ANNUAL INFORMATION FORM

For the year ended December 31, 2016

 

 

 

Dated as of February 23, 2017



Table of Contents

Preliminary Notes. 1
   
Corporate Structure. 8
   
General Development of the Business. 9
   
Description of the Business. 13
   
Mineral Properties. 17
   
Dividends. 56
   
Description of Capital Structure. 56
   
Market for Securities. 57
   
Directors and Officers. 58
   
Legal Proceedings. 62
   
Interest of Management and Others in Material Transactions. 63
   
Transfer Agents and Registrars. 63
   
Material Contracts. 63
   
Names and Interests of Experts. 64
   
Additional Information. 64
   
Schedule "A" - Audit Committee Charter 65
   
Schedule "B" - Risk Factors. 69


 

ANNUAL INFORMATION FORM – December 31, 2016

Preliminary Notes

In this annual information form (“AIF”) reference to the Company or Nevsun or NRL means Nevsun Resources Ltd. and all of its wholly and majority owned subsidiaries, and except as otherwise noted herein, the information in this AIF is as of December 31, 2016. We prepare the financial statements referred to in the AIF in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board, and file the AIF with appropriate regulatory authorities in Canada and the United States. Information on our website is not part of this AIF or incorporated by reference.  Filings on SEDAR are also not part of this AIF or incorporated by reference except as specifically stated herein.  Additional financial and other information regarding the Company can be found in our consolidated financial statements for the year ended December 31, 2016, together with the auditors’ report thereon dated February 22, 2017 and our Management’s Discussion and Analysis (“MD&A”) for the year ended December 31, 2016.

All dollar amounts in this AIF are expressed in USD, unless otherwise indicated (“USD” denotes United States dollars and “CAD” denotes Canadian dollars).  All capitalized terms in this AIF not otherwise defined in the text have meanings ascribed to those terms in the Glossary and Defined Terms section below unless the context requires otherwise.

Forward-Looking Statements

This AIF contains certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to herein as “forward-looking statements”).  These forward-looking statements relate to future events or the Company’s future performance including anticipated developments in the Company’s continuing and future operations, and the adequacy of the Company’s financial resources and financial projections.  All statements other than statements of historical fact are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” “budget” and similar expressions, or statements that events, conditions or results “will,” “may,” “could” or “should” occur or be achieved. In addition, the Bisha Technical Reports and the Timok PEA contain forward-looking statements related to the Bisha Property and the Timok Property respectively. An update to the Mineral Reserves and Mineral Resources on the Bisha Property is expected to be completed by the end of the second quarter of 2017 and a pre-feasibility study on the Timok Project is expected to be completed by September 2017. As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon forward looking information related to the Bisha Property and the Timok Project.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results or events to differ materially from those anticipated in such forward-looking statements. This is particularly the case with respect to forward-looking statements contained in the past Bisha Technical Reports and the Timok PEA given the expected updated technical reports. These statements speak only as of the date of this AIF.

Forward-looking statements include, but are not limited to statements concerning:

  • forecasts or outlook and guidance related to construction, exploration drilling programs and production targets, timetables and estimates of capital and operating costs;
  • the timing, nature and extent of future zinc, copper and gold production, the estimation of mineral reserves and resources, methodologies and models used to prepare resource and reserve estimates as set out in the Bisha Technical Reports concerning the Bisha Property and the Timok PEA concerning the Timok Project;
  • estimates of the quantity, quality and the realization of mineral reserves and resources, the conversion of mineral properties to reserves and resources as set out in the Bisha Technical Reports concerning the Bisha Property and the Timok PEA concerning the Timok Project;
  • interpretation of drill results as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed;
1 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  • statements based on certain assumptions that a mineral deposit can or may be economically exploited;
  • any pending litigation to which the Company is a party;
  • the timing and success of improving the quality of copper and zinc circuit products by resolving the metallurgical challenges from the variable ore materials being processed to produce concentrate from both circuits;
  • the effect on resource or reserve estimates due to the possible inability to resolve the metallurgical challenges on the variable ore materials being processed on a timely basis or at all;
  • the potential to expand resources, reserves and mine life;
  • exploration, environmental, health and safety initiatives;
  • future exploration budgets, plans, work programs and capital expenditures;
  • integration or expansion of operations and requirements for additional capital;
  • anticipated timing of grant of permits, licenses, mining and development plans and activities;  
  • in-situ and ore feed grades, processing rates and net cash flows;
  • metal prices and exchange rates;
  • reclamation costs and unanticipated reclamation expenses;
  • environmental risks;
  • dividend plans and policy;
  • government regulation of mining operations and project development;
  • political risks and uncertainties;
  • general business and economic conditions; and
  • other events or conditions that may occur in the future. 

Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties, assumptions and other factors, including, without limitation, the risks more fully described under the Section titled “Risk Factors” in Schedule B.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that could cause actual results to differ from what is anticipated, estimated or intended. The Company’s forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Company assumes no obligation to update such forward-looking statements in the future, except as required by law.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. For the reasons set forth above, readers should not place undue reliance on forward-looking statements.

Cautionary Note Regarding Disclosure as set out in the current Bisha Technical Reports and Timok PEA

Although the latest Bisha Technical Reports and the Timok PEA are “current” as defined in NI 43-101, an updated Mineral Reserve and Mineral Resource estimate and associated technical report on the Bisha Property and a pre-feasibility study (“PFS”) on the Timok Project are expected in June 2017 and in September 2017, respectively. These studies may or may not contain material scientific and technical information that differs from that contained in the Bisha Technical Reports and the Timok PEA. As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

2 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Cautionary Note to US Readers Regarding Disclosure of Mineral Reserves and Resource Estimates

The disclosure in this AIF uses mineral resource and mineral reserve classification terms that comply with Canadian securities laws that differ in certain material respects from the requirements of United States securities laws.  Disclosure has been made in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum’s Classification System.  The NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the disclosure requirements of the Securities and Exchange Commission (“SEC”).   

The SEC’s disclosure standards normally do not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” in documents filed with the SEC, unless such information is required to be disclosed by the law of the Company’s jurisdiction of incorporation or of a jurisdiction in which its securities are traded.  Consequently, mineral resource and mineral reserve information contained in this AIF is not comparable to similar information that would generally be disclosed by US companies in accordance with the rules of the SEC.

The SEC’s Industry Guide 7 applies different standards in order to classify mineralization as a reserve. As a result, the definitions of proven and probable reserves used in NI 43-101 differ from the definitions in Industry Guide 7. Under SEC standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Accordingly, mineral reserve estimates contained in this AIF may not qualify as “reserves” under SEC standards.

This AIF uses the terms “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” to comply with the reporting standards in Canada. The SEC’s Industry Guide 7 does not recognize these terms and US companies are generally not permitted to use these terms in documents they file with the SEC. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into SEC defined mineral “reserves.” Further, “inferred mineral resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically.

Therefore, readers are also cautioned not to assume that all or any part of an inferred mineral resource exists. In accordance with reporting standards in Canada, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in rare cases. In addition, disclosure of “contained ounces” in a mineral resource estimate is permitted disclosure under NI 43-101 provided that the grade or quality and the quantity of each category is stated; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in place tonnage and grade without reference to unit measures. For the above reasons, information contained in this AIF containing descriptions of mineral resource and mineral reserve estimates is not comparable to similar information made public by US companies subject to the reporting and disclosure requirements of the SEC.

3 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Glossary and Defined Terms

2013 Technical Report: the NI 43-101 technical report on the Bisha Mine titled “Bisha Mine NI 43-101 Technical Report” with an effective date of December 31, 2013 filed March 24, 2014.
   
Ag: silver.
   
Au: gold.
   
Bisha Main: a large precious metal (Au) and base metal rich (Cu, Zn) VMS deposit on the Bisha Property.
   
Bisha Mining License: the mining license issued to BMSC in 2008 which is valid for 20 years covering an area of 16.5 square kilometers over the Bisha Main and Northwest Zone deposits
   
Bisha Property: the Company’s principal mineral property in Eritrea as more particularly described under the heading “Description of the Business”.
   
Bisha Technical Reports: means, collectively the 2013 Technical Report effective December 31, 2013; the December 31, 2015 Mineral Resource estimate effective December 31, 2015; and the December 31, 2015 Mineral Reserve estimate for Bisha and Harena effective December 31, 2015.
   
BMSC: Bisha Mining Share Company, an Eritrean entity that owns and operates the Bisha Mine and is a 60% owned indirect subsidiary of NRL with the 40% balance of the outstanding shares owned by ENAMCO.
   
Board: board of directors of Nevsun Resources Ltd.
   
C1 cash cost: C1 cash cost per pound is a non-GAAP measure and represents the cash cost incurred at each processing stage, from mining through to recoverable metal delivered to customers, less net by-product credits. 
   
CIM: Canadian Institute of Mining, Metallurgy and Petroleum.
   
CSAMT: Controlled Source Audio Magneto-Telluric survey.
   
Cu: copper.
   
EITI: Extractive Industries Transparency Initiative.
   
ENAMCO: Eritrean National Mining Corporation, an Eritrean entity owned by the State of Eritrea.
   
g/t: grams per metric tonne (1,000 kilograms or 2,204 pounds).
   
Harena Mining License: a conditional license issued to BMSC in 2012 for the Harena deposit and valid for 10 years, covering an area of 7.5 square kilometers located approximately 10 kilometers from the Bisha Mine.
   
HSE: High Sulphidation Epithermal mineralization.
   
IFC: International Finance Corporation.

4 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

indicated mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.
   
inferred mineral resource: that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.
   
in-situ: natural material in the ground prior to excavation, processing and transport.
   
IP: induced polarization survey.
   
LG: Lerchs-Grossmann, a method used to determine the optimal open pit limit within the ground including the mineralized material, founded in 3-dimensional graph theory and relying upon a regular system of blocks which defines the value (profit, loss) and type (ore, waste) of material contained in the blocks.
   
LOM: life of mine.
   
measured mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape, physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.
   
mineral reserve: the economically mineable part of a measured mineral resource or indicated mineral resource demonstrated by at least a preliminary feasibility study.  This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.  A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined.
   
mineral resource: a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal and industrial minerals in or on the earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge.

5 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Mining Agreement: the mining agreement between BMSC and the Government of the State of Eritrea dated December 2007, as amended or supplemented from time to time, covering the future development and operations for the Bisha Property, including all substantive requirements of international financial institutions.
   
Moz: million ounces.
   
Mt: metric tonne.
   
New Mogoraib River
Exploration License:
the exploration license acquired by the Company in 2012 from Sanu Resources, a subsidiary of NGEx Resources, and subsequently materially expanded in 2016 to 630 square kilometers of area located to the west and north of the Bisha Mining License.
   
NI 43-101: a national instrument for the Standards of Disclosure for Mineral Projects within Canada involving a codified set of rules and guidelines for reporting and displaying information related to mineral properties.
   
NRL: Nevsun Resources Ltd.
   
NSR: net smelter return used in mineral resource and reserve calculations is the net value per tonne of ore, inclusive of all recoveries and costs outside the mine gate.  It does not include operating costs inside the mine gate.
   
probable mineral reserve: the economically mineable part of an indicated mineral resource and, in some circumstances, a measured mineral resource demonstrated by at least a preliminary feasibility study.  This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.
   
QAQC:  quality assurance quality control.
   
QP: a qualified person as defined in NI 43-101.
   
reserve: see “mineral reserve”.
   
resource: see “mineral resource”.
   
Run of mine (ROM): generally ore material excavated from a mine that has not been crushed or screened.
   
SEC: United States Securities and Exchange Commission.
   
SEDAR: the System for Electronic Document Analysis and Retrieval (SEDAR) is a filing system developed for the Canadian Securities Administrators to facilitate the electronic filing of securities information as required by Canadian Securities Administrator; allow for the public dissemination of Canadian securities information collected in the securities filing process; and provide electronic communication between electronic filers, agents and the Canadian Securities Administrator.
   
SEIA: Social and Environmental Impact Assessment.

6 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

SEMP: Social and Environmental Management Plan.
   
Tabakin Exploration License: an exploration license issued to BMSC in 2016 for a period of 10 years, covering an area of 184 square kilometers, located immediately between the Bisha Mining License and the Harena Mining License.
   
Timok PEA: 2016 Preliminary Economic Assessment of the Cukaru Peki Upper Zone Deposit concerning the Timok Project.
   
Timok Project: a copper-gold development asset in eastern Serbia focused on the Cukaru Peki deposit, which includes the high grade Upper Zone (characterized by massive and semi-massive sulphide mineralization) and the Lower Zone (characterized by porphyry-style mineralization).
   
TMF: tailings management facility, historically referred to as tails storage facilities or tailings ponds.
   
TSX: the Toronto Stock Exchange.
   
VMS: volcanogenic massive sulphides.
   
Zn: zinc.

7 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Corporate Structure

Name, Address and Incorporation

NRL was incorporated under the laws of the Province of British Columbia under the Companies Act (British Columbia) on July 19, 1965 under the name of “Hogan Mines Ltd.” Since inception, it has undergone four name changes until December 19, 1991 when it adopted the name of “Nevsun Resources Ltd.” NRL is governed by the Business Corporations Act (British Columbia) and its Articles.  

The head office of NRL is located at 760 - 669 Howe Street, Vancouver, British Columbia, V6C 0B4 and its registered and records office is located at 1000 - 840 Howe Street, Vancouver, British Columbia, V6Z 2M1 and its website address is http://www.nevsun.com.

Intercorporate Relationships

The following diagram explains the intercorporate relationships among NRL, and its wholly and partially owned subsidiaries, (collectively referred to as “Nevsun” or the “Company”); the name and place of incorporation of each subsidiary; and the percentage of voting securities legally and beneficially owned:

8 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

General Development of the Business

Three Year History

The Company’s major achievements during the past three fiscal years include:

  • completing the acquisition of Reservoir Minerals Inc. (“Reservoir”), and its ownership interest in the high-grade Timok Project;
  • successfully integrating and now advancing the development of the Timok Project Upper Zone to production;
  • completing the Bisha zinc expansion project on time and under budget, declaring commercial production October 1, 2016;
  • completing the acquisition of significant additional exploration licenses in the Bisha District which now total 814 square kilometers, up 1,891% from the previous square kilometers;
  • maintaining an industry leading safety performance record at Bisha;
  • generating $958 million of after-tax operating cash flows since the commencement of commercial gold, copper and zinc production;
  • continually replacing and increasing potentially available mineral resources for the Bisha mill;
  • declaring and paying industry-leading dividends to shareholders; and
  • enhancing its corporate social responsibility programs.
2016 Significant Developments

Acquisition

On June 23, 2016, the Company completed its acquisition of 100% of the issued and outstanding shares of Reservoir. The acquisition of Reservoir and its principal asset, its ownership interest in the Timok Project, located in eastern Serbia near the Bor Mining and Smelting complex, is the culmination of a long-term strategic objective of the Company to grow through merger and acquisition (“M&A”) transactions. The transaction fits the Company’s M&A criteria of a transformative, high quality, copper and gold project in a different geographical location. Based on the Company’s due diligence and long-term commodity price expectations, the transaction is expected to generate a strong return for the Company’s shareholders. Additional benefits of the transaction include exploration potential in Serbia and Macedonia and the addition of both Freeport-McMoRan Exploration Corp. (“Freeport”) and Rio Tinto plc as major strategic partners.

The Timok Project is focused on the Cukaru Peki deposit, which includes the high grade Upper Zone (characterized by massive and semi-massive sulphide mineralization) and the Lower Zone (characterized by porphyry-style mineralization). The Upper Zone has an extremely high copper and gold content consisting of 1.7 million tonnes of indicated resource grading 13.5% copper and 10.4 g/t gold and 35.0 million tonnes of inferred resource grading 2.9% copper and 1.7 g/t gold.

The Timok Project is a joint venture between the Company and Freeport. The Company is the operator of the Timok Project until the occurrence of certain events and will advance the development of both the Upper Zone and the Lower Zone. The Company will fund 100% of the Upper Zone development costs and will solely fund the first $20 million of agreed Lower Zone work. The Company and Freeport will fund additional Lower Zone work based on their respective ownership interests in the Lower Zone. After delivery of a feasibility study on either the Upper Zone or the Lower Zone, Freeport’s ownership in the Lower Zone will increase to 54% and the Company will own 100% of the Upper Zone and 46% of the Lower Zone. The Company and Freeport will be entitled to their pro rata share of the economic benefits of the Lower Zone, and the Company will be entitled to 100% of the economic benefits of the Upper Zone.

9 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The acquisition of Reservoir was completed under a plan of arrangement pursuant to an arrangement agreement dated April 22, 2016 as amended on June 16, 2016 (the “Arrangement Agreement”). Under the terms of the Arrangement Agreement, each issued and outstanding common share and restricted share unit of Reservoir was exchanged for two Nevsun common shares plus CAD$2.00 in cash. The Arrangement Agreement included $135 million of funding to Reservoir (via a private placement for 19.9% of the issued shares of Reservoir and an unsecured loan).  The $135 million of funding allowed Reservoir to exercise its right of first offer (“ROFO”) with Freeport on May 3, 2016.  After exercising the ROFO, Reservoir had increased its ownership in the Upper Zone of the Timok Project to 100% and in the Lower Zone to 60.4%.  Upon completion of the plan of arrangement on June 23, 2016, Nevsun and Reservoir shareholders owned approximately 67% and 33% of the Company, respectively.  The total purchase price for the acquisition was $512,554.

Bisha Mine Operations

During 2016 the Company produced 56 million pounds of copper at C1 cash costs of $1.04 per payable pound sold as well as 90 million pounds of zinc from primary ore, generating operating cash flows before taxes of $71 million.  The Company completed its zinc expansion project on time and under budget with commercial production declared on October 1, 2016.  Total project cost was approximately $78 million, compared to a budget of $100 million.

Since commissioning commenced in June 2016, the existing copper circuit and the new zinc circuit have produced approximately 100,000 dry metric tonnes (“DMT”) of commercially saleable zinc concentrate.

Exploration Activities

Timok Project (Serbia)

  • Upper Zone – Ongoing drilling of the Upper Zone at the Timok Project confirms continuity and the high grade nature of this zone, which is part of an approximately 50,000 meter drill program for both resource infill drilling and technical drilling that will support delivery of a pre-feasibility study on the Upper Zone in September 2017.
  • Lower Zone – The Company commenced an approximate 60,000 meter drill program to define higher grade areas at shallower depths and to further expand the mineralization footprint.

Bisha (Eritrea)

  • During 2016 the Company announced a series of assay results for its Asheli prospect as part of its ongoing regional exploration at Bisha.  New drill results demonstrated the continuity and high grade nature of the Asheli mineralization with further expansion potential.
  • Based on the prospectivity of Bisha’s VMS District, BMSC increased its total land package of exploration licenses to 814 square kilometers, up from the previous 41 square kilometers. NRL funded its share of these newly acquired exploration licenses via a $22.6 million reduction in the amount receivable from ENAMCO. 

Dividends

NRL declared an annualized dividend of $0.16 per share, the sixth consecutive year of dividend declarations since the start of commercial production at the Bisha Mine in 2011.

In September 2016, the Company adopted a Dividend Reinvestment Plan (“DRIP”) to offer shareholders an opportunity to increase their investment without additional transaction costs by reinvesting their cash dividends into additional common shares of the Company at a 3% discount to the prevailing market price.  Participation in the DRIP is optional and shareholders holding approximately 13% of the outstanding shares of the Company are currently participating in the DRIP.

Legal Update

Please refer to the section titled “Legal Proceedings” on page 62 of this AIF for the update on current legal proceedings.

Corporate Social Responsibility

The Company released its 2015 Corporate Social Responsibility Report in May highlighting its safety record of only one lost time injury and over 6.1 million hours without an incident effective date of that report; second independent human rights audit progress; training mine security on the Voluntary Principles for Security and Human Rights; community infrastructure pilot projects; local employment and training; social and environmental programs at Bisha Mine and nearby communities; taxes and royalties paid to the state of Eritrea and dividends paid to ENAMCO.

10 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

2015 Significant Developments

In 2015, the Company produced 135.9 million pounds of copper in concentrate from the Bisha Mine at C1 cash costs of $1.31 per payable pound sold which lead to earnings and operating cash flows with year-end working capital of $462 million including $434 million in cash. NRL declared an annualized dividend of $0.16 per share, representing a fifth consecutive year of increased dividend declarations since the start of commercial production at the Bisha Mine in early 2011. The Company also advanced the zinc expansion project.

Exploration drilling results at the Harena deposit during 2015 continued to demonstrate continuity of mineralization down dip and plunge and as a result, the Company announced revised mineral resources for Harena on February 17, 2016.  The Company announced that drilling at Harena added 0.5 million tonnes of indicated resource and 4.5 million tonnes of inferred resource.  It further disclosed that the total indicated resource at Harena was now 3.7 million tonnes (including in-situ 70 million pounds copper, 258 million pounds zinc, 70,000 ounces gold and 3.3 million ounces silver) and the total inferred resource was 11.0 million tonnes (including in-situ 348 million pounds copper, 952 million pounds zinc, 360,000 ounces gold and 14.4 million ounces silver).  The deposit remained open at depth with the grade and thickness of the massive sulphides increasing in the deepest tier of exploration holes.

In Q2, the Company announced the discovery of a new massive sulphide deposit at the greenfield Asheli prospect on the Mogoraib River Exploration License located 20 kilometers southwest of the Bisha processing plant. Highlight drill holes include:

  • MX-052 which graded 2.29% Cu, 4.50% Zn, 0.45 g/t Au, 37 g/t Ag over 22.9 meters, including 3.67% Cu, 8.04% Zn, 0.68 g/t Au, 50 g/t Ag over 7.4 meters and 7.92% Cu, 3.89% Zn, 1.14 g/t Au, 101 g/t Ag over 2.9 meters; and
  • MX-056 which graded 1.26% Cu, 6.08% Zn, 0.28 g/t Au, 26 g/t Ag over 20.9 meters including 1.71% Cu, 8.51% Zn, 0.37 g/t Au, 35 g/t Ag over 10.9 meters. 

The deposit is associated with highly altered felsic volcanics and is open to expansion with numerous untested geochemical and geophysical targets occurring along at least 4 kilometers of similar stratigraphy.

The Company also provided an update on its human rights and reported that it commissioned an independent human rights impact assessment (HRIA) in 2013 which was completed in and published in April 2014 with cooperation from the State of Eritrea. 

The Company released its 2014 Corporate Social Responsibility Report in April highlighting its safety record, community engagement efforts and local employment, successful environmental management and practices, and progress on independent human rights impact assessment follow-up recommendations in training and development.

On February 3, 2015 the Company announced the updated mineral resource estimate effective December 31, 2014 for the Bisha and Harena deposits.  The Bisha primary indicated resource grew by 0.9 million tonnes and primary inferred resource grew by 0.6 million tonnes.  This primary zone growth added indicated resources of 83 million pounds of zinc and 40 million pounds of copper, and inferred resources of 96 million pounds of zinc and 21 million pounds of copper. The Harena open pit indicated resource grew by 1.4 million tonnes adding 113 million pounds of zinc and 32 million pounds of copper, and primary inferred resources increased by 6.1 million tonnes for an addition of 408 million pounds of zinc and 156 million pounds of copper.

11 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

2014 Significant Developments

In 2014, the Company produced 196 million pounds of copper in concentrate from the Bisha Mine against guidance of 180 million to 200 million pounds at C1 cash costs of $1.05 per payable pound sold which lead to earnings and cash flows with year-end working capital of $520 million including $442 million in cash.

The Company conducted a 27,300 meter drilling program and progressed zinc plant expansion on time and on budget.

In 2014, NRL declared a cash dividend of $0.04 per common share in the fourth quarter, payable on January 15, 2015, an increase of 14% from the cash dividends declared in the first three quarters of 2014 of $0.035 per common share quarterly which were paid to shareholders on April 15, 2014, July 15, 2014 and October 15, 2014, respectively.  Dividends declared in 2014 totalled $28.9 million.

The Company conducted significant exploration drilling at the Harena Mining License as part of an ongoing program designed to expand the deposit beyond the known resource.  The drilling program successfully extended the deposit by 250 meters down dip and increased the strike length from 300 meters to over 600 meters.  Highlight drill holes include massive sulphides intersected in the southern extension discovery hole HX-005 which graded 1.77% Cu, 3.99% Zn, 1.22 g/t Au, 78 g/t Ag over 18.5 meters and hole HX-040 which graded 1.78% Cu, 5.78% Zn, 0.53 g/t Au, 31 g/t Ag over 32.0 meters.  Borehole geophysics suggests that Harena has considerable further down dip extension potential.  Also intersected were a number of precious metal-bearing stringer zones found below and along strike of the massive sulphides such as hole HX-008 which returned 0.71% Cu, 0.22% Zn, 6.15 g/t Au, 242 g/t Ag over 17.2 meters.

The Company issued an updated mineral resource and mineral reserve estimate effective December 31, 2014 for the Bisha and Harena deposits.  The Bisha primary indicated resource increased by 0.9 million tonnes, adding 83 million pounds of zinc and 40 million pounds of copper, and primary inferred resource increased by 0.6 million tonnes, adding 96 million pounds of zinc and 21 million pounds of copper.  The Harena pit indicated resource increased by 1.4 million tonnes, adding 113 million pounds of zinc and 32 million pounds of copper, and primary inferred resources increased by 6.1 million tonnes for an additional 498 million pounds of zinc and 156 million pounds of copper.

In 2014 the Bisha supergene reserve, inclusive of stockpiles, decreased by 3.9 million tonnes, which included 295 million pounds of copper.  Of this reduction, approximately 1.8 million tonnes and 230 million pounds of copper were due to mine depletion.  The remaining reduction of 2.1 million tonnes and 65 million pounds of copper came from reclassification of supergene to primary ore, removal of the hanging wall copper ore pending further metallurgical test work, pyrite sand displacement and elevated operating costs.  The Company announced that reclassification and a deepening of the Bisha Main pit, lead in part to the Bisha primary reserve increasing by 1.7 million tonnes including an increase of 91 million pounds of copper and 270 million pounds of zinc.  The Harena primary reserve increased by 0.3 million tonnes including 8 million pounds of copper and 26 million pounds of zinc.

