-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: keymaster@town.hall.org Originator-Key-Asymmetric: MFkwCgYEVQgBAQICAgADSwAwSAJBALeWW4xDV4i7+b6+UyPn5RtObb1cJ7VkACDq pKb9/DClgTKIm08lCfoilvi9Wl4SODbR1+1waHhiGmeZO8OdgLUCAwEAAQ== MIC-Info: RSA-MD5,RSA, rOHR0ZZzZijt+97MaCndypySfTsu5goPm+6DSz0GcQP7L2g90JReLSNBEbphjj46 veVmhxxNThUqk1j3NQn8Ng== 0000827052-94-000020.txt : 19940817 0000827052-94-000020.hdr.sgml : 19940817 ACCESSION NUMBER: 0000827052-94-000020 CONFORMED SUBMISSION TYPE: 10-Q PUBLIC DOCUMENT COUNT: 1 CONFORMED PERIOD OF REPORT: 19940630 FILED AS OF DATE: 19940811 FILER: COMPANY DATA: COMPANY CONFORMED NAME: SCECORP CENTRAL INDEX KEY: 0000827052 STANDARD INDUSTRIAL CLASSIFICATION: 4911 IRS NUMBER: 954137452 STATE OF INCORPORATION: CA FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 10-Q SEC ACT: 1934 Act SEC FILE NUMBER: 001-09936 FILM NUMBER: 94542827 BUSINESS ADDRESS: STREET 1: 2244 WALNUT GROVE AVE STREET 2: P O BOX 800 CITY: ROSEMEAD STATE: CA ZIP: 91770 BUSINESS PHONE: 8183022222 10-Q 1 SCECORP 10Q SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-Q (Mark One) /X/ Quarterly report pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 For the quarterly period ended June 30, 1994 --------------------------------------- OR / / Transition report pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 For the transition period from to ---------------- ----------------- Commission File Number 1-9936 SCEcorp (Exact name of registrant as specified in its charter) CALIFORNIA 95-4137452 (State or other jurisdiction of (I.R.S. Employer incorporation or organization) Identification No.) 2244 Walnut Grove Avenue (P.O. Box 999) Rosemead, California (Address of principal 91770 executive offices) (Zip Code) 818-302-2222 (Registrant's telephone number, including area code) Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes X No ----- ----- Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date: Class Outstanding at August 5, 1994 - - - -------------------------- ----------------------------- Common Stock, no par value 447,798,240 SCEcorp INDEX
Page No. ---- Part I. Financial Information: Item 1. Consolidated Financial Statements: Consolidated Statements of Income--Three and Six Months Ended June 30, 1994, and 1993 2 Consolidated Balance Sheets--June 30, 1994, and December 31, 1993 3 Consolidated Statements of Cash Flows--Six Months Ended June 30, 1994, and 1993 5 Notes to Consolidated Financial Statements 6 Item 2. Management's Discussion and Analysis of Results of Operations and Financial Condition 12 Part II. Other Information: Item 1. Legal Proceedings 18 Item 5. Other Information 19 Item 6. Exhibits and Reports on Form 8-K 19
SCEcorp PART I--FINANCIAL INFORMATION Item 1. Consolidated Financial Statements CONSOLIDATED STATEMENTS OF INCOME In thousands, except per-share amounts
3 Months Ended 6 Months Ended June 30, June 30, -------------- --------------- 1994 1993 1994 1993 ---- ---- ---- ---- (Unaudited) Electric utility revenue $1,746,438 $1,689,576 $3,423,117 $3,390,547 Diversified operations 112,083 78,161 164,150 162,151 ---------- ---------- ---------- ---------- Total operating revenue 1,858,521 1,767,737 3,587,267 3,552,698 ---------- ---------- ---------- ---------- Fuel 198,679 165,994 391,030 380,797 Purchased power 537,346 508,739 1,026,861 969,587 Provisions for regulatory adjustment clauses -- net (30,532) (16,166) (39,439) 6,072 Other operating expenses 379,723 334,874 701,640 675,176 Maintenance 88,309 87,212 172,481 177,813 Depreciation and decommissioning 234,904 228,080 470,826 455,341 Income taxes 109,177 112,551 200,007 187,766 Property and other taxes 52,802 53,508 107,359 114,696 ---------- ---------- ---------- ---------- Total operating expenses 1,570,408 1,474,792 3,030,765 2,967,248 ---------- ---------- ---------- ---------- Operating income 288,113 292,945 556,502 585,450 ---------- ---------- ---------- ---------- Provision for rate phase-in plan (31,580) (31,580) (64,226) (64,930) Allowance for equity funds used during construction 3,565 5,075 7,489 10,090 Other nonoperating income -- net 25,859 11,060 57,647 35,260 ---------- ---------- ---------- ---------- Total other income (deductions) -- net (2,156) (15,445) 910 (19,580) ---------- ---------- ---------- ---------- Income before interest and other expenses 285,957 277,500 557,412 565,870 ---------- ---------- ---------- ---------- Interest on long-term debt 127,656 140,170 252,735 272,826 Other interest expense 22,276 19,334 40,670 27,230 Allowance for borrowed funds used during construction (3,715) (4,049) (7,804) (8,052) Capitalized interest (12,083) (29,315) (22,392) (36,839) Dividends on subsidiary preferred stock 10,020 10,212 20,040 20,682 ---------- ---------- ---------- ---------- Total interest and other expenses -- net 144,154 136,352 283,249 275,847 ---------- ---------- ---------- ---------- Net income $ 141,803 $ 141,148 $ 274,163 $ 290,023 ========== ========== ========== ========== Weighted-average shares of common stock outstanding 447,799 447,739 447,799 447,738 Earnings per share $ .32 $ .32 $ .61 $ .65 Dividends declared per common share .25 .355 .605 .705
The accompanying notes are an integral part of these financial statements. SCEcorp CONSOLIDATED BALANCE SHEETS In thousands
June 30, December 31, 1994 1993 ------------- ------------ (Unaudited) ASSETS Utility plant, at original cost $18,738,591 $18,436,134 Less -- accumulated provision for depreciation and decommissioning 7,463,420 7,138,289 ----------- ----------- 11,275,171 11,297,845 Construction work in progress 938,367 857,225 Nuclear fuel, at amortized cost 118,963 148,012 ----------- ----------- Total utility plant 12,332,501 12,303,082 ----------- ----------- Nonutility property -- less accumulated provision for depreciation of $83,243 and $73,169 at respective dates 1,330,176 1,276,471 Nuclear decommissioning trusts 869,954 788,575 Investments in partnerships and unconsolidated subsidiaries 1,254,753 1,162,452 Investments in leveraged leases 502,331 497,469 Other investments 41,803 20,577 ----------- ----------- Total other property and investments 3,999,017 3,745,544 ----------- ----------- Cash and equivalents 540,811 420,510 Receivables, including unbilled revenue, less allowances of $18,162 and $18,669 for uncollectible accounts at respective dates 947,964 880,758 Fuel inventory 136,216 120,859 Materials and supplies, at average cost 118,237 104,092 Accumulated deferred income taxes -- net 197,283 204,119 Regulatory balancing accounts -- net 10,426 -- Prepayments and other current assets 18,984 117,758 ----------- ----------- Total current assets 1,969,921 1,848,096 ----------- ----------- Unamortized debt issuance and reacquisition expense 370,728 381,781 Rate phase-in plan 306,218 364,209 Unamortized nuclear plant -- net 222,521 273,837 Income tax-related deferred charges 1,836,360 2,016,194 Other deferred charges 472,320 445,799 ----------- ----------- Total deferred charges 3,208,147 3,481,820 ----------- ----------- Total assets $21,509,586 $21,378,542 =========== ===========
The accompanying notes are an integral part of these financial statements. SCEcorp CONSOLIDATED BALANCE SHEETS In thousands
