Revenues from Contracts with Customers
Electric and Gas Distribution and Transmission Revenues—PSE&G sells gas and electricity to customers under default commodity supply tariffs. PSE&G’s regulated electric and gas default commodity supply and distribution services are separate tariffs which are satisfied as the product(s) and/or service(s) are delivered to the customer. The electric and gas commodity and delivery tariffs are recurring contracts in effect until modified through the regulatory approval process as appropriate. Revenue is recognized over time as the service is rendered to the customer. Included in PSE&G’s regulated revenues are unbilled electric and gas revenues which represent the estimated amount customers will be billed for services rendered from the most recent meter reading to the end of the respective accounting period.
PSE&G’s transmission revenues are earned under a separate tariff using a FERC-approved annual formula rate mechanism. The performance obligation of transmission service is satisfied and revenue is recognized as it is provided to the customer. The formula rate mechanism provides for an annual filing of an estimated revenue requirement with rates effective January 1 of each year and a true-up to that estimate based on actual revenue requirements. The true-up mechanism is an alternative revenue which is outside the scope of revenue from contracts with customers.
Other Revenues from Contracts with Customers
Other revenues from contracts with customers, which are not a material source of PSE&G revenues, are generated primarily from appliance repair services and solar generation projects. The performance obligations under these contracts are satisfied and revenue is recognized as control of products is delivered or services are rendered.
Payment for services rendered and products transferred are typically due on average within 30 days of delivery.
Revenues Unrelated to Contracts with Customers
Other PSE&G revenues unrelated to contracts with customers are derived from alternative revenue mechanisms recorded pursuant to regulatory accounting guidance. These revenues, which include the Conservation Incentive Program (CIP), green energy program true-ups and transmission formula rate true-ups, are not a material source of PSE&G revenues.
Other
Revenues from Contracts with Customers
Electricity and Related Products—PSEG Power sells to the Independent System Operators (ISOs) energy and ancillary services which are separately transacted in the day-ahead or real-time energy markets. The energy and ancillary services performance obligations are typically satisfied over time as delivered and revenue is recognized accordingly. In addition, wholesale load contracts have been executed in the different ISO regions for the bundled supply of energy, capacity, renewable energy credits and ancillary services representing PSEG Power’s performance obligations. Revenue for these contracts is recognized over time as the bundled service is provided to the customer. Transaction terms generally run from several months to three years. PSEG generally reports electricity sales and purchases conducted with those individual ISOs net on an hourly basis in either Operating Revenues or Energy Costs in its Condensed Consolidated Statements of Operations. The classification depends on the net hourly activity.
PSEG Power enters into capacity sales and capacity purchases through the ISOs. The transactions are reported on a net basis dependent on PSEG Power’s monthly net sale or purchase position through the individual ISOs. The performance obligations with the ISOs are satisfied over time upon delivery of the capacity and revenue is recognized accordingly. In addition to capacity sold through the ISOs, PSEG Power sells capacity through bilateral contracts and the related revenue is reported on a gross basis and recognized over time upon delivery of the capacity.
PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants have been awarded Zero Emission Certificates (ZECs) by the BPU through May 2025. These nuclear plants are expected to receive ZEC revenue from the electric distribution companies (EDCs) in New Jersey. PSEG Power recognizes revenue when the units generate electricity, which is when the performance obligation is satisfied. These revenues are included in PJM Sales in the following tables. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments for additional information.
Gas Contracts—PSEG Power sells wholesale natural gas, primarily through an index based full-requirements Basic Gas Supply Service (BGSS) contract with PSE&G to meet the gas supply requirements of PSE&G’s customers. The BGSS contract remains in effect unless terminated by either party with a two-year notice. Based upon the availability of natural gas, storage and pipeline capacity beyond PSE&G’s daily needs, PSEG Power also sells gas and pipeline capacity to other counterparties under bilateral contracts. The performance obligation is primarily the delivery of gas which is satisfied over time. Revenue is recognized as gas is delivered or pipeline capacity is released.
PSEG LI Contract—PSEG LI has a contract with LIPA which generates revenues. PSEG LI’s subsidiary, Long Island Electric Utility Servco, LLC (Servco) records costs which are recovered from LIPA and records the recovery of those costs as revenues when Servco is a principal in the transaction.