The Company received strong support at the 2014 annual general meeting for the election of NRL’s nominees as directors as well as its approach to executive compensation and the continuation of the shareholder rights plan.

The Company released its 2013 Corporate Social Responsibility Report highlighting its safety record, local employment opportunities and evolving environmental and social performance governance programs at the Bisha Mine aimed at reinforcing its commitment to making a collaborative, positive impact in Eritrea.

The Company filed the 2013 Technical Report in March 2014.

The Company announced maiden open pit mineral resource estimates on February 18, 2014 for Hambok and the Northwest deposits for a combined 92 million pounds copper and 60 million pounds zinc and an updated mineral reserve estimate for the Bisha Main pit and Harena open pit mines.  This resulted in a 29% increase in the total indicated mineral resource estimate of the combined Bisha property tenements by an additional 9.3 million combined oxide gold, supergene copper and primary copper-zinc zone tonnes which resulted in an additional 247 million pounds of in-situ copper for a 22 percent increase in contained copper and an additional 47 million pounds of in-situ zinc.

12 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Description of the Business

The Company’s two principal properties are the Timok Project in Serbia which hosts the copper-gold Cukaru Peki deposit on the Brestovac-Metovnica Exploration Permit (the “B-M Permit”) and the Bisha Property in Eritrea which hosts the copper-zinc-gold Bisha deposit and includes potential satellite VMS deposits at Harena, Northwest, Hambok and Asheli.

The Company’s principal mining operation is the Bisha Mine which is located on the Bisha Property and is owned and operated by BMSC.  The Mining Agreement governs the development of the Bisha Property and covers an area of 46.5 square kilometers which contains the Bisha Mine and the Bisha Mining License and the Harena Mining License.  In addition, the Company owns the New Mogoraib River Exploration License which covers an area of 630 square kilometers and the Tabakin Exploration License covering 184 square kilometers both adjacent to the Bisha Mining License.  

The Bisha Mine

The Bisha Mine, located on the Bisha Property, is owned and operated by BMSC.  The Company is a 60% shareholder in BMSC with the remaining 40% interest held by ENAMCO.  BMSC is governed under the terms of a shareholder agreement between the Company and ENAMCO.  The Bisha Mine began commercial production of gold in February 2011 that allowed an early payback of gold phase capital and allowed for complete funding of both the copper and zinc phase expansions. The Bisha Mine transitioned from gold production to copper production in late H2 2013 and commenced commercial production of copper in December 2013 and commercial production of zinc in October 2016 following the completion of the zinc expansion project. Mining of the supergene copper ore continued until late Q2 2016 when the operation commenced processing primary ore.  The primary phase ore contains a significant amount of zinc and copper.

The Timok Project

The Timok Project is located in eastern Serbia near the Bor Mining and Smelting complex. The Timok Project is focussed on the Cukaru Peki (“Timok”) deposit which includes the high grade Upper Zone (characterized by massive and semi-massive sulphide mineralization) and the Lower Zone (characterized by porphyry-style mineralization). The Upper Zone has an extremely high copper and gold content consisting of 1.7 million tonnes of indicated resource grading 13.5% copper and 10.4 g/t gold and 35.0 million tonnes of inferred resource grading 2.9% copper and 1.7 g/t gold. The Timok Project is a joint venture between Nevsun and Freeport. Nevsun owns a 100% interest in the Upper Zone and currently a 60.4% interest in the Lower Zone and is the operator of the Timok Project. Nevsun’s ownership interest in the Lower Zone will decline to 46% once a feasibility study has been prepared for either the Timok Upper or Lower Zone.

Metal Sales

There are numerous customers for the copper and zinc concentrates and by-product gold and silver, as well as for stockpiled gold material.  Accordingly, the Company is not dependent upon any one customer.  Copper and zinc concentrates as well as stockpiled material sold as Direct Ship Ore are produced at site and transported in country by truck and trailer to the port of Massawa and then loaded into ocean freighters for transport to customers in Europe and Asia.

13 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Methods of Production

At Bisha, the Company began processing supergene copper ore in 2013 using selective flotation to recover copper as a sulphide concentrate. The commissioning of a zinc circuit was completed in October 2016, thereby enabling production of both high quality copper and zinc concentrates from primary ore. During 2016 the Company achieved commercial production of zinc, meeting guidance of 90 million pounds in concentrate but was not able to produce commercially viable copper concentrate from primary ore due to metallurgical challenges. A clear priority remains to resolve these challenges which are related to dilutive pre-activation of zinc minerals along with pyrite in the copper flotation circuit. The Company continues to work diligently to solve this problem by utilizing selected external specialists, conducting further diamond drilling, completing new geo-metallurgical test work, flotation testing and campaigning batch trials at the plant. The Company’s 2017 guidance is to produce 200 to 230 million pounds of zinc at a C1 cash cost per payable pound of zinc of $0.70 to $0.90 and 10 to 20 million pounds of copper at a C1 cash cost per payable pound of copper of $0.90 to $1.10 and to monetize 10,000 to 15,000 gold equivalent ounces from stockpiles.

The current open pit mine life effective at December 31, 2015 was estimated to be 9.5 years, which includes three to six months of processing remnant gold oxide ores to produce gold doré in the final year of mine life by restarting the original carbon-in-leach circuit.  An updated life of mine plan commensurate with the updated mineral resource and mineral reserve effective at December 31, 2016 will be completed and published before the end of Q2 2017. The Company continues with its efforts to expand mineral resources with ongoing exploration drilling programs with an expectation of subsequent conversion into mineral reserves. The Company has been conducting ongoing drilling programs on the Bisha and Harena Mining Licenses and on the Tabakin and New Mogoraib River Exploration Licenses with the plan to further extend the life at the Bisha Property.  Exploration on the Bisha and Harena Mining licenses has focussed mainly on expanding the known deposits, while work on the Tabakin and New Mogoraib River Licenses is entirely directed at discovering new satellite deposits. Many untested geophysical targets remain on these properties and new targets are being generated which will be evaluated with future drilling. This exploration work, as in the past, has a high potential to provide significant additional near and long-term mineral resources for the Bisha operations.  As referenced above, the updated drilling results from 2016 are being analyzed and will be reflected in an updated Mineral Reserves and Resource estimate for Bisha which is expected to be finalized during Q2 2017.

Skill and Knowledge

BMSC has built a management team of skilled mining, processing, exploration, maintenance, environmental, financial, and administrative personnel located at and reporting to the General Manager at the Bisha Mine.  The General Manager is in charge of mine production, the process plant and shipping facilities and exploration programs.   The specialized knowledge and skills required in all areas of mining include mining, engineering, geology, metallurgy, environmental permitting, drilling, and exploration program planning and implementation is available on-site. The Bisha Mine was the first modern mining operation in Eritrea. Training of local staff to attain and maintain the requisite skills in all aspects of mining operations remains a high priority.

Employees

In Eritrea, BMSC directly employs approximately 1,200 Eritreans and 100 expatriates at the Bisha Mine and provides a safe and supportive working environment.

The Company strives to ensure that its presence has a positive social and economic impact in all jurisdictions that it operates.

Specifically with respect to Eritrea, the spin-off effects from local suppliers for certain goods and services required by the Bisha Mine has created meaningful employment for thousands of Eritreans. Compensation for Eritreans directly employed by BMSC is well above the average wage in Eritrea. Employees are provided food and accommodations, access to medical care at the mine’s health clinic, and commuting both locally and to Asmara, at company expense. These employees also receive training and have opportunities for advancement. The use of national service labour at Bisha is not permitted, and BMSC has strong practices and procedures which include the inspection of national service discharge documentation for all Eritrean workers as a condition of pre-employment at Bisha.

14 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

In Serbia, the newly acquired Rakita Explorations d.o.o. Bor (“Rakita”) (the legal entity that operates the Timok Project) employs approximately 95 Serbian staff and 4 expatriates at the Timok Project  The Company plans to cultivate the same strong safety culture that has been successful at its Bisha Mine in Eritrea.

Corporate Social Responsibility

The Company’s objective is to generate sustainable prosperity through its business operations which means respecting the safety and health of its employees, protecting the environment, respecting the human rights of its employees and the residents of the communities in which it operates, and contributing to the sustainable development of those communities. The Social, Environmental, Health and Safety Committee established by the Board oversees the Company’s efforts in meeting these objectives.

While not a member of the EITI, the Company supports the goals of fiscal transparency and governance and has taken the approach of disclosing payments made to governments in countries in which it operates, whether or not the host government is a member of EITI.

Since commencement of commercial gold production in early 2011, the Company has contributed over $1 billion in cash remittances to the Eritrean government and government-owned entities in various forms of taxation and for the provision of goods and services. The Bisha Mine is a significant benefit to Eritrea and its direct contribution through salaries, wages, benefits, local supply-chain purchases and community assistance, is a significant benefit to the national economy and the local communities. The resulting impact through the indirect multiplier effect on the economy of Eritrea is significant.  The Company will look to cultivate a similar positive impact in Serbia as it develops the Timok Project and advances it toward full production.

The Company voluntarily releases a corporate social responsibility report annually that adheres to the Global Reporting Initiative (GRI) G4.0 Core requirements. The report addresses a hybrid of general and specific sectorial information about the Bisha Mine and its relevance to annualized corporate social responsibility objectives.

The Company has also undertaken an independent human rights impact assessment and a follow-up audit, and implemented numerous measures and safeguards to further advance human rights at the Bisha Mine and the surrounding communities.  The Company has adopted a Human Rights Policy and has embedded mandatory training in human rights at all of its operations and development projects.  Spot audits/validation on human rights compliance for the direct workforce, contractors, subcontractors and suppliers has also been embedded into standard operating procedures.

Social Responsibility

The Company recognizes that its activities have the potential to impact the human rights of individuals affected by its business operations.  As such, the Company seeks to integrate human rights best practices into its business processes and conducts its business within a framework that promotes worker and community health and safety, environmental protection, community involvement, community benefits and quality of life for employees and their families.  The Company is committed to responsible operations and practices at all of its operations and development projects, based on national and international standards of safety, environmental management, governance and human rights and strives to ensure that the Company’s presence has a positive socio-economic impact to the national economy and the nearby local communities. Some of the Company’s social responsibility commitments and practices include:

  • actively promoting understanding by all employees of the culture, language and history of the communities, regions and countries in which it operates;
  • working to protect cultural heritage resources potentially affected by the Company’s activities;
  • conducting activities in a manner that respects traditional-use rights, cultures, customs and social values;
  • promoting job equity and equal access to employment opportunities for women;
  • maintaining formal human resources practices and procedures to ensure that national service labour is prohibited and inspection and audits of national service discharge are conducted;
15 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  • building capacity by sharing environmental and social experiences and solutions with local communities and regional and national governments;
  • actively consulting with local communities to identify and resolve environmental and social issues;
  • promoting the use of various grievance mechanisms to enable ongoing constructive feedback with workers and communities alike;
  • procuring materials, goods and services in a manner that enhances local benefits and protects against unethical practices such as child labour and forced labour;
  • investing in nearby community infrastructure projects to assist in local community development for the purposes of increasing the quality of life for its citizens;
  • establishing social responsibility performance criteria; and
  • monitoring and reporting performance to senior management through periodic audits.
Health and Safety

The Company recognizes that the safety and security of its employees and the communities in which it operates is an integral part of its business.  The Company strives to maintain industry leading safety performance at Bisha and Timok in order for employees and contractors of the Company to operate injury-free, regardless of what role they perform. The Company likewise has advanced its corporate responsibility initiatives to reflect evolving international standards. The Company has maintained top quartile safety performance at the Bisha Mine to December 31, 2016 where employees worked 12.8 million consecutive hours to December 31, 2016 since the Company’s last lost time injury (“LTI”) experienced in February 2015.  Timok experienced a single lost time injury in November 2016 since the transaction closed between Reservoir and Nevsun.

To achieve its health and safety objectives, the Company is training employees to work in a safe and responsible manner.  This includes:

  • carrying out risk assessments for all construction and operational activities;
  • conducting thorough investigations when incidents do occur to understand the underlying causes;
  • taking the appropriate corrective actions to avoid recurrence of incidents;
  • ensuring that health and safety performances comply with relevant legislation and regulation;
  • adhering to local laws as well as international standards on law enforcement in securing its operations, particularly those that relate to the use of force; and
  • carrying out risk assessments in relation to security issues at each of its project sites, ensuring that security is managed in a way that respects and protects human rights, avoids creating conflict, and addresses security threats in as peaceful a way as possible.

Environment

The Company is committed to achieving high standards of environmental responsibility in its operations and compliance with all applicable regulations and laws. 

The Company is committed to devoting its resources to the goal of:

  • complying with all host country environmental laws and regulations together with industry best practice standards or whichever is the more stringent of the two;
  • ensuring the necessary resources are provided to support and implement the Company’s environmental policy;
  • continual improvement in environmental performance by developing environmental indicators, monitoring and auditing performance, and by implementing corrective actions where needed;
  • reporting externally on environmental performance and encouraging dialogue with employees, local communities and other stakeholders to promote environmental awareness;
  • applying the principles of best available technology to environment management;
  • reducing, re-using and recycling resources and implementing proper waste management practices;
  • training, motivating and ensuring that all employees adhere to environmental protection and pollution prevention policies;
16 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  • incorporating an emergency preparedness and response system into standard operating practices; and
  • monitoring and reporting on performance to senior management through periodic audits.
Mineral Properties

The Company’s two principal properties are the Timok Project in Serbia, which hosts the copper-gold Cukaru Peki deposit on the B-M Permit; and the Bisha Property in Eritrea, which hosts the copper-zinc-gold Bisha deposit and includes satellite VMS deposits at Harena, Northwest, Hambok, Aderat and Asheli.

The Timok Project

The Timok Project, located in Serbia, is focused on the Cukaru Peki deposit, which includes the high grade Upper Zone (characterized by massive and semi-massive sulphide mineralization) and the Lower Zone (characterized by porphyry-style mineralization). Cukaru Peki is contained within the B-M Permit, through Rakita Exploration d.o.o. (“Rakita”), a Serbian entity that is indirectly owned upstream by the Timok JVSA (BVI) Ltd., a joint venture that is owned 45% by Global Reservoir Minerals (BVI) Inc. (a 100% owned subsidiary of the Company) and 55% by Freeport International Holdings (BVI) Ltd. (a company with a dual share structure of A and B class shares, of which Global Reservoir Minerals (BVI) Inc. owns 100% of the Class A shares and 28% of the Class B shares). The Class A shares relate to the Upper Zone and the Class B shares relate to the Lower Zone. The Company effectively owns 100% of the Upper Zone and 60.4% of the Lower Zone through its indirect interests in both Timok JVSA (BVI) Ltd. and Freeport International Holdings (BVI) Ltd. Nevsun’s ownership interest in the Lower Zone will decline to 46% once a feasibility study has been prepared for either the Timok Upper or Lower Zones.  

Unless otherwise stated, the relevant technical and scientific information included in this AIF concerning the Timok Project is derived from the Timok PEA (the 2016 Preliminary Economic Assessment of the Cukaru Peki Upper Zone Deposit) prepared by Martin Pittuck, CEng, FGS, MIMMM (SRK Consulting (UK) Limited) and Tim McGurk, CEng, FIMMM (SRK Consulting (UK) Limited), effective March 31, 2016. These authors are QPs within the meaning of NI 43-101. The Timok PEA for Reservoir is available for review on SEDAR (www.sedar.com) and EDGAR (http://www.sec.gov/edgar.shtml).

The key 2017 milestones for the Timok Upper Zone are the PFS completion in September 2017 and commencing the exploration decline in Q4 2017.  The PFS remains on time and budget.  The Company has completed approximately half of the required permitting obligations necessary for decline construction permit and is expecting to receive approval during the second half of 2017. The Company will begin the tendering process for the decline development during Q2 2017.

Other key activities, including the Environmental Impact Assessment (EIA) and land acquisition, are progressing well.  Keeping the Upper Zone on track for production by approximately mid-2021 is the number one priority of the Company.

The Bisha Property

The Bisha Property, located in Eritrea, hosts the Bisha Mine. The property is owned and operated by BMSC which in turn is controlled 60% by the Company and 40% by ENAMCO.  BMSC is governed under the terms of a shareholder agreement between the Company and ENAMCO.  Under Eritrean Mining Law, ENAMCO initially held a 10% free carried interest in BMSC.  In October 2007, ENAMCO agreed to purchase an additional 30% interest in BMSC, the terms of which were finalized in 2011.  In December 2007, BMSC concluded a Mining Agreement with the State of Eritrea. Royalties payable to the State of Eritrea include a 5.0% royalty on precious metals and a 3.5% royalty on base metals.

The Bisha Mine on the Bisha Property began commercial production in February 2011 with approximately 784,000 ounces of gold in doré being produced from oxide mineralization until late 2013.  The Bisha Mine achieved commercial production of copper derived from supergene mineralization in December 2013 with the production of approximately 438 million pounds (198,800 tonnes) of copper during the supergene phase. The Company transitioned to production of both copper and zinc from the primary zone in Q2 2016, although challenges currently remain with copper production in a separate clean copper concentrate.  Construction and commissioning of a zinc flotation circuit required for future zinc production from the primary sulphide zone was completed on time and under budget.

17 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Unless otherwise stated, the relevant technical and scientific information included in this AIF concerning the Bisha Property is derived from either the 2013 Technical Report prepared by Paul Gribble, C. Eng., FIMMM, Chief Resource Geologist, BMSC; Jay Melnyk, P.Eng. AGP; and Peter Munro, BAppSc. Mineralurgy Pty. Ltd. effective December 31, 2013; the December 31, 2015 Mineral Resource estimate completed by Phil Jankowski, MAusIMM (CP), (BMSC), effective December 31, 2015; or from the December 31, 2015 Mineral Reserve estimate for Bisha and Harena completed by Anoush Ebrahimi, P.Eng., PhD. (SRK Consulting Canada Inc.), effective December 31, 2015 (collectively the “Bisha Technical Reports”). These authors are QPs within the meaning of NI 43-101. The 2013 Technical Report is available for review on SEDAR (www.sedar.com) and EDGAR (http://www.sec.gov/edgar.shtml).

Although the Bisha Technical Reports are current as defined in NI 43-101, an updated Mineral Reserve and Resource estimate on the Bisha Property is expected by the end of the second quarter of 2017.  This report may or may not contain material scientific and technical information that differs from that contained in the Bisha Technical Reports. As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

18 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Timok Project – Project Description and Location

The Timok Project is located in eastern Serbia on a gently rolling plateau between 300 and 400 meters above sea level and has a moderate-continental climate. It is located 5 kilometers south of the town of Bor, which is a regional administrative and mining centre, located approximately 245 kilometers by road southeast of Belgrade, the capital of Serbia. The site is favourably located for mining infrastructure (road, rail, power, water) and nearby the recently upgraded copper smelter complex in Bor.  The Universal Transverse Mercator System (UTM) coordinates (the World Geodetic System, 1984) of the Cukaru Peki deposit is 4874888 N and 590706 E (UTM zone 34).

Figure 1 – Timok Project Location

The original B-M Permit, exploration field no.1926, was granted to Rakita on 28 February 2012, under the terms of the 2011 Law on Mining and Geological Explorations. The Permit was originally valid until February 28, 2015 with any future extensions subject to approval by the Ministry of Natural Resources, Mining and Spatial Planning (the “Ministry of Mines”).

On February 28, 2015 the B-M Permit was renewed and is now valid until February 28, 2017. A renewal of the B-M Permit was submitted on January 27, 2017 to the Ministry of Mines and the Company is awaiting confirmation of extension of the B-M Permit to February 28, 2020. Under the terms of the 2011 Law on Mining and Geological Explorations, 25% of the original shape of the original B-M Permit was relinquished. The relinquished area forming the southwestern and southern fringe of the original area was re-applied for under a new Exploration Permit named Brestovac-Zapad.

19 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Future extensions are now subject to approval by the Ministry of Natural Resources, Mining and Spatial Planning. The Company interprets the new Law to mean that:

  • the B-M Permit can be extended for a final renewal of two years and the re-applied area may remain the same or be reduced when compared to the original area specified in the approval for exploration (article 38 and 39). This Final extension would need to be granted before February 28, 2017.
  • Brestovac-Zapad can be extended for two consecutive periods of up to three years for the first renewal and two years for the second renewal. The re-applied area may remain the same or be reduced compared to the original area according to the request of the entity in charge of the exploration (article 38 and 39). This final extension would need to be granted before April 30, 2018.

Land in the project area is mainly used for agricultural purposes, but it also includes municipal land, military land and the Bor Municipality airport. The land in the project area is divided into hundreds of small portions of land which will have to be acquired to develop the mine. Many of the land parcels are owned by the same families having been passed on through the generations.

Ahead of application to develop a mine, Rakita will need to secure surface rights, in the form of land ownership or easement agreements on 80% of the area for which a mining permit application is made.

The process of obtaining surface rights started in 2015 and has been advancing as a separate work stream to the current primary objective of delivering a PFS by the end of Q3 2017. It is estimated by Rakita that up to 800 hectares of land will be required to secure the Mine Use Permit for the Upper Zone project.

20 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Figure 2 – Brestovac-Metovnica and Bretovac-Zapad Exploration Permits

21 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Agreements and Encumbrances

The Serbian government levies a royalty of 5% net smelter return (‘‘NSR’’) for metallic raw materials (status as of 2011, Guide for Investors, Ministry of Natural Resources, Mining and Spatial Planning) and then there are additional royalties which may be due; these are individually negotiated for each mineral license.

The Brestovac portion of the Brestovac-Metovnica property to the west of Cukaru Peki is subject to a 2% NSR royalty on gold and silver and a 1% NSR royalty on other minerals pursuant to a royalty agreement (‘‘Eurasian Agreement’’).

The Metovnica portion of the Brestovac-Metovnica property which contains the Cukaru Peki deposit is subject to a 0.5% NSR sliding royalty pursuant to a royalty agreement. As the Metovnica property was previously owned by Freeport, who conducted geophysics and limited drilling, the NSR royalty will not apply to any portion of the property eventually owned by Freeport and does not apply to the portion of the property that has been purchased by Reservoir through the exercise of the ROFO.

For exploration, agreements have been reached with landowners of each drill site. The agreements cover compensation for disturbance and the requirement for full rehabilitation of the site. Drill sites are photographed before commencement of the drilling, and after completion of the rehabilitation.

Significant Factors That May Affect Access, Title, or the Ability to Work

In December 2015 the Serbian Government introduced a new Law on Mining and Geological Explorations. The new Law introduces the concept of mineral and other geological resources of strategic importance, including copper. In case of mineral resources of strategic importance, the procedure for the expropriation of the relevant land to be used for mining can be implemented, even when the prospective exploitation is to be done by private parties.

Under the new Law, geological exploration permit holders are entitled to submit a request for the preservation of their priority rights for exploitation of the specific exploration area at least thirty days prior to the expiration of the duration of the permit for geological exploration, in order to prepare the documentation necessary to issue a decision on the approval of the exploitation field. Such a preservation of rights can be approved for a period of up to two years and, in case of mineral resources of strategic importance, for up to three years. In either case, the preservation of rights cannot be prolonged.

The new Law provides for issuing of five permits:

  • Permit for Geological Explorations;
  • Certificate of Resources and Reserves;
  • Exploitation Field Permit;
  • Mine Building Permit; and
  • Mine Use Permit.

The process for obtaining the above five permits is governed by the new Law on Mining and Geological Explorations and a series of rulebooks.

22 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Accessibility, Climate, Infrastructure & Physiography

Accessibility

The Timok Project area is easily accessible by paved roads that connect with the Serbian main road network. Travel time from Belgrade to Bor and the Timok Project area by road is about 3 hours. In addition, there are numerous small agricultural and forestry tracks within the permit area that are suitable for four-wheel drive vehicles.

A regional bus service connects Bor with Belgrade and other cities and towns. Bor is integrated into the Serbian railway system and connects to Belgrade and the main lines. The line from Bor is primarily for freight, but there are regular passenger services to Belgrade. The site is also favourably situated for export freight logistics.

Climate

The climate of Serbia is described as moderate-continental with local variations. July is the warmest month with mean monthly temperatures, depending on altitude, in the range 11ºC to 22ºC (reaching up to 42ºC). The lowest temperatures are registered in January and range from -35ºC to -21ºC. The majority of Serbia has most rainfall during May and June, particularly in eastern Serbia, which is furthest from the influence of the Mediterranean precipitation patterns.  Exploration drilling can continue throughout the year. Other field activities are constrained by snow cover during the winter months which can extend from December to April.

Infrastructure

The Cukaru Peki deposit is located about 5 kilometers southeast from Bor town and is accessible by paved road. The road and rail access to Bor is good. Bor is an active mining town and contains a regional administrative centre possessing the facilities, services and experienced workforce required for advanced mineral exploration projects. Reliable power is available with power lines passing through the B-M Permit area. NRL’s subsidiary, Reservoir Minerals Inc., maintains an office in the town as a technical base for exploration activities on the B-M Permit and other exploration permits in the Timok region and is located close to the major centre of drilling.

In January 2011 Outotec signed a contract with SNC Lavalin International to design, supply and install a new copper flash smelting furnace and related services for Rudarsko toipioničarski basen Bor d.o.o. (“RTB Bor”) in central Serbia. RTB Bor has recently upgraded the smelter capacity at Bor, utilizing a loan from the Canadian Development Bank, guaranteed by the Serbian Government. The smelter was constructed by SNC Lavalin, and commissioning work was undertaken prior to its departure in late 2015. The smelter is currently treating a mixture of concentrates from the existing RTB Bor mining operations, alongside imported concentrates from overseas. Though there is no requirement under Serbian law to treat concentrates within country, it is envisaged that there could be spare capacity at the facility which the Company may utilize, should the opportunity arise. This is an attractive option since the smelter facility is only 7 kilometers from the Timok Project and could significantly reduce concentrate transport costs.

Physiography

The relief of the Timok Project area is marked by a gently rolling plateau with elevations approximately between 300 to 400 meters above sea level. The Cukaru Peki deposit itself is at an elevation of approximately 375 meters above sea level. The Crni Vrh hills to the west of the exploration permit rise to over 1,000 meters above sea level.

