Commitments and Contingent Liabilities
12 Months Ended
Dec. 31, 2021
Other Commitments [Line Items]  
Commitments and Contingent Liabilities Commitments and Contingent Liabilities
Guaranteed Obligations
PSEG Power’s activities primarily involve the purchase and sale of energy and related products under transportation, physical, financial and forward contracts at fixed and variable prices. These transactions are with numerous counterparties and brokers that may require cash, cash-related instruments or guarantees as a form of collateral.
PSEG Power has unconditionally guaranteed payments to counterparties on behalf of its subsidiaries in commodity-related transactions in order to
support current exposure, interest and other costs on sums due and payable in the ordinary course of business, and
obtain credit.
PSEG Power is subject to
counterparty collateral calls related to commodity contracts of its subsidiaries, and
certain creditworthiness standards as guarantor under performance guarantees of its subsidiaries.
Under these agreements, guarantees cover lines of credit between entities and are often reciprocal in nature. The exposure between counterparties can move in either direction.
In order for PSEG Power to incur a liability for the face value of the outstanding guarantees,
its subsidiaries would have to fully utilize the credit granted to them by every counterparty to whom PSEG Power has provided a guarantee, and
the net position of the related contracts would have to be “out-of-the-money” (if the contracts are terminated, PSEG Power would owe money to the counterparties).
PSEG Power believes the probability of this result is unlikely. For this reason, PSEG Power believes that the current exposure at any point in time is a more meaningful representation of the potential liability under these guarantees. Current exposure consists of the net of accounts receivable and accounts payable and the forward value on open positions, less any collateral posted.
Changes in commodity prices can have a material impact on collateral requirements under such contracts, which are posted and received primarily in the form of cash and letters of credit. PSEG Power also routinely enters into futures and options transactions for electricity and natural gas as part of its operations. These futures contracts usually require a cash margin deposit with brokers, which can change based on market movement and in accordance with exchange rules.
In addition to the guarantees discussed above, PSEG Power has also provided payment guarantees to third parties and regulatory authorities on behalf of its affiliated companies. These guarantees support various other non-commodity related obligations.
The following table shows the face value of PSEG Power’s outstanding guarantees, current exposure and margin positions as of December 31, 2021 and 2020.
As of December 31, 2021As of December 31, 2020
 Millions
Face Value of Outstanding Guarantees$1,959 $1,792 
Exposure under Current Guarantees$176 $128 
Letters of Credit Margin Posted$80 $128 
Letters of Credit Margin Received$242 $45 
Cash Deposited and Received
Counterparty Cash Collateral Deposited$60 $— 
Counterparty Cash Collateral Received$(1)$(5)
Net Broker Balance Deposited (Received)$785 $59 
Additional Amounts Posted
Other Letters of Credit$67 $42 
As part of determining credit exposure, PSEG Power nets receivables and payables with the corresponding net fair values of energy contracts. See Note 18. Financial Risk Management Activities for further discussion. In accordance with PSEG’s accounting policy, where it is applicable, cash (received)/deposited is allocated against derivative asset and liability positions with the same counterparty on the face of the Consolidated Balance Sheet. The remaining balances of net cash (received)/deposited after allocation are generally included in Accounts Payable and Receivable, respectively.
In addition to amounts for outstanding guarantees, current exposure and margin positions, PSEG and PSEG Power have posted letters of credit to support PSEG Power’s various other non-energy contractual and environmental obligations. See the preceding table.
Environmental Matters
Passaic River
Lower Passaic River Study Area    
The U.S. Environmental Protection Agency (EPA) has determined that a 17-mile stretch of the Passaic River (Lower Passaic River Study Area (LPRSA)) in New Jersey is a “Superfund” site under the Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). PSE&G and certain of its predecessors conducted operations at properties in this area, including at one site that was transferred to PSEG Power.
Certain Potentially Responsible Parties (PRPs), including PSE&G and PSEG Power, formed a Cooperating Parties Group (CPG) and agreed to conduct a Remedial Investigation and Feasibility Study of the LPRSA. The CPG allocated, on an interim
basis, the associated costs among its members. The interim allocation is subject to change. In June 2019, the EPA conditionally approved the CPG’s Remedial Investigation. In September 2021, the EPA approved the CPG’s Feasibility Study (FS), which evaluated various adaptive management scenarios for the remediation of only the upper 9 miles of the LPRSA. In October 2021, the EPA announced a Record of Decision (ROD) outlining its selection of an adaptive management scenario for the upper 9 miles from the options presented in the FS (the Upper 9 ROD Remedy). Specifically, the Upper 9 ROD Remedy calls for dredging and capping contaminated sediments from certain areas of the upper 9 miles at an estimated cost of $550 million, and then assessing the results. Based on the results, the EPA may determine that additional remediation work will be required in the future. The cost estimates in the Upper 9 ROD Remedy are substantively identical to those in the proposed remediation plan that the EPA issued in April 2021. PSEG has previously adjusted its accrued liability based on the cost estimates in the proposed remediation plan, so no additional accrual adjustment is warranted for the Upper 9 ROD Remedy.
Separately, the EPA has released a ROD for the LPRSA’s lower 8.3 miles that requires the removal of sediments at an estimated cost of $2.3 billion (the Lower 8.3 ROD Remedy). An EPA-commenced process to allocate the associated costs is underway and PSEG cannot predict the outcome. The allocation does not address certain costs incurred by the EPA for which they may be entitled to reimbursement and which may be material. Occidental Chemical Corporation, one of the PRPs, has commenced the design of the Lower 8.3 ROD Remedy, but declined to participate in the allocation process. Instead, it filed suit against PSE&G and others seeking cost recovery and contribution under CERCLA but has not quantified alleged damages. The litigation is ongoing and PSEG cannot predict the outcome.
Two PRPs, Tierra Solutions, Inc. (Tierra) and Maxus Energy Corporation (Maxus), have filed for Chapter 11 bankruptcy. The trust representing the creditors in this proceeding has filed a complaint asserting claims against Tierra’s and Maxus’ current and former parent entities, among others. Any damages awarded may be used to fund the remediation of the LPRSA.
As of December 31, 2021, PSEG has approximately $66 million accrued for this matter. PSE&G has an Environmental Costs Liability of $53 million and a corresponding Regulatory Asset based on its continued ability to recover such costs in its rates. PSEG Power has an Other Noncurrent Liability of $13 million.
