COMMITMENTS AND CONTINGENCIES
6 Months Ended
Jun. 30, 2017
Statement [Line Items]  
Commitments and Contingencies Disclosure [Text Block]
COMMITMENTS AND CONTINGENCIES
Nuclear Insurance

Under Price-Anderson, SCE&G (for itself and on behalf of Santee Cooper, a one-third owner of Unit 1) maintains agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at SCE&G's nuclear power plant. Price-Anderson provides funds up to $13.4 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $450 million by ANI with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. Each reactor licensee is liable for up to $127.3 million per reactor owned for each nuclear incident occurring at any reactor in the United States, provided that not more than $18.9 million of the liability per reactor would be assessed per year. SCE&G’s maximum assessment, based on its two-thirds ownership of Unit 1, would be $84.8 million per incident, but not more than $12.6 million per year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years.

SCE&G currently maintains insurance policies (for itself and on behalf of Santee Cooper) with NEIL. The policies provide coverage to Unit 1 for property damage and outage costs up to $2.75 billion resulting from an event of nuclear origin and up to $2.33 billion resulting from an event of a non-nuclear origin. In addition, a builder's risk insurance policy has been purchased from NEIL for the New Units. This policy provides the owners of the New Units up to $500 million of total coverage for accidental property damage occurring at the New Units. The NEIL policies, in the aggregate, are subject to a maximum loss of $2.75 billion for any single loss occurrence. The NEIL policies permit retrospective assessments under certain conditions to cover insurer’s losses. Based on the current annual premium, SCE&G’s portion of the retrospective premium assessment would not exceed $45.4 million. SCE&G currently maintains an excess property insurance policy (for itself and on behalf of Santee Cooper) with EMANI. The policy provides coverage to Unit 1 for property damage and outage costs up to $415 million resulting from an event of a non-nuclear origin. The EMANI policy permits retrospective assessments under certain conditions to cover insurer's losses. Based on the current annual premium, SCE&G's portion of the retrospective premium assessment would not exceed $1.9 million.
 
To the extent that insurable claims for property damage, decontamination, repair and replacement and other costs and expenses arising from an incident at Unit 1 exceed the policy limits of insurance, or to the extent such insurance becomes unavailable in the future, and to the extent that SCE&G's rates would not recover the cost of any purchased replacement power, SCE&G will retain the risk of loss as a self-insurer. SCE&G has no reason to anticipate a serious nuclear or other incident.  However, if such an incident were to occur, it likely would have a material impact on the Company’s and Consolidated SCE&G's results of operations, cash flows and financial position.
New Nuclear Construction

SCE&G, on behalf of itself and as agent for Santee Cooper, entered into the EPC Contract with the Consortium in 2008 for the design and construction of the New Units. SCE&G's ownership share in the New Units is 55%. As discussed below, various difficulties have been encountered in connection with the project. The ability to adhere to established budgets and construction schedules was affected by many variables, including unanticipated difficulties encountered in connection with project engineering and the construction of project components, constrained financial resources of the contractors, regulatory, legal, training and construction processes associated with securing approvals, permits and licenses and necessary amendments to them within projected timeframes, the availability of labor and materials at estimated costs, the efficiency of project labor and weather. There were also contractor and supplier performance issues, difficulties in timely meeting critical regulatory requirements, contract disputes, and changes in key contractors or subcontractors. These matters, and others as more fully discussed below, have resulted in the Company’s determination on July 31, 2017, after a comprehensive analysis, to abandon the construction of the New Units and to seek recovery under the abandonment provisions of the BLRA of costs expended on them.

EPC Contract and BLRA Matters

The construction of the New Units and SCE&G’s related recovery of financing costs through rates has been subject to review and approval by the SCPSC as provided for in the BLRA. Under the BLRA, the SCPSC has approved, among other things, a milestone schedule and a capital costs estimates schedule for the New Units. This approval constitutes a final and binding determination that the New Units are used and useful for utility purposes, and that the capital costs associated with the New Units are prudent utility costs and expenses and are properly included in rates, so long as the New Units are constructed or are being constructed within the parameters of the approved milestone schedule, including specified contingencies, and the approved capital costs estimates schedule. Subject to the same conditions, the BLRA provides that SCE&G may apply to the SCPSC annually for an order to recover through revised rates SCE&G’s weighted average cost of capital applied to all or part of the outstanding balance of construction work in progress concerning the New Units. As of June 30, 2017, SCE&G’s investment in the New Units, including related transmission, totaled $4.9 billion, for which the financing costs on $3.8 billion have been reflected in rates under the BLRA.

