Below is a brief description of our ongoing material legal proceedings, including any material developments that occurred in such proceedings during the nine months ended September 30, 2012. Additional information with respect to these proceedings can be found in Note 16 to our consolidated financial statements that were included in our 2011 Form 10-K and in our Current Report on Form 8-K filed May 1, 2012. This note also contains a description of any material legal proceedings that were initiated against us during the nine months ended September 30, 2012, and a description of any material events occurring subsequent to September 30, 2012, but before the filing of this report.
In this note, we refer to our subsidiary SFPP, L.P. as SFPP; our subsidiary Calnev Pipe Line LLC as Calnev; Chevron Products Company as Chevron; BP West Coast Products, LLC as BP; ConocoPhillips Company (now Phillips 66 Company) as Phillips 66; Tesoro Refining and Marketing Company as Tesoro; Western Refining Company, L.P. as Western Refining; Navajo Refining Company, L.L.C. as Navajo; Holly Refining & Marketing Company LLC (now HollyFrontier Refining & Marketing LLC) as HollyFrontier; ExxonMobil Oil Corporation as ExxonMobil; Valero Energy Corporation as Valero; Valero Marketing and Supply Company as Valero Marketing; Continental Airlines, Inc., Northwest Airlines, Inc. (now Delta Air Lines, Inc.), Southwest Airlines Co. and US Airways, Inc., collectively, as the Airlines; our subsidiary Tennessee Gas Pipeline L.L.C. as TGP; our subsidiary Kinder Morgan CO2 Company, L.P. (the successor to Shell CO2 Company, Ltd.) as Kinder Morgan CO2; the United States Court of Appeals for the District of Columbia Circuit as the D.C. Circuit; the Federal Energy Regulatory Commission as the FERC; the California Public Utilities Commission as the CPUC; the Union Pacific Railroad Company (the successor to Southern Pacific Transportation Company) as UPRR; the American Railway Engineering and Maintenance-of-Way Association as AREMA; Severstal Sparrows Point, LLC as Severstal; RG Steel Sparrows Point LLC as RG Steel; the Texas Commission of Environmental Quality as the TCEQ; The Premcor Refining Group, Inc. as Premcor; Port Arthur Coker Company as PACC; the United States Department of Transportation Pipeline and Hazardous Materials Safety Administration as the PHMSA; a Notice of Probable Violation, Proposed Civil Penalty and Proposed Compliance Order as an NOPV; the federal Comprehensive Environmental Response, Compensation and Liability Act as CERCLA; the United States Environmental Protection Agency as the U.S. EPA; the United States Environmental Protection Agency’s Suspension and Debarment Division as the U.S. EPA SDD; the New Jersey Department of Environmental Protection as the NJDEP; our subsidiary Kinder Morgan Bulk Terminals, Inc. as KMBT; our subsidiary Kinder Morgan Liquids Terminals LLC as KMLT; our subsidiary Kinder Morgan Interstate Gas Transmission LLC as KMIGT; Rockies Express Pipeline LLC as Rockies Express; and Plantation Pipe Line Company as Plantation. “OR” dockets designate complaint proceedings, and “IS” dockets designate protest proceedings.
Federal Energy Regulatory Commission Proceedings
The tariffs and rates charged by SFPP are subject to a number of ongoing proceedings at the FERC, including the shippers' complaints and protests regarding interstate rates on the pipeline systems listed below. In general, these complaints and protests allege the rates and tariffs charged by SFPP are not just and reasonable. If the shippers are successful in proving their claims, they are entitled to seek reparations (which may reach up to two years prior to the filing of their complaints) or refunds of any excess rates paid, and SFPP may be required to reduce its rates going forward. These proceedings tend to be protracted, with decisions of the FERC often appealed to the federal courts.
The issues involved in these proceedings include, among others: (i) whether “substantially changed circumstances” have occurred with respect to any "grandfathered" rates under the Energy Policy Act of 1992 such that those rates could be challenged; (ii) whether indexed rate increases are justified; and (iii) the appropriate level of return and income tax allowance we may include in our rates.
