(14) COMMITMENTS AND CONTINGENCIES

General Litigation and Other Matters

In September 2011, an asbestos complaint was filed in the New Jersey Superior Court, Law Division, against ACE (among other defendants) asserting claims under New Jersey’s Wrongful Death and Survival statutes. The complaint, filed by the estate of a decedent who was the wife of a former employee of ACE, alleges that the decedent’s mesothelioma was caused by exposure to asbestos brought home by her husband on his work clothes. New Jersey courts have recognized a cause of action against a premise owner in a so-called “take home” case if it can be shown that the harm was foreseeable. In this case, the complaint seeks recovery of an unspecified amount of damages for, among other things, the decedent’s past medical expenses, loss of earnings, and pain and suffering between the time of injury and death, and asserts a punitive damage claim. At this time, ACE has concluded that a loss is reasonably possible with respect to this matter, but ACE was unable to estimate an amount or range of reasonably possible loss because the damages sought are indeterminate and the matter involves facts that ACE believes are distinguishable from the facts of the “take-home” cause of action recognized by the New Jersey courts. This case remains pending.

In October 2010, a farm combine came into and remained in contact with a primary electric line in ACE’s service territory in New Jersey. As a result, two individuals operating the combine received fatal electrical contact injuries. While attempting to rescue those two individuals, another individual sustained third-degree burns to his torso and upper extremities. In September 2012, the individual who received third-degree burns filed suit in New Jersey Superior Court, Salem County. In October 2012, an additional suit was filed in the same court by the estate of one of the deceased individuals. Plaintiffs in both cases allege that ACE was negligent in the design, construction, erection, operation and maintenance of its poles, power lines, and equipment, and that ACE failed to warn and protect the public from the foreseeable dangers of farm equipment contacting electric lines. ACE is investigating the incident involved and discovery is ongoing. At this time, ACE has concluded that a loss is reasonably possible with respect to these claims, but ACE is unable to estimate an amount or range of reasonably possible loss because the damages sought are indeterminate and the matter remains under investigation.

During 2012, Pepco Energy Services received letters on behalf of two school districts in Maryland, which claim that invoices in connection with electricity supply contracts contained certain allegedly unauthorized charges, totaling approximately $7 million. The school districts also claim additional compounded interest totaling approximately $9 million. Although no litigation involving Pepco Energy Services related to these claims has commenced, in August and September 2013, Pepco Energy Services received correspondence from the Superintendent of each of the school districts advising of the intention to render a decision regarding an unresolved dispute between the school district and Pepco Energy Services. Pepco Energy Services is reviewing the authority of the respective Superintendents to render decisions on the claims and it disputes the merits of the allegations regarding unauthorized charges as well as the claims of entitlement to compounded interest. As of September 30, 2013, the amount of loss, if any, that may be associated with these claims is not reasonably estimable, and Pepco Energy Services cannot estimate an amount or range of reasonably possible loss, if any, associated with the claims.

Environmental Matters

PHI, through its subsidiaries, is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of PHI’s utility subsidiaries, environmental clean-up costs incurred by Pepco, DPL and ACE generally are included by each company in its respective cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies described below of PHI and its subsidiaries at September 30, 2013 are summarized as follows:

 

            Legacy Generation                
     Transmission
and Distribution
     Regulated      Non-
Regulated
     Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 15       $ 7      $ 5       $ 2       $ 29  

Accruals

     4         —          —           1         5   

Payments

     1        1         —           2         4  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Ending balance as of September 30

     18        6        5        1         30  

Less amounts in Other Current Liabilities

     3        1         —           —           4  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Amounts in Other deferred credits

   $ 15      $ 5      $ 5      $ 1       $ 26  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Conectiv Energy Wholesale Power Generation Sites

In July 2010, PHI sold the Conectiv Energy wholesale power generation business to Calpine Corporation (Calpine). Under New Jersey’s Industrial Site Recovery Act (ISRA), the transfer of ownership triggered an obligation on the part of Conectiv Energy to remediate any environmental contamination at each of the nine Conectiv Energy generating facility sites located in New Jersey. Under the terms of the sale, Calpine has assumed responsibility for performing the ISRA-required remediation and for the payment of all related ISRA compliance costs up to $10 million. PHI is obligated to indemnify Calpine for any ISRA compliance remediation costs in excess of $10 million. According to preliminary estimates, the costs of ISRA-required remediation activities at the nine generating facility sites located in New Jersey are in the range of approximately $7 million to $18 million. The amount accrued by PHI for the ISRA-required remediation activities at the nine generating facility sites is included in the table above in the column entitled “Legacy Generation – Non-Regulated.”