In the immediate Timok Project area there is plenty of accessible flat or gently undulating land to accommodate surface processing facilities and waste storage as necessary. There are a few river valleys which are of sufficient depth to provide the necessary volume of tailings storage.

Vegetation in the area comprises mostly arable crops, some grassland and deciduous woodland.

The Timok River is the major drainage system in the project area, with multiple tributaries such as the Brestovac, Bor and Borska. It originates in the north of the Svrljig Mountains in the Carpathian-Balkan region in eastern Serbia running 203 kilometers before discharging into the Danube River. Topographic elevation within the Timok catchment ranges from 142 meters above sea level at the Timok-Danube confluence, to 1,049 meters above sea level in the upper reaches of the catchment.

23 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The Crni Vrh plateau is incised by the southeast-flowing drainage of the Brestovac River and its tributaries, and by the Bor River in the northeast of the B-M Permit area. The Brestovac River descends from about 280 meters in the northwest corner of the property perimeter to about 160 meters, where it flows across the south boundary of the exploration permit. The highest elevation is recorded as 464 meters on the eastern margin of the property.

Anthropogenic features related to the mining activity, including waste dumps, dominate the physiography to the north of the exploration permit. The Bor open pit, approximately 2 kilometers north of the northern perimeter of the B-M Permit, is approximately 300 meters deep and 1.0 kilometer long.

Mineral Property History

Historical Exploration and Mining to 2004

The Cukaru Peki exploration site in the B-M Permit is located five kilometers south of the Bor mining complex. Exploitation of the surface outcrops, primarily for gold, of the massive sulphide mineralization at Coka Dulkan and Tilva Ros may have commenced during the Bronze Age and again by the Romans, who were active throughout the region. Serbian investors financed prospecting and exploration at Coka Dulkan and Tilva Ros during 1897-1902, and mine development during 1903-1905. Mining commenced in 1907, and the Serbian investors sold to a French group (Society of the Bor Mines) that controlled the mines until 1941. The mines and smelter were rehabilitated after the Second World War and have operated since then under the Yugoslav, and later Serbian, state-owned companies, RTB Bor Mining and Smelting Basin Bor.

Trial mining of copper and zinc mineralization south of Brestovac village, within the Timok Project area, was undertaken from an adit and blind shaft south of Brestovac by a French group in the 1930’s, however there are only incomplete records and no meaningful recorded production.

There are records of approximately 41 RTB Bor drill holes at various locations in and near the project area from 1975 to 1988. Most drilling took place in small clusters, and targeted gravity and other geophysical anomalies. The records are not complete, and no drill core was retained. Most holes were relatively shallow, with depths less than 500 meters. The Cukaru Peki mineralization was not intersected in any drill holes from this time and no discoveries were reported, other than one hole south of Brestovac village showing enhanced gold grades in altered andesite, for which the sampling and analytical records are incomplete. This hole was followed up by an exploration program in 2006 by Eurasian Minerals, Inc. (“Eurasian”).

No effective mineral exploration was undertaken in the period 1990-2002 due to the period of political uncertainties in the former Yugoslavia and Serbia at that time. Mineral exploration resumed when the Serbian government issued exploration permits and concessions after 2002.

Historical Exploration 2004-2010

The first Brestovac exploration permit was awarded in 2004 to Southeast Europe Exploration d.o.o (“SEE”), a 100% owned subsidiary of Eurasian. In 2006, Eurasian validated the reports of gold mineralization encountered in a historical drill hole from the 1970s. Diamond drill hole BN-01 was terminated at 296.8 meters, and intersected gold and copper mineralization in the upper 60 meters including 22.4 meters at 4.51 g/t gold, and non-auriferous replacement zinc mineralization from 286-294 meters. Ground magnetometry, IP and resistivity geophysical surveys indicated an area with very high chargeability and conductivity characteristics in the so-called “Corridor Zone” extending through drill site BN-01.

In 2007, SEE became a 100% owned subsidiary of Reservoir Capital Corp. During 2007-2008, Reservoir Capital Corp. undertook further geophysics and soil geochemical surveys in the Brestovac area, and outlined a high-grade epithermal copper-gold system in the "Corridor Zone" along a strike length of 550 meters, defined by 14 drill holes (total 1,937 meters). Drill hole BN-19, at the eastern end of the Corridor close to the interpreted extension of Bor Fault, intercepted a massive sulphide zone with 24.8 meters at 0.33% copper and 0.16 g/t gold, which supported the concept that the epithermal gold mineralization of the Corridor Zone grades into a copper-rich zone.

24 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

During 2006-2009, Phelps Dodge Exploration Corp. (“PDEX”) undertook geological and large-scale IP geophysical surveys on the adjacent Metovnica exploration permit. PDEX also completed 14 drill holes (including three holes drilled during a joint venture with Euromax Resources Ltd.) in the west and south of the Metovnica exploration permit. None of these holes intersected significant mineralization.

Geological Setting

Geologically, the region is part of the Western or Eurasian Tethyan Belt, which hosts Mesozoic to Cenozoic subduction-related gold and base metal deposits from Romania and Serbia through to Turkey, Iran and Pakistan. Locally, the Timok Metallogenic Complex has one of the highest concentrations of copper enrichment in the Belt, containing world-class examples of porphyry and high sulphidation epithermal types of copper-gold deposits, such as Bor and Majdanpek, which have an estimated historical production of some six million tonnes of copper and nearly ten million ounces of gold. The Bor cluster of deposits is hosted by Upper Cretaceous andesites and volcanoclastics that continue at least five kilometers south to Cukaru Peki, where the Cretaceous is overlain by a Miocene basin containing clastic sediments that can reach up to 600 meters in thickness.

The Cukaru Peki deposit is subdivided into an Upper Zone of high-sulphidation epithermal mineralization and the underlying Lower Zone of porphyry type mineralization which has not yet been modelled due to insufficient drill data and geometrical understanding, and is not included in current resource estimates. Despite incomplete drill coverage in the Lower Zone, there are indications of a large deposit that may be amenable to a bulk mining method. The Lower Zone is currently an exploration target that remains open to the north and at depth below the Upper Zone, with several drill hole intersections that outline the potential magnitude of the mineralized system.

The close spatial association of the high sulphidation and porphyry copper-gold mineralization at Cukaru Peki is very similar to that observed and described from the active Bor mining district, and Company geologists interpret the Lower Zone and Upper Zone mineralization at Cukaru Peki to be comparable to, respectively, the porphyry and high sulphidation mineralization in the Bor District. The porphyry style mineralization at Bor includes the Borska Reka deposit and the spatially associated high sulphidation copper gold mineralization at Bor which occurs in several deposits (Tilva Ros, Tilva Mika, Coka Dulkan, etc.) that have been mined out with past production estimated as approximately 200 Mt at 1.5% copper and 0.8 g/t gold.

Exploration History Since 2010

Since 2010 exploration in the B-M Permit was undertaken under the terms of an earn-in agreement between Reservoir Minerals Inc. and Freeport.

During 2010-2012 field work included geological mapping, geochemical surveys and large scale CSAMT and additional IP surveys. These surveys covered areas where Miocene sediments (known as the Miocene sedimentary basin target), concealed the target Upper Cretaceous volcanic rocks, as well as the Ogasu Kucajna target areas. Orientation surveys over known deposits in the Bor district were also carried out.

The CSAMT survey highlighted the position of the base of the Miocene and the location of high/low resistivity zones and potential structural zones which is over the Upper Zone deposit. The CSAMT data has been used for exploration targeting and contributed significantly to the initial (drill defined) discovery of the Cukaru Peki deposit. Drill hole to surface IP resistivity measurements were conducted around drill hole FTMC1210, but the results were not sufficiently encouraging to justify further downhole IP surveys.

During 2013-2015 field work included geological mapping, structural investigations and geochemical sampling, large scale CSAMT and IP/Resistivity surveys. A seismic experimental investigation was also carried out to establish the feasibility of the application of the seismic reflection method for investigation of mineral deposits and deep structures. Seismic data was acquired using a combination of small explosive charges placed in shallow boreholes and an accelerated weight drop. Active receiver spread consisted of 174 channels arranged in a split spread configuration.

25 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

In 2016 limited drilling was conducted during the first six months due to the Freeport sale process which was concluded in June with the Company acquiring ownership in the project and becoming the operator.  Since that time, drilling on the Upper Zone has been ramping-up with a goal of increasing the confidence in the resource model by converting the inferred resource to indicated resource with tighter spaced drilling.  Geotechnical and hydrologic drilling also commenced to determine the optimum location of potential access ramp locations and for other infrastructure and mining considerations.  Drilling was also restarted on the Lower Zone in an effort to determine areas of higher grade mineralization and to expand the known footprint of the deposit.  Limited geochemical and geophysical surveying, including borehole electromagnetic and gravity surveying was also completed.

Mineralization

Three  styles  of  mineralization  are  defined  at  Cukaru  Peki,  based  on  core  logging  and petrographic studies by Cvetković et al (2012) and Pačevski et al (2013):

  • HSE mineralization comprising massive to semi massive sulphide and vein stockworks. The Upper Zone comprises a single coherent zone of HSE mineralization, ranging in depth from 400 to over 1,000 meters below surface. The predominant sulphides are pyrite and covellite, with minor enargite and rare bornite. The massive sulphides are generally fine-grained and often display breccia textures indicative of replacement and or open-space infill.
  • Porphyry mineralization comprises quartz-sulphide vein stockwork, veinlets and disseminations of chalcopyrite and pyrite, locally bornite and with rare molybdenite. Anhydrite veins are commonly associated with this type of mineralization. This type of mineralization occurs in the Lower Zone of the Cukaru Peki deposit, at depths greater than about 1,000 meters.
  • An overprinting epithermal mineralization phase is locally present where Lower Zone mineralization has been overprinted by argillic to locally advanced argillic alteration. It is transitional between the shallower high sulphidation and deeper porphyry styles. It comprises covellite-digenite-pyrite and locally enargite replacing the primary sulphides (chalcopyrite-pyrite) in porphyry style mineralization, and is associated with quartz-clay+sericite+alunite alteration assemblages.
Upper Zone

The high sulphidation Upper Zone comprises an irregular but broadly ovoid-shaped body of mineralization with a very distinctive internal layering. The long axis of the Upper Zone mineralization plunges steeply (approximately 60°) to the northwest, whereas the internal layering generally dips shallowly (approximately 30°) to the southwest. The overall sequence progresses from a high-grade covellite-pyrite massive sulphide breccia near the top of the Upper Zone, down into a mixed zone comprising both covellite-pyrite massive to semi massive sulphide breccia and veined or brecciated advanced argillic altered andesite. With increasing depth, the proportion of massive sulphide generally decreases and the proportion of advanced argillic altered (with associated silicification) andesite increases as mineralization becomes more vein-controlled. This downward change in mineralization style broadly corresponds with decreasing copper and gold grades.

Lower Zone

The Lower Zone mineralization has significantly less drilling and thus its overall geometry is not as well constrained as the Upper Zone, particularly its lateral and depth extents. The sulphide mineralogy (chalcopyrite-pyrite, bornite and locally overprinted covellite) and distribution of potassic/phyllic/argillic alteration defines a somewhat irregular ‘upper surface’  to the porphyry mineralization; however, when looking at the copper and molybdenum assays a sub-planar grade boundary becomes apparent which dips shallowly (approximately 30°) to the west-southwest and may relate to a low angle structural control.

26 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Within the Lower Zone mineralization there are also distinct domains of relative lower and higher grades, these variations are possibly caused by a combination of multiple mineralization phase events related to multiple intrusive phases. Offsetting of mineralization by faults may also be locally important.

Drilling

A total of 111 holes totalling 90,739 meters were completed by Rakita at the Cukaru Peki Project as of December 14, 2015.

The drilling was performed by contractors and managed by Rakita’s geological team. The drilling program was completed by utilizing four drilling contractors: Drillex International, Geops Balkan Drilling Services, S&V Drilling Mine Services, and Geomag Drilling.

All drilling was completed by diamond core drilling–aside from hole FMTC1224 where an attempt was made to drill through the Miocene and Upper Cretaceous sedimentary cover rocks with reverse circulation drilling.  This attempt was unsuccessful and the approach abandoned.

Diamond drilling was performed with the use of a double tube with casing reducing from PQ to HQ and NQ rods at the appropriate depths.

Core was produced in 3 meter core runs and then placed by hand into an open V-rail for measurement of recovered core length, before being transported to the drill site geologist. This geologist then inspected the core before transporting the core into numbered plastic core boxes. Cut plastic blocks were used to record core depths.

All drill sites were initially located with the use of a handheld GPS with final locations recorded by a surveyor once the drilling was completed.

In 2016 diamond drilling continued at Cukaru Peki on the Upper Zone following the acquisition of the project by the Company.  A total of 12,247 meters of infill drilling was completed in 21 holes by Geops Balkan Drilling Services Ltd.  As part of the program to test areas of proposed infrastructure such as portal access location, tailings facilities and other geotechnical and hydrogeological sites for future Upper Zone mining, a further 4,581 meters of diamond drilling was completed by S&V Drilling Mine Services, Geops Balkan Drilling Services and Geomag Drilling.  For the Lower Zone, drilling also re-started with 7,004 meters in 5 holes being completed by Capital Drilling to the end of the year.  All drilling at Cukaru Peki is managed by Rakita’s geological team.

Diamond drilling was also completed in 2016 on the Rakita owned exploration licenses: Jasikovo – Durlan Potok and Leskovo.  At Jasikovo-Durlan Potok, 1,712 meters of drilling was completed in 3 holes by Geomag Drilling and Geops Balkan Drilling Services.  A total of 1,391 meters of drilling in 3 holes was completed by S&V Drilling Mine Services and Geops Balkan Drilling Services at Leskovo.  These drill programs were supervised by the geological staff of Rakita.

On the Tilva JV, (a Joint Venture with Rio Tinto funding 100% of the work), diamond drilling was completed on the Tilva Njagra property with 2 holes (2,094 meters) being completed by Capital Drilling and Geops Balkan Drilling Services and on the Coka Kupjatra property where 2,683 meters of diamond drilling was completed in 2 holes by Capital Drilling and Geomag Drilling.  This work was supervised by Tilva geologists.

At the Balkan Exploration and Mining d.o.o. (“BEM”) owned Bobija property, S&V Drilling Mine Services completed 950 meters of diamond drilling in 11 holes under the supervision of geologists from BEM.

Sampling and Analysis

All drill core is logged for core recovery and rock fracture quality at the drill site before being transported to the core storage facility for photography and geological logging. A portable hand held Niton x-ray defraction meter is used to assist with visual copper grade estimation and a Terraspec spectrometer for mineral identification. Sampling lengths are then allocated (typically 1 meter and 2 meters for the Upper Zone and Lower Zone respectively), guided by geological contacts and the core is subsequently split using a diamond core saw. Samples are placed into heavy duty plastic bags and QAQC materials are inserted into the sample stream.

27 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

2011-2013

For the 2011-2013 drill program, samples were sent for sample preparation to the Eurotest Control EAD Laboratory in Bulgaria (“ETC”). ETC was previously the laboratory of the Geological Survey of Bulgaria and then privatized in 2000. Since September 2011, the company has new purpose-built premises that house in one building the entire laboratory and processing procedures as well as management and quality control. ETC has accreditation ISO 17025 for commercial analytical laboratories valid until May 31, 2016 and also ISO 9001 certification for their quality management system.

Sample preparation involved crushing to (>)95% passing -10 mesh (2 millimeters) using a jaw crusher prior to a 400 gram split being taken and pulverized to better than 90% passing 140 mesh (140 µm) with an LM2 pulverizing ring mill.

ETC analyzed the samples for gold by Aqua Regia Digestion with AAS finish until April 2013. After this date, samples were assayed for gold by fire assay with AAS finish (which showed improved analytical performance), with high grade samples re-assayed using gravimetric finish. Copper and arsenic were assayed for by Aqua Regia with ICP-AES, with high grade copper (1-11%) re-assayed by AAS and very high grade copper (>11%) re- assayed by ICP-AES using a 0.1 gram aliquot.

2014-2015

For drilling completed subsequent to 2013, samples were sent for sample preparation to the ALS laboratory located at Bor in Serbia. Sample preparation involved crushing to (>)80% passing -10 mesh (2 millimeters) prior to a 400 gram split being taken and pulverized to better than 85% passing 140 mesh (140 µm).

Samples were sent for analysis to the ALS Laboratories in Loughrea, Ireland and (for gold only) in Rosia Montana, Romania. After March 2015 all samples were sent to ALS Loughrea. Gold was assayed for by fire assay with AAS or ICP-AES, with high grade samples re-assayed using gravimetric finish. Copper and arsenic were assayed for by Aqua Regia or 4 Acid digest with ICP-AES or ICP-MS, with high grade copper (>1%) re-assayed by ICP-AES using a 0.5 g aliquot. Both ALS Loughrea and ALS Rosia Montana are ISO 17025 accredited.

2016

Following the completion of the acquisition of the Timok Project by the Company, Rakita completed assaying of backlogged samples drilled in late 2015. A total of 10 drill holes were sampled and base metals assays completed.  Rakita continued to use the same preparation and analytical laboratories as in 2015. Samples were submitted to ALS facilities in Bor, Serbia, for sample preparation (crushing and pulverizing) and then sent to ALS in Loughrea for analysis.

Copper was analyzed by inductively coupled plasma – mass spectroscopy (ICP-MS) after four-acid digestion. Higher grade copper samples containing more than 1% copper underwent repeat analysis using ICP-AES after longer sample digestion times and higher dilution. Gold was analyzed by fire assay (30 gram samples) with an ICP-AES finish.  Samples containing greater than 3 g/t gold were re-analyzed by fire assay (30 gram samples) with a gravimetric finish.

Beginning with drill hole TC160112 drilled in August 2016, a period of transition of the analytical method protocol for gold analysis and control samples percentage within the analytical batches, started.  As in the past, all samples were analyzed for gold by fire assay (30 gram samples) with ICP-AES finish; however, samples containing greater than 9 g/t gold were re-analyzed by fire assay (30 gram samples) with a gravimetric finish.  The number of internal control samples to check laboratory precision and accuracy was increased from 10% to 17% both for copper and gold analytical batches.

Drill core samples were collected in accordance with the Company protocols that are compatible with accepted industry procedures and best practice.  Most drill core samples through the mineralized intervals were one meter in length. Beginning with drill hole TC160112 the sample interval length was increased from 1 meter to 1.5 meters.  At the Lower Zone, sample interval lengths were increased to 3 meters for the 2016 drilling.

28 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The Company continues to conduct its own analysis of QAQC results generated by the systematic inclusion of certified reference materials, blank samples and duplicate samples. Company used well homogenized certified material prepared of project drill holes intervals in order to cover three different mineralization intensity (3 CRM with <1% copper grades, 3 CRM with copper grades for interval with 5-10% copper, and two for very high grade assays >10% of copper). The analytical results from the quality control samples have been evaluated and demonstrated to conform to best practice standards.

Security of Samples

Samples are collected from the Rakita core facility by the accredited ALS laboratory in Bor on a weekly basis and transported to their facilities for preparation and assay.  Once core logging and sampling is complete, all core boxes are covered and stored in the centralized Rakita core storage building for permanent record.

Mineral Resource Estimate

The mineral resource estimate prepared by SRK utilizes 90,739 meters of drilling for a total of 111 drill holes at the Cukaru Peki site. The Mineral Resource estimate was supervised by Mr. Martin Pittuck, C.Eng, FGS, MIMMM an “independent qualified person” as defined in National Instrument 43-101. The effective date of the resource statement is March 31, 2016.

On a 100% attributable basis, the Cukaru Peki Upper Zone Mineral Resource comprises an Indicated Mineral Resource of 1.7 Mt above a cut-off grade of 0.75% copper, with average grades of 13.5% copper, 10.4 g/t gold and 0.23% arsenic and an Inferred Mineral Resource of some 35.0 Mt above a cut-off grade of 0.75% copper, with average grades of 2.9% copper, 1.7 g/t gold and 0.17% arsenic. The Table ES1-1 gives the current Mineral Resource estimate which has been prepared in accordance with the CIM Code.

This Mineral Resource estimate is currently being updated and categories upgraded for inclusion in the upcoming PFS due September 2017 and will be published at that time; however, after completion of approximately 30 percent of this planned infill Mineral Resource drilling program as at December 31, 2016, there appear to be no material changes with this current Resource estimate.

Table 1.1 Mineral Resource Estimate Cukaru Peki Deposit Upper Zone
SRK, Effective Date: March 31, 2016

Category Grade Category Tonnes Mt Grade Metal
% Cu % Cu g/t Au % As Cu Mt Au Moz
Indicated >10.0 1.2 15.5 12.4 0.21 0.2 0.5
0.75-10.0 0.5 8.2 5.1 0.27 0.04 0.08
Inferred >10.0 1.2 13.2 10.5 0.20 0.2 0.4
0.75-10.0 33.8 2.5 1.4 0.17 0.8 1.5
Total Indicated   1.7 13.5 10.4 0.23 0.2 0.6
Total Inferred   35.0 2.9 1.7 0.17 1.0 1.9
(1) The cut-off grade used for the estimate is 0.75% Cu.
(2) All figures are rounded to reflect the relative accuracy of the estimate.
(3) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
(4) The Mineral Resource is reported on 100% basis; currently 45% is attributable to Reservoir.

The majority of the estimate is an Inferred Mineral Resource, which SRK expects can be upgraded to an Indicated Mineral Resource with further drilling and sampling. There are no Mineral Reserves at this time.

29 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Bisha Mine – Project Description and Location

The Bisha Mine is located 150 kilometers west of Asmara, 43 kilometers southwest of the regional town of Akurdat and 50 kilometers north of Barentu, the regional or zone Administration Centre of the Gash-Barka District, in Eritrea.  The Universal Transverse Mercator system (UTM) coordinates (The World Geodetic System, 1984) of the centre of the Bisha Property are 1,711,000 N and 334,500 E (UTM zone 37). The following Figure 3 shows the location of the Bisha Property.

Figure 3 – Bisha Site Location

Onsite infrastructure includes two open pits (Bisha and Harena), a process plant (crushers and primary and secondary grinding mills; leach, flotation, thickener, and other tanks; and filter presses), a wet tailings facility and waste rock storage facilities, offices, maintenance and laboratory facilities, fuel storage areas, an on-site power plant, an 1,100 main person camp, a 225 construction person camp and an airstrip nearby.

The Bisha Property consists of the 100% BMSC owned Bisha Mining License, the Harena Mining License, the New Mogoraib River Exploration License and the Tabakin Exploration License.  The Bisha Property hosts the Bisha deposit, a large precious metal (Au) and base metal rich (Cu, Zn) VMS deposit currently being mined, as well as the Harena VMS deposit where a portion of the oxide gold cap mineralization was mined until mid-2013.  Additional potential satellite-feed VMS deposits include Northwest, Hambok, Aderat and Asheli.

BMSC has the exclusive right of land use in the areas comprising the BMSC mining licenses.

30 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

BMSC’s total land package of exploration licenses consists of 814 square kilometers in Eritrea’s Bisha VMS District. The exploration license area consists of two land packages:

  • 184 square kilometers surrounding the existing BMSC mining licenses (“Tabakin Exploration License”), providing continuous coverage for 15 kilometers over the Bisha Mine stratigraphy; and
  • 630 square kilometers in the vicinity of the Bisha mine, combining new and previously relinquished property and the New Mogoraib River Exploration License that hosts the Hambok, Asheli and Aderat deposits. 

The Tabakin Exploration License includes the area between the Bisha and Harena mining licenses. BMSC will be permitted to hold the area covered by the Tabakin Exploration License for ten years before any partial relinquishments. The New Mogoraib River Exploration License will be subject to a relinquishment regime for exploration licenses (three years of no relinquishment, followed by two one-year renewals with a 25% annual area reduction beginning after year three).

Annual fees are approximately $96 per square kilometer for the mining licenses and $32 per square kilometer for the exploration licenses.

Figure 4 – BMSC Resource Areas and License Map

31 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Accessibility, Climate, Infrastructure & Physiography

Accessibility

Access to the Bisha Mine is by paved road from Asmara to Akurdat, a distance by road of 181 kilometers and then 52 kilometers from Akurdat via an all-weather road which is currently being upgraded with over 35 kilometers now paved. The drive from Asmara to the Bisha camp (also referred to as Bisha Village) takes approximately four to six hours by passenger vehicle or bus.  Asmara is the capital city of Eritrea and is serviced currently by regular international flights out of Cairo, Dubai and Istanbul.

Climate

The climate is semi-arid, with elevated temperatures year-round.   During the hot season in April and May, the average temperature is +42°C.  Total annual rainfall is sparse, with between 250 millimeters and 300 millimeters.  The main rainy season is between June and September and local heavy rains can result in flash floods of the Mogoraib and Barka Rivers. Mining activities are planned on a year-round basis.

Physiography

The Bisha Property is mainly located on a flat, desert-like outwash plain.  The plain is at 560 meters above sea level and contains scattered vegetation and few trees.  Locally, steep hills and ridges rise above the plain with the Bisha, Wade, and Neve peaks reaching elevations of up to 1,226 meters above sea level.

The Bisha Property is crosscut by the Mogoraib River, a tributary of the Barka River, as well as seasonal streams that all flow northwards.  A small seasonal tributary of the Mogoraib River, the Ferektatet River, originally passed immediately over the Bisha Property but has since been diverted around the deposit.

Infrastructure

The principal port for importation of heavy equipment and shipment of concentrate is Massawa on the Red Sea coast which is about 350 kilometers from the Bisha Property.  Massawa is connected to Asmara by all-weather paved road.  The Company has a special loading system to accommodate the handling and bulk loading of both copper and future zinc concentrates onto shipping vessels.

The village of Mogoraib located 6 kilometers from the Bisha Mine is the closest settlement and is the local administration centre for the Dighe Sub-zone within the Gash-Barka District.  The village contains a well-equipped, eight-person health centre with nursing staff capable of taking care of small medical problems.  Better-equipped hospitals are found in Akurdat and Keren.  Camp Mogoraib is a military site located just outside the village boundaries and provides basic security to the Mine area.  Basic goods are commercially available in the immediate region near the Bisha Mine at Mogoraib or Akurdat, but the main centre for support is the capital city of Asmara.

Freshwater is supplied to the Bisha Property from groundwater.  Two well farms have been established by the Company, the first approximately 1 kilometer south of the open pit on the western bank of the Ferektatet River (which also serves to dewater the Bisha pit), and the second, 5 kilometers to the west, adjacent to the Mogoraib River.  Potable water sourced from the well fields is pumped to a potable water plant utilizing chlorination filtration and ultraviolet radiation treatment. 

Process water is recycled within the plant as much as possible to minimize the use of fresh groundwater.  Water from the pit and seasonal water from the tailings management facility will be treated in a water treatment plant that was completed in H2 2016 to supplement and reduce the dependence on raw water although currently at lower capacity than originally planned.

Electric power for the mine and processing plant site is supplied from a diesel-fuelled power station located adjacent to the process facilities. Site communication is via a satellite communications system and includes wireless internet access at the village and administration buildings.

32 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Mineral Property History

The Company has no record of any previous exploration or mining activities on the property or surrounding areas prior to 1998.  In June 1998, the Company signed a prospecting license agreement with the State of Eritrea.  In 1999, this agreement was converted to an exploration license that covered an area of 49 square kilometers.  This license was expanded to an area of 224 square kilometers in 2003.

Geological Setting

Eritrea is divided into several north or northeast trending Proterozoic terranes which are separated by major crustal sutures.  The Bisha Property is in the Nakfa Terrane which comprises low-grade metamorphosed calc-alkaline volcanics and sediments.

The VMS deposits at the Bisha Property are hosted by a bimodal sequence of volcanic rocks.  Felsic volcanics directly host and both underlie and overlie the mineralization at Bisha, Harena and Northwest deposits.  These felsic volcanics are flow dominated, indicating proximity to volcanic vents.   Mafic volcanic rocks occur deeper in the footwall to the east of the known mineralized zones.  Alteration of the felsic volcanics is often very intense with the primary mineralogy being converted to sericite and chlorite.  The Hambok deposit, in contrast to the Bisha deposits, is entirely hosted in mafic volcanic rocks.  All rock-types are variably foliated and metamorphosed.

Exploration History

Initial work on the property began in 1998 but was suspended between 1999 and late 2002 due to the border war with Ethiopia.  The Bisha deposit was discovered in November 2002 by diamond drilling geophysical and geochemical anomalies associated with a prominent gossan that locally had highly anomalous gold values.  A VMS deposit was defined and found to be overlain by a supergene copper-enriched zone and a gold-enriched gossan cap.

Between 2003 and 2006, 403 diamond drill and 33 reverse circulation holes were completed at Bisha to enable a Feasibility Study.  Additional work included mapping, geochemical sampling, trenching, ground and airborne geophysics, metallurgical test work and environmental baseline studies.  The Northwest and Harena deposits were discovered with 26 and 27 holes being drilled respectively.

No holes were drilled in 2007 and 2008 and only minor gravity surveying, geological mapping and mechanical trenching were completed.  In 2009 and 2010, 35 mainly geotechnical holes were completed at Bisha and 51 holes were completed at Harena to better define the oxide zone. Thirteen diamond drill holes were drilled to test gravity targets in the Harena area.  No significant mineralization was intersected. 

In 2011, 167 diamond drill holes were drilled at Bisha for resource upgrading as well as for metallurgical and geotechnical studies.  At Harena, five regional exploration holes were drilled to test coincident gravity/EM/soil geochemical anomalies with no significant mineralization being encountered.  Drilling began to define the Northwest deposit to bring it to a maiden resource estimate.  A total of 22 holes were drilled.

In 2012 the majority of drilling was focussed on the development of the Northwest deposit.  Seventy-five holes were drilled to define a maiden resource.  At Harena, exploration diamond drilling included a total of 6 holes with one of the holes intersecting mineralization peripheral to the Harena open pit.

In 2013 diamond drilling consisted of 27,828 meters of exploration and resource development drilling at Bisha Main, the Northwest deposit and Hambok.  At Bisha, 23 holes for 6,223 meters were completed in the immediate Bisha area testing geophysical targets.  A further 8 holes tested below the northern portion of the Bisha Main deposit.  Drilling concluded at Northwest with 93 holes being completed.  At Hambok, 8 holes were completed to infill areas of the deposit that had large gaps in the geological model.  This work allowed for a new open pit constrained mineral resource estimate to be completed.

In 2014 a total of 91 drill holes were completed at Bisha and Harena, around Hambok and Aderat and near Tekewuda to complete 27,300 meters of exploration diamond drilling.  A total of 230 line kilometers of ground and 44 holes of Transient EM surveying was conducted and a 2,500 line kilometer Versatile Transient Electromagnetic (“VTEM”) survey was flown.  A significant new extension of the Harena deposit was discovered and new mineralization was found at Aderat on the New Mogoraib River Exploration License.

33 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

In 2015 a total of 35,805 meters of exploration diamond drilling (72 holes), approximately 30 square kilometers of ground geophysical surveying, geophysical surveying of 85 drill holes and other geological work was completed. Drilling at Harena continued to be successful and the deposit was further defined at depth where it remains open to further expansion. In the immediate Bisha Mine area, exploration efforts were ramped-up, testing for extensions to the main pit deposit both along strike and at depth. Exploration on the New Mogoraib River Exploration License resulted in the discovery of the Asheli deposit in mid-2015. Drilling was suspended as per usual practice due to the annual rainy season in Q3 2015 and no further drilling was completed. However, further geological work resulted in the definition of new targets along strike and to the east of Asheli. Further drilling was also completed at the Aderat prospect which was discovered in 2014.

In 2016 a total of 44,210 meters of diamond drilling was completed property-wide in 91 holes. In addition, ground and borehole geophysical surveys and soil and rock sampling programs were also completed. Forty-three holes (20,595 meters) were drilled at Bisha (21 within the pit and 22 outside of the pit), 36 holes (15,645.5 meters) were completed on the New Mogoraib River Exploration License (20 Asheli, 5 Shabyt, 2 Railway, 1 Bisha Village), 8 holes were drilled at Harena (6,079.5 meters) and 4 holes (1,890 meters) were completed on the Tabakin Exploration license. Work at Bisha included testing the deposit at depth below the currently defined pit. This work has defined the Bisha deposit at depth and will be included in the resource update in early 2017. Condemnation drilling for potential waste dumps defined a number of altered and mineralized horizons trending south of the Bisha open pit that will be continued to be tested in 2017. At Harena, drilling was focussed on continuing to define the down dip extension of the deposit which remains open. Drilling at Asheli was successful in delimiting the massive sulphide intersections made in 2015 which will be included in a maiden resource in early 2017. In late 2016, a new massive sulphide lens was discovered 200 meters to the north of the main deposit at Asheli and this will be the focus of further drilling in 2017. Planning and permitting was finalized for a VTEM survey to be initiated in January 2017 over all the new exploration ground that has not previously been surveyed.

Mineralization

Mineralization at the Bisha deposit is divided into three major zones: oxide, supergene and primary sulphide.  The host rocks are felsic volcanics that have been altered to chlorite and sericite.

Oxide

In the surficial oxide zone, deep weathering affected the primary massive sulphides producing a high-grade stratified gossanous zone that was enriched in gold.  This zone varied in composition from highly siliceous and somewhat ferruginous to a massive goethite-hematite-jarosite.  The depth of this oxidation zone was on the order of 35 meters.  The oxidation of the massive sulphides generated strong acid solutions that had progressively destroyed the sulphides and host rock.  Gold remained in the oxide zone and became concentrated.  This zone is now largely mined out.

Supergene

As the acid solutions percolated downward, they deposited their dissolved copper at the primary sulphide interface to produce a copper-rich supergene zone. A horizon of extremely acid-leached material or “soap” was developed between the oxide and supergene/primary domains and the host rocks.  The principal copper mineral in the supergene zone was covellite.  This zone was mostly mined with its majority excavated by mid-2016, although remnants do remain for potential future minor campaign processing over the next few years.

Primary Sulphide

This zone is a typical VMS with pyrite, chalcopyrite and sphalerite mineralogy in the massive sulphide and chalcopyrite in the stringer zones.  Mining and stockpiling of primary zinc ores commenced in March 2014 and by the end of the 2016 year, stockpiles of 2.5 million tonnes of zinc ore formed part of the stockpile inventory.

34 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The Harena deposit is also a typical massive sulphide body that has been affected by weathering.  The host rocks to the Harena deposit are intensely chloritized and sericitized hydrothermally-altered felsic volcanic rocks.  Surficial weathering processes have produced a surficial oxide/gossan zone with good gold grades underlain by a primary massive sulphide deposit.  Supergene mineralization is not well developed at Harena.  The primary massive sulphide body is currently being explored and is mainly composed of pyrite, chalcopyrite and sphalerite.  Chalcopyrite-rich stringer zones occur stratigraphically beneath the massive sulphides, some of which have high precious metal contents.

The Hambok deposit consists of a single massive sulphide lens.  Base metal values are generally higher nearer to surface along the top and outer edges of the body. The deposit is hosted by variably chloritized mafic volcanic rocks and is dominantly composed of massive pyrite with zones of finely banded chalcopyrite and sphalerite. Intervals of near massive magnetite are often found associated with the massive sulphides.

Mineralization at the Northwest Zone occurs in a series of predominantly pyrite massive sulphide lenses hosted within altered felsic volcanic rocks.  Copper and zinc-rich stringer sulphide mineralization is sporadic within the massive sulphide lenses and in stockwork zones. Some of the massive sulphides have been exposed to weathering at surface creating an oxide zone that is locally enriched in gold. Beneath these areas, some supergene copper mineralization may also be present.

The Asheli deposit consists of a massive sulphide body composed of pyrite, chalcopyrite and sphalerite with minor galena underlain by associated pyrite and pyrrhotite stringer mineralization.   A second lens of massive sulphide was intersected to the north of the main deposit in late 2016 which will be the focus of further drilling in 2017.

Drilling

Diamond drilling at the Bisha, Harena, Northwest, Hambok and Asheli deposits has been undertaken by contractors in a number of campaigns since 2002, with Boart Longyear being the most recent suppliers in 2016For drilling prior to 2014, please refer to the 2013 Technical Report.

In 2015 and 2016, drilling was completed using Longyear LF90 track mounted drill rigs.  In late 2016, a larger Longyear LF240 drill rig capable of drilling holes in excess of 1,500 meters was employed at Harena. Holes are typically initially collared HQ size diameter and reduced to NQ size diameter after approximately 75 meters.  In difficult ground conditions, PQ size diameter may also be used to start holes until the broken ground conditions improve and the hole can be reduced to HQ size diameter.  All drill hole collars are surveyed and down-the-hole surveys were completed with Reflex EZ-Shot camera methods.

At the Bisha Main deposit, massive sulphide mineralization has been well defined with drilling spaced at 25 meters by 25 meters or closer in some areas.  Drilling density decreases with depth but is nominally at 100 meter centres to a depth of 600 meters where it now appears closed off.  

At the Harena deposit, massive sulphide mineralization was drilled on a 30 meter by 50 meter pattern prior to 2014.  Post 2014, drilling down to a depth of 200 meters was on a 50 meter by 50 meter pattern while deeper holes were on a 100 meter by 100 meter pattern or wider.  The deposit has been traced to a depth of 900 meters and remains open at depth.

At the Hambok deposit, much of the massive sulphide mineralization has been well defined with drilling spaced at 50 meters by 50 meters or closer in some areas.  Drilling density decreases with depth and the deposit remains open at depth and along strike to the north.  No drilling was completed at Hambok in 2015 or 2016.

At Northwest, the deposit is well defined with drilling spaced at 25 meters by 25 meters or closer in some areas.  Drilling density decreases with depth and the deposit is open in a number of directions. Core recovery problems in the oxide zone and supergene zone were countered by classification of this material as Inferred Resources.  No drilling was completed at Northwest during 2015 or 2016.

The Asheli deposit has been defined down to a depth of 500 meters on a 50 meter by 100 meter drill pattern.  The main deposit appears to be closed off at this depth, but a new massive sulphide body has been discovered about 200 meters to the north which remains open for expansion along this strike direction.

35 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Sampling and Analysis

For sampling programs prior to 2014, please refer to the 2013 Technical Report.

For 2014, 2015 and 2016, holes were nominally sampled over all sulphide-bearing intervals at a target length of 1.0 meter per sample which was reduced to 0.5 meter per sample to better understand the metal zonation.  Sample intervals vary based upon mineralogical and lithological contacts. The logging geologist sets out the sample regime. Standard diamond cutting blades flushed with fresh water are used to halve the core. 

Highly broken core pieces are cut along the axis if possible or the core is split using a trowel down the middle of the tray row and handpicked or scooped to ensure representative samples are obtained.  Cutting lines may be drawn on the core. The remaining half core is returned to the box and boxes stacked in numerical order by hole.

The technicians or samplers under the supervision of technicians place half of the core in individual trays laid out in numerical order.  Samples are then placed in a drying oven for 12 to 18 hours at between 80°C and 100°C. The samples then pass through a jaw crusher to greater than 75% of sample passing 10 mesh (2 millimeter) screen.  The sample is then split using a Jones-type riffle splitter to achieve a sub-sample weight of approximately 200 to 300 grams.  The sample reject is then bagged, labelled with the original sample ID and put into storage at Bisha site.  The sub-samples are pulverised to better than 85% passing 75 microns.  Samples are analyzed at the accredited on-site SGS laboratory for 37 elements.  Any result that may be used in resource calculation work is then forwarded to Genalysis. When ready for shipping, the pulps are then dispatched by courier in twenty-litre sealed plastic pails along with a sample list and sample submission form to the Genalysis laboratory in Perth, Western Australia for analysis.  Results from the Genalysis re-assay are given priority in the assay database used for resource calculation work.

Bulk density for all samples is determined using Archimedes principle. Rock samples are dried and then wrapped in foil prior to weighing in air and water.

Security of Samples

The chain-of-custody for core samples collected, analyzed and being shipped from site is as follows:

  • Core is transported to the Bisha camp by Bisha personnel and placed in the core logging area.
  • The logging and sample preparation area and the Bisha camp are within a fenced and guarded compound.
  • Core samples are crushed, sub-sampled and pulverized and sent to the on-site SGS lab in containers of 84 samples.
  • Once analyzed, selected sample intervals are placed in sealed pails.
  • Each pail has a list of samples written on the outside of the container.
  • A sample submission form accompanies each pail.
  • Pails are transported to Asmara in company-owned vehicles managed by BMSC.

The sample pails are submitted to the Eritrean Ministry of Energy and Mines for inspection and submission to customs, a customs seal is placed on the pails and they are shipped via air transport directly to the analytical laboratories of Genalysis.

Mineral Resource Estimate

Although the Bisha Technical Reports are current as defined in NI 43-101, an updated Mineral Reserve and Resource estimate on the Bisha Property is expected by the end of the second quarter of 2017.  Therefore, all commentary below refers to the Mineral Resource effective December 31, 2015. This upcoming report for Mineral Resources effective December 31, 2016 may or may not contain material scientific and technical information that differs from that contained in the latest Bisha Technical Report and Mineral Resource statementsAs a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

36 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Commencing in 2005, an initial mineral resource model for Bisha Main was constructed by AMEC.  This model was subsequently updated with new information.  In 2012, AGP Mining Consultants Inc. (“AGP”), an independent mining and geological consulting firm that had not previously reported on the Bisha Property, estimated an updated mineral resource at Bisha.  In 2012, AMEC estimated a mineral resource at Harena.  In August 2012, AGP prepared a new combined Bisha and Harena mineral reserves estimate with an effective date of May 31, 2012 with a technical report which was subsequently filed on SEDAR and EDGAR.

In late 2013, new revised updated mineral resources were estimated with an effective date of December 31, 2013 for both the Bisha Main and Harena deposits which took into effect mine depletion, additional drill, structural mapping and metallurgical test data, and a more refined and slightly differing approach to mineral resource modeling.  Likewise, an updated mineral resource estimate was generated for the Hambok deposit succeeding the past historic mineral resource generated by the previous owner Sanu Resources which importantly employs a constraining pit shell.  In addition, a maiden mineral resource estimate was completed for Northwest.  Details and methodology of this mineral resource estimate can be viewed more fully in the 2013 Technical Report.

Subsequent to the 2013 Technical Report, the resources for both Bisha Main and Harena were estimated by independent consultants Cube Consulting with an effective date of December 31, 2014.

Effective December 31, 2015 a mineral resource estimate was completed for the Bisha Main and Harena deposits by BMSC and announced on February 17, 2016 from an additional 2,819 meters of diamond drilling completed in 2015.

The current December 31, 2015 interpretation and estimation for Bisha was completed using diamond drilled cored holes and recent RC grade control holes.  The majority of the RC holes were drilled as part of a grade control program for the supergene copper phase beginning in 2013 while almost all the diamond drilled holes were drilled prior to May 2012. Diamond drill data for the Northwest and Harena deposits include a significant proportion of drilling completed from 2012 onwards.  All data for Hambok acquired from Sanu Resources was validated before being used.

Indicated resources at Harena as at December 31, 2015 grew from the year previous due to infill drilling by 480,000 tonnes or 15% adding 12 million pounds of copper, 20 thousand ounces of gold and 560 thousand ounces of silver, offset by zinc indicated resources decreasing slightly by 10 million pounds.  The inferred resources at Harena during this same period were increased by the additional drilling of the down-plunge extension which added 4.5 million tonnes or 69% from the year earlier for an additional 186 million pounds of copper, 423 million pounds of zinc, 230 thousand ounces of gold and 6.47 million ounces of silver.  In-situ metal grade estimates in the inferred resource category also increased as contained copper grew by 115%, zinc by 80%, gold by 177% and silver by 82%.

Despite the lower commodity prices used in 2015 for NSR calculations as compared with 2014, the measured and indicated resource at Bisha remained essentially unchanged from the year previous while the inferred resource decreased slightly by 0.30 million tonnes.  The Bisha measured and indicated resources of contained zinc, gold and silver increased by 5%, 11% and 11% respectively; the 25% reduction in copper was mainly due to mining depletion of the supergene zone.

Bulk density values were assigned on the basis of rock type and oxidation state, as defined by the interpreted geological wireframes. The values are based on a combination of bulk densities from the previous resource estimate and in-situ measurements in use at the mine derived during mining.

For all deposits, the estimation process involved the creation of 3D geological and mineralization shapes from interpreted cross sections, statistical domaining, flagging of database, compositing of samples, variography, and estimation of grades by ordinary kriging using search parameters optimized by kriging neighbourhood analysis. Each domain was separately estimated using the unique set of composite samples associated with that domain. 

Visual and statistical validation of the copper, zinc, lead, gold, and silver grade estimates for Bisha demonstrate that the model is a reasonable representation of the input data. A comparison of the copper supergene estimate to actual production to date also demonstrated that the model is a good predictor of production.

37 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The mineral resource for all deposits is a global estimate representing a reliable estimate of the total contained metal at the applied cutoffs, but the block estimates are likely to vary significantly compared with the actual grade/tonnage distribution that will be achieved during selective mining and over short production periods; this variability was considered when applying resource classifications.

The mineralization at each deposit has been sufficiently drilled and sampled to allow classification as a combination of Measured, Indicated or Inferred Mineral Resource in accordance with the current CIM Definition Standards for Mineral Resources and Mineral Reserves. The classification employed reflects a practical combination of both geological knowledge and estimation quality parameters that may be more numerical in nature. This approach to classification aims to avoid creating a complex classification system.

Reasonable prospects for economic extraction were made by applying an NSR-based cutoff to blocks within a constraining optimized pit shell using Lerchs-Grossmann optimization.

The assumed long-term metal prices used for the optimization work as applied to Mineral Resources are shown in the footnotes of the mineral resource tables below. These metal prices are approximately 15% higher than those used in the estimation of Mineral Reserves.

The NSR calculation and pit optimization process considers many of the parameters used in the mineral reserve estimation, as these parameters are well established within the working mine. These parameters include commodity price, budget costs for production and processing, process recoveries, concentrate grade, selling costs, and other ore-based costs. The optimization process also uses the current geotechnical model for the pit design.

For the Bisha and Harena deposits, mineralization below the pit shell described above was studied for potential for underground mining. A high-level assessment in 2015 concluded that an appropriate underground mining cost per tonne would be $60/t. The mineralization was then analyzed for contiguous blocks with NSR values exceeding $100/t. A shape of sufficient tonnage and value was identified and this tonnage is included in the Inferred Resource category given in the Mineral Resource statement. An update to this initial Underground Scoping Study will be released along with the updated Mineral Resource and Reserve and associated technical report no later than the end of Q2 2017 and may or may not contain material scientific and technical information that differs in views in terms of underground mining potential and associated Inferred resources as noted above.

The following tables are based on the December 31, 2015 mineral resource statement, as certified by the identified QPs as of the effective dates indicated. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral Resources reported here for Bisha and Harena are inclusive of Mineral Reserves.

As noted above, an updated Mineral Resource estimate is expected by the end of the second quarter of 2017 that may or may not contain material scientific and technical information that differs from that contained in the tables below.  As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

38 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 2.1 Mineral Resource Estimate (Combined Bisha, Harena, Northwest and Hambok)
Phil Jankowski, MAusIMM (CP), (BMSC), Effective Date: December 31, 2015

Measured  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase       0.0 0        
Supergene Phase 550 2.42   0.6 13 30,000   10 230
Primary Phase 1,150 2.79 3.55 0.8 48 71,000 90,000 30 1,770
Total Measured 1,700   101,000 90,000 40 2,000
   
Indicated  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 300     13.6 427     130 4,120
Supergene Phase 1,490 1.56   0.4 12 51,150   20 580
Primary Phase 36,540 1.00 4.31 0.6 33 806,390 3,471,490 650 39,300
Total Indicated 38,330   857,540 3,471,490 800 44,000
                 
Measured and Indicated Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 300     13.6 427     130 4,120
Supergene Phase 2,040 1.80   0.5 12 81,150   30 810
Primary Phase 37,690 1.06 4.29 0.6 34 877,390 3,561,490 680 41,070
Total Meas & Ind 40,030   958,540 3,561,490 840 46,000
           
Inferred  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 1,060     3.6 35     121 1,180
Supergene Phase 1,400 1.23   0.2 4 38,000   10 190
Primary Phase 12,572 1.40 4.18 1.0 42 388,430 1,158,410 400 16,860
Total Inferred 15,032   426,430 1,158,410 531 18,230
                       

39 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 2.2 Bisha Mineral Resource Estimate
Phil Jankowski, MAusIMM (CP), (BMSC), Effective Date: December 31, 2015

Measured  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase                  
Supergene Phase 550 2.42   0.6 13 30,000   10 230
Primary Phase 1,150 2.79 3.55 0.8 48 71,000 90,000 30 1,770
Total Measured 1,700         101,000 90,000 40 2,000
           
Indicated Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 300     13.6 427     130 4,120
Supergene Phase 470 1.76   0.6 17 18,000   10 250
Primary Phase 23,430 0.98 5.56 0.7 43 506,000 2,872,000 520 32,730
Total Indicated 24,200   525,000 2,872,000 660 37,110
 
Measured and Indicated Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 300     13.6 427     130 4,120
Supergene Phase 1,030 2.11   0.6 15 48,000   20 490
Primary Phase 24,590 1.07 5.47 0.7 44 577,000 2,962,000 550 34,500
Total Meas & Ind 25,920   625,000 2,962,000 700 39,110
   
Inferred  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 400     4.3 60     60 780
Supergene Phase 1,300 1.28   0.1 3 36,000   0 120
Primary Phase 1,600 1.09 5.94 0.7 50 38,000 204,000 40 2,520
Total Inferred 3,200   74,000 204,000 100 3,420

40 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 2.3 Harena Mineral Resource Estimate
Phil Jankowski, MAusIMM (CP), (BMSC), Effective Date: December 31, 2015

Indicated  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase                  
Primary Phase 3,720 0.86 3.14 0.6 27 70,000 258,000 70 3,260
Total Indicated 3,720   70,000 258,000 70 3,260
                   
Inferred  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 130     2.0 21     10 90
Primary Phase 10,870 1.45 3.97 1.0 41 348,000 952,000 350 14,280
Total Inferred 11,000   348,000 952,000 360 14,360
                       
Table 2.4 Northwest Mineral Resource Estimate
Phil Jankowski, MAusIMM (CP), (BMSC), Effective Date: December 31, 2014 (not updated as no change to drill information)

Indicated  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase                  
Supergene Phase 1,020 1.47   0.2 10 33,150   10 330
Primary Phase 2,530 1.04 1.08 0.3 13 58,020 60,250 20 1,050
Total Indicated 3,550   91,170 60,250 30 1,380
                   
Inferred  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 500     3.7 18     50 300
Supergene Phase 100 0.8   3.7 19 2,000   10 70
Primary Phase 100 0.9 0.9 2.9 15 2,400 2,400 10 60
Total Inferred 700   4,400 2,400 70 430
                     

41 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 2.5 Hambok Mineral Resource Estimate
Phil Jankowski, MAusIMM (CP), (BMSC), Effective Date: December 31, 2014 (not updated as no change to drill information)

Indicated  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase                  
Primary Phase 6,860 1.14 1.86 0.2 10 172,370 281,240 40 2,260
Total Indicated 6,860   172,370 281,240 40 2,260
                   
Inferred  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide Phase 20     1.5 17     1 10
Primary Phase 2 0.9 0.2 0.2 8 30 10 0 0
Total Indicated 22   30 10 1 10

Bisha and Harena notes to be read in conjunction with the Resource tables above:

(1) Mineral Resources are defined within an optimal LG pit shell, generated using metal prices for copper, zinc, gold and silver of $3.15/lb, $1.10/lb, $1,265/oz and $21/oz respectively using blocks of all Resource categories. The mining cost and total ore based cost (process, G&A and stockpile rehandle) applied was approximately 10% below the long term view on costs with appropriate ore haulage costs for each satellite deposit. Overall pit slopes varied from 31 deg to 44 deg for Bisha and 29 deg to 44 deg for Harena NSR cut-off ($US/t) used were:
  a. Bisha: $37.50 for Oxide Phase; $37.00 for Supergene and $38.50 for Primary Phase.
  b. Harena: $40.00 for Oxide Phase and $41.00 for Primary Phase.
(2) Net Smelter Return values were calculated for each block using all resource categories, metal prices, recoveries, appropriate smelter terms and downstream costs. Metallurgical recoveries, supported by metallurgical test work, were applied as follows:
  a. Bisha oxide zone: recoveries of 88% and 22% were applied for gold and silver respectively.
  b. Harena oxide zone: a recovery of 75% and 22% were applied for gold and silver respectively.
  c. Bisha Supergene zone; recoveries of 83.3%, 55.5% and 70% were applied for copper, gold and silver respectively.
  d. Bisha Primary zone; recoveries to copper concentrate of 85%, 36% and 29% were applied for copper, gold and silver respectively. Recovery to zinc concentrate of 83.5% was applied for zinc.
  e. Harena primary zone; recoveries to copper concentrate of 85%, 36% and 29% were applied for copper, gold and silver respectively. A zinc recovery to zinc concentrate of 72% was applied.
(3) Mineral Resources are reported within the pit shell generated using the specified commodity prices, using NSR block grade cut-off derived as above. Tonnage is rounded to the nearest 10,000 tonnes and grades are rounded to two decimal places for copper and zinc, one decimal place for gold and zero decimal places for silver. Tonnages and grades for the Inferred category are further rounded reflecting the uncertainty that attaches to this category. Contained metal for copper and zinc are rounded to the nearest million pounds for Bisha and Harena.
(4) Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.
(5) Tonnage and grade measurements are in metrics units. Contained gold and silver ounces are reported as troy ounces, contained copper and zinc pounds as imperial pounds.
(6) Stockpile tonnages are included in the total given in the tables for Bisha and Harena, with their resource category generally reflecting the underlying resource category from which they were derived.
(7) Both the Bisha and Harena Primary Inferred Resources include an Underground Resource. These were derived by defining a shape around contiguous blocks outside the optimized resource pit shell, where an overall NSR of $100 was achieved. The value of NSR $100 represents the processing cost plus approximately $60/t mining cost.
(8) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Hambok and Northwest notes to be read in conjunction with the Resource tables above:

(1) No change has occurred to Hambok and Northwest since 2014 which used metal prices for copper, zinc, gold and silver of $3.35/lb, $1.05/lb, $1,350/oz and $23/oz, respectively. Mineral Resources are defined within an optimal LG Pit Shell. The mining cost and total ore based cost (process, G&A and stockpile rehandle) applied was approximately 10% below the long term view on costs with appropriate ore haulage costs for each satellite deposit. Overall pit slopes varied from 39 to 45 for Northwest and 40 overall for Hambok (preliminary assessment). NSR cut-off ($US/t) used were:

42 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  a. Northwest: $40.70 for Oxide Phase, $39.70 for Supergene and Primary Phase.
  b. Hambok: $44.45 for Oxide Phase and $43.45 for Primary Phase.
(2) Net Smelter Return values were calculated for each block using all resource categories, metal prices, recoveries, appropriate smelter terms and downstream costs. Metallurgical recoveries, supported by metallurgical test work, were applied as follows:
  a. Northwest oxide zone; recoveries of 88% and 22% were applied to gold and silver respectively.
  b. Northwest Supergene zone; recoveries of 87%, 46% and 50% were applied for copper, gold and silver respectively. Zinc has not been assigned a recovery as the values are isolated on the fringes of the deposit.
  c. Northwest Primary zone; recoveries to copper concentrate of 87%, 36% and 29% were applied for copper, gold and silver respectively. Recoveries to zinc concentrate of 81%, 36% and 29% were applied for zinc, gold and silver respectively.
  d. Hambok oxide zone; recoveries of 88% and 22% were applied to gold and silver respectively.
  e. Hambok; recoveries to copper concentrate of 88%, 87%, 36% and 29% were applied for copper, zinc, gold and silver respectively. Preliminary metallurgical characterization studies, but not full testing, have been completed for Hambok.
(3) Mineral Resources are reported within the pit shell generated using the specified commodity prices, using NSR block grade cut-off derived as above. Tonnage is rounded to the nearest 10,000 tonnes and grades are rounded to two decimal places for copper and zinc, one decimal place for gold and zero decimal places for silver. Tonnages and grades for the Inferred category are further rounded reflecting the uncertainty that attaches to this category. Contained metal for copper and zinc are rounded to the nearest million pounds for Bisha and Harena.
(4) Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.
(5) Tonnage and grade measurements are in metrics units. Contained gold and silver ounces are reported as troy ounces, contained copper and zinc pounds as imperial pounds.

43 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Mineral Reserves

Although the Bisha Technical Reports are current as defined in NI 43-101, an updated Mineral Reserve and Resource estimate on the Bisha Property is expected by the end of the second quarter of 2017.  Therefore, all commentary below refers to the Mineral Reserves effective December 31, 2015. This upcoming report for Mineral Reserves effective December 31, 2016 may or may not contain material scientific and technical information that differs from that contained in the latest Bisha Technical Report and Mineral Reserve statementsAs a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

The Proven and Probable Mineral Reserves at the operation have been classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves.  Mineral Reserves were defined within a mine plan, with open pit phase designs guided by Lerchs-Grossmann optimized pit shells, generated using long-term metal prices for copper, zinc, gold, and silver of $2.74/pound, $0.95/pound, $1,100/ounce, and $18.50/ounce respectively. These prices were based on Consensus Market Forecasting that can be applied on long term projects such as Bisha.

Despite a number of factors including mine depletion during 2015 and a reduction in metal prices, the Company managed to minimize the impact of market conditions on any mineral reserve changes effective December 31, 2015. This was possible primarily because of a) an improvement in the Bisha main resource model; b) a reduction in mining costs; and c) a reduction of treatment charges and shipping costs.  The total reserve, inclusive of stockpiles, decreased by 3.1 million tonnes from the year previous which included 248 million pounds of copper. Of this reduction, approximately 1.9 million tonnes and 165 million pounds of copper was due to mill production (mine depletion). The remaining reduction of 1.2 million tonnes and 83 million pounds of copper came from minor changes in the resource model and an increase in cut-off grade for primary ore. Overall, due to higher processing costs forecast for primary ore than the year previous, the Bisha primary reserve decreased by 0.1 million tonnes including a decrease of 1 million pounds of copper and 70 million pounds of zinc. The Harena primary reserve decreased by 0.4 million tonnes including 4 million pounds of copper and 39 million pounds of zinc.

The NSR Cut-Offs (per tonne) are: oxide zone $41.58 for Bisha; supergene zone $41.18 for Bisha; and primary zone $42.92 for Bisha; and $45.48 for Harena.

Pit slope design criteria reflect no change from the previous reserves estimate with overall pit slopes varied from 31.0° to 44° for Bisha, and from 29° to 35.5° for Harena. Revenue will continue to be generated from the sale of copper concentrates (which contain payable co-products of gold and silver) during the supergene ore phase. For Mineral Reserve purposes, the assumption was that both copper and zinc concentrates would be produced during the primary ore phase of the operation that was expected to start in late Q2 2016. Small quantities of oxides remaining in the stockpiles will be processed at the end of the mine life through the currently inactive carbon-in-leach circuit, producing doré with payable gold and silver. Some of the high grade gold stockpiles are saleable as Direct Shipping Ore (“DSO”) and most were monetized in 2016 and there are some to be monetized in 2017.

To capture the multi-rock ore types, variable recoveries by rock type, and multi-element complexity NSR values were calculated for block valuation.  The NSR grade determination considers the recoveries, concentrate grades, and penalties (where applicable) for each rock type, and applies the metal prices as noted above and various cost parameters, resulting in a net value per tonne of ore, inclusive of all costs outside the mine gate. Only Measured and Indicated Mineral Resources were considered for processing. Inferred Mineral Resources were treated as waste.

The waste and ore-based costs applied for pit optimization and mine planning for the 2015 Mineral Reserve process were based on 2016 budget costs developed by BMSC. The mining cost (inclusive of loading, hauling, and support including maintenance) was $2.62 per tonne, plus an appropriate incremental haulage cost per bench. The total ore-based costs for Bisha (ore control, geology, lab services, process, G&A and stockpile re-handle) totaled $41.58 per tonne for supergene and $42.92 for primary ores. For Harena, the ore-based costs include an additional $2.56 per tonne for overland ore haulage.

44 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Because the mineralization-waste delineation was performed using an NSR block value, net of downstream costs, the total ore-based cost represents the marginal break-even cut-off grade for pit optimization and mine planning purposes.

The Mineral Resource estimates for Bisha and Harena are undiluted.  A 1.0 meter dilution skin was added at the time of ore and waste delineation for mine planning purposes (i.e., as a part of the Mineral Reserves process).  Dilution is calculated to be 8% at Bisha main pit. No mining loss adjustments were made.

Factors that may affect the mineral reserve estimates include dilution; metal prices; smelter, refining, and shipping terms; metallurgical recoveries and geotechnical characteristics of the rock mass; operating cost estimates; and effectiveness of surface and groundwater management.

The QPs who prepared this information were of the opinion at the time that these potential modifying factors had been adequately accounted for using the assumptions in the Bisha Technical Report, and therefore the mineral resources within the mine plan could be converted to mineral reserves. Factors that may affect the assumptions in this report are as follows:

  • Commodity price assumptions.
  • The actual Zinc and Copper metallurgical recovery in primary ore.
  • The assumed predominant mineralogy of the primary ore being chalcopyrite and sphalerite absent of metallurgically detrimental elements.
  • Non adverse geotechnical structural complexity as currently modelled in the resource model.
  • Mill throughput of the identified ore types may prove to be higher or lower than modelled. If certain rock types or delivered blends of rock types have lower throughputs than currently modelled, this would increase the processing cost which would in turn increase the mill cut-off grade. If all other variables are held constant, this would tend to reduce the tonnage of the Mineral Reserve and the amount of contained metal. If throughput reductions are significant, this could reduce the size of the economic pit limits, further reducing the Mineral Reserve. Furthermore, a reduction in throughput would delay cash flow, resulting in a negative impact on economics.  For now, none of this is foreseen to occur.
  • Effective surface and groundwater management are important to the safety and productivity of the mining operation. If the currently planned water management methods prove to be ineffective, additional dewatering wells and/or sumps and pump systems may be required which would add to the capital and operating costs, resulting in a negative impact on economics and a potential reduction in the Mineral Reserves.

The summary of the Mineral Reserves is shown in the following tables. The Company as of December 31, 2016 had not completed any re- estimates.

As noted above, an updated Mineral Reserve estimate is expected by the end of the second quarter of 2017 that may or may not contain material scientific and technical information that differs from that contained in the tables below.  As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

45 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 3.1 Mineral Reserve Estimate (Combined Bisha and Harena)
Anoush Ebrahimi, P.Eng, Ph.D., effective December 31, 2015

Proven Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Supergene 236 3.09 - 0.56 14.0 16,067 0 4 106
Primary 141 1.75 5.00 0.80 41.8 5,450 15,529 4 190
Total 377   21,517 15,529 8 296
                   
Probable Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide 300 - - 13.17 415.2 0 0 127 4,000
Supergene 633 1.84 - 0.56 14.7 25,660 0 11 299
Primary 20,891 1.09 5.57 0.68 43.9 503,973 2,565,325 458 29,468
Total 21,824   529,633 2,565,325 596 33,767
                   
Total Reserve (P&P) Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide 300 - - 13.17 415.2 0 0 127 4,000
Supergene 869 2.18 - 0.56 14.5 41,727 0 16 405
Primary 21,032 1.10 5.57 0.68 43.9 509,423 2,580,854 461 29,658
Total 22,201   551,150 2,580,854 604 34,063

46 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Table 3.2 Bisha Mineral Reserve Estimate
Anoush Ebrahimi, P.Eng, Ph.D., effective December 31, 2015

Proven Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Supergene 236 3.09 - 0.56 14.0 16,067 0 4 106
Primary 141 1.75 5.00 0.80 41.8 5,450 15,529 4 190
Subtotal 377   21,517 15,529 8 296
                   
Probable  Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide 300 - - 13.17 415.2 0 0 127 4,000
Supergene 633 1.84 - 0.56 14.7 25,660 0 11 299
Primary 19,866 1.10 5.68 0.69 44.8 483,861 2,486,459 440 28,614
Subtotal 20,799   509,521 2,486,459 579 32,913
 
Total Reserve (P&P) Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Oxide 300 - - 13.17 415.2 0 0 127 4,000
Supergene 869 2.18 - 0.56 14.5 41,727 0 16 405
Primary 20,007 1.11 5.67 0.69 44.8 489,311 2,501,988 444 28,803
Subtotal 21,176   531,038 2,501,988 587 33,208

Table 3.3 Harena Mineral Reserve Estimate
Anoush Ebrahimi, P.Eng, Ph.D., effective December 31, 2015

Probable Contained Metal
  Tonnes Copper Zinc Gold Silver Cu Zn Au Ag
Zone ('000s) % % g/t g/t ('000 lbs) ('000 lbs) ('000 Oz) ('000 Oz)
Primary 1,025 0.89 3.49 0.52 25.9 20,112 78,866 17 855
Subtotal 1,025         20,112 78,866 17 855

Notes to be read in conjunction with the Reserve tables above:

(1) NSR Cut-Off ($US/t): Oxide zone $41.58/t, Supergene zone $41.18/t and Primary zone $42.92/t for Bisha. The only mineable resource in Harena is Primary zone and the NSR Cut-Off used is $45.48/t. Mineral Reserves are defined within a mine plan, with phase designs guided by LG Pit Shells, generated using metal prices for copper, zinc, gold and silver of $2.74/lb, $0.95/lb, $1100/oz, $18.50/oz respectively. The mining cost was $2.62/t, plus $0.015/t/5 m bench for ore and waste below reference elevations of 560 masl and 600 masl for Bisha and Harena respectively. The total ore-based cost (process, G&A, stockpile and rehandle) are 41.58/t for oxide, $1.18/t for supergene and $42.92/t primary ores. Harena ore-based costs include an additional $2.56/t overland ore haulage cost for 10km distance between Harena pit and the crusher. Overall pit slopes varied from 31 degrees to 44 degrees for Bisha and from 29 degrees to 35.5 degrees for Harena.
(2) Economic values for the multi-metal, multi zones were modelled using Net Smelter Return values. Each block NSR value was calculated using diluted grades, metal prices, recoveries and appropriate smelter terms and downstream costs. Metallurgical recoveries, supported by metallurgical test work, were applied as follows:

47 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  Bisha oxide zone: recoveries of 85% and 30% were applied for gold and silver respectively.
  Bisha Supergene zone: recoveries of 83.3%, 55.5% and 70% were applied for copper, gold and silver respectively. Zinc has not been assigned a recovery as most of the supergene zone will be processed prior to start-up of the zinc flotation plant. An arsenic recovery of 60% was applied for smelter penalty inclusion in the NSR calculation and cash flow analysis.
  Bisha Transition zone has applied the same metallurgical parameters as Bisha supergene phase. In this zone if the copper to zinc ratio is less than 5 then it is not included in the reserve.
  Bisha Primary zone: recoveries to copper concentrate of 85%, 36% and 29% were applied for copper, gold and silver respectively. A zinc recovery to zinc concentrate of 83.5% was applied.
  Harena primary zone: recoveries to copper concentrate of 85%, 36% and 29% were applied for copper, gold and silver respectively. A zinc recovery to zinc concentrate of 72% was applied.
(3) Mineral Reserves are reported within Bisha and Harena ultimate pit designs, using NSR block grade, where the marginal cut-off is the total ore based cost stated above. Tonnages are rounded to the nearest 1,000 tonnes. Grades of copper, zinc and gold are rounded to two decimal places. Grades of silver are rounded to one decimal place.
(4) Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.
(5) Tonnage and grade measurements are in metrics units. Contained gold and silver ounces are reported as troy ounces, contained copper and zinc pounds as imperial pounds.
(6) The life of mine strip ratios (by weight) for Bisha and Harena are 6.50:1 and 5.74:1 respectively.
(7) The Bisha oxide Probable Mineral Reserves, which include DSO Reserves, are 300 kt at 13.17 g/t Au and 415.17g/t Ag in stockpile as of 31 Dec 2015.
(8) The Bisha supergene Probable Mineral Reserves are inclusive of 221 kt at 1.83% Cu in stockpile as of 31 Dec 2015.
(9) The Bisha primary Probable Mineral Reserves are inclusive of 983 kt at 3.36% Zn and 3% Cu in stockpile as of 31 Dec 2015.
(10) 8% dilution was estimated in Primary zone in Bisha after applying 1.0 m "skin" of dilution at ore/waste contacts.
(11) No mining losses adjustments are made; a 0.5% shipping loss for concentrates have been accounted for.
(12) The end of December 2015 topography was used for this calculation.

48 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Mining Operations

The table below highlights the three-year key mine and process metrics at Bisha.

Table 4.1 Key Production Highlights – 3 Year History

  2016 2015 2014
Oxide ore mined, tonnes - 240,000 225,000
Supergene ore mined, tonnes 902,000 2,064,000 1,936,000
Primary ore mined, tonnes 2,741,000 846,000 121,000
Waste mined, tonnes 9,367,000 10,654,000 12,277,000
Strip ratio, (using tonnes) 2.6 3.4 5.4
       
Processing – supergene ore:      
Tonnes milled 1,055,000 1,929,000 1,789,000
Copper feed grade, % 2.8 3.9 5.9
Recovery, % of copper 85.2 82.6 85.0
Copper in concentrate produced, millions pounds 55.8 135.9 196.0
       
Processing – primary ore:      
Tonnes milled 1,223,000 - -
Zinc feed grade, % 5.7 - -
Copper feed grade, % 0.9 - -
Recovery, % of zinc 58.8 - -
Zinc in concentrate produced, million of pounds 90.2 - -

The ultimate Bisha Main pit is planned to be approximately 1.3 kilometers long and 0.7 kilometer wide.  The maximum planned slope height is 240 meters.

The metallurgical recovery of zinc at 58.8% noted in the table above, while much different than assumed in the latest December 31 2015 Mineral Reserve estimate footnotes, was reflective of a combination of commissioning start-up issues for 3 months prior to commercial production and ongoing metallurgical challenges predominantly with the production of a clean copper concentrate but also adversely affecting recovery of zinc into concentrate.  These matters are subject to ongoing test work and analyses with progressive improvements expected during 2017.

Geotechnical domains have been revised and were updated in 2016, with updated slope design recommendations having been provided for each design sector in each geotechnical domain. Design sectors are defined by the average azimuth of the planned wall orientations, based on geological structural controls on slope stability. Geotechnical domains result from the combination of structural domains and geotechnical units, resulting in ten discrete geotechnical domains within the footwall, and eight within the hanging wall. Recommended inter-ramp angles vary from 41° - 46° depending on the design sector and geotechnical domain. The 2016 geotechnical design recommendations predominantly resulted in minor increases of slope inter-ramp angles due to the increased level of knowledge and data accuracy.  All of the slope designs assume that controlled blasting will be undertaken for the final walls of the pit.

Depressurization of the open pit slopes is required to achieve the open pit slope design in some areas of the pit, and is carried out through the installation of sub-horizontal depressurization drainage holes. Dewatering of the open pit floor is conducted primarily through the use of in-pit sumps. In-pit vertical dewatering bores have proven to be ineffective due to the restricted nature of the flow paths being located on discrete and predominantly sub-vertical structures making intersection with a dewatering bore difficult to achieve.

The Bisha and Harena deposits are being mined by conventional truck and shovel open pit mining methods. 

The Harena deposit is scheduled to recommence mining at the tail end of the Life of Mine. The original Bisha pit consisted of nine individual pit phases (although in mid-2015 there was a suspension of waste mining pending further investigation of Phase 9 economics), where the first three phases targeted oxide ore production, the second three targeted supergene ore production, and the final three phases planned to target primary ore production.  The oxide pit phases have now been exhausted, as have Phases 4, 5 and 6 which provided supergene ore.  Stripping for the primary mineralization started with Phase 8 in late 2013 and Phase 9 in 2014 and a re-optimization resulted in the suspension of Phase 9 stripping from mid-2015 while ongoing updated LOM and underground scoping study value optimization investigations continue, with results expected no later than the end of Q2 2017 in the upcoming technical report.

49 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The Harena pit features two pit phases, one targeting oxide production (which was mainly completed in mid-2013 with some remnant material remaining), and the final phase targeting primary production to be active in 2021 for waste stripping with ore extraction scheduled commencing 2023 as per the latest Life of Mine plan dated December 31, 2015.  The Harena pit is currently inactive for mining but additional exploration drilling was completed during 2016 with exploration drilling continuing to further highlight growing at depth with the deposit to be investigated for underground mining potential.

Although the initial oxide production phase of the operation is complete, oxide ore has since been mined and placed in stockpiles.  The higher grade portion of these stockpiles (100,000 tonnes) was directly shipped and sold during 2016 realizing 90,000 equivalent gold ounces.  Additional oxide gold stock (30,000 tonnes) will be direct shipped and sold in 2017 and the remaining 130,000 tonnes will be processed at the end of the mine life. 

The open pit designs for Bisha Main include double lane ramp design widths of 24 meters, based on 3.5 times the width of the Cat 775 truck, ramp gradient of 10%, and smoothing of walls in areas where convex “noses” may potentially cause geotechnical issues.

The mine plan for the current December 31, 2015 mineral reserves was developed using an average throughput of 2.4 million tonnes per annum for all materials. Descent rates in the pit were limited to 50 vertical meters per year.  Drilling and blasting will be performed on 5 meter benches in ore and waste ranging between 5 and 10 meters.  The mine is scheduled to work 360 days a year, with five days allowed for delays due to weather disruptions.  The plant is scheduled to operate 365 days a year.

The mine delivers ore to the ROM pad, where it is sorted into several different short-term stockpiles.  This ore is then reclaimed by a front-end loader to the crusher, following a blending plan that is provided daily and modified as required based on process plant performance.  Longer-term stockpiling of non-oxide material has been minimized to limit oxidization.

Bisha has three different types of mineralization – oxide, supergene, and primary – each requiring a specific process flow sheet.  The plan in the 2006 Bisha Feasibility Study was to mine and process each zone in succession starting with the top oxide zone (now ceased).  The oxide plant facilities included a primary jaw crusher, a single Semi-Autogenous Grinding followed by single ball grinding mills, cyanide leach/carbon-in-leach circuit, cyanide destruction circuit, refinery to produce doré bullion, tailings thickener, tailings discharge system, and the necessary reagent, water, and air systems. Additional process equipment as part of the copper flotation plant to treat the supergene mineralization was commissioned by mid-2013 and installed downstream of the crushing and grinding “front end” part of the carbon-in-leach plant which treated the oxide ore.  This equipment consists of flotation cells for copper roughing and cleaning requirements, regrind mills for size reduction of rougher concentrate, copper concentrate thickener and pressure filters, a copper concentrate load-out building, copper flotation reagent systems, flotation air blowers, and pressure filter air compressors.  A decision was made in 2014 and construction completed in Q1 2016 to replace the 4 x Metso vertical regrind mills in the copper flotation plant with an IsaMillTM regrind mill, to be commissioned in Q2 2016.  A near identical duplicate of this copper flotation circuit has been constructed downstream for the zinc flotation circuit, that was commissioned in June 2016.

Due to the sub-horizontal and undulating contact between the supergene and primary mineralized materials, there could be a multi-year period where both minor amounts of supergene and dominant primary materials are mined and processed during 2017 and through 2019.  During this overlap period, both supergene and primary ores could be treated in campaigns of appropriate durations.  Some stockpiling of supergene and primary mineralization types has and will continue to occur.  The effect of any possible sulphide mineral oxidation on flotation performance is expected to be minimized by management practices currently used in the base metal sulphide sector, such as reduced wetting of broken ore.

50 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The current life of mine plan is being updated and will be completed before the end of Q2 2017, and will be published in the upcoming Mineral Resource and Mineral Reserve statement and associated technical report. The latest life of mine plan started from the December 2015 end-of-month surveyed surface. For this current LOM, it was envisioned that the waste rock which would be produced from the Bisha Main and Harena pits would continue to be placed in two waste rock facilities to the east and southeast of the Bisha Main open pit, as well as in a backfill dump located in the north end of the ultimate Bisha Main pit. The east waste rock facility nominally covers 80 hectares, and the southeast waste rock facility nominally covers 90 hectares. An operational scheduling plan has been prepared for placement of the rock within the dumps that allows potential acid rock drainage issues to be appropriately managed during operations and closure.

At the end of 2016, there were four distinct types of stockpiled material – 400,000 tonnes of pyrite sand material, 130,000 tonnes of oxide ore, 2,500,000 tonnes of primary ore, inclusive of boundary layer material, and 40,000 tonnes of supergene ore.

The pyrite sand material consists of approximately 10,000 tonnes of high grade material, and 390,000 tonnes of lower grade material. Further study is required to determine the most economic method of monetizing the lower grade stockpiled pyrite sand.

The 2,500,000 tonnes of primary ore include 2,300,000 tonnes of boundary layer material. The boundary layer material had been intended to be either processed in a blended manner with in-pit fresher primary ore through both the existing copper flotation plant followed by the new zinc flotation plant, and/or processed via an alternative method based on future planned boundary material processing studies commencing later this year. The Company has decided to segregate and stockpile all boundary primary material for future processing pending these technical investigations.

The composition of stockpiled materials as at December 31, 2016 is as follows:

Table 4.2 Stockpiled Materials

  Total Current Non-current
Supergene ore 40,000 - 40,000
Primary ore 2,500,000 200,000 2,300,000
Oxide ore 130,000 30,000 100,000
Pyrite sand ore 400,000 - 400,000

Underground Scoping Study

The discussion in the section below on underground mining potential at Bisha is based on information as at the end of 2015. An updated underground scoping study as at the end of 2016 is ongoing (being conducted by SRK Consulting Canada) and will be completed and published in the upcoming Mineral Reserve and Resource estimate and associated technical report that is expected by the end of the second quarter of 2017.  Therefore, all commentary below is derived from the internal underground scoping study a year previous, as at the end of 2015As a result, readers are cautioned that the scientific and technical information contained in this AIF may change and caution should be used by readers in relying upon such information.

