COMMITMENTS AND CONTINGENCIES
3 Months Ended
Mar. 31, 2017
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies COMMITMENTS AND CONTINGENCIES
LEGAL PROCEEDINGS
We accrue losses for a legal proceeding when it is probable that a loss has been incurred and the amount of the loss can be reasonably estimated. However, the uncertainties inherent in legal proceedings make it difficult to estimate with reasonable certainty the costs and effects of resolving these matters. Accordingly, actual costs incurred may differ materially from amounts accrued, may exceed applicable insurance coverage and could materially adversely affect our business, cash flows, results of operations, financial condition and prospects. Unless otherwise indicated, we are unable to estimate reasonably possible losses in excess of any amounts accrued.
At March 31, 2017, accrued liabilities for legal proceedings, including associated legal fees and costs of litigation, were $18 million for Sempra Energy Consolidated, including $11 million for SDG&E and $5 million for SoCalGas. Amounts for Sempra Energy and SoCalGas include $5 million for matters related to the Aliso Canyon natural gas leak, which we discuss below.
SDG&E
2007 Wildfire Litigation
SDG&E has resolved almost all of the lawsuits associated with three wildfires that occurred in October 2007. Two appeals remain pending after judgment in the trial court. SDG&E does not expect additional plaintiffs to file lawsuits given the applicable statutes of limitation, but could receive additional settlement demands and damage estimates from the remaining plaintiffs until the cases are resolved. SDG&E maintains reserves for the wildfire litigation and makes adjustments to these reserves as information becomes available and amounts are estimable.
SDG&E has concluded that it is probable that it will be permitted to recover in rates a substantial portion of the costs incurred to resolve wildfire claims in excess of its liability insurance coverage and the amounts recovered from third parties. Accordingly, at March 31, 2017, Sempra Energy and SDG&E have recorded assets of $350 million in Regulatory Assets (long-term) and Other Regulatory Assets (long-term), respectively, on their Consolidated Balance Sheets ($349 million related to CPUC-regulated operations and $1 million related to Federal Energy Regulatory Commission (FERC)-regulated operations). In September 2015, SDG&E filed an application with the CPUC seeking authority to recover these CPUC-related costs in rates over a six- to ten-year period. The requested amount is the net estimated CPUC-related cost incurred by SDG&E after deductions for insurance reimbursement and third party settlement recoveries, and reflects a voluntary 10-percent shareholder contribution applied to the net Wildfire Expense Memorandum Account balance. In April 2016, the CPUC issued a ruling establishing the scope and schedule for the proceeding, which will be managed in two phases. Phase 1 addresses SDG&E’s operational and management prudence surrounding the 2007 wildfires. We expect a final CPUC decision in late 2017. Phase 2 will address whether SDG&E’s actions and decision-making in connection with settling legal claims in relation to the wildfires were reasonable, with a final CPUC decision expected by early 2019. Should SDG&E conclude that recovery in rates is no longer probable, SDG&E will record a charge against earnings at the time such conclusion is reached. If SDG&E had concluded that the recovery of regulatory assets related to CPUC-regulated operations was no longer probable or was less than currently estimated at March 31, 2017, the resulting after-tax charge against earnings would have been up to approximately $207 million. A failure to obtain substantial or full recovery of these costs from customers, or any negative assessment of the likelihood of recovery, would likely have a material adverse effect on SDG&E’s and Sempra Energy’s results of operations and cash flows.
We discuss how we assess the probability of recovery of our regulatory assets in Note 1 of the Notes to Consolidated Financial Statements in the Annual Report.
Lawsuit Against MHI
SDG&E participated as a claimant and respondent in an arbitration proceeding initiated by Edison in October 2013 against MHI seeking damages stemming from the failure of the MHI replacement steam generators at the SONGS nuclear power plant. In December 2013, MHI answered and filed a counterclaim against Edison. The arbitration hearing concluded at the end of April 2016.
In March 2017, the Tribunal found MHI liable for breach of contract, subject to a contractual limitation of liability, but determined that MHI was the prevailing party and awarded it 95 percent of its arbitration costs. We discuss this arbitration and decision further in Note 9.
SoCalGas
Aliso Canyon Natural Gas Storage Facility Gas Leak
On October 23, 2015, SoCalGas discovered a leak at one of its injection-and-withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility, located in the northern part of the San Fernando Valley in Los Angeles County. The Aliso Canyon facility has been operated by SoCalGas since 1972. SS25 is one of more than 100 injection-and-withdrawal wells at the storage facility.
Stopping the Leak, and Local Community Mitigation Efforts. SoCalGas worked closely with several of the world’s leading experts to stop the leak, and on February 18, 2016, the California Department of Conservation’s Division of Oil, Gas, and Geothermal Resources (DOGGR) confirmed that the well was permanently sealed.
Pursuant to a stipulation and order by the Los Angeles County Superior Court (Superior Court), SoCalGas provided temporary relocation support to residents in the nearby community who requested it before the well was permanently sealed. Following the permanent sealing of the well, the Los Angeles County Department of Public Health (DPH) conducted indoor testing of certain homes in the Porter Ranch community, and concluded that indoor conditions did not present a long-term health risk and that it was safe for residents to return home. In May 2016, the Superior Court ordered SoCalGas to offer to clean residents’ homes at SoCalGas’ expense as a condition to ending the relocation program. SoCalGas completed the residential cleaning program and the relocation program ended in July 2016.