The outcome of this matter is uncertain, and until (i) a final remedy for the entire LPRSA is selected and an agreement is reached by the PRPs to fund it, (ii) PSE&G’s and PSEG Power’s respective shares of the costs are determined, and (iii) PSE&G’s ability to recover the costs in its rates is determined, it is not possible to predict this matter’s ultimate impact on PSEG’s financial statements. It is possible that PSE&G and PSEG Power will record additional costs beyond what they have accrued, and that such costs could be material, but PSEG cannot at the current time estimate the amount or range of any additional costs.
Natural Resource Damage Claims
New Jersey and certain federal regulators have alleged that PSE&G, PSEG Power and 56 other PRPs may be liable for natural resource damages within the LPRSA. In particular, PSE&G, PSEG Power and other PRPs received notice from federal regulators of the regulators’ intent to move forward with a series of studies assessing potential damages to natural resources at the Diamond Alkali Superfund Site, which includes the LPRSA and the Newark Bay Study Area. PSE&G and PSEG Power are unable to estimate their respective portions of any possible loss or range of loss related to this matter.
Newark Bay Study Area
The EPA has established the Newark Bay Study Area, which is an extension of the LPRSA and includes Newark Bay and portions of surrounding waterways. The EPA has notified PSEG and 11 other PRPs of their potential liability. PSE&G and PSEG Power are unable to estimate their respective portions of any loss or possible range of loss related to this matter. In December 2018, PSEG Power completed the sale of the site of the Hudson electric generating station. PSEG Power contractually transferred all land rights and structures on the Hudson site to a third-party purchaser, along with the assumption of the environmental liabilities for the site.
MGP Remediation Program
PSE&G is working with the New Jersey Department of Environmental Protection (NJDEP) to assess, investigate and remediate environmental conditions at its former MGP sites. To date, 38 sites requiring some level of remedial action have been identified. Based on its current studies, sites requiring some level of remedial action have been identified. Based on its current studies, PSE&G has determined that the estimated cost to remediate all MGP sites to completion could range between $220 million and $249 million on an undiscounted basis, including its $53 million share for the Passaic River as discussed above. Since no amount within the range is considered to be most likely, PSE&G has recorded a liability of $220 million as of December 31, 2021. Of this amount, $33 million was recorded in Other Current Liabilities and $187 million was reflected as Environmental Costs in Noncurrent Liabilities. PSE&G has recorded a $220 million Regulatory Asset with respect to these costs. PSE&G periodically updates its studies taking into account any new regulations or new information which could impact future remediation costs and adjusts its recorded liability accordingly. PSE&G completed sampling in the Passaic River in 2020
to delineate coal tar from certain MGP sites that abut the Passaic River Superfund site. PSEG cannot determine at this time the magnitude of any impact on the Passaic River Superfund remedy.
CWA Section 316(b) Rule
The EPA’s CWA Section 316(b) rule establishes requirements for the regulation of cooling water intakes at existing power plants and industrial facilities with a design flow of more than two million gallons of water per day. The EPA requires that National Pollutant Discharge Elimination System permits be renewed every five years and that each state Permitting Director manage renewal permits for its respective power generation facilities on a case by case basis. The NJDEP manages the permits under the New Jersey Pollutant Discharge Elimination System (NJPDES) program. Connecticut and New York also have permits to manage their respective pollutant discharge elimination system programs.
In June 2016, the NJDEP issued a final NJPDES permit for Salem. In July 2016, the Delaware Riverkeeper Network (Riverkeeper) filed an administrative hearing request challenging certain conditions of the permit, including the NJDEP’s application of the 316(b) rule. If the Riverkeeper’s challenge is successful, PSEG Power may be required to incur additional costs to comply with the CWA. Potential cooling water and/or service water system modification costs could be material and could adversely impact the economic competitiveness of this facility. The NJDEP granted the hearing request but no hearing date has been established.
Jersey City, New Jersey Subsurface Feeder Cable Matter
In October 2016, a discharge of dielectric fluid from subsurface feeder cables located in the Hudson River near Jersey City, New Jersey, was identified and reported to the NJDEP. The feeder cables are located within a subsurface easement granted to PSE&G by the property owners, Newport Associates Development Company (NADC) and Newport Associates Phase I Developer Limited Partnership. The feeder cables are subject to agreements between PSE&G and Consolidated Edison Company of New York, Inc. (Con Edison) and are jointly owned by PSE&G and Con Edison. The impacted cable was repaired in September 2017. A federal response was initially led by the U.S. Coast Guard. The U.S. Coast Guard transitioned control of the federal response to the EPA, and the EPA ended the federal response to the matter in 2018. The investigation of small amounts of residual dielectric fluid believed to be contained with the marina sediment is ongoing as part of the NJDEP site remediation program. In August 2020, PSE&G finalized a settlement with the federal government regarding the reimbursement of costs associated with the federal response to this matter and payment of civil penalties of an immaterial amount.
A lawsuit in federal court is pending to determine ultimate responsibility for the costs to address the leak among PSE&G, Con Edison and NADC. In addition, Con Edison filed counter claims against PSE&G and NADC, including seeking injunctive relief and damages. Based on the information currently available and depending on the outcome of the federal court action, PSE&G’s portion of the costs to address the leak may be material; however, PSE&G anticipates that it will recover its costs, other than civil penalties, through regulatory proceedings.
BGS, BGSS and ZECs
Each year, PSE&G obtains its electric supply requirements through annual New Jersey BGS auctions for two categories of customers that choose not to purchase electric supply from third-party suppliers. The first category is residential and smaller commercial and industrial customers (BGS-Residential Small Commercial Pricing (RSCP)). The second category is larger customers that exceed a BPU-established load (kW) threshold (BGS-Commercial and Industrial Energy Pricing (CIEP)). Pursuant to applicable BPU rules, PSE&G enters into the Supplier Master Agreements with the winners of these RSCP and CIEP BGS auctions to purchase BGS for PSE&G’s load requirements. The winners of the RSCP and CIEP auctions have been responsible for fulfilling all the requirements of a PJM load-serving entity including the provision of capacity, energy, ancillary services, transmission and any other services required by PJM. BGS suppliers assume all volume risk and customer migration risk and must satisfy New Jersey’s renewable portfolio standards. Beginning with the 2021 BGS auction, transmission became the responsibility of the New Jersey EDCs, and is no longer a component of the BGS auction product for either the RSCP or CIEP auctions. BGS suppliers serving load from the 2018, 2019 and 2020 BGS auctions had the option to transfer the transmission obligation to the New Jersey EDCs as of February 2021. Suppliers that did so had their total BGS payment from the EDCs reduced to reflect the transfer of the transmission obligation to the EDCs.
