EX-99.2 3 land.htm LAND Land

EXHIBIT 99.2
 
ROWAN COMPANIES, INC.
LAND RIG FLEET AND CONTRACT STATUS
As of November 22, 2006
                                 
ONSHORE RIGS
             
Maximum
 
 
 
Contract Status
 
 
 
 
 
 
Horsepower
 
Drilling
 
 
 
 
 
Estimated
 
 
Name
 
Type
 
Drawworks
 
Mud Pumps
 
Depth (feet)
 
Location
 
Customer
 
Duration
 
Comments
                                 
Rig 9
 
Diesel electric
 
2,000
 
3,200
 
20,000
 
Louisiana
 
Anadarko
 
January 2007
 
 
Rig 12
 
SCR diesel electric
 
1,500
 
2,600
 
18,000
 
Texas
 
Cimarex
 
January 2007
 
 
Rig 14
 
AC electric
 
3,000
 
3,200
 
35,000
 
Texas
 
Newfield
 
November 2007
 
Reflects recently exercised option for one additional year at current day rate.
Rig 15
 
AC electric
 
3,000
 
3,200
 
35,000
 
Texas
 
Newfield
 
December 2006
 
 
 
 
 
 
 
 
 
 
 
 
Louisiana
 
McMoRan
 
April 2007
 
 
Rig 18
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Texas
 
Anadarko
 
January 2007
 
 
Rig 26
 
SCR diesel electric
 
2,000
 
4,800
 
25,000
 
Texas
 
Newfield
 
March 2007
 
Rig incurred approximately 20 days of October 2006 downtime due to equipment repairs.
Rig 29
 
Mechanical
 
1,500
 
2,600
 
18,000
 
Louisiana
 
Anadarko
 
March 2007
 
 
Rig 30
 
AC electric
 
2,000
 
2,600
 
20,000
 
Louisiana
 
Castex
 
January 2007
 
 
Rig 31
 
SCR diesel electric
 
3,000
 
4,400
 
35,000
 
Louisiana
 
Noble Energy
 
April 2007
 
 
Rig 33
 
SCR diesel electric
 
1,500
 
3,200
 
18,000
 
Texas
 
Devon
 
June 2009
 
 
Rig 34
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Texas
 
Anadarko
 
January 2007
 
 
Rig 35
 
SCR diesel electric
 
1,500
 
4,400
 
18,000
 
Louisiana
 
Anadarko
 
January 2007
 
 
Rig 41
 
SCR diesel electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Newfield
 
April 2007
 
 
Rig 51
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Louisiana
 
McMoRan
 
December 2006
 
 
 
 
 
 
 
 
 
 
 
 
Texas
 
Pogo
 
December 2007
 
 
Rig 52
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Texas
 
Newfield
 
October 2007
 
 
Rig 53
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Oklahoma
 
Marathon
 
February 2007
 
 
Rig 54
 
SCR diesel electric
 
2,000
 
4,400
 
25,000
 
Texas
 
Newfield
 
May 2007
 
 
Rig 59
 
AC electric
 
2,000
 
3,200
 
25,000
 
Louisiana
 
Dominion
 
June 2008
 
Rig incurred approximately 15 days of October 2006 downtime.
Rig 60
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Anadarko
 
April 2009
 
 
Rig 61
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Anadarko
 
April 2008
 
Rig was idle during October 2006 due to equipment repairs.
Rig 62
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Anadarko
 
April 2009
 
 
Rig 63
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Anadarko
 
April 2008
 
Rig commenced operations on October 16, 2006.
Rig 64
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Cabot
 
October 2008
 
Rig commenced operations on October 24, 2006.
Rig 65
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Pioneer
 
December 2009
 
Completion of rig construction is expected by late November or early December 2006.
Rig 66
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
PetroQuest
 
January 2010
 
Completion of rig construction is expected by late December 2006 or early January 2007.
Rig 67
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Burlington
 
February 2010
 
Completion of rig construction is expected by late January or early February 2007.
Rig 68
 
AC electric
 
2,000
 
3,200
 
25,000
 
TBD
 
Pioneer
 
March 2010
 
Completion of rig construction is expected by late February or early March 2007.
Rig 69
 
AC electric
 
2,000
 
3,200
 
25,000
 
Texas
 
Anadarko
 
March 2010
 
Completion of rig construction is expected by late March 2007.
Rig 70
 
AC electric
 
2,000
 
3,200
 
25,000
 
TBD
 
TBD
 
TBD
 
Completion of rig construction is expected by late March 2007.
 


Rigs 9 through 41 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt. Rigs 51, 52, 53 and 54 were constructed during 2001-02.
Rigs 59 through 62 were completed earlier during 2006. Rig 65 is rigging-up on its initial location. All but Rigs 9, 29 and 35 are equipped with a top-drive drilling system. Day rates range from $18,000 to $35,000.
 
ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME.
THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE.
                                             
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial
performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant
factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission.