Commitments and Contingencies
12 Months Ended
Dec. 31, 2015
Commitments and Contingencies
(16) COMMITMENTS AND CONTINGENCIES

General Litigation

From time to time, PHI and its subsidiaries are named as defendants in litigation, usually relating to general liability or auto liability claims that resulted in personal injury or property damage to third parties. PHI and each of its subsidiaries are self-insured against such claims up to a certain self-insured retention amount and maintain insurance coverage against such claims at higher levels, to the extent deemed prudent by management. In addition, PHI’s contracts with its vendors generally require the vendors to name PHI and/or its subsidiaries as additional insureds for the amounts at least equal to PHI’s self-insured retention. Further, PHI’s contracts with its vendors require the vendors to indemnify PHI for various acts and activities that may give rise to claims against PHI. Loss contingency liabilities for both asserted and unasserted claims are recognized if it is probable that a loss will result from such a claim and if the amounts of the losses can be reasonably estimated. Although the outcome of the claims and proceedings cannot be predicted with any certainty, management believes that there are no existing claims or proceedings that are likely to have a material adverse effect on PHI’s or its subsidiaries’ financial condition, results of operations or cash flows. At December 31, 2015, PHI had recorded estimated loss contingency liabilities for general litigation totaling approximately $12 million.

Environmental Matters

PHI, through its subsidiaries, is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of PHI’s utility subsidiaries, environmental clean-up costs incurred by Pepco, DPL and ACE generally are included by each company in its respective cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies described below of PHI and its subsidiaries at December 31, 2015 are summarized as follows:

 

            Legacy Generation         
     Transmission
and Distribution
     Regulated      Non-Regulated      Total  
            (millions of dollars)         

Balance as of January 1

   $ 17      $ 6      $ 5       $ 28  

Accruals

     7        3        —          10  

Payments

     (4 )      (1 )      —          (5 )
  

 

 

    

 

 

    

 

 

    

 

 

 

Balance as of December 31

     20        8        5        33  

Less amounts in Other Current Liabilities

     3        1        —          4  
  

 

 

    

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ 17      $ 7      $ 5      $ 29  
  

 

 

    

 

 

    

 

 

    

 

 

 

Conectiv Energy Wholesale Power Generation Sites

In July 2010, PHI sold the wholesale power generation business of Conectiv Energy Holdings, Inc. and substantially all of its subsidiaries (Conectiv Energy) to Calpine Corporation (Calpine). Under New Jersey’s Industrial Site Recovery Act (ISRA), the transfer of ownership triggered an obligation on the part of Conectiv Energy to remediate any environmental contamination at each of the nine Conectiv Energy generating facility sites located in New Jersey. Under the terms of the sale, Calpine has assumed responsibility for performing the ISRA-required remediation and for the payment of all related ISRA compliance costs up to $10 million. PHI is obligated to indemnify Calpine for any ISRA compliance remediation costs in excess of $10 million. According to PHI’s estimates, the costs of ISRA-required remediation activities at the nine generating facility sites located in New Jersey are in the range of approximately $7 million to $18 million. The amount accrued by PHI for the ISRA-required remediation activities at the nine generating facility sites is included in the table above in the column entitled “Legacy Generation – Non-Regulated.”

 

In September 2011, PHI received a request for data from the U.S. Environmental Protection Agency (EPA) regarding operations at the Deepwater generating facility in New Jersey (which was included in the sale to Calpine) between February 2004 and July 1, 2010, to demonstrate compliance with the Clean Air Act’s new source review permitting program. PHI responded to the data request. Under the terms of the Calpine sale, PHI is obligated to indemnify Calpine for any failure of PHI, on or prior to the closing date of the sale, to comply with environmental laws attributable to the construction of new, or modification of existing, sources of air emissions. At this time, PHI does not expect that any financial consequences that could arise from this inquiry would have a material adverse effect on its consolidated financial condition, results of operations or cash flows.

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from EPA concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA’s claims are based on ACE’s sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period from June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA’s expenditures for response measures at the site have exceeded $6 million. EPA’s feasibility study (FS) for this site conducted in 2007 identified a range of alternatives for permanent remedial measures with varying cost estimates, and the estimated cost of EPA’s preferred alternative is approximately $6 million.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE’s position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Peck Iron and Metal Site

EPA informed Pepco in a May 2009 letter that Pepco may be a PRP under CERCLA with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that the Peck Iron and Metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) for the site using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with this RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

 

Benning Road Site

Contamination of Lower Anacostia River

In September 2010, PHI received a letter from EPA identifying the Benning Road site as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. A portion of the site was formerly the location of a Pepco Energy Services electric generating facility. That generating facility was deactivated in June 2012 and plant structure demolition was completed in July 2015. The remaining portion of the site consists of a Pepco transmission and distribution service center that remains in operation. The principal contaminants allegedly of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons. In December 2011, the U.S. District Court for the District of Columbia approved a consent decree entered into by Pepco and Pepco Energy Services with the District of Columbia Department of Energy and Environment (DOEE) (formerly the District of Columbia Department of the Environment), which requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10 to 15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for the remedial actions for the Benning Road site and for the Anacostia River sediment associated with the site. The consent decree does not obligate Pepco or Pepco Energy Services to pay for or perform any remediation work, but it is anticipated that DOEE will look to Pepco and Pepco Energy Services to assume responsibility for cleanup of any conditions in the river that are determined to be attributable to past activities at the Benning Road site.