The BGS-CIEP auction is for a one-year supply period from June 1 to May 31 with the BGS-CIEP auction price measured in dollars per MW-day for capacity. The final price for the BGS-CIEP auction year commencing June 1, 2022 is $276.26 per MW-day, replacing the BGS-CIEP auction year price ending May 31, 2022 of $351.06 per MW-day. Energy for BGS-CIEP is priced at hourly PJM locational marginal prices for the contract period.
PSE&G contracts for its anticipated BGS-RSCP load on a three-year rolling basis, whereby each year one-third of the load is procured for a three-year period. The contract prices in dollars per MWh for the BGS-RSCP supply, as well as the approximate load, are as follows:
 Auction Year 
 2019202020212022 
36-Month Terms EndingMay 2022May 2023May 2024May 2025(A) 
Load (MW)2,800 2,800 2,900 2,800 
$ per MWh$98.04$102.16$64.80$76.30
(A)Prices set in the 2022 BGS auction will become effective on June 1, 2022 when the 2019 BGS auction agreements expire.
PSE&G has a full-requirements contract with PSEG Power to meet the gas supply requirements of PSE&G’s gas customers. PSEG Power has entered into hedges for a portion of these anticipated BGSS obligations, as permitted by the BPU. The BPU permits PSE&G to recover the cost of gas hedging up to 115 billion cubic feet or 80% of its residential gas supply annual requirements through the BGSS tariff. Current plans call for PSEG Power to hedge on behalf of PSE&G approximately 70 billion cubic feet or 50% of its residential gas supply annual requirements. For additional information, see Note 26. Related-Party Transactions.
Pursuant to a process established by the BPU, New Jersey EDCs, including PSE&G, are required to purchase ZECs from eligible nuclear plants selected by the BPU. In April 2019, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were selected to receive ZEC revenue for approximately three years, through May 2022. In April 2021, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded ZECs for the three-year eligibility period starting June 2022. PSE&G has implemented a tariff to collect a non-bypassable distribution charge in the amount of $0.004 per KWh from its retail distribution customers to be used to purchase the ZECs from these plants. PSE&G will purchase the ZECs on a monthly basis with payment to be made annually following completion of each energy year. The legislation also requires nuclear plants to reapply for any subsequent three-year periods and allows the BPU to adjust prospective ZEC payments.
Minimum Fuel Purchase Requirements
PSEG Power’s nuclear fuel strategy is to maintain certain levels of uranium and to make periodic purchases to support such levels. As such, the commitments referred to in the following table may include estimated quantities to be purchased that deviate from contractual nominal quantities. PSEG Power’s nuclear fuel commitments cover approximately 100% of its estimated uranium, enrichment and fabrication requirements through 2022 and a significant portion through 2023 at Salem, Hope Creek and Peach Bottom.
PSEG Power has various multi-year contracts for natural gas and firm transportation and storage capacity for natural gas that are primarily used to meet its obligations to PSE&G.
As of December 31, 2021, the total minimum purchase requirements included in these commitments were as follows:
Fuel TypePSEG Power’s Share of Commitments through 2026
 Millions
Nuclear Fuel
Uranium$226 
Enrichment$331 
Fabrication$193 
Natural Gas (A)$1,266 
(A)Approximately $39 million of commitments related to natural gas were transferred with the sale of PSEG Power’s fossil generation plants in February 2022.
Pending FERC Matters
FERC has been conducting a non-public investigation of the Roseland-Pleasant Valley transmission project. In November 2021, FERC staff presented PSE&G with its non-public preliminary findings, alleging that PSE&G violated a FERC regulation. PSE&G disagrees with FERC staff’s allegations and believes it has factual and legal defenses that refute these allegations. PSE&G has the opportunity to respond to these preliminary findings. The matter is pending and the investigation is ongoing. We are unable to predict the outcome or estimate the range of possible loss related to this matter; however, depending on the success of PSE&G’s factual and legal arguments, the potential financial and other penalties that PSE&G may incur could be material to PSEG’s and PSE&G’s results of operations and financial condition.
Pending Tropical Storm Matter
Following the effects of Tropical Storm Isaias, the New York Attorney General (AG) initiated an inquiry into PSEG LI’s preparation and response to the storm. In addition, the Department of Public Service (DPS) within the New York State Public Service Commission launched an investigation of the State’s electric service providers’, including PSEG LI’s, preparation and response to the storm. The DPS issued an interim storm investigation report finding that PSEG LI violated its Emergency Response Plan and DPS Regulations, and recommended that LIPA consider taking various actions, including terminating or renegotiating the OSA. LIPA also issued a report with recommendations for improvements to PSEG LI’s structure and processes, and recommended that LIPA either renegotiate or terminate the OSA.
PSEG LI agreed with LIPA that it would fund approximately $7 million in claims by customers for food and medication spoilage costs incurred as a result of being without electric service during the storm.
In December 2020, LIPA filed a complaint against PSEG LI in New York State court alleging multiple breaches of the OSA in connection with PSEG LI’s preparation for and response to Tropical Storm Isaias seeking specific performance and $70 million in damages. In June 2021, LIPA and PSEG LI executed a non-binding term sheet, which is expected to guide amendments to the OSA. The term sheet includes several changes to the OSA, including shifting a portion of PSEG LI’s fixed revenues to incentive compensation and subjecting a portion of revenue to the potential imposition of penalties by the DPS due to certain performance failures by PSEG LI, and resolves all of LIPA’s claims related to Tropical Storm Isaias and the DPS investigation. An amended OSA based on the term sheet was agreed to by both parties and approved by the LIPA Board in December 2021. In January 2022, the New York AG approved the Amended OSA and it has been submitted to the New York Comptroller for approval, which approval must occur by April 1, 2022 (such date is subject to amendment by mutual agreement of PSEG LI and LIPA) in order for the Amended OSA to become binding and effective. Such approval would result in retroactive effectiveness to January 1, 2022 for purposes of compensation. The OSA contract term will continue through 2025, with a mutual option to extend for five years. No assurances can be given regarding obtaining the New York Comptroller approval and the closing of the inquiry by the AG.