Apart from the Superior Court order, in May 2016, the DPH also issued a directive that SoCalGas professionally clean (in accordance with the proposed protocol prepared by the DPH) the homes of all residents located within the Porter Ranch Neighborhood Council boundary, or who participated in the relocation program, or who are located within a five mile radius of the Aliso Canyon natural gas storage facility and have experienced symptoms from the natural gas leak (the Directive). SoCalGas disputes the Directive, contending that it is invalid and unenforceable, and has filed a petition for writ of mandate to set aside the Directive.
The total costs incurred to remediate and stop the leak and to mitigate local community impacts are significant and may increase, and we may be subject to civil or administrative fines, costs or other penalties, if awarded or imposed. To the extent any of these costs are not covered by insurance (including any costs in excess of applicable policy limits), or if there were to be significant delays in receiving insurance recoveries, such costs could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
Cost Estimates and Accounting Impact. As of March 31, 2017, SoCalGas recorded estimated costs of $799 million related to the leak. Of this amount, approximately 70 percent is for the temporary relocation program (including cleaning costs and certain labor costs) and approximately 20 percent is for efforts to control the well, stop the leak, stop or reduce the emissions, and the estimated cost of the root cause analysis being conducted by an independent third party to determine the cause of the leak. The remaining portion of the $799 million includes legal costs incurred to defend litigation, the value of lost gas, the costs to mitigate the actual natural gas released, and other costs. As the value of lost gas reflects the current replacement cost, the value may fluctuate until such time as replacement gas is purchased and injected into storage. SoCalGas adjusts its estimated total liability associated with the leak as additional information becomes available. The $799 million represents management’s best estimate of these costs related to the leak. Of these costs, a substantial portion has been paid and $49 million is accrued as Reserve for Aliso Canyon Costs as of March 31, 2017 on SoCalGas’ and Sempra Energy’s Condensed Consolidated Balance Sheets for amounts expected to be paid after March 31, 2017.
As of March 31, 2017, we recorded the expected recovery of the costs described in the immediately preceding paragraph related to the leak of $621 million as Insurance Receivable for Aliso Canyon Costs on SoCalGas’ and Sempra Energy’s Condensed Consolidated Balance Sheets. This amount is net of insurance retentions and $173 million of insurance proceeds we received through March 31, 2017 related to control-of-well expenses and temporary relocation costs. If we were to conclude that this receivable or a portion of it was no longer probable of recovery from insurers, some or all of this receivable would be charged against earnings, which could have a material adverse effect on SoCalGas’ and Sempra Energy’s financial condition, results of operations and cash flows.
The above amounts do not include any unsettled damage claims, restitution, or civil, administrative or criminal fines, costs or other penalties that may be imposed in connection with the incident or our responses thereto, as it is not possible to predict the outcome of any civil or criminal proceeding or any administrative action in which such damage awards, restitution or civil, administrative or criminal fines, costs or other penalties could be imposed, and any such amounts, if awarded or imposed or otherwise paid, cannot be reasonably estimated at this time. In addition, the recorded amounts above do not include the costs to clean additional homes pursuant to the DPH Directive, future legal costs necessary to defend litigation, and other potential costs that we currently do not anticipate incurring or that we cannot reasonably estimate.
In March 2016, the CPUC ordered SoCalGas to establish a memorandum account to track its authorized revenue requirement and all revenues that it receives for its normal, business-as-usual costs to own and operate the Aliso Canyon gas storage field and, in September 2016, approved SoCalGas’ request to begin tracking these revenues as of March 17, 2016. The CPUC will determine at a later time whether, and to what extent, the authorized revenues tracked in the memorandum account may be refunded to ratepayers.
Insurance. Excluding directors and officers liability insurance, we have four kinds of insurance policies that together provide between $1.2 billion to $1.4 billion in insurance coverage, depending on the nature of the claims. We cannot predict all of the potential categories of costs or the total amount of costs that we may incur as a result of the leak. Subject to various policy limits, exclusions and conditions, based upon what we know as of the filing date of this report, we believe that our insurance policies collectively should cover the following categories of costs: costs incurred for temporary relocation (including cleaning costs and certain labor costs), costs to address the leak and stop or reduce emissions, the root cause analysis being conducted to determine the cause of the leak, the value of lost natural gas, costs incurred to mitigate the actual natural gas released, costs associated with litigation and claims by nearby residents and businesses, any costs to clean additional homes pursuant to the DPH Directive, and, in some circumstances depending on their nature and manner of assessment, fines and penalties. We have been communicating with our insurance carriers and, as discussed above, we have received insurance payments for a portion of control-of-well expenses and a portion of temporary relocation costs. We intend to pursue the full extent of our insurance coverage for the costs we have incurred or may incur. There can be no assurance that we will be successful in obtaining insurance coverage for these costs under the applicable policies, and to the extent we are not successful, such costs could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
Our recorded estimate as of March 31, 2017 of $799 million of certain costs in connection with the Aliso Canyon storage facility leak may rise significantly as more information becomes available, and any costs not included in our estimate could be material. To the extent not covered by insurance (including any costs in excess of applicable policy limits), or if there were to be significant delays in receiving insurance recoveries, such costs could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
Governmental Investigations and Civil and Criminal Litigation. Various governmental agencies, including DOGGR, DPH, South Coast Air Quality Management District (SCAQMD), California Air Resources Board (CARB), Los Angeles Regional Water Quality Control Board, California Division of Occupational Safety and Health, CPUC, Pipeline and Hazardous Materials Safety Administration (PHMSA), U.S. Environmental Protection Agency (EPA), Los Angeles County District Attorney’s Office and California Attorney General’s Office, have investigated or are investigating this incident. Other federal agencies (e.g., the U.S. Department of Energy (DOE) and the U.S. Department of the Interior) investigated the incident as part of the joint interagency task force discussed below. In January 2016, DOGGR and the CPUC selected Blade Energy Partners (Blade) to conduct an independent analysis under their supervision and to be funded by SoCalGas to investigate the technical root cause of the Aliso Canyon gas leak. The timing of the root cause analysis is under the control of Blade, DOGGR and the CPUC.