SFPP
The following FERC dockets are currently pending:
FERC Docket No. IS08-390 (West Line Rates) (Opinion Nos. 511 and 511-A)-Protestants: BP, ExxonMobil, Phillips 66, Valero Marketing, Chevron, the Airlines-Status: FERC order issued on December 16, 2011 (Opinion No. 511-A). While the order made certain findings that were adverse to SFPP, it ruled in favor of SFPP on many significant issues. SFPP made a compliance filing at the end of January 2012, and our rates reflect this filing. SFPP also filed a rehearing request on certain adverse rulings in the FERC order. Petitions for review of Opinion Nos. 511 and 511-A have been filed at the D.C. Circuit and are held in abeyance pending a ruling on SFPP's request for rehearing. It is not possible to predict the outcome of FERC review of the rehearing request or appellate review;
FERC Docket No. IS09-437 (East Line Rates)-Protestants: BP, ExxonMobil, ConocoPhillips, Valero Marketing, Chevron, Western Refining, Navajo, HollyFrontier, and Southwest Airlines-Status: Opinion and Order on Initial Decision, Opinion No. 522, issued on September 20, 2012. The FERC generally made findings favorable to SFPP on significant issues and consistent with FERC's Opinion Nos. 511 and 511-A. Requests for rehearing, if any, must be filed in October 2012. It is not possible to predict the outcome of FERC review of any request for rehearing or appellate review of this order;
FERC Docket No. IS11-444 (2011 West Line Index Rate Increases)-Protestants: BP, ExxonMobil, Phillips 66, Valero Marketing, Chevron, the Airlines, Tesoro, Western Refining, Navajo, and HollyFrontier-Status: The shippers filed a motion for summary disposition that was granted in the shippers' favor in an initial decision issued on March 16, 2012. SFPP filed a brief with the FERC taking exception to the initial decision. The FERC will review the initial decision, and it is not possible to predict the outcome of FERC or appellate review;
FERC Docket Nos. IS12-390 (SFPP East Line Index Rates)/IS12-388 and IS12-501 (SFPP West Line Index Rates)-Protestants: the Airlines, BP, Chevron, HollyFrontier, Phillips 66, Tesoro, Valero Marketing, and Western Refining-Status: Collectively, these shippers protested SFPP's index-based rate increases for its East Line (IS12-390) and West Line (IS12-388 and IS12-501). FERC rejected the protests against SFPP's East Line rate increases and accepted the protests against SFPP's West Line rate increases (IS12-388). Following FERC acceptance of the West Line protests, SFPP withdrew these rate increases, and FERC terminated the IS12-388 proceeding. SFPP subsequently made a new filing to increase its West Line rates by a smaller index-based percentage (IS12-501), which FERC accepted notwithstanding shipper protests. Shippers requested rehearing of FERC's acceptance of the East Line and West Line rate increases, and those requests are pending before FERC. It is not possible to predict the outcome of FERC or appellate review;
FERC Docket Nos. IS12-388/IS12-500 (SFPP West Line Index Rates)-Protestants: the Airlines, BP, Chevron, Phillips 66, Tesoro, Valero Marketing-Status: These shippers protested SFPP's index-based rate increases for its West Line. Following FERC acceptance of the protests, SFPP withdrew these rate increases and subsequently increased its West Line rates by a smaller percentage that FERC found acceptable as to SFPP's East Line in IS12-390. Shippers may protest SFPP's new West Line index filing, and it is not possible to predict the outcome of further FERC review, if any;
FERC Docket No. OR11-13 (SFPP Base Rates)—Complainant: Phillips 66—Status: SFPP to provide further data within 90 days of the issuance of a final order in Docket No. IS08-390. Phillips 66 permitted to amend its complaint based on additional data;
FERC Docket No. OR11-16 (SFPP Base Rates)—Complainant: Chevron—Status: SFPP to provide further data within 90 days of the issuance of a final order in Docket No. IS08-390. Chevron permitted to amend its complaint based on additional data; and
FERC Docket No. OR11-18 (SFPP Base Rates)—Complainant: Tesoro—Status: SFPP to provide further data within 90 days of the issuance of a final order in Docket No. IS08-390. Tesoro permitted to amend its complaint based on additional data.
With respect to all of the SFPP proceedings above, we estimate that the shippers are seeking approximately $20 million in annual rate reductions and approximately $100 million in refunds. However, applying the principles of Opinion Nos. 511, 511-A, 522, as applicable, to pending cases would result in substantially lower rate reductions and refunds than those sought by the shippers. We do not expect refunds in these cases to have an impact on our distributions to our limited partners.