In the event that the Amended OSA is not approved by the New York Comptroller on April 1, 2022, PSEG LI intends to vigorously defend itself with regard to the allegations in LIPA’s complaint alleging breaches of the OSA. A decision in this proceeding requiring specific performance or the payment of damages by PSEG LI or resulting in the termination of the OSA could have a material adverse effect on PSEG’s results of operations and financial condition.
BPU Audit of PSE&G
In September 2020, the BPU ordered the commencement of a comprehensive affiliate and management audit of PSE&G. It has been more than ten years since the BPU last conducted a management and affiliate audit of this kind of PSE&G, which is initiated periodically as required by New Jersey statutes/regulations. Phase 1 of the planned audit will review affiliate relations and cost allocation between PSE&G and its affiliates, including an analysis of the relationship between PSE&G and PSEG Energy Resources & Trade, LLC, a wholly owned subsidiary of PSEG Power over the past ten years, and between PSE&G and PSEG LI. Phase 2 will be a comprehensive management audit, which will address, among other things, executive management, corporate governance, system operations, human resources, cyber security, compliance with customer protection requirements and customer safety. The audit officially began in late May 2021 and is in the data collection phase. It is not possible at this time to predict the outcome of this matter.
Litigation
Sewaren 7 Construction
In June 2018, a complaint was filed in federal court in Newark, New Jersey against PSEG Fossil LLC, a wholly owned subsidiary of PSEG Power, regarding an ongoing dispute with Durr Mechanical Construction, Inc. (Durr), a contractor on the Sewaren 7 project. Among other things, Durr seeks damages of $93 million and alleges that PSEG Power withheld money owed to Durr and that PSEG Power’s intentional conduct led to the inability of Durr to obtain prospective contracts. PSEG Power intends to vigorously defend against these allegations. In January 2021, the court partially granted PSEG Power’s motion to dismiss certain claims, reducing the amount claimed to $68 million. In December 2018, Durr filed for Chapter 11 bankruptcy in the federal court in the Southern District of New York (SDNY). The SDNY bankruptcy court has allowed the New Jersey litigation to proceed. PSEG Power has accrued an amount related to outstanding invoices which does not reflect an assessment of claims and potential counterclaims in this matter. Due to its preliminary nature, PSEG Power cannot predict the outcome of this matter.
Other Litigation and Legal Proceedings
PSEG and its subsidiaries are party to various lawsuits in the ordinary course of business. In view of the inherent difficulty in predicting the outcome of such matters, PSEG and PSE&G generally cannot predict the eventual outcome of the pending
matters, the timing of the ultimate resolution of these matters, or the eventual loss, fines or penalties related to each pending matter.
In accordance with applicable accounting guidance, a liability is accrued when those matters present loss contingencies that are both probable and reasonably estimable. In such cases, there may be an exposure to loss in excess of any amounts accrued. PSEG will continue to monitor the matter for further developments that could affect the amount of the accrued liability that has been previously established.
Based on current knowledge, management does not believe that loss contingencies arising from pending matters, other than the matters described herein, could have a material adverse effect on PSEG’s, PSE&G’s or PSEG Power’s consolidated financial position or liquidity. However, in light of the inherent uncertainties involved in these matters, some of which are beyond PSEG’s control, and the large or indeterminate damages sought in some of these matters, an adverse outcome in one or more of these matters could be material to PSEG’s or PSE&G’s results of operations or liquidity for any particular reporting period.
Ongoing Coronavirus Pandemic
PSE&G, PSEG Power and PSEG LI are providing essential services during this national emergency related to the ongoing coronavirus (COVID-19) pandemic. The COVID-19 pandemic and associated government actions and economic effects continue to impact our businesses. PSEG and its subsidiaries have incurred additional expenses to protect our employees and customers, and PSE&G is experiencing significantly higher bad debts and lower cash collections from customers due to the moratorium on shutoffs for residential customers that has been extended through December 31, 2021. PSE&G has deferred the impact of these costs for future recovery. The potential future impact of the pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, could have risks that drive certain accounting considerations. The ultimate impact of the ongoing coronavirus pandemic is highly uncertain and cannot be predicted at this time.
Nuclear Insurance Coverages and Assessments
PSEG Power is a member of the joint underwriting association, American Nuclear Insurers (ANI), which provides nuclear liability insurance coverage at the Salem and Hope Creek site and the Peach Bottom site. The ANI policies are designed to satisfy the financial protection requirements outlined in the Price-Anderson Act, which sets the limit of liability for claims that could arise from an incident involving any licensed nuclear facility in the United States. The limit of liability per incident per site is composed of primary and excess layers. As of December 31, 2021, nuclear sites were required to purchase $450 million of primary liability coverage for each site (through ANI). The primary layer is supplemented by an excess layer, which is an industry self-insurance pool. In the event a nuclear site, which is part of the industry self-insurance pool, has a claim that exceeds the primary layer, each licensee would be assessed a prorated share of the excess layer. The excess layer limit is $13.1 billion. PSEG Power’s maximum aggregate assessment per incident is $433 million (based on PSEG Power’s ownership interests in Salem, Hope Creek and Peach Bottom) and its maximum aggregate annual assessment per incident is $65 million. If the damages exceed the limit of liability, Congress could impose further revenue-raising measures on the nuclear industry to pay claims. Further, a decision by the U.S. Supreme Court, not involving PSEG Power, held that the Price-Anderson Act did not preclude punitive damage awards based on state law claims.
PSEG Power is also a member of an industry mutual insurance company, Nuclear Electric Insurance Limited (NEIL), which provides the property, decontamination and decommissioning liability insurance at the Salem and Hope Creek site and the Peach Bottom site. NEIL also provides replacement power coverage through its accidental outage policy. NEIL policies may make retrospective premium assessments in the case of adverse loss experience. The current maximum aggregate annual retrospective premium obligation for PSEG Power is approximately $46 million. NEIL requires its members to maintain an investment grade credit rating or to ensure collectability of their annual retrospective premium obligation by providing a financial guarantee, letter of credit, deposit premium, or some other means of assurance. Certain provisions in the NEIL policies provide that the insurer may suspend coverage with respect to all nuclear units on a site without notice if the NRC suspends or revokes the operating license for any unit on that site, issues a shutdown order with respect to such unit or issues a confirmatory order keeping such unit down.
The ANI and NEIL policies all include coverage for claims arising out of acts of terrorism. However, NEIL policies are subject to an industry aggregate limit of $3.2 billion plus such additional amounts as NEIL recovers for such losses from reinsurance, indemnity and any other source applicable to such losses.
