Commitments and Contingencies
9 Months Ended
Sep. 30, 2012
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies
Third-Party Power Purchase Agreements
During the nine months ended September 30, 2012, SCE had power purchase contracts with additional commitments estimated to be: $17 million in 2014, $43 million in 2015, $66 million in 2016 and $970 million for the period remaining thereafter. Some of these power purchase agreements are classified as operating leases. The additional commitments for these leases, which are also included in the amounts above, are estimated to be: $21 million in 2015, $45 million in 2016 and $942 million for the period remaining thereafter.
Coal Transportation Agreements
At September 30, 2012, Midwest Generation had contractual agreements for the transportation of coal. The commitments under these contracts are based on either actual coal purchases derived from committed coal volumes set forth in fuel supply contracts or minimum quantities as set forth in the transportation agreements as adjusted for provisions that mitigate the financial exposure of Midwest Generation related to a plant closure under certain circumstances as specified in the agreements. Estimated contractual obligations for coal transportation agreements are estimated to aggregate $2.3 billion, which consists of: $118 million for the remainder of 2012, $292 million for 2013, $286 million for 2014, $260 million for 2015, $260 million for 2016 and $1.1 billion thereafter. Years subsequent to 2012 reflect a reduction in minimum volumes for the shutdown of the Fisk and Crawford Stations.
Capital Commitments
At September 30, 2012, EMG's subsidiaries had firm commitments to spend approximately $92 million during the remainder of 2012, $44 million for 2013 and $17 million for 2015 for capital expenditures. These expenditures primarily relate to the Walnut Creek project, construction of wind projects and capital expenditures at the Midwest Generation plants.
Homer City Lease
Homer City received a forbearance of the $47 million senior rent payment due October 1, 2012. Homer City made the required April 1, 2012 senior rent payment of $48 million but did not make the April 1, 2012 payment of equity rent of $65 million and was granted a waiver by the owner-lessors of any rent default event with respect to the payment of the equity rent for all purposes other than restrictions on distributions from Homer City, including repayment of its intercompany loan, and the $48 million senior rent reserve letter of credit remains in place. Homer City and an affiliate of GECC entered into the Homer City MTA for the divestiture by Homer City of substantially all of its remaining assets and certain specified liabilities. For further discussion, see Note 18.
Guarantees and Indemnities
Edison International's subsidiaries have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business. The contracts discussed below included performance guarantees.
Environmental Indemnities Related to the Midwest Generation Plants
In connection with the acquisition of the Midwest Generation plants, EME agreed to indemnify Commonwealth Edison Company ("Commonwealth Edison") with respect to specified environmental liabilities before and after December 15, 1999, the date of sale. The indemnification obligations are reduced by any insurance proceeds and tax benefits related to such indemnified claims and are subject to a requirement that Commonwealth Edison takes all reasonable steps to mitigate losses related to any such indemnification claim. Also, in connection with the sale-leaseback transaction related to the Powerton and Joliet Stations in Illinois, EME agreed to indemnify the owner-lessors for specified environmental liabilities. These indemnities are not limited in term or amount. Due to the nature of the obligations under these indemnities, a maximum potential liability cannot be determined. Commonwealth Edison has advised EME that Commonwealth Edison believes it is entitled to indemnification for all liabilities, costs, and expenses that it may be required to bear as a result of the litigation discussed below under "—Contingencies—Midwest Generation New Source Review and Other Litigation," and one of the Powerton-Joliet owner-lessors has made a similar request for indemnification. Commonwealth Edison has also advised EME that it believes it is entitled to indemnification for costs and expenses incurred in connection with the information requested under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 regarding environmental sampling and investigation performed at Midwest Generation's Fisk and Crawford sites. Except as discussed below, EME has not recorded a liability related to these environmental indemnities.