In September 2011, PHI received a request for data from the U.S. Environmental Protection Agency (EPA) regarding operations at the Deepwater generating facility in New Jersey (which was included in the sale to Calpine) between February 2004 and July 1, 2010, to demonstrate compliance with the Clean Air Act’s new source review permitting program. PHI responded to the data request. Under the terms of the Calpine sale, PHI is obligated to indemnify Calpine for any failure of PHI, on or prior to the closing date of the sale, to comply with environmental laws attributable to the construction of new, or modification of existing, sources of air emissions. At this time, PHI does not expect this inquiry to have a material adverse effect on its consolidated financial condition, results of operations or cash flows.

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from EPA concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA’s claims are based on ACE’s sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA’s expenditures for response measures at the site have exceeded $6 million. EPA’s feasibility study for this site conducted in 2007 identified a range of alternatives for permanent remedial measures with varying cost estimates, and the estimated cost of EPA’s preferred alternative is approximately $6 million.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE’s position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Peck Iron and Metal Site

EPA informed Pepco in a May 2009 letter that Pepco may be a PRP under CERCLA with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck’s metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List. The National Priorities List, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with the RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

 

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE, DPL and Pepco, based on their alleged sale of transformers to Ward Transformer, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants’ motion to dismiss. The litigation is moving forward with certain “test case” defendants (not including ACE, DPL and Pepco) filing summary judgment motions regarding liability. The case has been stayed as to the remaining defendants pending rulings upon the test cases. In a January 31, 2013 order, the district court granted summary judgment for the test case defendant whom plaintiffs alleged was liable based on its sale of transformers to Ward Transformer. The district court’s order, which plaintiffs have appealed to the U.S. Court of Appeals for the Fourth Circuit, addresses only the liability of the test case defendant. PHI has concluded that a loss is reasonably possible with respect to this matter, but PHI was unable to estimate an amount or range of reasonably possible losses to which it may be exposed. PHI does not believe that any of its three utility subsidiaries had extensive business transactions, if any, with the Ward Transformer site.

Benning Road Site

In September 2010, PHI received a letter from EPA identifying the Benning Road location, consisting of a generation facility operated by Pepco Energy Services until the facility was deactivated in June 2012, and a transmission and distribution facility operated by Pepco, as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons. In December 2011, the U.S. District Court for the District of Columbia approved a consent decree entered into by Pepco and Pepco Energy Services with the District of Columbia Department of the Environment (DDOE), which requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE’s selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. The consent decree does not obligate Pepco or Pepco Energy Services to pay for or perform any remediation work, but it is anticipated that DDOE will look to the companies to assume responsibility for cleanup of any conditions in the river that are determined to be attributable to past activities at the Benning Road site.

In December 2012, DDOE approved the RI/FS work plan. RI/FS field work commenced in January 2013 and is still in progress. The final permit to authorize sampling in the river was issued in September 2013, and that sampling work is expected to be completed during the fourth quarter of 2013. In October 2013, Pepco and Pepco Energy Services submitted a work plan addendum for approval by DDOE identifying the location of groundwater monitoring wells to be installed at the site and sampled as the last phase of the field work. Following the field work, Pepco and Pepco Energy Services will prepare RI/ FS reports for review and approval by DDOE after solicitation and consideration of public comment. The next status report to the court is due on May 24, 2014.

The remediation costs accrued for this matter are included in the table above in the columns entitled “Transmission and Distribution,” “Legacy Generation – Regulated,” and “Legacy Generation – Non-Regulated.”

Indian River Oil Release

In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. The amount of remediation costs accrued for this matter is included in the table above in the column entitled “Legacy Generation – Regulated.”

 

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco’s Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

Beginning in March 2011, DDOE issued a series of compliance directives requiring Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco completed field sampling during the fourth quarter of 2011 and submitted sampling results to DDOE during the second quarter of 2012. Pepco is continuing discussions with DDOE regarding the need for any further response actions but expects that additional monitoring of shoreline sediments may be required.

In June 2012, Pepco commenced discussions with DDOE regarding a possible consent decree that would resolve DDOE’s threatened enforcement action, including civil penalties, for alleged violation of the District’s Water Pollution Control Law, as well as for damages to natural resources. Pepco and DDOE have reached an agreement in principle that would consist of a combination of a civil penalty and Supplemental Environmental Projects (SEPs) with a total cost to Pepco of approximately $1 million. DDOE has endorsed Pepco’s proposed SEP involving the installation and operation of a trash collection system at a stormwater outfall that drains to the Anacostia River. DDOE and Pepco will negotiate a consent decree to document the settlement of DDOE’s enforcement action. Discussions will proceed separately with DDOE and the federal resource trustees regarding the settlement of a natural resource damage (NRD) claim under federal law. Based on discussions to date, PHI and Pepco do not believe that the resolution of DDOE’s enforcement action or the federal NRD claim will have a material adverse effect on their respective financial condition, results of operations or cash flows.

