholder derivative lawsuit in the U.S. District Court for the Northern District of Georgia that names as defendants Southern Company, certain of its directors, certain of its officers, and certain of Mississippi Power's former officers. The complaint alleges that the defendants caused Southern Company to make false or misleading statements regarding the Kemper IGCC cost and schedule. Further, the complaint alleges that the defendants were unjustly enriched and caused the waste of corporate assets. The plaintiff seeks to recover, on behalf of Southern Company, unspecified actual damages and, on her own behalf, attorneys' fees and costs in bringing the lawsuit. The plaintiff also seeks certain changes to Southern Company's corporate governance and internal processes. On March 27, 2017, the court deferred this lawsuit until 30 days after certain further action in the purported securities class action complaint discussed above. Southern Company believes that this legal challenge has no merit; however, an adverse outcome in this proceeding could have an impact on Southern Company's results of operations, financial condition, and liquidity. Southern Company will vigorously defend itself in this matter, and the ultimate outcome of this matter cannot be determined at this time.
Georgia Power
In 2011, plaintiffs filed a putative class action against Georgia Power in the Superior Court of Fulton County, Georgia alleging that Georgia Power's collection in rates of municipal franchise fees (all of which are remitted to municipalities) exceeded the amounts allowed in orders of the Georgia PSC and alleging certain state tort law claims. In November 2016, the Georgia Court of Appeals reversed the trial court's previous dismissal of the case and remanded the case to the trial court for further proceedings. Georgia Power has filed a petition for writ of certiorari with the Georgia Supreme Court. Georgia Power believes the plaintiffs' claims have no merit and intends to vigorously defend itself in this matter. The ultimate outcome of this matter cannot be determined at this time.
Southern Company Gas
Nicor Gas and Nicor Energy Services Company, wholly-owned subsidiaries of Southern Company Gas, and Nicor Inc. were defendants in a putative class action initially filed in 2011 in state court in Cook County, Illinois. The plaintiffs purported to represent a class of the customers who purchased the Gas Line Comfort Guard product from Nicor Energy Services Company and variously alleged that the marketing, sale, and billing of the Gas Line Comfort Guard product violated the Illinois Consumer Fraud and Deceptive Business Practices Act, constituting common law fraud and resulting in unjust enrichment of these entities. The plaintiffs sought, on behalf of the classes they purported to represent, actual and punitive damages, interest, costs, attorney fees, and injunctive relief. On February 8, 2017, the judge denied the plaintiffs' motion for class certification and Southern Company Gas' motion for summary judgment. On March 7, 2017, the parties reached a settlement, which was finalized and effective on April 3, 2017. The settlement did not have a material impact on Southern Company's or Southern Company Gas' financial statements.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and the natural gas distribution utilities in Illinois, New Jersey, Georgia, and Florida have each received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental compliance costs through regulatory mechanisms. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies.
Georgia Power's environmental remediation liability as of March 31, 2017 was $13 million. Georgia Power has been designated or identified as a potentially responsible party at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act, and assessment and potential cleanup of such sites is expected.
Gulf Power's environmental remediation liability includes estimated costs of environmental remediation projects of approximately $52 million as of March 31, 2017. These estimated costs primarily relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at Gulf Power's substations. The schedule for completion of the remediation projects is subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through Gulf Power's environmental cost recovery clause; therefore, these liabilities have no impact on net income.
Southern Company Gas' environmental remediation liability as of March 31, 2017 was $409 million based on the estimated cost of environmental investigation and remediation associated with known current and former manufactured gas plant operating sites. These environmental remediation expenditures are recoverable from customers through rate mechanisms approved by the applicable state regulatory agencies of the natural gas distribution utilities, with the exception of one site representing $5 million of the total accrued remediation costs.
The final outcome of these matters cannot be determined at this time. However, the final disposition of these matters is not expected to have a material impact on the financial statements of Southern Company, Georgia Power, Gulf Power, or Southern Company Gas.
FERC Matters
Municipal and Rural Associations Tariff
See Note 3 to the financial statements of Mississippi Power under "FERC Matters" in Item 8 of the Form 10-K for additional information regarding a settlement agreement entered into by Mississippi Power regarding the establishment of a regulatory asset for Kemper IGCC-related costs. See "Integrated Coal Gasification Combined Cycle" herein for additional information regarding Mississippi Power's construction of the Kemper IGCC.
In March 2016, Mississippi Power reached a settlement agreement with its wholesale customers, which was subsequently approved by the FERC, for an increase in wholesale base revenues under the MRA cost-based electric tariff, primarily as a result of placing scrubbers for Plant Daniel Units 1 and 2 in service in 2015. The settlement agreement became effective for services rendered beginning May 1, 2016, resulting in an estimated annual revenue increase of $7 million under the MRA cost-based electric tariff. Additionally, under the settlement agreement, the tariff customers agreed to similar regulatory treatment for MRA tariff ratemaking as the treatment approved for retail ratemaking through an order issued by the Mississippi PSC in December 2015 (In-Service Asset Rate Order). This regulatory treatment primarily includes (i) recovery of the Kemper IGCC assets currently operational and providing service to customers and other related costs, (ii) amortization of the Kemper IGCC-related regulatory assets included in rates under the settlement agreement over the 36 months ending April 30, 2019, (iii) Kemper IGCC-related expenses included in rates under the settlement agreement no longer being deferred and charged to expense, and (iv) removing all of the Kemper IGCC CWIP from rate base with a corresponding increase in accrual of AFUDC. The additional resulting AFUDC is estimated to be approximately $18 million until the end of May 2017 when the Kemper IGCC is projected to be placed in service.
Fuel Cost Recovery
Mississippi Power has a wholesale MRA and a Market Based (MB) fuel cost recovery factor. At March 31, 2017, the amount of over-recovered wholesale MRA fuel costs included in the balance sheets was $12 million compared to $13 million at December 31, 2016. At March 31, 2017 and December 31, 2016, the amount of over-recovered wholesale MB fuel costs included in the balance sheets was $1 million.
See Note 3 to the financial statements of Mississippi Power under "FERC Matters Fuel Cost Recovery" in Item 8 of the Form 10-K for additional information.
Market-Based Rate Authority
The traditional electric operating companies and Southern Power have authority from the FERC to sell electricity at market-based rates. Since 2008, that authority, for certain balancing authority areas, has been conditioned on compliance with the requirements of an energy auction, which the FERC found to be tailored mitigation that addresses potential market power concerns. In accordance with FERC regulations governing such authority, the traditional electric operating companies and Southern Power filed a triennial market power analysis in 2014, which included continued reliance on the energy auction as tailored mitigation. In 2015, the FERC issued an order finding that the traditional electric operating companies' and Southern Power's existing tailored mitigation may not effectively mitigate the potential to exert market power in certain areas served by the traditional electric operating companies and in some adjacent areas. The FERC directed the traditional electric operating companies and Southern Power to show why market-based rate authority should not be revoked in these areas or to provide a mitigation plan to further address market power concerns. The traditional electric operating companies and Southern Power filed a request for rehearing and filed their response with the FERC in 2015.
In December 2016, the traditional electric operating companies and Southern Power filed an amendment to their market-based rate tariff that proposed certain changes to the energy auction, as well as several non-tariff changes. On February 2, 2017, the FERC issued an order accepting all such changes subject to an additional condition of cost-based price caps for certain sales outside of the energy auction, finding that all of these changes would provide adequate alternative mitigation for the traditional electric operating companies' and Southern Power's potential to exert market power in certain areas served by the traditional electric operating companies and in some adjacent areas. On February 23, 2017, the traditional electric operating companies and Southern Power accepted the terms of the order in a compliance filing. While the FERC's February 2, 2017 order references the market power proceeding discussed above, it remains a separate, ongoing matter.
The ultimate outcome of these matters cannot be determined at this time.
Regulatory Matters
Alabama Power
See Note 3 to the financial statements of Southern Company and Alabama Power under "Regulatory Matters Alabama Power" and "Retail Regulatory Matters," respectively, in Item 8 of the Form 10-K for additional information regarding Alabama Power's recovery of retail costs through various regulatory clauses and accounting orders. The balance of each regulatory clause recovery on the balance sheet follows:
Regulatory Clause
Balance Sheet Line Item
March 31,
2017
December 31, 2016


(in millions)
Rate CNP Compliance(*)
Deferred under recovered regulatory clause revenues
$