Midwest Generation entered into a supplemental agreement with Commonwealth Edison and Exelon Generation Company LLC on February 20, 2003 to resolve a dispute regarding interpretation of Midwest Generation's reimbursement obligation for asbestos claims under the environmental indemnities set forth in the Asset Sale Agreement. Under this supplemental agreement, Midwest Generation agreed to reimburse Commonwealth Edison and Exelon Generation for 50% of specific asbestos claims pending as of February 2003 and related expenses less recovery of insurance costs, and agreed to a sharing arrangement for liabilities and expenses associated with future asbestos-related claims as specified in the agreement. The obligations under this agreement are not subject to a maximum liability. The supplemental agreement had an initial five-year term with an automatic renewal provision for subsequent one-year terms (subject to the right of either party to terminate); pursuant to the automatic renewal provision, the supplemental agreement has been extended until February 2013. There were approximately 230 cases for which Midwest Generation was potentially liable that had not been settled and dismissed at September 30, 2012. Midwest Generation had recorded a liability of $53 million at September 30, 2012 related to this contractual indemnity.
Indemnities Related to the Homer City Plant
In connection with the original acquisition of the Homer City plant, Homer City agreed to indemnify the sellers with respect to specified environmental liabilities before and after the date of sale. EME guaranteed this obligation of Homer City. Also, in connection with the sale-leaseback transaction related to the Homer City plant, Homer City agreed to indemnify the owner-lessors for specified environmental liabilities. Due to the nature of the obligations under these indemnity provisions, they are not subject to a maximum potential liability and do not have expiration dates. EME has not recorded a liability related to this indemnity. For discussion of the New Source Review lawsuit filed against Homer City, see "—Contingencies—Homer City New Source Review and Other Litigation."
Indemnities Provided under Asset Sale and Sale-Leaseback Agreements
The asset sale agreements for the sale of EME's international assets contain indemnities from EME to the purchasers, including indemnification for taxes imposed with respect to operations of the assets prior to the sale and for pre-closing environmental liabilities. Not all indemnities under the asset sale agreements have specific expiration dates. At September 30, 2012, EME had recorded a liability of $20 million related to these matters.
In connection with the sale-leaseback transactions related to the Homer City plant in Pennsylvania, the Powerton and Joliet Stations in Illinois and, previously, the Collins Station in Illinois, EME and several of its subsidiaries entered into tax indemnity agreements. Under certain of these tax indemnity agreements, Homer City and Midwest Generation, as the lessees in the sale-leaseback transactions agreed to indemnify the respective owner-lessors for specified adverse tax consequences that could result from certain situations set forth in each tax indemnity agreement, including specified defaults under the respective leases. Although the Collins Station lease terminated in April 2004, Midwest Generation's indemnities in favor of its former lease equity investors are still in effect. EME provided similar indemnities in the sale-leaseback transactions related to the Powerton and Joliet Stations in Illinois. The potential indemnity obligations under these tax indemnity agreements could be significant. Due to the nature of these potential obligations, EME cannot determine a range of estimated obligations which would be triggered by a valid claim from the owner-lessors. EME has not recorded a liability for these matters.
In addition to the indemnity provided by Homer City, EME agreed to indemnify the owner-lessors in the sale-leaseback transaction related to the Homer City plant for certain negative federal income tax consequences should the rent payments be "levelized" for tax purposes and for potential foreign tax credit losses in the event that the owner-lessor's debt is characterized as recourse, rather than nonrecourse. This indemnity covers a limited range of possible tax consequences that are unrelated to performance under the lease.
Upon closing of the Homer City MTA, the tax indemnity agreements between EME, Homer City and GECC will be terminated and GECC will release EME and Homer City from its obligations thereunder. Completion of the Homer City MTA is subject to the satisfaction of a number of closing conditions, including the successful restructuring and reorganization of an affiliate of GECC and receipt of the regulatory approvals required for the transfer of the Homer City plant to GECC. For further discussion, see Note 18.
