Commitments and Contingencies
9 Months Ended
Sep. 30, 2021
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies

Note 12. Commitments and Contingencies

Indemnities

Edison International and SCE have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business.

Edison International and SCE have agreed to provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, indemnities for specified environmental liabilities and income taxes with respect to assets sold or other contractual arrangements. Edison International's and SCE's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International and SCE may have recourse against third parties. Edison International and SCE have not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.

Contingencies

In addition to the matters disclosed in these Notes, Edison International and SCE are involved in other legal, tax, and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International and SCE believe the outcome of each of these other proceedings will not materially affect its financial position, results of operations and cash flows.

Southern California Wildfires and Mudslides

Wildfires in SCE's territory, including those where SCE's equipment may be alleged to be associated with the fire's ignition, have caused loss of life and substantial damage in recent years. Multiple factors have contributed to increased wildfire activity and faster progression of wildfires across SCE's service territory and in other areas of California. These include the buildup of dry vegetation in areas severely impacted by years of historic drought, lack of adequate clearing of hazardous fuels by responsible parties, higher temperatures, lower humidity, increased incidence of dry lightning, and strong Santa Ana winds. At the same time that wildfire risk has been increasing in Southern California, residential and commercial development has occurred and is occurring in some of the highest-risk areas. Such factors can increase the likelihood and extent of wildfires. SCE has determined that approximately 27% of its service territory is in areas identified as high fire risk.

California has experienced unprecedented weather conditions in recent years due to climate change, and SCE's service territory remains susceptible to additional wildfire activity in 2021 and beyond. The worsening weather and fuel conditions across California increase the likelihood of wildfires, including those where SCE's equipment may be alleged to be associated with the fire's ignition. In response to worsening conditions and increased wildfire activity over the past several years, SCE has developed and is implementing its 2020 – 2022 Wildfire Mitigation Plan ("WMP") to reduce the risk of SCE equipment contributing to the ignition of wildfires. In addition, California has increased its investment in wildfire prevention and fire suppression capabilities.

In addition to the investments SCE is making as part of its WMP, SCE also uses Public Safety Power Shutoffs ("PSPS") to proactively de-energize power lines as a last resort to mitigate the risk of catastrophic wildfires during extreme weather events. SCE initiated PSPS 12 times in 2020 as part of its wildfire mitigation efforts, impacting an aggregate of approximately 145,000 unique customers. In January 2021, the President of the CPUC sent SCE a letter expressing her concern regarding SCE's execution of PSPS in 2020 and notifying SCE that it must implement a PSPS action plan to reduce the impacts of PSPS on the customers and communities it serves. On a risk-informed basis, SCE is making efforts to reduce the frequency and impacts of PSPS in 2021 as compared to 2020, assuming that weather patterns in the 2021 are similar to

those experienced in 2020. SCE had initiated PSPS eight times in 2021 as of October 26, 2021, impacting an aggregate of approximately 98,000 unique customers. The 2021 events consist of a January 2021 event that impacted approximately 98,000 unique customers and seven other events that impacted an aggregate of approximately 300 unique customers. SCE may be subject to mandated changes to, or restrictions on, its operational PSPS practices, regulatory fines and penalties, claims for damages and reputational harm if SCE does not execute PSPS in compliance with applicable rules and regulations or if it is determined that SCE has placed excessive or unreasonable reliance on PSPS. In June 2021, the CPUC issued a final decision which, among other things, will reduce future authorized revenue for the volumetric reductions in electricity sales resulting from PSPS events initiated after June 2021 until the CPUC determines that improvements in the PSPS program have been made.

Edison International and SCE have incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events, which are described below. SCE's equipment has been, and may further be, alleged to be associated with several wildfires that have originated in Southern California subsequent to 2018. Edison International and SCE expect that any losses incurred in connection with those fires will be covered by insurance, subject to self-insured retentions and co-insurance, or third-party receivables, and expect that any such losses after recoveries will not be material.

Liability Overview

The extent of liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether the utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be required to show negligence in addition to causation. California courts have previously found utilities to be strictly liable for property damage along with associated interest and attorneys' fees, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. If inverse condemnation is held to be inapplicable to SCE in connection with a wildfire, SCE still could be held liable for property damages and associated interest if the property damages were found to have been proximately caused by SCE's negligence. If SCE were to be found negligent, SCE could also be held liable for, among other things, fire suppression costs, business interruption losses, evacuation costs, clean-up costs, medical expenses, and personal injury/wrongful death claims. Additionally, SCE could potentially be subject to fines and penalties for alleged violations of CPUC rules and state laws investigated in connection with the ignition of a wildfire.

Final determinations of liability for wildfire events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes. Even when investigations are still pending or liability is disputed, an assessment of likely outcomes, including through future settlement of disputed claims, may require estimated losses to be accrued under accounting standards. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. For instance, as a result of additional information, management increased its estimated losses for the 2017/2018 Wildfire/Mudslide Events (as defined below) in the third quarter of 2021.

2017/2018 Wildfire/Mudslide Events

Wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The investigating government agencies, the Ventura County Fire Department ("VCFD") and California Department of Forestry and Fire Protection ("CAL FIRE"), have determined that the largest of the 2017 fires in SCE's territory originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by a second fire that originated

near Koenigstein Road in the City of Santa Paula (the "Koenigstein Fire"). The December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. According to CAL FIRE, the Thomas and Koenigstein Fires, collectively, burned over 280,000 acres, destroyed or damaged an estimated 1,343 structures and resulted in two confirmed fatalities. The largest of the November 2018 fires in SCE's territory, known as the "Woolsey Fire," originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties. According to CAL FIRE, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three confirmed fatalities. Four additional fatalities are alleged to have been associated with the Woolsey Fire.