The initial remedial investigation field work began in January 2013 and was completed in December 2014. In addition, in conjunction with the power plant demolition activities, Pepco and Pepco Energy Services collected soil samples adjacent to and beneath the concrete basins for the dismantled cooling towers for the generating facility. This sampling showed localized areas of soil contamination associated with the cooling tower basins, and, beginning in the first quarter of 2016, Pepco and Pepco Energy Services expect to implement a plan approved by DOEE to remove contaminated soil in conjunction with the demolition and removal of the concrete basins. On April 30, 2015, Pepco and Pepco Energy Services submitted a draft Remedial Investigation (RI) Report to DOEE. After review, DOEE determined that additional field investigation and data analysis is required to complete the RI process (much of which is beyond the scope of the original DOEE-approved RI work plan). In the meantime, Pepco and Pepco Energy Services will revise the draft RI Report as appropriate to address DOEE’s comments and DOEE will make the draft RI available for public review during the first quarter of 2016. The additional field investigation and data analysis will proceed later in 2016 according to a schedule to be developed by Pepco and Pepco Energy Services and approved by DOEE. Once the additional RI work has been completed, Pepco and Pepco Energy Services will issue a draft “final” RI report for review and comment by DOEE and the public. Pepco and Pepco Energy Services will then proceed with an FS to evaluate possible remedial alternatives. This effort also may include a treatability study to evaluate the effectiveness of potential remedial options. Once the FS has been completed, Pepco and Pepco Energy Services will prepare and submit a draft FS Report for review and comment by DOEE and the public. Thereafter, Pepco and Pepco Energy Services will revise the draft FS Report as appropriate to address comments received and will submit a final FS Report to DOEE.

Upon DOEE’s approval of the final RI and FS Reports, Pepco and Pepco Energy Services will have satisfied their obligations under the consent decree. At that point, DOEE will prepare a Proposed Plan regarding further response actions based on the results of the RI/FS. After considering public comment on the Proposed Plan, DOEE will issue a Record of Decision identifying any further response actions determined to be necessary.

DOEE, Pepco and Pepco Energy Services must submit their next joint status report to the court regarding progress on the RI/FS by May 24, 2016.

 

PHI, Pepco and Pepco Energy Services have determined that a loss associated with this matter for PHI, Pepco and Pepco Energy Services is probable and have estimated that the costs of remediation are in the range of approximately $9 million to $13 million.

The remediation costs accrued for this matter are included in the table above in the columns entitled “Transmission and Distribution,” “Legacy Generation – Regulated,” and “Legacy Generation – Non-Regulated.”

NPDES Permit Limit Exceedances

Pepco holds a National Pollutant Discharge Elimination System (NPDES) permit issued by EPA with a July 19, 2009 effective date, which authorizes discharges from the Benning Road site, including the Pepco Energy Services generating facility previously located on the site that was deactivated in 2012 and has been demolished. The 2009 permit for the first time imposed numerical limits on the allowable concentration of certain metals in storm water discharged from the site into the Anacostia River as determined by EPA to be necessary to meet the applicable District of Columbia surface water quality standards. The permit contemplated that Pepco would meet these limits over time through the use of best management practices (BMPs). As of December 2012, Pepco completed the implementation of the first two phases of BMPs identified in a plan approved by EPA (consisting principally of installing metal absorbing filters to capture contaminants at storm water inlets, removing stored equipment from areas exposed to the weather, covering and painting exposed metal pipes, and covering and cleaning dumpsters). These measures were effective in reducing metal concentrations in storm water discharges, but were not sufficient to meet all of the numerical limits for metals. Most of the quarterly monitoring results since the issuance of the permit have shown exceedances of the limits for copper and zinc, as well as occasional exceedances for iron and lead.

The NPDES permit was due to expire on June 19, 2014. Pepco submitted a permit renewal application on December 17, 2013. In November 2014, EPA advised Pepco that it will not renew the permit until the Benning Road site has come into compliance with the existing permit limits. The current permit remains in effect pending EPA’s action on the renewal application. In December 2014, Pepco submitted a plan to EPA to implement the third phase of BMPs recommended in the original permit compliance plan with the objective of achieving full compliance with the permit limits for metals by the end of 2015 and Pepco immediately began to implement the additional BMPs in accordance with the plan. On September 1, 2015, Pepco submitted a report to EPA on the status of implementation of the third phase of BMPs. As of that date, Pepco had fully implemented most of the elements of the Phase 3 plan, including installation of upgraded storm water inlet controls (filters and booms), enhanced inspection and maintenance of inlets, removal of materials and equipment from exposure to storm water, and removal of accumulated sediments from the underground storm drains. The sampling results from the third quarter of 2015 showed compliance with all of the permit limits. The sampling results from the fourth quarter of 2015 showed compliance with all but a single permit limit for metals; the concentration of copper was below the daily maximum limit but exceeded the monthly average limit. As confirmed by this latest sampling, because the permit limits are low and site conditions are subject to variation, Pepco has concluded that some form of storm water treatment prior to discharge will be necessary to ensure ongoing compliance with all permit limits and has begun the process of evaluating treatment options. The nature and scope of the necessary treatment system, and the amount of the associated capital expenditures, will not be known until Pepco has completed the evaluation and design process.

Pepco has been engaged in discussions with representatives from EPA and the DOJ regarding permit compliance. On October 30, 2015, EPA filed a Clean Water Act civil enforcement action against Pepco in federal district court. Pepco expects that this enforcement action will be resolved through a consent decree that will (i) establish further requirements to achieve compliance with the permit limits, including the design and installation of an appropriate storm water treatment system as noted above, and (ii) include civil penalties for past noncompliance. The amount of such penalties is not known or estimable at this time and Pepco does not expect the amount of such penalties to have a material adverse effect on PHI’s consolidated financial condition, results of operations or cash flows.

 

Pepco and EPA are currently in discussions regarding the terms of the contemplated consent decree, and it is anticipated that the parties will finalize the consent decree during the first half of 2016. In response to a joint motion by the parties, the court has extended the deadline for Pepco to answer the complaint to May 16, 2016, to give the parties time to work towards agreement on the terms of a consent decree. The parties contemplate seeking a further extension if necessary to complete their negotiations. Once executed by the parties, the consent decree will be filed with the court for review and approval following a period for public comment.