Other Revenues from Contracts with Customers
Prior to the sale of Solar Source in June 2021, PSEG Power entered into bilateral contracts to sell solar power and solar renewable energy certificates (SRECs) from its solar facilities. Contract terms ranged from 15 to 30 years. The performance obligations were generally solar power and SRECs which were transferred to customers upon generation. Revenue was recognized upon generation of the solar power. These performance obligations were transferred as part of the sale of Solar Source. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments.
PSEG Power has entered into long-term contracts with LIPA for energy management and fuel procurement services. Revenue is recognized over time as services are rendered.
Revenues Unrelated to Contracts with Customers
PSEG Power’s revenues unrelated to contracts with customers include electric, gas and certain energy-related transactions accounted for in accordance with Derivatives and Hedging accounting guidance. See Note 13. Financial Risk Management Activities for further discussion. Prior to the sale of Solar Source, PSEG Power was also a party to solar contracts that qualified as leases and were accounted for in accordance with lease accounting guidance. These performance obligations were transferred as part of the sale of Solar Source. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments.
Energy Holdings generates lease revenues which are recorded pursuant to lease accounting guidance.
Disaggregation of Revenues
PSE&GOther (A)EliminationsConsolidated
Millions
Three Months Ended September 30, 2022
Revenues from Contracts with Customers
Electric Distribution$1,282 $— $— $1,282 
Gas Distribution160 — — 160 
Transmission 400 — — 400 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 633 — 633 
Sales to Affiliates— 34 (34)— 
New York ISO
— — — — 
ISO New England
— — 
Gas Sales
Third-Party Sales
— 144 — 144 
Sales to Affiliates
— 77 (77)— 
Other Revenues from Contracts with Customers (B)94 160 (3)251 
Total Revenues from Contracts with Customers1,936 1,052 (114)2,874 
Revenues Unrelated to Contracts with Customers (C)17 (619)— (602)
Total Operating Revenues$1,953 $433 $(114)$2,272 
PSE&GOther (A)EliminationsConsolidated
Millions
Nine Months Ended September 30, 2022
Revenues from Contracts with Customers
Electric Distribution$2,838 $— $— $2,838 
Gas Distribution1,524 — (1)1,523 
Transmission 1,188 — — 1,188 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 1,690 — 1,690 
Sales to Affiliates— 125 (125)— 
New York ISO
— 88 — 88 
ISO New England
— 93 — 93 
Gas Sales
Third-Party Sales
— 357 — 357 
Sales to Affiliates
— 805 (805)— 
Other Revenues from Contracts with Customers (B)273 456 (4)725 
Total Revenues from Contracts with Customers5,823 3,614 (935)8,502 
Revenues Unrelated to Contracts with Customers (C)82 (1,923)— (1,841)
Total Operating Revenues$5,905 $1,691 $(935)$6,661 
PSE&GOther (A)EliminationsConsolidated
Millions
Three Months Ended September 30, 2021
Revenues from Contracts with Customers
Electric Distribution$1,181 $— $— $1,181 
Gas Distribution142 — (4)138 
Transmission 409 — — 409 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 622 — 622 
Sales to Affiliates— 65 (65)— 
New York ISO
— 69 — 69 
ISO New England
— 49 — 49 
Gas Sales
Third-Party Sales— 47 — 47 
Sales to Affiliates— 58 (58)— 
Other Revenues from Contracts with Customers (B)80 164 — 244 
Total Revenues from Contracts with Customers1,812 1,074 (127)2,759 
Revenues Unrelated to Contracts with Customers (C)(864)— (856)
Total Operating Revenues$1,820 $210 $(127)$1,903 
PSE&GOther (A)EliminationsConsolidated
Millions
Nine Months Ended September 30, 2021
Revenues from Contracts with Customers
Electric Distribution$2,653 $— $— $2,653 
Gas Distribution1,294 — (9)1,285 
Transmission 1,213 — — 1,213 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 1,501 — 1,501 
Sales to Affiliates— 215 (215)— 
New York ISO
— 166 — 166 
ISO New England
— 118 — 118 
Gas Sales
Third-Party Sales
— 135 — 135 
Sales to Affiliates
— 578 (578)— 
Other Revenues from Contracts with Customers (B)236 472 (2)706 
Total Revenues from Contracts with Customers5,396 3,185 (804)7,777 
Revenues Unrelated to Contracts with Customers (C)11 (1,122)— (1,111)
Total Operating Revenues$5,407 $2,063 $(804)$6,666 
(A)Other consists of revenues at PSEG Power, Energy Holdings and PSEG LI.
