Commitments And Contingencies
12 Months Ended
Dec. 31, 2011
Commitments And Contingencies

(17) COMMITMENTS AND CONTINGENCIES

General Litigation

In 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other corporate entities were brought into these cases on a theory of premises liability. Under this theory, the plaintiffs argued that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant.

As of December 31, 2011, there are approximately 180 cases still pending against Pepco in the Maryland State Courts, of which approximately 90 cases were filed after December 19, 2000, and were tendered to Mirant Corporation (Mirant) for defense and indemnification in connection with the sale by Pepco of its generation assets to Mirant in 2000. While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) is approximately $360 million, PHI and Pepco believe the amounts claimed by the remaining plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time. If an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's financial condition, results of operations and cash flows.

In September 2011, an asbestos complaint was filed in the New Jersey Superior Court, Law Division, against ACE (among other defendants) asserting claims under New Jersey's Wrongful Death and Survival statutes. The complaint, filed by the estate of a decedent who was the wife of a former employee of ACE, alleges that the decedent's mesothelioma was caused by exposure to asbestos brought home by her husband on his work clothes. Unlike the other jurisdictions to which PHI subsidiaries are subject, New Jersey courts have recognized a cause of action against a premise owner in a so-called "take home" case if it can be shown that the harm was foreseeable. In this case, the complaint seeks recovery of an unspecified amount of damages for the decedent's past medical expenses, loss of earnings, and pain and suffering between the time of injury and death, and asserts a punitive damage claim. At this time, ACE cannot estimate an amount or range of reasonably possible loss to which it may be exposed that may be associated with the claims raised in this complaint. Such an estimate of reasonably possible loss must await further internal investigation and discovery procedures.

 

Environmental Matters

PHI, through its subsidiaries, is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of the operating utilities, environmental clean-up costs incurred by Pepco, DPL and ACE generally are included by each company in its respective cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of PHI and its subsidiaries described below at December 31, 2011 are summarized as follows:

 

           Legacy Generation                
     Transmission
and Distribution
    Regulated     Non-Regulated      Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 13      $ 9      $ 10       $ 2       $ 34   

Accruals

     3        —          —           —           3   

Payments

     (1     (1     —           —           (2
  

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Ending balance as of December 31

     15        8        10        2         35   

Less amounts in Other Current Liabilities

     2        2        —           2         6   
  

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ 13      $ 6      $ 10      $ —         $ 29   
  

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Conectiv Energy Wholesale Power Generation Sites

On July 1, 2010, PHI sold the Conectiv Energy wholesale power generation business to Calpine. Under New Jersey's Industrial Site Recovery Act (ISRA), the transfer of ownership triggered an obligation on the part of Conectiv Energy to remediate any environmental contamination at each of the nine Conectiv Energy generating facility sites located in New Jersey. Under the terms of the sale, Calpine has assumed responsibility for performing the ISRA-required remediation and for the payment of all related ISRA compliance costs up to $10 million. PHI is obligated to indemnify Calpine for any ISRA compliance remediation costs in excess of $10 million. According to preliminary estimates, the costs of ISRA-required remediation activities at the nine generating facility sites located in New Jersey are in the range of approximately $7 million to $18 million. The amount accrued by PHI for the ISRA-required remediation activities at the nine generating facility sites is included in the table above under the column entitled Legacy Generation – Non-Regulated.

On September 14, 2011, PHI received a request for data from the U.S. Environmental Protection Agency (EPA) regarding operations at the Deepwater generating facility in New Jersey (which was included in the sale to Calpine) between January 1, 2001 and July 1, 2010, to demonstrate compliance with the Clean Air Act's new source review permitting program. The data request covers the period from February 2004 to July 1, 2010. Under the terms of the Calpine sale, PHI is obligated to indemnify Calpine for any failure of PHI, on or prior to the closing date of the sale, to comply with environmental laws attributable to the construction of new, or modification of existing, sources of air emissions. At this time, PHI does not expect this inquiry to have a material effect on its financial position or results of operations.

