XML 91 R75.htm IDEA: XBRL DOCUMENT v3.6.0.2
SCHEDULE III REAL ESTATE AND ACCUMULATED DEPRECIATION - By Property (Details) - USD ($)
$ in Thousands
Dec. 31, 2016
Dec. 31, 2015
Dec. 31, 2014
Dec. 31, 2013
Initial Cost to Company        
Land $ 116,096      
Buildings and Improvements 1,099,030      
Costs Capitalized Subsequent to acquisition 86,437      
Gross Amount at Which Carried As of Year End        
Land 116,096      
Buildings and Improvements 1,185,467      
Total 1,301,563 $ 1,198,686 $ 949,838 $ 937,617
Accum Deprec 275,861 $ 251,265 $ 223,315 $ 218,700
SNF        
Initial Cost to Company        
Land 48,196      
Buildings and Improvements 441,762      
Costs Capitalized Subsequent to acquisition 45,828      
Gross Amount at Which Carried As of Year End        
Land 48,196      
Buildings and Improvements 487,590      
Total 535,786      
Accum Deprec 133,250      
ALF        
Initial Cost to Company        
Land 57,010      
Buildings and Improvements 606,034      
Costs Capitalized Subsequent to acquisition 35,235      
Gross Amount at Which Carried As of Year End        
Land 57,010      
Buildings and Improvements 641,269      
Total 698,279      
Accum Deprec 126,768      
ROC        
Initial Cost to Company        
Land 2,733      
Buildings and Improvements 35,033      
Costs Capitalized Subsequent to acquisition 5,374      
Gross Amount at Which Carried As of Year End        
Land 2,733      
Buildings and Improvements 40,407      
Total 43,140      
Accum Deprec 15,594      
Other School and Land        
Initial Cost to Company        
Land 2,908      
Buildings and Improvements 7,308      
Gross Amount at Which Carried As of Year End        
Land 2,908      
Buildings and Improvements 7,308      
Total 10,216      
Accum Deprec 249      
School        
Initial Cost to Company        
Land 1,965      
Buildings and Improvements 7,308      
Gross Amount at Which Carried As of Year End        
Land 1,965      
Buildings and Improvements 7,308      
Total 9,273      
Accum Deprec 249      
Land        
Initial Cost to Company        
Land 943      
Gross Amount at Which Carried As of Year End        
Land 943      
Total 943      
Properties under Development        
Initial Cost to Company        
Land 5,249      
Buildings and Improvements 8,893      
Gross Amount at Which Carried As of Year End        
Land 5,249      
Buildings and Improvements 8,893      
Total 14,142      
134 Alamogordo, NM | SNF        
Initial Cost to Company        
Land 210      
Buildings and Improvements 2,593      
Costs Capitalized Subsequent to acquisition 641      
Gross Amount at Which Carried As of Year End        
Land 210      
Buildings and Improvements 3,234      
Total 3,444      
Accum Deprec 1,158      
218 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 1,696      
Buildings and Improvements 3,891      
Costs Capitalized Subsequent to acquisition 530      
Gross Amount at Which Carried As of Year End        
Land 1,696      
Buildings and Improvements 4,421      
Total 6,117      
Accum Deprec 1,616      
219 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 1,950      
Buildings and Improvements 8,910      
Costs Capitalized Subsequent to acquisition 207      
Gross Amount at Which Carried As of Year End        
Land 1,950      
Buildings and Improvements 9,117      
Total 11,067      
Accum Deprec 3,249      
220 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 2,463      
Buildings and Improvements 7,647      
Costs Capitalized Subsequent to acquisition 9      
Gross Amount at Which Carried As of Year End        
Land 2,463      
Buildings and Improvements 7,656      
Total 10,119      
Accum Deprec 2,717      
042 Altoona, IA | SNF        
Initial Cost to Company        
Land 105      
Buildings and Improvements 2,309      
Costs Capitalized Subsequent to acquisition 444      
Gross Amount at Which Carried As of Year End        
Land 105      
Buildings and Improvements 2,753      
Total 2,858      
Accum Deprec 1,787      
252 Amarillo, TX | SNF        
Initial Cost to Company        
Land 844      
Costs Capitalized Subsequent to acquisition 7,925      
Gross Amount at Which Carried As of Year End        
Land 844      
Buildings and Improvements 7,925      
Total 8,769      
Accum Deprec 1,285      
214 Aransas Pass, TX | SNF        
Initial Cost to Company        
Land 154      
Buildings and Improvements 1,276      
Costs Capitalized Subsequent to acquisition 589      
Gross Amount at Which Carried As of Year End        
Land 154      
Buildings and Improvements 1,865      
Total 2,019      
Accum Deprec 783      
247 Arlington, TX | SNF        
Initial Cost to Company        
Land 1,016      
Buildings and Improvements 13,649      
Gross Amount at Which Carried As of Year End        
Land 1,016      
Buildings and Improvements 13,649      
Total 14,665      
Accum Deprec 2,959      
171 Atlanta, GA | SNF        
Initial Cost to Company        
Land 175      
Buildings and Improvements 1,282      
Costs Capitalized Subsequent to acquisition 3      
Gross Amount at Which Carried As of Year End        
Land 175      
Buildings and Improvements 1,285      
Total 1,460      
Accum Deprec 735      
040 Atmore, AL | SNF        
Initial Cost to Company        
Land 131      
Buildings and Improvements 2,877      
Costs Capitalized Subsequent to acquisition 196      
Gross Amount at Which Carried As of Year End        
Land 131      
Buildings and Improvements 3,073      
Total 3,204      
Accum Deprec 1,843      
221 Beaumont, TX | SNF        
Initial Cost to Company        
Land 370      
Buildings and Improvements 1,141      
Costs Capitalized Subsequent to acquisition 106      
Gross Amount at Which Carried As of Year End        
Land 370      
Buildings and Improvements 1,247      
Total 1,617      
Accum Deprec 488      
213 Beeville, TX | SNF        
Initial Cost to Company        
Land 186      
Buildings and Improvements 1,197      
Costs Capitalized Subsequent to acquisition 70      
Gross Amount at Which Carried As of Year End        
Land 186      
Buildings and Improvements 1,267      
Total 1,453      
Accum Deprec 433      
007 Bradenton, FL | SNF        
Initial Cost to Company        
Land 330      
Buildings and Improvements 2,720      
Costs Capitalized Subsequent to acquisition 160      
Gross Amount at Which Carried As of Year End        
Land 330      
Buildings and Improvements 2,880      
Total 3,210      
Accum Deprec 1,959      
256 Brownwood, TX | SNF        
Initial Cost to Company        
Land 164      
Buildings and Improvements 6,336      
Gross Amount at Which Carried As of Year End        
