EX-99.2 3 land.htm LAND land.htm

EXHIBIT 99.2
 
ROWAN COMPANIES, INC.
LAND RIG FLEET AND CONTRACT STATUS
As of June 22, 2009
                                 
                                 
ONSHORE RIGS
         
Maximum
   
Contract Status
   
       
Horsepower
 
Drilling
         
Estimated
   
Name
 
Type
 
Drawworks
Mud Pumps
 
Depth (feet)
Location
Customer
 
Duration
 
Comments
                                 
Rig 9
 
Diesel electric
        2,000
 
          3,200
 
       20,000
 
Texas
 
Cold Stacked
     
Rig 12
 
SCR diesel electric
        1,500
 
          2,600
 
       18,000
 
Louisiana
Midstates
 
June 2009
   
Rig 14
 
AC electric
 
        3,000
 
          3,200
 
       35,000
 
Texas
 
Available
       
Rig 15
 
AC electric
 
        3,000
 
          3,200
 
       35,000
 
Texas
 
Forest Oil
 
July 2009
   
Rig 18
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Available
       
Rig 26
 
SCR diesel electric
        2,000
 
          4,800
 
       25,000
 
Texas
 
Available
       
Rig 29
 
Mechanical
 
        1,500
 
          2,600
 
       18,000
 
Texas
 
Cold Stacked
     
Rig 30
 
AC electric
 
        2,000
 
          2,600
 
       20,000
 
Texas
 
BBX
 
October 2009
 
Rig 31
 
SCR diesel electric
        3,000
 
          4,400
 
       35,000
 
Texas
 
Available
       
Rig 33
 
SCR diesel electric
        1,500
 
          3,200
 
       18,000
 
Texas
 
Available
       
Rig 34
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Cold Stacked
     
Rig 35
 
SCR diesel electric
        1,500
 
          4,400
 
       18,000
 
Texas
 
Cabot
 
June 2010
 
Rig is expected to commence operations in early July 2009.
Rig 51
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Newfield
 
June 2010
   
Rig 52
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Available
     
Prior customer will pay a reduced rate through October 2009.
Rig 53
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Available
       
Rig 54
 
SCR diesel electric
        2,000
 
          4,400
 
       25,000
 
Texas
 
Available
     
Prior customer will pay early termination fee equal to reduced rate through October 2009.
Rig 59
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Available
       
Rig 60
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Devon
 
April 2011
 
Rig is currently stacked at a reduced rate.
Rig 61
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
August 2009
 
Rig 62
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Devon
 
March 2011
 
Rig is currently stacked at a reduced rate.
Rig 63
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Available
       
Rig 64
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Cold Stacked
     
Rig 65
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Pioneer
 
November 2009
Rig is currently stacked at a reduced rate.
Rig 66
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Oklahoma
PetroQuest
 
December 2009
 
Rig 67
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
ConocoPhillips
January 2010
 
Rig 68
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Alaska
 
Pioneer
 
March 2010
 
Rig is currently stacked at a reduced rate.
Rig 76
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
April 2011
   
Rig 77
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
December 2009
 
Rig 84
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
May 2011
   
Rig 85
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
Common Resources
October 2010
 
Rig 86
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
Texas
 
EnCana
 
February 2012
 
Rig 87
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
TBD
 
Common Resources
May 2012
   
TBD
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
TBD
 
EnCana
 
3 Years
 
Currently in negotiations with EnCana to substitute existing land rigs for this contract.
TBD
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
TBD
 
EnCana
 
3 Years
 
Currently in negotiations with EnCana to substitute existing land rigs for this contract.
TBD
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
TBD
 
EnCana
 
3 Years
 
Currently in negotiations with EnCana to substitute existing land rigs for this contract.
TBD
 
AC electric
 
        2,000
 
          3,200
 
       25,000
 
TBD
 
EnCana
 
3 Years
 
Currently in negotiations with EnCana to substitute existing land rigs for this contract.
 

 
Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt.  Rigs 51, 52, 53 and 54 were constructed during 2001-02. Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007, Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009.  All but Rig 29 are equipped with a top-drive drilling system.  Day rates range from $9,000 to $26,000. Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells.  Estimated number of idle days during May 2009 was 378.
 
ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.  THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.
 
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filiings with the U. S. Securities and Exchange Commission.