The sale of the Conectiv Energy wholesale power generation business to Calpine did not include a coal ash landfill site located at the Edge Moor generating facility, which PHI intends to close. The preliminary estimate of the costs to PHI to close the coal ash landfill ranges from approximately $2 million to $3 million, plus annual post-closure operations, maintenance and monitoring costs, estimated to range between $120,000 and $193,000 per year for 30 years. The amounts accrued by PHI for this matter are included in the table above under the column entitled Legacy Generation – Non-Regulated.

 

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from EPA concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA's claims are based on ACE's sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA's expenditures for response measures at the site have exceeded $6 million. EPA estimates the additional cost for future response measures will be approximately $6 million. ACE believes that EPA sent similar general notice letters to three other companies and various individuals.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE's position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Peck Iron and Metal Site

EPA informed Pepco in a May 2009 letter that Pepco may be a PRP under CERCLA with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck's metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List (NPL). The NPL, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with the RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

 

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE, DPL and Pepco with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. The next step in the litigation will be the filing of summary judgment motions regarding liability for certain "test case" defendants other than ACE, DPL and Pepco. The case has been stayed as to the remaining defendants pending rulings upon the test cases. Although PHI cannot at this time estimate an amount or range of reasonably possible losses to which it may be exposed, PHI does not believe that any of its three utility subsidiaries had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Benning Road Site

In September 2010, PHI received a letter from EPA stating that EPA and the District of Columbia Department of the Environment (DDOE) have identified the Benning Road location, consisting of a transmission and distribution facility operated by Pepco and a generation facility operated by Pepco Energy Services, as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons, that EPA is monitoring the efforts of DDOE and that EPA intends to use federal authority to address the Benning Road site if an agreement for a comprehensive study to evaluate (and, if necessary, to clean up) the facility is not reached. In January 2011, Pepco and Pepco Energy Services entered into a proposed consent decree with DDOE that requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE's selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. In February 2011, the District of Columbia filed a complaint against Pepco and Pepco Energy Services in the United States District Court for the District of Columbia for the purpose of obtaining judicial approval of the consent decree. The complaint asserted claims under CERCLA, the Resource Conservation and Recovery Act, and District of Columbia law seeking to compel Pepco and Pepco Energy Services to take actions to investigate and clean up contamination allegedly originating from the Benning Road site, and to reimburse the District of Columbia for its response costs. On December 1, 2011, the District Court issued an order granting the motion to enter a revised consent decree. The District Court's order entering the consent decree requires DDOE to solicit and consider public comment on the key RI/FS documents prior to final approval, requires DDOE to make final versions of all approved RI/FS documents available to the public, and requires the parties to submit a written status report to the District Court on May 24, 2013 regarding the implementation of the requirements of the consent decree and any related plans for remediation. In addition, if the RI/FS has not been completed by May 24, 2013, the status report must provide an explanation and a showing of good cause for why the work has not been completed.

Pepco and Pepco Energy Services commenced work on the RI/FS upon entry of the consent decree. On December 21, 2011, they submitted a draft RI/FS Scope of Work and a draft Community Involvement Plan to DDOE for review. DDOE has solicited public comment on these documents, which were due by February 13, 2012, with respect to the draft Scope of Work, and are due by March 7, 2012 with respect to the draft Community Involvement Plan. Depending on the nature and extent of public comments received, Pepco and Pepco Energy Services anticipate that these documents will be approved and a draft RI/FS work plan will be submitted by the end of the first quarter of 2012. The field work will commence after final work plan approval by DDOE.

 

The amount of remediation costs accrued for this matter is included in the table above under the column entitled Transmission and Distribution.

Price's Pit Site

ACE owns a transmission and distribution right-of-way that traverses the Price's Pit superfund site in Egg Harbor Township, New Jersey. EPA placed Price's Pit on the NPL in 1983 and the New Jersey Department of Environmental Protection (NJDEP) undertook an environmental investigation to identify and implement remedial action at the site. NJDEP's investigation revealed that landfill waste had been disposed on ACE's right-of-way and NJDEP determined that ACE was a responsible party as the owner of a facility on which a hazardous substance has been deposited. ACE, EPA and NJDEP entered into a settlement agreement effective on August 11, 2011 to resolve ACE's alleged liability. Under the settlement agreement, ACE made a payment of approximately $1 million (the amount accrued by ACE in 2010) to the EPA Hazardous Substance Superfund, and donated a four-acre parcel of land adjacent to the site to NJDEP.