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco’s Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

In March 2014, Pepco and DOEE entered into a consent decree to resolve a threatened DOEE enforcement action, the terms of which include a combination of a civil penalty and a Supplemental Environmental Project (SEP) with a total cost to Pepco of $875,000. The consent decree was approved and entered by the District of Columbia Superior Court on April 4, 2014. Pepco has paid the $250,000 civil penalty imposed under the consent decree and, pursuant to the consent decree, has made a one-time donation in the amount of $25,000 to the Northeast Environmental Enforcement Training Fund, Inc., a non-profit organization that funds scholarships for environmental enforcement training. The consent decree confirmed that no further actions are required by Pepco to investigate, assess or remediate impacts to the river from the mineral oil release. To implement the SEP, Pepco has entered into an agreement with Living Classrooms Foundation, Inc., a non-profit educational organization, pursuant to which Pepco will provide $600,000 to fund the design, installation and operation of a trash collection system at a storm water outfall that drains to the Anacostia River. DOEE approved the design for the trash collection system and efforts to secure necessary permits are in progress. Pepco expects that this system will be constructed and placed into operation by the end of 2016, which will satisfy Pepco’s obligations under the consent decree. On September 11, 2015, Pepco and DOEE filed a joint report with the D.C. Superior Court on the status of the trash cage project and other elements of the consent decree. The court accepted that report and scheduled the next status hearing in this matter for September 23, 2016.

The consent decree did not resolve potential claims under federal law for natural resource damages resulting from the mineral oil release. Pepco has engaged in separate discussions with DOEE and the federal resource trustees regarding the settlement of a possible natural resource damages claim under federal law. In July 2013, Pepco submitted a natural resource damage assessment to DOEE and the federal trustees that proposed monetary compensation for such damages in the range of $106,000 to $161,000. By letter dated September 16, 2015, the U.S. Department of Interior, on behalf of the trustees, made a confidential counter-proposal for settlement of the natural resource damage claim. Pepco has engaged in subsequent discussions with the trustees and believes that the parties are close to reaching an agreement to settle the claims. Based on the discussions to date, PHI and Pepco do not believe that the resolution of the natural resource damages claim will have a material adverse effect on their respective financial condition, results of operations or cash flows.

As a result of the mineral oil release, Pepco implemented certain interim operational changes to the secondary containment systems at the facility, which involve pumping accumulated storm water to an above-ground holding tank for off-site disposal. Pepco is continuing to use the above-ground holding tank to manage storm water from the secondary containment system while it evaluates other technical and regulatory options.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

 

Metal Bank Site

In the first quarter of 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted Pepco and DPL on behalf of itself and other federal and state trustees to request that Pepco and DPL execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Cottman Avenue Superfund Site located in Philadelphia, Pennsylvania. Pepco and DPL executed a tolling agreement, which has been extended to March 15, 2016, and will continue settlement discussions with the NOAA, the trustees and other PRPs.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Brandywine Fly Ash Disposal Site

In February 2013, Pepco received a letter from the Maryland Department of the Environment (MDE) requesting that Pepco investigate the extent of waste on a Pepco right-of-way that traverses the Brandywine fly ash disposal site in Brandywine, Prince George’s County, Maryland, owned by NRG Energy, Inc. (as successor to GenOn MD Ash Management, LLC) (NRG). In July 2013, while reserving its rights and related defenses under a 2000 agreement covering the sale of this site, Pepco indicated its willingness to investigate the extent of, and propose an appropriate closure plan to address, ash on the right-of-way. Pepco submitted a schedule for development of a closure plan to MDE on September 30, 2013 and, by letter dated October 18, 2013, MDE approved the schedule.

PHI and Pepco have determined that a loss associated with this matter for PHI and Pepco is probable and have estimated that the costs for implementation of a closure plan and cap on the site are in the range of approximately $3 million to $6 million. PHI and Pepco believe that the costs incurred in this matter will be recoverable from NRG under the 2000 sale agreement.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Virginia Department of Environmental Quality Notice of Violation

On February 3, 2015, the Virginia Department of Environmental Quality (VDEQ) issued a notice of violation (NOV) to DPL in connection with alleged violations of state water control laws and regulations associated with recent construction activities undertaken to replace certain transmission facilities. The NOV informed DPL of information on which VDEQ may rely to institute an administrative or judicial enforcement action, requested a meeting, and stated that DPL may be asked to enter into a consent order to formalize a plan and schedule of corrective action and settle any outstanding issues regarding the matter including the assessment of civil charges. At a February 20, 2015 meeting, VDEQ confirmed that the NOV would be resolved through a consent order, which will require the payment of a penalty, but did not specify the potential penalty amount. DPL will pursue recovery of the restoration costs for this matter from the contractor responsible for the vegetation management activities that gave rise to the alleged violations. PHI and DPL have substantially completed all remediation activities related to this matter and do not believe that the potential penalty to resolve this matter will have a material adverse effect on their respective financial condition, results of operations or cash flows.

Rock Creek Mineral Oil Release

In late August 2015, a Pepco underground transmission line in the District of Columbia suffered a breach, resulting in the release of non-toxic mineral oil surrounding the transmission line into the surrounding soil, and a small amount also reached Rock Creek through a storm drain. Pepco notified regulatory authorities, and Pepco and its spill response contractors placed booms in Rock Creek, blocked the storm drain to prevent the release of mineral oil into the creek and commenced remediation of soil around the transmission line and the Rock Creek shoreline. Pepco estimates that approximately 6,100 gallons of mineral oil were released and that its remediation efforts recovered approximately 80 percent of the amount released. Pepco’s remediation efforts are ongoing under the direction of the DOEE and in collaboration with the National Park Service, the Smithsonian Institution/National Zoo and EPA. Pepco’s investigation presently indicates that the damage to Pepco’s facilities occurred prior to the release of mineral oil when third-party excavators struck the Pepco underground transmission line while installing cable for another utility.

To the extent recovery is available against any party who contributed to this loss, PHI and Pepco will pursue such action. PHI and Pepco continue to investigate the cause of the incident, the parties involved, and legal responsibility under District of Columbia law, but do not believe that the remediation costs to resolve this matter will have a material adverse effect on their respective financial condition, results of operations or cash flows.

PHI’s Cross-Border Energy Lease Investments

PHI held a portfolio of cross-border energy lease investments involving public utility assets located outside of the United States. Each of these investments was comprised of multiple leases and was structured as a sale and leaseback transaction commonly referred to by the IRS as a SILO transaction. During the second and third quarters of 2013, PHI terminated early all of its remaining cross-border energy lease investments.