Indemnity Provided as Part of the Acquisition of Mountainview
In connection with the acquisition of the Mountainview power plant, SCE agreed to indemnify the seller with respect to specific environmental claims related to SCE's previously owned San Bernardino Generating Station, divested by SCE in 1998 and reacquired as part of the Mountainview acquisition. SCE retained certain responsibilities with respect to environmental claims as part of the original divestiture of the station. The aggregate liability for either party to the purchase agreement for damages and other amounts is a maximum of $60 million. This indemnification for environmental liabilities expires on or before March 12, 2033. SCE has not recorded a liability related to this indemnity.
Mountainview Filter Cake Indemnity
SCE has indemnified the City of Redlands, California in connection with Mountainview's California Energy Commission permit for cleanup or associated actions related to groundwater contaminated by perchlorate due to the disposal of filter cake at the City's solid waste landfill. The obligations under this agreement are not limited to a specific time period or subject to a maximum liability. SCE has not recorded a liability related to this indemnity.
Other Edison International Indemnities and Guarantees
EME guarantees Midwest Generation's payments under the Powerton and Joliet sale-leaseback agreements. A default by Midwest Generation in meeting its obligations under those agreements could have an adverse impact on EME.
Edison International provides other indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, and indemnities for specified environmental liabilities and income taxes with respect to assets sold. Edison International's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International may have recourse against third parties. Edison International has not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.
Contingencies
In addition to the matters disclosed in these Notes, Edison International is involved in other legal, tax and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International believes the outcome of these other proceedings will not, individually or in the aggregate, materially affect its results of operations or liquidity.
Midwest Generation New Source Review and Other Litigation
In August 2009, the United States Environmental Protection Agency ("US EPA") and the State of Illinois filed a complaint in the Northern District of Illinois alleging that Midwest Generation or Commonwealth Edison performed repair or replacement projects at six Illinois coal-fired electric generating stations in violation of the Prevention of Significant Deterioration ("PSD") requirements and of the New Source Performance Standards of the Clean Air Act ("CAA"), including alleged requirements to obtain a construction permit and to install controls sufficient to meet best available control technology ("BACT") emission rates. The US EPA also alleged that Midwest Generation and Commonwealth Edison violated certain operating permit requirements under Title V of the CAA. Finally, the US EPA alleged violations of certain opacity and particulate matter standards at the Midwest Generation plants. In addition to seeking penalties ranging from $25,000 to $37,500 per violation, per day, the complaint called for an injunction ordering Midwest Generation to install controls sufficient to meet BACT emission rates at all units subject to the complaint and other remedies. The remedies sought by the plaintiffs in the lawsuit could go well beyond the requirements of the Combined Pollutant Standard ("CPS"). Several Chicago-based environmental action groups intervened in the case.
Nine of the ten PSD claims raised in the complaint have been dismissed, along with claims related to alleged violations of Title V of the CAA, to the extent based on the dismissed PSD claims, and all claims asserted against Commonwealth Edison and EME. The court denied a motion to dismiss a claim by the Chicago-based environmental action groups for civil penalties in the remaining PSD claim, but noted that the plaintiffs will be required to convince the court that the statute of limitations should be equitably tolled. The court did not address other counts in the complaint that allege violations of opacity and particulate matter limitations under the Illinois State Implementation Plan and Title V of the CAA. The dismissals have been certified as "partial final judgments" capable of appeal, and an appeal is pending before the Seventh Circuit Court of Appeals. The remaining claims have been stayed pending the appeal. In February 2012, certain of the environmental action groups that had intervened in the case entered into an agreement with Midwest Generation to dismiss without prejudice all of their opacity claims as to all defendants. The agreed upon motion to dismiss was approved by the court on March 26, 2012.
In January 2012, two complaints were filed against Midwest Generation in Illinois state court by residents living near the Crawford and Fisk Stations on behalf of themselves and all others similarly situated, each asserting claims of nuisance, negligence, trespass, and strict liability. The plaintiffs seek to have their suits certified as a class action and request injunctive relief, as well as compensatory and punitive damages. The complaints are similar to two complaints previously filed in the Northern District of Illinois, which were dismissed in October 2011 for lack of federal jurisdiction. Midwest Generation's motions to dismiss the cases were denied in August 2012, following which the plaintiffs filed amended complaints alleging substantially similar claims and requesting similar relief.
In October 2012, Midwest Generation and the Illinois Environmental Protection Agency entered into Compliance Commitment Agreements outlining specified environmental remediation measures and groundwater monitoring activities to be undertaken at its Powerton, Joliet, Crawford, Will County and Waukegan generating stations. Also in October 2012, several environmental groups filed a complaint before the Illinois Pollution Control Board against Midwest Generation, alleging violations of the Illinois groundwater standards through the operation of coal ash disposal ponds at its Powerton, Joliet, Waukegan and Will County generating stations. The complaint requests the imposition of civil penalties, injunctive relief and remediation.
Adverse decisions in these cases could involve penalties, remedial actions and damages that could have a material impact on the financial condition and results of operations of Midwest Generation and EME. EME cannot predict the outcome of these matters or estimate the impact on the Midwest Generation plants, or its and Midwest Generation's results of operations, financial position or cash flows. EME has not recorded a liability for these matters.
Homer City New Source Review and Other Litigation
In January 2011, the US EPA filed a complaint in the Western District of Pennsylvania against Homer City, the sale-leaseback owner participants of the Homer City plant, and two prior owners of the Homer City plant. The complaint alleged violations of the PSD and Title V provisions of the CAA, as a result of projects in the 1990s performed by prior owners without PSD permits and the subsequent failure to incorporate emissions limitations that meet BACT into the station's Title V operating permit. In addition to seeking penalties ranging from $32,500 to $37,500 per violation, per day, the complaint called for an injunction ordering Homer City to install controls sufficient to meet BACT emission rates at all units subject to the complaint and for other remedies. The PADEP, the State of New York and the State of New Jersey intervened in the lawsuit. In October 2011, all of the claims in the US EPA's lawsuit were dismissed with prejudice. An appeal of the dismissal is pending before the Third Circuit Court of Appeals.
Also in January 2011, two residents filed a complaint in the Western District of Pennsylvania, on behalf of themselves and all others similarly situated, against Homer City, the sale-leaseback owner participants of the Homer City plant, two prior owners of the Homer City plant, EME, and Edison International, claiming that emissions from the Homer City plant had adversely affected their health and property values. The plaintiffs sought to have their suit certified as a class action and requested injunctive relief, the funding of a health assessment study and medical monitoring, as well as compensatory and punitive damages. In October 2011, the claims in the purported class action lawsuit that were based on the federal CAA were dismissed with prejudice, while state law statutory and common law claims were dismissed without prejudice to re-file in state court should the plaintiffs choose to do so. EME does not know whether the plaintiffs will file a complaint in state court.
In February 2012, Homer City received a 60-day Notice of Intent to Sue indicating the Sierra Club’s intent to file a citizen lawsuit alleging violations of emissions standards and limitations under the CAA and the Pennsylvania Air Pollution Control Act.
Adverse decisions in these cases could involve penalties, remedial actions and damages that could have a material impact on the financial condition and results of operations of Homer City and EME. EME cannot predict the outcome of these matters or estimate the impact on the Homer City plant, or its and Homer City's results of operations, financial position or cash flows. EME has not recorded a liability for these matters.