Calnev
On March 17, 2011, the FERC issued an order consolidating and setting for hearing the complaints in Docket Nos. OR07-7, OR07-18, OR07-19, OR07-22, OR09-15, and OR09-20 filed by Tesoro, the Airlines, BP, Chevron, Phillips 66 and Valero Marketing. A settlement agreement resolving these proceedings was filed on February 24, 2012 and was certified to the FERC on March 1, 2012. On April 3, 2012, the FERC approved the settlement, and in May 2012, after the rates reduced by the settlement became effective, we made settlement payments of $54 million.
California Public Utilities Commission Proceedings
We have previously reported ratemaking and complaint proceedings against SFPP pending with the CPUC.  The ratemaking and complaint cases generally involve challenges to rates charged by SFPP for intrastate transportation of refined petroleum products through its pipeline system in the state of California and request prospective rate adjustments and refunds with respect to tariffed and previously untariffed charges for certain pipeline transportation and related services.  These matters have been consolidated and assigned to two administrative law judges. 
On May 26, 2011, the CPUC issued a decision in several intrastate rate cases involving SFPP and a number of its shippers (the “Long” cases).  The decision includes determinations on issues, such as SFPP's entitlement to an income tax allowance, allocation of environmental expenses, and refund liability which we believe are contrary both to CPUC policy and precedent and to established federal regulatory policies for pipelines.  On March 8, 2012, the CPUC issued another decision related to the Long cases. This decision largely reflected the determinations made on May 26, 2011, including the denial of an income tax allowance for SFPP. The CPUC's order denied SFPP's request for rehearing of the CPUC's income tax allowance treatment, while granting requested rehearing of various other issues relating to SFPP's refund liability and staying the payment of refunds until resolution of the outstanding issues on rehearing. On March 23, 2012, SFPP filed a petition for writ of review in the California Court of Appeals including, among other things, a review of the CPUC's determination that SFPP is not entitled to recover an income tax allowance in its intrastate rates. In October 2012, the Court agreed to hear an appeal on the merits of the issues appealed.
On April 6, 2012, in proceedings unrelated to the above-referenced CPUC dockets, a CPUC administrative law judge issued a proposed decision substantially reducing SFPP’s authorized cost of service and ordering SFPP to pay refunds from May 24, 2007 to the present of revenues collected in excess of the authorized cost of service. The proposed decision was subsequently withdrawn, and the presiding administrative law judge is expected to reissue a proposed decision at some indeterminate time in the future. On January 30, 2012, SFPP filed an application reducing its intrastate rates by approximately 7%. This matter remains pending before the CPUC.
Based on our review of these CPUC proceedings and the shipper comments thereon, we estimate that the shippers are requesting approximately $375 million in reparation payments and approximately $30 million in annual rate reductions.  The actual amount of reparations will be determined through further proceedings at the CPUC and, potentially, the California Court of Appeals. We believe that the appropriate application of the income tax allowance and corrections of errors in law and fact should result in a considerably lower amount.  We do not expect any reparations that we would pay in these matters to have an impact on our distributions to our limited partners.
Carbon Dioxide Tax Assessments
Colorado Severance Tax Assessment
On September 16, 2009, the Colorado Department of Revenue issued three Notices of Deficiency to our subsidiary Kinder Morgan CO2. The Notices of Deficiency assessed additional state severance tax against Kinder Morgan CO2 with respect to carbon dioxide produced from the McElmo Dome unit for tax years 2005, 2006, and 2007. The total amount of tax assessed was $6 million, plus interest of $1 million and penalties of $2 million. Kinder Morgan CO2 protested the Notices of Deficiency and paid the tax and interest under protest. Kinder Morgan CO2 is now awaiting the Colorado Department of Revenue’s response to the protest.