The SCPSC granted initial approval of the construction schedule and related forecasted capital costs in 2009. The NRC issued COLs in March 2012. In November 2012, and again in September 2015 and November 2016 (see discussion below), the SCPSC approved SCE&G's requested updates to the milestone schedule, revised contractual substantial completion dates, and increases in capital and other costs. As further discussed below, approval by the SCPSC of cost recovery under the abandonment provisions of the BLRA will be required as a consequence of the Company’s determination on July 31, 2017 to cease construction of the New Units.
    
October 2015 Amendment and WEC's Engagement of Fluor

On October 27, 2015, SCE&G, Santee Cooper and the Consortium amended the EPC Contract. The October 2015 Amendment became effective in December 2015, upon the consummation of the acquisition by WEC of the stock of Stone & Webster from CB&I. Following that acquisition, WECTEC remained a member of the Consortium as a subsidiary of WEC, and Fluor has served as a subcontracted construction manager.

The October 2015 Amendment provided SCE&G and Santee Cooper an option to fix the total amount to be paid to the Consortium for its entire scope of work on the project (excluding a limited amount of work within the time and materials component of the contract price) after June 30, 2015 at $6.082 billion (SCE&G’s 55% portion being approximately $3.345 billion). This total amount to be paid would be reduced by amounts paid since June 30, 2015. SCE&G, on behalf of itself and as agent for Santee Cooper, executed the fixed price option, subject to SCPSC approval, on July 1, 2016.

Among other things the October 2015 Amendment revised the contractual guaranteed substantial completion dates of Unit 2 and Unit 3 to August 31, 2019 and 2020, respectively, and provided for development of a revised construction milestone payment schedule. In February 2017, WEC notified the Company and Consolidated SCE&G that the contractual guaranteed substantial completion dates of August 2019 and 2020 for Unit 2 and Unit 3, respectively, which were reflected in the October 2015 Amendment, would not be met. Instead, WEC provided further revised estimated substantial completion dates of April 2020 and December 2020.

November 2016 SCPSC Order

In May 2016, SCE&G petitioned the SCPSC for approval of the updated construction and capital cost schedules for the New Units which had been developed in connection with the October 2015 Amendment. On November 9, 2016, the SCPSC approved a settlement agreement among SCE&G, ORS and certain other parties concerning this petition. The SCPSC also approved SCE&G's election of the fixed price option.

The construction schedule approved by the SCPSC in November 2016 provided for contractual guaranteed substantial completion dates of August 31, 2019 and August 31, 2020 for Unit 2 and Unit 3, respectively, and the approved capital cost schedule included incremental capital costs totaling $831 million. Under such approved capital cost schedule, SCE&G’s total project capital cost would be approximately $6.8 billion including owner’s costs and transmission, or $7.7 billion with escalation and AFC. In addition, the SCPSC approved revising SCE&G’s allowed ROE for new nuclear construction from 10.5% to 10.25%, with this revised ROE being applied prospectively for the purpose of calculating revised rates sought by SCE&G under the BLRA on and after January 1, 2017.

On February 28, 2017, the SCPSC issued its order denying Petitions for Rehearing which had been filed by certain parties that were not included in the settlement. The time period to appeal the SCPSC’s decision expired with no appeal having been filed.

Contractor Bankruptcy Proceedings and Related Uncertainties

On March 29, 2017, WEC and WECTEC, the two members of the Consortium, and certain of their affiliates filed petitions for protection under Chapter 11 of the U.S. Bankruptcy Code, citing a liquidity crisis arising from project contract losses attributable to the New Units and the Vogtle Units as a material factor that caused them to seek protection under the bankruptcy laws. As part of such filing, WEC and WECTEC publicly announced their inability to complete the New Units under the terms of the EPC Contract and their need to reject the obligations thereunder. In connection with the bankruptcy filing, SCE&G, Santee Cooper, WEC and WECTEC entered into an Interim Assessment Agreement under which all parties continued to perform under the EPC Contract and under which SCE&G and Santee Cooper were provided the right to discuss project status with Fluor and other subcontractors and vendors and to obtain relevant project information and documents from them in order for SCE&G and Santee Cooper to perform comprehensive analyses regarding whether or how to proceed with the project. As part of the Interim Assessment Agreement, and to avoid an immediate rejection of the EPC Contract upon the filing of the bankruptcy case, WEC and WECTEC required SCE&G and Santee Cooper to make up front cash payments to WEC, WECTEC, subcontractors and vendors, irrespective of the fixed price provisions of the EPC Contract, to permit the time to conduct analyses. SCE&G and Santee Cooper paid all costs incurred by the Consortium, Fluor, other subcontractors and vendors for work performed or services rendered while the Interim Assessment Agreement remained in effect.

During the period of the Interim Assessment Agreement, as amended and extended, SCE&G and Santee Cooper evaluated the various elements of the project, including forecasted costs and completion dates, while construction continued and SCE&G and Santee Cooper continued to make payments for such work.