San Onofre Outage, Inspection and Repair Issues
SCE replaced four steam generators at San Onofre Units 2 and 3 in 2010 and 2011, respectively. In the first quarter of 2012, a water leak suddenly occurred in one of the heat transfer tubes in San Onofre's Unit 3 steam generators. Unit 3 was safely taken off-line. At the time, San Onofre Unit 2 was off-line for a planned outage when areas of unexpected wear in some of its heat transfer tubes were found. Both Units have remained off-line for extensive inspections, testing and analysis of their steam generators. Each Unit will be restarted only when and if SCE determines that it is safe to do so and when start-up has been approved by the NRC pursuant to the terms of a Confirmatory Action Letter (“CAL”) issued by the NRC in March 2012. The CAL requires NRC permission to restart Unit 2 and Unit 3 and outlines actions SCE must complete before permission to restart either Unit may be sought. In October 2012, SCE submitted to the NRC a response to the CAL and restart plans for Unit 2. SCE proposed to restart Unit 2 and operate at a reduced power level (70%) for approximately five months, followed by a mid-cycle scheduled outage.
In 2005, the CPUC authorized expenditures of approximately $525 million ($665 million after adjustment for inflation) for SCE's 78.21% share of San Onofre to purchase and install the four new steam generators in Units 2 and 3 and remove and dispose of their predecessors. SCE has spent $594 million through September 30, 2012 on the steam generator replacement project, including $95 million reflected in construction work in progress primarily related to the disposal of the replaced steam generators. Those expenditures remain subject to CPUC reasonableness review. Final costs for the project will not be known until after disposal of the original steam generators is completed.
As a result of outages associated with the steam generator inspection and repair, electric power and capacity normally provided by San Onofre are being purchased in the market by SCE (commencing on February 1 for Unit 3 and March 5 for Unit 2). Market costs through September 30, 2012 were approximately $221 million, net of avoided nuclear fuel costs, and are recoverable through the ERRA balancing account subject to CPUC reasonableness review. Because of the uncertainties associated with when and at what output levels the Units will or may be returned to service, total potential market power costs cannot be estimated at this time.
Through September 2012, SCE's share of incremental inspection and repair costs totaled $96 million for both Units. At September 30, 2012, the repairs to restart Unit 2 at the reduced power levels described above have been substantially completed. The costs for Unit 2 may increase following NRC review under the CAL and any new developments that may result from further analysis, testing and inspection, and there is no assurance that start-up of Unit 2 will occur as described above. Total incremental repair costs associated with returning Unit 3 to service, and returning both Units to service at originally specified capabilities safely, remain uncertain.
In addition to the amounts for inspection and repair and market power costs discussed below, SCE has collected through customer rates an estimated $625 million of revenue through third quarter 2012 (based on current authorized revenue requirements) associated with the plant. SCE's total 2012 San Onofre annual revenue requirement, including the 2012 GRC proposed decision, is approximately $820 million, made up of $170 million in refueling outage, nuclear fuel and decommissioning costs and $650 million for its direct operating and maintenance costs, depreciation and return on its investment in San Onofre Unit 2, Unit 3 and related common plant. At September 30, 2012, SCE's rate base and net investment and inventory associated with San Onofre was $1.2 billion and $2.1 billion, respectively.
Under California Public Utilities Code Section 455.5, SCE is required to notify the CPUC if either of the San Onofre Units has been out of service for nine consecutive months (not including preplanned outages). SCE will provide such notice to the CPUC on November 1, 2012 for Unit 3 and expects to do so by December 6, 2012 for Unit 2. The CPUC is required within 45 days of SCE's notice for a particular Unit to initiate an investigation to determine whether to remove from customer rates some or the entire revenue requirement associated with the portion of the facility that is out of service. From the initiation date of the investigation, such rates are collected subject to refund. Under Section 455.5 any determination to adjust rates is made after hearings are conducted in connection with the utility's next general rate case. If, after investigation and hearings, the costs associated with a Unit are disallowed recovery because it is out of service and the Unit is subsequently returned to service, rates may be readjusted to reflect that return to service after 100 continuous hours of operation.
