0001144204-12-017267.txt : 20120327 0001144204-12-017267.hdr.sgml : 20120327 20120327083120 ACCESSION NUMBER: 0001144204-12-017267 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 4 CONFORMED PERIOD OF REPORT: 20120327 ITEM INFORMATION: Regulation FD Disclosure ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20120327 DATE AS OF CHANGE: 20120327 FILER: COMPANY DATA: COMPANY CONFORMED NAME: ROWAN COMPANIES INC CENTRAL INDEX KEY: 0000085408 STANDARD INDUSTRIAL CLASSIFICATION: DRILLING OIL & GAS WELLS [1381] IRS NUMBER: 750759420 STATE OF INCORPORATION: DE FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-05491 FILM NUMBER: 12715818 BUSINESS ADDRESS: STREET 1: 2800 POST OAK BLVD. STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 BUSINESS PHONE: 7136217800 MAIL ADDRESS: STREET 1: 2800 POST OAK BOULEVARD STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO INC DATE OF NAME CHANGE: 19711110 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO DATE OF NAME CHANGE: 19671112 8-K 1 v307193_8k.htm FORM 8-K

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

 

Date of Report (Date of earliest event reported): March 27, 2012

 

ROWAN COMPANIES, INC.

(Exact name of registrant as specified in its charter)

               

 DELAWARE  1-5491  75-0759420
 (State or other jurisdiction  (Commission file Number)  (IRS Employer
 of incorporation)    Identification No.)

                               

            

 2800 POST OAK BOULEVARD  
 SUITE 5450  
 HOUSTON, TEXAS  77056
   (Address of principal executive offices)    (zip code)

 

(713) 621-7800

(Registrant’s telephone number, including area code)

 

Check the appropriate box below if the Form 8-K is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

 

¨ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

 

¨ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 14a-12)

 

¨ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240-14d-2(b))

 

¨ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240-13e-4(c))

 

1
 

 

Item 7.01. Regulation FD Disclosure

 

The following information is furnished pursuant to Item 7.01:

 

The Monthly Fleet Status Report for Rowan Companies, Inc., as of March 27, 2012, is attached as Exhibit 99.1.

 

Item 8.01. Other Events

 

Rowan Companies, Inc. confirmed that an incident occurred on Sunday, March 25, 2012 on the Total E&P UK (“Total”) wellhead platform in the Elgin Field in the North Sea, resulting in a gas release.  Total is working to control the release.  The Rowan Viking has been working on the platform, and all Rowan and Total personnel have been safely evacuated.

 

Item 9.01. Financial Statements and Exhibits

 

(c) Exhibits

 

Exhibit    
Number   Exhibit Description
     
99.1   Monthly Fleet Status Report at March 27, 2012

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

    ROWAN COMPANIES, INC.
     
  By: /s/ William H. Wells
    William H. Wells
    Senior Vice President – CFO and Treasurer
    (Principal Financial Officer)           

  

Dated: March 27, 2012

 

2
 

 

EXHIBIT INDEX

 

 

EXHIBIT DESCRIPTION

 

Exhibit    
Number   Exhibit Description
     
99.1   Monthly Fleet Status Report at March 27, 2012

 

3

EX-99.1 2 v307193_ex99-1.htm EXHIBIT 99.1

 

  ROWAN COMPANIES, INC.
MONTHLY FLEET STATUS REPORT AS OF MARCH 27, 2012

Revisions to Fleet Status Report Noted in Bold
 
     

  

                    Contract Status  
    Depth (feet)   Year in           Day Rate   Estimated    
Rig Class / Name   Water   Drilling   Service   Location   Customer   (in thousands)   Duration   Comments ($ in thousands)
                                 
Ultra Deepwater Drillships                      
GustoMSC 10,000                       
Rowan Reliance   12,000   40,000   2015       Available           Rig is contracted for construction by HHI with expected delivery in late 2014
Rowan Resolute   12,000   40,000   2014       Available           Rig is contracted for construction by HHI with expected delivery in mid 2014
Rowan Renaissance   12,000   40,000   2014       Available           Rig is contracted for construction by HHI with expected delivery in late 2013
                                 