Montezuma County, Colorado Property Tax Assessment
In November of 2009, the County Treasurer of Montezuma County, Colorado, issued to Kinder Morgan CO2, as operator of the McElmo Dome unit, retroactive tax bills for tax year 2008, in the amount of $2 million. Of this amount, 37.2% is attributable to Kinder Morgan CO2’s interest. The retroactive tax bills were based on the assertion that a portion of the actual value of the carbon dioxide produced from the McElmo Dome unit was omitted from the 2008 tax roll due to an alleged overstatement of transportation and other expenses used to calculate the net taxable value. Kinder Morgan CO2 paid the retroactive tax bills under protest and filed petitions for a refund of the taxes paid under protest. On February 6, 2012, the Montezuma County Board of County Commissioners denied the refund petitions, and we appealed to the Colorado Board of Assessment Appeals. A hearing on this matter will be held in the first quarter of 2013.
Other
In addition to the matters listed above, audits and administrative inquiries concerning Kinder Morgan CO2’s payments on carbon dioxide produced from the McElmo Dome and Bravo Dome units are currently ongoing.  These audits and inquiries involve federal agencies, the states of Colorado and New Mexico, and county taxing authorities in the state of Colorado.
Commercial Litigation Matters
Union Pacific Railroad Company Easements
SFPP and UPRR are engaged in a proceeding to determine the extent, if any, to which the rent payable by SFPP for the use of pipeline easements on rights-of-way held by UPRR should be adjusted pursuant to existing contractual arrangements for the ten-year period beginning January 1, 2004 (Union Pacific Railroad Company v. Santa Fe Pacific Pipelines, Inc., SFPP, L.P., Kinder Morgan Operating L.P. “D”, Kinder Morgan G.P., Inc., et al., Superior Court of the State of California for the County of Los Angeles, filed July 28, 2004). In September 2011, the judge determined that the annual rent payable as of January 1, 2004 was $15 million, subject to annual consumer price index increases. SFPP intends to appeal the judge’s determination, but if that determination is upheld, SFPP would owe approximately $75 million in back rent. Accordingly, during 2011, we increased our rights-of-way liability to cover this liability amount. In addition, the judge determined that UPRR is entitled to an estimated $20 million for interest on the outstanding back rent liability. We believe the award of interest is without merit and we are pursuing our appellate rights.
SFPP and UPRR are also engaged in multiple disputes over the circumstances under which SFPP must pay for a relocation of its pipeline within the UPRR right-of-way and the safety standards that govern relocations. In July 2006, a trial before a judge regarding the circumstances under which SFPP must pay for relocations concluded, and the judge determined that SFPP must pay for any relocations resulting from any legitimate business purpose of the UPRR. SFPP appealed this decision, and in December 2008, the appellate court affirmed the decision. In addition, UPRR contends that SFPP must comply with the more expensive AREMA standards in determining when relocations are necessary and in completing relocations. Each party is seeking declaratory relief with respect to its positions regarding the application of these standards with respect to relocations. A trial occurred in the fourth quarter of 2011, with a verdict having been reached that SFPP was obligated to comply with AREMA standards in connection with a railroad project in Beaumont Hills, California. SFPP is evaluating its post-trial and appellate options.
Since SFPP does not know UPRR’s plans for projects or other activities that would cause pipeline relocations, it is difficult to quantify the effects of the outcome of these cases on SFPP. Even if SFPP is successful in advancing its positions, significant relocations for which SFPP must nonetheless bear the expense (i.e., for railroad purposes, with the standards in the federal Pipeline Safety Act applying) would have an adverse effect on our financial position, our results of operations, our cash flows, and our distributions to our limited partners. These effects would be even greater in the event SFPP is unsuccessful in one or more of these litigations.
Severstal Sparrows Point Crane Collapse
On June 4, 2008, a bridge crane owned by Severstal and located in Sparrows Point, Maryland collapsed while being operated by KMBT. According to our investigation, the collapse was caused by unexpected, sudden and extreme winds. On June 24, 2009, Severstal filed suit against KMBT in the United States District Court for the District of Maryland, Case No. 09CV1668-WMN. Severstal and its successor in interest, RG Steel, allege that KMBT was contractually obligated to replace the collapsed crane and that its employees were negligent in failing to properly secure the crane prior to the collapse. RG Steel seeks to recover in excess of $30 million for the alleged value of the crane and lost profits. KMBT denies each of RG Steel’s allegations. On or about June 1, 2012, RG Steel filed for bankruptcy in Case No. 12-11669 in the United States Bankruptcy Court for the District of Delaware; consequently, the trial date has been postponed indefinitely.