As a result of the oil release, Pepco implemented certain interim operational changes to the secondary containment systems at the facility which involve pumping accumulated storm water to an aboveground holding tank for off-site disposal. In December 2011, Pepco completed the installation of a treatment system designed to allow automatic discharge of accumulated storm water from the secondary containment system. Pepco currently is seeking DDOE’s and EPA’s approval to commence operation of the new system on a pilot basis to demonstrate its effectiveness in meeting both secondary containment requirements and water quality standards related to the discharge of storm water from the facility. In the meantime, Pepco is continuing to use the aboveground holding tank to manage storm water from the secondary containment system.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Metal Bank Site

In January 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted Pepco (and contacted DPL in March 2013) on behalf of itself and other federal and state trustees to request that Pepco and DPL execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Superfund Site located in Philadelphia, Pennsylvania. Pepco and DPL have executed the tolling agreement and will participate in settlement discussions with the NOAA, the trustees and other PRPs.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Brandywine Fly Ash Disposal Site

In February 2013, Pepco received a letter from the Maryland Department of the Environment (MDE) requesting that Pepco investigate the extent of waste on a Pepco right-of-way that traverses the Brandywine fly ash disposal site in Brandywine, Prince George’s County, Maryland, owned by GenOn MD Ash Management, LLC (GenOn). The letter requests that Pepco submit a plan of action for the investigation and capping of the right-of-way within 90 days. In its February 2013 response, Pepco informed MDE that, under a 2000 asset purchase and sale agreement (the Sale Agreement), the buyer of Pepco’s generation assets assumed environmental liability for hazardous substances, including ash, which remain on or have been removed from the land on which the generating stations are situated. In July 2013, Pepco received a letter from the Maryland Attorney General’s office on behalf of MDE, which takes the position that agreements between private parties do not operate to shift responsibility for compliance with landfill closure regulations and that Pepco, as the former owner and operator of a portion of the landfill, is responsible for compliance with closure requirements for that portion. The letter urges Pepco to work with GenOn concerning a closure plan and cap for the entire landfill and indicates that, absent an agreement between Pepco and GenOn concerning a closure plan and cap for the entire landfill or Pepco’s submission of a plan to investigate and cap the portion of the landfill that Pepco owns, MDE will take formal action against Pepco to enforce the landfill closure regulations. In its July 22, 2013 response to the Maryland Attorney General’s office, Pepco indicated, while reserving its rights under the Sale Agreement, its willingness to investigate the extent of, and propose an appropriate closure plan to address, ash on the right-of-way. Pepco submitted a schedule for development of a closure plan to MDE on September 30, 2013, which was approved on October 18, 2013.

PHI and Pepco have determined that a loss associated with this matter for PHI and Pepco is probable and have estimated that the costs for implementation of a closure plan and cap on the site are in the range of approximately $3 million to $6 million. PHI and Pepco believe that the costs incurred in this matter will be recoverable from GenOn under the Sale Agreement.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Watts Branch Insulating Fluid Release

On September 13, 2013, a Washington Metropolitan Area Transit Authority (WMATA) contractor damaged a Pepco underground transmission feeder while drilling a grout column for a subway tunnel under a city street. The damage caused the release of approximately 11,250 gallons of insulating fluid, a small amount of which reached the Watts Branch, a tributary of the Anacostia River. Pepco responded to the release of the insulating fluid. The U.S. Coast Guard (USCG) issued a notice of federal interest for an oil pollution incident, informing Pepco of its responsibility under the Oil Pollution Act of 1990 for removal costs and damages from the release and indicating that USCG would take Pepco’s response actions into account in determining the penalty that may be assessed as a result of the release. In addition, on September 25, 2013, DDOE issued a compliance directive that requires Pepco to prepare an incident investigation report describing the events leading up to the release. The compliance directive also requires Pepco to prepare work plans for sampling the insulating fluid and for developing and implementing a biological assessment and physical habitat quality assessment to be conducted in Watts Branch. Pepco prepared the incident investigation report and work plans and submitted them to DDOE and USCG.

PHI and Pepco believe that a loss in this matter is probable; however, the costs to resolve this matter are expected to be less than $1 million and are being expensed as incurred. PHI and Pepco further believe that the costs incurred will be recoverable from the party or parties responsible for the release.

PHI’s Cross-Border Energy Lease Investments

As discussed in Note (16), “Discontinued Operations – Cross-Border Energy Lease Investments,” PHI held a portfolio of cross-border energy lease investments involving public utility assets located outside of the United States. Each of these investments was comprised of multiple leases and was structured as a sale and leaseback transaction commonly referred to by the IRS as a sale-in, lease-out, or SILO, transaction.