June 30, December 31, 1994 1993 ----------- ------------ (Unaudited) CAPITALIZATION AND LIABILITIES Common shareholders' equity: Common stock (447,799 shares outstanding at each date) $ 2,691,605 $ 2,691,605 Retained earnings 3,269,218 3,265,976 ----------- ----------- 5,960,823 5,957,581 Preferred stock: Not subject to mandatory redemption 358,755 358,755 Subject to mandatory redemption 275,000 275,000 Long-term debt 6,309,462 6,459,195 ----------- ----------- Total capitalization 12,904,040 13,050,531 ----------- ----------- Other long-term liabilities 302,573 266,595 ----------- ----------- Current portion of long-term debt 323,766 348,896 Short-term debt 1,030,471 655,344 Accounts payable 359,461 373,092 Accrued taxes 516,159 410,612 Accrued interest 102,939 101,360 Dividends payable 115,803 162,818 Regulatory balancing accounts -- net -- 57,932 Deferred unbilled revenue and other current liabilities 812,373 741,334 ----------- ----------- Total current liabilities 3,260,972 2,851,388 ----------- ----------- Accumulated deferred income taxes -- net 3,978,239 4,168,719 Accumulated deferred investment tax credits 441,973 455,574 Customer advances and other deferred credits 621,789 585,735 ----------- ----------- Total deferred credits 5,042,001 5,210,028 ----------- ----------- Commitments and contingencies (Notes 1, 2 and 3) Total capitalization and liabilities $21,509,586 $21,378,542 =========== ===========
The accompanying notes are an integral part of these financial statements. SCEcorp CONSOLIDATED STATEMENTS OF CASH FLOWS In thousands
6 Months Ended June 30, ---------------------------- 1994 1993 --------- ----------- (Unaudited) Cash flows from operating activities: Net income $ 274,163 $ 290,023 Adjustments for noncash items: Depreciation and decommissioning 470,826 455,341 Amortization 77,542 57,870 Rate phase-in plan 57,991 57,459 Deferred income taxes and investment tax credits (18,680) (24,674) Equity in income from partnerships and unconsolidated subsidiaries (41,505) (41,811) Other long-term liabilities 35,978 (102,296) Other -- net (47,255) 21,236 Changes in working capital components: Receivables (47,802) (27,311) Regulatory balancing accounts (68,358) 268,989 Fuel inventory, materials and supplies (29,502) (15,450) Prepayments and other current assets 101,782 145,314 Accrued interest and taxes 102,680 73,891 Accounts payable and other current liabilities 29,220 (37,240) Distributions from partnerships and unconsolidated subsidiaries 35,158 53,364 --------- ----------- Net cash provided by operating activities 932,238 1,174,705 --------- ----------- Cash flows from financing activities: Issuances of long-term debt 97,379 1,468,064 Issuances of preferred stock -- 74,626 Repayment of long-term debt (230,040) (1,265,021) Redemption of preferred stock -- (86,392) Nuclear fuel financing -- net (13,816) (12,246) Proceeds from sales of common stock -- 141 Short-term debt financings -- net 319,321 (40,243) Dividends paid (317,937) (313,416) --------- ----------- Net cash used by financing activities (145,093) (174,487) --------- ----------- Cash flows from investing activities: Additions to property and plant (540,730) (585,483) Nuclear decommissioning trusts (81,379) (71,309) Investments in partnerships and unconsolidated subsidiaries (112,683) (150,636) Other -- net 67,948 (31,848) --------- ----------- Net cash used by investing activities (666,844) (839,276) --------- ----------- Net increase in cash and equivalents 120,301 160,942 Cash and equivalents, beginning of period 420,510 496,338 --------- ----------- Cash and equivalents, end of period $ 540,811 $ 657,280 ========= ===========
The accompanying notes are an integral part of these financial statements. SCEcorp NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Management's Statement In the opinion of management, all adjustments necessary to present a fair statement of the financial position and results of operations for the periods covered by this report, including recurring accruals, have been made. SCEcorp's significant accounting policies were described in Note 1 of "Notes to Consolidated Financial Statements" included in its 1993 Annual Report on Form 10-K filed with the Securities and Exchange Commission. SCEcorp follows the same accounting policies for interim reporting purposes. In January 1994, SCEcorp adopted a new accounting standard which requires that certain debt and equity instruments be reported at fair value. Adoption of this standard did not have a material effect on results of operations or financial position. This quarterly report should be read in conjunction with SCEcorp's 1993 Annual Report. Certain prior-period amounts have been reclassified to conform to the June 30, 1994, financial statement presentation. Note 1. Regulatory Matters California Public Utilities Commission (CPUC) Electric Utility Industry Restructuring Proposal On April 20, 1994, the CPUC issued a proposal for restructuring California's electric utility industry. Under the proposal, large electric customers would have the option to choose a range of generation providers, including utilities, (direct access) beginning in 1996. As proposed, eligibility would expand gradually, until all customers, including residential, have the option for direct access to this competitive generation market beginning in 2002. Edison would continue to provide transmission and distribution services to all customers in its service territory. Performance-based regulation would replace traditional cost-of-service regulation for all transmission and distribution services. The proposal also stated that utilities should be entitled to recover all of their investments in generation developed under traditional cost-of- service regulation even if a portion is uneconomic under current conditions. On June 8, 1994, Edison filed its response to the CPUC's proposal recommending the creation of an independent regional power pool company that would act as an intermediary between all power consumers and suppliers. Additionally, Edison has recommended that the CPUC reaffirm in a definitive way that prudent investments made under existing regulation will be protected in the transition to direct access, and in anticipation of a delay in implementing the CPUC's proposal due to several regulatory, legislative and jurisdictional issues, Edison proposed the adoption of performance-based ratemaking for its generation operations until direct access phase-in begins. The CPUC has held three full-panel hearings to address comments on its proposal. A fourth full-panel hearing is scheduled for September 1994. A CPUC final policy statement is expected in early 1995. Edison currently applies accounting standards that recognize the economic effects of rate regulation and, accordingly, has recorded regulatory assets related to its generation, transmission and distribution operations. If rate recovery of generation-related costs becomes unlikely or uncertain, whether due to competition or regulatory action, these SCEcorp NOTES TO CONSOLIDATED FINANCIAL STATEMENTS accounting standards may no longer apply to Edison's generation operations. This change could result in either full recovery of generation-related regulatory assets or a non-cash write-off of up to approximately $1 billion, depending on whether the CPUC adopts a