Indian River Oil Release

In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. The amount of remediation costs accrued for this matter is included in the table above under the column entitled Legacy Generation—Regulated.

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco's Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

The release falls within the regulatory jurisdiction of multiple federal and state agencies. Beginning in March 2011, DDOE issued a series of compliance directives that require Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco has submitted an incident report and is providing the requested records. In December 2011, Pepco completed field sampling and anticipates submitting a report to DDOE during the second quarter of 2012.

On March 16, 2011, the Virginia Department of Environmental Quality (VADEQ) requested documentation regarding the release and the preparation of an emergency response report, which Pepco submitted to the agency on April 20, 2011. On March 25, 2011, Pepco received a notice of violation from VADEQ and in December 2011, VADEQ executed a consent agreement that had been executed by Pepco in August, pursuant to which Pepco paid a civil penalty of approximately $40,000.

During March 2011, EPA conducted an inspection of the Potomac River substation to review compliance with federal regulations regarding Spill Prevention, Control, and Countermeasure (SPCC) plans for facilities using oil-containing equipment in proximity to surface waters. As a result, EPA identified several potential violations of the SPCC regulations relating to SPCC plan content, recordkeeping, and secondary containment, which EPA advised may lead to an EPA demand for noncompliance penalties. As a result of the oil release, Pepco submitted a revised SPCC plan to EPA in August 2011 and implemented certain interim operational changes to the secondary containment systems at the facility which involve pumping accumulated storm water to an aboveground holding tank for off-site disposal. In December 2011, Pepco completed the installation of a treatment system designed to allow automatic discharge of accumulated storm water from the secondary containment system. Pepco is currently seeking DDOE's approval to commence operation of the new system and, after receiving such approval, will submit a further revised SPCC plan to EPA. In the meantime, Pepco will continue to use the above ground holding tank to manage storm water from the secondary containment system.

The U.S. Coast Guard assessed a $5,000 penalty against Pepco for the release of oil into the waters of the United States, which Pepco has paid.

In addition to the cost to remediate impacts to the river and shoreline, Pepco also may be liable for non-compliance penalties and/or natural resource damages in addition to those it has already paid. It is not possible to accurately estimate an amount or range of reasonably possible loss to which it may be exposed associated with this liability at this time; however, based on current information, PHI and Pepco do not believe this matter will have a material adverse effect on their respective financial conditions, results of operations or cash flows.

The amounts accrued for these matters are included in the table above under the column entitled Transmission and Distribution.

Fauquier County Landfill Site

On October 7, 2011, Pepco Energy Services received a notice of violation dated October 5, 2011, from the VADEQ, which advised Pepco Energy Services of information on which VADEQ may rely to institute an administrative or judicial enforcement action in connection with alleged violation of Virginia air pollution control law and regulations at the facility of Pepco Energy Services' subsidiary Fauquier County Landfill Gas, L.L.C. in Warrenton, Virginia. The notice of violation is based on an on-site VADEQ inspection during which VADEQ observed certain alleged deficiencies relating to the facility's permit to construct and operate. On February 6, 2012, VADEQ sent Pepco Energy Services a proposed consent order pursuant to which Pepco Energy Services would agree to perform certain remedial actions and agree to pay a civil charge of approximately $10,000. Pepco Energy Services is presently reviewing the proposed consent order.

PHI's Cross-Border Energy Lease Investments

Between 1994 and 2002, PCI entered into eight cross-border energy lease investments involving public utility assets (primarily consisting of hydroelectric generation and coal-fired electric generation facilities and natural gas distribution networks) located outside of the United States. Each of these investments is comprised of multiple leases and each investment is structured as a sale and leaseback transaction commonly referred to by the IRS as a sale-in, lease-out, or SILO transaction.