$
9

Rate CNP PPA
Over recovered regulatory clause revenues
3


 
Deferred under recovered regulatory clause revenues

142

Retail Energy Cost Recovery
Other regulatory liabilities, current
40

76

Natural Disaster Reserve
Other regulatory liabilities, deferred
66

69


(*)
In accordance with an accounting order issued on February 17, 2017 by the Alabama PSC, Alabama Power reclassified the $23 million under recovered balance for Rate CNP Compliance to a deferred regulatory asset account.
Georgia Power
Rate Plans
See Note 3 to the financial statements of Southern Company and Georgia Power under "Regulatory Matters – Georgia Power – Rate Plans" and "Retail Regulatory Matters – Rate Plans," respectively, in Item 8 of the Form 10-K for additional information.
Georgia Power's revenues from regulated retail operations are collected through various rate mechanisms subject to the oversight of the Georgia PSC. Georgia Power currently recovers its costs from the regulated retail business through the 2013 ARP, which includes traditional base tariff rates, Demand-Side Management tariffs, Environmental Compliance Cost Recovery tariffs, and Municipal Franchise Fee tariffs. In addition, financing costs related to the construction of Plant Vogtle Units 3 and 4 are being collected through the NCCR tariff and fuel costs are collected through a separate fuel cost recovery tariff. See "Nuclear Construction" herein and Note 3 to the financial statements of Southern Company under "Regulatory Matters – Georgia Power – Nuclear Construction" and Georgia Power under "Retail Regulatory Matters – Nuclear Construction" in Item 8 of the Form 10-K for additional information regarding the NCCR tariff. Also see "Fuel Cost Recovery" herein and Note 3 to the financial statements of Southern Company under "Regulatory Matters – Georgia Power – Fuel Cost Recovery" and Georgia Power under "Retail Regulatory Matters – Fuel Cost Recovery" in Item 8 of the Form 10-K for additional information regarding fuel cost recovery.
Integrated Resource Plan
See Note 3 to the financial statements of Southern Company and Georgia Power under "Regulatory Matters – Georgia Power – Integrated Resource Plan" and "Retail Regulatory Matters – Integrated Resource Plan," respectively, in Item 8 of the Form 10-K for additional information regarding Georgia Power's triennial Integrated Resource Plan.
On March 7, 2017, the Georgia PSC approved Georgia Power's decision to suspend work at a future generation site in Stewart County, Georgia, due to changing economics, including load forecasts and lower fuel costs. The timing of recovery for costs of approximately $50 million incurred through March 31, 2017 will be determined by the Georgia PSC in a future base rate case. The ultimate outcome of this matter cannot be determined at this time.
Fuel Cost Recovery
See Note 3 to the financial statements of Southern Company and Georgia Power under "Regulatory Matters – Georgia Power – Fuel Cost Recovery" and "Retail Regulatory Matters – Fuel Cost Recovery," respectively, in Item 8 of the Form 10-K for additional information.
As of March 31, 2017 and December 31, 2016, Georgia Power's over recovered fuel balance totaled $18 million and $84 million, respectively, and is included in other current liabilities on Southern Company's and Georgia Power's condensed balance sheets.
Fuel cost recovery revenues are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's or Georgia Power's revenues or net income, but will affect cash flow.
Nuclear Construction
See Note 3 to the financial statements of Southern Company and Georgia Power under "Regulatory Matters – Georgia Power – Nuclear Construction" and "Retail Regulatory Matters – Nuclear Construction," respectively, in Item 8 of the Form 10-K for additional information regarding Georgia Power's construction of Plant Vogtle Units 3 and 4, Vogtle Construction Monitoring (VCM) reports, the NCCR tariff, the Vogtle Construction Litigation (as defined below), and the Contractor Settlement Agreement (as defined below).
Vogtle 3 and 4 Agreement and Contractor Bankruptcy
In 2008, Georgia Power, acting for itself and as agent for the Vogtle Owners, entered into an agreement with the Contractor, pursuant to which the Contractor agreed to design, engineer, procure, construct, and test Plant Vogtle Units 3 and 4 (Vogtle 3 and 4 Agreement). Under the terms of the Vogtle 3 and 4 Agreement, the Vogtle Owners agreed to pay a purchase price subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. The Vogtle 3 and 4 Agreement also provides for liquidated damages upon the Contractor's failure to fulfill the schedule and certain performance guarantees, each subject to an aggregate cap of 10% of the contract price, or approximately $920 million. In addition, the Vogtle 3 and 4 Agreement provides for limited cost sharing by the Vogtle Owners for Contractor costs under certain conditions with maximum additional capital costs under this provision attributable to Georgia Power (based on Georgia Power's ownership interest) of approximately $114 million. Each Vogtle Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. Georgia Power's proportionate share is 45.7%. In the event of a credit rating downgrade below investment grade of any Vogtle Owner, such Vogtle Owner will be required to provide a letter of credit or other credit enhancement.
On December 31, 2015, Westinghouse and the Vogtle Owners entered into a definitive settlement agreement (Contractor Settlement Agreement) to resolve disputes between the Vogtle Owners and the Contractor under the Vogtle 3 and 4 Agreement, including litigation that was pending in the U.S. District Court for the Southern District of Georgia (Vogtle Construction Litigation). Among other things, the Contractor Settlement Agreement and the related amendment to the Vogtle 3 and 4 Agreement (i) revised the guaranteed substantial completion dates to June 30, 2019 for Unit 3 and June 30, 2020 for Unit 4; (ii) provided that delay liquidated damages will commence if the nuclear fuel loading date for each unit does not occur by December 31, 2018 for Unit 3 and December 31, 2019 for Unit 4; and (iii) provided that, pursuant to the amendment to the Vogtle 3 and 4 Agreement, Georgia Power, based on its ownership interest, pay to the Contractor and capitalize to the project cost approximately $350 million in settlement of disputed claims. Further, as a consequence of the settlement and Westinghouse's acquisition of WECTEC, Westinghouse engaged Fluor Enterprises, Inc. (Fluor Enterprises), a subsidiary of Fluor Corporation (Fluor), as a new construction subcontractor.
Under the terms of the Vogtle 3 and 4 Agreement, the Contractor does not have a right to terminate the Vogtle 3 and 4 Agreement for convenience. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Vogtle Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Vogtle Owners, Vogtle Owner insolvency, and certain other events. In the event of an abandonment of work by the Contractor, the maximum liability of the Contractor under the Vogtle 3 and 4 Agreement is increased to 40% of the contract price (approximately $1.7 billion based on Georgia Power's ownership interest). The Vogtle Owners may terminate the Vogtle 3 and 4 Agreement at any time for convenience, provided that the Vogtle Owners will be required to pay certain termination costs. In addition, the Vogtle Owners may terminate the Vogtle 3 and 4 Agreement for certain Contractor breaches, including abandonment of work by the Contractor.
Under the Toshiba Guarantee, Toshiba has guaranteed certain payment obligations of the Contractor, including any liability of the Contractor for abandonment of work. However, due to Toshiba's financial situation described below, substantial risk regarding the Vogtle Owners' ability to fully collect under the Toshiba Guarantee exists. In January 2016, Westinghouse delivered to the Vogtle Owners $920 million of letters of credit from financial institutions (Westinghouse Letters of Credit) to secure a portion of the Contractor's potential obligations under the Vogtle 3 and 4 Agreement. The Westinghouse Letters of Credit are subject to annual renewals through June 30, 2020 and require 60 days' written notice to Georgia Power in the event the Westinghouse Letters of Credit will not be renewed. In the event of such notice, the Vogtle Owners would be able to draw on the entire balance of the Westinghouse Letters of Credit. The Westinghouse Letters of Credit remain in place in accordance with the terms of the Vogtle 3 and 4 Agreement.