As part of its evaluation, SCE&G considered that, as a result of the bankruptcy process (including WEC and WECTEC's public announcements that they could not perform under the terms of the EPC Contract), the EPC Contract would likely be rejected and that the benefit of the fixed-price terms provided by the EPC Contract would be lost. As such the cost overruns expected to be incurred by the Consortium would become the responsibility of SCE&G and Santee Cooper. Additionally, these cost increases and other costs identified by SCE&G would not be fully recoverable from the Consortium or from Toshiba under its payment guaranty or the related Toshiba Settlement Agreement, discussed below, and such costs would likely substantially exceed the amount of the Consortium's payment obligations guaranteed by Toshiba. SCE&G also considered that even the newly revised substantial completion dates identified by WEC of April and December 2020 for Unit 2 and Unit 3, respectively, would not be met.

Toshiba Settlement Agreement

Payment and performance obligations under the EPC Contract are joint and several obligations of WEC and WECTEC, and in connection with the October 2015 Amendment, Toshiba, WEC’s parent company, reaffirmed its guaranty of WEC’s payment obligations.

In April of 2017, following WEC’s and WECTEC’s bankruptcy petitions, Toshiba announced that it had recorded an impairment charge of approximately $6.2 billion relating to its nuclear power systems business, leaving it with negative shareholders’ equity. Toshiba also disclosed that, although these conditions and events raised substantial doubt, it believed that its responses to such conditions, including the sale of a portion of its computer memory business as then anticipated by Toshiba, would enable it to continue to operate as a going concern. However, there can be no assurance that such sales or other actions will be successful. As such, there can be no assurance that Toshiba will fulfill its payment guaranty obligations under the Toshiba Settlement Agreement discussed below.

As discussed above, Toshiba provided a parental guaranty for WEC’s payment obligations under the EPC Contract. In satisfaction of such guaranty obligations, on July 27, 2017, the Toshiba Settlement Agreement was executed under which Toshiba is to begin making periodic payments from October 2017 through September 2022 in the total amount of approximately $2.2 billion ($1.2 billion for SCE&G’s 55% share), including certain amounts with respect to contractor liens discussed below. Certain of these payments may be satisfied by distributions from WEC through the bankruptcy process. These payments are payable even though the project has been abandoned.

A number of subcontractors and vendors to the Consortium, including Fluor, have alleged non-payment by the Consortium for amounts owed for work performed on the New Units.  SCE&G is contesting the filed liens.  SCE&G estimates that the aggregate amount of claims for which subcontractor and vendor liens have been filed is approximately $258 million (SCE&G’s 55% portion being approximately $142 million), of which $50 million (SCE&G’s 55% share being $27.5 million) have been paid.  The settlement payments above are subject to reduction if WEC pays creditors holding these liens directly.
SCE&G will continue to evaluate the issues relating to these claims.

Determination to Abandon Construction

Based on the thorough evaluation previously discussed, and in light of Santee Cooper's decision to suspend construction, on July 31, 2017, the Company determined to abandon the construction of the New Units and to pursue recovery of costs incurred in connection with such construction under the abandonment provisions of the BLRA. On July 31, 2017, SCE&G gave WEC a five-day notice of termination of the Interim Assessment Agreement, and notified WEC of its determination to abandon construction of the New Units.

On August 1, SCE&G senior management provided an allowable ex parte briefing to the SCPSC regarding the project and this decision, and SCE&G also filed the August 1, 2017 Petition with the SCPSC which included its plan of abandonment and also certain proposed actions which would mitigate related customer rate increases. Among the mitigation actions proposed in the August 1, 2017 Petition are the return to customers through a decrement rider of the net value of the payments to be made by Toshiba under the Toshiba Settlement Agreement as and to the extent those funds are received by SCE&G.

The BLRA provides that, in the event of abandonment prior to plant completion, costs incurred, including AFC, and a return on those costs may be recoverable through rates, so long as SCE&G demonstrates by a preponderance of the evidence that its decision to abandon the New Units was prudent. Through the petition filed on August 1, 2017, SCE&G has sought recovery of such costs expended on the construction of the New Units, including certain costs incurred subsequent to SCE&G's last revised rates update, and other costs under the abandonment provisions of the BLRA; however, the ability of SCE&G to recover such costs, and a reasonable return on them, through rates will be subject to review and approval by the SCPSC. While the Company's decision to abandon the New Units is expected to result in the reclassification in the third quarter of total construction work in progress related to the New Units into a regulatory asset, no impairment exists as of the filing date of this Form 10-Q.

