Note 14. Debt

 

Debt as of October 31, 2020 and 2019 consisted of the following (in thousands):

 

 

 

2020

 

 

2019

 

Orion Energy Partners Credit Facility

 

$

80,000

 

 

 

14,500

 

Connecticut Green Bank Loans

 

 

4,800

 

 

 

1,800

 

Connecticut Green Bank Loan (BFC Loan)

 

 

5,065

 

 

 

5,755

 

Liberty Bank Term Loan Agreement (BFC Loan)

 

 

9,549

 

 

 

11,632

 

Fifth Third Bank Term Loan Agreement (BFC Loan)

 

 

9,549

 

 

 

11,632

 

Finance obligations for sale-leaseback transactions

 

 

49,274

 

 

 

45,219

 

State of Connecticut Loan

 

 

9,454

 

 

 

10,000

 

New Britain Renewable Energy Term Loan

 

 

-

 

 

 

497

 

Enhanced Capital Loan and Security Agreement

 

 

-

 

 

 

1,500

 

Fifth Third Bank Construction Loan Agreement

 

 

-

 

 

 

11,072

 

Liberty Bank Promissory Note (PPP Note)

 

 

6,515

 

 

 

-

 

Finance lease obligations

 

 

38

 

 

 

141

 

Deferred finance costs

 

 

(3,737

)

 

 

(3,180

)

Unamortized debt discount

 

 

(5,152

)

 

 

(4,251

)

Total debt

 

$

165,355

 

 

$

106,317

 

Current portion of long-term debt

 

 

(21,366

)

 

 

(21,916

)

Long-term debt

 

$

143,989

 

 

$

84,401

 

 

Aggregate annual principal payments under our loan agreements and finance lease obligations for the years subsequent to October 31, 2020 are as follows (in thousands):

 

Year 1

 

$

22,708

 

Year 2

 

 

22,594

 

Year 3

 

 

20,832

 

Year 4

 

 

21,160

 

Year 5

 

 

19,753

 

Thereafter (1)

 

 

38,227

 

 

 

$

145,274

 

 

(1)

The annual principal payments included above only include sale-leaseback payments whereas the difference between debt outstanding as of October 31, 2020 and the annual principal payments represent accreted interest and amounts included in the finance obligation that exceed required principal payments.

Orion Energy Partners Investment Agent, LLC Credit Agreement

On October 31, 2019, the Company and certain of its affiliates as guarantors entered into a Credit Agreement (as amended from time to time, the “Orion Credit Agreement”) with Orion Energy Partners Investment Agent, LLC, as Administrative Agent and Collateral Agent (the “Orion Agent”), and certain lenders affiliated with the Orion Agent for a $200.0 million senior secured credit facility (the “Orion Facility”), structured as a delayed draw term loan to be provided by the lenders primarily to fund certain of the Company’s construction and related costs for fuel cell projects meeting the requirements of the Orion Facility. Under the Orion Credit Agreement, each lender funded its commitments less 2.50% of the aggregate principal amount of the loans funded by such lender (the “Loan Discount).

On October 31, 2019, the Company drew down $14.5 million (the “Initial Funding”) and received $14.1 million, after taking into account a Loan Discount of $0.4 million. On October 31, 2019, in connection with the Initial Funding, the Company issued warrants to the lenders under the Orion Credit Agreement to purchase up to a total of 6,000,000 shares of the Company’s common stock, at an exercise price of $0.310 per share (the “Initial Funding Warrants”).