In October 2012, in advance of SCE's required notification under Section 455.5, the CPUC issued an order instituting investigation ("OII") that will consolidate all San Onofre issues in related regulatory proceedings and consider appropriate cost recovery for all San Onofre costs, including among other costs, the cost of the steam generator replacement project, market power costs, capital and operations and maintenance costs, and seismic study costs. The order requires that all San Onofre-related costs incurred on and after January 1, 2012 be tracked in a memorandum account and, to the extent included in rates, collected subject to refund. The order also states that the CPUC will determine whether to order the immediate removal, effective as of the date of the order, of all costs related to San Onofre from SCE's rates, with placement of those costs in a deferred debit account pending the return of one or both Units to useful service, or other possible action. SCE will file its response to the order by November 26, 2012. SCE must also file testimony by December 10, 2012 detailing proposed rate adjustments due to the outages, including the amount of San Onofre costs in current rates, the amount to be removed, if any, the effective date, and related information. A pre-hearing conference will be scheduled early in 2013 after the issuance of a Scoping Memo by the Assigned Commissioner.
In parallel with the order instituting investigation, the 2012 GRC proposed decision would, if adopted, require SCE to track San Onofre-related costs in a memorandum account subject to refund, beginning January 1, 2012. SCE would be required by January 30, 2013 to file an application for reasonableness review of these costs and the proposed decision would allow that application to be consolidated with other proceedings. The 2012 GRC proposed decision also approves expenditures incurred through 2011 for the high pressure turbine project, but disallows recovery for post-2011 expenditures associated with the project and directs SCE to record those costs in either the memorandum account or seek future rate recovery in the next GRC. SCE anticipates that the inter-relationship between the Section 455.5 process and the issues to be reviewed in the investigation or pursuant to a final decision in the GRC will be addressed by the CPUC as it continues to develop the scope of the issues to be consolidated within the investigation.
The steam generators were designed and supplied by MHI and are warranted for an initial period of 20 years from acceptance. MHI is contractually obligated to repair or replace defective items and to pay specified damages for certain repairs. SCE's purchase contract with MHI states that MHI's liability under the purchase agreement is limited to $138 million and excludes consequential damages, defined to include "the cost of replacement power." Such limitations in the contract are subject to applicable exceptions. In September 2012, SCE submitted an invoice to MHI for costs paid through June 30, 2012 in the amount of $45 million for both SCE's and the other co-owners' share of steam generator repair costs. SCE expects to continue to invoice MHI for costs incurred. No amounts have been recognized in the financial statements as of September 30, 2012.
San Onofre carries both property damage and outage insurance issued by Nuclear Electric Insurance Limited (“NEIL”) and has placed NEIL on notice of potential claims for loss recovery. In October 2012, SCE filed separate proofs of loss for Unit 2 and Unit 3 under the outage policy. Pursuant to these proofs of loss SCE is seeking the weekly indemnity amounts provided under the policy for each Unit. Because the outage is ongoing, SCE will supplement these proofs of loss in the future. No amounts have been recognized in SCE's financial statements, pending further actions by NEIL. To the extent any costs are recovered under the outage policy, SCE expects to refund those amounts to ratepayers through the ERRA balancing account.
SCE will pursue recoveries arising from available agreements, but there is no assurance that SCE will recover all of its applicable costs pursuant to these arrangements.
CPSD Investigations
San Gabriel Valley Windstorm Investigation
In November 2011, a windstorm resulted in significant damage to SCE’s electric system and service outages for SCE customers primarily in the San Gabriel Valley. The CPUC directed its Consumer Protection and Safety Division (“CPSD”) to conduct an investigation focused on the cause of the outages, SCE’s service restoration effort, and SCE’s customer communications during the outages. The CPSD issued its preliminary report on February 1, 2012. The report asserts that SCE and others with whom SCE shares utility poles violated certain CPUC safety rules applicable to overhead line construction, maintenance and operation, which may have caused the failures of affected poles and supporting cables. The report also concludes that SCE’s restoration time was not adequate and makes other assertions. Additionally, the report contends that SCE violated CPUC rules by failing to preserve evidence relevant to the investigation when it did not retain damaged poles that were replaced following the windstorm. If the CPUC issues an OII regarding this matter and SCE is found to have violated any CPUC rules, it could face penalties. SCE is unable to estimate a possible loss or range of loss associated with any penalties that may be imposed by the CPUC on SCE.