Land 164      
Buildings and Improvements 6,336      
Total 6,500      
Accum Deprec 937      
043 Carroll, IA | SNF        
Initial Cost to Company        
Land 47      
Buildings and Improvements 1,033      
Costs Capitalized Subsequent to acquisition 213      
Gross Amount at Which Carried As of Year End        
Land 47      
Buildings and Improvements 1,246      
Total 1,293      
Accum Deprec 807      
177 Chesapeake, VA | SNF        
Initial Cost to Company        
Land 388      
Buildings and Improvements 3,469      
Costs Capitalized Subsequent to acquisition 1,423      
Gross Amount at Which Carried As of Year End        
Land 388      
Buildings and Improvements 4,892      
Total 5,280      
Accum Deprec 3,050      
257 Cincinnati, OH | SNF        
Initial Cost to Company        
Land 1,890      
Buildings and Improvements 25,110      
Gross Amount at Which Carried As of Year End        
Land 1,890      
Buildings and Improvements 25,110      
Total 27,000      
Accum Deprec 2,543      
125 Clovis, NM | SNF        
Initial Cost to Company        
Land 561      
Buildings and Improvements 5,539      
Costs Capitalized Subsequent to acquisition 307      
Gross Amount at Which Carried As of Year End        
Land 561      
Buildings and Improvements 5,846      
Total 6,407      
Accum Deprec 2,305      
129 Clovis, NM | SNF        
Initial Cost to Company        
Land 598      
Buildings and Improvements 5,902      
Costs Capitalized Subsequent to acquisition 59      
Gross Amount at Which Carried As of Year End        
Land 598      
Buildings and Improvements 5,961      
Total 6,559      
Accum Deprec 2,375      
268 Coldspring, KY | SNF        
Initial Cost to Company        
Land 2,050      
Buildings and Improvements 21,496      
Gross Amount at Which Carried As of Year End        
Land 2,050      
Buildings and Improvements 21,496      
Total 23,546      
Accum Deprec 2,158      
253 Colton, CA | SNF        
Initial Cost to Company        
Land 2,342      
Buildings and Improvements 15,158      
Gross Amount at Which Carried As of Year End        
Land 2,342      
Buildings and Improvements 15,158      
Total 17,500      
Accum Deprec 2,222      
211 Commerce City, CO | SNF        
Initial Cost to Company        
Land 236      
Buildings and Improvements 3,217      
Costs Capitalized Subsequent to acquisition 167      
Gross Amount at Which Carried As of Year End        
Land 236      
Buildings and Improvements 3,384      
Total 3,620      
Accum Deprec 1,376      
212 Commerce City, CO | SNF        
Initial Cost to Company        
Land 161      
Buildings and Improvements 2,160      
Costs Capitalized Subsequent to acquisition 95      
Gross Amount at Which Carried As of Year End        
Land 161      
Buildings and Improvements 2,255      
Total 2,416      
Accum Deprec 895      
246 Crowley, TX | SNF        
Initial Cost to Company        
Land 2,247      
Buildings and Improvements 14,276      
Gross Amount at Which Carried As of Year End        
Land 2,247      
Buildings and Improvements 14,276      
Total 16,523      
Accum Deprec 2,939      
235 Daleville, VA | SNF        
Initial Cost to Company        
Land 279      
Buildings and Improvements 8,382      
Gross Amount at Which Carried As of Year End        
Land 279      
Buildings and Improvements 8,382      
Total 8,661      
Accum Deprec 1,994      
258 Dayton, OH | SNF        
Initial Cost to Company        
Land 373      
Buildings and Improvements 26,627      
Gross Amount at Which Carried As of Year End        
Land 373      
Buildings and Improvements 26,627      
Total 27,000      
Accum Deprec 2,716      
196 Dresden, TN | SNF        
Initial Cost to Company        
Land 31      
Buildings and Improvements 1,529      
Costs Capitalized Subsequent to acquisition 1,073      
Gross Amount at Which Carried As of Year End        
Land 31      
Buildings and Improvements 2,602      
Total 2,633      
Accum Deprec 896      
298 Forth Worth, TX | SNF        
Initial Cost to Company        
Land 2,785      
Buildings and Improvements 7,546      
Gross Amount at Which Carried As of Year End        
Land 2,785      
Buildings and Improvements 7,546      
Total 10,331      
Accum Deprec 471      
185 Gardner, KS | SNF        
Initial Cost to Company        
Land 896      
Buildings and Improvements 4,478      
Costs Capitalized Subsequent to acquisition 4,150      
Gross Amount at Which Carried As of Year End        
Land 896      
Buildings and Improvements 8,628      
Total 9,524      
Accum Deprec 3,346      
248 Granbury, TX | SNF        
Initial Cost to Company        
Land 836      
Buildings and Improvements 6,693      
Gross Amount at Which Carried As of Year End        
Land 836      
Buildings and Improvements 6,693      
Total 7,529      
Accum Deprec 1,967      
044 Granger, IA | SNF        
Initial Cost to Company        
Land 62      
Buildings and Improvements 1,356      
Costs Capitalized Subsequent to acquisition 221      
Gross Amount at Which Carried As of Year End        
Land 62      
Buildings and Improvements 1,577      
Total 1,639      
Accum Deprec 989      
205 Grapevine, TX | SNF        
Initial Cost to Company        
Land 431      
Buildings and Improvements 1,449      
Costs Capitalized Subsequent to acquisition 188      
Gross Amount at Which Carried As of Year End        
Land 431      
Buildings and Improvements 1,637      
Total 2,068      
Accum Deprec 848      
172 Griffin, GA | SNF        
Initial Cost to Company        
Land 500      
Buildings and Improvements 2,900      
Gross Amount at Which Carried As of Year End        
Land 500      
Buildings and Improvements 2,900      
Total 3,400      
Accum Deprec 1,560      
250 Hewitt, TX | SNF        
Initial Cost to Company        
Land 1,780      
Buildings and Improvements 8,220      
Costs Capitalized Subsequent to acquisition 99      
Gross Amount at Which Carried As of Year End        
Land 1,780      
Buildings and Improvements 8,319      
Total 10,099      
Accum Deprec 1,324      
051 Houston, TX | SNF        
Initial Cost to Company        
Land 365      
Buildings and Improvements 3,769      
Costs Capitalized Subsequent to acquisition 1,598      
Gross Amount at Which Carried As of Year End        
Land 365      
Buildings and Improvements 5,367      
Total 5,732      
Accum Deprec 3,258      
054 Houston, TX | SNF        
Initial Cost to Company        
Land 202      
Buildings and Improvements 4,458      
Costs Capitalized Subsequent to acquisition 1,426      
Gross Amount at Which Carried As of Year End        
Land 202      