Cantilever Jack-up Rigs:                      
N-Class                      
Rowan Norway * 400   35,000   2011   UK N. Sea   Xcite Energy   Low 250s   October 2012   Rig commenced initial term of 240 days in mid March 2012. Contract has a one year priced option in the low 250s. Production fee of $1 per barrel of oil produced is also payable during the initial term. Xcite has agreed to release the rig following the initial term. Exercise date of the previously reported one year priced option in the low 250s has been deferred to eight months following the date operations under the initial term conclude. Any resulting rig requirement to be filled by an available rig selected by Rowan from the Super Gorilla Class or N-Class. Rig delivery to be within a nine month window commencing fourteen months from the option exercise date.
                Norway   ConocoPhillips   Low 350s   June 2016   Rig is expected to enter the shipyard in November 2012 for approximately 60 days prior to commencing a three and one-half year contract. The first 30 days in the shipyard is at zero day rate and the remainder are at a reduced day rate in the high 330s. The contract includes two priced options estimated at one year each. The first is at a day rate in the low 360s and the second is at a day rate in the low 370s.
Rowan Stavanger * 400   35,000   2011   Norway   Talisman Norway   High 330s   May 2012   Rig is conducting accommodations work
                        Low 350s   September 2012    
                      Mid 310s   December 2012    
                 UK N. Sea       Low 240s   June 2013    
                    Available       June 2014    
                    Lundin   Mid 340s   August 2015   Rig is contracted for 15 wells estimated to commence operations in the Norwegian sector of the North Sea in Q2 2014.  In the event the contract extends beyond 1000 days, the day rate increases to the mid 360s for the first 500-day extension and to the mid 370s for the second 500-day extension.  The Company may substitute a comparable rig depending on availability
                        Mid 350s   November 2016  
                               