Since 2005, PHI’s former cross-border energy lease investments have been under examination by the IRS as part of the PHI federal income tax audits. In connection with the audit of PHI’s 2001-2002 income tax returns, the IRS disallowed the depreciation and interest deductions in excess of rental income claimed by PHI for six of the eight lease investments and, in connection with the audits of PHI’s 2003-2005 and 2006-2008 income tax returns, the IRS disallowed such deductions in excess of rental income for all eight of the lease investments. In addition, the IRS has sought to recharacterize each of the leases as a loan transaction in each of the years under audit as to which PHI would be subject to original issue discount income. PHI had disagreed with the IRS’ proposed adjustments to the 2001-2008 income tax returns and filed protests of these findings for each year with the Office of Appeals of the IRS. In November 2010, PHI entered into a settlement agreement with the IRS for the 2001 and 2002 tax years for the purpose of commencing litigation associated with this matter and subsequently filed refund claims in July 2011 for the disallowed tax deductions relating to the leases for these years. In January 2011, as part of this settlement, PHI paid $74 million of additional tax for 2001 and 2002, penalties of $1 million, and $28 million in interest associated with the disallowed deductions. Since the July 2011 refund claims were not approved by the IRS within the statutory six-month period, in January 2012 PHI filed complaints in the U.S. Court of Federal Claims seeking recovery of the tax payment, interest and penalties.

On January 9, 2013, the U.S. Court of Appeals for the Federal Circuit issued an opinion in Consolidated Edison Company of New York, Inc. & Subsidiaries v. United States (to which PHI is not a party) that disallowed tax benefits associated with Consolidated Edison’s cross-border lease transaction. While PHI believed that its tax position with regard to its former cross-border energy lease investments was appropriate, after analyzing the recent U.S. Court of Appeals ruling, PHI determined in the first quarter of 2013 that its tax position with respect to the tax benefits associated with the cross-border energy leases no longer met the more-likely-than-not standard of recognition for accounting purposes. Accordingly, PHI recorded a non-cash after-tax charge of $377 million in the first quarter of 2013 consisting of a charge to reduce the carrying value of the cross-border energy lease investments and a charge to reflect the anticipated additional interest expense related to changes in PHI’s estimated federal and state income tax obligations for the period over which the tax benefits ultimately may be disallowed. PHI had also previously made certain business assumptions regarding foreign investment opportunities available at the end of the full lease terms. During the first quarter of 2013, management believed that its conclusions regarding these business assumptions were no longer supportable, and the tax effects of this change in conclusion were included in the charge. While the IRS could require PHI to pay a penalty of up to 20% of the amount of additional taxes due, PHI believed that it was more likely than not that no such penalty would be incurred, and therefore no amount for any potential penalty had been recorded.

 

Assuming that the IRS were to be successful in disallowing 100% of the tax benefits associated with these lease investments and recharacterize these lease investments as loans, PHI estimated that, as of March 31, 2013, it would have been obligated to pay approximately $192 million in additional federal taxes (net of the $74 million tax payment described above) and approximately $50 million of interest on the additional federal taxes. These amounts, totaling $242 million, were estimated after consideration of certain tax benefits arising from matters unrelated to the leases that would offset the taxes and interest due, including PHI’s best estimate of the expected resolution of other uncertain and effectively settled tax positions, the carrying back and carrying forward of any existing net operating losses, and the application of certain amounts paid in advance to the IRS. In order to mitigate PHI’s ongoing interest costs associated with the $242 million estimate of additional taxes and interest, PHI made an advanced payment to the IRS of $242 million in the first quarter of 2013. This advanced payment was funded from currently available sources of liquidity and short-term borrowings. A portion of the proceeds from lease terminations effected during the second and third quarters of 2013 was used to repay the short-term borrowings utilized to fund the advanced payment.

On November 18, 2015, PHI entered into the Global Tax Settlement with the IRS and the DOJ to provide for the resolution of the tax treatment of its previously held cross-border energy lease investments structured as SILO transactions. As a result of the Global Tax Settlement, PHI and the DOJ filed stipulations of dismissal regarding the litigation in the U.S. Court of Federal Claims. The Court dismissed the complaint on November 20, 2015. For additional discussion on the Global Tax Settlement with the IRS, see Note (11), “Income Taxes.”

Third Party Guarantees, Indemnifications, and Off-Balance Sheet Arrangements

PHI and certain of its subsidiaries have various financial and performance guarantees and indemnification obligations that they have entered into in the normal course of business to facilitate commercial transactions with third parties as discussed below.

As of December 31, 2015, PHI and its subsidiaries were parties to a variety of agreements pursuant to which they were guarantors. The commitments and obligations were as follows:

 

     Guarantor         
     PHI      Pepco      DPL      ACE      Total  
     (millions of dollars)  

Guarantees associated with disposal of Conectiv Energy assets (a)

   $ 13       $ —         $ —         $ —         $ 13   

Guaranteed lease residual values (b)

     3         5         6         5         19   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 16       $ 5       $ 6       $ 5       $ 32   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a) Represents guarantees by PHI of Conectiv Energy’s derivative portfolio transferred in connection with the disposition of Conectiv Energy’s wholesale business. The derivative portfolio guarantee is currently $13 million and covers Conectiv Energy’s performance prior to the assignment. The guarantee was terminated in January 2016.
(b) Represents the maximum potential obligation in the event that the fair value of certain leased equipment and fleet vehicles is zero at the end of the maximum lease term. The maximum lease term associated with these assets ranges from 3 to 8 years. The maximum potential obligation at the end of the minimum lease term would be $52 million, $9 million of which is a guarantee by PHI, $13 million by Pepco, $16 million by DPL and $14 million by ACE. The minimum lease term associated with these assets ranges from 1 to 4 years. Historically, payments under the guarantees have not been made and PHI believes the likelihood of payments being required under the guarantees is remote.

