XML 204 R79.htm IDEA: XBRL DOCUMENT v3.8.0.1
Regulatory Matters Regulatory Matters - Schedule of Regulatory Assets (Details) - USD ($)
$ in Millions
Dec. 31, 2017
Dec. 31, 2016
Mar. 31, 2013
Dec. 31, 2008
Regulatory Assets [Line Items]        
Regulatory Assets $ 9,288 $ 11,388    
Current regulatory assets 1,267 1,342    
Noncurrent regulatory assets 8,021 10,046    
Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 3,848 4,162    
Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 306 2,016    
AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 640 701    
Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 244 188    
Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 166      
Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 116 124    
Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 758 812    
Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 750 1,085    
Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 109 111    
MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 295 305    
Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 61 56    
Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 258 260    
Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 82 89    
Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 27 36    
Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   10    
Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   7    
Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 596 621    
Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 45 25    
Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 55 27    
COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 5 8    
Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 35 34    
Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 19 31    
Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 79 138    
CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 8 11    
Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 529 477    
DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 190      
Other        
Regulatory Assets [Line Items]        
Regulatory Assets 67 54    
Commonwealth Edison Co [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 1,279 1,167    
Current regulatory assets 225 190    
Noncurrent regulatory assets 1,054 977    
Commonwealth Edison Co [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 0 75    
Commonwealth Edison Co [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 155 164    
Commonwealth Edison Co [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 244 188    
Commonwealth Edison Co [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 166      
Commonwealth Edison Co [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 37 42    
Commonwealth Edison Co [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 73 76    
Commonwealth Edison Co [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 273 278    
Commonwealth Edison Co [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 61 56    
Commonwealth Edison Co [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 256 258    
Commonwealth Edison Co [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 6 23    
Commonwealth Edison Co [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Commonwealth Edison Co [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Commonwealth Edison Co [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Commonwealth Edison Co [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Commonwealth Edison Co [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets 8 7    
PECO Energy Co [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 410 1,710    
Current regulatory assets 29 29    
Noncurrent regulatory assets 381 1,681    
PECO Energy Co [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 297 1,583    
PECO Energy Co [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 36 49    
PECO Energy Co [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
PECO Energy Co [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 1 1    
PECO Energy Co [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 22 23    
PECO Energy Co [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 22 26    
PECO Energy Co [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 1 0    
PECO Energy Co [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
PECO Energy Co [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
PECO Energy Co [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 1 1    
PECO Energy Co [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 6 7    
PECO Energy Co [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 8 11    
PECO Energy Co [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
PECO Energy Co [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
PECO Energy Co [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets 16 9    
Baltimore Gas and Electric Company [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 571 712    
Current regulatory assets 174 208    
Noncurrent regulatory assets 397 504    
Baltimore Gas and Electric Company [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 0 98    
Baltimore Gas and Electric Company [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 214 230    
Baltimore Gas and Electric Company [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Baltimore Gas and Electric Company [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 11 7    
Baltimore Gas and Electric Company [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 14 12    
Baltimore Gas and Electric Company [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 1    
Baltimore Gas and Electric Company [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 23 38    
Baltimore Gas and Electric Company [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 1    
Baltimore Gas and Electric Company [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   10    
Baltimore Gas and Electric Company [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   7    
Baltimore Gas and Electric Company [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 285 285    
Baltimore Gas and Electric Company [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 6 10 $ 4  
Baltimore Gas and Electric Company [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 14 3    
Baltimore Gas and Electric Company [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Baltimore Gas and Electric Company [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Baltimore Gas and Electric Company [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets 4 10    
Pepco Holdings LLC [Member] | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 3,047 3,504    
Current regulatory assets 554 653    
Noncurrent regulatory assets 2,493 2,851    
Pepco Holdings LLC [Member] | Pension and other postretirement benefits | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | Deferred income taxes | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 9 260    
Pepco Holdings LLC [Member] | AMI programs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 235 258    
Pepco Holdings LLC [Member] | Electric distribution formula rate | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | Energy efficiency costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Pepco Holdings LLC [Member] | Debt costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 73 81    
Pepco Holdings LLC [Member] | Fair value of long-term debt | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 619 671    
Pepco Holdings LLC [Member] | Fair value of PHI's unamortized energy contracts | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 750 1,085    
Pepco Holdings LLC [Member] | Asset retirement obligations | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | MGP remediation costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | Under-recovered uncollectible accounts | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | Renewable energy | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 2 2    
Pepco Holdings LLC [Member] | Energy and transmission programs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 52 28    
Pepco Holdings LLC [Member] | Deferred storm costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 27 35    