Pipeline Integrity and Releases
From time to time, despite our best efforts, our pipelines experience leaks and ruptures. These leaks and ruptures may cause explosions, fire, and damage to the environment, damage to property and/or personal injury or death. In connection with these incidents, we may be sued for damages caused by an alleged failure to properly mark the locations of our pipelines and/or to properly maintain our pipelines. Depending upon the facts and circumstances of a particular incident, state and federal regulatory authorities may seek civil and/or criminal fines and penalties.
Perth Amboy, New Jersey Tank Release
In May 2011, the PHMSA issued an NOPV to KMLT. The notice alleges violations of PHMSA’s regulations related to an October 28, 2009 tank release from our Perth Amboy, New Jersey liquids terminal.  No product left the company’s property, and additionally, there were no injuries, no impact to the adjacent community or public, and no fire as a result of the release. The notice proposes a penalty of less than $1 million. KMLT is pursuing an administrative appeal of the NOPV.
Central Florida Pipeline Release, Tampa, Florida
On July 22, 2011, our subsidiary Central Florida Pipeline LLC reported a refined petroleum products release on a section of its 10-inch diameter pipeline near Tampa, Florida. The pipeline carries jet fuel and diesel to Orlando and was carrying jet fuel at the time of the incident.  There was no fire and were no injuries associated with the incident.  We immediately began clean up operations in coordination with federal, state and local agencies.  The cause of the incident is outside force damage. The incident is under investigation by the PHMSA, U.S. EPA and the Florida Department of Environmental Protection.
General
Although no assurance can be given, we believe that we have meritorious defenses to the actions set forth in this note and, to the extent an assessment of the matter is reasonably possible, if it is probable that a liability has been incurred and the amount of loss can be reasonably estimated, we believe that we have established an adequate reserve to cover potential liability.
Additionally, although it is not possible to predict the ultimate outcomes, we also believe, based on our experiences to date and the reserves we have established, that the ultimate resolution of these matters will not have a material adverse impact on our business, financial position, results of operations or distributions to limited partners. As of September 30, 2012 and December 31, 2011, we have recorded a total reserve for legal fees, transportation rate cases and other litigation liabilities in the amount of $309 million and $332 million, respectively. The reserve is primarily related to various claims from regulatory proceedings arising from our West Coast products pipeline transportation rates, and the contingent amount is based on both the circumstances of probability and reasonability of dollar estimates. We regularly assess the likelihood of adverse outcomes resulting from these claims in order to determine the adequacy of our liability provision.
Environmental Matters
New Jersey Department of Environmental Protection v. Occidental Chemical Corporation, et al. (Defendants), Maxus Energy Corp. and Tierra Solutions, Inc. (Third Party Plaintiffs) v. 3M Company et al., Superior Court of New Jersey, Law Division – Essex County, Docket No. L-9868-05
The NJDEP sued Occidental Chemical and others under the New Jersey Spill Act for contamination in the Newark Bay Complex including numerous waterways and rivers. Occidental et al. then brought in approximately 300 third party defendants for contribution. NJDEP claimed damages related to forty years of discharges of TCDD (a form of dioxin), DDT and “other hazardous substances.” GATX Terminals Corporation (n/k/a/ KMLT) was brought in as a third party defendant because of the noted hazardous substances language and because the Carteret, New Jersey facility (a former GATX Terminals facility) is located on the Arthur Kill River, one of the waterways included in the litigation. This case was filed against third party defendants in 2009. The judge issued his trial plan for this case during the first quarter of 2011. According to the trial plan, the judge allowed the State to file summary judgment motions against Occidental, Maxus and Tierra on liability issues immediately. Numerous third party defendants, as part of a joint defense group of which KMLT is a member, filed motions to dismiss, which were denied, and now have filed interim appeals from those motions. The appeals court panel heard oral arguments on these motions to dismiss in March 2012 and issued a ruling denying these motions in June 2012. The appellants have filed appeals to the New Jersey Supreme Court regarding this lower court ruling. Maxus/Tierra’s claims against the third party defendants are set to be tried in April 2013 with damages to be tried in September 2013.