(B)Includes primarily revenues from appliance repair services and the sale of SRECs at auction at PSE&G, PSEG Power’s energy management fee with LIPA and PSEG LI’s OSA with LIPA in Other. Other also includes PSEG Power’s solar power projects in 2021.
(C)Includes alternative revenues at PSE&G primarily from the CIP program in 2022 and derivative contracts and lease contracts in 2022 and 2021 in Other.
Contract Balances
PSE&G
PSE&G did not have any material contract balances (rights to consideration for services already provided or obligations to provide services in the future for consideration already received) as of September 30, 2022 and December 31, 2021. Substantially all of PSE&G’s accounts receivable and unbilled revenues result from contracts with customers that are priced at tariff rates. Allowances represented approximately 22% and 21% of accounts receivable (including unbilled revenues) as of September 30, 2022 and December 31, 2021, respectively.
Accounts ReceivableAllowance for Credit Losses
PSE&G’s accounts receivable, including unbilled revenues, is primarily comprised of utility customer receivables for the provision of electric and gas service and appliance services, and are reported on the balance sheet as gross outstanding amounts adjusted for an allowance for credit losses. The allowance for credit losses reflects PSE&G’s best estimate of losses on the account balances. The allowance is based on PSE&G’s projection of accounts receivable aging, historical experience, economic factors and other currently available evidence, including the estimated impact of the ongoing coronavirus (COVID-19) pandemic on the outstanding balances as of September 30, 2022. PSE&G’s electric bad debt expense is recoverable through its Societal Benefits Clause mechanism. As of September 30, 2022, PSE&G had a deferred balance of $131 million from electric bad debts recorded as a Regulatory Asset. In addition, PSE&G had deferred incremental gas bad debt expense of $62 million as a Regulatory Asset for future regulatory recovery due to the impact of the ongoing pandemic. See Note 6. Rate Filings for additional information.
The following provides a reconciliation of PSE&G’s allowance for credit losses for the three months and nine months ended September 30, 2022 and 2021:
Three Months Ended
September 30, 2022
Millions
Balance as of June 30, 2022$335 
Utility Customer and Other Accounts
Provision24 
Write-offs, net of Recoveries of $12 million
(35)
Balance as of September 30, 2022$324 
Nine Months Ended
September 30, 2022
Millions
Balance as of January 1, 2022$337 
Utility Customer and Other Accounts
Provision63 
Write-offs, net of Recoveries of $34 million
(76)
Balance as of September 30, 2022$324 
Three Months Ended
September 30, 2021
Millions
Balance as of June 30, 2021 $260 
Utility Customer and Other Accounts
Provision46 
Write-offs, net of Recoveries of $4 million
(19)
Balance as of September 30, 2021$287 
Nine Months Ended
September 30, 2021
Millions
Balance as of January 1, 2021$206 
Utility Customer and Other Accounts
Provision124 
Write-offs, net of Recoveries of $11 million
(43)
Balance as of September 30, 2021$287 
Other
PSEG Power generally collects consideration upon satisfaction of performance obligations, and therefore, PSEG Power had no material contract balances as of September 30, 2022 and December 31, 2021.
PSEG Power’s accounts receivable include amounts resulting from contracts with customers and other contracts which are out of scope of accounting guidance for revenues from contracts with customers. The majority of these accounts receivable are subject to master netting agreements. As a result, accounts receivable resulting from contracts with customers and receivables unrelated to contracts with customers are netted within Accounts Receivable and Accounts Payable on the Condensed Consolidated Balance Sheets.