The proposed decision in SCE’s 2012 GRC would direct SCE to, among other things, make an assessment of a representative sampling of its loaded poles to determine their conformance with current legal standards and report by January 31, 2013 on the results of this assessment. The cost of any large scale review of poles or other equipment for safety compliance, as well as any remediation measures required to assure compliance, could be significant.
Malibu Fire Order Instituting Investigation
Following a 2007 wildfire in Malibu, California, the CPUC issued an OII to determine if any statutes, CPUC general orders, rules or regulations were violated by SCE or telecomm providers (“OII Respondents”) that shared the use of three failed power poles in the wildfire area. The CPSD has alleged, among other things, that the poles were overloaded, that the OII Respondents violated the CPUC's rules governing the design, construction and inspection of poles and misled the CPUC during its investigation of the fire, and that SCE failed to preserve evidence relevant to the investigation. In October 2011, the CPSD proposed that the OII Respondents be assessed penalties of approximately $99 million, with SCE being allocated approximately $50 million of the total. SCE has denied the allegations and believes the proposed penalties are excessive. In September 2012, the CPUC approved a partial settlement between the CPSD and three telecomm providers, leaving SCE and a non-settling telecomm provider as the remaining respondents. The partial settlement did not resolve any of the claims against SCE or the remaining telecomm provider.
Four Corners New Source Review Litigation
In October 2011, four private environmental organizations filed a CAA citizen lawsuit against the co-owners of Four Corners. The complaint alleges that certain work performed at the Four Corners generating units 4 and 5, over the approximate periods of 1985-1986 and 2007-present, constituted plant “major modifications” and the plant's failure to obtain permits and install best available control technology ("BACT") violated the PSD requirements and the New Source Performance Standards of the CAA. The complaint also alleges subsequent and continuing violations of BACT air emissions limits. The lawsuit seeks injunctive and declaratory relief, civil penalties, including a mitigation project and litigation costs. In November 2010, SCE entered into an agreement to sell its ownership interest in generating units 4 and 5 to APS. The sale is subject to certain closing conditions, including APS obtaining a long-term fuel supply agreement for the plant, and is expected to close no earlier than December 2012. Under the agreement SCE would remain responsible for its pro rata share of certain environmental liabilities, including penalties arising from environmental violations prior to the sale, but SCE would not be liable for any costs of installing BACT or other costs related to continuing or extending Four Corners operations. SCE is unable to estimate a possible loss or range of loss associated with this matter.
Environmental Remediation
Edison International records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. Edison International reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operation and maintenance, monitoring and site closure. Unless there is a single probable amount, Edison International records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.
At September 30, 2012, Edison International's recorded estimated minimum liability to remediate its 27 identified material sites (sites in which the upper end of the range of the costs is at least $1 million) at SCE (25 sites) and EME (2 sites related to Midwest Generation) was $121 million, of which $113 million was related to SCE, including $78 million related to San Onofre. In addition to its identified material sites, SCE also has 33 immaterial sites for which the total minimum recorded liability was $3 million. Of the $116 million total environmental remediation liability for SCE, $113 million has been recorded as a regulatory asset. SCE expects to recover $31 million through an incentive mechanism that allows SCE to recover 90% of its environmental remediation costs at certain sites (SCE may request to include additional sites) and $82 million through a mechanism that allows SCE to recover 100% of the costs incurred at certain sites through customer rates. Edison International's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that Edison International may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.
The ultimate costs to clean up Edison International's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. Edison International believes that, due to these uncertainties, it is reasonably possible that cleanup costs at the identified material sites and immaterial sites could exceed its recorded liability by up to $185 million and $6 million, respectively, all of which is related to SCE. The upper limit of this range of costs was estimated using assumptions least favorable to Edison International among a range of reasonably possible outcomes.