Portland Harbor Superfund Site, Willamette River, Portland, Oregon
In December 2000, the U.S. EPA sent out General Notice letters to potentially responsible parties including GATX Terminals Corporation (n/k/a KMLT). At that time, GATX owned two liquids terminals along the lower reach of the Willamette River, an industrialized area known as Portland Harbor. Portland Harbor is listed on the National Priorities List and is designated as a Superfund Site under CERCLA. The major potentially responsible parties formed what is known as the Lower Willamette Group (LWG), of which KMLT is a non-voting member and pays a minimal fee to be part of the group. The LWG agreed to conduct the Remedial Investigation and Feasibility Study leading to the proposed remedy for cleanup of the Portland Harbor site. Once the U.S. EPA determines the cleanup remedy from the remedial investigations and feasibility studies conducted during the last decade at the site, it will issue a Record of Decision. Currently, KMLT and 90 other parties are involved in an allocation process to determine each party’s respective share of the cleanup costs. This is a non-judicial allocation process. We are participating in the allocation process on behalf of both KMLT and KMBT. Each entity has two facilities located in Portland Harbor. We expect the allocation to conclude in 2013 or 2014, depending upon when the U.S. EPA issues its Record of Decision.
Roosevelt Irrigation District v. Kinder Morgan G.P., Inc., Kinder Morgan Energy Partners, L.P. , U.S. District Court, Arizona
This is a CERCLA case brought against a number of defendants by a water purveyor whose wells have allegedly been contaminated due to the presence of a number of contaminants. The Roosevelt Irrigation District is seeking up to $175 million from approximately 70 defendants. The plume of contaminants has traveled under Kinder Morgan’s Phoenix Terminal. The plaintiffs have advanced a novel theory that the releases of petroleum from the Phoenix Terminal (which are exempt under the petroleum exclusion under CERCLA) have facilitated the natural degradation of certain hazardous substances and thereby have resulted in a release of hazardous substances regulated under CERCLA. We are part of a joint defense group consisting of other terminal operators at the Phoenix Terminal including Chevron, BP, Salt River Project, Shell and a number of others, collectively referred to as the terminal defendants. Together, we filed a motion to dismiss all claims based on the petroleum exclusion under CERCLA. This case was assigned to a new judge, who has deemed all previous motions withdrawn and will grant leave to re-file such motions at a later date. We plan to re-file the motion to dismiss as well as numerous summary judgment motions as the judge allows.
Casper and Douglas, U.S. EPA Notice of Violation
In March 2011, the U.S. EPA conducted inspections of several environmental programs at the Douglas and Casper Gas Plants in Wyoming. In June 2011, we received two letters from the U.S. EPA alleging violations at both gas plants of the Risk Management Program requirements under the Clean Air Act. In September 2012, we entered into Combined Complaint and Consent Agreements and paid a monetary penalty of $158,000 for each plant to resolve these issues.

The City of Los Angeles v. Kinder Morgan Liquids Terminals, LLC, Shell Oil Company, Equilon Enterprises LLC;  California Superior Court, County of Los Angeles, Case No. NC041463
KMLT is a defendant in a lawsuit filed in 2005 alleging claims for environmental cleanup costs at the former Los Angeles Marine Terminal in the Port of Los Angeles. The lawsuit was stayed beginning in 2009 and remains stayed through the next case management conference in March 2013. During the stay, the parties deemed responsible by the local regulatory agency (including the City of Los Angeles) have worked with that agency concerning the scope of the required cleanup and have now completed a sampling and testing program at the site. We anticipate that cleanup activities at the site will begin in the Spring of 2013. The local regulatory agency issued specific cleanup goals in early 2010, and two of those parties, including KMLT, have appealed those cleanup goals to the state water board. The state water board has not yet taken any action with regard to our appeal petitions.
Plaintiff’s Third Amended Complaint alleges that future environmental cleanup costs at the former terminal will exceed $10 million, and that the plaintiff’s past damages exceed $2 million.  No trial date has yet been set. We have begun settlement negotiations with the Port of Los Angeles.
Exxon Mobil Corporation v. GATX Corporation, Kinder Morgan Liquids Terminals, LLC and ST Services, Inc.