As described below, multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by debris flows and flooding in Montecito and surrounding areas in January 2018 (the "Montecito Mudslides") based on a theory alleging that SCE has responsibility for the Thomas and/or Koenigstein Fires and further alleging that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in 21 confirmed fatalities, with two additional fatalities presumed. One of the presumed fatalities has been confirmed.

The Thomas Fire, the Koenigstein Fire, the Montecito Mudslides (defined below) and the Woolsey Fire are each referred to as a "2017/2018 Wildfire/Mudslide Event," and, collectively, referred to as the "2017/2018 Wildfire/Mudslide Events." Based on information available to SCE and consideration of the risks associated with litigation, Edison International and SCE expect to incur a material loss in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The 2017/2018 Wildfire/Mudslide Events are discussed further below.

Recent developments

As of September 30, 2021, in addition to the Local Public Entity Settlement, the TKM Subrogation Settlement and the Woolsey Subrogation Settlement (all defined below), SCE has entered into settlements with approximately 4,000 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it has agreed to pay an aggregate of approximately $1.5 billion.

In addition, in October 2021, SCE and the SED executed an agreement (the "SED Agreement") , subject to CPUC approval, to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events and three other 2017 wildfires for, among other things, aggregate costs of $550 million. The $550 million in costs is comprised of a $110 million fine to be paid to the State of California General Fund, $65 million of shareholder-funded safety measures, and an agreement by SCE to waive its right to seek cost recovery in CPUC-jurisdictional rates for $375 million of third-party uninsured claims payments (the "SED Excluded Losses"). The SED Agreement provides that SCE may, on a permanent basis, exclude from its ratemaking capital structure any after-tax charges to equity or debt borrowed to finance costs incurred under the SED Agreement. The SED Agreement also imposes other obligations on SCE, including reporting requirements and safety-focused studies. SCE's obligations under the SED Agreement commence after CPUC approval of the SED Agreement is final and non-appealable. In the SED Agreement, SCE did not admit imprudence, negligence or liability with respect to the 2017/2018 Wildfire/Mudslide Events.

Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The net result of management's third quarter 2021 review, including a review of information obtained as a result of achieving key milestones in the litigation process, including settlement activity to date and the expiration of some statutes of limitations, was a $1.3 billion increase in estimated losses for the 2017/2018 Wildfire/Mudslide Events as of September 30, 2021. As a result, Edison International and SCE also recorded expected recoveries through FERC electric rates of $67 million against the charge, and the resulting net charge to earnings was $1.2

billion ($894 million after-tax). The estimated losses for the 2017/2018 Wildfire/Mudslide Events as of September 30, 2021 reflect the impact of the SED Agreement.

As of September 30, 2021, Edison International and SCE had paid $5.2 billion in settlements, had $84 million to be paid under executed settlements and had $2.2 billion of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, Edison International and SCE had assets for expected recoveries through FERC electric rates of $162 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events.

Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including: the uncertainty in estimating damages that have been or may be alleged, the ability to reach settlements through the ongoing claims mediation processes, uncertainties related to the litigation processes, uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements.

The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. SCE will seek rate recovery of prudently-incurred, actual losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance, other than for CPUC-jurisdictional rate recovery of the $375 million of SED Excluded Losses. See "Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates" below for additional information.

External Investigations and Internal Review

The VCFD and CAL FIRE have jointly issued reports concerning their findings regarding the causes of the Thomas Fire and the Koenigstein Fire. The reports did not address the causes of the Montecito Mudslides. SCE has also received a non-final redacted draft of a report from the VCFD regarding Woolsey Fire (the "Redacted Woolsey Report"). SCE anticipates that the VCFD will release its final report regarding the Woolsey Fire in 2021. The VCFD and CAL FIRE findings do not determine legal causation of or assign legal liability for the Thomas, Koenigstein or Woolsey Fires; final determinations of legal causation and liability would only be made during lengthy and complex litigation.

The CPUC's Safety and Enforcement Division ("SED") has conducted investigations to assess SCE's compliance with applicable rules and regulations in areas impacted by the Thomas, Koenigstein and Woolsey Fires. As discussed above, in October 2021, SCE and the SED executed the SED Agreement, subject to CPUC approval, to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events. If the SED Agreement is not approved by the CPUC, the CPUC may initiate proceedings to investigate these matters and SCE could be subject to material fines or penalties in connection with any such proceeding that is initiated.

The California Attorney General's Office has completed its investigation of the Thomas Fire and the Woolsey Fire without pursuing criminal charges.

SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is complex and time consuming. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation processes.

Thomas Fire

On March 13, 2019, the VCFD and CAL FIRE jointly issued a report concluding, after ruling out other possible causes, that the Thomas Fire was started by SCE power lines coming into contact during high winds, resulting in molten metal falling to the ground. However, the report does not state that their investigation found molten metal on the ground. At this time, based

on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the report's indicated start time, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's system and at least 15 minutes prior to the start time indicated in the report. SCE is continuing to assess the extent of damages that may be attributable to the Thomas Fire.

Koenigstein Fire

On March 20, 2019, the VCFD and CAL FIRE jointly issued a report finding that the Koenigstein Fire was caused when an energized SCE electrical wire separated and fell to the ground along with molten metal particles and ignited the dry vegetation below. As previously disclosed, SCE believes that its equipment was associated with the ignition of the Koenigstein Fire. SCE is continuing to assess the extent of damages that may be attributable to the Koenigstein Fire.

Montecito Mudslides

SCE's internal review includes inquiry into whether the Thomas and/or Koenigstein Fires proximately caused or contributed to the Montecito Mudslides, whether, and to what extent, the Thomas and/or Koenigstein Fires were responsible for the damages in the Montecito area and other factors that potentially contributed to the losses that resulted from the Montecito Mudslides. Many other factors, including, but not limited to, weather conditions and insufficiently or improperly designed and maintained debris basins, roads, bridges and other channel crossings, could have proximately caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides.