On March 29, 2017, Westinghouse and WECTEC each filed for bankruptcy protection under Chapter 11 of the U.S. Bankruptcy Code. Georgia Power, acting for itself and as agent for the Vogtle Owners, entered into an interim assessment agreement with the Contractor and WECTEC Staffing Services LLC (WECTEC Staffing), as of March 29, 2017 (Interim Assessment Agreement), to provide for a continuation of work with respect to Plant Vogtle Units 3 and 4. Georgia Power's entry into the Interim Assessment Agreement was conditioned upon South Carolina Electric & Gas Company entering into a similar interim assessment agreement with the Contractor relating to V.C. Summer, which also occurred on March 29, 2017. The provisions in the Interim Assessment Agreement became effective upon approval of the Interim Assessment Agreement by the bankruptcy court on March 30, 2017. The term of the Interim Assessment Agreement was originally scheduled to expire on April 28, 2017. On April 28, 2017, Georgia Power, acting for itself and as agent for the Vogtle Owners, entered into an amendment to the Interim Assessment Agreement with the Contractor and WECTEC Staffing solely to extend the term of the Interim Assessment Agreement through the earlier of (i) May 12, 2017 and (ii) termination of the Interim Assessment Agreement by any party upon five business days' notice (Interim Assessment Period).
The Interim Assessment Agreement provides, among other items, that (i) Georgia Power will be obligated to pay, on behalf of the Vogtle Owners, all costs accrued by the Contractor for subcontractors and vendors for services performed or goods provided during the Interim Assessment Period, with these amounts to be paid to the Contractor, except for amounts accrued for Fluor, which will be paid directly to Fluor; (ii) during the Interim Assessment Period, the Contractor shall provide certain engineering, procurement, and management services for Plant Vogtle Units 3 and 4, to the same extent as contemplated by the Vogtle 3 and 4 Agreement, and Georgia Power, on behalf of the Vogtle Owners, will make payments of $5.4 million per week for these services; (iii) Georgia Power will have the right to make payments, on behalf of the Vogtle Owners, directly to subcontractors and vendors who have accounts past due with the Contractor; (iv) during the Interim Assessment Period, the Contractor will use its commercially reasonable efforts to provide information reasonably requested by Georgia Power as is necessary to continue construction and investigate the completion status of Plant Vogtle Units 3 and 4; (v) the Contractor will reject or accept the Vogtle 3 and 4 Agreement by the termination of the Interim Assessment Agreement; and (vi) during the Interim Assessment Period, Georgia Power will not exercise any remedies against Toshiba under the Toshiba Guarantee. Under the Interim Assessment Agreement, all parties expressly reserve all rights and remedies under the Vogtle 3 and 4 Agreement, all related security and collateral, under applicable law.
A number of subcontractors to the Contractor, including Fluor Enterprises, have alleged non-payment by the Contractor for amounts owed for work performed on Plant Vogtle Units 3 and 4. Georgia Power, acting for itself and as agent for the Vogtle Owners, has taken, and continues to take, action to remove liens filed by these subcontractors through the posting of surety bonds.
Georgia Power estimates the aggregate liability for the Vogtle Owners under the Interim Assessment Agreement and the removal of subcontractor liens to be approximately $470 million, of which Georgia Power's proportionate share would total approximately $215 million. As of March 31, 2017, $245 million of this aggregate liability had been paid or accrued. Georgia Power is evaluating remedies available to the Vogtle Owners for these payments, including draws under the Westinghouse Letters of Credit and enforcement of the Toshiba Guarantee.
In February 2017, the Contractor provided Georgia Power with revised forecasted in-service dates of December 2019 and September 2020 for Plant Vogtle Units 3 and 4, respectively. However, based on information subsequently made available during Westinghouse and WECTEC's bankruptcy proceedings and pursuant to the Interim Assessment Agreement, Georgia Power and the Vogtle Owners do not believe the revised in-service dates are achievable. Georgia Power, along with the other Vogtle Owners, is undertaking a comprehensive schedule and cost-to-complete assessment, as well as a cancellation cost assessment. It is reasonably possible these assessments result in estimated incremental costs to complete, including owners' costs, that materially exceed the value of the Toshiba Guarantee. Georgia Power intends to work with the Georgia PSC and the other Vogtle Owners to determine future actions related to Plant Vogtle Units 3 and 4. Georgia Power, for itself and as agent for the other Vogtle Owners, is also negotiating a new service agreement which would, if necessary, engage the Contractor to provide design, engineering, and procurement services to Southern Nuclear, in the event Southern Nuclear assumes control over construction management. In addition, Georgia Power, on behalf of itself and the other Vogtle Owners, intends to take all actions available to it to enforce its rights related to the Vogtle 3 and 4 Agreement, including enforcing the Toshiba Guarantee, subject to the Interim Assessment Agreement, and accessing the Westinghouse Letters of Credit.
On April 11, 2017, Toshiba filed its unaudited financial statements as of and for the nine months ended December 31, 2016, which reflected a negative shareholders' equity balance of $1.9 billion, with Japanese regulators. Toshiba also announced that further substantial charges may be required in the quarter ended March 31, 2017 in connection with the bankruptcy filing of Westinghouse and WECTEC and that there are material events and conditions that raise substantial doubt about Toshiba's ability to continue as a going concern.
The Contractor's bankruptcy filing is expected to have a material impact on the construction cost and schedule of, as well as the cost recovery for, Plant Vogtle Units 3 and 4 and could have a material impact on Southern Company's and Georgia Power's financial statements. In addition, an inability or other failure by Toshiba to perform its obligations under the Toshiba Guarantee could have a further material impact on the net cost to the Vogtle Owners to complete construction of Plant Vogtle Units 3 and 4 and, therefore, on Southern Company's and Georgia Power's financial statements.
The ultimate outcome of these matters also is dependent on the results of the assessments currently underway, as well as the related regulatory treatment, and cannot be determined at this time.
Regulatory Matters
In 2009, the Georgia PSC voted to certify construction of Plant Vogtle Units 3 and 4 with a certified capital cost of $4.418 billion. In addition, in 2009 the Georgia PSC approved inclusion of the Plant Vogtle Units 3 and 4 related CWIP accounts in rate base, and the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows Georgia Power to recover financing costs for nuclear construction projects certified by the Georgia PSC. Financing costs are recovered on all applicable certified costs through annual adjustments to the NCCR tariff by including the related CWIP accounts in rate base during the construction period.