On April 23, 2003, ExxonMobil filed a complaint in the Superior Court of New Jersey, Gloucester County. The lawsuit relates to environmental remediation obligations at a Paulsboro, New Jersey liquids terminal owned by ExxonMobil from the mid-1950s through November 1989, by GATX Terminals Corp. from 1989 through September 2000, and later owned by Support Terminals and Pacific Atlantic Terminals, LLC. The terminal is now owned by Plains Products, and it too is a party to the lawsuit.
On June 25, 2007, the NJDEP, the Commissioner of the New Jersey Department of Environmental Protection and the Administrator of the New Jersey Spill Compensation Fund, referred to collectively as the plaintiffs, filed a complaint against ExxonMobil and KMLT, formerly known as GATX Terminals Corporation, alleging natural resource damages related to historic contamination at the Paulsboro terminal.  The complaint was filed in Gloucester County, New Jersey.  Both ExxonMobil and KMLT filed third party complaints against Support Terminals/Plains seeking to bring Support Terminals/Plains into the case. Support Terminals/Plains filed motions to dismiss the third party complaints, which were denied. Support Terminals/Plains is now joined in the case, and it filed an Answer denying all claims. The court has consolidated the two cases. All private parties and the state participated in two mediation conferences in 2010.
In mid 2011, KMLT and Plains Products entered into an agreement in principle with the NJDEP for settlement of the state’s alleged natural resource damages claim. The parties then entered into a Consent Judgment which was subject to public notice and comment and court approval. The natural resource damage settlement includes a monetary award of $1 million and a series of remediation and restoration activities at the terminal site. KMLT and Plains Products have joint responsibility for this settlement. Simultaneously, KMLT and Plains Products entered into a settlement agreement that settled each parties’ relative share of responsibility (50/50) to the NJDEP under the Consent Judgment noted above. The Consent Judgment is now entered with the Court and the settlement is final. Now Plains will begin conducting remediation activities at the site and KMLT will provide oversight and 50% of the costs. The settlement with the state does not resolve the original complaint brought by ExxonMobil. KMLT and Plains received a settlement demand from ExxonMobil in the amount of $1.38 million for past costs related to the remediation at the Paulsboro facility. Plains and KMLT are in discussions regarding the ExxonMobil offer. There is no trial date set.
Mission Valley Terminal Lawsuit
In August 2007, the City of San Diego, on its own behalf and purporting to act on behalf of the People of the State of California, filed a lawsuit against us and several affiliates seeking injunctive relief and unspecified damages allegedly resulting from hydrocarbon and methyl tertiary butyl ether (MTBE) impacted soils and groundwater beneath the City’s stadium property in San Diego arising from historic operations at the Mission Valley terminal facility. The case was filed in the Superior Court of California, San Diego County, case number 37-2007-00073033-CU-OR-CTL. On September 26, 2007, we removed the case to the United States District Court, Southern District of California, case number 07CV1883WCAB. The City disclosed in discovery that it is seeking approximately $170 million in damages for alleged lost value/lost profit from the redevelopment of the City’s property and alleged lost use of the water resources underlying the property. Later, in 2010, the City amended its initial disclosures to add claims for restoration of the site as well as a number of other claims that increased their claim for damages to approximately $365 million.
The Court issued a Case Management Order on January 6, 2011, setting dates for completion of discovery and setting a trial date. In April 2011, the parties filed a joint stipulation to extend the discovery schedule by approximately three months. In December 2011, the parties again entered into a joint stipulation to extend the various schedules in the Court’s Case Management Order. According to the schedule, the parties completed fact discovery in March 2012 and expert discovery in May 2012. Both parties filed their respective summary adjudication motions and motions to exclude experts on June 29, 2012. Oral arguments related to these motions are set for November 30, 2012. The trial is now set for April 9, 2013. We have been and will continue to aggressively defend this action. This site has been, and currently is, under the regulatory oversight and order of the California Regional Water Quality Control Board. We continue to conduct an extensive remediation effort at the City's stadium property site.
Kinder Morgan, U.S. EPA Section 114 Information Request
On January 8, 2010, KMI, on behalf of Natural Gas Pipeline Company of America LLC, Horizon Pipeline Company and Rockies Express, received a Clean Air Act Section 114 information request from the U.S. EPA, Region V. This information request requires that the three affiliated companies provide the U.S. EPA with air permit and various other information related to their natural gas pipeline compressor station operations located in Illinois, Indiana, and Ohio. The affiliated companies have responded to the request and believe the relevant natural gas compressor station operations are in substantial compliance with applicable air quality laws and regulations.