At this time, based on available information, SCE has not been able to determine whether the Thomas Fire or the Koenigstein Fire, or both, were responsible for the damages in the Montecito area. In the event that SCE is determined to have caused the fire that spread to the Montecito area, SCE cannot predict whether, if fully litigated, the courts would conclude that the Montecito Mudslides were caused or contributed to by the Thomas and/or Koenigstein Fires or that SCE would be liable for some or all of the damages caused by the Montecito Mudslides.

Woolsey Fire

SCE's internal review into the facts and circumstances of the Woolsey Fire is ongoing. SCE has reported to the CPUC that there was an outage on SCE's electric system in the vicinity of where the Woolsey Fire reportedly began on November 8, 2018. SCE is aware of witnesses who saw fire in the vicinity of SCE's equipment at the time the fire was first reported. While SCE did not find evidence of downed electrical wires on the ground in the suspected area of origin, it observed a pole support wire in proximity to an electrical wire that was energized prior to the outage.

The Redacted Woolsey Report states that the VCFD investigation team determined that electrical equipment owned and operated by SCE was the cause of the Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment was associated with the ignition of the Woolsey Fire. SCE expects to obtain and review additional information and materials in the possession of CAL FIRE and others during the course of its internal review and the Woolsey Fire litigation process, including SCE equipment that has been retained by CAL FIRE.

Litigation

Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. Because potential plaintiffs can still timely file claims related to some of the 2017/2018 Wildfire/Mudslide Events, SCE expects to be the subject of additional lawsuits related to the events. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.

As of October 26, 2021, SCE was aware of at least currently pending 280 lawsuits, representing approximately 3,000 plaintiffs, related to the Thomas and Koenigstein Fires naming SCE as a defendant. One hundred fifty-one of the 280 lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least four of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties allege, among other things, negligence, inverse condemnation, trespass, private nuisance, and violations of the public utilities and health and safety codes. An initial trial for a limited number of plaintiffs, sometimes referred to as a bellwether trial, on certain fire only matters is currently scheduled for March 17, 2022. The bellwether trial date may be further delayed to provide SCE and certain of the individual plaintiffs in the Thomas and Koenigstein Fire litigation the opportunity to pursue settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs have, and others may, opt to pursue trial outside of the settlement program.

Seventy-three of the 280 pending lawsuits mentioned in the paragraph above allege that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides, resulting in the plaintiffs' claimed damages. Forty-seven of the 73 Montecito Mudslides lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. In addition to other causes of action, some of the Montecito Mudslides lawsuits also allege personal injury and wrongful death. A bellwether jury trial previously scheduled for October 12, 2020 was vacated due to the wide-spread disruption being caused by the COVID-19 pandemic.

As of October 26, 2021, SCE was aware of at least 348 currently pending lawsuits, representing approximately 7,000 plaintiffs, related to the Woolsey Fire naming SCE as a defendant. Two hundred eighty-four of the 348 lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least two of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura and Los Angeles Counties allege, among other things, negligence, inverse condemnation, personal injury, wrongful death, trespass, private nuisance, and violations of the public utilities and health and safety codes. A bellwether jury trial previously scheduled for October 26, 2021 has been vacated to provide SCE and certain of the individual plaintiffs in the Woolsey Fire litigation the opportunity to pursue settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs may opt to pursue trial outside of the settlement program.

The Thomas and Koenigstein Fires and Montecito Mudslides lawsuits are being coordinated in the Los Angeles Superior Court. The Woolsey Fire lawsuits have also been coordinated in the Los Angeles Superior Court. On October 4, 2018, the Superior Court denied Edison International's and SCE's challenge to the application of inverse condemnation to SCE with respect to the Thomas and Koenigstein Fires and, on February 26, 2019, the California Supreme Court denied SCE's petition to review the Superior Court's decision. In January 2019, SCE filed a cross-complaint against certain local public entities alleging that failures by these entities, such as failure to adequately plan for flood hazards and build and maintain adequate debris basins, roads, bridges and other channel crossings, among other things, caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. These cross-claims in the Montecito Mudslides litigation were not released as part of the Local Public Entity Settlements (as defined below).

Additionally, in September 2018, a derivative lawsuit for breach of fiduciary duties and unjust enrichment was filed in the Los Angeles Superior Court against certain current and former members of the Boards of Directors of Edison International and SCE. Edison International and SCE are identified as nominal defendants in the action. The derivative lawsuit generally alleges that the individual defendants violated their fiduciary duties by causing or allowing SCE to operate in an unsafe manner in violation of relevant regulations, resulting in substantial liability and damage from the Thomas and Koenigstein Fires and the Montecito Mudslides. The lawsuit is currently stayed.

In November 2018, a purported class action lawsuit alleging securities fraud and related claims was filed in federal court against Edison International, SCE and certain current and former officers of Edison International and SCE. The plaintiff alleges that Edison International and SCE made false and/or misleading statements in filings with the Securities and

Exchange Commission by failing to disclose that SCE had allegedly failed to maintain its electric transmission and distribution networks in compliance with safety regulations, and that those alleged safety violations led to fires that occurred in 2017 and 2018, including the Thomas Fire and the Woolsey Fire. In April 2021, the court granted a motion to dismiss the lawsuit. The plaintiff has appealed the dismissal to the United States Court of Appeals for the Ninth Circuit.

In January 2019, two separate derivative lawsuits alleging breach of fiduciary duties, securities fraud, misleading proxy statements, unjust enrichment, and related claims were filed in federal court against certain current and former members of the Boards of Directors and certain current and former officers of Edison International and SCE. Edison International and SCE are named as nominal defendants in those actions. The derivative lawsuits generally allege that the individual defendants breached their fiduciary duties and made misleading statements or allowed misleading statements to be made (i) between March 21, 2014 and August 10, 2015, with respect to certain ex parte communications between SCE and CPUC decisionmakers concerning the settlement of the San Onofre Order Instituting Investigation proceeding (the "San Onofre OII") and (ii) from February 23, 2016 to the present, concerning compliance with applicable laws and regulations concerning electric system maintenance and operations related to wildfire risks. The lawsuits generally allege that these breaches of duty and misstatements led to substantial liability and damage resulting from the disclosure of SCE's ex parte communications in connection with the San Onofre OII settlement, and from the 2017/2018 Wildfire/Mudslide Events. The lawsuits are currently stayed.