As more fully discussed in Note (8), "Leasing Activities," PHI entered into early termination agreements with two lessees, at their request, with respect to all of the leases comprising one cross-border energy lease investment and a small portion of the leases comprising another cross-border energy lease investment in the second quarter of 2011. PHI received net cash proceeds of $161 million (net of a termination payment of $423 million used to retire the non-recourse debt associated with the terminated leases) and recorded a pre-tax gain of $39 million, representing the excess of the net cash proceeds over the carrying value of the lease investments. In the future, PHI anticipates that it will receive annual tax benefits from these lease investments of approximately $51 million. As of December 31, 2011, the book value of PHI's investment in its cross-border energy lease investments was approximately $1.3 billion. After taking into consideration the $74 million paid with the 2001-2002 audit (as discussed below), the net federal and state tax benefits received for the remaining leases from January 1, 2001, the earliest year that remains open to audit, to December 31, 2011, has been approximately $510 million.

 

Since 2005, PHI's cross-border energy lease investments have been under examination by the IRS as part of the PHI federal income tax audits. In connection with the audit of PHI's 2001-2002 and 2003-2005 income tax returns, respectively, the IRS disallowed the depreciation and interest deductions in excess of rental income claimed by PHI with respect to each of its cross-border energy lease investments. In addition, the IRS has sought to recharacterize each of the leases as a loan transaction as to which PHI would be subject to original issue discount income. PHI disagrees with the IRS' proposed adjustments and in August 2006 and May 2009 filed protests of these findings with the Office of Appeals of the IRS. Effective November 2010, PHI entered into a settlement agreement with the IRS for the 2001 and 2002 tax years and subsequently filed refund claims in July 2011 for the disallowed tax deductions relating to the leases for these years. In January 2011, as part of this settlement, PHI paid $74 million of additional tax for 2001 and 2002, penalties of $1 million, and $28 million in interest associated with the disallowed deductions. Since the July 2011 claim for refund was not approved by the IRS within the statutory six-month period, in January 2012 PHI filed complaints in the U.S. Court of Federal Claims seeking recovery of the tax payment, interest and penalties. Absent a settlement, any litigation against the IRS may take several years to resolve. The 2003-2005 income tax return review continues to be in process with the IRS Office of Appeals and at present, will not be a part of any U.S. Court of Federal Claims litigation discussed above.

In the event that the IRS were to be successful in disallowing 100% of the tax benefits associated with these leases and recharacterizing these leases as loans, PHI estimates that, as of December 31, 2011, it would be obligated to pay approximately $643 million in additional federal and state taxes and $121 million of interest on the remaining leases. The $643 million in additional federal and state taxes is net of the $74 million tax payment made in January 2011. In addition, the IRS could require PHI to pay a penalty of up to 20% on the amount of additional taxes due.

PHI anticipates that any additional taxes that it would be required to pay as a result of the disallowance of prior deductions or a re-characterization of the leases as loans would be recoverable in the form of lower taxes over the remaining terms of the affected leases. Moreover, the entire amount of any additional federal and state tax would not be due immediately, but rather, the federal and state taxes would be payable when the open audit years are closed and PHI amends subsequent tax returns not then under audit. To mitigate the taxes due in the event of a total disallowance of tax benefits, PHI could elect to liquidate all or a portion of its seven remaining cross-border energy lease investments, which PHI estimates could be accomplished over a period of six months to one year. Based on current market values, PHI estimates that liquidation of the remaining portfolio would generate sufficient cash proceeds to cover the estimated $764 million in federal and state taxes and interest due as of December 31, 2011, in the event of a total disallowance of tax benefits and a recharacterization of the leases as loans. If payments of additional taxes and interest preceded the receipt of liquidation proceeds, the payments would be funded by currently available sources of liquidity.

To the extent that PHI does not prevail in this matter and suffers a disallowance of the tax benefits and incurs imputed original issue discount income, PHI would be required under FASB guidance on leases (ASC 840) to recalculate the timing of the tax benefits generated by the cross-border energy lease investments and adjust the equity value of the investments, which would result in a non-cash charge to earnings.

District of Columbia Tax Legislation

On June 14, 2011, the Council of the District of Columbia approved the Budget Support Act. The Budget Support Act includes a provision requiring that corporate taxpayers in the District of Columbia calculate taxable income allocable or apportioned to the District of Columbia by reference to the income and apportionment factors applicable to commonly controlled entities organized within the United States that are engaged in a unitary business. This new reporting method was enacted on September 14, 2011 and is effective for tax years beginning on or after December 31, 2010. In the aggregate, this new tax reporting method negatively affected pre-tax earnings by $7 million ($5 million after-tax), which is reflected in PHI's consolidated results of operations, as

 

further discussed in Note (8), "Leasing Activities," and Note (12), "Income Taxes." The District of Columbia Office of Tax and Revenue issued proposed regulations on January 20, 2012, to implement this reporting method. PHI will continue to analyze these regulations and will record the impact, if any, of such regulations on PHI's results of operations in the period in which the proposed regulations are adopted as final regulations.