On December 20, 2016, the Georgia PSC voted to approve a settlement agreement (Vogtle Cost Settlement Agreement) resolving the following prudence matters: (i) none of the $3.3 billion of costs incurred through December 31, 2015 and reflected in the fourteenth VCM report will be disallowed from rate base on the basis of imprudence; (ii) the Contractor Settlement Agreement is reasonable and prudent and none of the amounts paid or to be paid pursuant to the Contractor Settlement Agreement should be disallowed from rate base on the basis of imprudence; (iii) financing costs on verified and approved capital costs will be deemed prudent provided they are incurred prior to December 31, 2019 and December 31, 2020 for Plant Vogtle Units 3 and 4, respectively; and (iv) (a) the in-service capital cost forecast will be adjusted to $5.680 billion (Revised Forecast), which includes a contingency of $240 million above Georgia Power's then current forecast of $5.440 billion, (b) capital costs incurred up to the Revised Forecast will be presumed to be reasonable and prudent with the burden of proof on any party challenging such costs, and (c) Georgia Power would have the burden to show that any capital costs above the Revised Forecast are reasonable and prudent. Under the terms of the Vogtle Cost Settlement Agreement, the certified in-service capital cost for purposes of calculating the NCCR tariff will remain at $4.418 billion. Construction capital costs above $4.418 billion will accrue AFUDC through the date each unit is placed in service. The ROE used to calculate the NCCR tariff was reduced from 10.95% (the ROE rate setting point authorized by the Georgia PSC in the 2013 ARP) to 10.00% effective January 1, 2016. For purposes of the AFUDC calculation, the ROE on costs between $4.418 billion and $5.440 billion will also be 10.00% and the ROE on any amounts above $5.440 billion would be Georgia Power's average cost of long-term debt. If the Georgia PSC adjusts Georgia Power's ROE rate setting point in a rate case prior to Plant Vogtle Units 3 and 4 being placed into retail rate base, then the ROE for purposes of calculating both the NCCR tariff and AFUDC will likewise be 95 basis points lower than the revised ROE rate setting point. If Plant Vogtle Units 3 and 4 are not placed in service by December 31, 2020, then (i) the ROE for purposes of calculating the NCCR tariff will be reduced an additional 300 basis points, or $8 million per month, and may, at the Georgia PSC's discretion, be accrued to be used for the benefit of customers, until such time as the units are placed in service and (ii) the ROE used to calculate AFUDC will be Georgia Power's average cost of long-term debt.
Under the terms of the Vogtle Cost Settlement Agreement, Plant Vogtle Units 3 and 4 will be placed into retail rate base on December 31, 2020 or when placed in service, whichever is later. The Georgia PSC will determine for retail ratemaking purposes the process of transitioning Plant Vogtle Units 3 and 4 from a construction project to an operating plant no later than Georgia Power's base rate case required to be filed by July 1, 2019.
The Georgia PSC has approved fifteen VCM reports covering the periods through June 30, 2016, including construction capital costs incurred, which through that date totaled $3.7 billion. Georgia Power filed its sixteenth VCM report, covering the period from July 1 through December 31, 2016, requesting approval of $222 million of construction capital costs incurred during that period, with the Georgia PSC on February 27, 2017. Georgia Power's CWIP balance for Plant Vogtle Units 3 and 4 was approximately $4.1 billion as of March 31, 2017 and Georgia Power had incurred $1.3 billion in financing costs through March 31, 2017.
The ultimate outcome of these matters cannot be determined at this time.
Other Matters
As of March 31, 2017, Georgia Power had borrowed $2.6 billion related to Plant Vogtle Units 3 and 4 costs through a loan guarantee agreement between Georgia Power and the DOE and a multi-advance credit facility among Georgia Power, the DOE, and the FFB. See Note 6 to the financial statements of Southern Company and Georgia Power under "DOE Loan Guarantee Borrowings" in Item 8 of the Form 10-K and Note (E) under "DOE Loan Guarantee Borrowings" for additional information, including applicable covenants, events of default, mandatory prepayment events, and conditions to borrowing.
The IRS has allocated PTCs to Plant Vogtle Units 3 and 4 which require that the applicable unit be placed in service prior to 2021. The net present value of Georgia Power's PTCs is estimated at approximately $400 million per unit.
There have been technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4 at the federal and state level and additional challenges may arise as construction proceeds. Processes are in place that are designed to assure compliance with the requirements specified in the Westinghouse Design Control Document and the combined construction and operating licenses, including inspections by Southern Nuclear and the NRC that occur throughout construction. As a result of such compliance processes, certain license amendment requests have been filed and approved or are pending before the NRC. Various design and other licensing-based compliance matters, including the timely resolution of Inspections, Tests, Analyses, and Acceptance Criteria and the related approvals by the NRC, may arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests or other licensing-based compliance issues are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs.
As construction continues, the risk remains that challenges with labor productivity, fabrication, delivery, assembly, and installation of plant systems, structures, and components, or other issues could arise and may further impact project schedule and cost. Georgia Power's previously estimated owner's costs of approximately $10 million per month and financing costs of approximately $30 million per month for Plant Vogtle Units 3 and 4 are being evaluated as part of the comprehensive schedule and cost-to-complete analysis being performed as a result of the Contractor's bankruptcy.
The ultimate outcome of these matters cannot be determined at this time.
Gulf Power
See Note 3 to the financial statements of Gulf Power under "Retail Regulatory Matters" in Item 8 of the Form 10-K for additional information regarding Gulf Power's rates and charges for service to retail customers.
Retail Base Rate Cases
See Note 3 to the financial statements of Southern Company and Gulf Power under "Regulatory Matters – Gulf Power – Retail Base Rate Cases" and "Retail Regulatory Matters – Retail Base Rate Cases," respectively, in Item 8 of the Form 10-K for additional information.
In 2013, the Florida PSC approved a settlement agreement (2013 Rate Case Settlement Agreement) that authorized Gulf Power to reduce depreciation and record a regulatory asset up to $62.5 million from January 2014 through June 2017. In any given month, such depreciation reduction may not exceed the amount necessary for the retail ROE, as reported to the Florida PSC monthly, to reach the midpoint of the authorized retail ROE range then in effect. For 2014 and 2015, Gulf Power recognized reductions in depreciation of $8.4 million and $20.1 million, respectively. No net reduction in depreciation was recorded in 2016. In the first quarter 2017, Gulf Power recognized reductions in depreciation totaling $25.5 million. The 2013 Rate Case Settlement Agreement remains in effect through June 30, 2017.
On April 4, 2017, the Florida PSC approved the 2017 Rate Case Settlement Agreement among Gulf Power and three of the intervenors to Gulf Power's retail base rate case, with respect to Gulf Power's request to increase retail base rates. Under the terms of the 2017 Rate Case Settlement Agreement, Gulf Power will, among other things, increase rates effective July 1, 2017 to provide an annual overall net customer impact of approximately $54.3 million. The net customer impact consists of a $62.0 million increase in annual base revenues less an annual credit for certain wholesale revenues to be provided through December 2019 through the purchased power capacity cost recovery clause, which is estimated to be approximately $7.7 million for 2017. Gulf Power also will (1) continue its current authorized retail ROE midpoint (10.25%) and range (9.25% to 11.25%); (2) be deemed to have an equity ratio of 52.5% for all retail regulatory purposes; (3) begin amortizing the regulatory asset associated with the investment balances remaining after the retirement of Plant Smith Units 1 and 2 (357 MWs) over 15 years effective January 1, 2018; and (4) implement new depreciation rates effective January 1, 2018. The 2017 Rate Case Settlement Agreement also resulted in a $32.5 million write-down of Gulf Power's ownership of Plant Scherer Unit 3 (205 MWs), which was recorded in the first quarter 2017. The remaining issues related to the inclusion of Gulf Power's investment in Plant Scherer Unit 3 in retail rates have been resolved as a result of the 2017 Rate Case Settlement Agreement, including recoverability of certain costs associated with the ongoing ownership and operation of the unit through the environmental cost recovery clause rate approved by the Florida PSC in November 2016.
Cost Recovery Clauses
See Note 3 to the financial statements of Gulf Power under "Retail Regulatory Matters – Cost Recovery Clauses" in Item 8 of the Form 10-K for additional information regarding Gulf Power's recovery of retail costs through various regulatory clauses and accounting orders. Gulf Power has four regulatory clauses which are approved by the Florida PSC. The balance of each regulatory clause recovery on the balance sheet follows:
Regulatory Clause
Balance Sheet Line Item
March 31,
2017
December 31, 2016


