0001144204-11-042011.txt : 20110726 0001144204-11-042011.hdr.sgml : 20110726 20110726090036 ACCESSION NUMBER: 0001144204-11-042011 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 5 CONFORMED PERIOD OF REPORT: 20110726 ITEM INFORMATION: Regulation FD Disclosure ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20110726 DATE AS OF CHANGE: 20110726 FILER: COMPANY DATA: COMPANY CONFORMED NAME: ROWAN COMPANIES INC CENTRAL INDEX KEY: 0000085408 STANDARD INDUSTRIAL CLASSIFICATION: DRILLING OIL & GAS WELLS [1381] IRS NUMBER: 750759420 STATE OF INCORPORATION: DE FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-05491 FILM NUMBER: 11986028 BUSINESS ADDRESS: STREET 1: 2800 POST OAK BLVD. STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 BUSINESS PHONE: 7136217800 MAIL ADDRESS: STREET 1: 2800 POST OAK BOULEVARD STREET 2: SUITE 5450 CITY: HOUSTON STATE: TX ZIP: 77056-6127 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO INC DATE OF NAME CHANGE: 19711110 FORMER COMPANY: FORMER CONFORMED NAME: ROWAN DRILLING CO DATE OF NAME CHANGE: 19671112 8-K 1 v229544_8k.htm Unassociated Document

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 8-K

CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): July 26, 2011

ROWAN COMPANIES, INC.
(Exact name of registrant as specified in its charter)

DELAWARE
 
1-5491
 
75-0759420
(State or other jurisdiction
 
(Commission file Number)
 
(IRS Employer
of incorporation)
  
 
  
Identification No.)

2800 POST OAK BOULEVARD
   
SUITE 5450
   
HOUSTON, TEXAS
 
77056
(Address of principal executive offices)
  
(zip code)

(713) 621-7800
(Registrant’s telephone number, including area code)

Check the appropriate box below if the Form 8-K is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

¨ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

¨ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 14a-12)

¨ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240-14d-2(b))

¨ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240-13e-4(c))
 
 
 

 

Item 7.01. Regulation FD Disclosure

The following information is furnished pursuant to Item 7.01:

The Offshore and Land Rig Fleet and Contract Status Reports for Rowan Companies, Inc., each as of July 26, 2011, is attached as Exhibit 99.1 and 99.2.

Item 9.01. Financial Statements and Exhibits

(c) Exhibits

Exhibit
   
Number
 
Exhibit Description
     
99.1
 
Offshore Rig Fleet and Contract Status at July 26, 2011
     
99.2
 
Land Rig Fleet and Contract Status at July 26, 2011

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 
ROWAN COMPANIES, INC.
   
 
By:
/s/ William H. Wells
   
  William H. Wells
   
Senior Vice President – CFO and Treasurer
   
(Principal Financial Officer)

Dated: July 26, 2011
 
 
2

 

EXHIBIT INDEX

EXHIBIT DESCRIPTION

Exhibit
   
Number
 
Exhibit Description
     
99.1
 
Offshore Rig Fleet and Contract Status at July 26, 2011
     
99.2
 
Land Rig Fleet and Contract Status at July 26, 2011
 
 
3

 
 
EX-99.1 2 v229544_ex99-1.htm Unassociated Document
 
ROWAN COMPANIES, INC.
OFFSHORE RIG FLEET AND CONTRACT STATUS
As of July 26, 2011
 

 
OFFSHORE RIGS
                     
Contract Status
   
       
Depth (feet)
 
Year in
         
Day Rate
 
Estimated
   
Name
 
Class
 
Water
 
Drilling
 
Service
 
Location
 
Customer
 
(in thousands)
 
Duration
 
Comments ($ in thousands)
Ultra Deepwater Drillships:
                                   
Drillship TBN/Hull 2560
 
GustoMSC 10,000
 
12,000
 
40,000
 
2014
     
Available
         
Rig is contracted for construction by HHI with expected delivery in mid 2014.
Drillship TBN/Hull 2559
 