In Q2 2015, Nevsun commissioned SRK Consulting (Canada) Inc. to conduct an internal conceptual study of the potential for underground mining at Bisha and Harena as well as to conduct a Life of Mine optimization study considering all Bisha regional resources. As this optimization study used inferred mineral resources, no mineral reserves had been estimated. The status of those assessments from end of 2015 for Harena and Bisha are outlined below. The deposits at Hambok and Northwest remain of interest, but of lower priority, for potential eventual economic extraction based upon a number of variables including size, projected costs and metal prices.  As the assessments of Hambok and Northwest were less encouraging as compared with Harena and Bisha, the Company elected to allocate investment capital to Harena and Bisha in 2017 with limited investment for Hambok and Northwest.

51 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Bisha Underground

Ongoing investigations during H2 2015 continued to assess the reasonable prospects of eventual economic extraction of the currently defined Indicated and Inferred mineral resources at Bisha Main pit by means of underground mining methods. Conceptual mining constraints were used to assess the potential optimum interfaces between open pit mining and underground mining for the purposes of updating future mineral reserves and the associated production profile which may be revised as a result. The interim results of the ongoing internal study indicated that underground mining at Bisha Main Pit was plausible and that some of the material currently in the open pit mine plan may be more economic if extracted by underground bulk mining methods as compared with high strip ratio open pit cutbacks.  This may or may not change, depending on the updated underground scoping study to be completed and published in the upcoming Mineral Reserve and Resource estimate and associated technical report expected in Q2 of 2017.  Any decisions regarding future underground development including a potential exploration decline will be made following receipt of the upcoming Mineral Reserve and Resource estimate and associated technical report. 

Harena Underground

The Harena underground mining conceptual investigations used the Mineral Resource that was announced on February 17, 2016. The findings based upon this Mineral Resource implied a potentially mineable deposit with marginal economics that remains sensitive to metal prices and metallurgical recoveries. Updated metallurgical recoveries have since been conducted and subsequent study results will be detailed in the upcoming Mineral Reserve and Resource estimate and associated technical report expected in Q2 of 2017. Any decision to invest in an exploration decline will be made at time of this upcoming technical report as well.

Capital and Operating Costs

Capital and operating costs for the Bisha Property are shown in the table below.

Table 4.3 Capital and Operating Costs (‘000s)

  2016 Actuals $ 2017 Outlook $
Operating Expenses 103,442 175,000
Capital Expenditures:    
Bisha Mineral Properties Acquisition 37,630 -
Zinc Plant Expansion 13,240 -
Pre-commercial zinc phase costs capitalized, net of sales receipts 21,072 -
Capitalized Exploration    
Bisha 10,643 9,000
Sustaining Capital (including expansion of tailings facility) 7,516 14,000
Total Capital Expenditures 90,101 23,000

Operating expenses include mine operating costs as well as commercialization costs comprised primarily of trucking, port and shipping costs. In 2016, $40 million of operating expenses were capitalized for the pre-commercial phase of the new zinc plan but not included in the 2016 operating expenses shown in the above table. 

52 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Metallurgical Test Work and Process Plant Design

The Bisha Property mineral resource contained three ore types: a gold and silver bearing oxide cap, underlain by a more complex secondary copper mineralized supergene ore which was in turn underlain by primary copper-zinc ore where chalcopyrite (copper) and sphalerite (zinc) are the main economic minerals.

The metallurgical performances of the three ore types corresponding with metallurgical test data completed in 2013 and 2014 coupled with actual observed behaviour in 2013 through 2015 are summarized in the table below.

Table 4.4 Key Processing Highlights – 3 Year History 2013 through 2015

  %Au Recovery %Ag Recovery %Cu Grade %Cu Recovery %Zn Grade %Zn Recovery
Historical            
Bullion from Bisha Oxide Ore 88 22 - - - -
Bullion from Harena Oxide Ore 75 n/a - - - -
Cu Conc from Bisha Supergene Ore 54 74 22-30 80-87 - -

However, after commissioning of the zinc flotation plant expansion in mid-2016, the actual metallurgical performance was not as expected due to challenges with the primary ore and pre-activation of the zinc ore sphalerite in the copper circuit.  This resulted in dilution of the concentrate produced from the copper flotation circuit with much higher than planned zinc and pyrite reporting to the concentrate, leading to a saleable bulk zinc rich concentrate in addition to the good quality zinc concentrate produced from the newly expanded zinc flotation circuit.  The metallurgical performance for since June 2016 is highlighted below:

Table 4.5 Key Processing Highlights – June 2016 – December 2016

  %Au Recovery %Ag Recovery %Cu Grade %Cu Recovery %Zn Grade %Zn Recovery
Historical            
Bulk Conc from Bisha Primary Ore 8 16 5-10 10-58 29-39 8-35
Zn Conc from Bisha Primary Ore - - 3-4 9-19 43-49 26-39

A significant amount of work from Q4 2016 has been conducted to try to overcome the metallurgical challenges due to the highly variable primary ore body, from recent process plant operating and design improvements, geo-metallurgy test work with additional diamond drilling, metallurgical flotation testing and the extensive use of external specialist companies who have been on site during Q4 2016 and Q1 2017.  The results of this work and the updated drilling results from 2016 are being analyzed and will be reflected in an updated Mineral Reserves and Resource estimate for Bisha and will include a forecast of expected metallurgical recoveries and concentrate quality in the Bisha flotation plant, with the 2017 technical report expected to be finalized in Q2 2017.

The oxide, supergene and primary ores required different processing techniques and equipment.  Oxide ore processing ceased in Q2 2013 whereupon supergene ore commenced. Supergene ore processing ceased near the end of Q2 2016. The current plan is to mine the remaining primary zones at Bisha Main first followed by the lower grade but mineral resource expanding (with ongoing successful resource drilling) Harena deposit.

The additional equipment installed for the completed zinc flotation circuit included zinc roughing and cleaner flotation sections, zinc rougher concentrate regrinding, zinc concentrate thickener and pressure filters, a zinc concentrate load-out facility, zinc flotation reagents system, a tailings return water treatment facility to recycle approximately 50% of water sent to tails and additional flotation air blowers.

In 2013, 89,800 dry metric tonnes (“DMT”) of concentrate was produced with the copper grade of 24.3% containing 21,800 tonnes of copper. In 2014, 337,500 DMT of concentrate was produced with the copper grade of 26.3% containing 88,900 tonnes of copper. Average copper recovery in 2014 was 85%.  In 2015, 260,900 DMT of concentrate was produced with the copper grade of 23.6% containing 61,600 tonnes of copper.  Average copper recovery in 2015 was 83%. In 2016, 113,800 DMT of copper concentrate was produced with a copper grade of 22.2% containing 25,300 tonnes of copper; 49,500 DMT of bulk concentrate was produced with a zinc grade of 33.6% containing 16,600 tonnes of zinc; and 52,800 DMT of zinc concentrate was produced with a zinc grade of 46.0% containing 24,300 tonnes of zinc.  Average copper recovery in 2016 to both concentrates was 46.7% and average zinc recovery to both concentrates was 58.8%.

53 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Concentrate is loaded from the dewatered mine site stockpile, sealed in special shipping containers and transported to the existing container port of Massawa on the Red Sea by truck. The concentrate is exported using a proven system with industry leading environmental controls. The sealed containers are stockpiled in Massawa at the container port facilities while waiting for ship arrival. The mobile crane system then lifts the containers with a specialized 360-degree rotating spreader (termed a Rotainer system) and discharges the concentrate from the containers into bulk vessels. The empty containers are returned to the Bisha Mine for re-loading. The bulk vessels deliver the concentrate to copper smelters worldwide.

Mine Waste and Water Management

Waste rock from the Bisha open pit is being placed in two separate waste rock dumps, non-acid generating (“NAG”) and potentially acid generating (“PAG”). The decision on where to place future waste rock excavated during pit stripping is based upon waste rock characterization laboratory work. Waste rock characterization at Harena has indicated there is no potential acid generating for the oxide zone and consequently no requirement for drainage and sump systems. Waste rock dump locations are determined taking into account the level of environmental impact, optimizing mining operations, and permit expansion of mining areas based on further exploration programs. The Bisha PAG waste rock dump has been designed with a compacted low permeable soil base layer, drainage and seepage collection system, and sumps to facilitate re-use of any seepage in the process plant should it occur. Design criteria at both pits allows for gravity drainage to the open pits on closure.  PAG waste will be encapsulated with NAG waste rock to control potential acid leachate generation.

Tailings generated from the processes are pumped to the Tails Management Facility (TMF) situated to the north of the process plant. Site selection of the TMF was based on storage characteristics of the basin and natural topography, extent of environmental impact and embankment construction requirements.  The TMF is lined with an impermeable High Density Polyethylene liner to reduce any potential impact to groundwater aquifer and/or downstream users and is subject to regular geotechnical inspections to monitor wall integrity.  Tailings deposited since commissioning is approximately 10.3 million tonnes (4.5 million tonnes from the oxide zone and 4.8 million tonnes from the supergene zone and 1.0 million tonnes from the primary zone). A return water methodology of operation ensures re-use of this valuable resource as far as practicable but further work was undertaken in 2016 to further improve TMF return water rates.  As the gold phase was complete in the middle of 2013 (and hence no longer using cyanide, and a subsequent lift completed to the tails facility in mid-2014), cyanide in the TMF has dissipated through natural solar destruction and is no longer a concern. The first 3 meter lift of the existing TMF was completed in April 2014 and there are currently 3.1 meters of freeboard remaining and another lift commenced in Q4 2016 due for completion Q1 2018.

Natural acid generation from the sulphides of the supergene zone is a new issue in the pit and steps were put in place to mitigate this influence on the environment by sending all pit water to the lined TMF.  BMSC is currently in the process of upgrading its TMF return water neutralization circuit that will have sufficient capacity to manage both TMF return water and pit water.

Surface water flow in the project area is non-existent for much of the year; however, river and stream flow can be significant during precipitation events.  Three separate diversions in the Ferektatet River ensure that storm water is directed away from operations to both the east (Shatera River) and the west (Mogoraib River). Groundwater is the main water source for the process plant, the volume of which is reduced by a zero discharge policy, judicious re-use of poor quality pit sump water and maximum use of dewatering well waters.  

54 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Socioeconomic and Environmental Assessment and Approval

The environmental assessment phase of Bisha Mine commenced with baseline studies in 2004. The Eritrean Ministry of Energy and Mines approved the Terms of Reference for the SEIA project in March 2006 and the SEIA was completed in December 2006.  During 2009 the Company completed an update report which augmented the 2006 SEIA and addressed the revisions to the configuration of the project that had occurred since the 2006 Bisha Feasibility Study.  The project SEMPs were extended to capture the additional details of the project resulting from the advancement of engineering and development and to ensure full compliance with the Eritrean National Standards. The Company continues to consult and work closely with government ministries on matters pertaining to social and environmental aspects and will continue to do so through the LOM.  There have been no material adverse social or environmental impacts identified.

The Company is aligning its environmental systems with the IFC Performance Standards and developing its management plans accordingly.  The plans have been subject to review by the host country, as well as part of an extensive due diligence by international bankers who at one time were considered for funding.  The social and environmental plans have been implemented and have subsequently been audited by an independent third party. Staff training and engagement with local authorities, as well as significant employment from both local and other in-country sources are key elements of the Company’s social and environmental management.  Department heads for both human resources and environment are experienced professionals with a solid understanding of local requirements as well as IFC Performance Standards.  The Company continues to place significant emphasis on all social and environmental impacts of its operations.

SEMPs are in place and serve to assist the Company in achieving compliance of the operation to both Eritrean legislation and where this is not available, to international best practice or standards. An in-house review and update of the SEMPs was conducted during 2012 based on comments received by the Impact Review Committee. An independent review and update of the SEMP was completed in Q2 2013 and has addressed the updated roles and responsibilities in the SEMP. Internally, policies and statements of intent have been developed with respect to environmental policy, water conservation, energy conservation, cyanide management and materials management. These policies will be augmented with training, awareness and toolbox talks, with the goal of implementing these policies throughout the workforce. An extensive environmental monitoring program which includes air quality (ambient and operational dust and emissions), noise (ambient and operational), water qualities and quantities, and natural resources, to  measure the effectiveness of the proposed mitigation actions in the environmental management plans.

The Company continues to consult and work closely with government ministries through the submission of annual and quarterly reports and quarterly inspections by the Impact Review Committee and will continue to do so throughout the LOM.  There have been no adverse social or environmental incidents since the commencement of commercial operations.

Exploration and Development

A further $9 million in exploration investment is planned for 2017.  Key 2017 exploration objectives which will be prioritized on a success basis for additional work include:

  • Completion of a 6,386 line kilometer VTEM survey over the newly acquired ground on the New Mogoraib River and Tabakin Exploration Licenses and follow-up promising results with ground geophysics and diamond drilling;
  • Further testing of the potential of the Asheli mineralized system searching for new mineralized zones;
  • Continued testing of known high priority greenfield targets on the New Mogoraib River and Tabakin Exploration Licenses; and BMSC expects to drill in excess of 31,500 meters during 2017.
Risk Factors

Risks and risk factors relating to the Company and its business are attached to this AIF as “Schedule B” in addition to other financial risks which are set out in the Company’s MD&A for the fiscal year ended December 31, 2016, all of which are hereby incorporated by reference.

55 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Dividends

NRL declared its first cash dividend of $0.03 per common share on May 18, 2011. The second dividend was declared on November 21, 2011 for $0.05 per common share, giving shareholders an accumulated annual dividend of $0.08 per common share for a total declared dividend of $15.9 million.

In 2012 NRL declared two cash dividends of $0.05 per common share ($0.10 per common share annually) on May 15, 2012 and November 15, 2012 for a total declared dividend of $19.9 million.

In 2013 NRL declared two cash dividends of $0.07 per common share ($0.14 per common share annually) on May 15, 2013 and November 14, 2013 for a total declared dividend of $27.9 million.

In 2014 NRL declared a cash dividend of $0.04 per common share in the fourth quarter, payable on January 15, 2015, an increase of 14% from the cash dividends declared in the first three quarters of 2014 of $0.035 per common share quarterly which were paid to shareholders on April 15, 2014, July 15, 2014, October 15, 2014, and January 15, 2015, respectively for a total declared dividend of $28.9 million.

In 2015 NRL declared a cash dividend of $0.04 per common share in each quarter which was paid to shareholders on April 15, 2015, July 15, 2015, October 15, 2015, and January 15, 2016, respectively for a total declared dividend of $32.0 million. 

In 2016 NRL declared a cash dividend of $0.04 per common share in each quarter which was paid to shareholders on April 15, 2016, July 8, 2016, October 14, 2016, and January 13, 2017, respectively for a total declared dividend of $40.1 million.  NRL intends to continue its policy of paying dividends to its shareholders on a quarterly basis.

In September 2016, the Company adopted a Dividend Reinvestment Plan (“DRIP”) to offer shareholders an opportunity to increase their investment in NRL without additional transaction costs by reinvesting their cash dividends into additional common shares of the Company. The shares are currently being issued from treasury at a 3% discount to the weighted average trading price of the common shares on the NYSE during the five trading days immediately preceding the dividend payment date.  The 3% discount will remain in effect for all cash dividends that may be declared, if any, by Nevsun’s Board of Directors until otherwise announced.  Participation in the DRIP is optional and currently shareholders holding approximately 13% of the issued and outstanding shares of NRL have enrolled.

Description of Capital Structure

NRL has authorized capital of an unlimited number of common shares without par value of which 301,869,593 are issued and outstanding at the date of this AIF.  All shares in the capital of NRL are of the same class.  The holders of common shares are entitled to dividends, if, as and when declared by the Board, to one vote per common share at meetings of the shareholders and, upon liquidation, to share equally in such assets of NRL as are distributable to the holders of common shares. NRL also has stock options outstanding.  See the notes to NRL’s audited consolidated financial statements for the year ended December 31, 2016 for additional information regarding NRL’s options. On May 22, 2014 the shareholders of NRL ratified a shareholder rights plan (the “Rights Plan”) that was originally adopted on June 8, 2011.  The Rights Plan was adopted to provide the Board with more time to consider alternatives in the event of a takeover bid for the common shares of NRL. A copy of the Rights Plan is available under NRL’s profile on SEDAR at www.sedar.com.

56 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Market for Securities

NRL’s common shares have traded on the TSX since March 8, 1996 and on the NYSE MKT since January 12, 2005.  During the 2016 financial year, the price of NRL’s common shares on the TSX ranged from CAD$3.27 to CAD$4.81, with monthly trading volume on the TSX ranging from 6.8 million shares in March to 23.8 million shares in June, with an average monthly volume of 16.2 million shares on TSX plus 13.5 million shares on NYSE MKT, for a total average monthly volume of 29.7 million shares.  There are no seasonal trends to fluctuations in volume or trading price.  The monthly high/low trading prices and closing prices on the TSX and monthly volume for 2016 are as follows:

Common Shares
CAD $ High ($) Low ($) Close ($) Volume
January 3.93 3.27 3.81 19,678,344
February 4.62 3.54 4.40 9,206,168
March 4.81 4.18 4.20 6,847,474
April 4.81 3.85 4.69 15,612,831
May 4.72 4.16 4.35 11,025,282
June 4.53 3.62 3.79 23,785,851
July 4.42 3.71 4.32 20,931,513
August 4.54 3.90 4.13 15,565,260
September 4.28 3.96 3.97 19,541,506
October 4.04 3.55 3.89 14,665,373
November 4.49 3.65 4.31 21,310,972
December 4.56 4.14 4.15 16,152,889

In addition to trading on the TSX and NYSE MKT, NRL’s common shares also trade on various alternative exchanges (Alpha, Chi-X, CX2, Pure, Omega, TMX Select, TriAct, LiquidNet, Instinet, Lynx, Aequitas) which all together and cumulatively trade significant volumes over the course of the year.  The following table shows the overall average monthly total volume for 2016 was 43.6 million shares and 30.1 million shares on Canadian exchanges.

  Volume all Canadian Exchanges Volume all USA Exchanges Volume Total
January 27,074,247 4,516,958 31,591,205
February 18,076,293 6,533,622 24,609,915
March 13,573,678 6,092,927 19,666,605
April 27,693,698 9,390,093 37,083,791
May 20,528,359 9,626,337 30,154,696
June 47,468,067 14,727,083 62,195,150
July 34,403,596 21,813,125 56,216,721
August 31,293,407 21,270,234 52,563,641
September 35,642,363 13,087,791 48,730,154
October 29,480,766 17,438,917 46,919,683
November 46,793,688 19,031,315 65,825,003
December 28,663,189 18,605,379 47,268,568
Cumulative Average 30,057,613 13,511,148 43,568,761

57 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Directors and Officers

Name, Occupation and Security Holding

The following table sets forth, for each director and officer of NRL as of the date of this AIF, the name, municipality of residence, office, periods of service and the principal occupations in which each director and executive officer of NRL has been engaged during the immediately preceding five years.  Each director of NRL holds office until the next annual general meeting of the shareholders of NRL or until his successor is duly elected or appointed, unless his office is earlier vacated in accordance with the articles of NRL or he becomes disqualified to act as a director.  The Board appoints each executive officer.

Name, Municipality of Residence and
Position Held
Principal Occupation for the Past
Five Years
Director Since Number & Percentage of Shares Held
R. Stuart Angus(1)(3)(5)
Sechelt, British
Columbia, Canada
Chair and Director
Business advisor to the mining industry January 2003 534,901 (<1%)
Ian R. Ashby(3)(4)
Campbell, California, USA
Director
Non-Executive Director and Corporate Advisor 2012-present; President–Iron Ore, BHP Billiton Ltd. 2006-2012
January
2014
30,000 (<1%)
Geoffrey Chater(2)
Comox, British Columbia, Canada
Director
Principal of Namron Advisors, a capital markets consultancy; President and CEO of Luna Gold Ltd. 2014-2015; Independent Director to international resource companies 2011-2016 June 2016 142,552 (<1%)
Clifford T. Davis
Vancouver, British Columbia, Canada
President, Chief Executive Officer,  Director
President, Chief Executive Officer and Director of NRL December 1997 1,865,222 (<1%)
Gary E. German(1)(2)(4)
Toronto, Ontario, Canada
Director
Independent Director and Advisor for international resource companies April 1996 546,094 (<1%)
Ian W. Pearce(1)
Oakville, Ontario, Canada
Director
Partner at X2 Resources LLP 2013-present; CEO Xstrata Nickel 2006-2013 January 2017 0
Stephen V. Scott(3)(5)
West Vancouver, British Columbia, Canada
Director
CEO of Entrée Gold Inc. 2015-present; various executive positions with Rio Tinto 2000-2014 June 2016 154,092 (<1%)
David S. Smith(2)
West Vancouver, British Columbia, Canada
Director
Corporate Director and Advisor 2015-present; Executive VP and CFO of Finning International Inc. 2009-2014 January 2017 17,440 (<1%)

58 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Name, Municipality of Residence and
Position Held
Principal Occupation for the Past
Five Years
Director Since Number & Percentage of Shares Held
Frazer W. Bourchier(4)
North Vancouver, British Columbia, Canada
Chief Operating Officer
Chief Operating Officer of NRL since 2012 N/A 0
Ken Engquist
Vancouver, British Columbia, Canada
Vice President Project Development
Vice President, Project Development of NRL since January 2017; Project Development Executive, Pilot Gold, 2014-2016; Project Development Executive, Anglogold Ashanti, 2012-2013 N/A 0
Joseph  P. Giuffre
North Vancouver, British Columbia, Canada
Chief Legal Officer and Corporate Secretary
Chief Legal Officer and Secretary of NRL since 2013; Partner of Axium Law Corporation, 2005-2012 N/A 32,500 (<1%)
Scott A. Trebilcock
Vancouver, British Columbia, Canada
Chief Development Officer
Chief Development Officer of NRL since 2014; Vice President Business Development & Investor Relations of NRL, 2010-2014 N/A 0
Thomas S. Whelan
Vancouver, British Columbia, Canada
Chief Financial Officer
Chief Financial Officer of NRL since 2014; Partner, EY LLP 2004-2014 N/A 51,364 (<1%)
Peter M. Manojlovic
Delta, British Columbia, Canada
Vice President Exploration
Vice President Exploration of NRL since 2012; VP Exploration, Sabina Gold & Silver Corp., 2010-2012 N/A 0
Todd E. Romaine(4)
West Vancouver, British Columbia, Canada
Vice President Corporate Social Responsibility
Vice President Corporate Social Responsibility of NRL since 2012; Senior Manager, Land Services (Operations), Enbridge Inc. 2008-2012 N/A 0
Peter Tam
Vancouver, British Columbia, Canada
Vice President Finance
Vice President Finance of NRL since November 2015; Independent Mining Consultant 2014-2015; Chief Financial Officer at Elgin Mining Inc. 2012-2014; Vice President Finance at Aura Minerals Inc. 2011-2012 N/A 0
(1) Member of the Corporate Governance and Nomination Committee
(2) Member of the Audit Committee
(3) Member of the Human Resources Committee
(4) Member of the Social Environment, Health & Safety Committee
(5) Member of Special Committee

As of February 23, 2017, the directors and executive officers of NRL, as a group, beneficially owned directly or indirectly, or exercised control or direction over 3,374,165 common shares or approximately 1.1% of the issued and outstanding common shares of NRL.  The same directors and executive officers, as a group, have been granted and currently hold options to purchase up to 3,121,500 shares of NRL, 753,500 of which were granted in 2016.

59 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Cease Trade Orders, Bankruptcies, Penalties or Sanctions

Certain directors or executive officers of NRL are, at the date of this AIF, or have been within the 10 years before the date of this AIF, a director, chief executive officer or chief financial officer of a company that:

(a)           was subject to a cease trade or similar order, or an order that denied the relevant company access to any exemption under securities legislation, that was in effect for a period of more than 30 consecutive days (an “Order”) that was issued while the director or executive officer was acting in the capacity as director, chief executive officer or chief financial officer, or

(b)           was subject to an Order that was issued after the director or executive officer ceased to be a director, chief executive officer or chief financial officer and which resulted from an event that occurred while that person was acting in the capacity as director, chief executive officer or chief financial officer,

details of which are described as follows:

R. Stuart Angus was a director of Wildcat Silver Corporation (“Wildcat”) which requested and received notice from the British Columbia Securities Commission of the issuance of a management cease trade order (the “MCTO”) on October 30, 2007 in connection with the late filing of its annual audited consolidated financial statements for the fiscal year ending June 30, 2007.  Wildcat’s failure to make the filing within the required time frame was due to the need to clarify potential foreign tax obligations relating to an acquisition it made.  The required filing was made on January 7, 2008 and the MCTO was revoked on January 8, 2008.

Conflicts of Interest

To the best of NRL’s knowledge, there are no existing or potential material conflicts of interest between NRL or any subsidiary of NRL and a director or officer of NRL or a subsidiary of NRL.  

Audit Committee

NRL has a separately-designated standing audit committee in accordance with CSA National Instrument 52-110 Audit Committees and with Section 3(a)(58)(A) of the United States Securities Exchange Act of 1934, as amended.

Audit Committee Charter

The Board has adopted a charter for the Audit Committee which sets out the committee’s mandate, composition, responsibilities and duties.  A copy of the Audit Committee Charter is attached to this AIF as Schedule “A”.

Independent Advice & Funding

The Audit Committee shall have the authority to determine the appropriate funding for the ordinary administrative expenses of the Audit Committee.  In addition, the Audit Committee may, in its sole discretion, retain, at the expense of NRL, and determine the compensation to be received by, such legal, financial or other advisors or consultants as it may deem necessary or advisable in order to properly and fully perform its duties and responsibilities hereunder.   