As of May 8, 2017, 266 lawsuits, including over 22,000 plaintiffs, are pending in the Los Angeles County Superior Court against SoCalGas, some of which have also named Sempra Energy. These various lawsuits assert causes of action for negligence, negligence per se, strict liability, property damage, fraud, public and private nuisance (continuing and permanent), trespass, inverse condemnation, fraudulent concealment, unfair business practices and loss of consortium, among other things, and additional litigation may be filed against us in the future related to this incident. A complaint alleging violations of Proposition 65 was also filed. These complaints seek compensatory and punitive damages, civil penalties, injunctive relief, costs of future medical monitoring and attorneys’ fees, and several seek class action status. All of these cases, other than a matter brought by the Los Angeles County District Attorney, the federal securities class action and one of the shareholder derivative actions discussed below, are coordinated before a single court in the Los Angeles County Superior Court for pretrial management.
In addition to the lawsuits described above, a federal securities class action alleging violation of the federal securities laws has been filed against Sempra Energy and certain of its officers and certain of its directors in the United States District Court for the Southern District of California (SDCA), and five shareholder derivative actions alleging breach of fiduciary duties against certain officers and certain directors of Sempra Energy and/or SoCalGas are pending, one in the SDCA and four in the coordination proceeding in the Los Angeles County Superior Court. In March 2017, the SDCA dismissed the shareholder derivative action pending in that court, ruling that the plaintiff did not have standing to pursue the alleged claims; the plaintiff was given leave to seek to amend his complaint to cure its deficiencies.
Pursuant to the coordination proceeding in the Los Angeles County Superior Court, in March 2017, the individuals and business entities asserting tort and Proposition 65 claims filed a Second Amended Consolidated Master Case Complaint for Individual Actions, through which their separate lawsuits will be managed for pretrial purposes. The consolidated complaint asserts causes of action for negligence, negligence per se, private and public nuisance (continuing and permanent), trespass, inverse condemnation, strict liability, negligent and intentional infliction of emotional distress, fraudulent concealment, loss of consortium and violations of Proposition 65 against SoCalGas, with certain causes also naming Sempra Energy. The consolidated complaint seeks compensatory and punitive damages for personal injuries, lost wages and/or lost profits, property damage and diminution in property value, injunctive relief, costs
of future medical monitoring, civil penalties (including penalties associated with Proposition 65 claims alleging violation of requirements for warning about certain chemical exposures), and attorneys’ fees.
In January 2017, pursuant to the coordination proceeding, two consolidated class action complaints were filed against SoCalGas and Sempra Energy, one on behalf of a putative class of persons and businesses who own or lease real property within a five-mile radius of the well (the Property Class Action), and a second on behalf of a putative class of all persons and entities conducting business within five miles of the facility (the Business Class Action). Both complaints assert claims for strict liability for ultra-hazardous activities, negligence and violation of California Unfair Competition Law. The Property Class Action also asserts claims for negligence per se, trespass, permanent and continuing public and private nuisance, and inverse condemnation. The Business Class Action also asserts a claim for negligent interference with prospective economic advantage. Both complaints seek compensatory, statutory and punitive damages, injunctive relief and attorneys’ fees.
Three actions filed by public entities are pending, as follows. These lawsuits are also included in the coordination proceeding in the Los Angeles County Superior Court. First, in July 2016, the County of Los Angeles, on behalf of itself and the people of the State of California, filed a complaint against SoCalGas in the Los Angeles County Superior Court for public nuisance, unfair competition, breach of franchise agreement, breach of lease, and damages. This suit alleges that the four natural gas storage fields operated by SoCalGas in Los Angeles County require safety upgrades, including the installation of a sub-surface safety shut-off valve on every well. It additionally alleges that SoCalGas failed to comply with the DPH Directive. It seeks preliminary and permanent injunctive relief, civil penalties, and damages for the County’s costs to respond to the leak, as well as punitive damages and attorneys’ fees.