GustoMSC 10,000
 
12,000
 
40,000
 
2014
     
Available
         
Rig is contracted for construction by HHI with expected delivery in late 2013.
Cantilever Jack-up Rigs:
                                   
Rowan EXL IV
 
S116-E
 
350
 
35,000
 
2012
     
Available
         
Rig is under construction and expected to be available in October 2011.
Joe Douglas
 
240-C
 
375
 
35,000
 
2012
 
Gulf of Mexico
 
McMoRan
         
Rig is under construction with delivery expected in Q4 2011. Received a verbal commitment from McMoRan for one ultra deep gas well in the Gulf of Mexico (approximately one year) at a day rate in the low 180's commencing early Q1 2012.
Rowan Norway
*
N-Class
 
400
 
35,000
 
2011
 
UK North Sea
 
Xcite Energy
 
Low 250s
 
June 2012
 
Rig was delivered in late June 2011.  Contract is for combined drilling and production operations with an initial term of 240 days followed by a one year priced option in the low $250s. Production fee of $1 per barrel of oil produced is also payable during the initial term. Customer was required to provide security for the initial term totaling $60 million and escrowed the final installment of $30 million in early July 2011. Rig is expected to commence operations in November 2011.
Rowan EXL III
 
S116-E
 
350
 
35,000
 
2011
 
Gulf of Mexico
 
McMoRan
 
Low 140s
 
May 2012
   
Rowan Stavanger
*
N-Class
 
400
 
35,000
 
2011
 
North Sea
 
Talisman Norway
 
Low 340s
 
December 2011
 
Rig is conducting accommodations work in the Norwegian sector of the North Sea.
                           
Mid 270s/ Low 350s
 
October 2012
 
Rig will drill three wells in the Norwegian sector of the North Sea at the higher day rate shown, and one well in the UK sector at the lower day rate shown. The combined duration for the four wells is expected to be 306 days commencing December 2011.
                   
Norway
 
Lundin
 
Mid 340s
Mid 350s
 
August 2015
November 2016
 
Rig received a Letter of Award for 15 wells estimated to commence operations in the Norwegian sector of the North Sea in Q2 2014.  The Company may substitute a comparable rig depending on availability.
Rowan Viking
*
N-Class
 
400
 
35,000
 
2011
 
UK North Sea
 
Total UK
 
Low 220s
 
January 2013
   
Rowan EXL II
 
S116-E
 
350
 
35,000
 
2011
 
Trinidad
 
BP Trinidad
 
Mid 130s
 
February 2014
 
Rig was idle for six days during the month of June 2011.
Rowan EXL I
 
S116-E
 
350
 
35,000
 
2010
 
Gulf of Mexico
 
McMoRan
 
Low 140s
 
September 2011
   
Ralph Coffman
 
240-C
 
375
 
35,000
 
2009
 
Gulf of Mexico
 
McMoRan
 
Low 180s
 
December 2011
 
Verbal commitment received from McMoRan for one ultra deep gas well in the Gulf of Mexico (approximately one year) at a day rate in the low 180's extimated to commence Q1 2012 as transferred from Rowan Mississippi to Ralph Coffman
J.P. Bussell
 
225-C
 
300
 
35,000
 
2008
 
Vietnam
 
Petronas Carigali
 
High 120s
 
May 2012
 
Rig is mobilizing to Singapore and expected to enter the shipyard in Q3 2011 for modifications/upgrades for Petronas on a 240 day term contract expected to commence in Q4 2011.  Rig was idle during the month of June 2011.
Rowan-Mississippi
 
240-C
 
375
 
35,000
 
2008
 
Middle East
 
Saudi Aramco
 
Low 220s
 
June 2014
 
Rig is in the shipyard in the GOM undergoing modifications/upgrades for Saudi Aramco and is expected to depart for the Middle East in Q3 2011 before commencing operations on three-year contract in Q4 2011.  Day rate may be subject to penalty of up to one half of the day rate for every day the rig is late beyond June 15, 2011.  Any such penalty would be recognized ratably over the balance of the primary contract term.  The contract includes a priced option for one additional year in the mid 190s.  The rig was idle for six days during the month of June 2011.
Hank Boswell
 