Public Service Electric and Gas Company  
Other Commitments [Line Items]  
Commitments and Contingent Liabilities Commitments and Contingent Liabilities
Guaranteed Obligations
PSEG Power’s activities primarily involve the purchase and sale of energy and related products under transportation, physical, financial and forward contracts at fixed and variable prices. These transactions are with numerous counterparties and brokers that may require cash, cash-related instruments or guarantees as a form of collateral.
PSEG Power has unconditionally guaranteed payments to counterparties on behalf of its subsidiaries in commodity-related transactions in order to
support current exposure, interest and other costs on sums due and payable in the ordinary course of business, and
obtain credit.
PSEG Power is subject to
counterparty collateral calls related to commodity contracts of its subsidiaries, and
certain creditworthiness standards as guarantor under performance guarantees of its subsidiaries.
Under these agreements, guarantees cover lines of credit between entities and are often reciprocal in nature. The exposure between counterparties can move in either direction.
In order for PSEG Power to incur a liability for the face value of the outstanding guarantees,
its subsidiaries would have to fully utilize the credit granted to them by every counterparty to whom PSEG Power has provided a guarantee, and
the net position of the related contracts would have to be “out-of-the-money” (if the contracts are terminated, PSEG Power would owe money to the counterparties).
PSEG Power believes the probability of this result is unlikely. For this reason, PSEG Power believes that the current exposure at any point in time is a more meaningful representation of the potential liability under these guarantees. Current exposure consists of the net of accounts receivable and accounts payable and the forward value on open positions, less any collateral posted.
Changes in commodity prices can have a material impact on collateral requirements under such contracts, which are posted and received primarily in the form of cash and letters of credit. PSEG Power also routinely enters into futures and options transactions for electricity and natural gas as part of its operations. These futures contracts usually require a cash margin deposit with brokers, which can change based on market movement and in accordance with exchange rules.
In addition to the guarantees discussed above, PSEG Power has also provided payment guarantees to third parties and regulatory authorities on behalf of its affiliated companies. These guarantees support various other non-commodity related obligations.
The following table shows the face value of PSEG Power’s outstanding guarantees, current exposure and margin positions as of December 31, 2021 and 2020.
As of December 31, 2021As of December 31, 2020
 Millions
Face Value of Outstanding Guarantees$1,959 $1,792 
Exposure under Current Guarantees$176 $128 
Letters of Credit Margin Posted$80 $128 
Letters of Credit Margin Received$242 $45 
Cash Deposited and Received
Counterparty Cash Collateral Deposited$60 $— 
Counterparty Cash Collateral Received$(1)$(5)
Net Broker Balance Deposited (Received)$785 $59 
Additional Amounts Posted
Other Letters of Credit$67 $42 
As part of determining credit exposure, PSEG Power nets receivables and payables with the corresponding net fair values of energy contracts. See Note 18. Financial Risk Management Activities for further discussion. In accordance with PSEG’s accounting policy, where it is applicable, cash (received)/deposited is allocated against derivative asset and liability positions with the same counterparty on the face of the Consolidated Balance Sheet. The remaining balances of net cash (received)/deposited after allocation are generally included in Accounts Payable and Receivable, respectively.
In addition to amounts for outstanding guarantees, current exposure and margin positions, PSEG and PSEG Power have posted letters of credit to support PSEG Power’s various other non-energy contractual and environmental obligations. See the preceding table.
Environmental Matters
Passaic River
Lower Passaic River Study Area    
The U.S. Environmental Protection Agency (EPA) has determined that a 17-mile stretch of the Passaic River (Lower Passaic River Study Area (LPRSA)) in New Jersey is a “Superfund” site under the Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). PSE&G and certain of its predecessors conducted operations at properties in this area, including at one site that was transferred to PSEG Power.
Certain Potentially Responsible Parties (PRPs), including PSE&G and PSEG Power, formed a Cooperating Parties Group (CPG) and agreed to conduct a Remedial Investigation and Feasibility Study of the LPRSA. The CPG allocated, on an interim
basis, the associated costs among its members. The interim allocation is subject to change. In June 2019, the EPA conditionally approved the CPG’s Remedial Investigation. In September 2021, the EPA approved the CPG’s Feasibility Study (FS), which evaluated various adaptive management scenarios for the remediation of only the upper 9 miles of the LPRSA. In October 2021, the EPA announced a Record of Decision (ROD) outlining its selection of an adaptive management scenario for the upper 9 miles from the options presented in the FS (the Upper 9 ROD Remedy). Specifically, the Upper 9 ROD Remedy calls for dredging and capping contaminated sediments from certain areas of the upper 9 miles at an estimated cost of $550 million, and then assessing the results. Based on the results, the EPA may determine that additional remediation work will be required in the future. The cost estimates in the Upper 9 ROD Remedy are substantively identical to those in the proposed remediation plan that the EPA issued in April 2021. PSEG has previously adjusted its accrued liability based on the cost estimates in the proposed remediation plan, so no additional accrual adjustment is warranted for the Upper 9 ROD Remedy.
Separately, the EPA has released a ROD for the LPRSA’s lower 8.3 miles that requires the removal of sediments at an estimated cost of $2.3 billion (the Lower 8.3 ROD Remedy). An EPA-commenced process to allocate the associated costs is underway and PSEG cannot predict the outcome. The allocation does not address certain costs incurred by the EPA for which they may be entitled to reimbursement and which may be material. Occidental Chemical Corporation, one of the PRPs, has commenced the design of the Lower 8.3 ROD Remedy, but declined to participate in the allocation process. Instead, it filed suit against PSE&G and others seeking cost recovery and contribution under CERCLA but has not quantified alleged damages. The litigation is ongoing and PSEG cannot predict the outcome.
Two PRPs, Tierra Solutions, Inc. (Tierra) and Maxus Energy Corporation (Maxus), have filed for Chapter 11 bankruptcy. The trust representing the creditors in this proceeding has filed a complaint asserting claims against Tierra’s and Maxus’ current and former parent entities, among others. Any damages awarded may be used to fund the remediation of the LPRSA.
As of December 31, 2021, PSEG has approximately $66 million accrued for this matter. PSE&G has an Environmental Costs Liability of $53 million and a corresponding Regulatory Asset based on its continued ability to recover such costs in its rates. PSEG Power has an Other Noncurrent Liability of $13 million.
