XML 73 R80.htm IDEA: XBRL DOCUMENT v3.19.3
Commitments and Contingencies (Details) - USD ($)
$ in Millions
9 Months Ended
Sep. 30, 2019
Dec. 31, 2018
Loss Contingencies [Line Items]    
Loss Contingency Accrual At Carrying Value $ 0.2 $ 0.2
Loss Contingency Actions Taken By Defendant Houghton’s Sao Paulo, Brazil site was required under Brazilian environmental, health and safety regulations to perform an environmental assessment as a part of a permit renewal process. The site has conducted a multi-year soil and groundwater investigation and corresponding risk assessments based on the result of the investigations. Initial investigations identified soil and ground water contamination in select areas of the site. In 2017, the site had to submit a new 5-year permit renewal request and was asked to complete additional investigations to further delineate the site based on review of the technical data by the local regulatory agency, Companhia Ambiental do Estado de São Paulo (“CETESB”). Based on review of the updated investigation data, CETESB issued a Technical Opinion regarding the investigation and remedial action taken to date. The site developed an action plan and submitted to CETESB in 2018 based on CETESB requirements. The site intervention plan primarily requires the site, amongst other actions, to conduct periodic monitoring for methane in soil vapors, source zone delineation, groundwater plume delineation, bedrock aquifer assessment, update the human health risk assessment, develop a current site conceptual model and conduct a remedial feasibility study and provide a revised intervention plan. In December 2019, the site is required to submit a report on the activitiescompleted including the revised site conceptual model and results of the remedial feasibility study and recommended remedial strategy for the site.  
ACP [Member] | Maximum [Member]    
Loss Contingencies [Line Items]    
Loss Contingency, Estimate of Possible Loss $ 1.0  
ACP [Member] | Minimum [Member]    
Loss Contingencies [Line Items]    
Loss Contingency, Estimate of Possible Loss 0.1  
SB Decking [Member]    
Loss Contingencies [Line Items]    
Loss Contingency, Estimate of Possible Loss 1.7  
Houghton Combination [Member]    
Loss Contingencies [Line Items]    
Loss Contingency Accrual At Carrying Value 4.8  
Houghton Combination [Member] | Maximum [Member]    
Loss Contingencies [Line Items]    
Loss Contingency, Estimate of Possible Loss 5.0  
Houghton Combination [Member] | Minimum [Member]    
Loss Contingencies [Line Items]    
Loss Contingency, Estimate of Possible Loss $ 4.0