225-C
 
300
 
35,000
 
2006
 
Middle East
 
Saudi Aramco
 
High 120s
 
August 2014
   
                           
 
 
 
   
Bob Keller
 
225-C
 
300
 
35,000
 
2005
 
Middle East
 
Saudi Aramco
 
High 120s
 
May 2014
   
Scooter Yeargain
 
225-C
 
300
 
35,000
 
2004
 
Middle East
 
Saudi Aramco
 
Low 180s
 
September 2011
   
                           
High 120s
 
September 2014
 
Rig is expected to commence  three-year contract at indicated day rate in early September 2011.
Bob Palmer
 
224-C
 
550
 
35,000
 
2003
 
Middle East
 
Saudi Aramco
 
Mid 270s
 
June 2014
 
Rig is in Saudi waters undergoing final acceptance testing for Saudi Aramco before commencing operations on three-year contract in early August 2011.  The contract includes a priced option for one additional year in the mid 290s.  The rig was idle during the month of June 2011.
Rowan Gorilla VII
 
219-C
 
400
 
35,000
 
2002
 
UK North Sea
 
Apache
 
Low 180s
 
May 2012
 
The contract includes two (2) six-month options at mutually agreed rates with a cap of 120% of the current day rate.
Rowan Gorilla VI
 
219-C
 
400
 
35,000
 
2000
 
UK North Sea
 
BG
 
Low 200s
 
November 2012
   
                           
Low 220s
 
October 2013
 
The contract includes priced option for one well estimated for 300 days in the low 220s.
Rowan Gorilla V
 
219-C
 
400
 
35,000
 
1998
 
UK North Sea
 
Total
 
Low 180s
 
February 2012
 
The rig was idle for four days during the month of June 2011.
                           
Mid 200s
 
February 2013
   
Rowan Gorilla IV
 
200-C
 
450
 
35,000
 
1986
 
Mexico
 
PEMEX
 
Mid 100s
 
December 2011
   
Rowan Gorilla III
 
200-C
 
450
 
30,000
 
1984
 
Trinidad
 
Niko Resources /
Bayfield Energy
 
Low 130s
 
September 2012
 
Rig is in the shipyard in the GOM undergoing modifications/upgrades for Niko Resouces and is expected to depart for Trinidad in Q3 2011 and commence operations in September 2011.  Contract is for a firm term of eight wells with an expected duration of one year.  Customer has the option to extend the contract for up to nine additional wells with an expected duration of one year.  Wells spud in the second year of the contract attract a day rate in the low 130s.
Rowan Gorilla II
 
200-C
 
350
 
30,000
 
1984
 
Malaysia
 
Petronas Carigali
 
High 110s
 
November 2012
 
Rig is in the shipyard in the GOM undergoing modifications/upgrades for Petronas and is expected to depart for Southeast Asia in Q3 2011 before commencing operations on a one year contract in Q4 2011. Rig was idle during the month of June 2011. 
Rowan-California
 
116-C
 
300
 
30,000
 
1983
 
Middle East
 
Total Qatar
 
Low 60s
 
December 2011
 
Rig commenced operations in late July 2011.  The contract includes two priced options with an expected duration of 30 days each at a day rate in the low 60s.  Rig was idle for eight days during the month of June 2011.
                       
Wintershall
 
Mid 70s
     
Customer has the right to exercise an option by early October 2011 for one well with an estimated duration of six months.
Cecil Provine
 
116-C
 
300
 
30,000
 
1982
 
Gulf of Mexico
 
Apache
 
Low 70s
 
October 2011
   
Gilbert Rowe
 
116-C
 
350
 
30,000
 
1981
 
Middle East
 
Available
         
Rig entered the shipyard in late July 2011 for approximately 9-12 month for inspections, general maintenance,and upgrades.  Rig was idle for four days during the month of June 2011.
Arch Rowan
 