Administrative Agreement with the U.S. EPA
In April 2011, we received Notices of Proposed Debarment from the U.S. EPA SDD. The Notices proposed the debarment of us (along with four of our subsidiaries), KMI, Kinder Morgan G.P., Inc., and Kinder Morgan Management, LLC, from participation in future federal contracting and assistance activities. The Notices alleged that certain of the respondents’ past environmental violations indicated a lack of present responsibility warranting debarment.
In May 2012, we reached an administrative agreement with the U.S. EPA which resolved this matter without the debarment of any Kinder Morgan entities. The agreement requires independent monitoring of our Environmental Compliance and Ethics Programs, independent auditing of our facilities, enhanced training and notification requirements, and certain enhancements to our operational and compliance policies and procedures. We take environmental compliance very seriously and expect to comply with all aspects of this agreement.
TGP, PHMSA Notice of Violation
On April 25, 2012, the PHMSA issued an NOPV against TGP proposing $118,500 in penalties for alleged violations discovered during an inspection prior to Kinder Morgan's ownership of TGP. We responded to the NOPV and paid the penalty to resolve this matter.

Other Environmental
We are subject to environmental cleanup and enforcement actions from time to time. In particular, CERCLA generally imposes joint and several liability for cleanup and enforcement costs on current and predecessor owners and operators of a site, among others, without regard to fault or the legality of the original conduct, subject to the right of a liable party to establish a “reasonable basis” for apportionment of costs. Our operations are also subject to federal, state and local laws and regulations relating to protection of the environment. Although we believe our operations are in substantial compliance with applicable environmental law and regulations, risks of additional costs and liabilities are inherent in pipeline, terminal and carbon dioxide field and oil field operations, and there can be no assurance that we will not incur significant costs and liabilities. Moreover, it is possible that other developments, such as increasingly stringent environmental laws, regulations and enforcement policies under the terms of authority of those laws, and claims for damages to property or persons resulting from our operations, could result in substantial costs and liabilities to us.
We are currently involved in several governmental proceedings involving alleged violations of environmental and safety regulations. As we receive notices of non-compliance, we negotiate and settle these matters. We do not believe that these alleged violations will have a material adverse effect on our business, financial position, results of operations or cash flows.
We are also currently involved in several governmental proceedings involving groundwater and soil remediation efforts under administrative orders or related state remediation programs. We have established a reserve to address the costs associated with the cleanup.
In addition, we are involved with and have been identified as a potentially responsible party in several federal and state superfund sites. Environmental reserves have been established for those sites where our contribution is probable and reasonably estimable. In addition, we are from time to time involved in civil proceedings relating to damages alleged to have occurred as a result of accidental leaks or spills of refined petroleum products, natural gas liquids, natural gas and carbon dioxide. See “—Pipeline Integrity and Releases” above for additional information with respect to ruptures and leaks from our pipelines.
General
Although it is not possible to predict the ultimate outcomes, we believe that the resolution of the environmental matters set forth in this note will not have a material adverse effect on our business, financial position, results of operations or cash flows. However, we are not able to reasonably estimate when the eventual settlements of these claims will occur, and changing circumstances could cause these matters to have a material adverse impact. As of September 30, 2012, we have accrued an environmental reserve of $110 million (including $1 million of environmental related liabilities belonging to our FTC Natural Gas Pipelines disposal group). In addition, as of September 30, 2012, we have recorded a receivable of $5 million for expected cost recoveries that have been deemed probable. As of December 31, 2011, our environmental reserve totaled $75 million and our estimated receivable for environmental cost recoveries totaled $5 million. Additionally, many factors may change in the future affecting our reserve estimates, such as (i) regulatory changes; (ii) groundwater and land use near our sites; and (iii) changes in cleanup technology.
Other
We are a defendant in various lawsuits arising from the day-to-day operations of our businesses. Although no assurance can be given, we believe, based on our experiences to date and taking into account established reserves, that the ultimate resolution of such items will not have a material adverse impact on our business, financial position, results of operations or cash flows.