Settlements

In the fourth quarter of 2019, SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Wildfire/Mudslide Events (the "Local Public Entity Settlements").

In the third quarter of 2020, Edison International and SCE entered into an agreement (the "TKM Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation (the "TKM Subrogation Plaintiffs") collective claims arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides have been resolved. Under the TKM Subrogation Settlement, SCE paid the TKM Subrogation Plaintiffs an aggregate of $1.2 billion in October 2020 and also agreed to pay $0.555 for each dollar in claims to be paid by the TKM Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.

In January 2021, Edison International and SCE entered into an agreement (the "Woolsey Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Woolsey Fire litigation (the "Woolsey Subrogation Plaintiffs") collective claims arising from the Woolsey Fire have been resolved. Under the Woolsey Subrogation Settlement, SCE paid the Woolsey Subrogation Plaintiffs an aggregate of $2.2 billion in March and April 2021. SCE has also agreed to pay $0.67 for each dollar in claims to be paid by the Woolsey Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.

As of September 30, 2021, SCE has also entered into settlements with approximately 4,000 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In 2020, SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $300 million to those individual plaintiffs. Between December 31, 2020 and September 30, 2021, SCE also entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $1.2 billion to those individual plaintiffs.

Edison International and SCE did not admit wrongdoing or liability as part of any of the settlements described above. Other claims and potential claims related to the 2017/2018 Wildfire/Mudslide Events remain.

SCE continues to explore reasonable settlement opportunities with other plaintiffs in the outstanding 2017/2018 Wildfire/Mudslide Events litigation.

Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates

At September 30, 2021 and December 31, 2020, Edison International's and SCE's consolidated balance sheets include fixed payments to be made under executed settlement agreements and accrued estimated losses of $2.3 billion and $4.4 billion, respectively, for the 2017/2018 Wildfire/Mudslide Events. The following table presents changes in estimated losses since December 31, 2020:

(in millions)

    

Balance at December 31, 20201

$

4,383

Increase in accrued estimated losses to reflect best estimate

 

1,265

Amounts paid

 

(3,392)

Balance at September 30, 20212

$

2,256

1At December 31, 2020, $2,231 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes an estimate for claims brought by insurance subrogation plaintiffs in the Woolsey Fire litigation, which were settled on January 22, 2021 for $2,212 million, and $19 million of other settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At December 31, 2020, the $2,281 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events after giving effect to the Woolsey Subrogation Settlement of $2,152 million and other wildfire-related claims estimates of $129 million.
2At September 30, 2021, $84 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At September 30, 2021, the $2,308 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events of $2,172 million and other wildfire-related claims estimates of $136 million.

For the three and nine months ended September 30, 2021 and 2020, Edison International's and SCE's income statements include charges for the estimated losses, net of expected recoveries from insurance and FERC customers, related to the 2017/2018 Wildfire/Mudslide Events as follows:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2021

    

2020

    

2021

    

2020

Charge for wildfire-related claims

$

1,265

$

1,297

$

1,265

$

1,297

Expected insurance recoveries

 

 

 

 

Expected revenue from FERC customers

 

(67)

 

(84)

 

(67)

 

(84)

Total pre-tax charge

 

1,198

 

1,213

 

1,198

 

1,213

Income tax benefit

 

(304)

 

(339)

 

(304)

 

(339)

Total after-tax charge

$

894

$

874

$

894

$

874

For events that occurred in 2017 and early 2018, principally the Thomas and Koenigstein Fires and Montecito Mudslides, SCE had $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. For the Woolsey Fire, SCE had an additional $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. Edison International and SCE record a receivable for insurance recoveries when recovery of a recorded loss is determined to be probable. The following table presents changes in expected

insurance recoveries associated with the estimated losses for the 2017/2018 Wildfire/Mudslide Events since December 31, 2020:

(in millions)

    

    

Balance at December 31, 2020

$

708

Insurance recoveries

 

(708)

Balance at September 30, 2021

$

In total, through September 30, 2021, SCE has accrued estimated losses of $7.5 billion, has paid or agreed to pay approximately $5.3 billion in settlements and has recovered $2.0 billion from its insurance carriers in relation to the 2017/2018 Wildfire/Mudslide Events.

Recovery of SCE's actual losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent in which a California investor-owned utility has sought recovery for uninsured wildfire-related costs is SDG&E's requests for cost recovery related to 2007 wildfire activity, where the FERC allowed recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that SDG&E did not meet the CPUC's prudency standard. As a result, while SCE does not agree with the CPUC's decision, it believes that the CPUC's interpretation and application of the prudency standard to SDG&E creates substantial uncertainty regarding how that standard will be applied to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. SCE will continue to evaluate the probability of recovery based on available evidence, including judicial, legislative and regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard when making determinations regarding recovery of uninsured wildfire-related costs. While the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates. SCE would record a regulatory asset at the time it obtains sufficient information to support a conclusion that recovery is probable.