transition mechanism for the recovery of all or a portion of these regulatory assets before rate recovery becomes unlikely or uncertain. Until the CPUC establishes more definitive valuation and pricing criteria for its restructuring proposal, Edison cannot predict the effect of the proposal on its results of operations or financial position. Mohave Outage Review In 1986, the CPUC began investigating a 1985 steam-pipe rupture at the Mohave Generating Station. Edison, plant operator and 56% owner, incurred costs of approximately $90 million, after insurance recoveries, to repair damage and provide replacement power during the six-month outage. In 1991, the CPUC's Division of Ratepayer Advocates (DRA) alleged that Edison contributed to the piping failure by imprudently operating the plant and recommended the disallowance of all accident-related expenditures. Edison believes the accident was caused by a manufacturing defect in a seam weld and filed testimony contesting the allegations. A CPUC decision issued in March 1994 agreed with the DRA's allegations and ordered a second phase of this proceeding to quantify the disallowance. The probable effect on net income cannot be determined at this time, but SCEcorp believes it will not materially affect its results of operations or financial position. Palo Verde Nuclear Generating Station Outage Review In March 1989, Arizona Public Service Company (APS), operating agent for Palo Verde, removed Units 1 and 3 from service for modifications required by regulatory agencies. As required by state law, the CPUC conducted an investigation, and ordered the authorized revenue collected during the outages be subject to refund. The units resumed operation in December 1989 and July 1990. During 1992, the CPUC consolidated its reasonableness review of replacement power costs from several Unit 2 outages in 1989 and 1990 with the investigation of Units 1 and 3. The DRA initially recommended a disallowance valued at $169 million, including: $63 million of revenue collected during the outages (including interest); $5 million for capital projects deemed unnecessary; $50 million in replacement power costs; and $51 million in penalties for environmental effects of replacement power and the outages' effect on the regional energy market. Edison filed testimony that its costs were reasonably incurred. In September 1993, Edison and the DRA agreed to settle these disputes for $38 million (including $29 million for replacement power costs, $2 million for capital projects and $7 million for interest), subject to CPUC approval. The effect of the settlement has been fully reflected in the financial statements. A CPUC decision is expected in 1995. Research, Development and Demonstration (RD&D) Cost Review In Edison's 1992 general rate case, the CPUC deferred a decision (pending additional information from Edison) on the recovery of $56 million in capitalized RD&D costs. Edison refiled, requesting that $35 million be included in rate base and $17 million be classified as RD&D expense. Subsequently, additional adjustments of $11 million were recorded. In SCEcorp NOTES TO CONSOLIDATED FINANCIAL STATEMENTS August 1993, the DRA recommended further disallowances of about $15 million on Edison's RD&D capital refiling. In June 1994, a CPUC administrative law judge issued a proposed decision recommending disallowances of $6 million. The probable effect of this matter has been fully reflected in the financial statements. A CPUC decision is expected in September 1994. Note 2. Nuclear Decommissioning Decommissioning of Edison's nuclear generating facilities is expected to cost an estimated $1.1 billion in current-year dollars (based on site- specific studies performed in 1990 for San Onofre Nuclear Generating Station and 1989 for Palo Verde). Edison expects to decommission its nuclear facilities by prompt removal or decontamination at the end of their useful lives. Decommissioning is scheduled to begin in 2013 at San Onofre and 2024 at Palo Verde. San Onofre Unit 1, which shut down in 1992, will be stored until decommissioning begins at the other San Onofre units. Decommissioning costs are recovered in customer rates through charges to depreciation expense. Decommissioning expense was $33 million and $68 million for the three and six months ended June 30, 1994, respectively, and $35 million and $71 million for the three and six months ended June 30, 1993, respectively. The accumulated provision for decommissioning at June 30, 1994, and December 31, 1993, was $865 million and $797 million, respectively. The estimated costs to decommission San Onofre Unit 1 have been recorded as a liability. Decommissioning costs recovered in rates are placed in external trusts, which, together with accumulated earnings, will be utilized solely for decommissioning. These amounts are invested in high-grade securities (classified as available-for-sale) and reported at market value in accordance with a new accounting standard for debt and equity securities implemented in January 1994. Unrealized gains are recorded in the accumulated provision for decommissioning. Trust investments include:
Maturity June 30, December 31, Dates 1994 1993 -------- -------- ------------ (In millions) Municipal bonds 1996-2021 $592 $680 Stocks 53 51 U.S. government and agency issues 1998-2023 129 36 Short-term investments and other 1994 91 22 ---- ---- Trust fund balance $865 $789 ==== ==== Market value (based on quoted market prices) $870 $853
Trust fund earnings (based on specific identification) increase the trust fund balance and the accumulated provision for decommissioning. Net earnings were $9 million and $20 million for the three and six months ended June 30, 1994, respectively, and $11 million and $23 million for the same periods in 1993. Proceeds from sales of securities (which are reinvested) were $358 million and $403 million for the three and six months ended June 30, 1994, respectively, and $91 million and $48 million SCEcorp NOTES TO CONSOLIDATED FINANCIAL STATEMENTS for the same periods in 1993. Approximately 87% of the trust fund contributions were tax-deductible. In its 1995 general rate case filing, Edison requested to revise its authorized decommissioning costs based on updated site-specific studies (1993 for San Onofre and 1992 for Palo Verde), and adjustments to its authorized escalation rates and after-tax rate of return on the trust funds. If approved by the CPUC, current fund contribution levels would be virtually unchanged. A CPUC decision is expected in late 1994. Edison believes the amounts collected in rates are adequate to meet estimated decommissioning costs. Note 3. Contingencies Conservation Expenditures Tax Issue The Internal Revenue Service (IRS) has completed its examination of tax years 1983-1988. In connection with this examination, the IRS has challenged certain tax positions, including how Edison deducts energy conservation expenditures. The deduction of energy conservation expenditures is consistent with positions taken by other members of the industry. According to the IRS, certain demand-side management (DSM) expenditures should not be treated as a current income tax deduction. The IRS claims that DSM programs create a future benefit by delaying the cost of building