SCE expects to clean up and mitigate its identified sites over a period of up to 30 years. Remediation costs for 2012 and in each of the next four years are expected to range from $7 million to $14 million. Costs incurred for the nine months ended September 30, 2012 and 2011 were $5 million and $9 million, respectively.
Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, Edison International believes that costs ultimately recorded will not materially affect its results of operations, financial position or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.
Nuclear Insurance
Federal law limits public liability claims from a nuclear incident to the amount of available financial protection, which is currently approximately $12.6 billion. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($375 million). The balance is covered by a loss sharing program among nuclear reactor licensees. If a nuclear incident at any licensed reactor in the United States results in claims and/or costs which exceed the primary insurance at that plant site, all nuclear reactor licensees could be required to contribute their share of the liability in the form of a deferred premium.
Based on its ownership interests, SCE could be required to pay a maximum of approximately $235 million per nuclear incident. However, it would have to pay no more than approximately $35 million per incident in any one year. If the public liability limit above is insufficient, federal law contemplates that additional funds may be appropriated by Congress. This could include an additional assessment on all licensed reactor operators as a measure for raising further federal revenue.
NEIL, a mutual insurance company owned by entities with nuclear facilities, issues primary property damage, decontamination and excess property damage and accidental outage insurance policies. At San Onofre and Palo Verde, property damage insurance covers losses up to $500 million, including decontamination costs. Decontamination liability and excess property damage coverage exceeding the primary $500 million also has been purchased in amounts greater than the federal requirement of a minimum of approximately $1.1 billion. Property damage insurance also covers damages caused by acts of terrorism up to specified limits. Additional outage insurance covers part of replacement power expenses during an accident-related nuclear unit outage.
If losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $49 million per year. Insurance premiums are charged to operating expense.
Wildfire Insurance
Severe wildfires in California have given rise to large damage claims against California utilities for fire-related losses alleged to be the result of the failure of electric and other utility equipment. Invoking a California Court of Appeal decision, plaintiffs pursuing these claims have relied on the doctrine of inverse condemnation, which can impose strict liability (including liability for a claimant's attorneys' fees) for property damage. On September 15, 2012, SCE's parent, Edison International, renewed its insurance coverage, which included coverage for SCE's wildfire liabilities up to a $550 million limit (with a self-insured retention of $10 million per wildfire occurrence). Various coverage limitations within the policies that make up the insurance coverage could result in additional self-insured costs in the event of multiple wildfire occurrences during the policy period (September 15, 2012 to August 31, 2013). SCE may experience coverage reductions and/or increased insurance costs in future years. No assurance can be given that future losses will not exceed the limits of SCE's insurance coverage.
Spent Nuclear Fuel
Under federal law, the Department of Energy ("DOE") is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE did not meet its contractual obligation to begin acceptance of spent nuclear fuel by January 31, 1998. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. Currently, both San Onofre and Palo Verde have interim storage for spent nuclear fuel on site sufficient for the current license period.
In June 2010, the United States Court of Federal Claims issued a decision granting SCE and the San Onofre co-owners damages of approximately $142 million to recover costs incurred through December 31, 2005 for the DOE's failure to meet its obligation to begin accepting spent nuclear fuel from San Onofre. SCE received payment from the federal government in the amount of the damage award in November 2011. SCE has returned to the San Onofre co-owners their respective share of the damage award paid. SCE, as operating agent, filed a lawsuit on behalf of the San Onofre owners against the DOE in the Court of Federal Claims in December 2011 seeking damages of approximately $98 million for the period from January 1, 2006 to December 31, 2010 for the DOE's failure to meet its obligation to begin accepting spent nuclear fuel. Additional legal action would be necessary to recover damages incurred after December 31, 2010. Any damages recovered by SCE are subject to CPUC review as to how these amounts would be distributed among customers, shareholders, or to offset fuel decommissioning or storage costs.