Rowan Viking * 400   35,000   2011   UK N. Sea   Total UK   Low 220s   January 2013    
S116-E EXL                       
Rowan EXL IV   350   35,000   2011   Malaysia             Rig is mobilizing to Malaysia under a Letter of Award from Carigali Hess for approximately 31 months commencing May 2012 at a day rate in the low 150s. Rig was idle for 28 days during the month of February 2012.
Rowan EXL III   350   35,000   2011   Gulf of Mexico   McMoRan   Low 140s   March 2012    
Rowan EXL II   350   35,000   2011   Trinidad   BP Trinidad   Mid 130s   February 2014    
Rowan EXL I   350   35,000   2010   Gulf of Mexico   McMoRan   Low 140s   April 2012    
240C                       
Joe Douglas   375   35,000   2012   Gulf of Mexico   Rooster Petroleum   Mid 120s   May 2012   Rig has a verbal commitment from McMoRan for one ultra deep gas well in the Gulf of Mexico (approximately one year) at a day rate in the low 180s.  
Ralph Coffman   375   35,000   2009   Gulf of Mexico   Energy XXI   Mid 120s   May 2012    
                Egypt   BG Egypt   Mid 220s   September 2014   Rig is expected to enter the shipyard in the Gulf of Mexico in May 2012 for approximately 45 days at a reduced day rate in the low 180s, and in the low 60s if the shipyard time goes longer. Rig is expected to commence operations in Egypt in September 2012. The contract includes a priced option for one additional well with an expected duration of 270 days in the low 200s.
Rowan-Mississippi   375   35,000   2008   Middle East   Saudi Aramco   Low 200s   June 2014   Company may be subject to penalty of up to one-half of the day rate for every day the rig was late beyond June 15, 2011, or approximately $21,000 per day, which is reflected in the indicated day rate. The Company has submitted a formal appeal to Aramco to reverse the penalty. The contract includes a priced option for one additional year in the mid 190s.
225C Tarzan                       
J.P. Bussell   300   35,000   2008   Vietnam   Petronas Carigali   High 120s   July 2012    
                        Mid 120s   October 2012    
Hank Boswell   300   35,000   2006   Middle East   Saudi Aramco   High 120s   May 2014   Rig is expected to enter the shipyard for approximately 60-90 days in Q4 2012 for customer-required well control equipment upgrades. No day rate revenue will be recognized while the rig is in the shipyard.
Bob Keller   300   35,000   2005   Middle East   Saudi Aramco   High 120s   May 2014   Rig will enter the shipyard for another 60-90 days in Q2/Q3 2012 for customer-required well control equipment upgrades.  No day rate revenue will be recognized while the rig is in the shipyard
Scooter Yeargain    300   35,000   2004   Middle East   Saudi Aramco   High 120s   August 2014   Rig is expected to enter the shipyard for approximately 90-120 days in early Q4 2012 for customer-required well control equipment and mud pump upgrades. No day rate revenue will be recognized while the rig is in the shipyard.
224C Super Gorilla XL                      
Bob Palmer    550   35,000   2003   Middle East   Saudi Aramco   Low 270s   June 2014   The indicated day rate reflects an approximate $6000 per day penalty for late delivery of the rig. The Company has submitted a formal appeal to Aramco to reverse the penalty. The contract includes a priced option for one additional year in the mid 290s.
219C Super Gorilla                      
Rowan Gorilla VII    400   35,000   2002   UK N. Sea   Apache   Low 180s   May 2012   The contract includes two (2) six-month options at mutually–agreed rates with a cap of 120% of the current day rate.  
Rowan Gorilla VI    400   35,000   2000   UK N. Sea   BG   Low 200s    December 2012   The contract includes priced option for one well estimated for 300 days in the low 220s
                Norway   ConocoPhillips   Low 350s   September 2016   Following the release of the rig from BG, it is expected to enter the shipyard for approximately 60 days prior to commencing a three and one-half year contract in late Q1 2013.  The first 30 days in the shipyard are at zero day rate and the remainder is at a reduced day rate in the high 330s.  The contract includes two priced options estimated at one year each.  The first is at a day rate in the low 360s and the second is at a day rate in the low 370s