Since 2005, PHI’s cross-border energy lease investments have been under examination by the IRS as part of the PHI federal income tax audits. In connection with the audit of PHI’s 2001-2002 income tax returns, the IRS disallowed the depreciation and interest deductions in excess of rental income claimed by PHI for six of the eight lease investments and, in connection with the audits of PHI’s 2003-2005 and 2006-2008 income tax returns, the IRS disallowed such deductions in excess of rental income for all eight of the lease investments. In addition, the IRS has sought to recharacterize each of the leases as a loan transaction in each of the years under audit as to which PHI would be subject to original issue discount income. PHI has disagreed with the IRS’ proposed adjustments to the 2001-2008 income tax returns and has filed protests of these findings for each year with the Office of Appeals of the IRS. In November 2010, PHI entered into a settlement agreement with the IRS for the 2001 and 2002 tax years for the purpose of commencing litigation associated with this matter and subsequently filed refund claims in July 2011 for the disallowed tax deductions relating to the leases for these years. In January 2011, as part of this settlement, PHI paid $74 million of additional tax for 2001 and 2002, penalties of $1 million, and $28 million in interest associated with the disallowed deductions. Since the July 2011 refund claims were not approved by the IRS within the statutory six-month period, in January 2012 PHI filed complaints in the U.S. Court of Federal Claims seeking recovery of the tax payment, interest and penalties. The 2003-2005 and 2006-2011 income tax return audits continue to be in process with the IRS Office of Appeals and the IRS Exam Division, respectively, and are not presently a part of the U.S. Court of Federal Claims litigation discussed above.

On January 9, 2013, the U.S. Court of Appeals for the Federal Circuit issued an opinion in Consolidated Edison Company of New York, Inc. & Subsidiaries v. United States (to which PHI is not a party) that disallowed tax benefits associated with Consolidated Edison’s cross-border lease transaction. While PHI believes that its tax position with regard to its cross-border energy lease investments is appropriate, after analyzing the recent U.S. Court of Appeals ruling, PHI determined in the first quarter of 2013 that its tax position with respect to the tax benefits associated with the cross-border energy leases no longer met the more-likely-than-not standard of recognition for accounting purposes. Accordingly, PHI recorded a non-cash charge of $377 million (after-tax) in the first quarter of 2013 (as discussed in Note (16), “Discontinued Operations – Cross-Border Energy Lease Investments”), consisting of a charge to reduce the carrying value of the cross-border energy lease investments and a charge to reflect the anticipated additional interest expense related to changes in PHI’s estimated federal and state income tax obligations for the period over which the tax benefits ultimately may be disallowed. PHI had also previously made certain business assumptions regarding foreign investment opportunities available at the end of the full lease terms. During the first quarter of 2013, management believed that its conclusions regarding these business assumptions were no longer supportable, and the tax effects of this change in conclusion were included in the charge. While the IRS could require PHI to pay a penalty of up to 20% of the amount of additional taxes due, PHI believes that it is more likely than not that no such penalty will be incurred, and therefore no amount for any potential penalty was included in the charge recorded in the first quarter of 2013.

In the event that the IRS were to be successful in disallowing 100% of the tax benefits associated with these lease investments and recharacterizing these lease investments as loans, PHI estimated that, as of March 31, 2013, it would have been obligated to pay approximately $192 million in additional federal taxes (net of the $74 million tax payment described above) and approximately $50 million of interest on the additional federal taxes. These amounts, totaling $242 million, were estimated after consideration of certain tax benefits arising from matters unrelated to the leases that would offset the taxes and interest due, including PHI’s best estimate of the expected resolution of other uncertain and effectively settled tax positions, the carrying back and carrying forward of any existing net operating losses, and the application of certain amounts paid in advance to the IRS. In order to mitigate PHI’s ongoing interest costs associated with the $242 million estimate of additional taxes and interest, PHI made an advanced payment to the IRS of $242 million in the first quarter of 2013. This advanced payment was funded from currently available sources of liquidity and short-term borrowings. A portion of the proceeds from lease terminations was used to repay the short-term borrowings utilized to fund the advanced payment.

PHI continues to weigh its options with respect to its litigation with the IRS. Pursuant to an order issued by the judge on October 31, 2013, further discovery in the case is stayed until January 30, 2014.

 

Third Party Guarantees, Indemnifications, and Off-Balance Sheet Arrangements

PHI and certain of its subsidiaries have various financial and performance guarantees and indemnification obligations that they have entered into in the normal course of business to facilitate commercial transactions with third parties as discussed below.