additional power plants. The utility industry believes that energy conservation expenditures constitute ordinary and necessary business expenses, which, under current provisions of the Internal Revenue Code, are deductible in the year incurred or accrued. SCEcorp believes the IRS' position is in conflict with existing tax laws and contrary to the nation's energy and environmental policy goals. SCEcorp will continue to vigorously defend its position. In March 1994, the CPUC approved Edison's request to establish a memorandum account to track the prospective income tax effect if a change in the method of deducting these expenditures were imposed. Such amounts would be recovered through customer rates, subject to reasonableness reviews. The probable effect on net income of the outcome of this matter cannot be determined at this time, but SCEcorp believes it will not materially affect its results of operations or financial position. Environmental Protection SCEcorp is subject to numerous legislative and regulatory environmental- protection requirements. To meet these requirements, SCEcorp will continue to incur substantial costs to operate existing facilities, construct and operate new facilities, and mitigate or remove the effect of past operations on the environment. SCEcorp has identified 59 sites for which it is, or may be, responsible for remediation under environmental laws. In 1994, Edison developed an above-ground storage tank inspection program to determine the future use of its existing fuel-oil pipeline and station tanks. As a result of this program, several above-ground storage tanks may require surrounding soil remediation and were added to Edison's total number of identified sites. Edison is participating in investigations and cleanups at a number of these identified sites and has estimated its minimum liability at $74 million. This estimate may change as progress is made in determining the SCEcorp NOTES TO CONSOLIDATED FINANCIAL STATEMENTS magnitude of required remedial actions, as Edison's share of these costs in proportion to other responsible parties is determined, and as additional investigations and cleanups are performed. On May 4, 1994, the CPUC approved an incentive mechanism for rate recovery of environmental-cleanup costs at 23 of Edison's identified sites (Edison may request to include additional sites). This mechanism allows Edison to recover 90% of cleanup costs through customer rates. Shareholders fund the remaining 10%, with the opportunity to recover these costs through insurance. Environmental-cleanup costs not included in the incentive mechanism are expected to be recovered through customer rates. As a result, Edison's regulatory asset of $68 million reflects the estimated future environmental-cleanup costs expected to be recovered in customer rates. The probable effect of the outcome of these environmental matters cannot be determined at this time, but SCEcorp believes they will not materially affect its financial position. Nuclear Insurance Federal law limits public liability claims from a nuclear incident to $9.2 billion. Edison and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($200 million). The balance is covered by the industry's retrospective rating plan that uses deferred premium charges. Federal regulations require this secondary level of financial protection. The Nuclear Regulatory Commission exempted San Onofre Unit 1 from this secondary level, effective June 3, 1994. The maximum deferred premium for each nuclear incident is $79 million per reactor, but not more than $10 million per reactor may be charged in any one year for each incident. Based on its ownership interests, Edison could be required to pay a maximum of $158 million per nuclear incident. However, it would have to pay no more than $20 million per incident in any one year. Such amounts include a 5% surcharge if additional funds are needed to satisfy public liability claims and are subject to adjustment for inflation. Property damage insurance covers losses up to $500 million, including decontamination costs, at San Onofre and Palo Verde. Decontamination liability and property damage coverage exceeding the primary $500 million also has been purchased in amounts greater than federal requirements. Additional insurance covers part of replacement power expenses during an accident-related nuclear unit outage. These policies are issued primarily by mutual insurance companies owned by utilities with nuclear facilities. If losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, Edison could be assessed retrospective premium adjustments of up to $34 million per year. Insurance premiums are charged to operating expense. Palo Verde Steam Generators In March 1993, a steam generator tube ruptured at Palo Verde Unit 2. A subsequent investigation of the unit revealed cracking in additional steam generator tubes. APS, operator of Palo Verde, reduced power at all three units to 85% in late 1993 to mitigate further tube degradation until investigations were completed. In April 1994, investigations revealed some minor cracking at Unit 3. APS implemented several remedial actions, and returned two units to full power in July 1994. APS expects Unit 2 (currently operated at 88% power) to be returned to full power by year- end 1994, following additional inspections. SCEcorp Item 2. Management's Discussion and Analysis of Results of Operations and Financial Condition RESULTS OF OPERATIONS Earnings SCEcorp's earnings per share for the three- and six-month periods ended June 30, 1994, were 32 cents and 61 cents, respectively, compared with 32 cents and 65 cents for the year-earlier periods. Southern California Edison Company's earnings were down 5 cents and 6 cents, respectively, for both periods ended June 30, 1994, primarily due to a lower authorized return on common equity and a 1993 benefit from refinancing long-term debt. The Mission companies' earnings for both the second quarter and year-to-date periods in 1993 reflect a 3-cent charge by Mission Power Engineering Company for the settlement of litigation for its Coso geothermal project and a 1-cent charge for additional reserves at Mission Land Company to recognize reduced real estate values. Excluding these charges, the Mission companies' earnings for the second quarter and year- to-date period ended June 30, 1994, compared to the year-earlier periods, increased 1 cent and decreased 2 cents, respectively. The quarterly increase is attributed to Mission Land's operating loss in 1993. The year-to-date decrease reflects Mission Energy Company's 1993 decision to forgo recording earnings from five geothermal projects, due to the reduced value of its investments. This decision will continue to significantly impact 1994 earnings and possibly beyond. Operating Revenue Electric utility revenue increased, almost entirely due to an increase in Edison's average rates. Almost 98% of electric utility revenue is from retail sales. Retail rates are regulated by the California Public Utilities Commission (CPUC) and wholesale rates are regulated by the Federal Energy Regulatory Commission. Revenue from diversified operations increased 43% for the quarter ended June 30, 1994, compared to the year- earlier period, primarily due to an