Pepco Holdings LLC [Member] | Electric generation-related regulatory asset | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Pepco Holdings LLC [Member] | Rate stabilization deferral | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Pepco Holdings LLC [Member] | Energy efficiency and demand response programs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 310 335    
Pepco Holdings LLC [Member] | Merger integration costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 39 15    
Pepco Holdings LLC [Member] | Under-recovered revenue decoupling | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 41 24    
Pepco Holdings LLC [Member] | COPCO acquisition adjustment | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 5 8    
Pepco Holdings LLC [Member] | Workers compensation and long-term disability costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 35 34    
Pepco Holdings LLC [Member] | Vacation accrual | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 13 24    
Pepco Holdings LLC [Member] | Securitized stranded costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 79 138    
Pepco Holdings LLC [Member] | CAP arrearage | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Pepco Holdings LLC [Member] | Removal costs | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 529 477    
Pepco Holdings LLC [Member] | DC PLUG charge | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 190      
Pepco Holdings LLC [Member] | Other | Successor [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 39 29    
Potomac Electric Power Company [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 891 852    
Current regulatory assets 213 162    
Noncurrent regulatory assets 678 690    
Potomac Electric Power Company [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 9 171    
Potomac Electric Power Company [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 158 174    
Potomac Electric Power Company [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Potomac Electric Power Company [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 15 17    
Potomac Electric Power Company [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 11 6    
Potomac Electric Power Company [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 7 12    
Potomac Electric Power Company [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Potomac Electric Power Company [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Potomac Electric Power Company [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 229 250    
Potomac Electric Power Company [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 20 11    
Potomac Electric Power Company [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 38 21    
Potomac Electric Power Company [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 35 34    
Potomac Electric Power Company [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Potomac Electric Power Company [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 150 134    
Potomac Electric Power Company [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 190      
Potomac Electric Power Company [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets 29 22    
Delmarva Power and Light Company [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 314 348    
Current regulatory assets 69 59    
Noncurrent regulatory assets 245 289    
Delmarva Power and Light Company [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 0 38    
Delmarva Power and Light Company [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 77 84    
Delmarva Power and Light Company [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Delmarva Power and Light Company [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 8 9    
Delmarva Power and Light Company [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 1 0    
Delmarva Power and Light Company [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 15 5    
Delmarva Power and Light Company [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 5 5    
Delmarva Power and Light Company [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Delmarva Power and Light Company [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Delmarva Power and Light Company [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 81 85    
Delmarva Power and Light Company [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 10 4    
Delmarva Power and Light Company [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 3 3    
Delmarva Power and Light Company [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 5 8   $ 41
Delmarva Power and Light Company [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 8 14    
Delmarva Power and Light Company [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Delmarva Power and Light Company [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 93 88    
Delmarva Power and Light Company [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Delmarva Power and Light Company [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets 8 5    
Atlantic City Electric Company [Member]        
Regulatory Assets [Line Items]        
Regulatory Assets 430 501    
Current regulatory assets 71 96    
Noncurrent regulatory assets 359 405    
Atlantic City Electric Company [Member] | Pension and other postretirement benefits        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Deferred income taxes        
Regulatory Assets [Line Items]        
Regulatory Assets 0 51    
Atlantic City Electric Company [Member] | AMI programs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Electric distribution formula rate        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Energy efficiency costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Atlantic City Electric Company [Member] | Debt costs        
Regulatory Assets [Line Items]        
Regulatory Assets 5 6    
Atlantic City Electric Company [Member] | Fair value of long-term debt        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Fair value of PHI's unamortized energy contracts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Asset retirement obligations        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | MGP remediation costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Under-recovered uncollectible accounts        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Renewable energy        
Regulatory Assets [Line Items]        
Regulatory Assets 1 2    
Atlantic City Electric Company [Member] | Energy and transmission programs        
Regulatory Assets [Line Items]        
Regulatory Assets 26 17    
Atlantic City Electric Company [Member] | Deferred storm costs        
Regulatory Assets [Line Items]        
Regulatory Assets 15 18    
Atlantic City Electric Company [Member] | Electric generation-related regulatory asset        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Atlantic City Electric Company [Member] | Rate stabilization deferral        
Regulatory Assets [Line Items]        
Regulatory Assets   0    
Atlantic City Electric Company [Member] | Energy efficiency and demand response programs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Merger integration costs        
Regulatory Assets [Line Items]        
Regulatory Assets 9 0    
Atlantic City Electric Company [Member] | Under-recovered revenue decoupling        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | COPCO acquisition adjustment        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Workers compensation and long-term disability costs        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Vacation accrual        
Regulatory Assets [Line Items]        
Regulatory Assets 5 10    
Atlantic City Electric Company [Member] | Securitized stranded costs        
Regulatory Assets [Line Items]        
Regulatory Assets 79 138    
Atlantic City Electric Company [Member] | CAP arrearage        
Regulatory Assets [Line Items]        
Regulatory Assets 0 0    
Atlantic City Electric Company [Member] | Removal costs        
Regulatory Assets [Line Items]        
Regulatory Assets 286 255    
Atlantic City Electric Company [Member] | DC PLUG charge        
Regulatory Assets [Line Items]        
Regulatory Assets 0      
Atlantic City Electric Company [Member] | Other        
Regulatory Assets [Line Items]        
Regulatory Assets $ 4 $ 4