EX-99.3 5 c79796exv99w3.htm EXHIBIT 99.3 Filed by Bowne Pure Compliance
Exhibit 99.3
         
(ROWAN COMPANIES, INC. LOGO)   ROWAN COMPANIES, INC.
LAND RIG FLEET AND CONTRACT STATUS
As of January 26, 2009
   
ONSHORE RIGS
                                             
                        Maximum         Contract Status    
        Horsepower     Drilling             Estimated    
Name   Type   Drawworks     Mud Pumps     Depth (feet)     Location   Customer   Duration   Comments
Rig 9
  Diesel electric     2,000       3,200       20,000     Texas   Available        
Rig 12
  SCR diesel electric     1,500       2,600       18,000     Texas   Available        
Rig 14
  AC electric     3,000       3,200       35,000     Texas   Available        
Rig 15
  AC electric     3,000       3,200       35,000     Texas   Forest Oil   May 2009    
Rig 18
  SCR diesel electric     2,000       4,400       25,000     Texas   Anadarko   November 2009    
Rig 26
  SCR diesel electric     2,000       4,800       25,000     Texas   Available        
Rig 29
  Mechanical     1,500       2,600       18,000     Texas   Available        
Rig 30
  AC electric     2,000       2,600       20,000     Texas   BBX   March 2009    
Rig 31
  SCR diesel electric     3,000       4,400       35,000     Texas   EnCana   April 2009    
Rig 33
  SCR diesel electric     1,500       3,200       18,000     Texas   Devon   June 2009    
Rig 34
  SCR diesel electric     2,000       4,400       25,000     Texas   Available        
Rig 35
  SCR diesel electric     1,500       4,400       18,000     Texas   EnCana   June 2009    
Rig 51
  SCR diesel electric     2,000       4,400       25,000     Texas   Newfield   September 2009    
Rig 52
  SCR diesel electric     2,000       4,400       25,000     Texas   Newfield   November 2009    
Rig 53
  SCR diesel electric     2,000       4,400       25,000     Texas   BBX   May 2009    
Rig 54
  SCR diesel electric     2,000       4,400       25,000     Texas   Newfield   October 2009    
Rig 59
  AC electric     2,000       3,200       25,000     Texas   BBX   March 2009    
Rig 60
  AC electric     2,000       3,200       25,000     Texas   Newfield   April 2009    
 
                                  Devon   April 2011    
Rig 61
  AC electric     2,000       3,200       25,000     Texas   Chesapeake   March 2009    
Rig 62
  AC electric     2,000       3,200       25,000     Texas   Newfield   February 2009    
 
                                  Devon   March 2011    
Rig 63
  AC electric     2,000       3,200       25,000     Texas   Anadarko   March 2009    
Rig 64
  AC electric     2,000       3,200       25,000     Texas   ExxonMobil   April 2009    
 
                              TBD   Cabot   April 2010    
Rig 65
  AC electric     2,000       3,200       25,000     Texas   Pioneer   November 2009    
Rig 66
  AC electric     2,000       3,200       25,000     Oklahoma   PetroQuest   December 2009    
Rig 67
  AC electric     2,000       3,200       25,000     Texas   ConocoPhillips   January 2010    
Rig 68
  AC electric     2,000       3,200       25,000     Alaska   Pioneer   March 2010    
Rig 76
  AC electric     2,000       3,200       25,000     Texas   EnCana   April 2011    
Rig 77
  AC electric     2,000       3,200       25,000     Texas   EnCana   March 2010    
Rig 84
  AC electric     2,000       3,200       25,000     Texas   EnCana   June 2011    
Rig 85
  AC electric     2,000       3,200       25,000     Texas   Common Resources   October 2010    
Rig 86
  AC electric     2,000       3,200       25,000     Texas   EnCana   February 2012   Rig is currently on location and will begin operations in late January.
Rig 87
  AC electric     2,000       3,200       25,000     TBD   Common Resources   March 2012   Rig currently under construction with completion expected during Q1 2009.
Rig 88
  AC electric     2,000       3,200       25,000     TBD   EnCana   May 2012   Currently in negotiations with EnCana to substitute existing land rigs for this contract.
Rig 89
  AC electric     2,000       3,200       25,000     TBD   EnCana   August 2012   Currently in negotiations with EnCana to substitute existing land rigs for this contract.
Rig 90
  AC electric     2,000       3,200       25,000     TBD   EnCana   November 2012   Currently in negotiations with EnCana to substitute existing land rigs for this contract.
Rig 91
  AC electric     2,000       3,200       25,000     TBD   EnCana   February 2013   Currently in negotiations with EnCana to substitute existing land rigs for this contract.
Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt. Rigs 51, 52, 53 and 54 were constructed during 2001-02. Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007 and Rigs 84 and 85 in 2008. All but Rig 29 are equipped with a top-drive drilling system. Day rates range from $19,000 to $27,500. Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells. Estimated number of idle days during December 2008 was 114.
ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME. THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company’s filings with the U. S. Securities and Exchange Commission.
Revisions to Fleet Status Report Noted in Bold
(RDC LISTED NYSE LOGO)