Buildings and Improvements 5,884      
Total 6,086      
Accum Deprec 3,700      
055 Houston, TX | SNF        
Initial Cost to Company        
Land 202      
Buildings and Improvements 4,458      
Costs Capitalized Subsequent to acquisition 1,359      
Gross Amount at Which Carried As of Year End        
Land 202      
Buildings and Improvements 5,817      
Total 6,019      
Accum Deprec 3,581      
208 Jacksonville, FL | SNF        
Initial Cost to Company        
Land 486      
Buildings and Improvements 1,981      
Costs Capitalized Subsequent to acquisition 30      
Gross Amount at Which Carried As of Year End        
Land 486      
Buildings and Improvements 2,011      
Total 2,497      
Accum Deprec 897      
045 Jefferson, IA | SNF        
Initial Cost to Company        
Land 86      
Buildings and Improvements 1,883      
Costs Capitalized Subsequent to acquisition 296      
Gross Amount at Which Carried As of Year End        
Land 86      
Buildings and Improvements 2,179      
Total 2,265      
Accum Deprec 1,348      
008 Lecanto, FL | SNF        
Initial Cost to Company        
Land 351      
Buildings and Improvements 2,665      
Costs Capitalized Subsequent to acquisition 2,737      
Gross Amount at Which Carried As of Year End        
Land 351      
Buildings and Improvements 5,402      
Total 5,753      
Accum Deprec 3,459      
300 Mansfield, TX | SNF        
Initial Cost to Company        
Land 2,890      
Buildings and Improvements 13,110      
Gross Amount at Which Carried As of Year End        
Land 2,890      
Buildings and Improvements 13,110      
Total 16,000      
Accum Deprec 448      
053 Mesa, AZ | SNF        
Initial Cost to Company        
Land 305      
Buildings and Improvements 6,909      
Costs Capitalized Subsequent to acquisition 1,876      
Gross Amount at Which Carried As of Year End        
Land 305      
Buildings and Improvements 8,785      
Total 9,090      
Accum Deprec 5,142      
226 Mesa, AZ | SNF        
Initial Cost to Company        
Land 1,095      
Buildings and Improvements 2,330      
Costs Capitalized Subsequent to acquisition 4,673      
Gross Amount at Which Carried As of Year End        
Land 1,095      
Buildings and Improvements 7,003      
Total 8,098      
Accum Deprec 915      
242 Mission, TX | SNF        
Initial Cost to Company        
Land 1,111      
Buildings and Improvements 16,602      
Gross Amount at Which Carried As of Year End        
Land 1,111      
Buildings and Improvements 16,602      
Total 17,713      
Accum Deprec 3,071      
041 Montgomery, AL | SNF        
Initial Cost to Company        
Land 242      
Buildings and Improvements 5,327      
Costs Capitalized Subsequent to acquisition 115      
Gross Amount at Which Carried As of Year End        
Land 242      
Buildings and Improvements 5,442      
Total 5,684      
Accum Deprec 3,332      
115 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,738      
Costs Capitalized Subsequent to acquisition 168      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,906      
Total 2,006      
Accum Deprec 1,084      
233 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 394      
Buildings and Improvements 7,456      
Costs Capitalized Subsequent to acquisition 268      
Gross Amount at Which Carried As of Year End        
Land 394      
Buildings and Improvements 7,724      
Total 8,118      
Accum Deprec 1,687      
249 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 1,015      
Buildings and Improvements 11,109      
Gross Amount at Which Carried As of Year End        
Land 1,015      
Buildings and Improvements 11,109      
Total 12,124      
Accum Deprec 2,684      
046 Norwalk, IA | SNF        
Initial Cost to Company        
Land 47      
Buildings and Improvements 1,033      
Costs Capitalized Subsequent to acquisition 239      
Gross Amount at Which Carried As of Year End        
Land 47      
Buildings and Improvements 1,272      
Total 1,319      
Accum Deprec 826      
176 Olathe, KS | SNF        
Initial Cost to Company        
Land 520      
Buildings and Improvements 1,872      
Costs Capitalized Subsequent to acquisition 313      
Gross Amount at Which Carried As of Year End        
Land 520      
Buildings and Improvements 2,185      
Total 2,705      
Accum Deprec 1,288      
251 Pasadena, TX | SNF        
Initial Cost to Company        
Land 1,155      
Buildings and Improvements 14,345      
Costs Capitalized Subsequent to acquisition 522      
Gross Amount at Which Carried As of Year End        
Land 1,155      
Buildings and Improvements 14,867      
Total 16,022      
Accum Deprec 2,115      
210 Phoenix, AZ | SNF        
Initial Cost to Company        
Land 334      
Buildings and Improvements 3,383      
Costs Capitalized Subsequent to acquisition 456      
Gross Amount at Which Carried As of Year End        
Land 334      
Buildings and Improvements 3,839      
Total 4,173      
Accum Deprec 1,686      
193 Phoenix, AZ | SNF        
Initial Cost to Company        
Land 300      
Buildings and Improvements 9,703      
Costs Capitalized Subsequent to acquisition 92      
Gross Amount at Which Carried As of Year End        
Land 300      
Buildings and Improvements 9,795      
Total 10,095      
Accum Deprec 5,098      
047 Polk City, IA | SNF        
Initial Cost to Company        
Land 63      
Buildings and Improvements 1,376      
Costs Capitalized Subsequent to acquisition 153      
Gross Amount at Which Carried As of Year End        
Land 63      
Buildings and Improvements 1,529      
Total 1,592      
Accum Deprec 967      
094 Portland, OR | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,925      
Costs Capitalized Subsequent to acquisition 2,652      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 4,577      
Total 4,677      
Accum Deprec 2,737      
254 Red Oak, TX | SNF        
Initial Cost to Company        
Land 1,427      
Buildings and Improvements 17,173      
Gross Amount at Which Carried As of Year End        
Land 1,427      
Buildings and Improvements 17,173      
Total 18,600      
Accum Deprec 2,448      
124 Richland Hills, TX | SNF        
Initial Cost to Company        
Land 144      
Buildings and Improvements 1,656      
Costs Capitalized Subsequent to acquisition 427      
Gross Amount at Which Carried As of Year End        
Land 144      
Buildings and Improvements 2,083      
Total 2,227      
Accum Deprec 1,072      
197 Ripley, TN | SNF        
Initial Cost to Company        
Land 20      
Buildings and Improvements 985      
Costs Capitalized Subsequent to acquisition 1,638      
Gross Amount at Which Carried As of Year End        