On November 22, 2019, a second draw (the “Second Funding”) of $65.5 million, funded by Orion Energy Credit Opportunities Fund II, L.P., Orion Energy Credit Opportunities Fund II GPFA, L.P., Orion Energy Credit Opportunities Fund II PV, L.P., and Orion Energy Credit Opportunities FuelCell Co-Invest, L.P. (as the lenders under the Orion Credit Agreement), was made to fully repay certain outstanding third party debt of the Company, including the outstanding construction loan from Fifth Third Bank with respect to the Groton Project and the outstanding loan from Webster Bank with respect to the CCSU Project, as well as to fund remaining going forward construction costs and anticipated capital expenditures relating to the Groton Project (a 7.4 megawatt (MW) project), the LIPA Yaphank Solid Waste Management Project (a 7.4 MW project), and the Tulare BioMAT Project (a 2.8 MW project). The Company received $63.9 million in the Second Funding after taking into account a Loan Discount of $1.6 million as described above. Also in conjunction with the Second Funding, the Company issued to the lenders warrants to purchase up to a total of 14.0 million shares of the Company’s common stock, with an initial exercise price with respect to 8.0 million of such shares of $0.242 per share and with an initial exercise price with respect to 6.0 million of such shares of $0.620 per share (the “Second Funding Warrants”).

Under the Orion Credit Agreement, cash interest of 9.9% per annum was paid quarterly. In addition to the cash interest, payment-in-kind interest of 2.05% per annum accrued which was added to the outstanding principal balance of the Orion Facility but was paid quarterly in cash to the extent of available cash after payment of the Company’s operating expenses and the funding of certain reserves for the payment of outstanding indebtedness to the State of Connecticut and Connecticut Green Bank.

Outstanding principal under the Orion Facility was to be amortized on a straight-line basis over a seven-year term with the initial payment due 21 business days after the end of the first quarter of fiscal year 2021. The maturity date of the Orion Facility was October 31, 2027.  The Orion Facility contained an administrative fee of $0.1 million per year paid on a quarterly basis and also included a prepayment premium of up to 35%.  Such prepayment fee was to be reduced over time based on the aggregate amount of principal and interest paid.

The issuance of the Initial Funding Warrants and recognition of the Second Funding Warrants resulted in $3.9 million being recorded as a liability as of October 31, 2019 with the offset recorded as a debt discount. Refer to Note 15. “Stockholders’ Equity and Warrant Liabilities” for additional information regarding the Initial Funding Warrants and Second Funding Warrants, including the accounting, terms and conversions during the year ended October 31, 2020.

 

During the year ended October 31, 2020, the Orion Credit Agreement was amended on five occasions including (a) to establish a debt reserve of $5.0 million to be released upon the occurrence of certain events and require the Company to enter into or modify certain commercial agreements in conjunction with the Second Funding, (b) to require the Company to make certain payment and funding commitments related to the Series 1 Preferred Shares in order to obtain consent from the lenders under the Orion Credit Agreement for modification of the terms of the Series 1 Preferred Shares, (c) to require the Company to pledge additional assets and to restrict the use of, or require the use in a specified manner of, the cash received from the Crestmark sale-leaseback transaction in order obtain consent from the lenders under the Orion Credit Agreement for the Crestmark sale-leaseback transaction, (d) to permit the release of a portion of restricted cash in exchange for additional collateral and performance commitments, and (e) to add additional covenants and security in conjunction with the establishment of a short-term secondary facility loan commitment of $35 million that expired unused. Upon entering into the secondary facility loan commitment, the Company owed the lenders under the Orion Credit Agreement an option premium of $1.0 million.

The Company paid the $1.0 million option premium during the year ended October 31, 2020 and recorded the amount as interest expense.

 

Subsequent to October 31, 2020, the Company paid off and extinguished the Orion Credit Agreement. Refer to Note 25 “Subsequent Events” for additional information.

 

Connecticut Green Bank Loans

 

As of October 31, 2019, the Company had a long-term loan agreement with the Connecticut Green Bank, providing the Company with a loan of $1.8 million (the “Green Bank Loan Agreement”). On and effective as of December 19, 2019, the Company and Connecticut Green Bank entered into an amendment to the Green Bank Loan Agreement (the “Green Bank Amendment”). Upon the execution of the Green Bank Amendment on December 19, 2019, Connecticut Green Bank made an additional loan to the Company in the aggregate principal amount of $3.0 million (the “December 2019 Loan”), which was to be used (i) first, to pay closing fees related to the May 9, 2019 acquisition of the Bridgeport Fuel Cell Project and the Subordinated Credit Agreement (as defined below), other fees and interest, and (ii) thereafter, for general corporate purposes.