Third Party Guarantees, Indemnifications, and Off-Balance Sheet Arrangements

PHI and certain of its subsidiaries have various financial and performance guarantees and indemnification obligations that they have entered into in the normal course of business to facilitate commercial transactions with third parties as discussed below.

As of December 31, 2011, PHI and its subsidiaries were parties to a variety of agreements pursuant to which they were guarantors for standby letters of credit, energy procurement obligations, and other commitments and obligations. The commitments and obligations, in millions of dollars, were as follows:

 

Guarantor         
     PHI      Pepco      DPL      ACE      Total  

Energy procurement obligations of Pepco Energy Services (a)

   $ 175      $ —         $ —         $ —         $ 175  

Guarantees associated with disposal of Conectiv Energy assets (b)

     23        —           —           —           23  

Guaranteed lease residual values (c)

     1        3        5        3        12  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   $ 199      $ 3      $ 5      $ 3      $ 210  
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

PHI and certain of its subsidiaries have entered into various indemnification agreements related to purchase and sale agreements and other types of contractual agreements with vendors and other third parties. These indemnification agreements typically cover environmental, tax, litigation and other matters, as well as breaches of representations, warranties and covenants set forth in these agreements. Typically, claims may be made by third parties under these indemnification agreements over various periods of time depending on the nature of the claim. The maximum potential exposure under these indemnification agreements can range from a specified dollar amount to an unlimited amount depending on the nature of the claim and the particular transaction. The total maximum potential amount of future payments under these indemnification agreements is not estimable due to several factors, including uncertainty as to whether or when claims may be made under these indemnities.

Energy Savings Performance Contracts

Pepco Energy Services has a diverse portfolio of energy savings performance contracts that are associated with the installation of energy savings equipment for federal, state and local government customers. As part of those contracts, Pepco Energy Services typically guarantees that the equipment or systems installed by Pepco Energy Services will generate a specified amount of energy savings on an annual basis over a multi-year period. As of December 31, 2011, Pepco Energy Services' energy savings guarantees on both completed projects and projects under construction totaled $435 million over the life of the performance contracts with the longest remaining term being 15 years. On an annual basis, Pepco Energy Services

 

undertakes a measurement and verification process to determine the amount of energy savings for the year and whether there is any shortfall in the annual energy savings compared to the guaranteed amount. Pepco Energy Services recognizes a liability for the value of the estimated energy savings shortfall when it is probable that the guaranteed energy savings will not be achieved and the amount is reasonably estimable. As of December 31, 2011, Pepco Energy Services did not have an accrued liability for energy savings performance contracts. There was no significant change in the type of contracts issued for the year ended December 31, 2011. Based on its historical experience, Pepco Energy Services believes the probability of incurring a material loss under its energy savings performance contracts is remote.

Dividends

On January 26, 2012, Pepco Holdings' Board of Directors declared a dividend on common stock of 27 cents per share payable March 30, 2012, to shareholders of record on March 12, 2012.

Contractual Obligations

As of December 31, 2011, Pepco Holdings' contractual obligations under non-derivative fuel and purchase power contracts were $553 million in 2012, $716 million in 2013 to 2014, $708 million in 2015 to 2016, and $2,125 million in 2017 and thereafter.

Potomac Electric Power Co [Member]
 
Commitments And Contingencies

(13) COMMITMENTS AND CONTINGENCIES

General Litigation

In 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other corporate entities were brought into these cases on a theory of premises liability. Under this theory, the plaintiffs argued that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant.

As of December 31, 2011, there are approximately 180 cases still pending against Pepco in the Maryland State Courts, of which approximately 90 cases were filed after December 19, 2000, and were tendered to Mirant Corporation (Mirant) for defense and indemnification in connection with the sale by Pepco of its generation assets to Mirant in 2000. While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) is approximately $360 million, PHI and Pepco believe the amounts claimed by the remaining plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time. If an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's financial condition, results of operations and cash flows.