116-C
 
350
 
30,000
 
1981
 
Middle East
 
Saudi Aramco
 
Low 80s
 
November 2014
 
Rig is expected to commence operations in November 2011.  Rig is in the shipyard for general maintenance and upgrades and was in the shipyard during the month of June 2011.
Charles Rowan
 
116-C
 
350
 
30,000
 
1981
 
Middle East
 
Saudi Aramco
 
Mid 80s
 
November 2014
 
Rig is expected to commence operations in November 2011.  Rig is in the shipyard for general maintenance and upgrades and was in the shipyard during the month of June 2011.
Rowan-Paris
 
116-C
 
350
 
30,000
 
1980
 
Middle East
 
Maersk
 
Mid 70s
 
September 2011
 
Rig is expected to enter the shipyard in September 2011 for inspections, general maintenance, and upgrades for approximately 9-12 months.
Rowan-Middletown
 
116-C
 
350
 
30,000
 
1980
 
Middle East
 
Saudi Aramco
 
Mid 80s
 
November 2014
 
Rig is expected to commence operations in November 2011.  Rig is in the shipyard for general maintenance and upgrades and was in the shipyard during the month of June 2011.
Conventional Jack-up Rigs:
                                   
Rowan-Juneau
 
116
 
250
 
30,000
 
1977
 
Gulf of Mexico
 
Available
         
Rig was idle during the month of June 2011.
Rowan-Alaska
 
84
 
350
 
30,000
 
1975
 
Gulf of Mexico
 
Available
         
Rig was idle during the month of June 2011.
Rowan-Louisiana
 
84
 
350
 
30,000
 
1975
 
Gulf of Mexico
 
McMoRan
 
Mid 50s
 
August 2011
 
Contract includes priced options for two wells. The first well is estimated for 200 days at a day rate in the low 70s and the second well is estimated for 200 days at a day rate in the low 80s.

 
"*" Denotes Keppel unit design constructed at Keppel FELS shipyard in Singapore.  Rig Class denotes LeTourneau, Inc. hull number. 200-C is a Gorilla class unit designed for extreme hostile environment capability. 219-C is a Super Gorilla class unit, an enhanced version of the Gorilla class, and 224-C is a Super Gorilla XL design.  225-C is a Tarzan Class unit.  240-C is LeTourneau's latest jack-up design.  Estimated contract durations reflect either stated drilling periods or expected time required for the contracted well or wells. Rowan EXL is an enhanced version of the Super 116E class.  Unless otherwise indicated, all day rates include estimated amortization of contract mobilization/modification revenues.

ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.  THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.

This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.

Revisions to Fleet Status Report Noted in Bold
 
 
 

 
 