As of September 30, 2013, PHI and its subsidiaries were parties to a variety of agreements pursuant to which they were guarantors for standby letters of credit, energy procurement obligations, and other commitments and obligations. The commitments and obligations, in millions of dollars, were as follows:

 

     Guarantor         
     PHI      Pepco      DPL      ACE      Total  
     (millions of dollars)  

Energy procurement obligations of Pepco Energy Services (a)

   $ 48       $ —         $ —         $ —         $ 48   

Guarantees associated with disposal of Conectiv Energy assets (b)

     13        —          —          —          13  

Guaranteed lease residual values (c)

     3        5        7        4        19  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 64       $ 5       $ 7       $ 4       $ 80   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a) PHI has continued contractual commitments for performance and related payments of Pepco Energy Services primarily to Independent System Operators and distribution companies.
(b) Represents guarantees by PHI of Conectiv Energy’s derivatives portfolio transferred in connection with the disposition of Conectiv Energy’s wholesale business. The derivative portfolio guarantee is currently $13 million and covers Conectiv Energy’s performance prior to the assignment. This guarantee will remain in effect until the end of 2015.
(c) Represents the maximum potential obligation in the event that the fair value of certain leased equipment and fleet vehicles is zero at the end of the maximum lease term. The maximum lease term associated with these assets ranges from 3 to 8 years. The maximum potential obligation at the end of the minimum lease term would be $56 million, $10 million of which is a guaranty by PHI, $15 million by Pepco, $18 million by DPL and $13 million by ACE. The minimum lease term associated with these assets ranges from 1 to 4 years. Historically, payments under the guarantees have not been made and PHI believes the likelihood of payments being required under the guarantees is remote.

PHI and certain of its subsidiaries have entered into various indemnification agreements related to purchase and sale agreements and other types of contractual agreements with vendors and other third parties. These indemnification agreements typically cover environmental, tax, litigation and other matters, as well as breaches of representations, warranties and covenants set forth in these agreements. Typically, claims may be made by third parties under these indemnification agreements over various periods of time depending on the nature of the claim. The maximum potential exposure under these indemnification agreements can range from a specified dollar amount to an unlimited amount depending on the nature of the claim and the particular transaction. The total maximum potential amount of future payments under these indemnification agreements is not estimable due to several factors, including uncertainty as to whether or when claims may be made under these indemnities.

Energy Services Performance Contracts

Pepco Energy Services has a diverse portfolio of energy savings services performance contracts that are associated with the installation of energy savings equipment or combined heat and power facilities for federal, state and local government customers. As part of the energy savings contracts, Pepco Energy Services typically guarantees that the equipment or systems it installs will generate a specified amount of energy savings on an annual basis over a multi-year period. As of September 30, 2013, the remaining notional amount of Pepco Energy Services’ energy savings guarantees over the life of the multi-year performance contracts on: i) completed projects was $242 million with the longest guarantee having a remaining term of 14 years; and, ii) projects under construction was $194 million with the longest guarantee having a term of 23 years after construction. On an annual basis, Pepco Energy Services undertakes a measurement and verification process to determine the amount of energy savings for the year and whether there is any shortfall in the annual energy savings compared to the guaranteed amount.

 

As of September 30, 2013, Pepco Energy Services had a performance guarantee contract associated with the production at a combined heat and power facility that is under construction totaling $15 million in notional value over 20 years.

Pepco Energy Services recognizes a liability for the value of the estimated energy savings or production shortfalls when it is probable that the guaranteed amounts will not be achieved and the amount is reasonably estimable. As of September 30, 2013, Pepco Energy Services had an accrued liability of $1 million for its energy savings or combined heat and power performance contracts that it established during 2012. There was no significant change in the type of contracts issued during the nine months ended September 30, 2013 as compared to the nine months ended September 30, 2012.

Dividends

On October 24, 2013, Pepco Holdings’ Board of Directors declared a dividend on common stock of 27 cents per share payable December 31, 2013, to stockholders of record on December 10, 2013.

Potomac Electric Power Co [Member]
 
Commitments and Contingencies

(11) COMMITMENTS AND CONTINGENCIES

Environmental Matters

Pepco is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of Pepco, environmental clean-up costs incurred by Pepco generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of Pepco described below at September 30, 2013 are summarized as follows:

 

     Transmission
and
Distribution
     Legacy
Generation -
Regulated
     Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 14      $ 3       $ 17   

Accruals

     4         —           4   

Payments

     1        —          1  
  

 

 

    

 

 

    

 

 

 

Ending balance as of September 30

     17        3         20   

Less amounts in Other Current Liabilities

     2        —           2   
  

 

 

    

 

 

    

 

 

 

Amounts in Other deferred credits

   $ 15      $ 3       $ 18   
  

 

 

    

 

 

    

 

 

 