The outcome of this matter is uncertain, and until (i) a final remedy for the entire LPRSA is selected and an agreement is reached by the PRPs to fund it, (ii) PSE&G’s and PSEG Power’s respective shares of the costs are determined, and (iii) PSE&G’s ability to recover the costs in its rates is determined, it is not possible to predict this matter’s ultimate impact on PSEG’s financial statements. It is possible that PSE&G and PSEG Power will record additional costs beyond what they have accrued, and that such costs could be material, but PSEG cannot at the current time estimate the amount or range of any additional costs.
Natural Resource Damage Claims
New Jersey and certain federal regulators have alleged that PSE&G, PSEG Power and 56 other PRPs may be liable for natural resource damages within the LPRSA. In particular, PSE&G, PSEG Power and other PRPs received notice from federal regulators of the regulators’ intent to move forward with a series of studies assessing potential damages to natural resources at the Diamond Alkali Superfund Site, which includes the LPRSA and the Newark Bay Study Area. PSE&G and PSEG Power are unable to estimate their respective portions of any possible loss or range of loss related to this matter.
Newark Bay Study Area
The EPA has established the Newark Bay Study Area, which is an extension of the LPRSA and includes Newark Bay and portions of surrounding waterways. The EPA has notified PSEG and 11 other PRPs of their potential liability. PSE&G and PSEG Power are unable to estimate their respective portions of any loss or possible range of loss related to this matter. In December 2018, PSEG Power completed the sale of the site of the Hudson electric generating station. PSEG Power contractually transferred all land rights and structures on the Hudson site to a third-party purchaser, along with the assumption of the environmental liabilities for the site.
MGP Remediation Program
PSE&G is working with the New Jersey Department of Environmental Protection (NJDEP) to assess, investigate and remediate environmental conditions at its former MGP sites. To date, 38 sites requiring some level of remedial action have been identified. Based on its current studies, sites requiring some level of remedial action have been identified. Based on its current studies, PSE&G has determined that the estimated cost to remediate all MGP sites to completion could range between $220 million and $249 million on an undiscounted basis, including its $53 million share for the Passaic River as discussed above. Since no amount within the range is considered to be most likely, PSE&G has recorded a liability of $220 million as of December 31, 2021. Of this amount, $33 million was recorded in Other Current Liabilities and $187 million was reflected as Environmental Costs in Noncurrent Liabilities. PSE&G has recorded a $220 million Regulatory Asset with respect to these costs. PSE&G periodically updates its studies taking into account any new regulations or new information which could impact future remediation costs and adjusts its recorded liability accordingly. PSE&G completed sampling in the Passaic River in 2020
to delineate coal tar from certain MGP sites that abut the Passaic River Superfund site. PSEG cannot determine at this time the magnitude of any impact on the Passaic River Superfund remedy.
CWA Section 316(b) Rule
The EPA’s CWA Section 316(b) rule establishes requirements for the regulation of cooling water intakes at existing power plants and industrial facilities with a design flow of more than two million gallons of water per day. The EPA requires that National Pollutant Discharge Elimination System permits be renewed every five years and that each state Permitting Director manage renewal permits for its respective power generation facilities on a case by case basis. The NJDEP manages the permits under the New Jersey Pollutant Discharge Elimination System (NJPDES) program. Connecticut and New York also have permits to manage their respective pollutant discharge elimination system programs.
In June 2016, the NJDEP issued a final NJPDES permit for Salem. In July 2016, the Delaware Riverkeeper Network (Riverkeeper) filed an administrative hearing request challenging certain conditions of the permit, including the NJDEP’s application of the 316(b) rule. If the Riverkeeper’s challenge is successful, PSEG Power may be required to incur additional costs to comply with the CWA. Potential cooling water and/or service water system modification costs could be material and could adversely impact the economic competitiveness of this facility. The NJDEP granted the hearing request but no hearing date has been established.
Jersey City, New Jersey Subsurface Feeder Cable Matter
In October 2016, a discharge of dielectric fluid from subsurface feeder cables located in the Hudson River near Jersey City, New Jersey, was identified and reported to the NJDEP. The feeder cables are located within a subsurface easement granted to PSE&G by the property owners, Newport Associates Development Company (NADC) and Newport Associates Phase I Developer Limited Partnership. The feeder cables are subject to agreements between PSE&G and Consolidated Edison Company of New York, Inc. (Con Edison) and are jointly owned by PSE&G and Con Edison. The impacted cable was repaired in September 2017. A federal response was initially led by the U.S. Coast Guard. The U.S. Coast Guard transitioned control of the federal response to the EPA, and the EPA ended the federal response to the matter in 2018. The investigation of small amounts of residual dielectric fluid believed to be contained with the marina sediment is ongoing as part of the NJDEP site remediation program. In August 2020, PSE&G finalized a settlement with the federal government regarding the reimbursement of costs associated with the federal response to this matter and payment of civil penalties of an immaterial amount.
A lawsuit in federal court is pending to determine ultimate responsibility for the costs to address the leak among PSE&G, Con Edison and NADC. In addition, Con Edison filed counter claims against PSE&G and NADC, including seeking injunctive relief and damages. Based on the information currently available and depending on the outcome of the federal court action, PSE&G’s portion of the costs to address the leak may be material; however, PSE&G anticipates that it will recover its costs, other than civil penalties, through regulatory proceedings.
BGS, BGSS and ZECs
Each year, PSE&G obtains its electric supply requirements through annual New Jersey BGS auctions for two categories of customers that choose not to purchase electric supply from third-party suppliers. The first category is residential and smaller commercial and industrial customers (BGS-Residential Small Commercial Pricing (RSCP)). The second category is larger customers that exceed a BPU-established load (kW) threshold (BGS-Commercial and Industrial Energy Pricing (CIEP)). Pursuant to applicable BPU rules, PSE&G enters into the Supplier Master Agreements with the winners of these RSCP and CIEP BGS auctions to purchase BGS for PSE&G’s load requirements. The winners of the RSCP and CIEP auctions have been responsible for fulfilling all the requirements of a PJM load-serving entity including the provision of capacity, energy, ancillary services, transmission and any other services required by PJM. BGS suppliers assume all volume risk and customer migration risk and must satisfy New Jersey’s renewable portfolio standards. Beginning with the 2021 BGS auction, transmission became the responsibility of the New Jersey EDCs, and is no longer a component of the BGS auction product for either the RSCP or CIEP auctions. BGS suppliers serving load from the 2018, 2019 and 2020 BGS auctions had the option to transfer the transmission obligation to the New Jersey EDCs as of February 2021. Suppliers that did so had their total BGS payment from the EDCs reduced to reflect the transfer of the transmission obligation to the EDCs.