In July 2019, SCE filed a CEMA application with the CPUC to seek recovery of, among other things, approximately $60 million of capital expenditures and capital related expenses incurred to restore service to customers and to repair, replace and restore buildings and SCE's facilities damaged or destroyed as a result of six 2017 fires, primarily the Thomas and Koenigstein Fires. In August 2021, the CPUC issued a final decision which denied without prejudice SCE's application to recover a revenue requirement of $8 million for all six 2017 wildfires on the basis that SCE did not demonstrate that it was prudent in relation to the Thomas and Rye fires and had failed to segregate the costs attributable to the other four fires. Of the $8 million revenue requirement that was denied, $6 million was for the Thomas and Rye fires. CAL FIRE has determined that the Thomas and Rye fires were caused by SCE equipment. The decision allows SCE to submit additional applications with the CPUC to recover the costs associated with the Thomas and Rye fires, does not specify a deadline for any such applications, and directs that SCE must prove it was prudent in relation to the Thomas and/or Rye fires, as applicable, in any such future applications. With respect to the other four 2017 fires, the final decision directed SCE to file supplemental testimony by November 2021 segregating the restoration/repair costs attributable each such fire, for which SCE's prudency was not in question. As of September 30, 2021, SCE has $187 million in assets recorded in property, plant and equipment in relation to restoration costs related to the 2017/2018 Wildfire/Mudslide Events which may not be recoverable. These assets would be impaired if the restoration costs are permanently disallowed by the CPUC in future cost recovery proceedings. SCE continues to incur costs for reconstructing its system and restoring service to structures that were damaged or destroyed by the Thomas, Koenigstein and Woolsey Fires and plans to file additional applications with the CPUC to recover such costs. See "Recovery of Wildfire-Related Costs" below.

Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded total expected recoveries of $300 million within the FERC balancing account. This was the FERC portion of the total estimated losses accrued. As of September 30, 2021, collections have reduced the regulatory assets remaining in the FERC balancing account to $162 million.

2019/2020 Wildfires

Several wildfires significantly impacted portions of SCE's service territory in 2019 and 2020 (the wildfires that originated in Southern California in 2019 and 2020 where SCE's equipment may be alleged to be associated with the fire's ignition are referred to collectively as the "2019/2020 Wildfires"). Edison International and SCE expect that any losses incurred in connection with the 2019/2020 Wildfires will be covered by insurance, subject to self-insured retentions and co-insurance, and expect that any such losses after insurance recoveries will not be material. As of September 30, 2021, Edison International and SCE had estimated losses (established at the lower end of the reasonably estimated range of expected losses) of $123 million, and expected recoveries from insurance of $75 million, reflected on their consolidated balance sheets related to the 2019/2020 Wildfires.

One of the 2019/2020 Wildfires, the "Saddle Ridge" Fire, originated in Los Angeles county in October 2019 and burned approximately 9,000 acres, destroyed an estimated 19 structures, damaged an estimated 88 structures, and resulted in injuries to 8 individuals and one fatality. An investigation into the cause of the Saddle Ridge Fire is being led by the Los Angeles Fire Department. Based on pending litigation and without considering insurance recoveries, it is reasonably possible that SCE will incur a material loss in connection with the Saddle Ridge Fire, but the range of possible losses that could be incurred cannot be estimated at this time. SCE has not accrued a charge for potential losses relating to the Saddle Ridge Fire.

Another of the 2019/2020 Wildfires, the "Bobcat Fire" was reported in the vicinity of Cogswell Dam in Los Angeles County, California in September 2020. The United States Forest Service ("USFS") has reported that the Bobcat Fire burned approximately 116,000 acres in Los Angeles County, destroyed an estimated 87 homes, 1 commercial property and 83 minor structures, damaged an estimated 28 homes and 19 minor structures, and resulted in injuries to 6 firefighters. In addition, the USFS has estimated suppression costs at $80 million. A camera in the vicinity of Cogswell Dam captured the initial stages of a fire with the first observed smoke approximately six minutes before an SCE circuit in the area experienced an anomaly (a relay). An investigation into the cause of the Bobcat Fire is being led by the USFS, and the USFS has taken a specific section of an SCE overhead conductor in the vicinity of Cogswell Dam into possession as part of its investigation. SCE understands that the USFS has also taken three tree branches in the area into possession. The SED is also conducting an investigation of the Bobcat Fire. SCE has accrued a charge for potential losses relating to the Bobcat Fire. The accrued charge corresponds to the lower end of the reasonably estimated range of expected losses that may be incurred in connection with the Bobcat Fire and is subject to change as additional information becomes available.

Current Wildfire Insurance Coverage

SCE has approximately $1.0 billion of wildfire-specific insurance coverage for events that may occur during the period July 1, 2021 through June 30, 2022, subject to $50 million of self-insured retention and up to approximately $75 million of co-insurance, which results in net coverage of approximately $875 million. Various coverage limitations within the policies that make up SCE's wildfire insurance coverage could result in additional material self-insured costs, for instance in the event of multiple wildfire occurrences during a policy period or with a single wildfire with damages in excess of the policy limits. SCE believes that its insurance coverage for the July 1, 2021 through June 30, 2022 period meets its obligation to maintain reasonable insurance coverage under AB 1054.

Based on policies currently in effect, SCE's 2021 wildfire insurance expense is expected to be approximately $425 million prior to any regulatory deferrals.

In August 2021, the CPUC issued a final decision in track 1 of the 2021 GRC proceeding which authorized $460 million for wildfire insurance expense for 2021 and a one-way balancing account to require any overcollection to be returned to customers. Under the final decision, SCE would continue to track incremental wildfire insurance expenses above authorized amounts in its WEMA and recovery of incremental amounts would be subject to future reasonableness review.

SCE tracks incremental insurance premium, self-insured retention and co-insurance costs related to wildfire liability insurance policies as well as other wildfire-related costs, including claims and legal costs, in its WEMA. In July 2019, SCE filed a WEMA application with the CPUC to seek recovery of an aggregate of $505 million, consisting of $478 million in wildfire insurance premium costs that had been incurred or were to be incurred before July 1, 2020 in excess of premiums approved in the 2018 GRC and the corresponding financing costs. In September 2020, the CPUC approved SCE's July 2019 WEMA application and authorized SCE to collect a total revenue requirement of $505 million over a two-year period. SCE included the authorized revenue requirement in rates in October 2020. In December 2020, SCE filed another WEMA application with the CPUC to seek recovery of an aggregate of $214 million, consisting of $204 million in wildfire insurance premium costs in excess of premiums approved in the 2018 GRC, representing wildfire insurance premiums for July 1, 2020 through December 31, 2020, the corresponding financing costs, memorandum account interest and a prior period premium adjustment.