Environmental Matters

Pepco is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from Pepco's customers, environmental clean-up costs incurred by Pepco generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of Pepco described below at December 31, 2011 are summarized as follows:

 

     Transmission
and Distribution
     Legacy
Regulated
Generation
     Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 12      $ 3       $ —         $ 15   

Accruals

     2         1         —           3   

Payments

     —           —           —           —     
  

 

 

    

 

 

    

 

 

    

 

 

 

Ending balance as of December 31

     14        4         —           18   

Less amounts in Other Current

Liabilities

     2        —           —           2   
  

 

 

    

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ 12      $ 4       $ —         $ 16   
  

 

 

    

 

 

    

 

 

    

 

 

 

 

Peck Iron and Metal Site

The U.S. Environmental Protection Agency (EPA) informed Pepco in a May 2009 letter that Pepco may be a potentially responsible party (PRP) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck's metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List (NPL). The NPL, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In September 2011, EPA initiated a remedial investigation/feasibility study (RI/FS) using federal funds. Pepco cannot at this time estimate an amount or range of reasonably possible loss associated with the RI/FS, any remediation activities to be performed at the site or any other costs that EPA might seek to impose on Pepco.

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including Pepco, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. The next step in the litigation will be the filing of summary judgment motions regarding liability for certain "test case" defendants other than Pepco. The case has been stayed as to the remaining defendants pending rulings upon the test cases. Although Pepco cannot at this time estimate an amount or range of reasonably possible losses to which it may be exposed, Pepco does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Benning Road Site

In September 2010, PHI received a letter from EPA stating that EPA and the District of Columbia Department of the Environment (DDOE) have identified the Benning Road location, consisting of a transmission and distribution facility operated by Pepco and a generation facility operated by Pepco Energy Services, as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons, that EPA is monitoring the efforts of DDOE and that EPA intends to use federal authority to address the Benning Road site if an agreement for a comprehensive study to evaluate (and, if necessary, to clean up) the facility is not reached. In January 2011, Pepco and Pepco Energy Services entered into a proposed consent decree with DDOE that requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE's selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. In February 2011, the District of Columbia filed a complaint against Pepco and Pepco Energy Services in the United States District Court for the District of Columbia for the purpose of obtaining judicial approval of the consent decree. The complaint asserted claims under CERCLA, the Resource Conservation and Recovery Act, and District of Columbia law seeking to compel Pepco and Pepco Energy Services to take actions to investigate and clean up contamination allegedly originating from the Benning Road site, and to reimburse the District of Columbia for its response costs. On December 1, 2011, the District Court issued an order granting the motion to enter a revised consent decree. The District Court's order entering the consent decree requires DDOE to solicit and consider public comment on the key RI/FS documents prior to final approval, requires DDOE to make final versions of all approved RI/FS documents available to the public, and requires the parties to submit a written status report to the District Court on May 24, 2013 regarding the implementation of the requirements of the consent decree and any related plans for remediation. In addition, if the RI/FS has not been completed by May 24, 2013, the status report must provide an explanation and a showing of good cause for why the work has not been completed.

Pepco and Pepco Energy Services commenced work on the RI/FS upon entry of the consent decree. On December 21, 2011, they submitted a draft RI/FS Scope of Work and a draft Community Involvement Plan to DDOE for review. DDOE has solicited public comment on these documents, which were due by February 13, 2012, with respect to the draft Scope of Work, and are due by March 7, 2012 with respect to the Draft Community Involvement Plan. Depending on the nature and extent of public comments received, Pepco and Pepco Energy Services anticipate that these documents will be approved and a draft RI/FS work plan will be submitted by the end of the first quarter of 2012. The field work will commence after final work plan approval by DDOE.

The amount of remediation costs accrued for this matter is included in the table above under the column entitled Transmission and Distribution.

Potomac River Mineral Oil Release

In January 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco's Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

The release falls within the regulatory jurisdiction of multiple federal and state agencies. Beginning in March 2011, DDOE issued a series of compliance directives that require Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco has submitted an incident report and is providing the requested records. In December 2011, Pepco completed field sampling and anticipates submitting a report to DDOE during the second quarter of 2012.