Second, in August 2016, the California Attorney General, acting in an independent capacity and on behalf of the people of the State of California and the CARB, together with the Los Angeles City Attorney, filed a third amended complaint on behalf of the people of the State of California against SoCalGas alleging public nuisance, violation of the California Unfair Competition Law, violations of California Health and Safety Code sections 41700, prohibiting discharge of air contaminants that cause annoyance to the public, and 25510, requiring reporting of the release of hazardous material, as well as California Government Code section 12607 for equitable relief for the protection of natural resources. The complaint seeks an order for injunctive relief, to abate the public nuisance, and to impose civil penalties.
Third, in March 2017, the County of Los Angeles filed a petition for writ of mandate against DOGGR and its State Oil & Gas Supervisor, as to which SoCalGas is the real party in interest. The petition alleges that DOGGR has failed to comply with the provisions of Senate Bill (SB) 380, which requires a comprehensive safety review of the Aliso Canyon facility before injection of natural gas may resume, because DOGGR declared the safety review complete before the root cause analysis was complete. The County further alleges that the California Environmental Quality Act requires DOGGR to perform an Environmental Impact Review before the resumption of injection of natural gas at the facility may be approved. The petition seeks a writ of mandate requiring DOGGR and the State Oil & Gas Supervisor to comply with SB 380, and declaratory and injunctive relief against any authorization to inject natural gas, as well as attorneys’ fees.
A complaint filed by the SCAQMD against SoCalGas seeking civil penalties for alleged violations of several nuisance-related statutory provisions arising from the leak and delays in stopping the leak was settled in February 2017, pursuant to which SoCalGas paid $8.5 million, of which $1 million is to be used to pay for a health study. The SCAQMD’s complaint was dismissed in February 2017.
Separately, in February 2016, the Los Angeles County District Attorney’s Office filed a misdemeanor criminal complaint against SoCalGas seeking penalties and other remedies for alleged failure to provide timely notice of the leak pursuant to California Health and Safety Code section 25510(a), Los Angeles County Code section 12.56.030, and Title 19 California Code of Regulations section 2703(a), and for allegedly violating California Health and Safety Code section 41700 prohibiting discharge of air contaminants that cause annoyance to the public. In September 2016, SoCalGas entered into a settlement agreement with the District Attorney’s Office in which it agreed to plead no contest to the notice charge under Health and Safety Code section 25510(a) and agreed to pay the maximum fine of $75,000, penalty assessments of approximately $233,500, and up to $4 million in operational commitments, reimbursement and assessments in exchange for the District Attorney’s Office moving to dismiss the remaining counts at sentencing and settling the complaint (collectively referred to as the District Attorney Settlement). In November 2016, SoCalGas completed the commitments and obligations under the District Attorney Settlement, and on November 29, 2016, the Court approved the settlement and entered judgment on the notice charge. Certain individuals residing near Aliso Canyon who objected to the settlement have filed a notice of appeal of the judgment, as well as a petition asking the Superior Court to set aside the November 29, 2016 order and grant them restitution. The Superior Court dismissed the petition in January 2017, ruling that the petitioners have a remedy at law via their direct appeal.
The costs of defending against these civil and criminal lawsuits, cooperating with these investigations, and any damages, restitution, and civil, administrative and criminal fines, costs and other penalties, if awarded or imposed, as well as the costs of mitigating the actual natural gas released, could be significant and to the extent not covered by insurance (including any costs in excess of applicable
policy limits), or if there were to be significant delays in receiving insurance recoveries, such costs could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations.
Regulatory Proceedings. In February 2017, the CPUC opened a proceeding pursuant to SB 380 to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region. The proceeding will be conducted in two phases, with Phase 1 conducting an analysis of the feasibility of reducing or eliminating the use of Aliso Canyon and Phase 2 considering the potential implementation of the Phase 1 analysis. In accordance with the Phase 1 schedule, public participation hearings began in April 2017, and workshops are expected to occur later in 2017.
The scope of the order, which is subject to modification, expressly excludes issues with respect to air quality, public health, causation, culpability or cost responsibility regarding the Aliso Canyon gas leak.
Section 455.5 of the California Public Utilities Code, among other things, directs regulated utilities to notify the CPUC if all or any portion of a major facility has been out of service for nine consecutive months. Although SoCalGas does not believe the Aliso Canyon facility or any portion of that facility has been out of service for nine consecutive months, SoCalGas provided notification for transparency, and because the process for obtaining authorization to resume injection operations at the facility is taking longer to complete than initially contemplated. In response, and as required by Section 455.5, the CPUC issued a draft OII to address whether the Aliso Canyon facility or any portion of that facility has been out of service for nine consecutive months pursuant to Section 455.5, and if it is determined to have been out of service, whether the CPUC should adjust SoCalGas’ rates to reflect the period the facility is deemed to have been out of service. If the CPUC adopts the order as drafted and as required under Section 455.5, hearings on the investigation will be consolidated with SoCalGas’ next GRC proceeding. In the event that the CPUC determines that all or any portion of the facility has been out of service for nine consecutive months, the amount of any refund to ratepayers and the inability to earn a return on those assets could have a material adverse effect on SoCalGas’ and Sempra Energy’s cash flows and results of operations.