Land 20      
Buildings and Improvements 2,623      
Total 2,643      
Accum Deprec 850      
133 Roswell, NM | SNF        
Initial Cost to Company        
Land 568      
Buildings and Improvements 5,235      
Costs Capitalized Subsequent to acquisition 1,396      
Gross Amount at Which Carried As of Year End        
Land 568      
Buildings and Improvements 6,631      
Total 7,199      
Accum Deprec 2,310      
081 Sacramento, CA | SNF        
Initial Cost to Company        
Land 220      
Buildings and Improvements 2,929      
Costs Capitalized Subsequent to acquisition 1,481      
Gross Amount at Which Carried As of Year End        
Land 220      
Buildings and Improvements 4,410      
Total 4,630      
Accum Deprec 1,960      
085 Salina, KS | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,153      
Costs Capitalized Subsequent to acquisition 628      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,781      
Total 1,881      
Accum Deprec 1,114      
281 Slinger, WI | SNF        
Initial Cost to Company        
Land 464      
Buildings and Improvements 13,482      
Gross Amount at Which Carried As of Year End        
Land 464      
Buildings and Improvements 13,482      
Total 13,946      
Accum Deprec 976      
234 St. Petersburg, FL | SNF        
Initial Cost to Company        
Land 1,070      
Buildings and Improvements 7,930      
Costs Capitalized Subsequent to acquisition 500      
Gross Amount at Which Carried As of Year End        
Land 1,070      
Buildings and Improvements 8,430      
Total 9,500      
Accum Deprec 1,671      
243 Stephenville TX | SNF        
Initial Cost to Company        
Land 670      
Buildings and Improvements 10,117      
Costs Capitalized Subsequent to acquisition 500      
Gross Amount at Which Carried As of Year End        
Land 670      
Buildings and Improvements 10,617      
Total 11,287      
Accum Deprec 2,032      
225 Tacoma, WA | SNF        
Initial Cost to Company        
Land 723      
Buildings and Improvements 6,401      
Costs Capitalized Subsequent to acquisition 901      
Gross Amount at Which Carried As of Year End        
Land 723      
Buildings and Improvements 7,302      
Total 8,025      
Accum Deprec 2,717      
178 Tappahannock, VA | SNF        
Initial Cost to Company        
Land 375      
Buildings and Improvements 1,327      
Costs Capitalized Subsequent to acquisition 397      
Gross Amount at Which Carried As of Year End        
Land 375      
Buildings and Improvements 1,724      
Total 2,099      
Accum Deprec 1,438      
270 Trinity, FL | SNF        
Initial Cost to Company        
Land 1,653      
Buildings and Improvements 12,748      
Gross Amount at Which Carried As of Year End        
Land 1,653      
Buildings and Improvements 12,748      
Total 14,401      
Accum Deprec 1,306      
192 Tucson, AZ | SNF        
Initial Cost to Company        
Land 276      
Buildings and Improvements 8,924      
Costs Capitalized Subsequent to acquisition 112      
Gross Amount at Which Carried As of Year End        
Land 276      
Buildings and Improvements 9,036      
Total 9,312      
Accum Deprec 4,697      
299 Weatherford, TX | SNF        
Initial Cost to Company        
Land 836      
Buildings and Improvements 11,902      
Gross Amount at Which Carried As of Year End        
Land 836      
Buildings and Improvements 11,902      
Total 12,738      
Accum Deprec 606      
077 Ada, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,650      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,650      
Total 1,750      
Accum Deprec 845      
136 Arlington, OH | ALF        
Initial Cost to Company        
Land 629      
Buildings and Improvements 6,973      
Gross Amount at Which Carried As of Year End        
Land 629      
Buildings and Improvements 6,973      
Total 7,602      
Accum Deprec 2,695      
105 Arvada, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,810      
Costs Capitalized Subsequent to acquisition 6,960      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 9,770      
Total 9,870      
Accum Deprec 2,226      
304 Athens, GA | ALF        
Initial Cost to Company        
Land 1,056      
Buildings and Improvements 13,326      
Gross Amount at Which Carried As of Year End        
Land 1,056      
Buildings and Improvements 13,326      
Total 14,382      
Accum Deprec 214      
063 Athens, TX | ALF        
Initial Cost to Company        
Land 96      
Buildings and Improvements 1,510      
Costs Capitalized Subsequent to acquisition 66      
Gross Amount at Which Carried As of Year End        
Land 96      
Buildings and Improvements 1,576      
Total 1,672      
Accum Deprec 824      
269 Aurora, CO | ALF        
Initial Cost to Company        
Land 850      
Buildings and Improvements 8,583      
Gross Amount at Which Carried As of Year End        
Land 850      
Buildings and Improvements 8,583      
Total 9,433      
Accum Deprec 783      
260 Aurora, CO | ALF        
Initial Cost to Company        
Land 831      
Buildings and Improvements 10,071      
Gross Amount at Which Carried As of Year End        
Land 831      
Buildings and Improvements 10,071      
Total 10,902      
Accum Deprec 1,213      
203 Bakersfield, CA | ALF        
Initial Cost to Company        
Land 834      
Buildings and Improvements 11,986      
Costs Capitalized Subsequent to acquisition 812      
Gross Amount at Which Carried As of Year End        
Land 834      
Buildings and Improvements 12,798      
Total 13,632      
Accum Deprec 5,497      
117 Beatrice, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,173      
Costs Capitalized Subsequent to acquisition 140      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,313      
Total 2,413      
Accum Deprec 1,075      
137 Bexley, OH | ALF        
Initial Cost to Company        
Land 306      
Buildings and Improvements 4,196      
Gross Amount at Which Carried As of Year End        
Land 306      
Buildings and Improvements 4,196      
Total 4,502      
Accum Deprec 1,623      
277 Burr Ridge, IL | ALF        
Initial Cost to Company        
Land 1,400      
Buildings and Improvements 11,102      
Gross Amount at Which Carried As of Year End        
Land 1,400      
Buildings and Improvements 11,102      
Total 12,502      
Accum Deprec 353      
278 Castle Rock, CO | ALF        
Initial Cost to Company        
Land 759      
Buildings and Improvements 9,041      
Gross Amount at Which Carried As of Year End        
Land 759      
Buildings and Improvements 9,041      
Total 9,800      
Accum Deprec 420      
160 Central, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,321      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,321      