Rowan Gorilla V    400   35,000   1998   UK N. Sea   Total   Low 180s   June 2012    
                        Mid 200s    March 2013    
200C Gorilla                      
Rowan Gorilla IV    450   35,000   1986   Gulf of Mexico    Walter Oil & Gas   Mid 120s   June 2012   Rig is expected to enter the shipyard at the conclusion of the current contract for life enhancement upgrades through the remainder of 2012.  Rig was idle for 11 days during the month of February 2012
                                We are in discussions with Pemex regarding the application and payment of the day rate charges for approximately 60 days of downtime occurring during August through November 2011. No day rate revenue was recognized during the periods of downtime.
Rowan Gorilla III    450   30,000   1984   Trinidad   Niko Resources / Bayfield Energy   Low 130s   November 2012   Contract is for a firm term of eight wells with an expected duration of one year.  Customer has the option to extend the contract for up to nine additional wells with an expected duration of one year.  The day rate for wells spud in the second year of the contract is the low 130s.  
Rowan Gorilla II    350   30,000   1984   Malaysia   Petronas Carigali   High 110s   November 2012    
116C                      
Rowan-California       300   30,000   1983   Middle East   Wintershall   Mid 70s   August 2012   Rig commenced operations in late March 2012.  
Cecil Provine    300   30,000   1982   Gulf of Mexico   Apache   Mid 70s   June 2012   Rig will undergo approximately two weeks of shipyard time in April 2012 for inspections and upgrades during which time no day rate revenue will be recognized. 
Gilbert Rowe    350   30,000   1981   Middle East   Shipyard       December 2012    Rig is in the shipyard for upgrades and was idle for the month of February 2012.
                    Saudi Aramco   Low 120s   December 2015  
Arch Rowan    350   30,000   1981   Middle East   Saudi Aramco   Low 80s   November 2014   Rig was in the shipyard for contractual upgrades for 17 days during the month of February 2012. Company may be subject to a penalty of up to one-half of the day rate for every day beyond November 13, 2011, which is reflected in the indicated day rate. Any such penalty would be recognized ratably over the remaining contract period.
Charles Rowan    350   30,000   1981   Middle East   Saudi Aramco   Low 80s   November 2014   Rig was in the shipyard for contractual upgrades during the month of February 2012. Rig commenced operations in mid March 2012. Company may be subject to a penalty of up to one-half of the day rate for every day beyond November 13, 2011, which is reflected in the indicated day rate. Any such penalty would be recognized ratably over the remaining contract period.
Rowan-Paris    350   30,000   1980   Middle East   Available           Rig is in the shipyard. Company is considering possible upgrades. Rig was idle during the month of February 2012.
Rowan-Middletown    350   30,000   1980   Middle East   Saudi Aramco   Low 80s   November 2014   Rig was in the shipyard for contractual upgrades during the month of February 2012. Rig is expected to commence operations in mid April 2012. Company may be subject to a penalty of up to one-half of the day rate for every day beyond November 13, 2011, which is reflected in the indicated day rate. Any such penalty would be recognized ratably over the remaining contract period.
Conventional Jack-ups                      
116 Slot                      
Rowan-Juneau    250   30,000   1977   Gulf of Mexico   Available           Rig was idle during the month of February 2012.
84 Slot                      
Rowan-Alaska    350   30,000   1975   Gulf of Mexico   Available           Rig was idle during the month of February 2012.
Rowan-Louisiana   350   30,000   1975   Gulf of Mexico   McMoRan   Low 70s   May 2012   Contract includes a priced option for one additional well estimated for 220 days at a day rate in the low 80s.  