Composition of the Audit Committee

The Audit Committee has three members, all of whom are independent and financially literate, one of which is an audit committee financial expert. An outline of each member’s relevant education and experience follows:

David S. Smith, Chair.  Mr. Smith has over 30 years of experience in various senior financial roles, including 14 years as CFO of publicly listed companies.  He has served on the audit committees of several publicly listed companies, including as chair.  Most recently he was the Executive Vice President and CFO of Finning International Inc.  Mr. Smith graduated from California State University, Sacramento with a Bachelor of Science in Business Administration and became a Certified Public Accountant in California in 1982.

60 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Gary E. German. Mr. German has over thirty-five years of senior management and executive positions in global resource projects and companies, including the provision of strategic and corporate finance direction and international commodity brokerage operations. Previously he was Managing Director, Corporate Finance Group (resources), Kingsdale Capital Corp. (2002-03), and prior to that, Chair of the Finance Committee and Senior Advisor to the President-CEO of Ma'aden, the Kingdom of Saudi Arabia's mineral resource development corporation. Mr. German is a graduate of the University of Toronto (Bachelor of Applied Science, Industrial Engineering) and the University of Western Ontario (Diploma, International Management).

Geoffrey Chater. Mr. Chater has over 30 years of progressive experience in the mineral and mining industries including as CEO of a gold producer.  He has served on the audit committees of several publicly listed companies, including as chair.  Mr. Chater graduated from Texas Christian University with a Bachelor of Science in Geology.

Pre-Approval Policies and Procedures

The Audit Committee has adopted policies and procedures for the engagement of non-audit services, described as follows:

NRL will not engage its external auditor KPMG LLP (“KPMG”) to carry out any non-audit services that are deemed inconsistent with an auditor’s independence (“Prohibited Service”).  The Audit Committee will consider the pre-approval of permitted services to be performed by the external auditor in each of the following broad categories:

Audit Services, Audit-Related Services, Tax Services, as well as Compliance Services, Tax Planning Services, Commodity Tax Services, Executive Tax Services.

Other Services:  Valuation Services, Information Technology Advisory and Risk Management Services, Forensic and Related Services, Corporate Recovery Services, Transaction Services, Corporate Finance Services, Project Risk Management Services, Operational Advisory and Risk Management Services, Regulatory and Compliance Services.

For permitted services the following pre-approval policies will apply:

A.    Audit Services

The Audit Committee will pre-approve all Audit Services provided by KPMG through the Audit Committee’s recommendation to shareholders at NRL’s annual meeting, of KPMG as NRL’s external auditor and through the Audit Committee’s review of KPMG’s annual Audit Plan. 

B.    Pre-Approval of Audit Related, Tax and Other Non-Audit Services

Periodically (e.g., annually), the Audit Committee will update a list of pre-approved services that are recurring or otherwise reasonably expected to be provided. 

The Audit Committee will be subsequently informed at least annually of the services on the attached list for which the auditor has been actually engaged.

Any additional requests for pre-approval will be addressed on a case-by-case specific engagement basis as described in (C) below. 

C.    Approval of Additional Services

The Company employee making the request will submit the request for service to the Chief Financial Officer (“CFO”).  The request for service should include a description of the service, the estimated fee, a statement that the service is not a “Prohibited Service” and the reason KPMG is being engaged.

Recommendations, in respect of each engagement, will be submitted by the CFO to the Chair of the Audit Committee for consideration and approval.  The full Audit Committee will subsequently be informed of the service at its next meeting.  The engagement may commence upon approval of the Chair of the Audit Committee.

61 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

External Auditor Fees

All dollar amounts in this section are expressed in Canadian currency.

The following table sets forth the aggregate fees incurred by the Company for the years ended December 31, 2016 and 2015 for KPMG’s services: 

  Year ended
December 31,
2016
  Year ended
December 31,
2015
Audit fees(1)
Audit-related fees(2)
$ 614,935
33,753
  $ 492,158
17,500
Tax fees(3) 54,670   57,781
All other fees(4) --   10,000
Total $ 703,358   $ 577,439

(1) Audit fees include fees related to the audit of the year-end financial statements, audit of the internal control over financial reporting, review of the interim financial statements, and services that are normally provided by the Auditors in connection with statutory and regulatory filings or engagements for such year.
(2) Audit-related fees consist of fees for assurance and related services by the Auditors that are reasonably related to the performance of the audit or review of the financial statements and are not reported above as Audit Fees.
(3) Tax fees for 2016 and 2015 are for tax advice in connection with proposed transaction and general matters, all in accordance with the pre-approval policies of the Audit Committee.
(4) Other fees were billed by the Auditors in 2015 for general advisory services relating to due diligence.

Legal Proceedings

Araya, Alemayo, Negash and Tsegay Actions

A lawsuit was filed in the Supreme Court of British Columbia against the Company (the "Araya Action") on November 20, 2014, by three plaintiffs who claimed to have once worked with a local sub-contractor at the Bisha Mine. The plaintiffs have claimed that the Company is legally responsible for breaches of customary international law and British Columbia law for conduct allegedly engaged in by the local sub-contractor and the Eritrean military.  The plaintiffs have also claimed the right to bring the action in a representative capacity on behalf of certain persons who they allege were forced to work at the Bisha Mine (the “Group Members”).  The plaintiffs have claimed general, aggravated and punitive damages for themselves and for the Group Members. No trial date has been set.

On October 6, 2016 the British Columbia Supreme Court released a decision on Nevsun’s preliminary legal challenges to the Araya Action.  The judge refused to permit the Araya Action against Nevsun to proceed as a representative action, a form of common law class action.  The judge dismissed the Company’s applications to stay or dismiss the Araya Action on jurisdictional and other grounds. The decision makes no findings with respect to the plaintiffs’ allegations, including whether any of them were in fact at the Bisha Mine. The judge emphasized that the case raises novel and complex legal questions, including on international law, which have never before been considered in Canada.

The Company has appealed and the plaintiffs have cross-appealed from the dismissal of the representative action.  The appeal is expected to be heard in Q4 of 2017.

On October 19, 2016 a second lawsuit was filed in the Supreme Court of British Columbia against the Company (the "Alemayo Action") by one plaintiff who made similar allegations to those described in the Araya Action and seeks similar relief.

62 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

On November 23, 2016 a third lawsuit was filed in the Supreme Court of British Columbia against the Company (the "Negash Action") by twenty-seven plaintiffs who make similar allegations to those advanced in the Araya and Alemayo actions and seek similar relief.

On February 16, 2017 a fourth lawsuit was filed in the Supreme Court of British Columbia (the “Tsegay Action”) by eighteen plaintiffs who make similar allegations to those advanced in the above-noted actions and seek similar relief.

Contractual Dispute with Canaccord

Canaccord Genuity Corp. (“Canaccord”) was an advisor to Reservoir in connection with the transaction described in Note 6 to the consolidated financial statements of Nevsun for the year ended December 31, 2016.

On March 18, 2016 Canaccord and Reservoir entered into an advisory agreement to evaluate third party funding arrangements which related to the potential exercise by Reservoir of a ROFO under its joint venture agreement with Freeport. Canaccord was paid a fee of $1 million for providing financial advisory services in connection with Reservoir’s exercise of the ROFO.

On April 6, 2016 Canaccord and Reservoir met to discuss a new mandate for Canaccord in relation to a transaction whereby a third party would acquire control of Reservoir. On April 18, 2016, Canaccord and Reservoir entered into a new advisory agreement (the “April Advisory Agreement”). This relates to advisory services provided by Canaccord in connection with the acquisition of Reservoir by the Company by way of a plan of arrangement (the “Transaction”) which was completed on June 23, 2016.

Canaccord has demanded an advisory fee of CAD$11,658,000 (the “Transaction Fee”) under what they have asserted are the terms of the April Advisory Agreement and has filed a Notice of Claim in the British Columbia Supreme Court. Canaccord has upwardly revised their estimate of the fee owed to CAD$14,670,000. This fee would represent approximately 3% of the overall transaction value of approximately CAD$482 million based on the closing price of the Company’s shares (CAD$4.70) on April 21, 2016, the last trading day prior to the date of announcement of the Transaction.

On September 12, 2016 Reservoir filed a Reply to the Notice of Claim to dispute the Transaction Fee demanded by Canaccord on the basis that, among other things, it is not determined in accordance with the terms of the April Advisory Agreement. Reservoir has paid to Canaccord the sum of CAD$6,047,000 (which includes a transaction fee of CAD$5,617,000 and a second fairness opinion fee of $100,000 taxes and expenses). Reservoir believes that this constitutes payment in full of all fees that Canaccord is entitled to receive under the April Advisory Agreement.

No provision has been recorded in the Company’s consolidated financial statements as the outcome of this claim is not determinable.

Interest of Management and Others in Material Transactions

No director, officer or other insider of the Company, nor any associate or affiliate of any director, officer or other insider has participated in, directly or indirectly, nor had any material interest in, any material transaction of the Company in the most recently completed financial year or any of the three preceding financial years.

Transfer Agents and Registrars

NRL’s registrar and transfer agent is Computershare Investor Services Inc., located in Vancouver, British Columbia.

Material Contracts

There were no material contracts entered into by the Company during 2016 in respect of any regulatory actions by a court or by a regulatory authority relating to securities legislation.

63 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Names and Interests of Experts

Unless otherwise stated, the relevant technical and scientific information included in this AIF concerning Bisha Property are derived from the 2013 Technical Report prepared by Paul Gribble, C.Eng., FIMMM, Jay Melnyk, and P.Eng., AGP; and Peter Munro, BAppSc. Mineralurgy Pty. Ltd., effective December 31, 2013.  These authors are QPs within the meaning of NI 43-101.   This report is available for review on SEDAR (www.sedar.com) and EDGAR (http://www.sec.gov/edgar.shtml).

Other relevant technical and scientific information included in this AIF concerning the Bisha Property that is not derived from the 2013 Technical Report is derived from the updated mineral resource estimate effective December 31, 2015, which was prepared by Phil Jankowski, MAusIMM (CP), (BMSC)   and Anoush Ebrahimi, P.Eng., PhD. (SRK Consulting Canada Inc.).

Unless otherwise stated, the relevant technical and scientific information included in this AIF concerning Timok Project are derived from the Preliminary Economic Assessment of the Cukaru Peki Upper Zone Deposit, Serbia, prepared by Martin Pittuck, CEng, FGS, MIMMM, and Timothy McGurk, CEng, FIMMM (both of SRK Consulting (UK) Limited), effective March 31, 2016.  These authors are QPs within the meaning of NI 43-101.   This report is available for review on SEDAR (www.sedar.com).

To the best of the knowledge of the Company, AGP Mining Consultants Inc., Mineralurgy Pty. Ltd, SRK Consulting Canada Inc. and the “designated professionals” (as such term is defined in Form 51-102F2) thereof hold less than a 1% interest in the outstanding securities of NRL.

KPMG is the auditor for the Company and has audited the annual financial statements of the Company for the year ended December 31, 2016.  KPMG have confirmed that they are independent with respect to the Company within the meaning of the relevant rules and related interpretations prescribed by the relevant professional bodies in Canada, and under all relevant US professional and regulatory standards, including PCAOB Rule 3520.

Additional Information

Additional information relating to the Company, may be found by using SEDAR on the internet at www.sedar.com, EDGAR filing system at http://www.sec.gov/edgar.shtml, or the Company’s website: www.nevsun.com.

Additional information including directors' and officers' remuneration and indebtedness, principal holders of NRL's securities and options to purchase securities is contained in NRL's information circular for its most recent annual meeting of shareholders that involves the election of directors.

Additional financial information is also provided in the Company's audited consolidated financial statements and MD&A for its most recently completed financial year, copies of which may be found on SEDAR or EDGAR, or be obtained by contacting the Company at:

Nevsun Resources Ltd.
Suite 760 – 669 Howe Street
Vancouver, BC V6C 0B4
Tel: 604-623-4700 or Toll-free 1-888-600-2200
Email: contact@nevsun.com

64 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Schedule “A” – Audit Committee Charter

NEVSUN RESOURCES LTD. (the “Company”)

AUDIT COMMITTEE CHARTER

The Audit Committee is appointed by the Board of Directors to:

  i. ensure the Company has in place an effective system of internal controls over financial reporting which meets high standards of quality and integrity and complies with legal and regulatory requirements, and

  ii. monitor the performance, independence and qualification of the Company’s independent auditor.

Composition

The Audit Committee shall consist of at least three members of the Board of Directors.  Each member of the Audit Committee shall be “independent” of the Company within the meaning of all applicable legal and regulatory requirements, and each such member must not have participated in the preparation of the Company’s financial statements, or that of the Company’s subsidiaries, at any time during the three years prior to becoming a member of the Audit Committee (except in the circumstances, and only to the extent, permitted by all applicable legal and regulatory requirements).  Each member of the Audit Committee shall also be “financially literate”, which means that he or she must have the ability to read and understand a set of financial statements that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of the issues that can reasonably be expected to be raised by the Company’s financial statements.  In addition, at least one member of the Audit Committee shall be a “financial expert” within the meaning of the rules and forms adopted by the US Securities and Exchange Commission and shall be financial sophisticated, in that he or she has past employment experience in finance or accounting, requisite professional certification in accounting or any other comparable experience or background which results in the individual’s financial sophistication, including but not limited to being or having been a chief executive officer, chief financial officer, or other senior officer with financial oversight responsibilities (except in the circumstances, and only to the extent, permitted by all applicable legal and regulatory requirements).

Responsibilities

The overall responsibilities of the Audit Committee are to:

1. assist the Board of Directors and Management with meeting their responsibilities with respect to financial reporting;

2. be directly responsible for (i) the selection of an external auditor to be proposed for election as the external auditor of the Company, (ii) the oversight of the work of the of the Company’s external auditor, (iii) the retention of the Company’s external auditor, and (iv) fixing the compensation of the external auditor of the Company, subject to the grant by the shareholders of the authority to do so, if required;

3. ensure that at all times there are direct communication channels between the Audit Committee and the Company’s external auditor;

4. ensure the independence of the Company’s external auditor, including ensuring receipt from the external auditor of a formal written statement delineating all relationships between the external auditor and the Company and actively engaging in dialogue with the external auditor with respect to any disclosed relationships or services that may impact the objectivity and independence of the external auditor;

5. periodically review and report to the Board of Directors whether Management has designed and implemented an effective system of internal controls over financial reporting for reviewing and reporting on the Company’s financial statements;

65 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

6. review and report to the Board of Directors on all financial statements (including interim financial statements) prepared by the Company and enhance the credibility and objectivity of all financial reports; and

7. otherwise review the Company’s compliance with regulatory and statutory requirements as they relate to financial statements, taxation matters and disclosure of related material facts.

Duties

For the purposes of fulfilling its responsibilities, the Audit Committee will:

1. schedule meetings to take place on a regular basis;

2. afford an opportunity periodically to the external auditor and to senior Management to meet separately with the Audit Committee, and when required, meet independently of the external auditor and Management;

3. keep minutes of all meetings of the Audit Committee;

4. periodically report the results of the reviews undertaken and any associated recommendations to the Board of Directors;

5. select an external auditor to be proposed by Management to the shareholders for election by the shareholders as the external auditor for the Company, review and approve the terms of the external auditor's engagement and determine the appropriateness and reasonableness of the proposed audit fees and any unpaid fees;

6. review and evaluate the qualifications, performance and independence of the lead partner of the external auditor, discuss with Management the timing and process for implementing the rotation of the lead audit partner and the reviewing partners of the external auditor, and other issues related to a change of the external auditor and the planned steps for an orderly transition;

7. obtain confirmation from the external auditor that it will report directly to the Audit Committee;

8. obtain confirmation from the external auditor that it will report in a timely matter to the Audit Committee all critical accounting policies and practices to be used, all alternative accounting policies and practices, the ramifications of each of such accounting policy and practice and the accounting policy and practice preferred by the external auditor, for the financial information of the Company within applicable generally accepted accounting principles (GAAP), which have been discussed with Management;

9. obtain confirmation from the external auditor that it will provide a copy of all material written communications between the external auditor and Management including, without limitation, any Management letter or schedule of unadjusted differences;

10. obtain confirmation from the external auditor that it will ensure that all reports filed under the United States Securities Exchange Act of 1934, as amended, which contain financial statements required to be prepared in accordance with GAAP and reflect all material correcting adjustments identified by the external auditor of the Company;

11. review and approve the Company’s hiring policies regarding partners, employees and former partners and employees of the present and any former external auditor of the Company;

12. review all reportable events, including disagreements, unresolved issues and consultations, as defined in National Instrument 51-102 of the Canadian Securities Administrators, on a routine basis;

13. review and pre-approve any and all engagements for non-audit services to be provided to the Company or to any of its subsidiaries by the Company’s external auditor or any affiliates of the external auditor, together with estimated fees, and review and approve the audit plan with the external auditor and with Management;

14. review with Management and with the external auditor any proposed changes in major accounting policies, the presentation and impact of significant financial risks and uncertainties and key estimates and judgments of Management that may be material to financial reporting and the steps Management has taken to minimize such risks to the Company;

66 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

15. assist in the preparation of any internal control report by Management, which provides that Management is responsible for establishing and maintaining an adequate control structure and procedures for financial reporting by the Company, assessing the effectiveness of such control structure and procedures and ensuring that the external auditor of the Company, if required by governing legislation or regulation, attest to and report on the assessment of such control structure and procedures by Management;

16. assist the Chief Executive Officer and the Chief Financial Officer of the Company in their assessment of the effectiveness of the Company’s internal control over financial reporting and in determining whether there has been any material change in the Company’s internal control over financial reporting which has materially affected or could materially affect such internal control subsequent to the date of the evaluation;

17. assist the Chief Executive Officer and the Chief Financial Officer of the Company in identifying and addressing any significant deficiencies or material weaknesses in the design or operation of the Company’s internal control over financial information and any fraud, whether or not material, that involves Management or other employees who have a significant role in the Company’s internal control over financial reporting;

18. question Management and the external auditor regarding significant financial reporting issues discussed during the fiscal period and the method of resolution;

19. review any problems experienced by the external auditor in performing the audit, including any restrictions imposed by Management or significant accounting issues to which there was a disagreement with Management;

20. review audited annual financial statements, in conjunction with the report of the external auditor, and obtain an explanation from Management of all significant variances between comparative reporting periods;

21. review the post-audit or Management letter, containing the recommendations of the external auditor and Management’s response and subsequent follow up to any identified weaknesses;

22. review all interim unaudited financial statements before release to the public;

23. review all public disclosure documents containing audited or unaudited financial information before release, including any prospectus, the annual report, the AIF and Management’s discussion and analysis;

24. ensure that the Company discloses in the periodic reports of the Company, as appropriate, whether at least one member of the Audit Committee is a “financial expert” within the meaning of the rules and forms adopted by the US Securities and Exchange Commission;

25. ensure that all non-audit services provided by the external auditor are approved by or on behalf of the Audit Committee and are disclosed in the periodic reports of the Company;

26. ensure that each annual report and, to the extent required by any applicable legal or regulatory requirement, any quarterly report of the Company includes disclosure with respect to all material off-balance sheet transactions, arrangements, obligations (including contingent obligations) and other relationships of the Company with unconsolidated entities which may have a current or future effect on the Company in accordance with all applicable legal and regulatory requirements;

27. ensure that all financial statements and other financial information, including pro forma financial information, included in any report filed by the Company with any regulatory authority or contained in any public disclosure or press release of the Company is presented in a manner which does not contain a material misstatement or omission and reconciles the pro forma information contained therein to GAAP, and which otherwise complies with all applicable legal and regulatory requirements;

28. review the evaluation of internal control by the external auditor, together with Management’s responses;

29. to assist Management with its annual risk assessment and reporting strategy to manage the process of the identification, evaluation and mitigation of the Company’s principal enterprise risks;

67 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

30. review the appointments of the chief financial officer and any key financial executives involved in the financial reporting process;

31. establish procedures for (i) the receipt, retention and treatment of complaints regarding accounting, internal accounting controls, or auditing matters, and (ii) the confidential, anonymous submission by employees of concerns regarding questionable accounting or auditing matters;

32. annually assess the adequacy of the Audit Committee Charter; and

33. annually evaluate the Audit Committee’s performance.

Independent Advice & Funding

The Audit Committee shall have the authority to determine the appropriate funding for the ordinary administrative expenses of the Audit Committee.  In addition, the Audit Committee may, in its sole discretion, retain, at the expense of the Company, and determine the compensation to be received by, such legal, financial or other advisors or consultants as it may deem necessary or advisable in order to properly and fully perform its duties and responsibilities hereunder.

68 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Schedule “B” – Risk Factors

Approach to Risk Management

The Company’s approach to identifying and managing risk has been a critical component of how management runs and the Board oversees management of the business.  The Company’s enterprise risk management process is currently coordinated by the Chief Development Officer, managed by the senior management team with direct oversight by the Chief Executive Officer and the Board of Directors.  The Company conducts a top down review of key strategic, operational and financial risks at least quarterly.  The Company maintains a risk register, which is updated on a regular basis by the appropriate business owner of the risk.  The risk register contains a list of actions to ensure risks are mitigated to the agreed upon level of risk tolerance.  The results of the Enterprise Risk Management process are reviewed on a regular basis by the Board of Directors.

The business and operations of the Company are highly speculative due to the high-risk nature of its business in the mining industry, including but not limited to the acquisition, financing, exploration, development, operation and production of metals at its mining properties.  The Company’s business is subject to strategic, financial and operating risks.  The risks below, some of which are summarized elsewhere in this Report, are not the only ones faced by the Company. Additional risks not currently known to the Company, or that the Company currently deems immaterial, may also arise in the future and impair the Company’s operations. If any of the following risks actually occur, the Company’s business, financial condition and operating results could be adversely affected.

Strategic Risk Factors

Foreign operation and political risks. The Company conducts business in Serbia and Eritrea through its foreign subsidiaries with financial assets in Barbados, Serbia and Eritrea, and substantially all of its assets are held in such entities.  While the Company believes that the political climate of these countries and strong government support in Serbia and Eritrea provide a stable environment for its operations, there is no guarantee against any future political, or economic instability in these countries or neighboring countries that might adversely affect the Company.  

Political unrest in Egypt, Libya, Syria, Yemen, Saudi Arabia, Somalia, South Sudan, Sudan and other countries in the region has had an impact on investor confidence with companies operating in northern Africa, including Eritrea, even though no direct effect is evident or anticipated in the operations at Bisha or communications with the Eritrean government.  New government regulations in Canada, the United States or other countries in which the Company operates could adversely affect the Company’s future business and operations.  In addition, intervention by the international community through organizations such as the United Nations could affect the political risk of operating in Eritrea. In December 2009 the United Nations Security Council (UNSC) imposed sanctions on Eritrea related to an arms embargo, which in itself has had no direct impact to the Bisha Mine, except to cause some uncertainty as to how UN member states may continue to deal with the country. In December 2011 the UNSC provided additional sanctions guidance to member states.  Effects of the sanctions could impact the Company’s ability to operate efficiently.  There are also unresolved tensions between Ethiopia and Eritrea and the possibility of future armed conflicts between Ethiopia and Eritrea by rebel groups or otherwise which could affect or interfere with continued operations at Bisha.

Other risks the Company may face in operating in foreign jurisdictions include unforeseen government actions, acts of god, terrorism, hostage taking, military repression, extreme fluctuations in currency exchange rates, high rates of inflation, labour unrest, the risks of war or civil unrest, expropriation and nationalization, renegotiation or nullification of existing concessions, licenses, permits and contracts, illegal mining, changes in taxation policies, restrictions on foreign exchange and repatriation, and changing political conditions, currency controls, export controls, and governmental regulations that favour or require the awarding of contracts to local contractors or require foreign contractors to employ citizens of, or purchase supplies from, a particular jurisdiction or other events.

All or any of these factors, limitations, or the perception thereof could impede the Company’s activities, result in the impairment or loss of part or all of the Company’s interest in the properties, or otherwise have an adverse impact on the Company’s valuation and stock price.

69 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Governmental regulatory risks.  The Company’s mineral exploration, development and production activities are subject to various laws governing prospecting, development, production, taxes, labour standards and occupational health, mine safety, toxic substances, environmental protection and preservation, and other matters.  No assurance can be provided that the Company will be successful in its efforts to comply with all existing rules and regulations, that new rules and regulations will not be enacted, or that existing rules and regulations will not be modified in a manner that could limit or curtail production or development of the Company’s properties.  All such rules and regulations governing the operations and activities of the Company could have a material adverse effect on the Company’s business, financial condition and results of operations.

Key executive risk.  The Company is to a large degree dependent on the services of key executives and senior personnel.  The loss of one or more of these persons or the Company’s inability to attract and retain executives and personnel with the qualifications necessary to successfully operate the business may adversely affect the Company’s business and future operations.  The Company competes with numerous other companies for the recruitment and retention of qualified executives and employees and thus there is a risk that from time to time one or more key executives or personnel move to a competitor.

Expatriate and nationals’ skills risk.  The Company’s operations in Eritrea and exploration and development programs in Serbia and elsewhere rely on attracting and retaining expatriate and nationals with mining experience to staff key operations and administration management positions.  The Company’s inability to attract and retain personnel with the skills and experience to manage the operation and train and develop staff, due to the intense international competition for such individuals, may adversely affect its business, future operations and financial condition.

Competition risks.  The mining industry is intensely competitive in all of its phases and the Company competes with many companies possessing greater financial and technical resources than itself.  There is intense competition in the mining industry for mineral rich properties that can be developed and produced economically, the technical expertise to find, develop, and operate such properties, the labour to operate the properties, and the capital for the purpose of funding such properties.  Many competitors not only explore for minerals, but conduct refining and marketing operations on a global basis.  Such current and future competition may frustrate the Company’s ability to acquire desired properties.    The Company is also subject to risks associated with a hostile takeover of the common shares of the Company or other unsolicited attempts to acquire control of the Company.

Litigation risk.  The Company is subject to litigation risks.  The mining industry is subject to legal risks and claims.  Such legal claims can relate to various matters including, without limitations, mining laws, environmental laws, labour laws and anti-corruption and anti-bribery laws in the jurisdictions in which the Company operates. Defense and settlement costs associated with legal claims can be substantial, even with respect to claims that are frivolous or have no merit.  Due to the inherent uncertainty of the litigation process, the resolution of any particular legal proceeding to which the Company is or may become subject could have a material adverse impact on its financial performance, cash flow and results of operations, including the Araya Action, Alemayo Action, Negash Action, Tsegay Action and Canaccord Dispute described under the heading “Legal Proceedings”.