(in millions)
Fuel Cost Recovery
Other regulatory liabilities, current
$
5

$
15

Purchased Power Capacity Recovery
Under recovered regulatory clause revenues
4


Environmental Cost Recovery
Under recovered regulatory clause revenues
40

13

Energy Conservation Cost Recovery
Under recovered regulatory clause revenues
3

4


As discussed previously, the 2017 Rate Case Settlement Agreement resolved the remaining issues related to Gulf Power's inclusion of certain costs associated with the ongoing ownership and operation of Plant Scherer Unit 3 in the environmental cost recovery clause and no adjustment to the environmental cost recovery clause rate approved by the Florida PSC in November 2016 was made.
Mississippi Power
Performance Evaluation Plan
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Performance Evaluation Plan" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's base rates.
On March 15, 2017, Mississippi Power submitted its annual PEP lookback filing for 2016, which reflected the need for a $5 million surcharge to be recovered from customers. The filing has been suspended for review by the Mississippi PSC. The ultimate outcome of this matter cannot be determined at this time.
Energy Efficiency
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Energy Efficiency" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's energy efficiency programs.
In November 2016, Mississippi Power submitted its Energy Efficiency Cost Rider (EECR) Compliance filing, which included an increase of $1 million in annual retail revenues. On March 13, 2017, Mississippi Power amended and revised the EECR Compliance filing to request a $2 million annual increase in retail revenues. The ultimate outcome of this matter cannot be determined at this time.
Fuel Cost Recovery
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Fuel Cost Recovery" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's retail fuel cost recovery.
At March 31, 2017, the amount of over-recovered retail fuel costs included on Mississippi Power's condensed balance sheet was $27 million compared to $37 million at December 31, 2016.
Ad Valorem Tax Adjustment
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Ad Valorem Tax Adjustment" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's ad valorem tax adjustments.
On April 7, 2017, Mississippi Power submitted its annual ad valorem tax adjustment factor filing for 2017, which included an annual rate increase of 0.85%, or $8 million in annual retail revenues, primarily due to increased assessments. The ultimate outcome of this matter cannot be determined at this time.
Southern Company Gas
Natural Gas Cost Recovery
Southern Company Gas has established natural gas cost recovery rates approved by the relevant state regulatory agencies in the states in which it serves. Natural gas cost recovery revenues are adjusted for differences in actual recoverable natural gas costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's or Southern Company Gas' revenues or net income, but will affect cash flows.
Base Rate Cases
See Note 3 to the financial statements of Southern Company Gas under "Regulatory Matters – Base Rate Cases" in Item 8 of the Form 10-K for additional information.
On February 21, 2017, the Georgia PSC approved the Georgia Rate Adjustment Mechanism (GRAM) and a $20 million increase in annual base rate revenues for Atlanta Gas Light, effective March 1, 2017. GRAM adjusts base rates annually, up or down, based on the previously approved ROE of 10.75% and does not collect revenue through special riders and surcharges. Various infrastructure programs previously authorized by the Georgia PSC under Atlanta Gas Light's STRIDE program, which include the Integrated Vintage Plastic Replacement Program, Integrated System Reinforcement Program, and Integrated Customer Growth Program, will continue under GRAM and the recovery of and return on the infrastructure program investments will be included in annual base rate adjustments. The Georgia PSC will review Atlanta Gas Light's performance annually under GRAM.
Beginning with the next rate adjustment in June 2018, Atlanta Gas Light's recovery of the previously unrecovered Pipeline Replacement Program revenue through 2014, as well as the mitigation costs associated with the Pipeline Replacement Program that were not previously included in its rates, will also be included in GRAM. In connection with the GRAM approval, the Georgia PSC allowed the last monthly Pipeline Replacement Program surcharge increase, originally scheduled for October 2017, to occur effective March 1, 2017.
In September 2016, Elizabethtown Gas filed a general base rate case with the New Jersey BPU requesting a $19 million increase in annual base rate revenues. The requested increase is based on a projected 12-month test year ending March 31, 2017 and an ROE of 10.25%. The New Jersey BPU is expected to issue an order on the filing in the third quarter 2017, after which rate adjustments will be effective.
On March 10, 2017, Nicor Gas filed a general base rate case with the Illinois Commission requesting a $208 million increase in annual base rate revenues. The requested increase is based on a 2018 projected test year and an ROE of 10.7%. The Illinois Commission is expected to rule on the requested increase within the 11-month statutory time limit, after which rate adjustments will be effective.
On March 31, 2017, Virginia Natural Gas filed a general base rate case with the Virginia Commission requesting a $44 million increase in annual base rate revenues. The requested increase is based on a projected 12-month test year beginning September 1, 2017 and an ROE of 10.25%. The requested increase includes $13 million related to the recovery of investments under the Steps to Advance Virginia's Energy (SAVE) program. The Virginia Commission is expected to rule on the requested increase in the first quarter 2018. Rate adjustments are expected to be effective September 1, 2017, subject to refund.
The ultimate outcome of the pending base rate cases cannot be determined at this time.
Regulatory Infrastructure Programs
Southern Company Gas is engaged in various infrastructure programs that update or expand its gas distribution systems to improve reliability and ensure the safety of its utility infrastructure, and recovers in rates its investment and a return associated with these infrastructure programs. See Note 3 to the financial statements of Southern Company and Southern Company Gas under "Regulatory Matters – Southern Company Gas – Regulatory Infrastructure Programs" and "Regulatory Matters – Regulatory Infrastructure Programs," respectively, in Item 8 of the Form 10-K for additional information.
Nicor Gas
In 2014, the Illinois Commission approved Nicor Gas' nine-year regulatory infrastructure program, Investing in Illinois. Under this program, Nicor Gas placed into service $24 million of qualifying assets during the first quarter 2017.
Atlanta Gas Light
Atlanta Gas Light's STRIDE program, which started in 2009, consists of three individual programs that update and expand gas distribution systems and liquefied natural gas facilities as well as improve system reliability to meet operational flexibility and customer growth. Through the programs under STRIDE, Atlanta Gas Light invested $38 million during the first quarter 2017.
In August 2016, Atlanta Gas Light filed a petition with the Georgia PSC for approval of a four-year extension of its Integrated System Reinforcement Program (i-SRP) seeking approval to invest an additional $177 million to improve and upgrade its core gas distribution system in years 2017 through 2020.
The recovery of and return on current and future capital investments under the STRIDE program will be included in the annual base rate revenue adjustment under GRAM rather than a separate surcharge. The proposed capital investments associated with the extension of i-SRP were included in the 2017 annual base rate revenue under GRAM that was approved by the Georgia PSC on February 21, 2017. See "Base Rate Cases" herein for additional information.
Elizabethtown Gas
In 2013, the New Jersey BPU approved the extension of Elizabethtown Gas' Aging Infrastructure Replacement program, under which Elizabethtown Gas invested $3 million during the first quarter 2017.
Virginia Natural Gas
In March 2016, the Virginia Commission approved an extension to the SAVE program, under which Virginia Natural Gas invested $7 million during the first quarter 2017.
Florida City Gas
The Florida PSC approved Florida City Gas' Safety, Access, and Facility Enhancement program in 2015. Under the program, Florida City Gas invested $3 million during the first quarter 2017.
Integrated Coal Gasification Combined Cycle
See Note 3 to the financial statements of Southern Company and Mississippi Power under "Integrated Coal Gasification Combined Cycle" in Item 8 of the Form 10-K for information regarding Mississippi Power's construction of the Kemper IGCC.
Kemper IGCC Overview
The Kemper IGCC utilizes IGCC technology with an expected output capacity of 582 MWs. The Kemper IGCC is fueled by locally mined lignite (an abundant, lower heating value coal) from a mine owned by Mississippi Power and situated adjacent to the Kemper IGCC. The mine, operated by North American Coal Corporation, started commercial operation in 2013. In connection with the Kemper IGCC, Mississippi Power constructed and plans to operate approximately 61 miles of CO2 pipeline infrastructure for the transport of captured CO2 for use in enhanced oil recovery.
Kemper IGCC Schedule and Cost Estimate
In 2012, the Mississippi PSC issued the 2012 MPSC CPCN Order, a detailed order confirming the CPCN originally approved by the Mississippi PSC in 2010 authorizing the acquisition, construction, and operation of the Kemper IGCC. The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC CPCN Order was $2.4 billion, net of $245 million of grants awarded to the Kemper IGCC project by the DOE under the Clean Coal Power Initiative Round 2 (Initial DOE Grants) and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and AFUDC related to the Kemper IGCC. The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. The Kemper IGCC was originally projected to be placed in service in May 2014. Mississippi Power placed the combined cycle and the associated common facilities portion of the Kemper IGCC in service in August 2014. The remainder of the plant, including the gasifiers and the gas clean-up facilities, represents first-of-a-kind technology. The initial production of syngas began on July 14, 2016 for gasifier "B" and on September 13, 2016 for gasifier "A." Mississippi Power achieved integrated operation of both gasifiers on January 29, 2017, including the production of electricity from syngas in both combustion turbines. Mississippi Power continues to work toward achieving sustained operation sufficient to place the remainder of the plant in service. The plant has, however, produced and captured CO2, and has produced sulfuric acid and ammonia, all of acceptable quality under the related off-take agreements. As a result of ongoing challenges associated with the ash removal and gas cleanup sour water systems, efforts to improve reliability and reach sustained operation of both gasifiers and production of electricity from syngas in both combustion turbines remain in process. Mississippi Power currently expects the remainder of the Kemper IGCC, including both gasifiers, will be placed in service by the end of May 2017. The schedule reflects the expected time needed to repair a leak in one of the particulate control devices for gasifier "A," make other minor modifications to each gasifier's ash removal systems, repair the sour water system, and establish sustained operation of both gasifiers for the production of electricity from syngas.
Mississippi Power's Kemper IGCC 2010 project estimate, current cost estimate (which includes the impacts of the Mississippi Supreme Court's (Court) decision discussed herein under "Rate Recovery of Kemper IGCC Costs – 2013 MPSC Rate Order"), and actual costs incurred as of March 31, 2017, all of which include 100% of the costs for the Kemper IGCC, are as follows:
Cost Category
2010 Project Estimate(a)
 
Current Cost Estimate(b)
 
Actual Costs
 
(in billions)
Plant Subject to Cost Cap(c)(e)
$
2.40

 
$
5.75

 
$
5.57

Lignite Mine and Equipment
0.21

 
0.23

 
0.23

CO2 Pipeline Facilities
0.14

 
0.12

 
0.12

AFUDC(d)
0.17

 
0.83

 
0.80

Combined Cycle and Related Assets Placed in
Service – Incremental
(e)

 
0.05

 
0.04

General Exceptions
0.05

 
0.10

 
0.09

Deferred Costs(e)

 
0.22

 
0.22

Additional DOE Grants(f)

 
(0.14
)
 