 

The Green Bank Amendment provides that, until such time as the loan (which includes both the outstanding principal balance of the original loan under the Green Bank Loan Agreement and the outstanding principal amount of the December 2019 Loan) has been repaid in its entirety, interest on the outstanding balance of the loan shall accrue at a rate of 8% per annum, payable by the Company on a monthly basis in arrears. Interest payments made by the Company after the date of the Green Bank Amendment are to be applied first to interest that has accrued on the outstanding principal balance of the original loan under the Green Bank Loan Agreement and then to interest that has accrued on the December 2019 Loan.

 

The Green Bank Amendment also modifies the repayment and mandatory prepayment terms and extends the maturity date set forth in the original Green Bank Loan Agreement. Under the Green Bank Amendment, to the extent that excess cash flow reserve funds under the BFC Credit Agreement (as defined below) are eligible for disbursement to Bridgeport Fuel Cell, LLC pursuant to Section 6.23(c) of the BFC Credit Agreement, such funds are to be paid to Connecticut Green Bank until the loans are repaid in full. The Green Bank Amendment further provides that any unpaid balance of the loan and all other obligations due under the Green Bank Loan Agreement will be due and payable on May 9, 2026. Finally, with respect to mandatory prepayments, the Green Bank Amendment provides that, when the Company has closed on the subordinated project term loan pursuant to the Commitment Letter, dated February 6, 2019, issued by Connecticut Green Bank to Groton Fuel Cell to provide a subordinated project term loan to Groton Fuel Cell in the amount of $5.0 million, the Company will be required to prepay to Connecticut Green Bank the lesser of any then outstanding amount of the December 2019 Loan and the amount of the subordinated project term loan actually advanced by Connecticut Green Bank. The balance under the original Green Bank Loan Agreement and the December 2019 Loan as of October 31, 2020 was $4.8 million.

Bridgeport Fuel Cell Project Loans

On May 9, 2019, in connection with the closing of the purchase of the membership interests of Bridgeport Fuel Cell, LLC (“BFC”) (and the 14.9 MW Bridgeport Fuel Cell Project), BFC entered into a subordinated credit agreement with the Connecticut Green Bank whereby Connecticut Green Bank provided financing in the amount of $6.0 million (the “Subordinated Credit Agreement”). This $6.0 million consisted of $1.8 million in incremental funding that was received by BFC and $4.2 million of funding previously received by FuelCell Energy, Inc. with respect to which BFC became the primary obligor. As security for the Subordinated Credit Agreement, Connecticut Green Bank received a perfected lien, subordinated and second in priority to the liens securing the $25.0 million loaned under the BFC Credit Agreement (as defined below), in all of the same collateral securing the BFC Credit Agreement. The interest rate under the Subordinated Credit Agreement is 8% per annum. Principal and interest are due monthly in amounts sufficient to fully amortize the loan over an 84-month period ending in May 2026. The Subordinated Credit Agreement contains a debt coverage ratio which is required to be maintained and may not be less than 1.10 as of the end of each fiscal quarter, beginning with the quarter ended July 31, 2020. The balance under the Subordinated Credit Agreement as of October 31, 2020 was $5.1 million.