The BGS-CIEP auction is for a one-year supply period from June 1 to May 31 with the BGS-CIEP auction price measured in dollars per MW-day for capacity. The final price for the BGS-CIEP auction year commencing June 1, 2022 is $276.26 per MW-day, replacing the BGS-CIEP auction year price ending May 31, 2022 of $351.06 per MW-day. Energy for BGS-CIEP is priced at hourly PJM locational marginal prices for the contract period.
PSE&G contracts for its anticipated BGS-RSCP load on a three-year rolling basis, whereby each year one-third of the load is procured for a three-year period. The contract prices in dollars per MWh for the BGS-RSCP supply, as well as the approximate load, are as follows:
 Auction Year 
 2019202020212022 
36-Month Terms EndingMay 2022May 2023May 2024May 2025(A) 
Load (MW)2,800 2,800 2,900 2,800 
$ per MWh$98.04$102.16$64.80$76.30
(A)Prices set in the 2022 BGS auction will become effective on June 1, 2022 when the 2019 BGS auction agreements expire.
PSE&G has a full-requirements contract with PSEG Power to meet the gas supply requirements of PSE&G’s gas customers. PSEG Power has entered into hedges for a portion of these anticipated BGSS obligations, as permitted by the BPU. The BPU permits PSE&G to recover the cost of gas hedging up to 115 billion cubic feet or 80% of its residential gas supply annual requirements through the BGSS tariff. Current plans call for PSEG Power to hedge on behalf of PSE&G approximately 70 billion cubic feet or 50% of its residential gas supply annual requirements. For additional information, see Note 26. Related-Party Transactions.
Pursuant to a process established by the BPU, New Jersey EDCs, including PSE&G, are required to purchase ZECs from eligible nuclear plants selected by the BPU. In April 2019, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were selected to receive ZEC revenue for approximately three years, through May 2022. In April 2021, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded ZECs for the three-year eligibility period starting June 2022. PSE&G has implemented a tariff to collect a non-bypassable distribution charge in the amount of $0.004 per KWh from its retail distribution customers to be used to purchase the ZECs from these plants. PSE&G will purchase the ZECs on a monthly basis with payment to be made annually following completion of each energy year. The legislation also requires nuclear plants to reapply for any subsequent three-year periods and allows the BPU to adjust prospective ZEC payments.
Minimum Fuel Purchase Requirements
PSEG Power’s nuclear fuel strategy is to maintain certain levels of uranium and to make periodic purchases to support such levels. As such, the commitments referred to in the following table may include estimated quantities to be purchased that deviate from contractual nominal quantities. PSEG Power’s nuclear fuel commitments cover approximately 100% of its estimated uranium, enrichment and fabrication requirements through 2022 and a significant portion through 2023 at Salem, Hope Creek and Peach Bottom.
PSEG Power has various multi-year contracts for natural gas and firm transportation and storage capacity for natural gas that are primarily used to meet its obligations to PSE&G.
As of December 31, 2021, the total minimum purchase requirements included in these commitments were as follows:
Fuel TypePSEG Power’s Share of Commitments through 2026
 Millions
Nuclear Fuel
Uranium$226 
Enrichment$331 
Fabrication$193 
Natural Gas (A)$1,266 
(A)Approximately $39 million of commitments related to natural gas were transferred with the sale of PSEG Power’s fossil generation plants in February 2022.
Pending FERC Matters
FERC has been conducting a non-public investigation of the Roseland-Pleasant Valley transmission project. In November 2021, FERC staff presented PSE&G with its non-public preliminary findings, alleging that PSE&G violated a FERC regulation. PSE&G disagrees with FERC staff’s allegations and believes it has factual and legal defenses that refute these allegations. PSE&G has the opportunity to respond to these preliminary findings. The matter is pending and the investigation is ongoing. We are unable to predict the outcome or estimate the range of possible loss related to this matter; however, depending on the success of PSE&G’s factual and legal arguments, the potential financial and other penalties that PSE&G may incur could be material to PSEG’s and PSE&G’s results of operations and financial condition.
Pending Tropical Storm Matter
Following the effects of Tropical Storm Isaias, the New York Attorney General (AG) initiated an inquiry into PSEG LI’s preparation and response to the storm. In addition, the Department of Public Service (DPS) within the New York State Public Service Commission launched an investigation of the State’s electric service providers’, including PSEG LI’s, preparation and response to the storm. The DPS issued an interim storm investigation report finding that PSEG LI violated its Emergency Response Plan and DPS Regulations, and recommended that LIPA consider taking various actions, including terminating or renegotiating the OSA. LIPA also issued a report with recommendations for improvements to PSEG LI’s structure and processes, and recommended that LIPA either renegotiate or terminate the OSA.
PSEG LI agreed with LIPA that it would fund approximately $7 million in claims by customers for food and medication spoilage costs incurred as a result of being without electric service during the storm.
In December 2020, LIPA filed a complaint against PSEG LI in New York State court alleging multiple breaches of the OSA in connection with PSEG LI’s preparation for and response to Tropical Storm Isaias seeking specific performance and $70 million in damages. In June 2021, LIPA and PSEG LI executed a non-binding term sheet, which is expected to guide amendments to the OSA. The term sheet includes several changes to the OSA, including shifting a portion of PSEG LI’s fixed revenues to incentive compensation and subjecting a portion of revenue to the potential imposition of penalties by the DPS due to certain performance failures by PSEG LI, and resolves all of LIPA’s claims related to Tropical Storm Isaias and the DPS investigation. An amended OSA based on the term sheet was agreed to by both parties and approved by the LIPA Board in December 2021. In January 2022, the New York AG approved the Amended OSA and it has been submitted to the New York Comptroller for approval, which approval must occur by April 1, 2022 (such date is subject to amendment by mutual agreement of PSEG LI and LIPA) in order for the Amended OSA to become binding and effective. Such approval would result in retroactive effectiveness to January 1, 2022 for purposes of compensation. The OSA contract term will continue through 2025, with a mutual option to extend for five years. No assurances can be given regarding obtaining the New York Comptroller approval and the closing of the inquiry by the AG.