Nuclear Production Tax Credits

In August 2014, the IRS notified SCE&G that, subject to a national megawatt capacity limitation, the electricity to be produced by each of the New Units would qualify for nuclear production tax credits under Section 45J of the IRC to the extent that such New Unit was operational before January 1, 2021 and other eligibility requirements were met. These nuclear production tax credits (related to SCE&G's 55% share of both New Units) could have totaled as much as approximately $1.4 billion. Due to the Company's determination to abandon the construction of the New Units, which determination was based in part on the expectation that the New Units would not be placed in service before January 2021, no such production tax credits will be earned.
Environmental
 
On August 3, 2015, the EPA issued its final rule on emission guidelines for states to follow in developing plans to address GHG emissions from existing units. The rule includes state-specific goals for reducing national CO2 emissions by 32% from 2005 levels by 2030. The rule establishes a phased-in compliance approach beginning in 2022. The rule gives each state from one to three years to issue its SIP, which will ultimately define the specific compliance methodology that will be applied to existing units in that state. On February 9, 2016, the Supreme Court stayed the rule pending disposition of a petition of review of the rule in the Court of Appeals. As a result of an Executive Order on March 28, 2017, the EPA is reconsidering the rule and the Court of Appeals agreed to hold the case in abeyance. The Company and Consolidated SCE&G expect any costs incurred to comply with such rule to be recoverable through rates.

In July 2011, the EPA issued the CSAPR to reduce emissions of SO2 and NOX from power plants in the eastern half of the United States. The CSAPR replaces the CAIR and requires a total of 28 states to reduce annual SO2 emissions and annual and ozone season NOX emissions to assist in attaining the ozone and fine particle NAAQS. The rule establishes an emissions cap for SO2 and NOX and limits the trading for emission allowances by separating affected states into two groups with no trading between the groups. The State of South Carolina has chosen to remain in the CSAPR program, even though recent court rulings exempted the state. This allows the state to remain compliant with regional haze standards. Air quality control installations that SCE&G and GENCO have already completed have positioned them to comply with the existing allowances set by the CSAPR. Any costs incurred to comply with CSAPR are expected to be recoverable through rates.

In April 2012, the EPA's MATS rule containing new standards for mercury and other specified air pollutants became effective. The MATS rule has been the subject of ongoing litigation even while it remains in effect. Rulings on this litigation are not expected to have an impact on SCE&G or GENCO due to plant retirements, conversions, and enhancements. SCE&G and GENCO are in compliance with the MATS rule and expect to remain in compliance.

The CWA provides for the imposition of effluent limitations that require treatment for wastewater discharges. Under the CWA, compliance with applicable limitations is achieved under state-issued NPDES permits. As a facility’s NPDES permit is renewed (every five years), any new effluent limitations would be incorporated. The ELG Rule became effective on January 4, 2016. After this date, state regulators will modify facility NPDES permits to match more restrictive standards, thus requiring facilities to retrofit with new wastewater treatment technologies. Compliance dates will vary by type of wastewater, and some will be based on a facility's five-year permit cycle and thus may range from 2018 to 2023. However, the ELG Rule is under reconsideration by the EPA and has been stayed administratively. The Company and Consolidated SCE&G expect that wastewater treatment technology retrofits will be required at Williams and Wateree Stations. Any costs incurred to comply with the ELG Rule are expected to be recoverable through rates.

The CWA Section 316(b) Existing Facilities Rule became effective in October 2014. This rule establishes national requirements for the location, design, construction and capacity of cooling water intake structures at existing facilities that reflect the best technology available for minimizing the adverse environmental impacts of impingement and entrainment. SCE&G and GENCO are conducting studies and implementing plans as required by the rule to determine appropriate intake structure modifications to ensure compliance with this rule. Any costs incurred to comply with this rule are expected to be recoverable through rates.

The EPA's final rule for CCR became effective in the fourth quarter of 2015. This rule regulates CCR as a non-hazardous waste under Subtitle D of the Resource Conservation and Recovery Act and imposes certain requirements on ash storage ponds and other CCR management facilities at SCE&G's and GENCO's coal-fired generating facilities. SCE&G and GENCO have already closed or have begun the process of closure of all of their ash storage ponds and have previously recognized AROs for such ash storage ponds under existing requirements. The Company and Consolidated SCE&G do not expect the incremental compliance costs associated with this rule to be significant and expect to recover such costs in future rates.