 

"*" Denotes Keppel unit design constructed at Keppel FELS shipyard in Singapore.  Rig Class denotes LeTourneau, Inc. hull number. 200-C is a Gorilla class unit designed for extreme hostile environment capability. 219-C is a Super Gorilla class unit, an enhanced version of the Gorilla class, and 224-C is a Super Gorilla XL design.  225-C is a Tarzan Class unit.  240-C is LeTourneau's latest jack-up design.  Estimated contract durations reflect either stated drilling periods or expected time required for the contracted well or wells. Rowan EXL is an enhanced version of the Super 116E class.  Unless otherwise indicated, all day rates include estimated amortization of contract mobilization/modification revenues. 

 

ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.  THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE. 

 

This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.

 

 

 

GRAPHIC 3 image_001.jpg GRAPHIC begin 644 image_001.jpg M_]C_X``02D9)1@`!`0```0`!``#_VP!#``@&!@<&!0@'!P<)"0@*#!0-#`L+ M#!D2$P\4'1H?'AT:'!P@)"XG("(L(QP<*#7J#A(6&AXB)BI*3E)66EYB9FJ*CI*6FIZBIJK*SM+6VM[BYNL+#Q,7& MQ\C)RM+3U-76U]C9VN'BX^3EYN?HZ>KQ\O/T]?;W^/GZ_\0`'P$``P$!`0$! M`0$!`0````````$"`P0%!@<("0H+_\0`M1$``@$"!`0#!`<%!`0``0)W``$" M`Q$$!2$Q!A)!40=A<1,B,H$(%$*1H;'!"2,S4O`58G+1"A8D-.$E\1<8&1HF M)R@I*C4V-S@Y.D-$149'2$E*4U155E=865IC9&5F9VAI:G-T=79W>'EZ@H.$ MA8:'B(F*DI.4E9:7F)F:HJ.DI::GJ*FJLK.TM;:WN+FZPL/$Q<;'R,G*TM/4 MU=;7V-G:XN/DY>;GZ.GJ\O/T]?;W^/GZ_]H`#`,!``(1`Q$`/P#W^BBD9E12 MS$!0,DD\"@#.UO7M-\.Z=#XZZ2;ME_L>^^S`X$H M92V/7;V_.N3^(NN1^+_&JV=K<"73-/3:&0Y5F_B(/Y+GVK,)MK.-(PJH&.U( MT7)8^@`Y)IUJU/#N--P2E:*ZG9>(/C1]NM39>%[.X6ZE MX^T7"@>6.Y"Y//N>!7GDVEZA>S_:[W59I;LG/F,S,0?]XG/Y5KO:7-L-UQ%9 MZ8K#/^GSB)R/^N:@O^8%0^;:\?\`%0Z;D]-MI<,/SVTY3QC2="'(O.S;)4:% M_P![+F?W(W?#'Q/U7PH?L'B%9M1LL?N9U;,B>V3]X>QY%=DOQM\)G&4U$?\` M;N./_'J\TBAEN_EM+C2M2S_RSM[G9(?HDH4G\*A\JV^T/;36@@N%^]!/#L^^'/%FC>*K9YM)NQ*8SB2-E*NG MID'^=;=?,.GZA/X+\2VFM6.