On May 9, 2019, in connection with the closing of the purchase of the Bridgeport Fuel Cell Project, BFC  entered into a Credit Agreement with Liberty Bank, as administrative agent and co-lead arranger, and Fifth Third Bank as co-lead arranger and swap hedger (the “BFC Credit Agreement”), whereby (i) Fifth Third Bank provided financing in the amount of $12.5 million towards the purchase price for the BFC acquisition; and (ii) Liberty Bank provided financing in the amount of $12.5 million towards the purchase price for the BFC acquisition. As security for the BFC Credit Agreement, Liberty Bank and Fifth Third Bank were granted a first priority lien in (i) all assets of BFC, including BFC’s cash accounts, fuel cells, and all other personal property, as well as third party contracts including the Energy Purchase Agreement between BFC and Connecticut Light and Power Company dated July 10, 2009, as amended; (ii) certain fuel cell modules that are intended to be used to replace the Bridgeport Fuel Cell Project’s fuel cell modules as part of routine operation and maintenance; and (iii) FuelCell Finance’s (a wholly-owned subsidiary of the Company and the direct parent of BFC) ownership interest in BFC. The maturity date under the BFC Credit Agreement is May 9, 2025. Monthly principal and interest are to be paid in arrears in an amount sufficient to fully amortize the term loan over a 72-month period. BFC has the right to make additional principal payments or pay the balance due under the BFC Credit Agreement in full, provided that it pays any associated breakage fees with regard to the interest rate swap agreements fixing the interest rate. The interest rate under the BFC Credit Agreement fluctuates monthly at the 30-day LIBOR rate plus 275 basis points.

An interest rate swap agreement was required to be entered into with Fifth Third Bank in connection with the BFC Credit Agreement to protect against movements in the floating LIBOR index. Accordingly, on May 16, 2019, an interest rate swap agreement (the “Swap Agreement”) was entered into with Fifth Third Bank in connection with the BFC Credit Agreement for the term of the loan. The net interest rate across the BFC Credit Agreement and the swap transaction results in a fixed rate of 5.09%. The interest rate swap is adjusted to fair value on a quarterly basis. The estimated fair value is based on Level 2 inputs including primarily the forward LIBOR curve available to swap dealers. The valuation methodology involves comparison of (i) the sum of the present value of all monthly variable rate payments based on a reset rate using the forward LIBOR curve and (ii) the sum of the present value of all monthly fixed rate payments on the notional amount, which is equivalent to the outstanding principal amount of the loans. The fair value adjustments for the years ended October 31, 2020 and 2019 resulted in a $0.3 million and a $0.6 million charge, respectively. The fair value of the interest rate swap liability as of October 31, 2020 and 2019 was $0.9 million and $0.6 million, respectively.

The BFC Credit Agreement requires BFC to maintain a debt service reserve. Each of Liberty Bank and Fifth Third Bank also has an operation and module replacement reserve (“O&M Reserve”) under the BFC Credit Agreement. BFC is required to deposit $100,000 per month into each O&M Reserve for the first five years of the BFC Credit Agreement, with such funds to be released at the sole discretion of Liberty Bank and Fifth Third Bank, as applicable. BFC is also required to maintain excess cash flow reserve accounts at each of Liberty Bank and Fifth Third Bank. Excess cash flow consists of cash generated by BFC from the Bridgeport Fuel Cell Project after payment of all expenses (including after payment of intercompany service fees to the Company), debt service to Liberty Bank and Fifth Third Bank, the funding of all required reserves, and payments to Connecticut Green Bank for the subordinated facility.  BFC is also required to maintain a debt service coverage ratio of not less than 1.20, measured for the trailing year based on fiscal quarters beginning with the quarter ended July 31, 2020. The Company has certain quarterly and annual financial reporting requirements under the BFC Credit Agreement. The annual financial statements to be provided pursuant to such requirements are to be audited and accompanied by a report of an independent certified public accountant, which report shall not include a “going concern” matter of emphasis or any qualification as to the scope of such audit.

 

Finance obligations for sale leaseback agreements

Several of the Company’s project subsidiaries previously entered into sale-leaseback agreements with PNC for commissioned projects where the Company had entered into a PPA with the site host/end-user of produced power, and CCFC2 entered into a sale-leaseback with Crestmark on February 11, 2020 (refer to Note. 13. “Leases” for additional information). The Company did not recognize as revenue any of the proceeds received from the lessor that contractually constitute payments to acquire the assets subject to these arrangements. Instead, the sale proceeds received were accounted for as financing obligations. The outstanding financing obligation balance as of October 31, 2020 was $49.3 million as compared to $45.2 million as of October 31, 2019. This change reflects the recording of the finance obligation with Crestmark and the recognition of interest expense, offset by lease payments and the payoff of the UCI Fuel Cell, LLC lease with PNC. As noted in Note 7. “Project Assets”, the Company repurchased the equipment leased by UCI Fuel Cell, LLC from PNC. The difference between the financing obligation and the payoff was reflected as a Gain on extinguishment of financing obligation on the Consolidated Statement of Operations. The outstanding financing obligation for the remaining leases includes an embedded gain of $29.0 million which will be recognized at the end of each 10-year lease term or upon early termination if applicable. The sale-leaseback arrangements with PNC allow the Company to repurchase the project assets at fair market value and