SCE&G is responsible for four decommissioned MGP sites in South Carolina which contain residues of by-product chemicals. These sites are in various stages of investigation, remediation and monitoring under work plans approved by DHEC and the EPA. SCE&G anticipates that major remediation activities at all these sites will continue at least through 2018 and will cost an additional $9.9 million, which is accrued in Other within Deferred Credits and Other Liabilities on the consolidated balance sheet. SCE&G expects to recover any cost arising from the remediation of MGP sites through rates. At June 30, 2017, deferred amounts, net of amounts previously recovered through rates and insurance settlements, totaled $25.0 million and are included in regulatory assets.
SCEG  
Statement [Line Items]  
Commitments and Contingencies Disclosure [Text Block]
COMMITMENTS AND CONTINGENCIES
Nuclear Insurance

Under Price-Anderson, SCE&G (for itself and on behalf of Santee Cooper, a one-third owner of Unit 1) maintains agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at SCE&G's nuclear power plant. Price-Anderson provides funds up to $13.4 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $450 million by ANI with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. Each reactor licensee is liable for up to $127.3 million per reactor owned for each nuclear incident occurring at any reactor in the United States, provided that not more than $18.9 million of the liability per reactor would be assessed per year. SCE&G’s maximum assessment, based on its two-thirds ownership of Unit 1, would be $84.8 million per incident, but not more than $12.6 million per year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years.

SCE&G currently maintains insurance policies (for itself and on behalf of Santee Cooper) with NEIL. The policies provide coverage to Unit 1 for property damage and outage costs up to $2.75 billion resulting from an event of nuclear origin and up to $2.33 billion resulting from an event of a non-nuclear origin. In addition, a builder's risk insurance policy has been purchased from NEIL for the New Units. This policy provides the owners of the New Units up to $500 million of total coverage for accidental property damage occurring at the New Units. The NEIL policies, in the aggregate, are subject to a maximum loss of $2.75 billion for any single loss occurrence. The NEIL policies permit retrospective assessments under certain conditions to cover insurer’s losses. Based on the current annual premium, SCE&G’s portion of the retrospective premium assessment would not exceed $45.4 million. SCE&G currently maintains an excess property insurance policy (for itself and on behalf of Santee Cooper) with EMANI. The policy provides coverage to Unit 1 for property damage and outage costs up to $415 million resulting from an event of a non-nuclear origin. The EMANI policy permits retrospective assessments under certain conditions to cover insurer's losses. Based on the current annual premium, SCE&G's portion of the retrospective premium assessment would not exceed $1.9 million.
 
To the extent that insurable claims for property damage, decontamination, repair and replacement and other costs and expenses arising from an incident at Unit 1 exceed the policy limits of insurance, or to the extent such insurance becomes unavailable in the future, and to the extent that SCE&G's rates would not recover the cost of any purchased replacement power, SCE&G will retain the risk of loss as a self-insurer. SCE&G has no reason to anticipate a serious nuclear or other incident.  However, if such an incident were to occur, it likely would have a material impact on the Company’s and Consolidated SCE&G's results of operations, cash flows and financial position.
New Nuclear Construction

SCE&G, on behalf of itself and as agent for Santee Cooper, entered into the EPC Contract with the Consortium in 2008 for the design and construction of the New Units. SCE&G's ownership share in the New Units is 55%. As discussed below, various difficulties have been encountered in connection with the project. The ability to adhere to established budgets and construction schedules was affected by many variables, including unanticipated difficulties encountered in connection with project engineering and the construction of project components, constrained financial resources of the contractors, regulatory, legal, training and construction processes associated with securing approvals, permits and licenses and necessary amendments to them within projected timeframes, the availability of labor and materials at estimated costs, the efficiency of project labor and weather. There were also contractor and supplier performance issues, difficulties in timely meeting critical regulatory requirements, contract disputes, and changes in key contractors or subcontractors. These matters, and others as more fully discussed below, have resulted in the Company’s determination on July 31, 2017, after a comprehensive analysis, to abandon the construction of the New Units and to seek recovery under the abandonment provisions of the BLRA of costs expended on them.

EPC Contract and BLRA Matters

The construction of the New Units and SCE&G’s related recovery of financing costs through rates has been subject to review and approval by the SCPSC as provided for in the BLRA. Under the BLRA, the SCPSC has approved, among other things, a milestone schedule and a capital costs estimates schedule for the New Units. This approval constitutes a final and binding determination that the New Units are used and useful for utility purposes, and that the capital costs associated with the New Units are prudent utility costs and expenses and are properly included in rates, so long as the New Units are constructed or are being constructed within the parameters of the approved milestone schedule, including specified contingencies, and the approved capital costs estimates schedule. Subject to the same conditions, the BLRA provides that SCE&G may apply to the SCPSC annually for an order to recover through revised rates SCE&G’s weighted average cost of capital applied to all or part of the outstanding balance of construction work in progress concerning the New Units. As of June 30, 2017, SCE&G’s investment in the New Units, including related transmission, totaled $4.9 billion, for which the financing costs on $3.8 billion have been reflected in rates under the BLRA.

