Utility Regulatory Assets and Liabilities and Regulatory Matters
9 Months Ended
Jun. 30, 2015
Regulated Operations [Abstract]  
Utility Regulatory Assets and Liabilities and Regulatory Matters
Note 6 — Utility Regulatory Assets and Liabilities and Regulatory Matters

For a description of the Company’s regulatory assets and liabilities other than those described below, see Note 9 in the Company’s 2014 Annual Report. UGI Utilities does not recover a rate of return on its regulatory assets. The following regulatory assets and liabilities associated with Utilities are included in our accompanying Condensed Consolidated Balance Sheets:
 
 
June 30,
2015
 
September 30,
2014
 
June 30,
2014
Regulatory assets (a):
 
 
 
 
 
 
Income taxes recoverable
 
$
111.8

 
$
110.7

 
$
107.2

Underfunded pension and postretirement plans
 
103.2

 
110.1

 
89.2

Environmental costs
 
14.5

 
14.6

 
14.6

Deferred fuel and power costs
 

 
11.8

 
9.4

Removal costs, net
 
19.6

 
16.8

 
15.6

Other
 
5.1

 
4.2

 
6.6

Total regulatory assets
 
$
254.2

 
$
268.2

 
$
242.6

Regulatory liabilities (a):
 
 
 
 
 
 
Postretirement benefits
 
$
19.6

 
$
18.6

 
$
17.5

Environmental overcollections
 

 
0.3

 
1.6

Deferred fuel and power refunds
 
45.6

 
0.3

 

State tax benefits—distribution system repairs
 
10.9

 
10.1

 
9.3

Other
 
1.4

 
3.2

 
1.9

Total regulatory liabilities
 
$
77.5

 
$
32.5

 
$
30.3



(a) Noncurrent regulatory assets are recorded in other assets and regulatory liabilities are recorded in other current and other noncurrent liabilities in the Condensed Consolidated Balance Sheets.

Deferred fuel and power—costs and refunds. Gas Utility’s and Electric Utility’s tariffs contain clauses that permit recovery of all prudently incurred purchased gas and power costs through the application of purchased gas cost (“PGC”) rates in the case of Gas Utility and default service (“DS”) tariffs in the case of Electric Utility. The clauses provide for periodic adjustments to PGC and DS rates for differences between the total amount of purchased gas and electric generation supply costs collected from customers and recoverable costs incurred. Net undercollected costs are classified as a regulatory asset and net overcollections are classified as a regulatory liability.

Gas Utility uses derivative instruments to reduce volatility in the cost of gas it purchases for firm- residential, commercial and industrial (“retail core-market”) customers. Realized and unrealized gains or losses on natural gas derivative instruments are included in deferred fuel costs or refunds. Net unrealized gains (losses) on such contracts at June 30, 2015September 30, 2014 and June 30, 2014 were $(0.7), $(1.4) and $0.7, respectively.

Electric Utility enters into forward electricity purchase contracts to meet a substantial portion of its electricity supply needs. Previous to March 1, 2015, we did not designate these purchase contracts as an NPNS election under GAAP. Therefore, we recognized the fair value of these contracts on the balance sheet with an associated adjustment to regulatory assets or liabilities because Electric Utility is entitled to fully recover its DS costs. At June 30, 2015September 30, 2014, and June 30, 2014, the fair values of Electric Utility’s electricity supply contracts were gains (losses) of $(1.4), $0.3 and $0.8, respectively. These amounts are reflected in current and noncurrent derivative assets and current and noncurrent derivative liabilities on the Condensed Consolidated Balance Sheets with equal and offsetting amounts reflected in deferred fuel and power costs and refunds in the table above. Effective with Electric Utility forward electricity purchase contracts entered into beginning March 1, 2015, Electric Utility has elected the NPNS exception under GAAP and, as a result, the fair values of such contracts are not recognized on the balance sheet (see Note 12).

In order to reduce volatility associated with a substantial portion of its electric transmission congestion costs, Electric Utility obtains financial transmission rights (“FTRs”). FTRs are derivative instruments that entitle the holder to receive compensation for electricity transmission congestion charges when there is insufficient electricity transmission capacity on the electric transmission grid. Because Electric Utility is entitled to fully recover its DS costs, realized and unrealized gains or losses on FTRs are included in deferred fuel and power costs or deferred fuel and power refunds. Unrealized gains or losses on FTRs at June 30, 2015September 30, 2014, and June 30, 2014, were not material.

Distribution System Improvement Charge. On April 14, 2012, legislation enabling gas and electric utilities in Pennsylvania to seek to charge recovery of eligible capital investment in distribution system infrastructure improvement projects became effective. The charge enabled by the legislation is known as a distribution system improvement charge (“DSIC”). The primary benefit to a company from a DSIC charge is the elimination of regulatory lag, or delayed rate recognition, that occurs under traditional ratemaking relating to qualifying capital expenditures, for up to five percent of distribution rates. To be eligible for a DSIC, a utility must have filed a general rate filing within five years of its petition seeking permission to include a DSIC in its tariff. PNG and CPG began seeking permission to include a DSIC in their tariffs in 2014, while UGI Gas has not had a general rate filing within the required time period to be eligible. Beginning on April 1, 2015, PNG was able to include a DSIC charge in its tariff rate in accordance with a PUC order. The impact of the DSIC charge at PNG did not have a material effect on Gas Utility results of operations.