increase in Mission Land's real estate rent and sales revenue resulting from an apartment complex sale, an increase in Mission Energy's electric revenue derived from its Loy Yang B project, and Mission Land's second quarter 1993 loss in partnership income from reduced real estate values. Operating Expenses Fuel expense increased 20% for the three months ended June 30, 1994, compared to the year-earlier period, primarily due to an increase in Edison's power generation. The increased power generation resulted from decreased hydro generation. Purchased-power expense increased, due to greater volume and higher- priced federally required purchases by Edison from nonutility generators. These purchases were made under contracts with CPUC-mandated pricing, which is generally higher than those for other sources. The provisions for regulatory adjustment clauses minimize rate fluctuations by adjusting for differences between estimated and actual kilowatt-hour sales or energy costs. These differences are accumulated in balancing accounts for subsequent rate adjustment. Prior-period rate adjustments are also reflected in these provisions. The quarterly and year-to-date decreases reflect authorized estimates exceeding actual kilowatt-hour sales, partially offset by CPUC-authorized estimates exceeding energy costs. Other operating expenses increased, mainly due to the CPUC authorizing accelerated recovery of costs related to an Edison demand-side management (DSM) program. Other Income and Deductions The provision for rate phase-in plan reflects a CPUC-authorized, 10-year rate phase-in plan for the three Palo Verde Nuclear Generating Station units. Phase-in plans minimize the effect on customer rates of newly constructed plant by implementing rate increases gradually. Palo Verde's plan deferred $200 million of revenue for each unit during the first four years of operation. The deferred revenue, including interest, is being collected evenly over six years ending in 1996 for Units 1 and 2, and in 1998 for Unit 3. The provision is a non-cash offset to the collection of deferred revenue. Other nonoperating income increased for both periods ended June 30, 1994, compared to the same periods in 1993, primarily due to Mission Power Engineering's second quarter 1993 charge for the settlement of litigation on its Coso geothermal project. Interest Expense Interest on long-term debt decreased, primarily due to refinancing debt at lower interest rates. Other interest expense increased 15% and 49% for the three and six months ended June 30, 1994, respectively, compared to the year-earlier periods, mainly due to Edison's increased short-term borrowings. Capitalized interest decreased, primarily due to decreased construction activity at Mission Energy. FINANCIAL CONDITION SCEcorp's liquidity is primarily affected by debt maturities, dividend payments and capital expenditures. Capital resources include cash from operations and external financings. Although SCEcorp is committed to a strong dividend, in light of declining authorized rates of return for Edison, Edison's ongoing cash needs, the changing nature of the electric utility industry and recently proposed changes in California utility regulation, in the second quarter of 1994 SCEcorp lowered its quarterly common stock dividend by about 30%. Cash Flows from Operating Activities Net cash provided by operating activities totaled $932 million for the six-month period ended June 30, 1994, compared to $1.2 billion for the same period in 1993. SCEcorp continues to meet most of its capital requirements with cash from operations. Cash Flows from Financing Activities Edison's short-term debt is used to finance fuel inventories, balancing account undercollections and general cash requirements. The Mission companies' short-term debt is used mainly for construction projects until long-term construction or project loans are secured. Long-term debt is used mainly to finance capital expenditures. Edison's external financings are influenced by market conditions and other factors, including limitations imposed by its articles of incorporation and trust indenture. As of June 30, 1994, Edison could issue approximately $5.7 additional first and refunding mortgage bonds and $3.5 billion of preferred stock at current interest and dividend rates. SCEcorp and its subsidiaries have lines of credit totaling $2.0 billion. Edison has lines of credit of $800 million for short-term debt and the Mission Companies have lines of credit of $600 million to finance general cash requirements. Edison also has lines of credit of $500 million for the long-term refinancing of its variable-rate pollution control bonds. California law prohibits Edison from incurring or guaranteeing debt for its nonutility affiliates. Additionally, the CPUC regulates Edison's capital structure, limiting the dividends Edison may pay SCEcorp. These restrictions are not expected to affect SCEcorp's ability to meet its cash obligations. Cash Flows from Investing Activities The primary uses of cash for investing activities are additions to property and plant, the Mission companies' investments, and contributions to nuclear decommissioning trusts. Decommissioning costs are accrued and recovered in rates over the useful life of each nuclear generating facility through charges to depreciation expense. Edison expects to spend approximately $7.9 billion to decommission its nuclear facilities, primarily between 2013-2035. This estimate is based on Edison's current- dollar decommissioning costs ($1.1 billion), escalated using a 7.7% rate and an earnings assumption on trust funds ranging from 5.25% to 6.0%. These amounts are expected to be funded from independent decommissioning trusts (see Notes to Consolidated Financial Statements). Edison contributes approximately $96 million per year to decommissioning trusts. Trust contributions will continue until decommissioning begins. Cash used for the Mission companies' investing activities was $118 million for the first six months of 1994. Capital Requirements SCEcorp's projected capital requirements for the years 1994 through 1998 are:
1994 1995 1996 1997 1998 ------ ------ ------ ------ ------ (In millions) Construction expenditures $1,248 $1,244 $1,074 $1,064 $1,309 Maturities of long-term debt 72 296 290 567 522 ------ ------ ------ ------ ------ Total $1,320 $1,540 $1,364 $1,631 $1,831 ====== ====== ====== ====== ======