The SCPSC granted initial approval of the construction schedule and related forecasted capital costs in 2009. The NRC issued COLs in March 2012. In November 2012, and again in September 2015 and November 2016 (see discussion below), the SCPSC approved SCE&G's requested updates to the milestone schedule, revised contractual substantial completion dates, and increases in capital and other costs. As further discussed below, approval by the SCPSC of cost recovery under the abandonment provisions of the BLRA will be required as a consequence of the Company’s determination on July 31, 2017 to cease construction of the New Units.
    
October 2015 Amendment and WEC's Engagement of Fluor

On October 27, 2015, SCE&G, Santee Cooper and the Consortium amended the EPC Contract. The October 2015 Amendment became effective in December 2015, upon the consummation of the acquisition by WEC of the stock of Stone & Webster from CB&I. Following that acquisition, WECTEC remained a member of the Consortium as a subsidiary of WEC, and Fluor has served as a subcontracted construction manager.

The October 2015 Amendment provided SCE&G and Santee Cooper an option to fix the total amount to be paid to the Consortium for its entire scope of work on the project (excluding a limited amount of work within the time and materials component of the contract price) after June 30, 2015 at $6.082 billion (SCE&G’s 55% portion being approximately $3.345 billion). This total amount to be paid would be reduced by amounts paid since June 30, 2015. SCE&G, on behalf of itself and as agent for Santee Cooper, executed the fixed price option, subject to SCPSC approval, on July 1, 2016.

Among other things the October 2015 Amendment revised the contractual guaranteed substantial completion dates of Unit 2 and Unit 3 to August 31, 2019 and 2020, respectively, and provided for development of a revised construction milestone payment schedule. In February 2017, WEC notified the Company and Consolidated SCE&G that the contractual guaranteed substantial completion dates of August 2019 and 2020 for Unit 2 and Unit 3, respectively, which were reflected in the October 2015 Amendment, would not be met. Instead, WEC provided further revised estimated substantial completion dates of April 2020 and December 2020.

November 2016 SCPSC Order

In May 2016, SCE&G petitioned the SCPSC for approval of the updated construction and capital cost schedules for the New Units which had been developed in connection with the October 2015 Amendment. On November 9, 2016, the SCPSC approved a settlement agreement among SCE&G, ORS and certain other parties concerning this petition. The SCPSC also approved SCE&G's election of the fixed price option.

The construction schedule approved by the SCPSC in November 2016 provided for contractual guaranteed substantial completion dates of August 31, 2019 and August 31, 2020 for Unit 2 and Unit 3, respectively, and the approved capital cost schedule included incremental capital costs totaling $831 million. Under such approved capital cost schedule, SCE&G’s total project capital cost would be approximately $6.8 billion including owner’s costs and transmission, or $7.7 billion with escalation and AFC. In addition, the SCPSC approved revising SCE&G’s allowed ROE for new nuclear construction from 10.5% to 10.25%, with this revised ROE being applied prospectively for the purpose of calculating revised rates sought by SCE&G under the BLRA on and after January 1, 2017.

On February 28, 2017, the SCPSC issued its order denying Petitions for Rehearing which had been filed by certain parties that were not included in the settlement. The time period to appeal the SCPSC’s decision expired with no appeal having been filed.

Contractor Bankruptcy Proceedings and Related Uncertainties

On March 29, 2017, WEC and WECTEC, the two members of the Consortium, and certain of their affiliates filed petitions for protection under Chapter 11 of the U.S. Bankruptcy Code, citing a liquidity crisis arising from project contract losses attributable to the New Units and the Vogtle Units as a material factor that caused them to seek protection under the bankruptcy laws. As part of such filing, WEC and WECTEC publicly announced their inability to complete the New Units under the terms of the EPC Contract and their need to reject the obligations thereunder. In connection with the bankruptcy filing, SCE&G, Santee Cooper, WEC and WECTEC entered into an Interim Assessment Agreement under which all parties continued to perform under the EPC Contract and under which SCE&G and Santee Cooper were provided the right to discuss project status with Fluor and other subcontractors and vendors and to obtain relevant project information and documents from them in order for SCE&G and Santee Cooper to perform comprehensive analyses regarding whether or how to proceed with the project. As part of the Interim Assessment Agreement, and to avoid an immediate rejection of the EPC Contract upon the filing of the bankruptcy case, WEC and WECTEC required SCE&G and Santee Cooper to make up front cash payments to WEC, WECTEC, subcontractors and vendors, irrespective of the fixed price provisions of the EPC Contract, to permit the time to conduct analyses. SCE&G and Santee Cooper paid all costs incurred by the Consortium, Fluor, other subcontractors and vendors for work performed or services rendered while the Interim Assessment Agreement remained in effect.

During the period of the Interim Assessment Agreement, as amended and extended, SCE&G and Santee Cooper evaluated the various elements of the project, including forecasted costs and completion dates, while construction continued and SCE&G and Santee Cooper continued to make payments for such work.