Peck Iron and Metal Site

The U.S. Environmental Protection Agency (EPA) informed Pepco in a May 2009 letter that Pepco may be a potentially responsible party (PRP) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck’s metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List. The National Priorities List, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with the RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including Pepco, based on its alleged sale of transformers to Ward Transformer, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants’ motion to dismiss. The litigation is moving forward with certain “test case” defendants (not including Pepco) filing summary judgment motions regarding liability. The case has been stayed as to the remaining defendants pending rulings upon the test cases. In a January 31, 2013 order, the district court granted summary judgment for the test case defendant whom plaintiffs alleged was liable based on its sale of transformers to Ward Transformer. The district court’s order, which plaintiffs have appealed to the U.S. Court of Appeals for the Fourth Circuit, addresses only the liability of the test case defendant. Pepco has concluded that a loss is reasonably possible with respect to this matter, but was unable to estimate an amount or range of reasonably possible losses to which it may be exposed. Pepco does not believe that it had extensive business transactions, if any, with the Ward Transformer site.

Benning Road Site

In September 2010, PHI received a letter from EPA identifying the Benning Road location, consisting of a generation facility operated by Pepco Energy Services until the facility was deactivated in June 2012, and a transmission and distribution facility operated by Pepco, as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons. In December 2011, the U.S. District Court for the District of Columbia approved a consent decree entered into by Pepco and Pepco Energy Services with the District of Columbia Department of the Environment (DDOE), which requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE’s selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. The consent decree does not obligate Pepco or Pepco Energy Services to pay for or perform any remediation work, but it is anticipated that DDOE will look to the companies to assume responsibility for cleanup of any conditions in the river that are determined to be attributable to past activities at the Benning Road site.

In December 2012, DDOE approved the RI/FS work plan. RI/FS field work commenced in January 2013 and is still in progress. The final permit to authorize sampling in the river was issued in September 2013, and that sampling work is expected to be completed during the fourth quarter of 2013. In October 2013, Pepco and Pepco Energy Services submitted a work plan addendum for approval by DDOE identifying the location of groundwater monitoring wells to be installed at the site and sampled as the last phase of the field work. Following the field work, Pepco and Pepco Energy Services will prepare RI/ FS reports for review and approval by DDOE after solicitation and consideration of public comment. The next status report to the court is due on May 24, 2014.

The remediation costs accrued for this matter are included in the table above in the columns entitled “Transmission and Distribution” and “Legacy Generation – Regulated.”

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco’s Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

Beginning in March 2011, DDOE issued a series of compliance directives requiring Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco completed field sampling during the fourth quarter of 2011 and submitted sampling results to DDOE during the second quarter of 2012. Pepco is continuing discussions with DDOE regarding the need for any further response actions but expects that additional monitoring of shoreline sediments may be required.

In June 2012, Pepco commenced discussions with DDOE regarding a possible consent decree that would resolve DDOE’s threatened enforcement action, including civil penalties, for alleged violation of the District’s Water Pollution Control Law, as well as for damages to natural resources. Pepco and DDOE have reached an agreement in principle that would consist of a combination of a civil penalty and Supplemental Environmental Projects (SEPs) with a total cost to Pepco of approximately $1 million. DDOE has endorsed Pepco’s proposed SEP involving the installation and operation of a trash collection system at a stormwater outfall that drains to the Anacostia River. DDOE and Pepco will negotiate a consent decree to document the settlement of DDOE’s enforcement action. Discussions will proceed separately with DDOE and the federal resource trustees regarding the settlement of a natural resource damage (NRD) claim under federal law. Based on discussions to date, PHI and Pepco do not believe that the resolution of DDOE’s enforcement action or the federal NRD claim will have a material adverse effect on their respective financial condition, results of operations or cash flows.

As a result of the oil release, Pepco implemented certain interim operational changes to the secondary containment systems at the facility which involve pumping accumulated storm water to an aboveground holding tank for off-site disposal. In December 2011, Pepco completed the installation of a treatment system designed to allow automatic discharge of accumulated storm water from the secondary containment system. Pepco currently is seeking DDOE’s and EPA’s approval to commence operation of the new system on a pilot basis to demonstrate its effectiveness in meeting both secondary containment requirements and water quality standards related to the discharge of storm water from the facility. In the meantime, Pepco is continuing to use the aboveground holding tank to manage storm water from the secondary containment system.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Metal Bank Site

In January 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted Pepco on behalf of itself and other federal and state trustees to request that Pepco execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Superfund Site located in Philadelphia, Pennsylvania. Pepco has executed the tolling agreement and will participate in settlement discussions with the NOAA, the trustees and other PRPs.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Brandywine Fly Ash Disposal Site