REGULATORY MATTERS The CPUC increased Edison's 1994 authorized revenue by $232 million, or 3.2%. The increase includes a $275 million increase for fuel and related costs and an $82 million increase for higher operating costs, partially offset by a $108 million decrease for the lower costs of debt and equity. In its 1994 cost-of-capital decision, the CPUC approved Edison's request to increase its equity ratio from 46% to 47.25%. The increase reflects the CPUC's recognition of Edison's need to reduce debt to levels more in line with other utilities and the competitive environment. The CPUC also authorized Edison an 11.0% return on common equity for 1994. Authorized return on common equity was 11.8% for 1993. This decision is expected to reduce 1994 earnings by approximately 6 cents per share. The CPUC is reviewing Edison's costs (approximately $90 million) related to a 1985 steam-pipe rupture at the Mohave Generating Station. A March 1994 CPUC decision stated that Edison had contributed to the piping failure by imprudently operating the plant and recommended the disallowance of all accident-related expenditures. The CPUC also ordered a second phase of this proceeding to quantify the disallowance. The probable effect on net income cannot be determined at this time, but SCEcorp believes it will not materially affect its results of operations or financial position. The CPUC is also reviewing extended outages at Palo Verde. The CPUC's Division of Ratepayer Advocates (DRA) initially recommended disallowances valued at $169 million. In September 1993, Edison and the DRA agreed to settle these disputes for $38 million, subject to CPUC approval. The effect of the settlement has been fully reflected in the financial statements. A CPUC decision is expected in 1995. In its 1995 general rate case filing, Edison requested a $117 million revenue increase to recover the higher costs of operations (excluding fuel) resulting from inflation and new capital investments. Adjusted for inflation, this increase represents a 7.2% reduction from Edison's 1992 authorized revenue. In addition, Edison filed a proposal for a performance-based rate-making mechanism that would determine most of Edison's revenue (excluding fuel) from 1996-2000 (see Competitive Environment). In March 1994, as part of its response to the general rate case filing, the DRA recommended that Edison be denied funds to continue operating San Onofre Nuclear Generating Station Units 2 and 3 after 1998, or that an alternative pricing mechanism (a fixed price per kilowatt-hour generated) be implemented. Edison believes the continued operation of the nuclear units would benefit its customers by providing reliable and non- polluting energy. A CPUC decision is expected on the general rate case in late 1994. Hearings on performance-based ratemaking are currently being conducted with a CPUC decision expected in 1995. On May 25, 1994, the CPUC approved Edison's request to accelerate recovery of its investments in San Onofre and Palo Verde by $75 million, or 40%, annually through 2011. This decision also adopted Edison's request to offset the rate impact of the accelerated cost recovery with a corresponding deceleration of rate recovery associated with its transmission and distribution assets. COMPETITIVE ENVIRONMENT Electric utilities operate in a highly regulated environment in which they have an obligation to provide electric service to their customers in return for an exclusive franchise within their service territory. This regulatory environment is changing. The generation sector has experienced competition from nonutility power producers and Edison expects even greater competition in the generation sector over the next decade. Due to this changing environment, Edison requested a performance-based rate-making mechanism in its 1995 general rate case filing. The filing asks for a revenue-indexing formula that combines operating expenses and capital-related costs into a single index. This is a departure from the traditional utility model that links potential earnings levels with capital investment. It would provide stronger incentives for efficient utility operations and investment and allow for a better alignment of customer and shareholder interests. On July 12, 1994, the CPUC ordered Edison to divide its performance-based rate-making application into two phases--transmission and distribution, and power generation. Hearings are scheduled to begin in October 1994 for the transmission and distribution phase and in 1995 for the power generation phase. On April 20, 1994, the CPUC issued a proposal for restructuring California's electric utility industry. Under the proposal, large electric customers would have the option to choose a range of generation providers, including utilities, (direct access) beginning in 1996. As proposed, eligibility would expand gradually, until all customers, including residential, have the option for direct access to this competitive generation market beginning in 2002. Edison would continue to provide transmission and distribution services to all customers in its service territory. Performance-based regulation would replace traditional cost-of-service regulation for all transmission and distribution services. The proposal also stated that utilities should be entitled to recover all of their investments in generation developed under traditional cost-of- service regulation even if a portion is uneconomic under current conditions. On June 8, 1994, Edison filed its response to the CPUC's proposal recommending the creation of an independent regional power pool company that would act as an intermediary between all power consumers and suppliers. Additionally, Edison has recommended that the CPUC reaffirm in a definitive way that prudent investments made under existing regulation will be protected in the transition to direct access, and in anticipation of a delay in implementing the CPUC's proposal due to several regulatory, legislative and jurisdictional issues, Edison proposed the adoption of performance-based ratemaking for its generation operations until direct access phase-in begins. The CPUC has held three full-panel hearings to address comments on its proposal. A fourth full-panel hearing is scheduled for September 1994. A CPUC final policy statement is expected in early 1995. Edison currently applies accounting standards that recognize the economic effects of rate regulation and, accordingly, has recorded regulatory assets related to its generation, transmission and distribution operations. If rate recovery of generation-related costs becomes unlikely or uncertain, whether due to competition or regulatory action, these accounting standards may no longer apply to Edison's generation operations. This change could result in either full recovery of generation-related regulatory assets or a non-cash write-off of up to approximately $1 billion, depending on whether the CPUC adopts a transition mechanism for the recovery of all or a portion of these regulatory assets before rate recovery becomes unlikely or uncertain. Until the CPUC establishes more detailed valuation and pricing criteria for its restructuring proposal, Edison cannot predict the effect of the proposal on its results of operations or financial position. Mission Energy, one of the nation's largest independent power producers, is well positioned to participate in the changing regulatory environment for electric power. Further, international markets present an even greater opportunity for growth and earnings. Mission Energy currently owns 2,055 megawatts of generating capacity, enough power to serve a population of over one million. MISSION ENERGY PROJECT UPDATE In February 1994, Mission Energy signed a 30-year power purchase agreement for the 1,230-MW, coal-fired Paiton power project in Indonesia, which will be one of the largest privately owned power projects in the world. The plant, which is 32.5% owned by Mission Energy, is scheduled to begin operating in 1998 and is expected to contribute significantly to Mission Energy's earnings beginning in 1999. Mission Energy and ISAB, the