As part of its evaluation, SCE&G considered that, as a result of the bankruptcy process (including WEC and WECTEC's public announcements that they could not perform under the terms of the EPC Contract), the EPC Contract would likely be rejected and that the benefit of the fixed-price terms provided by the EPC Contract would be lost. As such the cost overruns expected to be incurred by the Consortium would become the responsibility of SCE&G and Santee Cooper. Additionally, these cost increases and other costs identified by SCE&G would not be fully recoverable from the Consortium or from Toshiba under its payment guaranty or the related Toshiba Settlement Agreement, discussed below, and such costs would likely substantially exceed the amount of the Consortium's payment obligations guaranteed by Toshiba. SCE&G also considered that even the newly revised substantial completion dates identified by WEC of April and December 2020 for Unit 2 and Unit 3, respectively, would not be met.

Toshiba Settlement Agreement

Payment and performance obligations under the EPC Contract are joint and several obligations of WEC and WECTEC, and in connection with the October 2015 Amendment, Toshiba, WEC’s parent company, reaffirmed its guaranty of WEC’s payment obligations.

In April of 2017, following WEC’s and WECTEC’s bankruptcy petitions, Toshiba announced that it had recorded an impairment charge of approximately $6.2 billion relating to its nuclear power systems business, leaving it with negative shareholders’ equity. Toshiba also disclosed that, although these conditions and events raised substantial doubt, it believed that its responses to such conditions, including the sale of a portion of its computer memory business as then anticipated by Toshiba, would enable it to continue to operate as a going concern. However, there can be no assurance that such sales or other actions will be successful. As such, there can be no assurance that Toshiba will fulfill its payment guaranty obligations under the Toshiba Settlement Agreement discussed below.

As discussed above, Toshiba provided a parental guaranty for WEC’s payment obligations under the EPC Contract. In satisfaction of such guaranty obligations, on July 27, 2017, the Toshiba Settlement Agreement was executed under which Toshiba is to begin making periodic payments from October 2017 through September 2022 in the total amount of approximately $2.2 billion ($1.2 billion for SCE&G’s 55% share), including certain amounts with respect to contractor liens discussed below. Certain of these payments may be satisfied by distributions from WEC through the bankruptcy process. These payments are payable even though the project has been abandoned.

A number of subcontractors and vendors to the Consortium, including Fluor, have alleged non-payment by the Consortium for amounts owed for work performed on the New Units.  SCE&G is contesting the filed liens.  SCE&G estimates that the aggregate amount of claims for which subcontractor and vendor liens have been filed is approximately $258 million (SCE&G’s 55% portion being approximately $142 million), of which $50 million (SCE&G’s 55% share being $27.5 million) have been paid.  The settlement payments above are subject to reduction if WEC pays creditors holding these liens directly.
SCE&G will continue to evaluate the issues relating to these claims.

Determination to Abandon Construction

Based on the thorough evaluation previously discussed, and in light of Santee Cooper's decision to suspend construction, on July 31, 2017, the Company determined to abandon the construction of the New Units and to pursue recovery of costs incurred in connection with such construction under the abandonment provisions of the BLRA. On July 31, 2017, SCE&G gave WEC a five-day notice of termination of the Interim Assessment Agreement, and notified WEC of its determination to abandon construction of the New Units.

On August 1, SCE&G senior management provided an allowable ex parte briefing to the SCPSC regarding the project and this decision, and SCE&G also filed the August 1, 2017 Petition with the SCPSC which included its plan of abandonment and also certain proposed actions which would mitigate related customer rate increases. Among the mitigation actions proposed in the August 1, 2017 Petition are the return to customers through a decrement rider of the net value of the payments to be made by Toshiba under the Toshiba Settlement Agreement as and to the extent those funds are received by SCE&G.

The BLRA provides that, in the event of abandonment prior to plant completion, costs incurred, including AFC, and a return on those costs may be recoverable through rates, so long as SCE&G demonstrates by a preponderance of the evidence that its decision to abandon the New Units was prudent. Through the petition filed on August 1, 2017, SCE&G has sought recovery of such costs expended on the construction of the New Units, including certain costs incurred subsequent to SCE&G's last revised rates update, and other costs under the abandonment provisions of the BLRA; however, the ability of SCE&G to recover such costs, and a reasonable return on them, through rates will be subject to review and approval by the SCPSC. While the Company's decision to abandon the New Units is expected to result in the reclassification in the third quarter of total construction work in progress related to the New Units into a regulatory asset, no impairment exists as of the filing date of this Form 10-Q.