[[/NV3Q`\,A^\O]1[BOI33]1M-5L8KVQN$GMY M5#*Z'(__`%^U4U"4%5I_"_P\F$7)2<)[HM4445!9GZYJL.AZ'>ZI.,QVL32% M1_$1T'XG`KYSO-;\0>,Y)9]3U.9+1F.VVB8K&/8*.N/4YKW/XD0I/\/-:21P M@%OO!/J""!^)&*\&TN=(="29@0L88D#N\VEZ>A,81J5>6>R5 MRS8Z.QKT<+A(T:;J5G>3W?_![?\/Z6TJSQXX^\5^[SRXJ[!#;.XN],N&MKA>DULVTCV(]/:JUYI_]JB< MI!'!J\*&5XXEVQWD8Y9T'\+@X]B.?QKDQM.K@)^TH/W6]5T^XWP\H8F/+4W6SZGL7PV\7R^+O#AFN]HO MK:3RIRHP&XR&QVR/U!KLJ\D^!$48TC6;@.-[W**4_N@+D?GN/Y5ZW6N(BHU6 MH["HR?^`@]/4UC:;:0#4=+LRN M;=9Q)(#W2,&0Y^NVLI=.N/#?BF]TG4%*3`E59OXQG*L#Z$2Q#%M:G[%:+V6*/CCZG)/N37+^'9DM_$6DS2'")=Q%B>PW"NB MLXV@>]MI.)(;N5''ON-=N=RE'#VCY+Y?TD<^7).K=F!KW_(4/^XM36.AQW=E M'.9W4OG@*"!S4.O?\A0_[BU7BO;^"W41RRI".`0O`_'%53A7G@:2H3479;^G MHR)2IQQ$W5C=:DEL9=,UD1;LD.$;'1@:Z._>6V2._MSMN;)Q-$WT/(^A%<_H MT`N]3#RODI^\(/5C70ZBXCTVY9NGEFO.S*HXXRE;6:M?S_K]3KPD;X>=_A=[ M&!XCM(+77+E;9=MK,%N(5'\*2*'`_#./PKI'F-S+I]ZW+7VG1M(?62(F)C^( M5:P?$X,>I6MNW^L@L+:)_9A&"1^M;,"E=.\/(?O"QFD/T:#\S M7SYKS>9%!9Q*9+B60;(U&2>P_,G%;O\`PIKQ/Z0?]]BN3"6KX>-2O*SU5^Z1 MO6;I590I*Z_(]-^*WAJSUCPC=:@R*E]I\9EBFZ':.64GT(_6O'--O;A+"SU$ M`O/:2K,OJ^P\C\1D5[Q\0[.XOO`&LP6H)E,!8*.I"D,1^0->!Z#=)-IZQ`C? M'P5]1V-<^*E*.&C42ORR7R7^3-:23K.#TYD4];TFWL=7N=CN;21EFM6CP,PR M?,C?AG'U!K8N;GS@->&2DVV'4E`P89P,+(1_=<#.?7(I_P!FCO(8=-E9(YX7 M+:9/(<+EN6MW/8$\H3P#QWK+LYKO2[B0KF"XBW0W$%V-P*9RRRJ?O`^G;@CF MNN=6&(I7D[PE^']?G^.$82I3LM&AFJ:7*D(MX[2TM^;>UB)VKGJV>K2>YZ]!BNN-*K5FJ^(2`OJH_D*Z2X:)M0N&M2'M;2-+* MV8='6(8+#_>;P)/I1*\.G M6.>%CC7"CU]!7/F6)DZ<0!ZH_`UZ1164*DH. M\6:2A&6Z/F*:SOM(UN[\.ZUMEEC'#=0ZXR"#W!'-69]MS$D.IP2WL<8"Q743 M`74*CHN3Q*H]&Y]#7I/Q2\"7GB!K;6=%4-J5LNQX@0#*G48)[@Y^H->4PW&M M^>;.30KR2\4X*+"X.?<8I3I5E/VV$MK\4=%KWZ;^1*G3M[.O?39BKI1D9Q8Z MM9WI?(\NZD^RSJ#VVOA?R)H'AK6S&!_8[DA0N]9(B"`I'7=ZFFW<]]8S)#KN MBS6B.<`SPD#]1S^%3K8Z;(OF+;VS*><@#%36Q/L/XU*U^SNG]UD.G1]I_#G> MWZN)/OL=SNQZL M2>I/]:]#T'X+)/%%=^)M1GEF8!FMH&P%]BW4_ABLOX?^`M8U7Q!;:_KULUM9 MVQ$D,,HVM(P^[\O4*#SSUKW.JIQ>&CRIWF]9/]+@[5G=KW>B*VGZ?::580V- MC`D%M"NU(T'`%6:**S;N:!1110`4444`4=7TBPUW39=/U*W2>VD'*MV/8@]B M/6OFSQ/X8LM%\8#2+66X-LSXR[`L!]