PSEG Power’s accounts receivable consist mainly of revenues from wholesale load contracts and capacity sales which are executed in the different ISO regions. PSEG Power also sells energy and ancillary services directly to ISOs and other counterparties. In the wholesale energy markets in which PSEG Power operates, payment for services rendered and products transferred are typically due within 30 days of delivery. As such, there is little credit risk associated with these receivables. PSEG Power did not record an allowance for credit losses for these receivables as of September 30, 2022 or December 31, 2021. PSEG Power monitors the status of its counterparties on an ongoing basis to assess whether there are any anticipated credit losses.
PSEG LI did not have any material contract balances as of September 30, 2022 and December 31, 2021.
Remaining Performance Obligations under Fixed Consideration Contracts
PSEG primarily records revenues as allowed by the guidance, which states that if an entity has a right to consideration from a customer in an amount that corresponds directly with the value to the customer of the entity’s performance completed to date, the entity may recognize revenue in the amount to which the entity has a right to invoice. PSEG has future performance obligations under contracts with fixed consideration as follows:
Capacity Revenues from the PJM Annual Base Residual and Incremental Auctions—The Base Residual Auction is generally conducted annually three years in advance of the operating period. The 2022/2023 auction was held in June 2021 and the 2023/2024 auction was held in June 2022. PSEG Power expects to realize the following average capacity prices resulting from the base and incremental auctions, including unit specific bilateral contracts for previously cleared capacity obligations.
Delivery Year$ per MW-DayMW Cleared
June 2022 to May 2023$973,300 
June 2023 to May 2024$493,700 
As previously stated, capacity transactions with ISOs are reported on a net basis dependent on PSEG Power’s monthly net sale
or purchase position through the individual ISOs.
Bilateral capacity contracts—Capacity obligations pursuant to contract terms through 2028 are anticipated to result in revenues totaling $41 million.
Amended OSA—In April 2022, PSEG LI entered into an amended OSA with LIPA. The OSA remains a 12-year services contract ending in 2025 with annual fixed and variable components. The fixed fee for the provision of services thereunder in 2022 is approximately $40 million and is updated each year based on the change in the Consumer Price Index.
Public Service Electric and Gas Company [Member]  
Revenue from Contract with Customer [Text Block] Revenues
Nature of Goods and Services
The following is a description of principal activities by which PSEG and its subsidiaries generate their revenues.
PSE&G
Revenues from Contracts with Customers
Electric and Gas Distribution and Transmission Revenues—PSE&G sells gas and electricity to customers under default commodity supply tariffs. PSE&G’s regulated electric and gas default commodity supply and distribution services are separate tariffs which are satisfied as the product(s) and/or service(s) are delivered to the customer. The electric and gas commodity and delivery tariffs are recurring contracts in effect until modified through the regulatory approval process as appropriate. Revenue is recognized over time as the service is rendered to the customer. Included in PSE&G’s regulated revenues are unbilled electric and gas revenues which represent the estimated amount customers will be billed for services rendered from the most recent meter reading to the end of the respective accounting period.
PSE&G’s transmission revenues are earned under a separate tariff using a FERC-approved annual formula rate mechanism. The performance obligation of transmission service is satisfied and revenue is recognized as it is provided to the customer. The formula rate mechanism provides for an annual filing of an estimated revenue requirement with rates effective January 1 of each year and a true-up to that estimate based on actual revenue requirements. The true-up mechanism is an alternative revenue which is outside the scope of revenue from contracts with customers.
Other Revenues from Contracts with Customers
Other revenues from contracts with customers, which are not a material source of PSE&G revenues, are generated primarily from appliance repair services and solar generation projects. The performance obligations under these contracts are satisfied and revenue is recognized as control of products is delivered or services are rendered.
Payment for services rendered and products transferred are typically due on average within 30 days of delivery.
Revenues Unrelated to Contracts with Customers
Other PSE&G revenues unrelated to contracts with customers are derived from alternative revenue mechanisms recorded pursuant to regulatory accounting guidance. These revenues, which include the Conservation Incentive Program (CIP), green energy program true-ups and transmission formula rate true-ups, are not a material source of PSE&G revenues.
Other
Revenues from Contracts with Customers
Electricity and Related Products—PSEG Power sells to the Independent System Operators (ISOs) energy and ancillary services which are separately transacted in the day-ahead or real-time energy markets. The energy and ancillary services performance obligations are typically satisfied over time as delivered and revenue is recognized accordingly. In addition, wholesale load contracts have been executed in the different ISO regions for the bundled supply of energy, capacity, renewable energy credits and ancillary services representing PSEG Power’s performance obligations. Revenue for these contracts is recognized over time as the bundled service is provided to the customer. Transaction terms generally run from several months to three years. PSEG generally reports electricity sales and purchases conducted with those individual ISOs net on an hourly basis in either Operating Revenues or Energy Costs in its Condensed Consolidated Statements of Operations. The classification depends on the net hourly activity.
PSEG Power enters into capacity sales and capacity purchases through the ISOs. The transactions are reported on a net basis dependent on PSEG Power’s monthly net sale or purchase position through the individual ISOs. The performance obligations with the ISOs are satisfied over time upon delivery of the capacity and revenue is recognized accordingly. In addition to capacity sold through the ISOs, PSEG Power sells capacity through bilateral contracts and the related revenue is reported on a gross basis and recognized over time upon delivery of the capacity.
PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants have been awarded Zero Emission Certificates (ZECs) by the BPU through May 2025. These nuclear plants are expected to receive ZEC revenue from the electric distribution companies (EDCs) in New Jersey. PSEG Power recognizes revenue when the units generate electricity, which is when the performance obligation is satisfied. These revenues are included in PJM Sales in the following tables. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments for additional information.
Gas Contracts—PSEG Power sells wholesale natural gas, primarily through an index based full-requirements Basic Gas Supply Service (BGSS) contract with PSE&G to meet the gas supply requirements of PSE&G’s customers. The BGSS contract remains in effect unless terminated by either party with a two-year notice. Based upon the availability of natural gas, storage and pipeline capacity beyond PSE&G’s daily needs, PSEG Power also sells gas and pipeline capacity to other counterparties under bilateral contracts. The performance obligation is primarily the delivery of gas which is satisfied over time. Revenue is recognized as gas is delivered or pipeline capacity is released.
PSEG LI Contract—PSEG LI has a contract with LIPA which generates revenues. PSEG LI’s subsidiary, Long Island Electric Utility Servco, LLC (Servco) records costs which are recovered from LIPA and records the recovery of those costs as revenues when Servco is a principal in the transaction.
Other Revenues from Contracts with Customers
Prior to the sale of Solar Source in June 2021, PSEG Power entered into bilateral contracts to sell solar power and solar renewable energy certificates (SRECs) from its solar facilities. Contract terms ranged from 15 to 30 years. The performance obligations were generally solar power and SRECs which were transferred to customers upon generation. Revenue was recognized upon generation of the solar power. These performance obligations were transferred as part of the sale of Solar Source. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments.
PSEG Power has entered into long-term contracts with LIPA for energy management and fuel procurement services. Revenue is recognized over time as services are rendered.
Revenues Unrelated to Contracts with Customers
PSEG Power’s revenues unrelated to contracts with customers include electric, gas and certain energy-related transactions accounted for in accordance with Derivatives and Hedging accounting guidance. See Note 13. Financial Risk Management Activities for further discussion. Prior to the sale of Solar Source, PSEG Power was also a party to solar contracts that qualified as leases and were accounted for in accordance with lease accounting guidance. These performance obligations were transferred as part of the sale of Solar Source. See Note 4. Early Plant Retirements/Asset Dispositions and Impairments.
Energy Holdings generates lease revenues which are recorded pursuant to lease accounting guidance.