GRAPHIC 3 logo1.jpg GRAPHIC begin 644 logo1.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`)@`I`P$1``(1`0,1`?_$`)H```("`P`````````` M``````D*!P@"!`8!``("`P$!``````````````8'`P4!`@@`!!````<``0,# M`04(`P```````0(#!`4&!P@1$A,`%`D5(3%Q(A91H>$C,Y/3%R14&!$``0($ M!0$$"`4$`P```````0(#$00%!@`A,1('(D$3%`A187&!D3)"%:&Q8B,7\9+" M8R0E"?_:``P#`0`"$0,1`#\`?T,8!#I]O4?N#H/X^HB]!(4`8D1@08P]@S[= M,>R&4YG8Y.C2>HZ!JKNEPULNM>$&]K9TF/@:A M:U7\!5I03,%Y%=9)-P\16*B42)]YEAR!S/Q-Q=<6]2_ MJ\L\TSJ6CG`JQV,U&F5BQX@P8)@58T-;96R-RZ%:EG+?I[B31DHI1/N$[=)( MH%`U2KE3EAVJM.VQQ/57^.5$A4W,..,U!23F7A+-$LI*0(!M48DYDXO%VC;; M,OX=^HM&J'0)ZD_W#*$<3G%_-?R(J*\/:M;X_8O/Y7'K-#:++8SHESE+E&UT M%"%F[C5H&PUPL9,(P3,QGBD49T#E1!,Y$US*`'6SM[FWCFY;Y8X_7+5^C7'. M+*&$5.72VAQT)CL!0K8F)Z4*.:LB0#BEG+#GI>0,Y+.MO+3FH-JW=/8K6ITJ\*T5 M;G?'1(@93L[BBKN<[ZNGC/AV>NJPFT.WR]4921DEK2%J:=F2N#K*3T]ZA2$D M%06`">G..#:R*73*C4U&J$^&905D1UVD9>_"US/D':-5Y&L,/PZAT=7COD;6 MP0,U3YUL_)1Y1BDW>P[V>ER1#AH^=DCYY8QXYKYA"0AG_E3;XF3D%%HH3'VQ5\,13R%V MB\4AOEF[YJQH-FR:>0E*BT MKI<223$9ZG&SS=3LY]B>E9GO:<]NVG,I4D'K"AV]HP7#XI-5-GG,'CW7LTN< ME6\#Y/T75_JN:N91Q_KM_=(*KL+O3Y&L5U\NI%U"\*'0?(K%C@;@^1!4AR'. M0!#GSA^H\B-O7?QCRQ-+J-U6?/M,RTRX$]\Y)ND!N*D@;V@DQZ@5!4"5PRQZ M]I207+2M8IS80Q,@1AI&!/N]F&[.[\/32Z?3A?;<*U_(5#WFA_(1>9O1557L M/M^459+C?9%.\T9"4S.8YJUU+,VA3"9.(FV5TF"S[GM`OU%K()*=1%OVDYT\ MQ%/J1GN/;L94$V11[A0FH-')+OW+([F:;5I].L)I(J*+ ME:0:'!RN#A,KA-(7**GF3`Y`$P.O_P!.9&>O"V[,N:UPI^U9"LR[TUW0W]VV MX$%+A&FTGYL\8XU?;E9R>EWLG]JAM[=#Z88IC0+)M5? MNJH5,K%V[E2ZA!_'U%5#.'V62%" M(4KNPDI[3VPP078W39&SI&00M3DPI!,,H@DQ((CE`Z8G7BEBU^O65<-,.JPN MX+8])U*&G,XM(J*-G>8-*!97.FV+22O4NKA!6JTF-5\*2(]7JKI-#^FH;UK7 M)==P^?V\[PMV="K/H%+98J"4&(F'WF0VF6RR(0M04J)$"G*.(IYY-+L%EB:9 M2MU]73'Z>DG,"8^5'AGM')B.PG2L$ M-6YN_P#'^9T)PIF]KEOTVTO]8TBOQ,--M8*T*H.H^$ML4K`-E60O2%9."'53 M552ZE/Z$;_L>0Y,XWJ7'=2G'9!F>6RXW,)&XMN2^\M*6-2(K,5"*OC@AMJLI MH-5%16@N(@0I,=089X7"9N'SMQ=(:8SJ71FZQ:)2#T/)[$\3HNG9YJ]<%(WO MJU<&:D@R@K`JV5#R"N1[$34:[*L4P)JJE<#ED\\4WC1IO@GS/.R;"?!)8DZF M$E=/J$LH?MI8,?Z4V5:H.GM>E'E5F#J3)UFIU$^TA$")KF`>\Q M2XF_*]Y/KHJZ+O15@V&W=Z%2]P([E';M;#BN];1`?