(0.14
)
Total Kemper IGCC(g)
$
2.97

 
$
7.16

 
$
6.93

(a)
The 2010 Project Estimate is the certificated cost estimate adjusted to include the certificated estimate for the CO2 pipeline facilities approved in 2011 by the Mississippi PSC, as well as the lignite mine and equipment, AFUDC, and general exceptions.
(b)
Amounts in the Current Cost Estimate include certain estimated post-in-service costs which are expected to be subject to the cost cap.
(c)
The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, net of the Initial DOE Grants and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, AFUDC, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when Mississippi Power demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on customers relative to the original proposal for the CPCN) (Cost Cap Exceptions). The Current Cost Estimate and the Actual Costs include non-incremental operating and maintenance costs related to the combined cycle and associated common facilities placed in service in August 2014 that are subject to the $2.88 billion cost cap and exclude post-in-service costs for the lignite mine. See "Rate Recovery of Kemper IGCC Costs2013 MPSC Rate Order" herein for additional information.
(d)
Mississippi Power's 2010 Project Estimate included recovery of financing costs during construction rather than the accrual of AFUDC. This approach was not approved by the Mississippi PSC as described in "Rate Recovery of Kemper IGCC Costs2013 MPSC Rate Order." The Current Cost Estimate also reflects the impact of a settlement agreement with the wholesale customers for cost-based rates under FERC's jurisdiction. See "FERC Matters" herein for additional information.
(e)
Non-capital Kemper IGCC-related costs incurred during construction were initially deferred as regulatory assets. Some of these costs are now included in rates and are being recognized through income; however, such costs continue to be included in the Current Cost Estimate and the Actual Costs at March 31, 2017. The wholesale portion of debt carrying costs, whether deferred or recognized through income, is not included in the Current Cost Estimate and the Actual Costs at March 31, 2017. See "Rate Recovery of Kemper IGCC CostsRegulatory Assets and Liabilities" herein for additional information.
(f)
On April 8, 2016, Mississippi Power received approximately $137 million in additional grants from the DOE for the Kemper IGCC (Additional DOE Grants), which are expected to be used to reduce future rate impacts for customers.
(g)
The Current Cost Estimate and the Actual Costs include $2.87 billion that will not be recovered for costs above the cost cap, $0.83 billion of investment costs included in current rates for the combined cycle and related assets in service, and $0.09 billion of costs that were previously expensed for the combined cycle and related assets in service. The Current Cost Estimate and the Actual Costs exclude $0.23 billion of costs not included in current rates for post-June 2013 mine operations, the lignite fuel inventory, and the nitrogen plant capital lease, which will be included in the 2017 Rate Case to be filed by June 3, 2017. See Note 1 and Note 6 to the financial statements of Mississippi Power under "Fuel Inventory" and "Capital Leases," respectively, in Item 8 of the Form 10-K and "Rate Recovery of Kemper IGCC Costs2017 Rate Case" herein for additional information.
Of the total costs, including post-in-service costs for the lignite mine, incurred as of March 31, 2017, $3.73 billion was included in property, plant, and equipment (which is net of the Initial DOE Grants, the Additional DOE Grants, and estimated probable losses of $2.95 billion), $6 million in other property and investments, $64 million in fossil fuel stock, $48 million in materials and supplies, $24 million in other regulatory assets, current, $173 million in other regulatory assets, deferred, $1 million in other current assets, and $17 million in other deferred charges and assets in the balance sheet.
Mississippi Power does not intend to seek rate recovery for any costs related to the construction of the Kemper IGCC that exceed the $2.88 billion cost cap, net of the Initial DOE Grants and excluding the Cost Cap Exceptions. Mississippi Power recorded pre-tax charges to income for revisions to the cost estimate of $108 million ($67 million after tax) in the first quarter 2017. Since 2012, in the aggregate, Mississippi Power has incurred charges of $2.87 billion ($1.77 billion after tax) as a result of changes in the cost estimate above the cost cap for the Kemper IGCC through March 31, 2017. The increase to the cost estimate in the first quarter 2017 primarily reflects $67 million for the extension of the Kemper IGCC's projected in-service date from mid-March 2017 to the end of May 2017, $23 million related to start-up fuel, and $18 million primarily related to outage maintenance and operational improvements.
In addition to the current construction cost estimate, Mississippi Power is identifying potential improvement projects to enhance plant performance, safety, and/or operations that ultimately may be completed subsequent to placing the remainder of the Kemper IGCC in service. Approximately $12 million of related potential costs was recorded in 2016 and included in the current construction cost estimate. Other projects have yet to be fully evaluated, have not been included in the current cost estimate, and may be subject to the $2.88 billion cost cap.
Any extension of the in-service date beyond May 31, 2017 is currently estimated to result in additional base costs of approximately $25 million to $35 million per month, which includes maintaining necessary levels of start-up labor, materials, and fuel, as well as operational resources required to execute start-up and commissioning activities. Additional costs may be required for remediation of any further equipment and/or design issues identified. Any extension of the in-service date beyond May 31, 2017 would also increase costs for the Cost Cap Exceptions, which are not subject to the $2.88 billion cost cap established by the Mississippi PSC. These costs include AFUDC, which is currently estimated to total approximately $16 million per month, as well as carrying costs and operating expenses on Kemper IGCC assets placed in service and consulting and legal fees of approximately $3 million per month. For additional information, see "Rate Recovery of Kemper IGCC Costs2015 Rate Case" herein.
Further cost increases and/or extensions of the expected in-service date may result from factors including, but not limited to, difficulties integrating the systems required for sustained operations, sustaining nitrogen supply, continued issues with ash removal systems, major equipment failure, unforeseen engineering or design problems including any repairs and/or modifications to systems, and/or operational performance (including additional costs to satisfy any operational parameters ultimately adopted by the Mississippi PSC). Any further changes in the estimated costs of the Kemper IGCC subject to the $2.88 billion cost cap, net of the Initial DOE Grants and excluding the Cost Cap Exceptions, will be reflected in Southern Company's and Mississippi Power's statements of income and these changes could be material.
Rate Recovery of Kemper IGCC Costs
Given the variety of potential scenarios and the uncertainty of the outcome of future regulatory proceedings with the Mississippi PSC (and any subsequent related legal challenges), the ultimate outcome of the rate recovery matters discussed herein, including the resolution of legal challenges, cannot now be determined but could result in further material charges that could have a material impact on Southern Company's and Mississippi Power's results of operations, financial condition, and liquidity.
As of March 31, 2017, in addition to the $2.87 billion of costs above the Mississippi PSC's $2.88 billion cost cap that have been recognized as a charge to income, Mississippi Power had incurred approximately $2.01 billion in costs subject to the cost cap and approximately $1.50 billion in Cost Cap Exceptions related to the construction and start-up of the Kemper IGCC that are not included in current rates. These costs primarily relate to the following:
Cost Category
Actual Costs
 