Disaggregation of Revenues
PSE&GOther (A)EliminationsConsolidated
Millions
Three Months Ended September 30, 2022
Revenues from Contracts with Customers
Electric Distribution$1,282 $— $— $1,282 
Gas Distribution160 — — 160 
Transmission 400 — — 400 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 633 — 633 
Sales to Affiliates— 34 (34)— 
New York ISO
— — — — 
ISO New England
— — 
Gas Sales
Third-Party Sales
— 144 — 144 
Sales to Affiliates
— 77 (77)— 
Other Revenues from Contracts with Customers (B)94 160 (3)251 
Total Revenues from Contracts with Customers1,936 1,052 (114)2,874 
Revenues Unrelated to Contracts with Customers (C)17 (619)— (602)
Total Operating Revenues$1,953 $433 $(114)$2,272 
PSE&GOther (A)EliminationsConsolidated
Millions
Nine Months Ended September 30, 2022
Revenues from Contracts with Customers
Electric Distribution$2,838 $— $— $2,838 
Gas Distribution1,524 — (1)1,523 
Transmission 1,188 — — 1,188 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 1,690 — 1,690 
Sales to Affiliates— 125 (125)— 
New York ISO
— 88 — 88 
ISO New England
— 93 — 93 
Gas Sales
Third-Party Sales
— 357 — 357 
Sales to Affiliates
— 805 (805)— 
Other Revenues from Contracts with Customers (B)273 456 (4)725 
Total Revenues from Contracts with Customers5,823 3,614 (935)8,502 
Revenues Unrelated to Contracts with Customers (C)82 (1,923)— (1,841)
Total Operating Revenues$5,905 $1,691 $(935)$6,661 
PSE&GOther (A)EliminationsConsolidated
Millions
Three Months Ended September 30, 2021
Revenues from Contracts with Customers
Electric Distribution$1,181 $— $— $1,181 
Gas Distribution142 — (4)138 
Transmission 409 — — 409 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 622 — 622 
Sales to Affiliates— 65 (65)— 
New York ISO
— 69 — 69 
ISO New England
— 49 — 49 
Gas Sales
Third-Party Sales— 47 — 47 
Sales to Affiliates— 58 (58)— 
Other Revenues from Contracts with Customers (B)80 164 — 244 
Total Revenues from Contracts with Customers1,812 1,074 (127)2,759 
Revenues Unrelated to Contracts with Customers (C)(864)— (856)
Total Operating Revenues$1,820 $210 $(127)$1,903 
PSE&GOther (A)EliminationsConsolidated
Millions
Nine Months Ended September 30, 2021
Revenues from Contracts with Customers
Electric Distribution$2,653 $— $— $2,653 
Gas Distribution1,294 — (9)1,285 
Transmission 1,213 — — 1,213 
Electricity and Related Product Sales
 PJM
Third-Party Sales
— 1,501 — 1,501 
Sales to Affiliates— 215 (215)— 
New York ISO
— 166 — 166 
ISO New England
— 118 — 118 
Gas Sales
Third-Party Sales
— 135 — 135 
Sales to Affiliates
— 578 (578)— 
Other Revenues from Contracts with Customers (B)236 472 (2)706 
Total Revenues from Contracts with Customers5,396 3,185 (804)7,777 
Revenues Unrelated to Contracts with Customers (C)11 (1,122)— (1,111)
Total Operating Revenues$5,407 $2,063 $(804)$6,666 
(A)Other consists of revenues at PSEG Power, Energy Holdings and PSEG LI.
(B)Includes primarily revenues from appliance repair services and the sale of SRECs at auction at PSE&G, PSEG Power’s energy management fee with LIPA and PSEG LI’s OSA with LIPA in Other. Other also includes PSEG Power’s solar power projects in 2021.
(C)Includes alternative revenues at PSE&G primarily from the CIP program in 2022 and derivative contracts and lease contracts in 2022 and 2021 in Other.
Contract Balances
PSE&G
PSE&G did not have any material contract balances (rights to consideration for services already provided or obligations to provide services in the future for consideration already received) as of September 30, 2022 and December 31, 2021. Substantially all of PSE&G’s accounts receivable and unbilled revenues result from contracts with customers that are priced at tariff rates. Allowances represented approximately 22% and 21% of accounts receivable (including unbilled revenues) as of September 30, 2022 and December 31, 2021, respectively.
Accounts ReceivableAllowance for Credit Losses
PSE&G’s accounts receivable, including unbilled revenues, is primarily comprised of utility customer receivables for the provision of electric and gas service and appliance services, and are reported on the balance sheet as gross outstanding amounts adjusted for an allowance for credit losses. The allowance for credit losses reflects PSE&G’s best estimate of losses on the account balances. The allowance is based on PSE&G’s projection of accounts receivable aging, historical experience, economic factors and other currently available evidence, including the estimated impact of the ongoing coronavirus (COVID-19) pandemic on the outstanding balances as of September 30, 2022. PSE&G’s electric bad debt expense is recoverable through its Societal Benefits Clause mechanism. As of September 30, 2022, PSE&G had a deferred balance of $131 million from electric bad debts recorded as a Regulatory Asset. In addition, PSE&G had deferred incremental gas bad debt expense of $62 million as a Regulatory Asset for future regulatory recovery due to the impact of the ongoing pandemic. See Note 6. Rate Filings for additional information.