On March 16, 2011, the Virginia Department of Environmental Quality (VADEQ) requested documentation regarding the release and the preparation of an emergency response report, which Pepco submitted to the agency on April 20, 2011. On March 25, 2011, Pepco received a notice of violation from VADEQ and in December 2011, VADEQ executed a consent agreement that had been executed by Pepco in August, pursuant to which Pepco paid a civil penalty of approximately $40,000.

During March 2011, EPA conducted an inspection of the Potomac River substation to review compliance with federal regulations regarding Spill Prevention, Control, and Countermeasure (SPCC) plans for facilities using oil-containing equipment in proximity to surface waters. As a result, EPA identified several potential violations of the SPCC regulations relating to SPCC plan content, recordkeeping, and secondary containment, which EPA advised may lead to an EPA demand for noncompliance penalties. As a result of the oil release, Pepco submitted a revised SPCC plan to EPA in August 2011 and implemented certain interim operational changes to the secondary containment systems at the facility which involve pumping accumulated storm water to an aboveground holding tank for off-site disposal. In December 2011, Pepco completed the installation of a treatment system designed to allow automatic discharge of accumulated storm water from the secondary containment system. Pepco is currently seeking DDOE's

 

approval to commence operation of the new system and, after receiving such approval, will submit a further revised SPCC plan to EPA. In the meantime, Pepco will continue to use the above ground holding tank to manage storm water from the secondary containment system.

The U.S. Coast Guard assessed a $5,000 penalty against Pepco for the release of oil into the waters of the United States, which Pepco has paid.

In addition to the cost to remediate impacts to the river and shoreline, Pepco also may be liable for non-compliance penalties and/or natural resource damages in addition to those it has already paid. It is not possible to accurately estimate an amount or range of reasonably possible loss to which it may be exposed associated with this liability at this time; however, based on current information, PHI and Pepco do not believe this matter will have a material adverse effect on their respective financial conditions, results of operations or cash flows.

The amounts accrued for these matters are included in the table above under the column entitled Transmission and Distribution.

District of Columbia Tax Legislation

On June 14, 2011, the Council of the District of Columbia approved the Fiscal Year 2012 Budget Support Act of 2011 (the Budget Support Act). The Budget Support Act includes a provision requiring that corporate taxpayers in the District of Columbia calculate taxable income allocable or apportioned to the District of Columbia by reference to the income and apportionment factors applicable to commonly controlled entities organized within the United States that are engaged in a unitary business. This new tax reporting method resulted in an additional state income tax provision of less than $1 million in 2011, which is reflected in Pepco's results of operations. The District of Columbia Office of Tax and Revenue issued proposed regulations on January 20, 2012, to implement this reporting method. Pepco will continue to analyze these regulations and will record the impact, if any, of such regulations on PHI's results of operations in the period in which the proposed regulations are adopted as final regulations.

Contractual Obligations

As of December 31, 2011, Pepco had no contractual obligations under non-derivative fuel and power purchase contracts.

Delmarva Power & Light Co/De [Member]
 
Commitments And Contingencies

(15) COMMITMENTS AND CONTINGENCIES

Environmental Matters

DPL is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from DPL's customers, environmental clean-up costs incurred by DPL generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of DPL described below at December 31, 2011 are summarized as follows:

 

 

     Transmission
and Distribution
     Legacy
Regulated
Generation
    Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 1       $ 5     $ 2       $ 8  

Accruals

     —           —          —           —     

Payments

     —           (1     —           (1
  

 

 

    

 

 

   

 

 

    

 

 

 

Ending balance as of December 31

     1         4       2         7   

Less amounts in Other Current Liabilities

     1         1       2         4   
  

 

 

    

 

 

   

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ —         $ 3     $ —         $ 3   
  

 

 

    

 

 

   

 

 

    

 

 

 

Ward Transformer Site

In April 2009, a group of potentially responsible parties (PRPs) with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including DPL, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. The next step in the litigation will be the filing of summary judgment motions regarding liability for certain "test case" defendants other than DPL. The case has been stayed as to the remaining defendants pending rulings upon the test cases. Although DPL cannot at this time estimate an amount or range of reasonably possible losses to which it may be exposed, DPL does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Indian River Oil Release

In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. The amount of remediation costs accrued for this matter is included in the table above under the column entitled Legacy Regulated Generation.