Governmental Orders and Additional Regulation. In January 2016, the Governor of the State of California issued an Order proclaiming a state of emergency to exist in Los Angeles County due to the natural gas leak at the Aliso Canyon facility. The Governor’s Order imposes various orders with respect to: stopping the leak; protecting public health and safety; ensuring accountability; and strengthening oversight. Most of the directives in the Governor’s Order have been fulfilled, with the following remaining open items: (1) the prohibition against SoCalGas injecting any natural gas into the Aliso Canyon facility will continue until a comprehensive review, utilizing independent experts, of the safety of the storage wells is completed; (2) applicable agencies must convene an independent panel of scientific and medical experts to review public health concerns stemming from the natural gas leak and evaluate whether additional measures are needed to protect public health; (3) the CPUC must ensure that SoCalGas covers costs related to the natural gas leak and its response, while protecting ratepayers, and CARB was ordered to develop a program to fully mitigate the leak’s emissions of methane by March 31, 2016, with such program to be funded by SoCalGas; and (4) DOGGR, CPUC, CARB and California Energy Commission (CEC) must submit to the Governor’s Office a report that assesses the long-term viability of natural gas storage facilities in California.
In December 2015, SoCalGas made a commitment to mitigate the actual natural gas released from the leak and has been working on a plan to accomplish the mitigation. In March 2016, pursuant to the Governor’s Order, the CARB issued its Aliso Canyon Methane Leak Climate Impacts Mitigation Program, which sets forth its recommended approach to achieve full mitigation of the emissions from the Aliso Canyon natural gas leak. The CARB program requires that reductions in short-lived climate pollutants and other greenhouse gases be at least equivalent to the amount of the emissions from the leak, and that the global warming potential to be used in deriving the amount of reductions required is based on a 20-year term (rather than the 100-year term the CARB and other state and federal agencies use in regulating emissions), resulting in a target of approximately 9,000,000 metric tons of carbon dioxide equivalent. CARB’s program also provides that all of the mitigation is to occur in California over the next five to ten years without the use of allowances or offsets. In October 2016, CARB issued its final report concluding that the incident resulted in total emissions from 90,350 to 108,950 metric tons of methane, and asserting that SoCalGas should mitigate 109,000 metric tons of methane to fully mitigate the greenhouse gas impacts of the leak. We have not agreed with CARB’s estimate of methane released and continue to work with CARB on developing a mitigation plan.
In January 2016, the Hearing Board of the SCAQMD ordered SoCalGas to take various actions in connection with injecting and withdrawing natural gas at Aliso Canyon, sealing the well, monitoring, reporting, safety and funding a health impact study, among other things (Abatement Order). SoCalGas fulfilled its obligations under the Abatement Order to the satisfaction of the SCAQMD and its Hearing Board, except for the condition that SoCalGas agree to fund the reasonable costs of a study of the health impacts of the leak. Pursuant to the settlement agreement between SCAQMD and SoCalGas described above, the SCAQMD agreed that the health study condition was satisfied and, in March 2017, the Hearing Board terminated the Abatement Order.
PHMSA, DOGGR, SCAQMD, EPA and CARB have each commenced separate rulemaking proceedings to adopt further regulations covering natural gas storage facilities and injection wells. DOGGR issued new regulations following the Governor’s Order as described above, and in 2016, the California Legislature enacted four separate bills providing for additional regulation of natural gas storage facilities. Additional hearings in the California Legislature, as well as with various other federal and state regulatory agencies,
have been or may be scheduled, additional legislation has been proposed in the California Legislature, and additional laws, orders, rules and regulations may be adopted. The Los Angeles County Board of Supervisors has formed a task force to review and potentially implement new, more stringent land use (zoning) requirements and associated regulations and enforcement protocols for oil and gas activities, including natural gas storage field operations, which could materially affect new or modified uses of the Aliso Canyon and other natural gas storage fields located in Los Angeles County.
Higher operating costs and additional capital expenditures incurred by SoCalGas as a result of new laws, orders, rules and regulations arising out of this incident or our responses thereto could be significant and may not be recoverable in customer rates, and SoCalGas’ and Sempra Energy’s cash flows, financial condition and results of operations may be materially adversely affected by any such new laws, orders, rules and regulations.
Natural Gas Storage Operations and Reliability. Natural gas withdrawn from storage is important for service reliability during peak demand periods, including peak electric generation needs in the summer and heating needs in the winter. Aliso Canyon, with a storage capacity of 86 billion cubic feet (Bcf) (which represents 63 percent of SoCalGas’ natural gas storage inventory capacity), is the largest SoCalGas storage facility and an important element of SoCalGas’ delivery system. SoCalGas calculated that approximately 4.62 Bcf of natural gas was released from the Aliso Canyon natural gas storage facility as a result of the leak. SoCalGas has not injected natural gas into Aliso Canyon since October 25, 2015, pursuant to orders by DOGGR and the Governor, and in accordance with SB 380. Limited withdrawals of natural gas from Aliso Canyon have been made in 2017 to augment gas supplies during critical demand periods. In November 2016, SoCalGas submitted a request to DOGGR seeking authorization to resume injection operations at the Aliso Canyon storage facility. In accordance with SB 380, DOGGR held public meetings in the affected community to provide the public an opportunity to comment on the safety review findings, and the comment period has expired. It remains for DOGGR to issue its safety determination, after which the CPUC’s executive director must concur with DOGGR’s safety determination, before injections at the facility can resume.