<8_2BBO1P#=VCCQ:5DSWSP;X0TCPMI IB_V="WG3J&EGE(:1_;.!Q["NEHHKAJMN;;.J"2BK!1114%!1110!_]D_ ` end GRAPHIC 4 image_002.jpg GRAPHIC begin 644 image_002.jpg M_]C_X``02D9)1@`!`0```0`!``#_VP!#``@&!@<&!0@'!P<)"0@*#!0-#`L+ M#!D2$P\4'1H?'AT:'!P@)"XG("(L(QP<*#7J#A(6&AXB)BI*3E)66EYB9FJ*CI*6FIZBIJK*SM+6VM[BYNL+#Q,7& MQ\C)RM+3U-76U]C9VN'BX^3EYN?HZ>KQ\O/T]?;W^/GZ_\0`'P$``P$!`0$! M`0$!`0````````$"`P0%!@<("0H+_\0`M1$``@$"!`0#!`<%!`0``0)W``$" M`Q$$!2$Q!A)!40=A<1,B,H$(%$*1H;'!"2,S4O`58G+1"A8D-.$E\1<8&1HF M)R@I*C4V-S@Y.D-$149'2$E*4U155E=865IC9&5F9VAI:G-T=79W>'EZ@H.$ MA8:'B(F*DI.4E9:7F)F:HJ.DI::GJ*FJLK.TM;:WN+FZPL/$Q<;'R,G*TM/4 MU=;7V-G:XN/DY>;GZ.GJ\O/T]?;W^/GZ_]H`#`,!``(1`Q$`/P#V'1-$TE]! MTYVTNR9FM8B2;=,D[1[5>_L+1_\`H%6/_@.G^%&A?\B]IG_7I%_Z`*T*`,_^ MPM'_`.@58_\`@.G^%']A:/\`]`JQ_P#`=/\`"M"JYOK0'!NH/^_@H`K_`-A: M/_T"K'_P'3_"C^PM'_Z!5C_X#I_A5]75U#*P93R"#D&H5O+5F"K/3;-''EX98%!'SK[5 MUM8'C;_D4+[_`+9_^C%H`OZ%_P`B]IG_`%Z1?^@"M"L_0O\`D7M,_P"O2+_T M`5H4`%?+?@'P5HOC'5]?76=3FLA:S9B,!'(R!0!T7PON[C0_B5J_A;3]3?4M$$4I$F[<@ M*@8<=AR2IQP:P/A?\.M/\>0:S)>7UY:R6GM77?`::RM[? MQ!I,UG'#K5NQ,LA'SO&,KM^BL#^8J#X!ZII^FVGB1KZ^MK4&>-@9I53(`;)& M30!<^'.M:UX4^(MYX`UJ^>]M@K&UED8DKA=XP3S@KGCL1Q6/HFFO\:?'VKW> MLW=P-$T\[8+>)\#!)"@>F0I8GJ:G\/7">-_VA+K6=/S)IUI&W[X#@J(_+4_B MQ./85+\$KN+PYXM\2>&]2=;>\:0>6)#MWE"P('O@@CVH`V/#'@CQ'X"^)8AT M1;BY\*7*#SC+,N(\@]L\LI`Y`Y!KV&N'D^)=@WQ$@\(65G)>RN/WEU#(I2(X M)8$>P`S]<5W%`!6!XV_Y%"^_[9_^C%K?K`\;?\BA??\`;/\`]&+0!?T+_D7M M,_Z](O\`T`5TS_KTB_]`%&O_P#(N:G_ M`->DO_H!H`Y[_A:W@4C_`)&2S_\`'O\`"N8\*:S\+?!UU?W&E^)5+WS!IO.D M9QD$GCY1C[QKQCP'I.EZP-934K-I_L>ERWL)69H\.F,*<=0<_6H?`6EV&O\` MC73M*U&W:2UO&9&"2%"GRE@01].]`'M-OJ?PKM/&5QXIMO$HBO[C<)425O*? M<,'*[>_7KUYKF3X8^"3-N;Q+.><\W+?_`!%<=X;\-6^O1>(KFQTU;Z^L77[) MI/VAEWQEB&?.0SX`'`/4_053LU\/2:]_9SZ)=![G4888XYYV1K6,X5U..6;< M>,]A0![MX<\6?"WPGIYLM&U>QMXV.YV^=GD/JS$9-8?BZ3X1>,KL7M]K\,%\ M`%-S:NR,X'3=\I!QZ]:\JU^V\/Z=XGNM%@TEU:TU;[/O-RY\Z#)4@\_*V<'( MJ[XX\,V?AZ?6X8M`N;>UMKB.&ROWGYN&9WV^@^7`'T%=G9?$GP=J-]!96>OVLUS.XCBC7=EF/0#BOGK M7K#PSH47AN6719I(-3TZ.