the sale-leaseback arrangement with Crestmark includes a purchase right for the greater of fair market value or 31% of the purchase price.

State of Connecticut Loan

In October 2015, the Company closed on a definitive Assistance Agreement with the State of Connecticut (the “Assistance Agreement”) and received a disbursement of $10.0 million, which was used for the first phase of the expansion of the Company’s Torrington, Connecticut manufacturing facility. In conjunction with this financing, the Company entered into a $10.0 million promissory note and related security agreements securing the loan with equipment liens and a mortgage on its Danbury, Connecticut location. Interest accrues at a fixed interest rate of 2.0%, and the loan is repayable over 15 years from the date of the first advance, which occurred in October of 2015. Principal payments were deferred for four years from disbursement and began on December 1, 2019. Under the Assistance Agreement, the Company was eligible for up to $5.0 million in loan forgiveness if the Company created 165 full-time positions and retained 538 full-time positions for two consecutive years (the “Employment Obligation”) as measured on October 28, 2017 (the “Target Date”). The Assistance Agreement was subsequently amended in April 2017 to extend the Target Date by two years to October 28, 2019.

In January 2019, the Company and the State of Connecticut entered into a Second Amendment to the Assistance Agreement (the “Second Amendment”). The Second Amendment extended the Target Date to October 31, 2022 and amended the Employment Obligation to require the Company to continuously maintain a minimum of 538 full-time positions for 24 consecutive months. If the Company meets the Employment Obligation, as modified by the Second Amendment, and creates an additional 91 full-time positions, the Company may receive a credit in the amount of $2.0 million to be applied against the outstanding balance of the loan. However, based on the Company’s current headcount and plans for fiscal year 2021 and beyond, it will not meet this requirement or receive this credit. A job audit will be performed within 90 days of the Target Date. If the Company does not meet the Employment Obligation, then an accelerated payment penalty will be assessed at a rate of $18,587.36 multiplied by the number of employees below the number of employees required by the Employment Obligation. Such penalty is immediately payable and will be applied first to accelerate the payment of any outstanding fees or interest due and then to accelerate the payment of outstanding principal.

In April of 2020, as a result of the COVID-19 pandemic, the State of Connecticut agreed to defer three months of principal and interest payments under the Assistance Agreement, beginning with the May 2020 payment. These deferred payments will be added at the end of the loan, thus extending out the maturity date by three months.

 

Liberty Bank Promissory Note

On April 20, 2020, the Company entered into the PPP Note, dated April 16, 2020, evidencing a loan to the Company from Liberty Bank, under the CARES Act, administered by the Small Business Administration (“SBA”). Pursuant to the PPP Note, the Company received total proceeds of approximately $6.5 million on April 24, 2020.

The PPP Note is scheduled to mature on April 16, 2022, has a 1.00% per annum interest rate, and is subject to the terms and conditions applicable to loans administered by the SBA under the CARES Act, as amended by the PPP Flexibility Act. Monthly principal and interest payments, less the amount of any potential forgiveness (as discussed below), commenced on November 16, 2020. The Company did not provide any collateral or guarantees for the PPP Note, nor did the Company pay any facility charge to obtain the PPP Note. The PPP Note may be prepaid at any time with no prepayment penalties.