If the Aliso Canyon facility were to be taken out of service for any meaningful period of time, it could result in an impairment of the facility and significantly higher than expected operating costs and/or additional capital expenditures, and natural gas reliability and electric generation could be jeopardized. At March 31, 2017, the Aliso Canyon facility has a net book value of $550 million, including $225 million of construction work in progress for the project to construct a new compression station. Any significant impairment of this asset could have a material adverse effect on SoCalGas’ and Sempra Energy’s results of operations for the period in which it is recorded. Higher operating costs and additional capital expenditures incurred by SoCalGas may not be recoverable in customer rates, and SoCalGas’ and Sempra Energy’s results of operations, cash flows and financial condition may be materially adversely affected.
Sempra Mexico
Property Disputes and Permit Challenges
Sempra Mexico has been engaged in a long-running land dispute relating to property adjacent to its Energía Costa Azul LNG terminal near Ensenada, Mexico. A claimant to the adjacent property filed complaints in the federal Agrarian Court challenging the refusal of the Secretaría de la Reforma Agraria (now the Secretaría de Desarrollo Agrario, Territorial y Urbano, or SEDATU) in 2006 to issue a title to him for the disputed property. In November 2013, the Agrarian Court ordered that SEDATU issue the requested title and cause it to be registered. Both SEDATU and Sempra Mexico challenged the ruling, due to lack of notification of the underlying process. Both challenges are pending to be resolved by a Federal Court in Mexico. Sempra Mexico expects additional proceedings regarding the claims.
The property claimant also filed a lawsuit in July 2010 against Sempra Energy in Federal District Court in San Diego seeking compensatory and punitive damages as well as the earnings from the Energía Costa Azul LNG terminal based on his allegations that he was wrongfully evicted from the adjacent property and that he has been harmed by other allegedly improper actions. In September 2015, the Court granted Sempra Energy’s motion for summary judgment and closed the case. The claimant has appealed the summary judgment and an earlier order dismissing certain of his causes of action. Argument on the appeal was held in March 2017.
Additionally, several administrative challenges are pending in Mexico before the Mexican environmental protection agency and the Federal Tax and Administrative Courts seeking revocation of the environmental impact authorization issued to Energía Costa Azul in 2003. These cases generally allege that the conditions and mitigation measures in the environmental impact authorization are inadequate and challenge findings that the activities of the terminal are consistent with regional development guidelines.
Two real property cases have been filed against Energía Costa Azul. In one, the plaintiffs seek to annul the recorded property title for a parcel on which the Energía Costa Azul LNG terminal is situated and to obtain possession of a different parcel that allegedly sits in the same place. A second complaint was served in April 2013 seeking to invalidate the contract by which Energía Costa Azul purchased another of the terminal parcels, on the grounds the purchase price was unfair. In January 2016, the second complaint was dismissed by the Federal Agrarian Court. Sempra Mexico expects further proceedings on these two matters.
In 2015, the Yaqui tribe, with the exception of the Bácum community, granted its consent and a right-of-way easement agreement for the construction of the Guaymas-El Oro segment of IEnova’s Sonora natural gas pipeline that crosses its territory. Representatives of the Bácum community filed an amparo claim in Mexican Federal Court demanding the right to withhold consent for the project, the stoppage of work in the Yaqui territory and damages. The judge granted a suspension order that prohibited the construction through the Bácum community territory only. As a result, IEnova was delayed in the construction of the approximately 14 kilometers of pipeline that pass through territory of the Yaqui tribe. The Comisión Federal de Electricidad agreed to extend the deadline for commercial operations until the second quarter of 2017. Later-appointed Bácum authorities have requested that the Mexican Federal Court dismiss the amparo claim. In the meantime, the portion of the pipeline crossing the Bácum territory has been completed.
In December 2012, Backcountry Against Dumps, Donna Tisdale and the Protect Our Communities Foundation filed a complaint in the United States District Court for the Southern District of California seeking to invalidate the presidential permit issued by the DOE for Energía Sierra Juárez’s cross-border generation tie line (Gen-tie line) connecting the Energía Sierra Juárez wind project in Mexico to the electric grid in the United States. The suit alleged violations of the National Environmental Policy Act (NEPA), the Endangered Species Act, the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. Plaintiffs filed a motion for summary judgment, which the court largely denied in September 2015. One NEPA claim, however, was not resolved whether the Environmental Impact Statement’s (EIS) assessment of alleged extraterritorial impacts of the Gen-tie line in the United States on the environment in Mexico was inadequate (the “extraterritorial impact issue”) and was the subject of additional briefing in 2016. On January 30, 2017, the Court issued a ruling on the extraterritorial impact issue and, contrary to its prior ruling, ruled that the EIS was deficient for not considering the effects in Mexico of both the U.S. and Mexican portion of the Gen-tie line and the wind farm itself. The Court has not yet made a decision on the ultimate remedy, and a final judgment has not been entered.