PHI and certain of its subsidiaries have entered into various indemnification agreements related to purchase and sale agreements and other types of contractual agreements with vendors and other third parties. These indemnification agreements typically cover environmental, tax, litigation and other matters, as well as breaches of representations, warranties and covenants set forth in these agreements. Typically, claims may be made by third parties under these indemnification agreements over various periods of time depending on the nature of the claim. The maximum potential exposure under these indemnification agreements can range from a specified dollar amount to an unlimited amount depending on the nature of the claim and the particular transaction. The total maximum potential amount of future payments under these indemnification agreements is not estimable due to several factors, including uncertainty as to whether or when claims may be made under these indemnities.

Energy Services Performance Contracts

Pepco Energy Services has a diverse portfolio of energy savings services performance contracts that are associated with the installation of energy savings equipment or combined heat and power facilities for federal, state and local government customers. As part of the energy savings contracts, Pepco Energy Services typically guarantees that the equipment or systems it installs will generate a specified amount of energy savings on an annual basis over a multi-year period. As of December 31, 2015 the remaining notional amount of Pepco Energy Services’ energy savings guarantees over the life of the multi-year performance contracts on: (i) completed projects was $221 million, with the longest guarantee having a remaining term of 23 years; and, (ii) projects under construction was $55 million, with the longest guarantee having a term of 19 years after completion of construction. On an annual basis, Pepco Energy Services undertakes a measurement and verification process to determine the amount of energy savings for the year and whether there is any shortfall in the annual energy savings compared to the guaranteed amount.

As of December 31, 2015, Pepco Energy Services had a performance guarantee contract associated with the production at a combined heat and power facility that is under construction totaling $15 million in notional value over 20 years.

Pepco Energy Services recognizes a liability for the value of the estimated energy savings or production shortfalls when it is probable that the guaranteed amounts will not be achieved and the amount is reasonably estimable. As of December 31, 2015, Pepco Energy Services had an accrued liability of $1 million for its energy savings contracts that it established during 2012. There was no significant change in the type of contracts issued during the year ended December 31, 2015 as compared to the year ended December 31, 2014.

Contractual Obligations

Power Purchase Contracts

As of December 31, 2015, Pepco Holdings’ contractual obligations under non-derivative power purchase contracts were $268 million in 2016, $469 million in 2017 to 2018, $472 million in 2019 to 2020 and $993 million thereafter.

Lease Commitments

Rental expense for operating leases was $60 million, $59 million and $54 million for the years ended December 31, 2015, 2014 and 2013, respectively.

Total future minimum operating lease payments for Pepco Holdings as of December 31, 2015 are $52 million in 2016, $48 million in 2017, $47 million in 2018, $34 million in 2019, $37 million in 2020 and $304 million thereafter.

Potomac Electric Power Co [Member]  
Commitments and Contingencies
(12) COMMITMENTS AND CONTINGENCIES

General Litigation

From time to time, Pepco is named as a defendant in litigation, usually relating to general liability or auto liability claims that resulted in personal injury or property damage to third parties. Pepco is self-insured against such claims up to a certain self-insured retention amount and maintains insurance coverage against such claims at higher levels, to the extent deemed prudent by management. In addition, Pepco’s contracts with its vendors generally require the vendors to name Pepco as an additional insured for the amount at least equal to Pepco’s self-insured retention. Further, Pepco’s contracts with its vendors require the vendors to indemnify Pepco for various acts and activities that may give rise to claims against Pepco. Loss contingency liabilities for both asserted and unasserted claims are recognized if it is probable that a loss will result from such a claim and if the amounts of the losses can be reasonably estimated. Although the outcome of the claims and proceedings cannot be predicted with any certainty, management believes that there are no existing claims or proceedings that are likely to have a material adverse effect on Pepco’s financial condition, results of operations or cash flows. At December 31, 2015, Pepco had recorded estimated loss contingency liabilities for general litigation totaling approximately $4 million.

Environmental Matters

Pepco is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of Pepco, environmental clean-up costs incurred by Pepco generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of Pepco described below at December 31, 2015 are summarized as follows:

 

     Transmission
and

Distribution
     Legacy
Generation -
Regulated
     Total  
     (millions of dollars)  

Balance as of January 1

   $ 16       $ 3       $ 19   

Accruals

     4        3        7   

Payments

     (2      —          (2 )
  

 

 

    

 

 

    

 

 

 

Balance as of December 31

     18        6        24   

Less amounts in Other Current Liabilities

     2        —          2   
  

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ 16       $ 6      $ 22   
  

 

 

    

 

 

    

 

 

 

Peck Iron and Metal Site

The U.S. Environmental Protection Agency (EPA) informed Pepco in a May 2009 letter that Pepco may be a potentially responsible party (PRP) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that the Peck Iron and Metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) for the site using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with this RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

 

Benning Road Site

Contamination of Lower Anacostia River

In September 2010, PHI received a letter from EPA identifying the Benning Road site as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. A portion of the site was formerly the location of a Pepco Energy Services electric generating facility. That generating facility was deactivated in June 2012 and plant structure demolition was completed in July 2015. The remaining portion of the site consists of a Pepco transmission and distribution service center that remains in operation. The principal contaminants allegedly of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons. In December 2011, the U.S. District Court for the District of Columbia approved a consent decree entered into by Pepco and Pepco Energy Services with the District of Columbia Department of Energy and Environment (DOEE) (formerly the District of Columbia Department of the Environment), which requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10 to 15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for the remedial actions for the Benning Road site and for the Anacostia River sediment associated with the site. The consent decree does not obligate Pepco or Pepco Energy Services to pay for or perform any remediation work, but it is anticipated that DOEE will look to Pepco and Pepco Energy Services to assume responsibility for cleanup of any conditions in the river that are determined to be attributable to past activities at the Benning Road site.