Nuclear Production Tax Credits

In August 2014, the IRS notified SCE&G that, subject to a national megawatt capacity limitation, the electricity to be produced by each of the New Units would qualify for nuclear production tax credits under Section 45J of the IRC to the extent that such New Unit was operational before January 1, 2021 and other eligibility requirements were met. These nuclear production tax credits (related to SCE&G's 55% share of both New Units) could have totaled as much as approximately $1.4 billion. Due to the Company's determination to abandon the construction of the New Units, which determination was based in part on the expectation that the New Units would not be placed in service before January 2021, no such production tax credits will be earned.
Environmental
 
On August 3, 2015, the EPA issued its final rule on emission guidelines for states to follow in developing plans to address GHG emissions from existing units. The rule includes state-specific goals for reducing national CO2 emissions by 32% from 2005 levels by 2030. The rule establishes a phased-in compliance approach beginning in 2022. The rule gives each state from one to three years to issue its SIP, which will ultimately define the specific compliance methodology that will be applied to existing units in that state. On February 9, 2016, the Supreme Court stayed the rule pending disposition of a petition of review of the rule in the Court of Appeals. As a result of an Executive Order on March 28, 2017, the EPA is reconsidering the rule and the Court of Appeals agreed to hold the case in abeyance. The Company and Consolidated SCE&G expect any costs incurred to comply with such rule to be recoverable through rates.

In July 2011, the EPA issued the CSAPR to reduce emissions of SO2 and NOX from power plants in the eastern half of the United States. The CSAPR replaces the CAIR and requires a total of 28 states to reduce annual SO2 emissions and annual and ozone season NOX emissions to assist in attaining the ozone and fine particle NAAQS. The rule establishes an emissions cap for SO2 and NOX and limits the trading for emission allowances by separating affected states into two groups with no trading between the groups. The State of South Carolina has chosen to remain in the CSAPR program, even though recent court rulings exempted the state. This allows the state to remain compliant with regional haze standards. Air quality control installations that SCE&G and GENCO have already completed have positioned them to comply with the existing allowances set by the CSAPR. Any costs incurred to comply with CSAPR are expected to be recoverable through rates.

In April 2012, the EPA's MATS rule containing new standards for mercury and other specified air pollutants became effective. The MATS rule has been the subject of ongoing litigation even while it remains in effect. Rulings on this litigation are not expected to have an impact on SCE&G or GENCO due to plant retirements, conversions, and enhancements. SCE&G and GENCO are in compliance with the MATS rule and expect to remain in compliance.

The CWA provides for the imposition of effluent limitations that require treatment for wastewater discharges. Under the CWA, compliance with applicable limitations is achieved under state-issued NPDES permits. As a facility’s NPDES permit is renewed (every five years), any new effluent limitations would be incorporated. The ELG Rule became effective on January 4, 2016. After this date, state regulators will modify facility NPDES permits to match more restrictive standards, thus requiring facilities to retrofit with new wastewater treatment technologies. Compliance dates will vary by type of wastewater, and some will be based on a facility's five-year permit cycle and thus may range from 2018 to 2023. However, the ELG Rule is under reconsideration by the EPA and has been stayed administratively. The Company and Consolidated SCE&G expect that wastewater treatment technology retrofits will be required at Williams and Wateree Stations. Any costs incurred to comply with the ELG Rule are expected to be recoverable through rates.

The CWA Section 316(b) Existing Facilities Rule became effective in October 2014. This rule establishes national requirements for the location, design, construction and capacity of cooling water intake structures at existing facilities that reflect the best technology available for minimizing the adverse environmental impacts of impingement and entrainment. SCE&G and GENCO are conducting studies and implementing plans as required by the rule to determine appropriate intake structure modifications to ensure compliance with this rule. Any costs incurred to comply with this rule are expected to be recoverable through rates.

The EPA's final rule for CCR became effective in the fourth quarter of 2015. This rule regulates CCR as a non-hazardous waste under Subtitle D of the Resource Conservation and Recovery Act and imposes certain requirements on ash storage ponds and other CCR management facilities at SCE&G's and GENCO's coal-fired generating facilities. SCE&G and GENCO have already closed or have begun the process of closure of all of their ash storage ponds and have previously recognized AROs for such ash storage ponds under existing requirements. The Company and Consolidated SCE&G do not expect the incremental compliance costs associated with this rule to be significant and expect to recover such costs in future rates.

SCE&G is responsible for four decommissioned MGP sites in South Carolina which contain residues of by-product chemicals. These sites are in various stages of investigation, remediation and monitoring under work plans approved by DHEC and the EPA. SCE&G anticipates that major remediation activities at all these sites will continue at least through 2018 and will cost an additional $9.9 million, which is accrued in Other within Deferred Credits and Other Liabilities on the consolidated balance sheet. SCE&G expects to recover any cost arising from the remediation of MGP sites through rates. At June 30, 2017, deferred amounts, net of amounts previously recovered through rates and insurance settlements, totaled $25.0 million and are included in regulatory assets.