Other Litigation
Sempra Energy holds a noncontrolling interest in RBS Sempra Commodities, a limited liability partnership in the process of being liquidated. The Royal Bank of Scotland (RBS), our partner in the joint venture, paid an £86 million assessment in October 2014 to the United Kingdom’s Revenue and Customs Department (HMRC) for denied value-added tax (VAT) refund claims filed in connection with the purchase of carbon credit allowances by RBS Sempra Energy Europe (RBS SEE), a subsidiary of RBS Sempra Commodities. RBS SEE has since been sold to JP Morgan and later to Mercuria Energy Group, Ltd. HMRC asserted that RBS was not entitled to reduce its VAT liability by VAT paid on certain carbon credit purchases during 2009 because RBS knew or should have known that certain vendors in the trading chain did not remit their own VAT to HMRC. After paying the assessment, RBS filed a Notice of Appeal of the assessment with the First-Tier Tribunal. The First-Tier Tribunal held a preliminary hearing in September 2016 to determine whether HMRC’s assessment was time-barred. In January 2017, the First-Tier Tribunal issued a decision in favor of HMRC concluding that the assessment was not time-barred. RBS has decided not to appeal the First-Tier Tribunal’s decision to the Upper Tribunal. There will be a hearing on the substantive matter regarding whether RBS knew or should have known that certain vendors in the trading chain did not remit their VAT to HMRC.
During 2015, liquidators, acting on behalf of ten companies (the Companies) that engaged in carbon credit trading via chains that included a company that RBS SEE traded with directly, filed a claim in the High Court of Justice asserting damages of £73 million against RBS and Mercuria Energy Europe Trading Limited (the Defendants). The claim alleges that the Defendants’ participation in the purchase and sale of carbon credits resulted in the Companies’ carbon credit trading transactions creating a VAT liability they were unable to pay. JP Morgan has notified us that Mercuria Energy Group, Ltd. has sought indemnity for the claim, and JP Morgan has in turn sought indemnity from us.
Our remaining balance in RBS Sempra Commodities is accounted for under the equity method. The investment balance of $67 million at March 31, 2017 reflects remaining distributions expected to be received from the partnership as it is liquidated. The timing and amount of distributions may be impacted by these matters.
We are also defendants in ordinary routine litigation incidental to our businesses, including personal injury, employment litigation, product liability, property damage and other claims. Juries have demonstrated an increasing willingness to grant large awards, including punitive damages, in these types of cases.
CONTRACTUAL COMMITMENTS
We discuss below significant changes in the first three months of 2017 to contractual commitments discussed in Notes 1 and 15 of the Notes to Consolidated Financial Statements in the Annual Report.
Natural Gas Contracts
Sempra LNG & Midstream’s natural gas purchase and transportation commitments have decreased by $90 million since December 31, 2016, primarily due to payments on existing contracts and changes in forward natural gas prices in the first three months of 2017. Net future payments are expected to decrease by $77 million in 2017 and $13 million in 2018 compared to December 31, 2016.
In May 2016, Sempra LNG & Midstream permanently released certain pipeline capacity that it held with Rockies Express and others, which we discuss in Note 15 of the Notes to Consolidated Financial Statements in the Annual Report. Sempra LNG & Midstream reached an agreement to settle a breach of contract claim against a counterparty in bankruptcy court for $57 million, which was approved by the court on April 25, 2017. Sempra LNG & Midstream expects to receive payment in the second quarter of 2017, which, upon receipt, will be recorded as a reduction to Other Cost of Sales on Sempra Energy’s Condensed Consolidated Statement of Operations.
LNG Purchase Agreement
Sempra LNG & Midstream has a purchase agreement for the supply of LNG to the Energía Costa Azul terminal. The commitment amount is calculated using a predetermined formula based on estimated forward prices of the index applicable from 2017 to 2029. At March 31, 2017, the commitment amount is expected to decrease by $174 million in 2017, $41 million in 2018, $32 million in 2019, $38 million in 2020, $40 million in 2021 and $677 million thereafter (through contract termination in 2029) compared to December 31, 2016, reflecting changes in estimated forward prices since December 31, 2016 and actual transactions for the first three months of 2017. These LNG commitment amounts are based on the assumption that all cargoes, less those already confirmed to be diverted, under the agreement are delivered. Although this agreement specifies a number of cargoes to be delivered, under its terms, the customer may divert certain cargoes, which would reduce amounts paid under the agreement by Sempra LNG & Midstream. Actual LNG purchases in the current and prior years have been significantly lower than the maximum amount provided under the agreement due to the customer electing to divert cargoes as allowed by the agreement.
Capital Leases Power Purchase Agreements
In the first quarter of 2017, SDG&E satisfied all of the conditions precedent for a CPUC-approved 20-year power purchase agreement with a 500-MW intermediate storage power plant facility that is under construction. Beginning with the initial delivery of the contracted power, scheduled in 2018, the power purchase agreement will be accounted for as a capital lease. Future minimum lease payments under the new power purchase agreement are as follows:
FUTURE MINIMUM PAYMENTS – POWER PURCHASE AGREEMENT
(Dollars in millions)
2017
$

2018
88

2019
105

2020
105

2021
105

Thereafter
1,706

Total minimum lease payments(1)
2,109

Less: interest(2)
(1,559
)
Present value of net minimum lease payments
$
550

(1)
This amount will be recorded over the life of the lease as Cost of Electric Fuel and Purchased Power on Sempra Energy’s and SDG&E’s Condensed Consolidated Statements of Operations. This expense will receive ratemaking treatment consistent with purchased-power costs, which are recovered in rates.
(2)
Amount necessary to reduce net minimum lease payments to estimated present value at the inception of the lease.