(in billions)
Gasifiers and Gas Clean-up Facilities
$
1.90

Lignite Mine Facility
0.31

CO2 Pipeline Facilities
0.11

Combined Cycle and Common Facilities
0.17

AFUDC
0.73

General exceptions
0.07

Plant inventory
0.04

Lignite inventory
0.06

Regulatory and other deferred assets
0.12

Subtotal
3.51

Additional DOE Grants
(0.14
)
Total
$
3.37


Of these amounts, approximately 29% is related to wholesale and approximately 71% is related to retail, including the 15% portion that was previously contracted to be sold to SMEPA. Mississippi Power and its wholesale customers have generally agreed to similar regulatory treatment for wholesale tariff purposes as approved by the Mississippi PSC for retail for Kemper IGCC-related costs. See "FERC MattersMunicipal and Rural Associations Tariff" and "Termination of Proposed Sale of Undivided Interest" herein for further information.
Prudence
On August 17, 2016, the Mississippi PSC issued an order establishing a discovery docket to manage all filings related to the prudence of the Kemper IGCC. On October 3, 2016, Mississippi Power made a required compliance filing, which included a review and explanation of differences between the Kemper IGCC project estimate set forth in the 2010 CPCN proceedings and the most recent Kemper IGCC project estimate, as well as comparisons of current cost estimates and current expected plant operational parameters to the estimates presented in the 2010 CPCN proceedings for the first five years after the Kemper IGCC is placed in service. Compared to amounts presented in the 2010 CPCN proceedings, operations and maintenance expenses have increased an average of $105 million annually and maintenance capital has increased an average of $44 million annually for the first full five years of operations for the Kemper IGCC. Additionally, while the current estimated operational availability estimates reflect ultimate results similar to those presented in the 2010 CPCN proceedings, the ramp up period for the current estimates reflects a lower starting point and a slower escalation rate. On November 17, 2016, Mississippi Power submitted a supplemental filing to the October 3, 2016 compliance filing to present revised non-fuel operations and maintenance expense projections for the first year after the Kemper IGCC is placed in service. This supplemental filing included approximately $68 million in additional estimated operations and maintenance costs expected to be required to support the operations of the Kemper IGCC during that period. Mississippi Power will not seek recovery of the $68 million in additional estimated costs from customers if incurred.
Mississippi Power responded to numerous requests for information from interested parties in the discovery docket, which is now complete. Mississippi Power expects the Mississippi PSC to address these matters in connection with the 2017 Rate Case.
Economic Viability Analysis
In the fourth quarter 2016, as a part of its Integrated Resource Plan process, the Southern Company system completed its regular annual updated fuel forecast, the 2017 Annual Fuel Forecast. This updated fuel forecast reflected significantly lower long-term estimated costs for natural gas than were previously projected.
As a result of the updated long-term natural gas forecast, as well as the revised operating expense projections reflected in the discovery docket filings discussed above, on February 21, 2017, Mississippi Power filed an updated project economic viability analysis of the Kemper IGCC as required under the 2012 MPSC CPCN Order confirming authorization of the Kemper IGCC. The project economic viability analysis measures the life cycle economics of the Kemper IGCC compared to feasible alternatives, natural gas combined cycle generating units, under a variety of scenarios and considering fuel, operating and capital costs, and operating characteristics, as well as federal and state taxes and incentives. The reduction in the projected long-term natural gas prices in the 2017 Annual Fuel Forecast and, to a lesser extent, the increase in the estimated Kemper IGCC operating costs, negatively impact the updated project economic viability analysis.
Mississippi Power expects the Mississippi PSC to address this matter in connection with the 2017 Rate Case.
2017 Rate Case
Mississippi Power continues to believe that all costs related to the Kemper IGCC that remain subject to recovery have been prudently incurred in accordance with the requirements of the 2012 MPSC CPCN Order. Mississippi Power recognizes significant areas of potential challenge during future regulatory proceedings (and any subsequent, related legal challenges) exist. As described further herein and under "Prudence," "Lignite Mine and CO2 Pipeline Facilities," "Termination of Proposed Sale of Undivided Interest," and "Income Tax Matters," these challenges include, but are not limited to, prudence issues associated with capital costs, financing costs (AFUDC), and future operating costs net of chemical revenues; potential operating parameters; income tax issues; costs deferred as regulatory assets; and the 15% portion of the project previously contracted to SMEPA.
Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization of up to $1.0 billion of prudently-incurred costs was enacted into law in 2013. Mississippi Power expects to utilize this legislation to securitize prudently-incurred qualifying facility costs in excess of the certificated cost estimate of $2.4 billion. Qualifying facility costs include, but are not limited to, pre-construction costs, construction costs, regulatory costs, and accrued AFUDC. The Court's decision regarding the 2013 MPSC Rate Order did not impact Mississippi Power's ability to utilize alternate financing through securitization or the February 2013 legislation.
After the remainder of the plant is placed in service, AFUDC equity of approximately $12 million per month will no longer be recorded in income, and Mississippi Power expects to incur approximately $25 million per month in depreciation, taxes, operations and maintenance expenses, interest expense, and regulatory costs in excess of current rates. In connection with the 2017 Rate Case, Mississippi Power expects to file a request for authority from the Mississippi PSC, and separately from the FERC, to defer all Kemper IGCC costs incurred after the in-service date that cannot be capitalized, are not included in current rates, and are not required to be charged against earnings as a result of the $2.88 billion cost cap until such time as the Mississippi PSC completes its review and includes the resulting allowable costs in rates. In the event the Mississippi PSC does not grant Mississippi Power's request, these monthly expenses will be charged to income as incurred and will not be recoverable through rates.
Although the 2017 Rate Case has not yet been filed and is subject to future developments with either the Kemper IGCC or the Mississippi PSC, consistent with its approach in the 2013 and 2015 rate proceedings in accordance with the law passed in 2013 authorizing multi-year rate plans, Mississippi Power is developing both a traditional rate case requesting full cost recovery of the amounts not currently in rates and a rate mitigation plan that together represent Mississippi Power's probable filing strategy. Mississippi Power has evaluated various scenarios in connection with its processes to prepare the 2017 Rate Case and recognized an $80 million charge to income in 2016, which is the estimated minimum probable amount of the $3.37 billion of Kemper IGCC costs not currently in rates that would not be recovered under the probable rate mitigation plan to be filed by June 3, 2017. Mississippi Power expects that timely resolution of the 2017 Rate Case will likely require a settlement agreement between Mississippi Power and the MPUS (and other parties) that may include other operational or cost recovery alternatives and would be subject to the approval of the Mississippi PSC. While Mississippi Power intends to pursue any available settlement alternatives, the ability to achieve a negotiated settlement is uncertain. If a settlement is achieved, full regulatory recovery of the amounts not currently in rates is unlikely and could result in further material charges; however, the impact of such an agreement on Southern Company's and Mississippi Power's financial statements would depend on the method, amount, and type of cost recovery ultimately excluded, none of which can be reasonably determined at this time. Certain costs, including operating costs, would be recorded to income in the period incurred, while other costs, including investment-related costs, would be charged to income when it is probable they will not be recovered and the amounts can be reasonably estimated. In the event an agreement acceptable to the parties cannot be reached, Mississippi Power intends to fully litigate its request for full recovery through the Mississippi PSC regulatory process and any subsequent legal challenges.
2015 Rate Case
On August 13, 2015, the Mississippi PSC approved Mississippi Power's request for interim rates, which presented an alternative rate proposal (In-Service Asset Proposal) designed to recover Mississippi Power's costs associated with the Kemper IGCC assets that are commercially operational and currently providing service to customers (the transmission facilities, combined cycle, natural gas pipeline, and water pipeline) and other related costs. The interim rates were designed to collect approximately $159 million annually and became effective in September 2015, subject to refund and certain other conditions.
On December 3, 2015, the Mississippi PSC issued the In-Service Asset Rate Order adopting in full a stipulation (2015 Stipulation) entered into between Mississippi Power and the MPUS regarding the In-Service Asset Proposal. The In-Service Asset Rate Order provided for retail rate recovery of an annual revenue requirement of approximately $126 million, based on Mississippi Power's actual average capital structure, with a maximum common equity percentage of 49.733%, a 9.225% return on common equity, and actual embedded interest costs. The In-Service Asset Rate Order also included a prudence finding of all costs in the stipulated revenue requirement calculation for the in-service assets. The stipulated revenue requirement excluded the costs of the Kemper IGCC related to the 15% undivided interest that was previously projected to be purchased by SMEPA but reserved Mississippi Power's right to seek recovery in a future proceeding. See "Termination of Proposed Sale of Undivided Interest" herein for additional information. Mississippi Power is required to file the 2017 Rate Case by June 3, 2017.
With implementation of the new rates on December 17, 2015, the interim rates were terminated and, in March 2016, Mississippi Power completed customer refunds of approximately $11 million for the difference between the interim rates collected and the permanent rates.
2013 MPSC Rate Order
In January 2013, Mississippi Power entered into a settlement agreement with the Mississippi PSC that was intended to establish the process for resolving matters regarding cost recovery related to the Kemper IGCC (2013 Settlement Agreement). Under the 2013 Settlement Agreement, Mississippi Power agreed to limit the portion of prudently-incurred Kemper IGCC costs to be included in retail rate base to the $2.4 billion certificated cost estimate, plus the Cost Cap Exceptions, but excluding AFUDC, and any other costs permitted or determined to be excluded from the $2.88 billion cost cap by the Mississippi PSC. In March 2013, the Mississippi PSC issued a rate order approving retail rate increases of 15% effective March 19, 2013 and 3% effective January 1, 2014, which collectively were designed to collect $156 million annually beginning in 2014 (2013 MPSC Rate Order) to be used to mitigate customer rate impacts after the Kemper IGCC is placed in service, based on a mirror CWIP methodology (Mirror CWIP rate).