The following provides a reconciliation of PSE&G’s allowance for credit losses for the three months and nine months ended September 30, 2022 and 2021:
Three Months Ended
September 30, 2022
Millions
Balance as of June 30, 2022$335 
Utility Customer and Other Accounts
Provision24 
Write-offs, net of Recoveries of $12 million
(35)
Balance as of September 30, 2022$324 
Nine Months Ended
September 30, 2022
Millions
Balance as of January 1, 2022$337 
Utility Customer and Other Accounts
Provision63 
Write-offs, net of Recoveries of $34 million
(76)
Balance as of September 30, 2022$324 
Three Months Ended
September 30, 2021
Millions
Balance as of June 30, 2021 $260 
Utility Customer and Other Accounts
Provision46 
Write-offs, net of Recoveries of $4 million
(19)
Balance as of September 30, 2021$287 
Nine Months Ended
September 30, 2021
Millions
Balance as of January 1, 2021$206 
Utility Customer and Other Accounts
Provision124 
Write-offs, net of Recoveries of $11 million
(43)
Balance as of September 30, 2021$287 
Other
PSEG Power generally collects consideration upon satisfaction of performance obligations, and therefore, PSEG Power had no material contract balances as of September 30, 2022 and December 31, 2021.
PSEG Power’s accounts receivable include amounts resulting from contracts with customers and other contracts which are out of scope of accounting guidance for revenues from contracts with customers. The majority of these accounts receivable are subject to master netting agreements. As a result, accounts receivable resulting from contracts with customers and receivables unrelated to contracts with customers are netted within Accounts Receivable and Accounts Payable on the Condensed Consolidated Balance Sheets.
PSEG Power’s accounts receivable consist mainly of revenues from wholesale load contracts and capacity sales which are executed in the different ISO regions. PSEG Power also sells energy and ancillary services directly to ISOs and other counterparties. In the wholesale energy markets in which PSEG Power operates, payment for services rendered and products transferred are typically due within 30 days of delivery. As such, there is little credit risk associated with these receivables. PSEG Power did not record an allowance for credit losses for these receivables as of September 30, 2022 or December 31, 2021. PSEG Power monitors the status of its counterparties on an ongoing basis to assess whether there are any anticipated credit losses.
PSEG LI did not have any material contract balances as of September 30, 2022 and December 31, 2021.
Remaining Performance Obligations under Fixed Consideration Contracts
PSEG primarily records revenues as allowed by the guidance, which states that if an entity has a right to consideration from a customer in an amount that corresponds directly with the value to the customer of the entity’s performance completed to date, the entity may recognize revenue in the amount to which the entity has a right to invoice. PSEG has future performance obligations under contracts with fixed consideration as follows:
Capacity Revenues from the PJM Annual Base Residual and Incremental Auctions—The Base Residual Auction is generally conducted annually three years in advance of the operating period. The 2022/2023 auction was held in June 2021 and the 2023/2024 auction was held in June 2022. PSEG Power expects to realize the following average capacity prices resulting from the base and incremental auctions, including unit specific bilateral contracts for previously cleared capacity obligations.
Delivery Year$ per MW-DayMW Cleared
June 2022 to May 2023$973,300 
June 2023 to May 2024$493,700 
As previously stated, capacity transactions with ISOs are reported on a net basis dependent on PSEG Power’s monthly net sale
or purchase position through the individual ISOs.
Bilateral capacity contracts—Capacity obligations pursuant to contract terms through 2028 are anticipated to result in revenues totaling $41 million.
Amended OSA—In April 2022, PSEG LI entered into an amended OSA with LIPA. The OSA remains a 12-year services contract ending in 2025 with annual fixed and variable components. The fixed fee for the provision of services thereunder in 2022 is approximately $40 million and is updated each year based on the change in the Consumer Price Index.