petroleum subsidiary of one of the largest industrial groups in Italy, have formed ISAB Energy to build a 500-MW combined-cycle power plant in Italy. The plant will use oil gasification technology and is expected to begin commercial operation in 1998. On June 1, 1994, the 240-MW, gas-fired Gordonsville plant in Virginia went into commercial operation. The 150-MW, gas-fired Auburndale plant in Florida commenced commercial operation on July 1, 1994. CPUC-MANDATED POWER CONTRACTS On June 22, 1994, the CPUC ordered the California utilities to proceed with the signing of new contracts with independent power producers. This decision will force Edison to purchase 686 MW of new power at fixed prices starting in 1997. This will cost Edison customers $14 billion over the life of the contracts. On July 25, 1994, Edison filed a petition with the CPUC asking it to reconsider its decision. Edison has consistently opposed this proposal because it has no need for additional generating capacity until at least 2005 and because the contracts will increase customer rates. Also, Edison believes the decision is inconsistent with the CPUC's restructuring proposal goal to ultimately lower rates. For the twelve months ended June 30, 1994, Edison paid about $800 million more than the cost of power available from other sources for federally required purchases from independent power producers under CPUC-mandated pricing. ENVIRONMENTAL PROTECTION Costs to protect the environment continue to grow due to increasingly stringent laws and regulations. SCEcorp has identified 59 sites for which it is, or may be, responsible for remediation under environmental laws. Earlier this year, Edison developed an above-ground storage tank inspection program to determine future use of its existing fuel-oil pipeline and station tanks. As a result of this program, several above-ground storage tanks may require surrounding soil remediation and were added to Edison's total number of identified sites. SCEcorp is participating in investigations and cleanups at a number of these identified sites and has recorded its minimum liability at $74 million. This estimate may change as progress is made in determining the magnitude of required remedial actions, as SCEcorp's share of these costs in proportion to other responsible parties is determined, and as additional investigations and cleanups are performed. On May 4, 1994, the CPUC approved an incentive mechanism for rate recovery of environmental-cleanup costs at 23 of Edison's identified sites (Edison may request to include additional sites). This mechanism allows Edison to recover 90% of cleanup costs through customer rates. Shareholders will fund the remaining 10%, with the opportunity to recover these costs through insurance. Environmental-cleanup costs not included in the incentive mechanism are expected to be recovered through customer rates. As a result, Edison's regulatory asset of $68 million reflects the estimated future environmental-cleanup costs expected to be recovered in customer rates. The 1990 federal Clean Air Act requires power producers to have emissions allowances to emit sulfur dioxide. Power companies receive emissions allowances from the federal government and may bank or sell excess allowances. Edison expects to have excess allowances under Phase II of the Clean Air Act (2000 and later). The act also calls for a five-year study of regional haze in the southwestern U.S. In addition, the U.S. Environmental Protection Agency is conducting a study of the effect of air contaminant emissions on visibility in Grand Canyon National Park. The potential effect of these studies on sulfur dioxide emissions regulations for the Mohave Coal Generating Station is unknown. SCEcorp's projected capital expenditures to protect the environment are $1.4 billion for the 1994-2001 period, mainly for placing overhead distribution lines underground and reducing nitrogen-oxides emissions from gas-fired electric generators. Edison's projected capital expenditures (up to $290 million by 2001) to reduce nitrogen-oxides emissions may be lowered by local regulations. The possibility that exposure to electric and magnetic fields (EMF) emanating from power lines, household appliances and other electric sources may result in adverse health effects has received increased attention. The scientific community has not yet reached a consensus on the nature of any health effects of EMF. However, an administrative law judge's proposed decision provides for a rate-recoverable research and public education program conducted by California electric utilities, and authorizes these utilities to take no-cost or low-cost steps to reduce EMF in new electric facilities. Edison is unable to predict when or if the scientific community will be able to reach a consensus on any health effects of EMF, or the effect that such a consensus, if reached, could have on future electric operations. The probable effect on net income of these environmental matters cannot be determined at this time, but SCEcorp believes they will not materially affect its financial position. NEW ACCOUNTING STANDARDS In January 1994, SCEcorp adopted a new accounting standard which requires the accrual of certain postemployment, but prior to retirement, benefits provided to former or inactive employees. Edison has recorded balance sheet adjustments of $10 million representing the additional liability for these postemployment benefits, and expects to recover these costs in rates. In January 1994, SCEcorp also adopted a new accounting standard which requires certain debt and equity investments be reported at fair value. Accordingly, nuclear decommissioning trusts and other equity investments are now reported at market value. Adoption of these new standards did not have a material effect on results of operations or financial position. OTHER CONTINGENCIES The Internal Revenue Service (IRS) has completed its examination of tax years 1983-1988. In connection with this examination, the IRS has challenged certain tax positions, including how Edison deducts energy conservation expenditures. The deduction of energy conservation expenditures is consistent with positions taken by other members of the industry. According to the IRS, certain demand-side management (DSM) expenditures should not be treated as a current income tax deduction. The IRS claims that DSM programs create a future benefit by delaying the cost of building additional power plants. The utility industry believes that energy conservation expenditures constitute ordinary and necessary business expenses, which, under current provisions of the Internal Revenue Code, are deductible in the year incurred or accrued. SCEcorp believes the IRS' position is in conflict with existing tax laws and contrary to the nation's energy and environmental policy goals. SCEcorp will continue to vigorously defend its position. In March 1993, a steam generator tube ruptured at Palo Verde Unit 2. A subsequent investigation of the unit revealed cracking in additional steam generator tubes. APS, operator of Palo Verde, reduced power at all three units to 85% in late 1993 to mitigate further tube degradation until investigations were completed. In April 1994, investigations revealed some minor cracking at Unit 