Total 2,421      
Accum Deprec 949      
263 Chatham, NJ | ALF        
Initial Cost to Company        
Land 5,365      
Buildings and Improvements 36,399      
Gross Amount at Which Carried As of Year End        
Land 5,365      
Buildings and Improvements 36,399      
Total 41,764      
Accum Deprec 4,198      
279 Corpus Christi, TX | ALF        
Initial Cost to Company        
Land 880      
Buildings and Improvements 11,369      
Gross Amount at Which Carried As of Year End        
Land 880      
Buildings and Improvements 11,369      
Total 12,249      
Accum Deprec 267      
292 De Forest, WI | ALF        
Initial Cost to Company        
Land 485      
Buildings and Improvements 5,568      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 485      
Buildings and Improvements 5,572      
Total 6,057      
Accum Deprec 241      
156 Denison, IA | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,713      
Costs Capitalized Subsequent to acquisition 207      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,920      
Total 3,020      
Accum Deprec 1,285      
057 Dodge City, KS | ALF        
Initial Cost to Company        
Land 84      
Buildings and Improvements 1,666      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 84      
Buildings and Improvements 1,670      
Total 1,754      
Accum Deprec 914      
083 Durant, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,769      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,769      
Total 1,869      
Accum Deprec 890      
107 Edmond, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,365      
Costs Capitalized Subsequent to acquisition 526      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,891      
Total 1,991      
Accum Deprec 931      
122 Elkhart, IN | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 41      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,476      
Total 2,576      
Accum Deprec 1,183      
155 Erie, PA | ALF        
Initial Cost to Company        
Land 850      
Buildings and Improvements 7,477      
Gross Amount at Which Carried As of Year End        
Land 850      
Buildings and Improvements 7,477      
Total 8,327      
Accum Deprec 3,530      
163 Ft. Collins, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,961      
Costs Capitalized Subsequent to acquisition 3,405      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 6,366      
Total 6,466      
Accum Deprec 1,734      
170 Ft. Collins, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 3,400      
Costs Capitalized Subsequent to acquisition 4,622      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 8,022      
Total 8,122      
Accum Deprec 1,931      
132 Ft. Meyers, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,728      
Costs Capitalized Subsequent to acquisition 9      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,737      
Total 2,837      
Accum Deprec 1,305      
230 Ft. Wayne, IN | ALF        
Initial Cost to Company        
Land 594      
Buildings and Improvements 3,461      
Costs Capitalized Subsequent to acquisition 731      
Gross Amount at Which Carried As of Year End        
Land 594      
Buildings and Improvements 4,192      
Total 4,786      
Accum Deprec 1,110      
229 Ft. Worth, TX | ALF        
Initial Cost to Company        
Land 333      
Buildings and Improvements 4,385      
Costs Capitalized Subsequent to acquisition 1,028      
Gross Amount at Which Carried As of Year End        
Land 333      
Buildings and Improvements 5,413      
Total 5,746      
Accum Deprec 1,797      
100 Fremont ,OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 69      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,504      
Total 2,604      
Accum Deprec 1,213      
267 Frisco, TX | ALF        
Initial Cost to Company        
Land 1,000      
Buildings and Improvements 5,154      
Gross Amount at Which Carried As of Year End        
Land 1,000      
Buildings and Improvements 5,154      
Total 6,154      
Accum Deprec 516      
167 Goldsboro, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,385      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,386      
Total 2,486      
Accum Deprec 908      
056 Great Bend, KS | ALF        
Initial Cost to Company        
Land 80      
Buildings and Improvements 1,570      
Costs Capitalized Subsequent to acquisition 21      
Gross Amount at Which Carried As of Year End        
Land 80      
Buildings and Improvements 1,591      
Total 1,671      
Accum Deprec 962      
102 Greeley, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,310      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,580      
Total 2,680      
Accum Deprec 1,268      
284 Green Bay, WI | ALF        
Initial Cost to Company        
Land 1,660      
Buildings and Improvements 19,079      
Costs Capitalized Subsequent to acquisition 56      
Gross Amount at Which Carried As of Year End        
Land 1,660      
Buildings and Improvements 19,135      
Total 20,795      
Accum Deprec 878      
164 Greenville, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,478      
Costs Capitalized Subsequent to acquisition 2      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,480      
Total 2,580      
Accum Deprec 1,061      
062 Greenville, TX | ALF        
Initial Cost to Company        
Land 42      
Buildings and Improvements 1,565      
Costs Capitalized Subsequent to acquisition 47      
Gross Amount at Which Carried As of Year End        
Land 42      
Buildings and Improvements 1,612      
Total 1,654      
Accum Deprec 849      
161 Greenwood, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,638      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,638      
Total 2,738      
Accum Deprec 1,154      
241 Gulf Breeze, FL | ALF        
Initial Cost to Company        
Land 720      
Buildings and Improvements 3,780      
Costs Capitalized Subsequent to acquisition 261      
Gross Amount at Which Carried As of Year End        
Land 720      
Buildings and Improvements 4,041      
Total 4,761      
Accum Deprec 815      
295 Jacksonville, FL | ALF        
Initial Cost to Company        
Land 1,389      
Buildings and Improvements 12,756      
Gross Amount at Which Carried As of Year End        
Land 1,389      
Buildings and Improvements 12,756      
Total 14,145      
Accum Deprec 422      
066 Jacksonville, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,900      
Costs Capitalized Subsequent to acquisition 31      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,931      
Total 2,031      
