Property, Plant and Equipment, net
9 Months Ended
Sep. 30, 2014
Property, Plant and Equipment, Net  
Property, Plant and Equipment, Net

9. Property, Plant and Equipment, net

        Property, plant and equipment, net consisted of the following:

                                                                                                                                                                                    

 

 

September 30,
2014

 

December 31,
2013

 

 

 

(in millions)

 

Land

 

$

1.6 

 

$

1.6 

 

Building and improvements

 

 

8.1 

 

 

8.1 

 

Plant and equipment

 

 

379.2 

 

 

375.6 

 

Construction in progress

 

 

106.3 

 

 

71.5 

 

 

 

 

 

 

 

 

 

 

495.2 

 

 

456.8 

 

Less: Accumulated depreciation and amortization

 

 

257.3 

 

 

242.7 

 

 

 

 

 

 

 

 

 

$

237.9 

 

$

214.1 

 

 

 

 

 

 

 

 

 

 

 

 

 

        Plant turnarounds—scheduled inspections, replacements and overhauls of plant and equipment at our continuous process manufacturing facility are referred to as plant turnarounds. The expenditures related to turnarounds are capitalized into property, plant and equipment when incurred. The following is a summary of plant turnaround activity:

                                                                                                                                                                                    

 

 

Nine months
ended
September 30,

 

 

 

2014

 

2013

 

 

 

(in millions)

 

Net capitalized turnaround costs:

 

 

 

 

 

 

 

Beginning balance

 

$

22.7

 

$

2.6

 

Additions

 

 

0.3

 

 

18.1

 

Depreciation

 

 

(4.7

)

 

(3.0

)

 

 

 

 

 

 

Ending balance

 

$

18.3

 

$

17.7

 

 

 

 

 

 

 

 

 

 

 

 

 

        Scheduled replacements and overhauls of plant and equipment include the dismantling, repair or replacement and installation of various components including piping, valves, motors, turbines, pumps, compressors, heat exchangers and the replacement of catalyst when a full plant shutdown occurs. Scheduled inspections are also conducted during full plant shutdowns, including required safety inspections which entail the disassembly of various components such as steam boilers, pressure vessels and other equipment requiring safety certifications. Internal employee costs and overhead are not considered turnaround costs and are not capitalized.