EX-99.2 5 v171258_ex99-2.htm
ROWAN COMPANIES, INC.
LAND RIG FLEET AND CONTRACT STATUS
As of January 13, 2010
 

 
ONSHORE RIGS
             
Maximum
   
Contract Status
 
     
Horsepower
   
Drilling
     
Estimated
 
Name
Type
 
Drawworks
   
Mud Pumps
   
Depth (feet)
 
Location
Customer
Duration
Comments
                             
Rig 9
Diesel electric
   
2,000
     
3,200
      20,000  
Texas
Available
   
Rig 12
SCR diesel electric
   
1,500
     
2,600
      18,000  
Texas
Legend
February 2010
 
Rig 14
AC electric
   
3,000
     
3,200
      35,000  
Texas
Available
   
Rig 15
AC electric
   
3,000
     
3,200
      35,000  
Texas
Available
   
Rig 18
SCR diesel electric
   
2,000
     
4,400
      25,000  
Texas
Available
   
Rig 26
SCR diesel electric
   
2,000
     
4,800
      25,000  
Texas
Available
   
Rig 29
Mechanical
   
1,500
     
2,600
      18,000  
Texas
Available
   
Rig 30
AC electric
 
 
2,000
 
 
 
2,600
 
 
 
20,000
 
Louisiana
Chesapeake
December 2010
 
Rig 31
SCR diesel electric
   
3,000
     
4,400
      35,000  
Texas
Available
   
Rig 33
SCR diesel electric
   
1,500
     
3,200
      18,000  
Texas
Available
   
Rig 34
SCR diesel electric
   
2,000
     
4,400
      25,000  
Texas
Available
   
Rig 35
SCR diesel electric
   
1,500
     
4,400
      18,000  
Texas
Cabot
July 2010
 
Rig 51
SCR diesel electric
   
2,000
     
4,400
      25,000  
Texas
Newfield
June 2010
 
Rig 52
SCR diesel electric
   
2,000
     
4,400
      25,000  
Oklahoma
Marathon
May 2010
 
Rig 53
SCR diesel electric
   
2,000
     
4,400
      25,000  
Louisiana
Chesapeake
December 2010
 
Rig 54
SCR diesel electric
   
2,000
     
4,400
      25,000  
Louisiana
Chesapeake
November 2010
 
Rig 59
AC electric
   
2,000
     
3,200
      25,000  
Louisiana
EnCana
August 2012
 
Rig 60
AC electric
   
2,000
     
3,200
      25,000  
Texas
Devon
April 2011
 
Rig 61
AC electric
   
2,000
   
 
3,200
      25,000  
Texas
EnCana
June 2015
 
Rig 62
AC electric
   
2,000
     
3,200
      25,000  
Texas
Devon
March 2011
 
Rig 63
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
November 2014
 
Rig 64
AC electric
   
2,000
     
3,200
      25,000  
Texas
Available
   
Rig 65
AC electric
   
2,000
     
3,200
      25,000  
Louisiana
EnCana
June 2010
 
Rig 66
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
May 2010
 
Rig 67
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
April 2010
 
Rig 68
AC electric
   
2,000
     
3,200
      25,000  
Alaska
Pioneer
March 2010
 
Rig 76
AC electric
   
2,000
     
3,200
      25,000  
Louisiana
EnCana
April 2011
 
Rig 77
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
December 2012
 
Rig 84
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
May 2011
 
Rig 85
AC electric
   
2,000
     
3,200
      25,000  
Texas
Common Resources
October 2010
 
Rig 86
AC electric
   
2,000
     
3,200
      25,000  
Texas
EnCana
February 2012
 
Rig 87
AC electric
   
2,000
     
3,200
      25,000  
Texas
Common Resources
May 2012
 
 
Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt. Rigs 51, 52, 53 and 54 were constructed during 2001-02. Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007, Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009. All but Rig 29 are equipped with a top-drive drilling system. Day rates range from $13,000 to $27,500. Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells. Estimated number of idle days during December 2009 was 390 (61% utilization).
 
   
ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME. THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.
 
   
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.
   
Revisions to Fleet Status Report Noted in Bold