Share price risk.  The market price of a publicly traded stock is affected by many variables not directly related to the success of the Company, including the market for all resource sector shares, the breadth of the public market for the stock, and the attractiveness of alternative investments. The effect of these and other factors on the market price of the common shares of the Company on the exchanges on which the common shares are listed suggests that the share price will be volatile. In the previous eight quarters, between January 1, 2015 and December 31, 2016 the Company’s shares traded in a range between CAD$3.27 and $5.35.

Dividend policy risks. The Company has established a dividend policy that has considered the long-term sustainability of cash flows and will be reviewed on a periodic basis and assessed in relation to the historical and anticipated growth of the Company’s operating cash flows. The Company began paying dividends in July 2011. The Company has increased its annual dividend every year since that time. During 2016 the Company paid quarterly dividends of $0.04 per share. Payment of any future dividends will be at the discretion of the Board after taking into account many factors, including the Company’s operating results, future capital requirements, financial condition, comparability of the dividend yield to peer mining companies and current and anticipated demands on the Company’s cash levels. There can be no assurance that the Company will continue to pay dividends at the current rate or at all.

70 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Conflicts of interest.  Certain of the directors and officers of the Company also serve as directors and/or officers of other companies involved in natural resource exploration and development and consequently there exists the possibility for such directors and officers to be in a position of conflict. Any decision made by any of such directors and officers involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company and its shareholders. In addition, each of the directors is required to declare and refrain from voting on any matter in which such directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws.

Financial Risk Factors

Commodity price risk.  Revenue and profitability of the Company’s operations will be dependent upon the market price of mineral and materials commodities.  Prices of metals are key performance drivers for the Company and fluctuations in the prices of these commodities can have a significant impact on the Company’s operations and financial performance.  The Company does not enter into any commodity hedging and accordingly is fully exposed to price risk.  The price of copper, zinc, gold, and other metals can and has experienced volatile and significant price movements over short periods of time, and is affected by numerous factors beyond the control of the Company, including international economic and political trends, expectations of inflation or deflation, currency exchange fluctuations (specifically, the US dollar and Serbian dinar relative to other currencies), interest rates, global or regional consumption patterns, speculative activities and increased production due to improved mining and production methods.  The supply of and demand for copper, zinc, gold and other metals are affected by various factors, including political events, economic conditions, competition, production costs, and governmental policies.  If the market price of copper, zinc, gold or silver falls significantly from its current level, the production and ongoing mine development at Bisha or any other project of the Company may be rendered uneconomic and the production or development at Bisha or any other project may be suspended or delayed.  In addition, if the market price of copper, zinc, gold or silver were to decrease significantly and remain at lower levels for a significant period of time, profitability of the Company and cash flow would be negatively affected.

Mineral reserve calculations and life-of-mine plans using significantly lower metal prices could result in material write-downs of the Company’s investment in mining properties and increased amortization, reclamation and closure charges. In addition to adversely affecting the Company’s Mineral Reserve estimates and its financial condition, declining commodity prices can impact operations by requiring a reassessment of the feasibility of a particular project. Such a reassessment may be the result of a management decision or may be required under financing arrangements related to a particular project. Even if the project is ultimately determined to be economically viable, the need to conduct such a reassessment may cause substantial delays or may interrupt operations until such time as the reassessment can be completed.

The Bisha Mine’s power generation plant and mobile equipment fleet are fueled by diesel petroleum. As fuel costs are a significant component of the Company’s operating costs, changes in the price of diesel could have a significant effect on its operating costs and adversely affect profitability. Energy prices can be affected by numerous factors beyond the Company’s control, including global and regional supply and demand, political and economic conditions and applicable governmental policies.

Funding risks. The exploration, development, operations, acquisitions or other activities may require substantial additional debt and equity capital financing. Failure to obtain sufficient financing may result in delaying or indefinite postponement of exploration, development, operations, acquisitions or other activities of the Company including a loss of property interest. Historically, the Company has financed its activities through the sale of equity capital and through cash flow from operations. The sale of metals from Bisha currently provides and is expected to continue to provide revenue from operations but will not be sufficient to fund all of its future financial needs for the operations and to fund exploration and development of the Timok Project and other projects. The Company will require additional financial resources for operations and for further exploration and development of its projects and will be dependent upon the Company’s ability to obtain financing through debt or equity financing or other means. Factors which may impact cash flows include changes in metal prices, taxes, operating costs, marketability of metals from operations, capital expenditures or other unexpected occurrences such as unanticipated costs, delays, downtimes, slowdown or stoppage of operations. Failure to obtain sufficient financing to continue operations or to fund ongoing exploration and development of the Company’s projects when such needs arise may adversely affect the Company’s business and financial position. When the Company requires additional funding for exploration, development, operations, acquisitions or other activities, there is no assurance that sources of financing will be available on acceptable terms or at all.

71 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Insurance risks.  Although the Company believes it maintains adequate insurance coverage to protect against certain risks at levels it considers reasonable, its insurance will not cover all the potential risks associated with a mining company’s operations. Nevsun may also be unable to maintain insurance to cover these risks at economically feasible premiums. In addition, insurance coverage may not continue to be available in the future or may not be adequate to cover any resulting liability.

Write-downs and impairments risk.  Mining and mineral interests are the most significant assets of the Company and represent capitalized expenditures related to the development of mining properties and related plant and equipment.

The Company reviews and evaluates its mining interests for impairment at each reporting period or when events or changes in circumstances indicate that the related carrying amounts may not be recoverable, which evidences greater risk levels due to changes in the global economic conditions that exist currently. An impairment is considered to exist if the total estimated future undiscounted cash flows are less than the carrying amount of the assets. An impairment loss is measured and recorded based on discounted estimated future cash flows. Future cash flows are estimated based on expected future production, commodity prices, operating costs and capital costs. There are numerous uncertainties inherent in estimating Mineral Reserves and Mineral Resources. Differences between management’s assumptions and market conditions could have a material effect in the future on the Company’s financial position and results of operation.

The assumptions used in the valuation of long-term stockpiles and work-in-process inventories by the Company include estimates of metals contained in the ore stockpiles, crushed ore piles, processing plant circuits, and an assumption of the metal prices expected to be realized when the copper, zinc, gold and silver are recovered.  If these estimates or assumptions prove to be inaccurate, the Company could be required to write-down the recorded value of its long-term stockpiles or work-in-process inventories, which would reduce the Company’s earnings and working capital.

Derivatives risk.  In the future the Company may use certain derivatives products to manage the risks associated with changes in metal prices, interest rates, foreign currency exchange rates and fuel prices.  The use of derivative instruments involves certain inherent risks including, among other things: (i) credit risk – the risk of default on amounts owed to the Company by financial counterparties; (ii) market liquidity risk – the risk that the Company has entered into a derivative position that cannot be closed out quickly, by either liquidating such derivative instrument or by establishing an offsetting position; and (iii) unrealized mark-to-market risk – the risk that, in respect of certain derivative products, an adverse change in market prices for commodities, currencies or interest rates will result in the Company incurring an unrealized mark-to-market loss in respect of such derivative products.

Counterparty risks.  The Company is exposed to various counterparty risks including, but not limited to: (i) financial institutions that hold the Company’s cash and cash equivalents; and (ii) amounts owing to the Company by copper and zinc concentrate customers.  As a result, the Company may become exposed to credit-related losses in the event of non-performance by such counterparties.

Currency risks.  At present all of the Company’s operations other than head office corporate functions are carried on outside of Canada and are subject to risks associated with fluctuations of the rate of exchange of foreign currencies.  The United States dollar (“USD”) is the Company’s functional currency, exposing the Company to risk on any fluctuations of the USD with other currencies to which the Company is exposed, which are primarily the Canadian dollar, Serbian dinar (“RSD”), South African rand (“ZAR”), the Eritrea Nakfa (“ERN”), and the Euro.  While only a small portion of the Bisha Mine’s operating expenses are denominated in ERN, a re-valuation or de-pegging of this currency to the USD could expose the Company to additional currency risk. It is anticipated that significant future development costs will be incurred in Serbian dinars. Fluctuations in currency exchange rates could significantly affect the Company’s business, financial condition, results of operations and liquidity.

72 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Information technology security risk.  Nevsun maintains information technology infrastructure, applications and communications networks to support its business activities.  These systems could be subject to security breaches resulting in theft, disclosure or corruption of information, including information relating to acquisitions and divestments, strategic decision-making, investment market communications or commercially sensitive information relating to major contracts. Security breaches could also result in misappropriation of funds or disruptions to business operations.

Operation Risk Factors

Mineral Reserve and Mineral Resource estimate risk. The tabulated data for Mineral Reserves and Mineral Resources presented in figures in this document and contained in the Company’s continuous disclosure documents filed on SEDAR (www.sedar.com) and EDGAR (http://www.sec.gov/edgar.shtml) are estimates generated by Qualified Persons, and no assurance can be given that the anticipated tonnages and grades will be achieved or, in the case of reserves, that the indicated level of metallurgical recovery will be realized. Actual Reserves may not conform to geological, metallurgical or other expectations, and the volume and grade of ore recovered may be below the estimated levels. Market fluctuations in the price of mineral commodities or increases in the costs to recover minerals may render the mining of ore reserves uneconomical and require the Company to take a write-down of the asset or to discontinue development or production. Moreover, short-term operating factors relating to the reserves, such as the need for orderly development of the ore body or the processing of new or different ore grades or ore mineralogies, may cause a mining operation to be unprofitable in any particular accounting period. Furthermore, Mineral Reserve and Mineral Resource estimates on the Bisha Property do not take into account recent drilling and other work. This additional drilling and work may result in a material change to the estimated mineral resources and reserves. An updated Mineral Resource and Mineral Reserve estimate and associated technical report on the Bisha Property and a prefeasibility study on the Timok Project are expected in June 2017 and September 2017, respectively. These studies may or may not contain material scientific or technical information that differs from what is contained in the Bisha Technical Reports and the Timok PEA.

There are numerous uncertainties inherent in estimating quantities of Mineral Resources and Mineral Reserves, including many factors that are beyond the Company’s control.  The estimates prepared by the Company are based on various assumptions relating to metal prices and exchange rates during the expected life of production, mineralization and mineralogy of the area and material to be mined, the projected cost of mining including costs of fuel and other critical operating consumables, and the results of additional planned development work.  Actual future production rates and amounts, revenues, taxes, operating expenses, environmental and regulatory compliance expenditures, development expenditures and recovery rates may vary substantially from those assumed in the estimates.  Any significant change in these assumptions, including changes that result from variances between projected and actual results or any assumptions in the historical resource estimates that turn out to be incorrect, incomplete or flawed in any respect or the methodologies and models used to prepare the resource and reserve estimates either underestimate or overestimate the resources or reserves due to hidden or unknown conditions, could result in material downward or upward revision of current estimates.

Exploration, development and operating risks.  Mining operations generally involve a high degree of risk. The Company’s operating mine in Eritrea is subject to all the hazards and risks normally associated with mineral production, including damage to or destruction of plant and equipment, unexpected geologic formations, pit collapse, injury or life endangerment, environmental damage, fire, equipment failure or structural failures, such as retaining walls or tailings dams and other equipment, potentially resulting in personal injury, property damage, environmental pollution and consequent liability.  The Company may at times experience some difficulty in managing the sulphide rich reactive ground[1] which may affect blasting and continuous ore supply and give rise to unplanned detonations resulting from reactive ground, or a failure of drilling, processing and mining equipment or unanticipated costs and downtimes due to optimizing the zinc and copper flotation plants and its operating facilities.   These costs, downturns and other risks can have a material adverse effect on the Company’s operating costs and results of operations and financial position. 

________________________________

[1] Reactive ground is a term to describe ground in which an exothermic chemical reaction between sulphides (in this case pyrite, which is an iron sulphide) contained in rock at Bisha and the ammonium nitrate contained in explosives may take place.

73 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate entirely. While the discovery of an ore body may result in substantial rewards, few properties that are explored are ultimately developed into producing mines. There is no certainty that expenditures made by the Company towards the search and evaluation of mineral deposits will result in discoveries or future development.  Whether a mineral deposit will be commercially viable depends on a number of factors, which include, among other things, the interpretation of geological data obtained from drill holes and other sampling techniques, feasibility studies (which include estimates of cash operating costs based upon anticipated tonnage and grades of ore to be mined and processed), the particular attributes of the deposit such as size, grade and metallurgy, expected recovery rates of metals from the ore, proximity to infrastructure and labour, the cost of water and power, anticipated climatic conditions, cyclical metal prices, fluctuations in inflation and currency exchange rates, higher input commodity and labour costs, and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection.

Major expenses may be required to locate and establish additional mineral reserves.  It is impossible to ensure that the exploration or development programs planned by Nevsun will result in additional profitable commercial mining operations. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in Nevsun not receiving an adequate return on invested capital.  In this regard the Company relies to a significant degree on the analysis performed by its Qualified Persons to estimate resources and reserves, and such estimates may be subject to material risks and uncertainties.

Production risk.  As is typically the case with the mining industry, no assurances can be given that future mineral production estimates will be achieved. Estimates of future production for the Company’s mining operations are derived from the Company’s mining plans. These estimates and plans are subject to change, including changes based on actual mining results at various phases of the mining operations. The estimated mining results from the Timok Property are based on the Timok PEA which is a preliminary economic assessment. The Company expects to have a pre-feasibility study on the Timok Property completed in September 2017 and the results from such study might differ materially from the results in this AIF. The Company cannot give any assurance that it will achieve its production estimates.  The Company may not be able to effectively manage potential deleterious elements contained within the ore to ensure continued salability of concentrates produced at projected costs. The Company may not be able to effectively manage the combination of oxidation of ore stocks coupled with in pit water inflow that may adversely affect flotation and quality of concentrates produced. There is a further risk that the potential reactive nature of the ore and waste with high pyrite (sulphides) content and its reactivity with ammonium nitrate contained in explosives will have a negative impact on ore and waste blasting efficiencies and result in increased costs.  An additional risk includes the true understanding of the full extent and mineralogical properties including metalions in solution of the transition zone between the supergene and primary ore bodies and within the ore body itself and the subsequent potential disruptive impact on processing this zone, even if campaigned in discrete periods, on the quality and future salability of the concentrates produced. Any process plant adjustments or modifications to further optimize and improve operating efficiencies could result in significant capital expenditures and have an impact on process plant productivity or result in a temporary shutdown to rectify the issues.  Failure to effectively manage these and other matters and to achieve its production estimates could have a material and adverse effect on the Company’s future cash flows, results of operations, production cost, financial condition and prospects. The plans are developed based on, among other things, mining experience, reserve estimates, assumptions regarding ground conditions, hydrologic conditions and physical characteristics of ores (such as hardness and presence or absence of certain metallurgical or mineralogical characteristics) and estimated rates and costs of production, and include assumptions derived by geological block models developed by the Qualified Person(s) in consultation with Company personnel.  Actual production may vary from such estimates for a variety of reasons, including risks and hazards of the types discussed above, and as set out below, including but not limited to:

  • greater mining dilution than expected affecting geological grades and material movement;

74 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

  • accidents;
  • mobile and fixed plant equipment failures;
  • natural phenomena such as inclement weather conditions, floods, droughts, rock slides and earthquakes;
  • unforeseen geotechnical structures and faults leading to pit wall failures and production delays;
  • adverse chemical nature and potential acidity and amount of in-pit water;
  • unexpected or higher than anticipated occurrence of deleterious elements in the ore such as arsenic, selenium,  tellurium, graphite, marcasite, or secondary copper ions impacting subsequent concentrate quality;
  • higher than expected oxidation of in-pit ore stocks adversely impacting flotation characteristics and subsequent concentrate quality;
  • unexpected mineralogical properties of the supergene to primary transition zone and within the primary ore body itself and impact on concentrate quality;
  • encountering unusual or unexpected mineralogy conditions including reactive sulphide rock with ammonia nitrate based explosives adversely affecting blasting procedures and productivity;
  • changes in power costs and potential power shortages;
  • shortages of principal supplies (fixed components, parts and consumables) needed for operations;
  • strikes and other actions by labour;
  • unanticipated costs, delays or downtime due to maintenance or further required optimization of the process plant and operation facilities; and
  • existing and new regulatory restrictions imposed by government agencies.

Such occurrences could, in addition to stopping or delaying mineral production or impacting quality and salability of metal concentrates, result in damage to mineral properties, injury or death to persons, damage to the Company’s property or the property of others, monetary losses and legal liabilities.  These factors may also cause a mineral deposit that has been mined profitably in the past to become unprofitable in the future. Estimates of production from properties not yet in production or from operations that are to be expanded are based on similar factors (including, in some instances, feasibility studies prepared by the Company’s personnel and outside consultants) but it is possible that actual operating costs and economic returns will differ significantly from those currently estimated.

Need for additional Mineral Reserves risk. Given that mines have limited lives based on Proven and Probable Mineral Reserves, the Company must continually review, replace and expand the reserves at its mines. The life-of-mine estimates included in the Company’s continuous disclosure documents filed on SEDAR and EDGAR are subject to continual adjustment. The Company’s ability to maintain or increase its annual production of gold, copper, zinc and other commodities will be dependent in significant part on its ability to bring new mines into production and to expand reserves at existing mines. Based on the current reserves, Bisha Mine has an estimated 9.5-year mine life remaining as at December 31, 2015. There is no assurance that Nevsun will be able to maintain or increase its annual production, bring new mines into production or maintain or expand the Mineral Reserves and Mineral Resources at its existing mine.

Permitting risk. The Company’s operations and future exploration and development activities are subject to receiving and maintaining permits from appropriate governmental authorities and the granting of new exploration and other licenses and permits. There is no assurance that delays will not occur in connection with obtaining all necessary renewals of existing permits for current operations or exploration tenements, or for additional permits for any possible future changes to operations or applications for new exploration tenements, or additional permits associated with regulations and legislation or that such renewals or additional permits will be granted. Prior to any development on any of its properties, the Company must receive permits from appropriate governmental authorities. There can be no assurance that the Company will obtain or continue to hold all permits necessary to develop or continue operating at any particular property site. Any failure to obtain or maintain the requisite permits could have a material adverse effect on the Company and its future production levels.

Environmental risk.  Production at the Company’s mine involves the use of toxic materials. Should toxic materials leak or otherwise be discharged from the containment system then the Company may become subject to liability for cleanup work that may not be insured against. While the Company intends to prevent discharges of pollutants into the ground water and the environment, it may be unsuccessful in such efforts and as a result may become subject to liability for hazards that it may not be insured against. Losses from these events may cause the Company to incur significant costs that could have a material adverse effect upon its financial performance and results of operations.

75 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

The Company’s operations and exploration and development activities are subject to environmental regulations promulgated by the government of Eritrea, Serbia and in other jurisdictions that it carries on these activities. Environmental legislation provides for restrictions and prohibitions on spills, releases or emissions of various substances produced in association with certain mining industry operations, such as seepage from tailings disposal areas that could result in environmental pollution.  A breach of such legislation may result in the imposition of fines and penalties.  Environmental legislation is evolving in general in a manner that means standards and enforcement, fines and penalties for non-compliance are becoming more stringent over time. Environmental assessments for projects carry a heightened degree of responsibility for companies, directors, officers and employees.  The cost of compliance with changes in government regulations has the potential to reduce the profitability of operations and its ability to conduct its exploration and development activities.  The Company devotes significant time and resources toward meeting its goal of complete compliance with all environmental regulations in the countries in which the Company has operations and exploration and development activities and seeks to comply with prudent international standards.

Environmental hazards may also exist on the properties on which the Company holds interests that are unknown to the Company at present and that may have been caused before the Company received title to the properties.

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations or exploration and development activities to cease or be substantially curtailed, and may include corrective measures requiring significant capital expenditures, installation of additional equipment, or remedial actions. In addition, parties that engage in mining operations or exploration and development activities, including the Company, may be required to compensate those suffering loss or damage by reason of the such activities and may face civil or criminal fines or penalties for violations of applicable laws or regulations.

Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on the Company and cause increases in exploration expenses, capital expenditures or production costs, reduction in levels of production at producing properties, or abandonment or delays in development of new mining properties.

Labour risk.  The Company is dependent on its workforce to extract and process minerals, and is therefore sensitive to its ability to source skilled labour in country and the potential for a labour disruption that impacts the Company's mining activities or changes to laws. The Company endeavours to maintain good relations with its contractors and workforce in order to minimize the possibility of strikes, lockouts and other stoppages at its work sites.  Relations between the Company and its employees may be impacted by changes in legislation or labour relations that may be introduced by, among other things, employee groups, unions, and the relevant governmental authorities in those jurisdictions where the Company operates and may have a material adverse effect on the Company’s business results of operations and financial conditions.

Risks related to the construction, plant expansion, zinc phase at Bisha, optimization of current process plant, and start-up of new mining operations or mining phases.  The success of construction projects, plant expansions and their optimization, the transition to primary production at Bisha or the start-up of new mines by the Company is subject to a number of factors including the availability and performance of qualified engineering and construction contractors, mining contractors, suppliers and consultants, the receipt of required governmental approvals and permits in connection with the construction of mining facilities and the conduct of mining operations, including environmental permits, price escalation on all components of construction, plant expansion, transition to primary production or start-up of new mines, the underlying characteristics, quality and unpredictability of the exact nature of mineralogy and metallurgy of a deposit and the consequent accurate understanding of doré or concentrate production, the successful completion and operation of conveyors to move ore and other operational elements. Any delay or deterioration in the performance of any one or more of the contractors, suppliers, consultants or other persons on which the Company is dependent in connection with its construction, expansion or transition activities or start-up of new mines, a delay in or failure to receive the required governmental approvals and permits in a timely manner or on reasonable terms, or a delay in or failure in connection with the completion and successful operation of facilities or other operational elements could delay or prevent the successful transition to primary production at Bisha as planned, or the start-up of new mines. There can be no assurance that current or future construction projects, plant expansions, the transition to primary production at Bisha as planned or the start-up of new mines by the Company will be successful.

76 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

Infrastructure risk.  Mining, processing and development activities depend, to some degree, on adequate infrastructure. Reliable roads, bridges, power sources and water supply are important determinants that affect capital and operating costs.  Disruption or curtailment of access to or maintenance of such infrastructure or supplies whether it is due to inclement weather, wear and tear, or other reasons, could have an adverse material impact on the Company’s ability to service and operate its mines due to higher costs or business interruption. Unusual or infrequent weather phenomena, sabotage, terrorist activities, government or other interference in the maintenance or provision of such infrastructure could adversely affect the Company’s operations and development activities, financial condition and results of operations.

Transportation risk.  Delivery to the mine operation of required operating consumables and fuel as well as delivery to the various smelters of mine-produced concentrates is most often subject to third party contractors, be it land transport in country or sea freight to and from the ocean port.  To a large extent there are many factors outside the control of the Company, which can adversely affect the delivery of these key commodities and consumables, or the export of these metal concentrates ranging from elevated transport costs to significant delays or temporary stoppage in product movement. The Company may be unable to achieve efficient transportation logistics when seeking to move copper or zinc concentrate from the mine site to port.  There remains a risk that the contractor will not be able to transport the required volume of concentrate due to various factors such as an inadequate number of trucks, poor maintenance of those trucks, or an inadequate number of trained drivers available to operate the trucks.  In addition, there may be difficulties in chartering marine bulk carriers into Massawa in a timely manner to transport concentrate from the port of Massawa to overseas customers.  There is also an ever-present risk of piracy with respect to marine transport in and around the Gulf of Aden and the risk that the port of Massawa could become inaccessible in the event of piracy, military conflict or political unrest.  Any interruption in the delivery chain from mine site to customers could both halt mine process plant production due to limited storage capacity for concentrates (as well as risks associated with build-up of concentrate stocks exposed to the elements) leading to business interruption losses which could also breach the terms and conditions of certain offtake agreements that may specify delivery of required quantities of concentrate over pre-established time periods. These factors could have a material impact on the Company’s results of operations and financial condition.

Land title risk.  The acquisition of clear title to mineral properties is a very detailed and time-consuming process. Title to, and the area of, mineral concessions may be disputed.  Although the Company believes that it has taken reasonable measures to ensure receipt of proper title to its properties, there is no guarantee that title to any one or more of its properties will not be challenged or impaired.  Third parties may have valid claims underlying portions of the Company’s interests, including prior unregistered liens, agreements, transfers or claims, including indigenous land claims, and title may be affected by, among other things, undetected defects.  In addition, the Company may be unable to operate its properties as permitted or to enforce its rights with respect to its properties while such title defects or claims are addressed.

Other Risks and Uncertainties.  The Company is subject to a number of other risks and uncertainties that could adversely affect the Company’s business, financial condition and operating results and its beliefs, plans and expectations about the future including, without limitation, risks that: (i) the Company becomes involved in any material disputes with any of its key business partners, suppliers or customers; (ii) the Company is subject to any adverse ruling in any of the pending litigation to which it is a party; (iii) the Company incurs unanticipated power interruptions or failures due to electrical circuit failures or inadequate fuel quality or continued supply required to effectively operate power generators for the plant or otherwise, the short supply or high cost of fuel and energy; (iv) fluctuating trends in the supply and cost of parts or fuel can make planning our business more difficult; or (v) unexpected costs or repairs to the plant; (vi) the timing and success of improving the quality of

77 | Nevsun Resources Ltd.


 

ANNUAL INFORMATION FORM – December 31, 2016

the copper circuit product by resolving metallurgical challenges from the variable ore materials being processed to produce concentrate from the copper circuit; (vii) the effect on Mineral Resource or Mineral Reserve estimates due to the possible inability to resolve the metallurgical challenges on the variable ore materials being processed on a timely basis or at all; or (viii) the Company experiences other challenges with copper mineralogy or host pyrite minerals that impacts metallurgical recoveries and concentrate grades in the transition zone.

78 | Nevsun Resources Ltd.