In February 2013, Pepco received a letter from the Maryland Department of the Environment (MDE) requesting that Pepco investigate the extent of waste on a Pepco right-of-way that traverses the Brandywine fly ash disposal site in Brandywine, Prince George’s County, Maryland, owned by GenOn MD Ash Management, LLC (GenOn). The letter requests that Pepco submit a plan of action for the investigation and capping of the right-of-way within 90 days. In its February 2013 response, Pepco informed MDE that, under a 2000 asset purchase and sale agreement (the Sale Agreement), the buyer of Pepco’s generation assets assumed environmental liability for hazardous substances, including ash, which remain on or have been removed from the land on which the generating stations are situated. In July 2013, Pepco received a letter from the Maryland Attorney General’s office on behalf of MDE, which takes the position that agreements between private parties do not operate to shift responsibility for compliance with landfill closure regulations and that Pepco, as the former owner and operator of a portion of the landfill, is responsible for compliance with closure requirements for that portion. The letter urges Pepco to work with GenOn concerning a closure plan and cap for the entire landfill and indicates that, absent an agreement between Pepco and GenOn concerning a closure plan and cap for the entire landfill or Pepco’s submission of a plan to investigate and cap the portion of the landfill that Pepco owns, MDE will take formal action against Pepco to enforce the landfill closure regulations. In its July 22, 2013 response to the Maryland Attorney General’s office, Pepco indicated, while reserving its rights under the Sale Agreement, its willingness to investigate the extent of, and propose an appropriate closure plan to address, ash on the right-of-way. Pepco submitted a schedule for development of a closure plan to MDE on September 30, 2013, which was approved on October 18, 2013.

 

Pepco has determined that a loss associated with this matter is probable and has estimated that the costs for implementation of a closure plan and cap on the site are in the range of approximately $3 million to $6 million. Pepco believes that the costs incurred in this matter will be recoverable from GenOn under the Sale Agreement.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Watts Branch Insulating Fluid Release

On September 13, 2013, a Washington Metropolitan Area Transit Authority (WMATA) contractor damaged a Pepco underground transmission feeder while drilling a grout column for a subway tunnel under a city street. The damage caused the release of approximately 11,250 gallons of insulating fluid, a small amount of which reached the Watts Branch, a tributary of the Anacostia River. Pepco responded to the release of the insulating fluid. The U.S. Coast Guard (USCG) issued a notice of federal interest for an oil pollution incident, informing Pepco of its responsibility under the Oil Pollution Act of 1990 for removal costs and damages from the release and indicating that USCG would take Pepco’s response actions into account in determining the penalty that may be assessed as a result of the release. In addition, on September 25, 2013, DDOE issued a compliance directive that requires Pepco to prepare an incident investigation report describing the events leading up to the release. The compliance directive also requires Pepco to prepare work plans for sampling the insulating fluid and for developing and implementing a biological assessment and physical habitat quality assessment to be conducted in Watts Branch. Pepco prepared the incident investigation report and work plans and submitted them to DDOE and USCG.

Pepco believes that a loss in this matter is probable; however, the costs to resolve this matter are expected to be less than $1 million and are being expensed as incurred. Pepco further believes that the costs incurred will be recoverable from the party or parties responsible for the release.

Delmarva Power & Light Co/De [Member]
 
Commitments and Contingencies

(13) COMMITMENTS AND CONTINGENCIES

Environmental Matters

DPL is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from DPL’s customers, environmental clean-up costs incurred by DPL generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of DPL described below at September 30, 2013 are summarized as follows:

 

     Transmission
and Distribution
     Legacy
Generation -
Regulated
     Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 1       $ 3      $ 2       $ 6   

Accruals

     —           —          1         1   

Payments

     —           1        2         3  
  

 

 

    

 

 

    

 

 

    

 

 

 

Ending balance as of September 30

     1         2        1         4   

Less amounts in Other Current Liabilities

     1         1        —           2   
  

 

 

    

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ —         $ 1      $ 1       $ 2   
  

 

 

    

 

 

    

 

 

    

 

 

 

Ward Transformer Site

In April 2009, a group of potentially responsible parties (PRPs) with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including DPL, based on its alleged sale of transformers to Ward Transformer, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants’ motion to dismiss. The litigation is moving forward with certain “test case” defendants (not including DPL) filing summary judgment motions regarding liability. The case has been stayed as to the remaining defendants pending rulings upon the test cases. In a January 31, 2013 order, the district court granted summary judgment for the test case defendant whom plaintiffs alleged was liable based on its sale of transformers to Ward Transformer. The district court’s order, which plaintiffs have appealed to the U.S. Court of Appeals for the Fourth Circuit, addresses only the liability of the test case defendant. DPL has concluded that a loss is reasonably possible with respect to this matter, but was unable to estimate an amount or range of reasonably possible losses to which it may be exposed. DPL does not believe that it had extensive business transactions, if any, with the Ward Transformer site.