SCE's cost of obtaining wildfire insurance coverage has increased significantly in recent years as a result of, among other things, the number of recent and significant wildfire events throughout California and the application of inverse condemnation to investor-owned utilities. As such, while SCE is required to maintain reasonable insurance coverage under AB 1054, SCE may not be able to obtain a reasonable amount of wildfire insurance, at a reasonable cost, for future policy periods.

Recovery of Wildfire-Related Costs

Pre-AB 1054 Cost Recovery

California courts have previously found investor-owned utilities to be strictly liable for property damage, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. The rationale stated by these courts for applying this theory to investor-owned utilities is that property damages resulting from a public improvement, such as the distribution of electricity, can be spread across the larger community that benefited from such improvement through recovery of uninsured wildfire-related costs in electric rates. However, in November 2017, the CPUC issued a decision denying SDG&E's request to include in its rates uninsured wildfire-related costs arising from several 2007 wildfires, finding that SDG&E did not meet the prudency standard because it did not prudently manage and operate its facilities prior to or at the outset of the 2007 wildfires. In July 2018, the CPUC denied both SDG&E's application for rehearing on its cost recovery request and a joint application for rehearing filed by SCE and PG&E limited to the applicability of inverse condemnation principles in the same proceeding. The California Court of Appeal, the California Supreme Court and the United States Supreme Court have denied SDG&E's petitions for review of the CPUC's denial of SDG&E's application.

2019 Wildfire Legislation

In July 2019, AB 1054 was signed by the governor of California and became effective immediately. The summary of the wildfire legislation below is based on SCE's interpretation of AB 1054. A lawsuit challenging the validity of AB 1054 was filed in federal court on July 19, 2019. Edison International and SCE are unable to predict the outcome of this lawsuit.

AB 1054 Prudency Standard

Under AB 1054, the CPUC must apply a new standard when assessing the prudency of a utility in connection with a request for recovery of wildfire costs for wildfires ignited after July 12, 2019. Under AB 1054, the CPUC is required to find a utility to be prudent if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have

undertaken under similar circumstances, at the relevant point in time, and based on the information available at that time. Prudent conduct under the AB 1054 standard is not limited to the optimum practice, method, or act to the exclusion of others, but rather encompasses a spectrum of possible practices, methods, or acts consistent with utility system needs, the interest of the ratepayers, and the requirements of governmental agencies. AB 1054 also provides that the CPUC may determine that wildfire costs may be recoverable, in whole or in part, by taking into account factors within and outside the utility's control, including humidity, temperature, and winds. Further, utilities with a valid safety certification will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was prudent. If a utility does not have a valid safety certification, it will have the burden to prove, based on a preponderance of evidence, that its conduct was prudent. The new prudency standard will survive the termination of the Wildfire Insurance Fund.

Utilities participating in the Wildfire Insurance Fund are not required to reimburse the fund for amounts withdrawn from the fund that the CPUC finds were prudently incurred and can recover such prudently incurred wildfire costs through electric rates if the fund has been exhausted.

Wildfire Insurance Fund

AB 1054 provided for the Wildfire Insurance Fund to reimburse a utility for payment of third-party damage claims arising from certain wildfires that exceed, in aggregate in a calendar year, the greater of $1.0 billion or the insurance coverage required to be maintained under AB 1054. The Wildfire Insurance Fund was established in September 2019 and is available for claims related to wildfires ignited after July 12, 2019 that are determined by the responsible government investigatory agency to have been caused by a utility.

SCE and SDG&E collectively made their initial contributions totaling approximately $2.7 billion to the Wildfire Insurance Fund in September 2019. Upon its emergence from bankruptcy, on July 1, 2020, PG&E made its initial contribution of approximately $4.8 billion to the Wildfire Insurance Fund. PG&E, SCE and SDG&E are also collectively expected to make aggregate contributions of approximately $3.0 billion to the Wildfire Insurance Fund through annual contributions to the fund over a 10-year period, of which they have made two annual contributions totaling approximately $600 million. In addition to PG&E's, SCE's and SDG&E's contributions to the Wildfire Insurance Fund, PG&E, SCE and SDG&E are expected to collect $6.1 billion, $6.1 billion and $1.3 billion, respectively, from their customers over a 15-year period through a dedicated rate component. The amount collected from customers may be directly contributed to the Wildfire Insurance Fund or used to support the issuance of up to $10.5 billion in bonds by the California Department of Water Resources, the proceeds of which would be contributed to the fund. In addition to funding contributions to the Wildfire Insurance Fund, the amount collected from utility customers will pay for, among other things, any interest and financing costs related to any bonds that are issued by the California Department of Water Resources to support the contributions to the Wildfire Insurance Fund.

SCE made an initial contribution of approximately $2.4 billion to the Wildfire Insurance Fund in September 2019 and committed to make ten annual contributions of approximately $95 million per year to the fund, by no later than January 1 of each year. Through September 30, 2021, SCE has contributed approximately $2.6 billion to the Wildfire Insurance Fund.

During 2020 SCE amortized its contributions to the Wildfire Insurance Fund over 10 years, based on evaluation of the fund's expected life based on fire experience. Based on information available in the first quarter of 2021 regarding catastrophic wildfires during 2019 and 2020, SCE reassessed its estimate of the life of the Wildfire Insurance Fund. Using 7 years of historical data (2014 – 2020) of wildfires caused by electrical utility equipment to create Monte Carlo simulations of expected loss, SCE expects the life of the fund to be 15 years from July 12, 2019 which will be reflected prospectively in amortization expense from January 1, 2021. As of September 30, 2021, the participating investor-owned utilities have not sought reimbursement of wildfire claims from the Wildfire Insurance Fund. SCE has considered the possible impact of PG&E seeking reimbursement from the fund for the Dixie fire, a July 2021 fire where PG&E's equipment has been alleged to be associated with the fire's ignition, and does not currently expect a change in the life of the fund as a result of the fire.

SCE's contributions to the Wildfire Insurance Fund will not be recoverable through electric rates and will be excluded from the measurement of SCE's CPUC-jurisdictional authorized capital structure. SCE will also not be entitled to cost recovery for any borrowing costs incurred in connection with its contributions to the Wildfire Insurance Fund. See Note 1 in the 2020 Form 10-K for information on the accounting impact of SCE's contributions to the Wildfire Insurance Fund.

Reimbursement from Wildfire Insurance Fund and AB 1054 Liability Cap

Participating investor-owned utilities will be reimbursed from the Wildfire Insurance Fund for eligible claims, subject to the fund administrator's review. SCE will reimburse the fund for any withdrawn amounts if SCE receives payment of such amounts under an indemnification agreement or from an insurance provider or other third-party. SCE will also be required to reimburse the fund for withdrawn amounts that the CPUC disallows, subject to the AB 1054 Liability Cap (as defined below). If the utility has maintained a valid safety certification and its actions or inactions that resulted in the wildfire are not found to constitute conscious or willful disregard of the rights and safety of others, the aggregate requirement to reimburse the fund over a trailing three calendar year period is capped at 20% of the equity portion of the utility's transmission and distribution rate base in the year of the prudency determination ("AB 1054 Liability Cap"). Based on SCE's forecasted weighted-average 2021 transmission and distribution rate base, excluding general plant and intangibles, and using the equity portion of SCE's CPUC authorized capital structure of 52%, SCE's requirement to reimburse the Wildfire Insurance Fund for eligible claims disallowed in 2021 would be capped at approximately $3.2 billion.

SCE will not be allowed to recover borrowing costs incurred to reimburse the fund for amounts that the CPUC disallows. The Wildfire Insurance Fund and, consequently, the AB 1054 Liability Cap will terminate when the administrator determines that the fund has been exhausted.

Safety Certification and Wildfire Mitigation Plan

Under AB 1054, SCE can obtain an annual safety certification upon the submission of certain required safety information, including an approved wildfire mitigation plan ("WMP"). On September 17, 2020, SCE obtained a safety certification that will be valid for 12 months. Notwithstanding its 12-month term, if SCE requested a new safety certification by September 13, 2021, then its current safety certification would remain valid until the Office of Energy Infrastructure Safety of the California Natural Resources Agency ("OEIS," which was previously the Wildfire Safety Division of the CPUC) acts on SCE's request for a new safety certification. SCE requested a new safety certification on September 13, 2021 and expects the OEIS to act on its request by December 13, 2021.

Under AB 1054, SCE is required to submit a comprehensive WMP to the CPUC at least once every three years for review and approval. Beginning in 2020, each such comprehensive plan was required to cover at least a three-year period. In addition, SCE anticipates updating its comprehensive three-year plans annually in the intervening years.

SCE submitted its 2020 – 2022 WMP in February 2020. In June 2020, the CPUC ratified the OEIS's conditional approval of SCE's 2020 – 2022 WMP. The approval was conditioned on SCE providing requested information to the OEIS, including additional descriptions of how SCE is implementing, and will implement, certain requirements imposed by the OEIS. SCE submitted updates to its 2020 – 2022 WMP in February 2021 to, among other things, report on implementation of its plan in 2020 and describe new and ongoing wildfire mitigation activities. In June 2021, SCE submitted revised updates to its 2020 – 2022 WMP in response to a revision notice received from the OEIS. In August 2021, the OEIS issued a resolution approving SCE's updates, and an action statement requiring SCE to remedy certain specified issues, including by reevaluating the scope and pace of its covered conductor program and providing additional clarity and consistency on risk mitigation analysis. As required under the action statement, SCE submitted a report regarding its progress on remedying these issues on November 1, 2021 and is required to submit an additional report in its 2022 WMP update.

Capital Expenditure Requirement

Under AB 1054, approximately $1.6 billion of spending by SCE on wildfire risk mitigation capital expenditures made after August 1, 2019, cannot be included in the equity portion of SCE's rate base ("AB 1054 Excluded Capital Expenditures"). SCE can apply for irrevocable orders from the CPUC to finance these AB 1054 Excluded Capital Expenditures, including through the issuance of securitized bonds, and can recover any prudently incurred financing costs. As of September 30, 2021, SCE had spent all of the approximately $1.6 billion in AB 1054 Excluded Capital Expenditures.

In November 2020, the CPUC issued an irrevocable order permitting SCE to finance approximately $340 million, comprised of AB 1054 Excluded Capital Expenditures incurred in connection with GS&RP and prudently incurred financing costs, through the issuance of securitized bonds. SCE issued securitized bonds in the amount of $338 million in February 2021.

In June 2021, SCE filed an application with the CPUC requesting to finance up to $1.0 billion of wildfire mitigation and customer uncollectible costs and associated financing costs through the issuance of securitized bonds. The $1.0 billion request included approximately $518 million of AB 1054 Excluded Capital Expenditures, comprised of $219 million approved in the 2021 GRC track 2 settlement and $299 million incurred in 2021 and approved in track 1 of the GRC.

In October 2021, the CPUC issued a decision which allows SCE to issue recovery bonds to recover the AB 1054 Excluded Capital Expenditures approved in tracks 1 and 2 of the 2021 GRC, but denied SCE's application to securitize the operations and maintenance expenditures approved in the GRC track 2 settlement and incremental residential uncollectible expenses. The decision directed SCE to recover the remaining costs in CPUC customer rates by submitting an advice letter to determine the amortization schedule and presumes that a three-year amortization period is reasonable.