Accum Deprec 1,020      
285 Kenosha, WI | ALF        
Initial Cost to Company        
Land 936      
Buildings and Improvements 12,361      
Costs Capitalized Subsequent to acquisition 70      
Gross Amount at Which Carried As of Year End        
Land 936      
Buildings and Improvements 12,431      
Total 13,367      
Accum Deprec 456      
255 Littleton, CO | ALF        
Initial Cost to Company        
Land 1,882      
Buildings and Improvements 8,248      
Gross Amount at Which Carried As of Year End        
Land 1,882      
Buildings and Improvements 8,248      
Total 10,130      
Accum Deprec 1,024      
268 Littleton, CO | ALF        
Initial Cost to Company        
Land 1,200      
Buildings and Improvements 8,688      
Gross Amount at Which Carried As of Year End        
Land 1,200      
Buildings and Improvements 8,688      
Total 9,888      
Accum Deprec 921      
148 Longmont, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,640      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,640      
Total 2,740      
Accum Deprec 1,248      
060 Longview, TX | ALF        
Initial Cost to Company        
Land 38      
Buildings and Improvements 1,568      
Costs Capitalized Subsequent to acquisition 93      
Gross Amount at Which Carried As of Year End        
Land 38      
Buildings and Improvements 1,661      
Total 1,699      
Accum Deprec 866      
261 Louisville, CO | ALF        
Initial Cost to Company        
Land 911      
Buildings and Improvements 11,703      
Gross Amount at Which Carried As of Year End        
Land 911      
Buildings and Improvements 11,703      
Total 12,614      
Accum Deprec 1,379      
301 Louisville, KY | ALF        
Initial Cost to Company        
Land 1,021      
Buildings and Improvements 13,157      
Gross Amount at Which Carried As of Year End        
Land 1,021      
Buildings and Improvements 13,157      
Total 14,178      
Accum Deprec 235      
114 Loveland, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,865      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,135      
Total 3,235      
Accum Deprec 1,526      
068 Lufkin, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,950      
Costs Capitalized Subsequent to acquisition 58      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,008      
Total 2,108      
Accum Deprec 1,043      
119 Madison, IN | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 207      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,642      
Total 2,742      
Accum Deprec 1,204      
061 Marshall, TX | ALF        
Initial Cost to Company        
Land 38      
Buildings and Improvements 1,568      
Costs Capitalized Subsequent to acquisition 503      
Gross Amount at Which Carried As of Year End        
Land 38      
Buildings and Improvements 2,071      
Total 2,109      
Accum Deprec 1,108      
293 McHenry, IL | ALF        
Initial Cost to Company        
Land 1,289      
Buildings and Improvements 28,976      
Costs Capitalized Subsequent to acquisition 45      
Gross Amount at Which Carried As of Year End        
Land 1,289      
Buildings and Improvements 29,021      
Total 30,310      
Accum Deprec 1,200      
058 McPherson, KS | ALF        
Initial Cost to Company        
Land 79      
Buildings and Improvements 1,571      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 79      
Buildings and Improvements 1,575      
Total 1,654      
Accum Deprec 952      
239 Merritt Island, FL | ALF        
Initial Cost to Company        
Land 550      
Buildings and Improvements 8,150      
Costs Capitalized Subsequent to acquisition 100      
Gross Amount at Which Carried As of Year End        
Land 550      
Buildings and Improvements 8,250      
Total 8,800      
Accum Deprec 1,604      
104 Millville, NJ | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,825      
Costs Capitalized Subsequent to acquisition 645      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,470      
Total 3,570      
Accum Deprec 1,407      
286 Milwaukee, WI | ALF        
Initial Cost to Company        
Land 818      
Buildings and Improvements 8,014      
Costs Capitalized Subsequent to acquisition 25      
Gross Amount at Which Carried As of Year End        
Land 818      
Buildings and Improvements 8,039      
Total 8,857      
Accum Deprec 346      
231 Monroeville, PA | ALF        
Initial Cost to Company        
Land 526      
Buildings and Improvements 5,334      
Costs Capitalized Subsequent to acquisition 435      
Gross Amount at Which Carried As of Year End        
Land 526      
Buildings and Improvements 5,769      
Total 6,295      
Accum Deprec 1,352      
280 Merrells Inlet, SC | ALF        
Initial Cost to Company        
Land 2,490      
Buildings and Improvements 13,000      
Gross Amount at Which Carried As of Year End        
Land 2,490      
Buildings and Improvements 13,000      
Total 15,490      
Accum Deprec 122      
294 Murrieta, CA | ALF        
Initial Cost to Company        
Land 2,022      
Buildings and Improvements 10,666      
Gross Amount at Which Carried As of Year End        
Land 2,022      
Buildings and Improvements 10,666      
Total 12,688      
Accum Deprec 124      
289 Neenah, WI | ALF        
Initial Cost to Company        
Land 694      
Buildings and Improvements 20,839      
Costs Capitalized Subsequent to acquisition 115      
Gross Amount at Which Carried As of Year End        
Land 694      
Buildings and Improvements 20,954      
Total 21,648      
Accum Deprec 840      
166 New Bern, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,427      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,428      
Total 2,528      
Accum Deprec 943      
118 Newark, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 182      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,617      
Total 2,717      
Accum Deprec 1,197      
074 Newport, OR | ALF        
Initial Cost to Company        
Land 621      
Buildings and Improvements 2,050      
Gross Amount at Which Carried As of Year End        
Land 621      
Buildings and Improvements 2,050      
Total 2,671      
Accum Deprec 1,290      
143 Niceville, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,680      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,680      
Total 2,780      
Accum Deprec 1,267      
095 Norfolk, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,123      
Costs Capitalized Subsequent to acquisition 33      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,156      
Total 2,256      
Accum Deprec 1,061      
290 Oshkosh, WI | ALF        
Initial Cost to Company        
Land 1,525      
Buildings and Improvements 9,192      
Costs Capitalized Subsequent to acquisition 34      
Gross Amount at Which Carried As of Year End        
Land 1,525      
Buildings and Improvements 9,226      
Total 10,751      
Accum Deprec 768      
291 Oshkosh, WI | ALF        
Initial Cost to Company        
Land 475      
Buildings and Improvements 7,364      
Costs Capitalized Subsequent to acquisition 39      
Gross Amount at Which Carried As of Year End        
Land 475      
Buildings and Improvements 7,403      
Total 7,878      
Accum Deprec 310      
302 Overland Park, KS | ALF        
Initial Cost to Company        
Land 2,297      
Buildings and Improvements 11,882      
Gross Amount at Which Carried As of Year End        
Land 2,297      
Buildings and Improvements 11,882      
Total 14,179      
Accum Deprec 220      
232 Pittsburgh, PA | ALF        
Initial Cost to Company        
Land 470      
Buildings and Improvements 2,615      
Costs Capitalized Subsequent to acquisition 333      
Gross Amount at Which Carried As of Year End        
Land 470      
Buildings and Improvements 2,948      
Total 3,418      
Accum Deprec 763      
165 Rocky Mount, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,494      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,495      
Total 2,595      
Accum Deprec 997      
141 Rocky River, OH | ALF        
Initial Cost to Company        
Land 760      
Buildings and Improvements 6,963      
Gross Amount at Which Carried As of Year End        
Land 760      
Buildings and Improvements 6,963      
Total 7,723      
Accum Deprec 3,242      
059 Salina, KS | ALF        
Initial Cost to Company        
Land 79      
Buildings and Improvements 1,571      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 79      
Buildings and Improvements 1,575      
Total 1,654      
Accum Deprec 952      
084 San Antonio, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,900      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,900      
Total 2,000      
Accum Deprec 955      
092 San Antonio, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,055      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,055      
Total 2,155      
Accum Deprec 1,027      
288 Sheboygan, WI | ALF        
Initial Cost to Company        
Land 1,168      
Buildings and Improvements 5,382      
Gross Amount at Which Carried As of Year End        
Land 1,168      
Buildings and Improvements 5,382      
Total 6,550      
Accum Deprec 258      
149 Shelby, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,805      
Costs Capitalized Subsequent to acquisition 2      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,807      
Total 2,907      
Accum Deprec 1,326      
150 Spring Hill, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,650      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,650      
Total 2,750      
Accum Deprec 1,253      
103 Springfield, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,035      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,305      
Total 2,405      
Accum Deprec 1,131      
162 Sumter, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,351      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,351      
Total 2,451      
Accum Deprec 986      
140 Tallahassee, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 3,075      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,075      
Total 3,175      
Accum Deprec 1,457      
098 Tiffin, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 43      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,478      
Total 2,578      
Accum Deprec 1,207      
282 Tinley Park, IL | ALF        
Initial Cost to Company        
Land 702      
Buildings and Improvements 11,481      
Gross Amount at Which Carried As of Year End        
Land 702      
Buildings and Improvements 11,481      
Total 12,183      
Accum Deprec 210      
088 Troy, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 541      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,976      
Total 3,076      
Accum Deprec 1,371      
080 Tulsa, OK | ALF        
Initial Cost to Company        
Land 200      
Buildings and Improvements 1,650      
Gross Amount at Which Carried As of Year End        
Land 200      
Buildings and Improvements 1,650      
Total 1,850      
Accum Deprec 839      
093 Tulsa, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,395      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,395      
Total 2,495      
Accum Deprec 1,193      
238 Tupelo, MS | ALF        
Initial Cost to Company        
Land 1,170      
Buildings and Improvements 8,230      
Costs Capitalized Subsequent to acquisition 30      
Gross Amount at Which Carried As of Year End        
Land 1,170      
Buildings and Improvements 8,260      
Total 9,430      
Accum Deprec 1,699      
075 Tyler, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,800      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,800      
Total 1,900      
Accum Deprec 920      
202 Vacaville, CA | ALF        
Initial Cost to Company        
Land 1,662      
Buildings and Improvements 11,634      
Costs Capitalized Subsequent to acquisition 1,141      
Gross Amount at Which Carried As of Year End        
Land 1,662      
Buildings and Improvements 12,775      
Total 14,437      
Accum Deprec 5,441      
091 Waco, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,235      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,235      
Total 2,335      
Accum Deprec 1,115      
096 Wahoo, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,318      
Costs Capitalized Subsequent to acquisition 50      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,368      
Total 2,468      
Accum Deprec 1,153      
108 Watauga, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,668      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,668      
Total 1,768      
Accum Deprec 827      
287 Waukesha, WI | ALF        
Initial Cost to Company        
Land 992      
Buildings and Improvements 15,183      
Costs Capitalized Subsequent to acquisition 111      
Gross Amount at Which Carried As of Year End        
Land 992      
Buildings and Improvements 15,294      
Total 16,286      
Accum Deprec 561      
109 Weatherford, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,669      
Costs Capitalized Subsequent to acquisition 592      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,261      
Total 2,361      
Accum Deprec 1,110      
276 Westminster, CO | ALF        
Initial Cost to Company        
Land 1,425      
Buildings and Improvements 9,575      