Indian River Oil Release

In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. The amount of remediation costs accrued for this matter is included in the table above in the column entitled “Legacy Generation – Regulated.”

Metal Bank Site

In March 2013, the National Oceanic and Atmospheric Administration (NOAA) contacted DPL on behalf of itself and other federal and state trustees to request that Pepco and DPL execute a tolling agreement to facilitate settlement negotiations concerning natural resource damages allegedly caused by releases of hazardous substances, including polychlorinated biphenyls, at the Metal Bank Superfund Site located in Philadelphia, Pennsylvania. DPL has executed the tolling agreement and will participate in settlement discussions with the NOAA, the trustees and other PRPs.

The amount accrued for this matter is included in the table above in the column entitled “Transmission and Distribution.”

Atlantic City Electric Co [Member]
 
Commitments and Contingencies

(12) COMMITMENTS AND CONTINGENCIES

General Litigation

In September 2011, an asbestos complaint was filed in the New Jersey Superior Court, Law Division, against ACE (among other defendants) asserting claims under New Jersey’s Wrongful Death and Survival statutes. The complaint, filed by the estate of a decedent who was the wife of a former employee of ACE, alleges that the decedent’s mesothelioma was caused by exposure to asbestos brought home by her husband on his work clothes. New Jersey courts have recognized a cause of action against a premise owner in a so-called “take home” case if it can be shown that the harm was foreseeable. In this case, the complaint seeks recovery of an unspecified amount of damages for, among other things, the decedent’s past medical expenses, loss of earnings, and pain and suffering between the time of injury and death, and asserts a punitive damage claim. At this time, ACE has concluded that a loss is reasonably possible with respect to this matter, but ACE was unable to estimate an amount or range of reasonably possible loss because the damages sought are indeterminate and the matter involves facts that ACE believes are distinguishable from the facts of the “take-home” cause of action recognized by the New Jersey courts. This case remains pending.

In October 2010, a farm combine came into and remained in contact with a primary electric line in ACE’s service territory in New Jersey. As a result, two individuals operating the combine received fatal electrical contact injuries. While attempting to rescue those two individuals, another individual sustained third-degree burns to his torso and upper extremities. In September 2012, the individual who received third-degree burns filed suit in New Jersey Superior Court, Salem County. In October 2012, an additional suit was filed in the same court by the estate of one of the deceased individuals. Plaintiffs in both cases allege that ACE was negligent in the design, construction, erection, operation and maintenance of its poles, power lines, and equipment, and that ACE failed to warn and protect the public from the foreseeable dangers of farm equipment contacting electric lines. ACE is investigating the incident involved and discovery is ongoing. At this time, ACE has concluded that a loss is reasonably possible with respect to these claims, but ACE is unable to estimate an amount or range of reasonably possible loss because the damages sought are indeterminate and the matter remains under investigation.

Environmental Matters

ACE is subject to regulation by various federal, regional, state and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of ACE, environmental clean-up costs incurred by ACE generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of ACE described below at September 30, 2013 are summarized as follows:

 

     Legacy Generation -
Regulated
 
     (millions of dollars)  

Beginning balance as of January 1

   $ 1   

Accruals

     —     

Payments

     —     
  

 

 

 

Ending balance as of September 30

     1   

Less amounts in Other Current Liabilities

     —     
  

 

 

 

Amounts in Other Deferred Credits

   $ 1   
  

 

 

 

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from the U.S. Environmental Protection Agency (EPA) concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA’s claims are based on ACE’s sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA’s expenditures for response measures at the site have exceeded $6 million. EPA’s feasibility study for this site conducted in 2007 identified a range of alternatives for permanent remedial measures with varying cost estimates, and the estimated cost of EPA’s preferred alternative is approximately $6 million.

 

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE’s position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE, based on its alleged sale of transformers to Ward Transformer, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants’ motion to dismiss. The litigation is moving forward with certain “test case” defendants (not including ACE) filing summary judgment motions regarding liability. The case has been stayed as to the remaining defendants pending rulings upon the test cases. In a January 31, 2013 order, the district court granted summary judgment for the test case defendant whom plaintiffs alleged was liable based on its sale of transformers to Ward Transformer. The district court’s order, which plaintiffs have appealed to the U.S. Court of Appeals for the Fourth Circuit, addresses only the liability of the test case defendant. ACE has concluded that a loss is reasonably possible with respect to this matter, but was unable to estimate an amount or range of reasonably possible losses to which it may be exposed. ACE does not believe that it had extensive business transactions, if any, with the Ward Transformer site.