Construction and Development Projects
SDG&E
In the first three months of 2017, significant net increases to contractual commitments at SDG&E were $68 million primarily for construction and infrastructure improvements for transmission systems. Net future payments under these contractual commitments are expected to increase by $31 million in 2017 and $42 million in 2018, decrease by $2 million in 2019, increase by $3 million in 2020 and $1 million in 2021, and decrease by $7 million thereafter compared to December 31, 2016.
NUCLEAR INSURANCE
SDG&E and the other owners of SONGS have insurance to cover claims from nuclear liability incidents arising at SONGS. This insurance provides $450 million in coverage limits, the maximum amount available, including coverage for acts of terrorism. In addition, the Price-Anderson Act provides for up to $13 billion of secondary financial protection (SFP). If a nuclear liability loss occurring at any U.S. licensed/commercial reactor exceeds the $450 million insurance limit, all nuclear reactor owners could be required to contribute to the SFP. In such case, SDG&E’s contribution would be up to $50.9 million. This amount is subject to an
annual maximum of $7.6 million, unless a default occurs by any other SONGS owner. If the SFP is insufficient to cover the liability loss, SDG&E could be subject to an additional assessment.
The SONGS owners, including SDG&E, also have $1.5 billion of nuclear property, decontamination, and debris removal insurance, subject to a $2.5 million deductible for “each and every loss.” This insurance coverage is provided through Nuclear Electric Insurance Limited (NEIL). The NEIL policies have specific exclusions and limitations that can result in reduced or eliminated coverage. Insured members as a group are subject to retrospective premium assessments to cover losses sustained by NEIL under all issued policies. SDG&E could be assessed up to $10.4 million of retrospective premiums based on overall member claims. All of SONGS’ insurance claims arising out of the failures of the MHI replacement steam generators have been settled with NEIL, as we discuss in Note 13 of the Notes to Consolidated Financial Statements in the Annual Report.
The nuclear property insurance program includes an industry aggregate loss limit for non-certified acts of terrorism (as defined by the Terrorism Risk Insurance Act). The industry aggregate loss limit for property claims arising from non-certified acts of terrorism is $3.24 billion. This is the maximum amount that will be paid to insured members who suffer losses or damages from these non-certified terrorist acts.
U.S. DEPARTMENT OF ENERGY NUCLEAR FUEL DISPOSAL
The Nuclear Waste Policy Act of 1982 made the DOE responsible for accepting, transporting, and disposing of spent nuclear fuel. However, it is uncertain when the DOE will begin accepting spent nuclear fuel from SONGS. This delay will lead to increased costs for spent fuel storage. SDG&E will continue to support Edison in its pursuit of claims on behalf of the SONGS co-owners against the DOE for its failure to timely accept the spent nuclear fuel. In April 2016, Edison executed a spent fuel settlement agreement with the DOE for $162 million covering damages incurred from January 1, 2006 through December 31, 2013. In May 2016, Edison refunded SDG&E $32 million for its respective share of the damage award paid. In applying this refund, SDG&E recorded a $23 million reduction to the SONGS regulatory asset, an $8 million reduction of its nuclear decommissioning balancing account and a $1 million reduction in its SONGS operation and maintenance cost balancing account.
In September 2016, Edison filed claims with the DOE for $56 million in spent fuel management costs incurred in 2014 and 2015 on behalf of the SONGS co-owners under the terms of the 2016 spent fuel settlement agreement. In February 2017, the DOE reduced the request to approximately $43 million primarily due to reductions to the claimed fuel canister costs. SDG&E’s respective share of the claim is $9 million. We expect Edison’s claim to be resolved, and to receive SDG&E’s portion of the final settlement award, net of legal costs, in the second quarter of 2017.
In October 2015, the California Coastal Commission approved Edison’s application for the proposed expansion of an Independent Spent Fuel Storage Installation (ISFSI) at SONGS. The ISFSI expansion began construction in 2016, will be fully loaded with spent fuel by 2019, and will operate until 2049, when it is assumed that the DOE will have taken custody of all the SONGS spent fuel. The ISFSI would then be decommissioned, and the site restored to its original environmental state.
We provide additional information about SONGS in Note 9 above and in Notes 13 and 15 of the Notes to Consolidated Financial Statements in the Annual Report.
CONCENTRATION OF CREDIT RISK
We maintain credit policies and systems to manage our overall credit risk. These policies include an evaluation of potential counterparties’ financial condition and an assignment of credit limits. These credit limits are established based on risk and return considerations under terms customarily available in the industry. We grant credit to utility customers and counterparties, substantially all of whom are located in our service territory, which covers most of Southern California and a portion of central California for SoCalGas, and all of San Diego County and an adjacent portion of Orange County for SDG&E. We also grant credit to utility customers and counterparties of our other companies providing natural gas or electric services in Mexico, Chile and Peru.
As they become operational, projects owned or partially owned by Sempra LNG & Midstream, Sempra Renewables, Sempra South American Utilities and Sempra Mexico place significant reliance on the ability of their suppliers, customers and partners to perform on long-term agreements and on our ability to enforce contract terms in the event of nonperformance. We consider many factors, including the negotiation of supplier and customer agreements, when we evaluate and approve development projects.