The initial remedial investigation field work began in January 2013 and was completed in December 2014. In addition, in conjunction with the power plant demolition activities, Pepco and Pepco Energy Services collected soil samples adjacent to and beneath the concrete basins for the dismantled cooling towers for the generating facility. This sampling showed localized areas of soil contamination associated with the cooling tower basins, and, beginning in the first quarter of 2016, Pepco and Pepco Energy Services expect to implement a plan approved by DOEE to remove contaminated soil in conjunction with the demolition and removal of the concrete basins. On April 30, 2015, Pepco and Pepco Energy Services submitted a draft Remedial Investigation (RI) Report to DOEE. After review, DOEE determined that additional field investigation and data analysis is required to complete the RI process (much of which is beyond the scope of the original DOEE-approved RI work plan). In the meantime, Pepco and Pepco Energy Services will revise the draft RI Report as appropriate to address DOEE’s comments and DOEE will make the draft RI available for public review during the first quarter of 2016. The additional field investigation and data analysis will proceed later in 2016 according to a schedule to be developed by Pepco and Pepco Energy Services and approved by DOEE. Once the additional RI work has been completed, Pepco and Pepco Energy Services will issue a draft “final” RI report for review and comment by DOEE and the public. Pepco and Pepco Energy Services will then proceed with a feasibility study (FS) to evaluate possible remedial alternatives. This effort also may include a treatability study to evaluate the effectiveness of potential remedial options. Once the FS has been completed, Pepco and Pepco Energy Services will prepare and submit a draft FS Report for review and comment by DOEE and the public. Thereafter, Pepco and Pepco Energy Services will revise the draft FS Report as appropriate to address comments received and will submit a final FS Report to DOEE.

Upon DOEE’s approval of the final RI and FS Reports, Pepco and Pepco Energy Services will have satisfied their obligations under the consent decree. At that point, DOEE will prepare a Proposed Plan regarding further response actions based on the results of the RI/FS. After considering public comment on the Proposed Plan, DOEE will issue a Record of Decision identifying any further response actions determined to be necessary.

DOEE, Pepco and Pepco Energy Services must submit their next joint status report to the court regarding progress on the RI/FS by May 24, 2016.

 

Pepco and Pepco Energy Services have determined that a loss associated with this matter for Pepco and Pepco Energy Services is probable and have estimated that the costs of remediation are in the range of approximately $8 million to $12 million.

The remediation costs accrued for this matter are included in the table above in the columns entitled “Transmission and Distribution” and “Legacy Generation – Regulated.”

NPDES Permit Limit Exceedances

Pepco holds a National Pollutant Discharge Elimination System (NPDES) permit issued by EPA with a July 19, 2009 effective date, which authorizes discharges from the Benning Road site, including the Pepco Energy Services generating facility previously located on the site that was deactivated in 2012 and has been demolished. The 2009 permit for the first time imposed numerical limits on the allowable concentration of certain metals in storm water discharged from the site into the Anacostia River as determined by EPA to be necessary to meet the applicable District of Columbia surface water quality standards. The permit contemplated that Pepco would meet these limits over time through the use of best management practices (BMPs). As of December 2012, Pepco completed the implementation of the first two phases of BMPs identified in a plan approved by EPA (consisting principally of installing metal absorbing filters to capture contaminants at storm water inlets, removing stored equipment from areas exposed to the weather, covering and painting exposed metal pipes, and covering and cleaning dumpsters). These measures were effective in reducing metal concentrations in storm water discharges, but were not sufficient to meet all of the numerical limits for metals. Most of the quarterly monitoring results since the issuance of the permit have shown exceedances of the limits for copper and zinc, as well as occasional exceedances for iron and lead.

The NPDES permit was due to expire on June 19, 2014. Pepco submitted a permit renewal application on December 17, 2013. In November 2014, EPA advised Pepco that it will not renew the permit until the Benning Road site has come into compliance with the existing permit limits. The current permit remains in effect pending EPA’s action on the renewal application. In December 2014, Pepco submitted a plan to EPA to implement the third phase of BMPs recommended in the original permit compliance plan with the objective of achieving full compliance with the permit limits for metals by the end of 2015 and Pepco immediately began to implement the additional BMPs in accordance with the plan. On September 1, 2015, Pepco submitted a report to EPA on the status of implementation of the third phase of BMPs. As of that date, Pepco had fully implemented most of the elements of the Phase 3 plan, including installation of upgraded storm water inlet controls (filters and booms), enhanced inspection and maintenance of inlets, removal of materials and equipment from exposure to storm water, and removal of accumulated sediments from the underground storm drains. The sampling results from the third quarter of 2015 showed compliance with all of the permit limits. The sampling results from the fourth quarter of 2015 showed compliance with all but a single permit limit for metals; the concentration of copper was below the daily maximum limit but exceeded the monthly average limit. As confirmed by this latest sampling, because the permit limits are low and site conditions are subject to variation, Pepco has concluded that some form of storm water treatment prior to discharge will be necessary to ensure ongoing compliance with all permit limits and has begun the process of evaluating treatment options. The nature and scope of the necessary treatment system, and the amount of the associated capital expenditures, will not be known until Pepco has completed the evaluation and design process.

Pepco has been engaged in discussions with representatives from EPA and the DOJ regarding permit compliance. On October 30, 2015, EPA filed a Clean Water Act civil enforcement action against Pepco in federal district court. Pepco expects that this enforcement action will be resolved through a consent decree that will (i) establish further requirements to achieve compliance with the permit limits, including the design and installation of an appropriate storm water treatment system as noted above, and (ii) include civil penalties for past noncompliance. The amount of such penalties is not known or estimable at this time and Pepco does not expect the amount of such penalties to have a material adverse effect on PHI’s consolidated financial condition, results of operations or cash flows.

 

Pepco and EPA are currently in discussions regarding the terms of the contemplated consent decree, and it is anticipated that the parties will finalize the consent decree during the first half of 2016. In response to a joint motion by the parties, the court has extended the deadline for Pepco to answer the complaint to May 16, 2016, to give the parties time to work towards agreement on the terms of a consent decree. The parties contemplate seeking a further extension if necessary to complete their negotiations. Once executed by the parties, the consent decree will be filed with the court for review and approval following a period for public comment.