3. APS implemented several remedial actions, and returned two units to full power in July 1994. APS expects Unit 2 (currently operated at 88% power) to be returned to full power by year- end 1994, following additional inspections. PART II--OTHER INFORMATION Item 1. Legal Proceedings Antitrust Matters Transphase Systems, Inc. filed a lawsuit on May 3, 1993, in the United States District Court for the Central District of California against Edison and San Diego Gas & Electric Company ("SDG&E"). The complaint alleged that Transphase was competitively disadvantaged because it could not directly access the demand-side management funds Edison collects from its ratepayers to fund demand-side management activities, and that the utilities willfully acquired and maintain monopoly power in the energy conservation industry. The complaint sought $50 million in damages before trebling. On October 7, 1993, the District Court dismissed the case and denied the plaintiffs the opportunity to replead. Transphase appealed to the Ninth Circuit Court of Appeals; the appeal was denied on May 6, 1994. Transphase has requested a hearing en banc on the denial of the appeal. This matter was previously reported in the Annual Report on Form 10-K for the year ended December 31, 1993, under the heading "Antitrust Matters" in Part I, Item 3 and in the Quarterly Report on Form 10-Q for the quarter ending March 31, 1994, under the heading "Legal Proceedings" in Part II, Item 1. Qualified Facilities ("QF") Litigation On May 20, 1993, four geothermal QFs filed a lawsuit against Edison in Los Angeles County Superior Court, claiming that Edison has underpaid the plaintiffs, and continues to underpay the plaintiffs, for energy. The action was brought on behalf of Vulcan/BN Geothermal Power Company, Elmore L.P., Del Ranch L.P., and Leathers L.P., each of which is partially owned by a subsidiary of Mission Energy Company (a subsidiary of SCEcorp). The plaintiffs allege that the underpayments totaled at least $10 million as of the filing of the complaint. In subsequent court filings, plaintiffs contend that contract payments due through the end of the contract term could total approximately $50 million. They also seek unspecified punitive damages. The matter is in the discovery stage. The materiality of a judgment in favor of the plaintiffs would be largely dependent on the extent to which additional payments resulting from such a judgment are recoverable through Edison's Energy Cost Adjustment Clause ("ECAC"). Edison believes the claims are without merit and is vigorously defending itself against the claims in the lawsuit. Between January 1994 and July 1994, Edison was named as a defendant in a series of seven lawsuits brought by independent power producers of wind generation. Six of the lawsuits were filed in Los Angeles County Superior Court and one was filed in Kern County Superior Court. The lawsuits allege Edison incorrectly interpreted contracts with the plaintiffs by limiting fixed energy payments to a single 10-year period rather than beginning a new 10-year period of fixed energy payments for each stage of development. In each of the lawsuits, the plaintiffs seek declaratory relief regarding the proper interpretation of the contracts. Plaintiffs allege a combined total of approximately $173 million in damages, which includes consequential damages claimed in six of the seven lawsuits. The lawsuits are in various stages of pleading and discovery. The materiality of judgments in favor of the plaintiffs would be largely dependent on the extent to which any damages or additional payments which might result from such judgments would be recoverable through Edison's ECAC. Edison believes the claims are without merit and is vigorously defending against these claims. Electric and Magnetic Fields ("EMF") Litigation Edison has been served with two lawsuits, both of which allege, among other things, that certain plaintiffs developed cancer and sustained other injuries as a result of EMF emitted from Edison facilities. The first lawsuit, filed in Orange County Superior Court and served on Edison in June 1994, requests compensatory and punitive damages. Although no specific damage amounts are alleged in the complaint, in subsequent court filings, plaintiffs estimated general damages at $8 million. On August 8, 1994, one of the co-defendants filed a cross-complaint against the other co-defendants, including Edison, requesting indemnification and declaratory relief concerning the rights and responsibilities of the parties. The second lawsuit was filed in Los Angeles County Superior Court and served on Edison in July 1994. This complaint requests an unspecified amount of compensatory damages. In subsequent court filings, however, plaintiffs claimed approximately $3 million in damages. Edison believes that the allegations in all of these actions are without merit and intends to vigorously defend against these allegations. The Orange County Superior Court case was previously reported in the Quarterly Report on Form 10-Q for the quarter ending March 31, 1994, under the heading "Environmental Litigation", in Part II, Item 1. San Onofre Personal Injury Litigation A former engineer for two contractors providing services for San Onofre has been diagnosed with leukemia. On July 12, 1994, the engineer and his wife sued Edison and SDG&E, as well as a manufacturer of fuel rods for the plant, in the United States District Court for the Southern District of California. The plaintiffs allege that the engineer's illness resulted from contact with radioactive fuel particles released from failed fuel rods. Plant records show that the engineer's exposure to radiation was well below Nuclear Regulatory Commission safety levels. In the complaint, plaintiffs seek unspecified compensatory and punitive damages. Edison believes the allegations are without merit and intends to vigorously contest the allegations. Item 5. Other Information Construction Program and Capital Expenditures Construction expenditures for the 1994-1998 period are estimated (as of July 14, 1994, the date of SCEcorp's latest approved budget) as follows:
1994 1995 1996 1997 1998 Total ---- ---- ---- ---- ---- ----- (In millions) Electric generating plant $ 338 $ 336 $ 274 $ 274 $ 500 $1,722 Electric transmission lines and substations 174 116 156 167 213 826 Electric distribution lines and substations 449 495 522 552 547 2,565 Other expenditures 256 267 131 113 91 858 Non-utility expenditures 61 74 34 1 1 171 ------ ------ ------ ------ ------ ------ Total 1,278 1,288 1,117 1,107 1,352 6,142 Less--Allowance for funds used during construction 30 44 43 43 43 203 ------ ------ ------ ------ ------ ------ Funds required for construction expenditures $1,248 $1,244 $1,074 $1,064 $1,309 $5,939 ====== ====== ====== ====== ====== ======
Item 6. Exhibits and Reports on Form 8-K (a) Exhibits: None (b) Reports on Form 8-K: June 16, 1994 Item No. 5 -- Other Events -- SCEcorp Common Stock Dividend Deduction SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized. SCEcorp (Registrant) By R. K. BUSHEY --------------------------------- R. K. BUSHEY Vice President and Controller By W. J. SCILACCI --------------------------------- W. J. SCILACCI Assistant Treasurer August 10, 1994