(@0`R`Q`W\.Q+2[BG MI?Q2^E4Y,3($70V%;G$N12E8,,\;2%IUFJ.?=;B5W$HR"51RW#6`3E#+++!? M>`_$_5;UI^#\K;C6F.+8_FE6MLOB>;NE3/-.NJ>CU(M5C;->6C5%"'SZMMZD M^,X9PY%';]159,S@4/'XQJN&^(%\,4^X7:W5G:WR-=$T'ZD\D!$LPL*"RRR, MBXI*@/W#],0"<5%Y75+5Q+$G34;:?+)V))U(A#V^_!Z/&'[?W_P],KN_UGX8 M`.[1Z,9GZ=/M'IZD>VEI6_)$,_9C88`KSKJWQ*V+DW/GWC2-6HG)%I5:P.E) M<=V/(5W(2D&9F<::&I#C%"N=<3GTX<`!E[TS>7^G"G][?Q>JZXGK4:D93^0F MJ`[([CX;[B98']0'?+0K9&.O3K#MP244W*!_T@>*<_DT]>*6_P#G;CV]E63C MC]\AMSKF03"AC/(C;.-NK7'8:FW`/^22E66R5:D/WIEP`?:A8(A^=N80,4ZX M=">N1+R7Y"WKN$Y<[;350005,4]VH"D.#<((/A6'I5!W0.]N9*X`C;M*B#FG M3/(R)8HEIH%8/X8G:MT[X:(!U7D=`U?D?>$XZQ1*$P[WN,YC, MNP;.F+%#P=O@\/:'B\'9_+\'CZ=G;^7MZ=/L]?6@$.+W']W=U:_-[\`YQL &>I<8Q__9 ` end GRAPHIC 4 logo2.jpg GRAPHIC begin 644 logo2.jpg M_]C_X``02D9)1@`!`@``9`!D``#_[``11'5C:WD``0`$````9```_^X`#D%D M;V)E`&3``````?_;`(0``0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$!`0$! M`0$!`0$!`0$!`0$!`0("`@("`@("`@("`P,#`P,#`P,#`P$!`0$!`0$"`0$" M`@(!`@(#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,#`P,# M`P,#`P,#`P,#_\``$0@`)@!6`P$1``(1`0,1`?_$`'T```$#!`,!```````` M``````<&"`D``@0*`0,%"P$!`````````````````````!````8"`0(#`@H) M!0$``````@,$!08'`0@1``D2$Q0A,4%A@2+4%96U%E910S9VUC=WN`I"))0F MEA<1`0````````````````````#_V@`,`P$``A$#$0`_`-Y^M(C$QUQ`#!QB M/#&9"8H,8QLK:(0QB84&1"$+*;.1"%GVYSGWYZ!;?@Z(_E:.?8C9]%Z`/7U9 M^M^K]5R:[K\L=W(@@/@*%P M,S'/&.-8$G.?]70&N[M]>W/KG#ZEL*X;RI&+P:^`.1E-RY$B!+X]9(&@#>- MQ'$W6$LLC1NH4^'5/CD`_GC-P$/(L9Q@$W`>Y)VPK)ES7`H[L31#=-7PT)## M%9\A%5+Z_*!C"6!,PMMHL$.5/2D9@PA"6E":/(A8QC'.<8Z`X[&[):8:BL37 M(ME;+I>G6]^4^CCB>7F,B9^E"SS"RLHXI%DJ57)I2K":<`(BV]&I&$0PXSC& M18Y`%P+N2=L^Q+#CM3-%UUE'+*F(RBH;"K5@DII%_F9R@T!"5/#T5RPJ!CE2 MI8>:$!)2#U!IPQ8"`.@"EJ M16+ESG6LLN-L!9:B['TL\`&=N"`\L.N=_G!+."%/@)@`G%!'C`N<8$'&??C' M0%:L?Y;5[^X\3^X4'0=M@6-7]3Q-TGEHS>)5S"&3TOUS,)Q(6F*QAI]U7=I/86_U.