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco’s Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

In March 2014, Pepco and DOEE entered into a consent decree to resolve a threatened DOEE enforcement action, the terms of which include a combination of a civil penalty and a Supplemental Environmental Project (SEP) with a total cost to Pepco of $875,000. The consent decree was approved and entered by the District of Columbia Superior Court on April 4, 2014. Pepco has paid the $250,000 civil penalty imposed under the consent decree and, pursuant to the consent decree, has made a one-time donation in the amount of $25,000 to the Northeast Environmental Enforcement Training Fund, Inc., a non-profit organization that funds scholarships for environmental enforcement training. The consent decree confirmed that no further actions are required by Pepco to investigate, assess or remediate impacts to the river from the mineral oil release. To implement the SEP, Pepco has entered into an agreement with Living Classrooms Foundation, Inc., a non-profit educational organization, pursuant to which Pepco will provide $600,000 to fund the design, installation and operation of a trash collection system at a storm water outfall that drains to the Anacostia River. DOEE approved the design for the trash collection system and efforts to secure necessary permits are in progress. Pepco expects that this system will be constructed and placed into operation by the end of 2016, which will satisfy Pepco’s obligations under the consent decree. On September 11, 2015, Pepco and DOEE filed a joint report with the D.C. Superior Court on the status of the trash cage project and other elements of the consent decree. The court accepted that report and scheduled the next status hearing in this matter for September 23, 2016.

The consent decree did not resolve potential claims under federal law for natural resource damages resulting from the mineral oil release. Pepco has engaged in separate discussions with DOEE and the federal resource trustees regarding the settlement of a possible natural resource damages claim under federal law. In July 2013, Pepco submitted a natural resource damage assessment to DOEE and the federal trustees that proposed monetary compensation for such damages in the range of $106,000 to $161,000. By letter dated September 16, 2015, the U.S. Department of Interior, on behalf of the trustees, made a confidential counter-proposal for settlement of the natural resource damage claim. Pepco has engaged in subsequent discussions with the trustees and believes that the parties are close to reaching an agreement to settle the claims. Based on the discussions to date, PHI and Pepco do not believe that the resolution of the natural resource damages claim will have a material adverse effect on their respective financial condition, results of operations or cash flows.

As a result of the mineral oil release, Pepco implemented certain interim operational changes to the secondary containment systems at the facility, which involve pumping accumulated storm water to an above-ground holding tank for off-site disposal. Pepco is continuing to use the above-ground holding tank to manage storm water from the secondary containment system while it evaluates other technical and regulatory options.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

 

Metal Bank Site

In the first quarter of 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted Pepco on behalf of itself and other federal and state trustees to request that Pepco execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Cottman Avenue Superfund Site located in Philadelphia, Pennsylvania. Pepco executed a tolling agreement, which has been extended to March 15, 2016, and will continue settlement discussions with the NOAA, the trustees and other PRPs.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Brandywine Fly Ash Disposal Site

In February 2013, Pepco received a letter from the Maryland Department of the Environment (MDE) requesting that Pepco investigate the extent of waste on a Pepco right-of-way that traverses the Brandywine fly ash disposal site in Brandywine, Prince George’s County, Maryland, owned by NRG Energy, Inc. (as successor to GenOn MD Ash Management, LLC) (NRG). In July 2013, while reserving its rights and related defenses under a 2000 agreement covering the sale of this site, Pepco indicated its willingness to investigate the extent of, and propose an appropriate closure plan to address, ash on the right-of-way. Pepco submitted a schedule for development of a closure plan to MDE on September 30, 2013 and, by letter dated October 18, 2013, MDE approved the schedule.

Pepco has determined that a loss associated with this matter for Pepco is probable and has estimated that the costs for implementation of a closure plan and cap on the site are in the range of approximately $3 million to $6 million. Pepco believes that the costs incurred in this matter will be recoverable from NRG under the 2000 sale agreement.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Rock Creek Mineral Oil Release

In late August 2015, a Pepco underground transmission line in the District of Columbia suffered a breach, resulting in the release of non-toxic mineral oil surrounding the transmission line into the surrounding soil, and a small amount also reached Rock Creek through a storm drain. Pepco notified regulatory authorities, and Pepco and its spill response contractors placed booms in Rock Creek, blocked the storm drain to prevent the release of mineral oil into the creek and commenced remediation of soil around the transmission line and the Rock Creek shoreline. Pepco estimates that approximately 6,100 gallons of mineral oil were released and that its remediation efforts recovered approximately 80 percent of the amount released. Pepco’s remediation efforts are ongoing under the direction of the DOEE and in collaboration with the National Park Service, the Smithsonian Institution/National Zoo and EPA. Pepco’s investigation presently indicates that the damage to Pepco’s facilities occurred prior to the release of mineral oil when third-party excavators struck the Pepco underground transmission line while installing cable for another utility. To the extent recovery is available against any party who contributed to this loss, Pepco will pursue such action. Pepco continues to investigate the cause of the incident, the parties involved, and legal responsibility under District of Columbia law, but does not believe that the remediation costs to resolve this matter will have a material adverse effect on its financial condition, results of operations or cash flows.

 

Contractual Obligations

Power Purchase Contracts

As of December 31, 2015, Pepco had no contractual obligations under non-derivative power purchase contracts.

Lease Commitments

Rental expense for operating leases was $7 million, $8 million and $7 million for the years ended December 31, 2015, 2014 and 2013, respectively.

Total future minimum operating lease payments for Pepco as of December 31, 2015 are $7 million in 2016, $6 million in 2017, $5 million in 2018, $4 million in 2019, $3 million in 2020 and $7 million thereafter.

Delmarva Power & Light Co/De [Member]  
Commitments and Contingencies
(14) COMMITMENTS AND CONTINGENCIES

General Litigation

From time to time, DPL is named as a defendant in litigation, usually relating to general liability or auto liability claims that resulted in personal injury or property damage to third parties. DPL is self-insured against such claims up to a certain self-insured retention amount and maintains insurance coverage against such claims at higher levels, to the extent deemed prudent by management. In addition, DPL’s contracts with its vendors generally require the vendors to name DPL as an additional insured for the amount at least equal to DPL’s self-insured retention. Further, DPL’s contracts with its vendors require the vendors to indemnify DPL for various acts and activities that may give rise to claims against DPL. Loss contingency liabilities for both asserted and unasserted claims are recognized if it is probable that a loss will result from such a claim and if the amounts of the losses can be reasonably estimated. Although the outcome of the claims and proceedings cannot be predicted with any certainty, management believes that there are no existing claims or proceedings that are likely to have a material adverse effect on DPL’s financial condition, results of operations or cash flows. At December 31, 2015, DPL had recorded estimated loss contingency liabilities for general litigation totaling approximately $3 million.