[N3'>N'C+'!V9R.,9P14UIX<'A7XTZ'IB7!N(/M MMO-!*1@M&_(R/7L?I0!]4U@>-O\`D4+[_MG_`.C%K?K`\;?\BA??]L__`$8M M`%_0O^1>TS_KTB_]`%)K_P#R+FJ?]>DO_H!I="_Y%[3/^O2+_P!`%6+^6 MKJ6Y3?`D3M(F,[E`)(QWXH`^1/`^O:3H0U5]3DNO].TZ2Q06\2OMWX^&O%.BZG')J$Z67F27$AA56E8@A55=^``#USDUZUX<\4?"SQ-K= MMI%GX:@BN+C(B,]A&JD@9QGGGBMCQ$_P]\,Z]IFCWWAFU-SJ+!83%8HRC+!? MF/;DT`?/UE>Z)#/>?9W\$66\L]490PP<\@@D=<\5:U/Q38ZU\ M21XDN4EM[07,4Q2-5:1A&%QD9`W-MYYXS7MD&I_#>7QJWA27PQ;VVI"5H@9K M",1LP&1AO<=/6M;Q99^`/!FC_P!IZKX>T\1&01HD5FC.['T'T!/X4`?.>MZK MI>J>/+G6(YKE+&YO?M3;HAYB9;<5V[L'TSFM+Q3X@\/Z[JVN:E%=:HQU`B2& MSDB5(XY0``S,'.=HW8`'>O9-3U;X8Z-X>L-7U'P_:6XOX_-M[5K%#.Z?WMHZ M#IR3WK-\/>+?A?XBUFVTJ/PJEM=73[(?/T]`KG&>HSB@#S#7->\*ZS#X?6:3 M5'32;%+22%8$3[1M.>&WG:#TZ&G:-XAN/$_QBT35;E8XFEU"!$BC/RQHO"J/ M7`[UZQXIU[X9^$-;;2=1\+PM<+&LA,-A&RX;..>/2H/#OC?X9ZEXCT^STOPW MY%_+,%@E.GHFQ^QR#Q0![#6!XV_Y%"^_[9_^C%K?K`\;?\BA??\`;/\`]&+0 M!?T+_D7M,_Z](O\`T`4:_P#\BYJ?_7I+_P"@&C0O^1>TS_KTB_\`0!2:_P#\ MBYJ?_7I+_P"@&@#Y)T_2KJS\&6GC"P9EN+#5!"Y'\/RJT;?GD'ZBO1/'^LP> M(?&7P[U>V_U5VL4F/[I\Y^M_%V@Z-?9#:9J:Q!#U0F4;A],C/XT`>L_';PQ-";'QGIF8[FT= M([ATZC!S')^!X_$5B/J<_P`:O'.A6!B>/2M/MEGOEZ#?QYGYG"CVS7MOC"*. M;P7K<*?[.%WI,"0JJ,N8E,;$^6W]T'.1VKT/PA\0_"?C>:"&**.WU2/YX[6ZC7 M>".\;=#CVY]JU=>\>>%-%U5]$UR_BMYGA$A2>,E'1B1UP1V/!KP?Q#%X?O\` MXK:,OP^Y9YHGD^S`B-9`^24ST`7.>U`&M\2-2M='^/5AJ5\&-I:I;2S!5W': M-V>.]>E>&_BEX.\2Z];Z5I<4XO)MQC+VFP?*"3SVX%><_$*[LK']H'3;O47C M2RA%L\[2#*A/FSD>E>GV'C_X=27T,=CJFF"Y=ML?EPE3D^^WB@#N*P/&W_(H M7W_;/_T8M:NGZC::I9K=V4ZS0,2`ZY[=>M97C;_D4+[_`+9_^C%H`OZ%_P`B M]IG_`%Z1?^@"KLL4<\+PRH'CD4JZGH0>"*I:%_R+VF_]>L7_`*`*T*`,[1]! MTKP_;/;:18064+MO9(5V@MC&?R`JG/X+\-7.K'59M$LGOS()3<&(;]XQAL^O M`K=HH`CN((KJWEMYXUDAE4HZ,,AE(P0:H:-X>T?P]%+%I&G6]E'*P:184VAB M!@$UIT4`8^L^%=`\0,K:OI%I>.HP'EC!8#TW=<4:+X4T#PZ7;2-)M+-WX9XH MP&(],]<5L44`8>J>#?#>MWIO=3T6SN[DJ%,LL8+8'09JO;_#_P`(VMQ'<0>' MM/CEC8,CB$94^M=)10!#:VEO8VZP6L*0Q+G"(,`5C>-O^10OO^V?_HQ:WZP/ M&O/A&^_[9_\`HQ:`/&+/_CQM_P#KDO\`(5/110`4444`%%%%`!1110`4444` 3%4=8_P"05/\`\!_]"%%%`'__V3\_ ` end