+=7;19VM0F4O531YXCS\T&Q!K1'I M0#1F%N)J$\'B*&84/R5!06]PFO*SOG6SM-1#5%QT'I!3IS-9=+[0UK1=P/7) M0PP$X4E@,F4(HA8S]8:O$Y33%XCS@LPO4&C7@$JP-<'!V1\@XWN?7(]=X.I8 M/K,]R;MI:>0!MLACGLFO.W.X?KI=L_8DK,G7)@M]:PBJ3SQEFNX%PL*QGNZ4 M*H!8",Y+`(1P0QMJJDJ&([Q:(;\:U;Y:)[9+]-Z7K"DY30>P&WU25^_2Q%7$ M7D,5!84"G+H]2.,-$T?\2(;J:6O+)P4^IBE.#C<"$$H'N61W(`[/VA2S4^51 MVDH#6\'DF)!-+#W9W5UAOB5Q(@\UM]6IHJ!U#*9"<@EF"4.<@7+7%$4>:$C` ML$A+R/H)K63?S1>2NS.PQS'544A;&MK0HY.< MJ<'%Q6G@)()*",PTT80AQD6<8Z!W'0!"U_V\UE_K>_\`]MVP70+>L?Y;5[^X M\3^X4'01A]]6B[9V2[7NR5-4?`G:S;-EP*V#'(4R&-93F\Y:+4A;TXX3C>E[ M8VA]&UMYQXO,/!\TO/'(N,9#3/9^USO,X=O-HU-?NWUL6UW$3M,KN5RMUCK7 M7V3$$5(?`4T9)IXA_%=K%,UJ9-*RQOH4Y@B6[U!GL#@?(^@Q@=K_`'E9M`[? MU4:^WEL>JLZ3[31ZTH):+S$-=$JUNI5DC3M'%E6OTJ36ZKDD>T@!ZN$D1S#RX&'*',(R3CDI@(R0:']T<[42IZXCFB MM_D;;1'8BU+EGEJK*]UIRW3&#V!'F1G::T4./_T1>[N+-$7%&J6`2*V<+7C* M[("2B\^WH%]$=$]SXYK)J/2!O;>N\%PTG(;R<;-GZF!4@J43!@M%0GS`&IN( M:-CXLYS<5/I,#&A2RDA2V'FA`5Y($PS@"!!L_;9WR8]"XOK(SZ%;/0N[XWM9 M++E)O--6NN#BY*::=(43&6*HCWLZZF>1*S4+XGR]')_8T@5J!A+#SC`\AZ"K MMO[RV5NKH1948[7TXH^.TE*]96BZK1/#1,??KKD$`LJ-O$ROZP876 M)_<*#H(>_P#(O)=5'9_VO*9"'=2YB+JG*4EB)7GN@\AN.!",]*4V`&M%D)6! M9%X,9X!C.<^SGH($->M>]ONUEK9J+W8](T4^N"FK+U]JMV[AVFCZZ21W<',@ MUN*$^6_7S8N`KTGJTZ4"%_CT,<$W#V5[T1UFU MW))+1&RDI9)6FA%ML3TA+<878-I7=)VUN5H5QF"F]X;D#HGR(:`_!B)46`PD MT(@%CP`TV9*W@[$^SC5I+H=>^Z1,"GVVYHQ*+16:>S296&TP)QED:? MTXS$RE6U#=_4%95A&E6)\8,6I#5:?"L\)G)/VFM9=/>WIL+#Y7MG=]46I>)< M>5[(=Q4+B^O=ZR:4.DQ:URD"A0BP[.K#6UR@PQ]?GN/D6NW/2QO M`9_NEQYA"@L/@P`!F0^'(.`_R5)9-;7UG[/D^*I6RZ+4R518+O(*7E")Y7/M M5IE,;IC`(C8!<7R:+)#,E+$6;@[)1XTX1X$`H[QE@!]^N*K2ECO*G7APE79! M"!MF\;5)ATW1%NQVW`/0#@8CPX"_O]C/#,U2HN1"2B)/4I3@AX%CPX%G&,@\&0B]GOZ`<6O\` MMYK+_6]__MNV"Z#UZT>7$-<0`(8G(#`AA,5#@P*F*X"/&&)!C`PX')@#P$6/ M;CG&,_IQCH%KE[<>,\Q"0\?#RIB7'R\RCH*P]N/'LB$AX^)3$N./_4<=!P%[ M@R!/;A[/%$)!\7B4Q'Y>.91T M%F'M7SCB(/O//LX4Q#GGX./^T>_H.W#VY?!$)%Q\2F)?Q1T`4M1W EX-99.2 5 v229544_ex99-2.htm Unassociated Document
 