In the event that the Amended OSA is not approved by the New York Comptroller on April 1, 2022, PSEG LI intends to vigorously defend itself with regard to the allegations in LIPA’s complaint alleging breaches of the OSA. A decision in this proceeding requiring specific performance or the payment of damages by PSEG LI or resulting in the termination of the OSA could have a material adverse effect on PSEG’s results of operations and financial condition.
BPU Audit of PSE&G
In September 2020, the BPU ordered the commencement of a comprehensive affiliate and management audit of PSE&G. It has been more than ten years since the BPU last conducted a management and affiliate audit of this kind of PSE&G, which is initiated periodically as required by New Jersey statutes/regulations. Phase 1 of the planned audit will review affiliate relations and cost allocation between PSE&G and its affiliates, including an analysis of the relationship between PSE&G and PSEG Energy Resources & Trade, LLC, a wholly owned subsidiary of PSEG Power over the past ten years, and between PSE&G and PSEG LI. Phase 2 will be a comprehensive management audit, which will address, among other things, executive management, corporate governance, system operations, human resources, cyber security, compliance with customer protection requirements and customer safety. The audit officially began in late May 2021 and is in the data collection phase. It is not possible at this time to predict the outcome of this matter.
Litigation
Sewaren 7 Construction
In June 2018, a complaint was filed in federal court in Newark, New Jersey against PSEG Fossil LLC, a wholly owned subsidiary of PSEG Power, regarding an ongoing dispute with Durr Mechanical Construction, Inc. (Durr), a contractor on the Sewaren 7 project. Among other things, Durr seeks damages of $93 million and alleges that PSEG Power withheld money owed to Durr and that PSEG Power’s intentional conduct led to the inability of Durr to obtain prospective contracts. PSEG Power intends to vigorously defend against these allegations. In January 2021, the court partially granted PSEG Power’s motion to dismiss certain claims, reducing the amount claimed to $68 million. In December 2018, Durr filed for Chapter 11 bankruptcy in the federal court in the Southern District of New York (SDNY). The SDNY bankruptcy court has allowed the New Jersey litigation to proceed. PSEG Power has accrued an amount related to outstanding invoices which does not reflect an assessment of claims and potential counterclaims in this matter. Due to its preliminary nature, PSEG Power cannot predict the outcome of this matter.
Other Litigation and Legal Proceedings
PSEG and its subsidiaries are party to various lawsuits in the ordinary course of business. In view of the inherent difficulty in predicting the outcome of such matters, PSEG and PSE&G generally cannot predict the eventual outcome of the pending
matters, the timing of the ultimate resolution of these matters, or the eventual loss, fines or penalties related to each pending matter.
In accordance with applicable accounting guidance, a liability is accrued when those matters present loss contingencies that are both probable and reasonably estimable. In such cases, there may be an exposure to loss in excess of any amounts accrued. PSEG will continue to monitor the matter for further developments that could affect the amount of the accrued liability that has been previously established.
Based on current knowledge, management does not believe that loss contingencies arising from pending matters, other than the matters described herein, could have a material adverse effect on PSEG’s, PSE&G’s or PSEG Power’s consolidated financial position or liquidity. However, in light of the inherent uncertainties involved in these matters, some of which are beyond PSEG’s control, and the large or indeterminate damages sought in some of these matters, an adverse outcome in one or more of these matters could be material to PSEG’s or PSE&G’s results of operations or liquidity for any particular reporting period.
Ongoing Coronavirus Pandemic
PSE&G, PSEG Power and PSEG LI are providing essential services during this national emergency related to the ongoing coronavirus (COVID-19) pandemic. The COVID-19 pandemic and associated government actions and economic effects continue to impact our businesses. PSEG and its subsidiaries have incurred additional expenses to protect our employees and customers, and PSE&G is experiencing significantly higher bad debts and lower cash collections from customers due to the moratorium on shutoffs for residential customers that has been extended through December 31, 2021. PSE&G has deferred the impact of these costs for future recovery. The potential future impact of the pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, could have risks that drive certain accounting considerations. The ultimate impact of the ongoing coronavirus pandemic is highly uncertain and cannot be predicted at this time.
Nuclear Insurance Coverages and Assessments
PSEG Power is a member of the joint underwriting association, American Nuclear Insurers (ANI), which provides nuclear liability insurance coverage at the Salem and Hope Creek site and the Peach Bottom site. The ANI policies are designed to satisfy the financial protection requirements outlined in the Price-Anderson Act, which sets the limit of liability for claims that could arise from an incident involving any licensed nuclear facility in the United States. The limit of liability per incident per site is composed of primary and excess layers. As of December 31, 2021, nuclear sites were required to purchase $450 million of primary liability coverage for each site (through ANI). The primary layer is supplemented by an excess layer, which is an industry self-insurance pool. In the event a nuclear site, which is part of the industry self-insurance pool, has a claim that exceeds the primary layer, each licensee would be assessed a prorated share of the excess layer. The excess layer limit is $13.1 billion. PSEG Power’s maximum aggregate assessment per incident is $433 million (based on PSEG Power’s ownership interests in Salem, Hope Creek and Peach Bottom) and its maximum aggregate annual assessment per incident is $65 million. If the damages exceed the limit of liability, Congress could impose further revenue-raising measures on the nuclear industry to pay claims. Further, a decision by the U.S. Supreme Court, not involving PSEG Power, held that the Price-Anderson Act did not preclude punitive damage awards based on state law claims.
PSEG Power is also a member of an industry mutual insurance company, Nuclear Electric Insurance Limited (NEIL), which provides the property, decontamination and decommissioning liability insurance at the Salem and Hope Creek site and the Peach Bottom site. NEIL also provides replacement power coverage through its accidental outage policy. NEIL policies may make retrospective premium assessments in the case of adverse loss experience. The current maximum aggregate annual retrospective premium obligation for PSEG Power is approximately $46 million. NEIL requires its members to maintain an investment grade credit rating or to ensure collectability of their annual retrospective premium obligation by providing a financial guarantee, letter of credit, deposit premium, or some other means of assurance. Certain provisions in the NEIL policies provide that the insurer may suspend coverage with respect to all nuclear units on a site without notice if the NRC suspends or revokes the operating license for any unit on that site, issues a shutdown order with respect to such unit or issues a confirmatory order keeping such unit down.
The ANI and NEIL policies all include coverage for claims arising out of acts of terrorism. However, NEIL policies are subject to an industry aggregate limit of $3.2 billion plus such additional amounts as NEIL recovers for such losses from reinsurance, indemnity and any other source applicable to such losses.