Gross Amount at Which Carried As of Year End        
Land 1,425      
Buildings and Improvements 9,575      
Total 11,000      
Accum Deprec 707      
110 Wheelersburg, OH | ALF        
Initial Cost to Company        
Land 29      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 123      
Gross Amount at Which Carried As of Year End        
Land 29      
Buildings and Improvements 2,558      
Total 2,587      
Accum Deprec 1,197      
303 Wichita, KS | ALF        
Initial Cost to Company        
Land 1,422      
Buildings and Improvements 9,957      
Gross Amount at Which Carried As of Year End        
Land 1,422      
Buildings and Improvements 9,957      
Total 11,379      
Accum Deprec 188      
259 Wichita, KS | ALF        
Initial Cost to Company        
Land 730      
Costs Capitalized Subsequent to acquisition 9,682      
Gross Amount at Which Carried As of Year End        
Land 730      
Buildings and Improvements 9,682      
Total 10,412      
Accum Deprec 1,278      
283 Wichita, KS | ALF        
Initial Cost to Company        
Land 624      
Buildings and Improvements 13,131      
Gross Amount at Which Carried As of Year End        
Land 624      
Buildings and Improvements 13,131      
Total 13,755      
Accum Deprec 29      
076 Wichita Falls, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,850      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,850      
Total 1,950      
Accum Deprec 945      
120 Wichita Falls, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,750      
Costs Capitalized Subsequent to acquisition 100      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,850      
Total 2,950      
Accum Deprec 1,364      
265 Williamstown, NJ | ALF        
Initial Cost to Company        
Land 711      
Buildings and Improvements 6,637      
Gross Amount at Which Carried As of Year End        
Land 711      
Buildings and Improvements 6,637      
Total 7,348      
Accum Deprec 858      
264 Williamstown, NJ | ALF        
Initial Cost to Company        
Land 711      
Buildings and Improvements 8,649      
Gross Amount at Which Carried As of Year End        
Land 711      
Buildings and Improvements 8,649      
Total 9,360      
Accum Deprec 1,011      
138 Worthington, OH | ALF        
Initial Cost to Company        
Buildings and Improvements 6,102      
Gross Amount at Which Carried As of Year End        
Buildings and Improvements 6,102      
Total 6,102      
Accum Deprec 5,732      
139 Worthington, OH | ALF        
Initial Cost to Company        
Buildings and Improvements 3,402      
Gross Amount at Which Carried As of Year End        
Buildings and Improvements 3,402      
Total 3,402      
Accum Deprec 3,201      
099 York, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,318      
Costs Capitalized Subsequent to acquisition 40      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,358      
Total 2,458      
Accum Deprec 1,153      
199 Brownsville, TX | ROC        
Initial Cost to Company        
Land 302      
Buildings and Improvements 1,089      
Costs Capitalized Subsequent to acquisition 835      
Gross Amount at Which Carried As of Year End        
Land 302      
Buildings and Improvements 1,924      
Total 2,226      
Accum Deprec 1,058      
168 Des Moines, IA(2) | ROC        
Initial Cost to Company        
Land 115      
Buildings and Improvements 2,096      
Costs Capitalized Subsequent to acquisition 1,433      
Gross Amount at Which Carried As of Year End        
Land 115      
Buildings and Improvements 3,529      
Total 3,644      
Accum Deprec 1,955      
26A Gardendale, AL | ROC        
Initial Cost to Company        
Land 100      
Buildings and Improvements 7,550      
Costs Capitalized Subsequent to acquisition 2,084      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 9,634      
Total 9,734      
Accum Deprec 5,209      
194 Holyoke, CO | ROC        
Initial Cost to Company        
Land 211      
Buildings and Improvements 1,513      
Costs Capitalized Subsequent to acquisition 283      
Gross Amount at Which Carried As of Year End        
Land 211      
Buildings and Improvements 1,796      
Total 2,007      
Accum Deprec 1,020      
245 Newberry, SC | ROC        
Initial Cost to Company        
Land 439      
Buildings and Improvements 4,639      
Costs Capitalized Subsequent to acquisition 608      
Gross Amount at Which Carried As of Year End        
Land 439      
Buildings and Improvements 5,247      
Total 5,686      
Accum Deprec 1,358      
244 Newberry, SC | ROC        
Initial Cost to Company        
Land 919      
Buildings and Improvements 5,454      
Costs Capitalized Subsequent to acquisition 131      
Gross Amount at Which Carried As of Year End        
Land 919      
Buildings and Improvements 5,585      
Total 6,504      
Accum Deprec 1,251      
236 Wytheville, VA | ROC        
Initial Cost to Company        
Land 647      
Buildings and Improvements 12,692      
Gross Amount at Which Carried As of Year End        
Land 647      
Buildings and Improvements 12,692      
Total 13,339      
Accum Deprec 3,743      
297 Las Vegas, NV | School        
Initial Cost to Company        
Land 1,965      
Buildings and Improvements 7,308      
Gross Amount at Which Carried As of Year End        
Land 1,965      
Buildings and Improvements 7,308      
Total 9,273      
Accum Deprec 249      
271 Howell, MI | Land        
Initial Cost to Company        
Land 420      
Gross Amount at Which Carried As of Year End        
Land 420      
Total 420      
275 Yale, MI | Land        
Initial Cost to Company        
Land 73      
Gross Amount at Which Carried As of Year End        
Land 73      
Total 73      
999 Milford, MI | Land        
Initial Cost to Company        
Land 450      
Gross Amount at Which Carried As of Year End        
Land 450      
Total 450      
305 Union, KY | Properties under Development        
Initial Cost to Company        
Land 858      
Buildings and Improvements 5,046      
Gross Amount at Which Carried As of Year End        
Land 858      
Buildings and Improvements 5,046      
Total 5,904      
296 Glenview, IL | Properties under Development        
Initial Cost to Company        
Land 2,800      
Buildings and Improvements 3,186      
Gross Amount at Which Carried As of Year End        
Land 2,800      
Buildings and Improvements 3,186      
Total 5,986      
306 Oaklawn, IL | Properties under Development        
Initial Cost to Company        
Land 1,591      
Buildings and Improvements 661      
Gross Amount at Which Carried As of Year End        
Land 1,591      
Buildings and Improvements 661      
Total $ 2,252