ROWAN COMPANIES, INC.
LAND RIG FLEET AND CONTRACT STATUS
As of July 26, 2011
 
 

 
ONSHORE RIGS
         
Maximum
     
Contract Status
   
       
Horsepower
 
Drilling
         
Estimated
   
Name
 
Type
 
Drawworks
 
Mud Pumps
 
Depth (feet)
 
Location
 
Customer
 
Duration*
 
Comments
Rig 9
 
SCR diesel electric
 
2,000
 
3,200
 
20,000
 
Alabama
 
Chevron
 
December 2011
   
Rig 12
 
SCR diesel electric
 
1,500
 
2,600
 
18,000
 
Texas
 
Choice Exploration
 
September 2011
   
Rig 14
 
AC electric
 
3,000
 
4,800
 
35,000
 
Louisiana
 
Armstrong
 
October 2011
   
Rig 15
 
AC electric
 
3,000
 
4,800
 
35,000
 
Texas
 
Available
       
Rig 26
 
SCR diesel electric
 
2,000
 
3,200
 
25,000
 
Texas
 
BBX
 
August 2011
   
Rig 29
 
SCR diesel electric
 
1,500
 
2,600
 
18,000
 
Texas
 
Available
       
Rig 30
 
AC electric
 
2,000
 
3,200
 
20,000
 
Louisiana
 
Chesapeake
 
August 2011
   
Rig 31
 
SCR diesel electric
 
3,000
 
4,400
 
35,000
 
Texas
 
Available
       
Rig 33
 
SCR diesel electric
 
1,500
 
3,200
 
18,000
 
Texas
 
Plains
 
September 2011
   
Rig 35
 
SCR diesel electric
 
1,500
 
4,400
 
18,000
 
Texas
 
EXCO Resources
 
September 2011
   
Rig 51
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Louisiana
 
Chesapeake
 
October 2011
   
Rig 52
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Texas
 
EOG
 
August 2011
   
Rig 53
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Louisiana
 
Chesapeake
 
August 2011
   
Rig 54
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Louisiana
 
Chesapeake
 
October 2011
   
Rig 59
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EnCana
 
August 2012
   
Rig 60
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Plains
 
December 2011
   
Rig 61
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Cheyenne
 
February 2012
   
Rig 62
 
AC electric
 
2,000
 
3,200
 
25,000
 
Oklahoma
 
Devon
 
September 2011
   
Rig 63
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Cheyenne
 
February 2012
   
Rig 64
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
BBX
 
November 2011
   
Rig 65
 
AC electric
 
2,000
 
3,200
 
25,000
 
Louisiana
 
EnCana
 
December 2014
   
Rig 66
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Hunt
 
June 2012
   
Rig 67
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EOG
 
October 2011
   
Rig 68
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EOG
 
October 2011
   
Rig 76
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EnCana
 
June 2012
   
Rig 77
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EnCana
 
September 2012
   
Rig 84
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EnCana
 
June 2015
   
Rig 85
 
AC electric
 
2,000
 
3,200
 
25,000
 
Alabama
 
Chevron
 
October 2011
   
Rig 86
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EOG
 
August 2011
   
Rig 87
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
EXCO Resources
 
May 2012
   

  
*On July 20, 2011, the Company announced that it has entered into a purchase and sale agreement with Ensign United States Drilling (S.W.) Inc., a subsidiary of Ensign Energy Services Inc., to sell Rowan’s land drilling division for $510 million in cash, plus working capital of approximately $30 million. The Agreement is subject only to regulatory approval, which the Company expects to obtain within the third quarter.
 
Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt.   Rigs 51, 52, 53 and 54 were constructed during 2001-02.  Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007, Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009.  All but Rig 29 are equipped with a top-drive drilling system.  Rigs 15 and 29 are not being marketed. Operating day rates range from $18,000 to $27,000.  Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells.  Estimated number of idle days during June 2011 was 130 (86% utilization).

ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.  THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.

This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.

Revisions to Fleet Status Report Noted in Bold