On February 12, 2015, the Court reversed the 2013 MPSC Rate Order based on, among other things, its findings that (1) the Mirror CWIP rate treatment was not provided for under the Baseload Act and (2) the Mississippi PSC should have determined the prudence of Kemper IGCC costs before approving rate recovery through the 2013 MPSC Rate Order. The Court also found the 2013 Settlement Agreement unenforceable due to a lack of public notice for the related proceedings. On July 7, 2015, the Mississippi PSC ordered that the Mirror CWIP rate be terminated effective July 20, 2015 and required the fourth quarter 2015 refund of the $342 million collected under the 2013 MPSC Rate Order, along with associated carrying costs of $29 million. The Court's decision did not impact the 2012 MPSC CPCN Order or the February 2013 legislation described above.
Because the 2013 MPSC Rate Order did not provide for the inclusion of CWIP in rate base as permitted by the Baseload Act, Mississippi Power continues to record AFUDC on the Kemper IGCC. Through March 31, 2017, AFUDC recorded since the original May 2014 estimated in-service date for the Kemper IGCC has totaled $445 million, which will continue to accrue at approximately $16 million per month until the remainder of the plant is placed in service. Mississippi Power has not recorded any AFUDC on Kemper IGCC costs in excess of the $2.88 billion cost cap, except for Cost Cap Exception amounts.
2012 MPSC CPCN Order
The 2012 MPSC CPCN Order included provisions relating to both Mississippi Power's recovery of financing costs during the course of construction of the Kemper IGCC and Mississippi Power's recovery of costs following the date the Kemper IGCC is placed in service. With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC CPCN Order provided for the establishment of operational cost and revenue parameters including availability factor, heat rate, lignite heat content, and chemical revenue based upon assumptions in Mississippi Power's petition for the CPCN. Mississippi Power expects the Mississippi PSC to apply operational parameters in connection with the 2017 Rate Case and future proceedings related to the operation of the Kemper IGCC. To the extent the Mississippi PSC determines the Kemper IGCC does not meet the operational parameters ultimately adopted by the Mississippi PSC or Mississippi Power incurs additional costs to satisfy such parameters, there could be a material adverse impact on Southern Company's or Mississippi Power's financial statements. See "Prudence" herein for additional information.
Regulatory Assets and Liabilities
Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC issued an accounting order in 2011 granting Mississippi Power the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset through the in-service date, subject to review of such costs by the Mississippi PSC. Such costs include, but are not limited to, carrying costs on Kemper IGCC assets currently placed in service, costs associated with Mississippi PSC and MPUS consultants, prudence costs, legal fees, and operating expenses associated with assets placed in service.
In August 2014, Mississippi Power requested confirmation by the Mississippi PSC of Mississippi Power's authority to defer all operating expenses associated with the operation of the combined cycle subject to review of such costs by the Mississippi PSC. In addition, Mississippi Power is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings. Beginning in the third quarter 2015 and the second quarter 2016, in connection with the implementation of retail and wholesale rates, respectively, Mississippi Power began expensing certain ongoing project costs and certain retail debt carrying costs (associated with assets placed in service and other non-CWIP accounts) that previously were deferred as regulatory assets and began amortizing certain regulatory assets associated with assets placed in service and consulting and legal fees. The amortization periods for these regulatory assets vary from two years to 10 years as set forth in the In-Service Asset Rate Order and the settlement agreement with wholesale customers. As of March 31, 2017, the balance associated with these regulatory assets was $86 million, of which $24 million is included in current assets. Other regulatory assets associated with the remainder of the Kemper IGCC totaled $111 million as of March 31, 2017. The amortization period for these assets is expected to be determined by the Mississippi PSC in the 2017 Rate Case. See "FERC Matters" herein for additional information related to the 2016 settlement agreement with wholesale customers.
The In-Service Asset Rate Order requires Mississippi Power to submit an annual true-up calculation of its actual cost of capital, compared to the stipulated total cost of capital, with the first occurring as of May 31, 2016. At March 31, 2017, Mississippi Power's related regulatory liability included in its balance sheet totaled approximately $8 million. See "2015 Rate Case" herein for additional information.
See Note 1 to the financial statements of Southern Company and Mississippi Power under "Regulatory Assets and Liabilities" in Item 8 of the Form 10-K for additional information.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, Mississippi Power owns the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site. The mine started commercial operation in June 2013.
In 2010, Mississippi Power executed a 40-year management fee contract with Liberty Fuels Company, LLC (Liberty Fuels), a wholly-owned subsidiary of The North American Coal Corporation, which developed, constructed, and is operating and managing the mining operations. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. In addition to the obligation to fund the reclamation activities, Mississippi Power currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses. See Note 1 to the financial statements of Mississippi Power under "Asset Retirement Obligations and Other Costs of Removal" and "Variable Interest Entities" in Item 8 of the Form 10-K for additional information.
In addition, Mississippi Power has constructed and will operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. Mississippi Power entered into agreements with Denbury Onshore (Denbury) and Treetop Midstream Services, LLC (Treetop), pursuant to which Denbury would purchase 70% of the CO2 captured from the Kemper IGCC and Treetop would purchase 30% of the CO2 captured from the Kemper IGCC. On June 3, 2016, Mississippi Power cancelled its contract with Treetop and amended its contract with Denbury to reflect, among other things, Denbury's agreement to purchase 100% of the CO2 captured from the Kemper IGCC, an initial contract term of 16 years, and termination rights if Mississippi Power has not satisfied its contractual obligation to deliver captured CO2 by July 1, 2017, in addition to Denbury's existing termination rights in the event of a change in law, force majeure, or an event of default by Mississippi Power. Any termination or material modification of the agreement with Denbury could impact the operations of the Kemper IGCC and result in a material reduction in Mississippi Power's revenues to the extent Mississippi Power is not able to enter into other similar contractual arrangements or otherwise sequester the CO2 produced. Additionally, sustained oil price reductions could result in significantly lower revenues than Mississippi Power originally forecasted to be available to offset customer rate impacts, which could have a material impact on Mississippi Power's financial statements.
The ultimate outcome of these matters cannot be determined at this time.
Termination of Proposed Sale of Undivided Interest
In 2010 and as amended in 2012, Mississippi Power and SMEPA entered into an agreement whereby SMEPA agreed to purchase a 15% undivided interest in the Kemper IGCC (15% Undivided Interest). On May 20, 2015, SMEPA notified Mississippi Power of its termination of the agreement. Mississippi Power previously received a total of $275 million of deposits from SMEPA that were required to be returned to SMEPA with interest. On June 3, 2015, Southern Company, pursuant to its guarantee obligation, returned approximately $301 million to SMEPA. Subsequently, Mississippi Power issued a promissory note in the aggregate principal amount of approximately $301 million to Southern Company, which matures on July 31, 2018.
Litigation
On April 26, 2016, a complaint against Mississippi Power was filed in Harrison County Circuit Court (Circuit Court) by Biloxi Freezing & Processing Inc., Gulfside Casino Partnership, and John Carlton Dean, which was amended and refiled on July 11, 2016 to include, among other things, Southern Company as a defendant. On August 12, 2016, Southern Company and Mississippi Power removed the case to the U.S. District Court for the Southern District of Mississippi. The plaintiffs filed a request to remand the case back to state court, which was granted on November 17, 2016. The individual plaintiff, John Carlton Dean, alleges that Mississippi Power and Southern Company violated the Mississippi Unfair Trade Practices Act. All plaintiffs have alleged that Mississippi Power and Southern Company concealed, falsely represented, and failed to fully disclose important facts concerning the cost and schedule of the Kemper IGCC and that these alleged breaches have unjustly enriched Mississippi Power and Southern Company. The plaintiffs seek unspecified actual damages and punitive damages; ask the Circuit Court to appoint a receiver to oversee, operate, manage, and otherwise control all affairs relating to the Kemper IGCC; ask the Circuit Court to revoke any licenses or certificates authorizing Mississippi Power or Southern Company to engage in any business related to the Kemper IGCC in Mississippi; and seek attorney's fees, costs, and interest. The plaintiffs also seek an injunction to prevent any Kemper IGCC costs from being charged to customers through electric rates. On December 7, 2016, Southern Company and Mississippi Power filed motions to dismiss, which the Circuit Court is expected to address in the second quarter 2017.
On June 9, 2016, Treetop, Greenleaf, Tenrgys, LLC, Tellus Energy, LLC, WCOA, LLC, and Tellus Operating Group filed a complaint against Mississippi Power, Southern Company, and SCS in the state court in Gwinnett County, Georgia. The complaint relates to the cancelled CO2 contract with Treetop and alleges fraudulent misrepresentation, fraudulent concealment, civil conspiracy, and breach of contract on the part of Mississippi Power, Southern Company, and SCS and seeks compensatory damages of $100 million, as well as unspecified punitive damages. Southern Company, Mississippi Power, and SCS have moved to compel arbitration pursuant to the terms of the CO2 contract, which the court is expected to address in the second quarter 2017.
Southern Company and Mississippi Power believe these legal challenges have no merit; however, an adverse outcome in these proceedings could impact Southern Company's results of operations, financial condition, and liquidity and could have a material impact on Mississippi Power's results of operations, financial condition, and liquidity. Southern Company and Mississippi Power will vigorously defend themselves in these matters, and the ultimate outcome of these matters cannot be determined at this time.
Baseload Act
In 2008, the Baseload Act was signed by the Governor of Mississippi. The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently-incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. See "Rate Recovery of Kemper IGCC Costs" herein for additional information.
Income Tax Matters
See Note 3 to the financial statements of Southern Company and Mississippi Power under "Integrated Coal Gasification Combined Cycle – Bonus Depreciation," " – Investment Tax Credits," and " – Section 174 Research and Experimental Deduction" in Item 8 of the Form 10-K and Note (G) under "Section 174 Research and Experimental Deduction" for additional information on bonus depreciation, investment tax credits, and the Section 174 research and experimental deduction.