Contractual Obligations

As of December 31, 2011, DPL's contractual obligations under non-derivative fuel and power purchase contracts were $65 million in 2012, $129 million in 2013 to 2014, $133 million in 2015 to 2016, and $268 million in 2017 and thereafter.

Atlantic City Electric Co [Member]
 
Commitments And Contingencies

(14) COMMITMENTS AND CONTINGENCIES

General Litigation

In September 2011, an asbestos complaint was filed in the New Jersey Superior Court, Law Division, against ACE (among other defendants) asserting claims under New Jersey's Wrongful Death and Survival statutes. The complaint, filed by the estate of a decedent who was the wife of a former employee of ACE, alleges that the decedent's mesothelioma was caused by exposure to asbestos brought home by her husband on his work clothes. Unlike the other jurisdictions to which PHI subsidiaries are subject, New Jersey courts have recognized a cause of action against a premise owner in a so-called "take home" case if it can be shown that the harm was foreseeable. In this case, the complaint seeks recovery of an unspecified amount of damages for the decedant's past medical expenses, loss of earnings, and pain and

 

suffering between the time of injury and death, and asserts a punitive damage claim. At this time, ACE cannot estimate an amount or range of reasonably possible loss to which it may be exposed that may be associated with the claims raised in this complaint. Such an estimate of reasonably possible loss must await further internal investigation and discovery procedures.

Environmental Matters

ACE is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from ACE's customers, environmental clean-up costs incurred by ACE generally are included in its cost of service for ratemaking purposes. The total accrued liabilities for the environmental contingencies of ACE described below at December 31, 2011 are summarized as follows:

 

     Transmission
and Distribution
    Legacy
Regulated
Generation
     Other      Total  
     (millions of dollars)  

Beginning balance as of January 1

   $ 1     $ 1       $ —         $ 2  

Accruals

     —          —           —           —     

Payments

     (1     —           —           (1
  

 

 

   

 

 

    

 

 

    

 

 

 

Ending balance as of December 31

     —          1         —           1  

Less amounts in Other Current Liabilities

     —          —           —           —     
  

 

 

   

 

 

    

 

 

    

 

 

 

Amounts in Other Deferred Credits

   $ —        $ 1       $ —         $ 1  
  

 

 

   

 

 

    

 

 

    

 

 

 

Franklin Slag Pile Site

In November 2008, ACE received a general notice letter from the U.S. Environmental Protection Agency (EPA) concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA's claims are based on ACE's sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA's expenditures for response measures at the site have exceeded $6 million. EPA estimates the additional cost for future response measures will be approximately $6 million. ACE believes that EPA sent similar general notice letters to three other companies and various individuals.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE's position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

 

Ward Transformer Site

In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE, with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. The next step in the litigation will be the filing of summary judgment motions regarding liability for certain "test case" defendants other than. The case has been stayed as to the remaining defendants pending rulings upon the test cases. Although ACE cannot at this time estimate an amount or range of reasonably possible losses to which it may be exposed, ACE does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Price's Pit Site

ACE owns a transmission and distribution right-of-way that traverses the Price's Pit superfund site in Egg Harbor Township, New Jersey. EPA placed Price's Pit on the NPL in 1983 and the New Jersey Department of Environmental Protection (NJDEP) undertook an environmental investigation to identify and implement remedial action at the site. NJDEP's investigation revealed that landfill waste had been disposed on ACE's right-of-way and NJDEP determined that ACE was a responsible party as the owner of a facility on which a hazardous substance has been deposited. ACE, EPA and NJDEP entered into a settlement agreement effective on August 11, 2011 to resolve ACE's alleged liability. Under the settlement agreement, ACE made a payment of approximately $1 million (the amount accrued by ACE in 2010) to the EPA Hazardous Substance Superfund and donated a four-acre parcel of land adjacent to the site to NJDEP.

Contractual Obligations

As of December 31, 2011, ACE's contractual obligations under non-derivative fuel and power purchase contracts were $197 million in 2012, $500 million in 2013 to 2014, $576 million in 2015 to 2016, and $1,857 million in 2017 and thereafter.