Under the requirements of the CARES Act, as amended by the PPP Flexibility Act, proceeds may only be used for the Company’s eligible payroll costs (with salary capped at $100,000 on an annualized basis for each employee), rent, mortgage interest and utilities, in each case paid during the 24-week period following disbursement. The loan may be fully forgiven if (i) proceeds are used to pay eligible payroll costs, rent, mortgage interest and utilities and (ii) full-time employee headcount and salaries are either maintained during the 24-week period following disbursement or restored by December 31, 2020. If not so maintained or restored, any forgiveness of the loan would be reduced in accordance with the regulations that were issued by the SBA. All of the proceeds of the PPP Note were used by the Company to pay eligible payroll costs and the Company maintained its headcount and otherwise complied with the terms of the PPP Note.

In October 2020, the Company applied for forgiveness of the PPP Note. The forgiveness application is subject to approval by the SBA and Liberty Bank, and no assurance can be given that any portion of the PPP Note will be

forgiven. Based on guidance from the United States Department of the Treasury, since the total PPP Note proceeds exceeded $2.0 million, the forgiveness application will be subject to audit by the SBA.

 

New Britain Renewable Energy Term Loan

 

In November 2016, the Company assumed debt with Webster Bank, National Association as a part of a project asset acquisition transaction. The term loan interest rate was 5.0% per annum. The balance outstanding as of October 31, 2019 was $0.5 million. The loan was paid off and extinguished during the three months ended January 31, 2020.

 

Enhanced Capital Loan

 

On January 9, 2019, the Company, through its indirect wholly-owned subsidiary TRS Fuel Cell, LLC, entered into a loan with Enhanced Capital Connecticut Fund V, LLC (“Enhanced”) in the amount of $1.5 million. Interest accrued at a rate of 6.0% per annum.  Under the terms of the loan, the Company was required to close on tax equity financing by January 14, 2020.  Given that the Company did not secure tax equity financing on this project, on January 13, 2020, TRS Fuel Cell, LLC and Enhanced entered into a payoff letter pursuant to which the loan was paid off and extinguished on January 14, 2020.

 

Fifth Third Bank Groton Loan

 

On February 28, 2019, the Company, through its indirect wholly-owned subsidiary, Groton Fuel Cell, entered into a Construction Loan Agreement (as amended from time to time, the “Groton Agreement”) with Fifth Third Bank pursuant to which Fifth Third Bank agreed to make available to Groton Fuel Cell a construction loan facility in an aggregate principal amount of up to $23.0 million (the “Groton Facility”) to fund the manufacture, construction, installation, commissioning and start-up of the 7.4 MW fuel cell power plant located on the U.S. Navy submarine base in Groton, Connecticut (the “Groton Project”). The Company made an initial draw under the Groton Facility on the date of closing of $9.7 million and made an additional draw of $1.4 million in April 2019.  The loan was amended during the year ended October 31, 2019 to, among other things, reduce the principal amount of the facility to $18.0 million, change the maturity date, require the Company to obtain financing for the Groton Project, and increase the interest rate if such financing was not obtained by specified dates.

The total outstanding balance under the Groton Facility as of October 31, 2019 was $11.1 million. This balance was paid off, the loan was extinguished and the Groton Facility was terminated during the three months ended January 31, 2020.

Prior Period Loans

The Company paid off several loans during the fiscal year ended October 31, 2019, which included the loans provided under the following agreements or facilities: the loan and security agreement, as amended, with Hercules Capital, Inc., the loan facilities with Webster Bank, National Association, the construction loan facility, as amended, with Fifth Third Bank with respect to the project at the U.S. Navy submarine base in Groton, Connecticut, the construction loan agreement, as amended, with Generate Lending, LLC, and the loan agreement, as amended, with NRG Energy, Inc.  

Deferred Finance Costs

As of October 31, 2020, deferred finance costs relate primarily to (i) sale-leaseback transactions entered into with PNC and Crestmark, which are being amortized over the 10-year terms of the lease agreements, (ii) payments under the loans obtained to purchase the membership interests in BFC, which are being amortized over the 8-year term of the loans and (iii) payments to enter into the Orion Facility, which were being amortized over the 8-year term of the facility, prior to extinguishment of the Orion Facility subsequent to year end.