SCE expects to seek additional irrevocable orders from the CPUC to finance the remaining AB 1054 Excluded Capital Expenditures.

Environmental Remediation

SCE records its environmental remediation and restoration liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operation and maintenance, monitoring, and site closure. Unless there is a single probable amount, SCE records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.

At September 30, 2021, SCE's recorded estimated minimum liability to remediate its 26 identified material sites (sites with a liability balance at September 30, 2021, in which the upper end of the range of expected costs is at least $1 million) was $258 million, including $170 million related to San Onofre. In addition to these sites, SCE also has 14 immaterial sites with a liability balance as of September 30, 2021, for which the total minimum recorded liability was $3 million. Of the $261 million total environmental remediation liability for SCE, $246 million has been recorded as a regulatory asset. SCE expects to recover $39 million through an incentive mechanism that allows SCE to recover 90% of its environmental remediation costs at certain sites (SCE may request to include additional sites in this mechanism) and $207 million through proceedings that allow SCE to recover up to 100% of the costs incurred at certain sites through customer rates. In addition, SCE has other identified sites including several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.

The ultimate costs to clean up SCE's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified

sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs at the identified material sites and immaterial sites could exceed its recorded liability by up to $110 million and $9 million, respectively. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes.

SCE expects to clean up and mitigate its identified sites over a period of up to 30 years. Remediation costs for each of the next five years are expected to range from $8 million to $24 million. Costs incurred for the nine months ended September 30, 2021 and 2020 were $6 million and $5 million, respectively.

Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, SCE believes that costs ultimately recorded will not materially affect its results of operations, financial position, or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.

Nuclear Insurance

SCE is a member of Nuclear Electric Insurance Limited ("NEIL"), a mutual insurance company owned by entities with nuclear facilities. NEIL provides insurance for nuclear property damage, including damages caused by acts of terrorism up to specified limits, and for accidental outages for active facilities. The amount of nuclear property damage insurance purchased for San Onofre and Palo Verde exceeds the minimum federal requirement of $50 million and $1.1 billion, respectively. If NEIL losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $30 million per year.

Federal law limits public offsite liability claims for bodily injury and property damage from a nuclear incident to the amount of available financial protection, which is currently approximately $13.5 billion for Palo Verde and $560 million for San Onofre. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available through a Facility Form issued by American Nuclear Insurers. SCE withdrew from participation in the secondary insurance pool for San Onofre for offsite liability insurance effective January 5, 2018. Based on its ownership interests in Palo Verde, SCE could be required to pay a maximum of approximately $65 million per nuclear incident for future incidents. However, it would have to pay no more than approximately $10 million per future incident in any one year. Based on its ownership interests in San Onofre and Palo Verde prior to January 5, 2018, SCE could be required to pay a maximum of approximately $255 million per nuclear incident and a maximum of $38 million per year per incident for liabilities arising from events prior to January 5, 2018, although SCE is not aware of any such events.

Spent Nuclear Fuel

Under federal law, the DOE is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE has not met its contractual obligation to accept spent nuclear fuel. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. Currently, both San Onofre and Palo Verde have interim storage for spent nuclear fuel on site sufficient for their current license period.

A settlement entered into between SCE, as operating agent of San Onofre, and the DOE provided for a claim submission/audit process for expenses incurred from 2014 – 2016, under which SCE submitted claims for damages caused by the DOE failure to accept San Onofre spent nuclear fuel each year and the DOE has approved reimbursement of and paid an aggregate of approximately $88 million (SCE's share was approximately $69 million). These damages awards have been refunded to customers.

In November 2019, SCE, as operating agent of San Onofre, filed a new complaint against the DOE to recover San Onofre related damages incurred from January 1, 2017 through July 31, 2018.

Upstream Lighting Program

From 2017 – 2019, SCE administered the Upstream Lighting Program, part of a statewide program administered by investor-owned utilities that offered discounted energy efficient light bulbs to customers through incentives to lighting manufacturers. The CPUC began investigating the programs administered by the investor-owned utilities based on reports that investor-owned utilities, including SCE, shipped a significant number of bulbs under the program that could not be tracked to customers. Beginning in January 2020, the CPUC has sought comments on remedies related to SCE's implementation of the Upstream Lighting Program from 2017 through 2019 program years. SCE undertook an independent investigation of bulbs shipped to retailers categorized as grocery and discount businesses during the 2017 to 2019 program years and found that there were overstocking of bulbs and program management shortcomings. Incentives paid to manufacturers for bulbs shipped to grocery and discount businesses during the relevant period, including those that were sold to customers, were approximately $91 million. In addition, SCE received incentives related to the bulbs shipped to grocery and discount businesses through an energy efficiency incentive mechanism ("ESPI Mechanism") of approximately $3.5 million related to the bulbs shipped in 2017 and 2018. SCE also expects to receive incentives of approximately $1.3 million under the ESPI Mechanism in 2022 related to bulbs shipped to grocery and discount businesses in 2018 and 2019.

In January 2021, the Public Advocates Office and The Utility Reform Network provided comments to the CPUC arguing that SCE imprudently managed the program and requesting: a refund of $33 million of ESPI awards, which includes incentives associated with the Upstream Lighting Program and other energy efficiency programs; a refund of $92 million of incentives paid to manufacturers and associated program administrative costs; $140 million in fines; and additional program improvements to be provided at shareholder expense. In March 2021, SCE filed reply comments arguing that remedies of approximately $21 million were appropriate.

SCE has accrued a charge for potential losses relating to the Upstream Lighting Program. The accrued charge corresponds to the lower end of the reasonably estimated range of expected losses that may be incurred in connection with the Upstream Lighting Program and is subject to change as additional information becomes available.