Environmental Matters

DPL is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from DPL’s customers, environmental clean-up costs incurred by DPL generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of DPL described below at December 31, 2015 are summarized as follows:

 

     Transmission
and Distribution
     Legacy
Generation -
Regulated
     Total  
     (millions of dollars)  

Balance as of January 1

   $ 1       $ 2      $ 3  

Accruals

     3         —          3  

Payments

     (2      (1      (3
  

 

 

    

 

 

    

 

 

 

Balance as of December 31

     2         1        3   

Less amounts in Other Current Liabilities

     1         1        2   
  

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ 1       $ —        $ 1   
  

 

 

    

 

 

    

 

 

 

 

Metal Bank Site

In the first quarter of 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted DPL on behalf of itself and other federal and state trustees to request that DPL execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Cottman Avenue Superfund Site located in Philadelphia, Pennsylvania. DPL executed a tolling agreement, which has been extended to March 15, 2016, and will continue settlement discussions with the NOAA, the trustees and other potentially responsible parties.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Virginia Department of Environmental Quality Notice of Violation

On February 3, 2015, the Virginia Department of Environmental Quality (VDEQ) issued a notice of violation (NOV) to DPL in connection with alleged violations of state water control laws and regulations associated with recent construction activities undertaken to replace certain transmission facilities. The NOV informed DPL of information on which VDEQ may rely to institute an administrative or judicial enforcement action, requested a meeting, and stated that DPL may be asked to enter into a consent order to formalize a plan and schedule of corrective action and settle any outstanding issues regarding the matter including the assessment of civil charges. At a February 20, 2015 meeting, VDEQ confirmed that the NOV would be resolved through a consent order, which will require the payment of a penalty, but did not specify the potential penalty amount. DPL will pursue recovery of the restoration costs for this matter from the contractor responsible for the vegetation management activities that gave rise to the alleged violations. DPL has substantially completed all remediation activities related to this matter and does not believe that the potential penalty to resolve this matter will have a material adverse effect on its financial condition, results of operations or cash flows.

Contractual Obligations

Power Purchase Contracts

As of December 31, 2015, DPL’s contractual obligations under non-derivative power purchase contracts were $64 million in 2016, $127 million in 2017 to 2018, $128 million in 2019 to 2020 and $296 million thereafter.

Lease Commitments

DPL leases an 11.9% interest in the Merrill Creek Reservoir. The lease is an operating lease and payments over the remaining lease term, which ends in 2032, are $75 million in the aggregate. DPL also has long-term leases for certain other facilities and equipment. Total future minimum operating lease payments for DPL, including the Merrill Creek Reservoir lease, as of December 31, 2015, are $13 million in 2016, $12 million in 2017, $16 million in 2018, $6 million in 2019, $9 million in 2020 and $118 million thereafter.

Rental expense for operating leases, including the Merrill Creek Reservoir lease, was $14 million, $14 million and $13 million for the years ended December 31, 2015, 2014 and 2013, respectively.

Atlantic City Electric Co [Member]  
Commitments and Contingencies
(13) COMMITMENTS AND CONTINGENCIES

General Litigation

From time to time, ACE is named as a defendant in litigation, usually relating to general liability or auto liability claims that resulted in personal injury or property damage to third parties. ACE is self-insured against such claims up to a certain self-insured retention amount and maintains insurance coverage against such claims at higher levels, to the extent deemed prudent by management. In addition, ACE’s contracts with its vendors generally require the vendors to name ACE as an additional insured for the amount at least equal to ACE’s self-insured retention. Further, ACE’s contracts with its vendors require the vendors to indemnify ACE for various acts and activities that may give rise to claims against ACE. Loss contingency liabilities for both asserted and unasserted claims are recognized if it is probable that a loss will result from such a claim and if the amounts of the losses can be reasonably estimated. Although the outcome of the claims and proceedings cannot be predicted with any certainty, management believes that there are no existing claims or proceedings that are likely to have a material adverse effect on ACE’s financial condition, results of operations or cash flows. At December 31, 2015, ACE had recorded estimated loss contingency liabilities for general litigation totaling approximately $5 million.

 

Environmental Matters

ACE is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of ACE, environmental clean-up costs incurred by ACE generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of ACE described below at December 31, 2015 are summarized as follows:

 

     Legacy Generation -
Regulated
 
     (millions of dollars)  

Balance as of January 1

   $ 1   

Accruals

     —     

Payments

     —     
  

 

 

 

Balance as of December 31

     1   

Less amounts in Other Current Liabilities

     —     
  

 

 

 

Amounts in Other Deferred Credits

   $ 1   
  

 

 

 

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from the U.S. Environmental Protection Agency (EPA) concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA’s claims are based on ACE’s sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period from June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA’s expenditures for response measures at the site have exceeded $6 million. EPA’s feasibility study (FS) for this site conducted in 2007 identified a range of alternatives for permanent remedial measures with varying cost estimates, and the estimated cost of EPA’s preferred alternative is approximately $6 million.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE’s position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Contractual Obligations

Power Purchase Contracts

As of December 31, 2015, ACE’s contractual obligations under non-derivative power purchase contracts were $203 million in 2016, $341 million in 2017 to 2018, $344 million in 2019 to 2020 and $697 million thereafter.

 

Lease Commitments

ACE leases certain types of property and equipment for use in its operations. Rental expense for operating leases was $13 million, $12 million and $12 million for the years ended December 31, 2015, 2014 and 2013, respectively.

Total future minimum operating lease payments for ACE as of December 31, 2015 are $8 million in 2016, $8 million 2017, $7 million in 2018, $6 million in 2019, $6 million in 2020 and $30 million thereafter.