Exhibit 99


Forward-Looking Statement
Certain of the matters discussed in this report about our and our subsidiaries' future performance, including, without limitation, future revenues, earnings, strategies, prospects, consequences and all other statements that are
not purely historical constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements are subject to risks and uncertainties, which could
cause actual results to differ materially from those anticipated. Such statements are based on management's beliefs as well as assumptions made by and information currently available to management. When used herein, the
words “anticipate,” “intend,” “estimate,” “believe,” “expect,” “plan,” “should,” “hypothetical,” “potential,” “forecast,” “project,” variations of such words and similar expressions are intended to identify forward-looking
statements. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Other factors that could cause actual results to differ materially from those contemplated in any
forward-looking statements made by us herein are discussed in filings we make with the United States Securities and Exchange Commission (SEC), including our Annual Report on Form 10-K and subsequent reports on Form 10-
Q and Form 8-K and available on our website: http://www.pseg.com. These factors include, but are not limited to:
adverse changes in the demand for or the price of the capacity and energy that we sell into wholesale electricity markets,
adverse changes in energy industry law, policies and regulation, including market structures and a potential shift away from competitive markets toward subsidized market 
mechanisms, capacity market design, transmission planning and cost allocation rules, including how transmission projects are planned and who is permitted to build transmission
in the future, and reliability standards,
any inability of our transmission and distribution businesses to obtain adequate and timely rate relief and regulatory approvals from federal and state regulators,
changes in federal and state environmental regulations and enforcement that could increase our costs or limit our operations,
changes in nuclear regulation and/or general developments in the nuclear power industry, including various impacts from any accidents or incidents experienced at our facilities or by others in the industry, that
could limit operations of our nuclear generating units,
actions or activities at one of our nuclear units located on a multi-unit site that might adversely affect our ability to continue to operate that unit or other units located at the same site,
any inability to manage our energy obligations, available supply and risks,
adverse outcomes of any legal, regulatory or other proceeding, settlement, investigation or claim applicable to us and/or the energy industry, 
any deterioration in our credit quality or the credit quality of our counterparties, 
availability of capital and credit at commercially reasonable terms and conditions and our ability to meet cash needs,
changes in the cost of, or interruption in the supply of, fuel and other commodities necessary to the operation of our generating units,
delays in receipt of necessary permits and approvals for our construction and development activities,
delays or unforeseen cost escalations in our construction and development activities,
any inability to achieve, or continue to sustain, our expected levels of operating performance,
any equipment failures, accidents, severe weather events or other incidents that impact our ability to provide safe and reliable service to our customers, and any inability to obtain sufficient insurance coverage or
recover proceeds of insurance with respect to such events,
acts of terrorism, cybersecurity attacks or intrusions that could adversely impact our businesses,
increases in competition in energy supply markets as well as competition for certain transmission projects, 
any inability to realize anticipated tax benefits or retain tax credits,
challenges associated with recruitment and/or retention of a qualified workforce,
adverse performance of our decommissioning and defined benefit plan trust fund investments and changes in funding requirements, 
changes in technology, such as distributed generation and micro grids, and greater reliance on these technologies, and 
changes in customer behaviors, including increases in energy efficiency, net-metering and demand response.
All of the forward-looking statements made in this report are qualified by these cautionary statements and we cannot assure you that the results or developments anticipated by management will be realized or even if realized,
will have the expected consequences to, or effects on, us or our business prospects, financial condition or results of operations. Readers are cautioned not to place undue reliance on these forward-looking statements in
making any investment decision. Forward-looking statements made in this report apply only as of the date of this report. While we may elect to update forward-looking statements from time to time, we specifically disclaim
any obligation to do so, even if internal estimates change, unless otherwise required by applicable securities laws.
The forward-looking statements contained in this report are intended to qualify for the safe harbor provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934,
as amended.
2


3
GAAP Disclaimer
These materials and other financial releases can be found on the
pseg.com
website under the investor tab, or at http://investor.pseg.com/
PSEG presents Operating Earnings in addition to its Net Income reported in
accordance with accounting principles generally accepted in the United States
(GAAP). Operating Earnings is a non-GAAP financial measure that differs from
Net Income because it excludes gains or losses associated with Nuclear
Decommissioning Trust (NDT), Mark-to-Market (MTM) accounting, and other
material one-time items. PSEG presents Operating Earnings because
management believes that it is appropriate for investors to consider results
excluding these items in addition to the results reported in accordance with
GAAP. PSEG believes that the non-GAAP financial measure of Operating
Earnings provides a consistent and comparable measure of performance of its
businesses to help shareholders understand performance trends. This
information is not
intended to be viewed as an alternative to GAAP information.
The last slides in this presentation include a list of items excluded from Net
Income to reconcile to Operating Earnings, with a reference to those slides
included on each of the slides where the non-GAAP information appears.


PSEG OVERVIEW
VICE PRESIDENT
INVESTOR RELATIONS
Kathleen Lally
EXECUTIVE VICE PRESIDENT AND
CHIEF FINANCIAL OFFICER
Caroline Dorsa
CHAIRMAN, PRESIDENT AND
CHIEF EXECUTIVE OFFICER
Ralph Izzo


5
PSEG’s Strategy –
delivering results
Our businesses’
focus on cost-
effective, reliable operations yields
strong cash flow
We are funding growth-oriented
investments aligned with customer
needs and state energy policies
We are enhancing the competitiveness
of our environmentally well-positioned
generation business
The results of our financial strategy
support a credit profile capable of
meeting our corporate objectives
and providing sustained dividend
growth for our shareholders


6
Two complementary businesses
Strong asset platform, performing well and positioned for the future
ASSETS AND OPERATING EARNINGS ARE FOR THE YEAR ENDED 12/31/2013.
PSE&G AND POWER DO NOT ADD TO TOTAL DUE TO PARENT, PSEG LONG ISLAND AND ENERGY HOLDINGS ACTIVITY.
SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET INCOME TO RECONCILE
TO OPERATING EARNINGS.
.
Strategy:
Fuel diverse fleet is geographically
and environmentally well positioned, with
investments to enhance competitiveness
Value
Proposition:
Provides
substantial
free cash flow in current environment
and poised for price recovery 
Assets $12B
Operating Earnings $710M
Regional Competitive Generation
Strategy:
Positioned
to
meet
customers’
needs as we respond to state and federal
energy policy and economic growth objectives
Value
Proposition:
An
$11.3
billion
infrastructure program –
focused on
transmission –
that is expected to produce
double-digit rate base growth through 2016
Assets  $20B
Operating Earnings $612M
Electric & Gas Delivery
and Transmission
2013
2013


7
Delivering on commitments and pursuing
opportunities for growth
Operational
Excellence
Power:  Record 2013 output at Linden CCGT and Salem 2;
nuclear capacity factor greater than 90% for 9   straight year
PSE&G:  Mid-Atlantic Reliability Award (12   consecutive year)
PSEG Long Island:  Went “live”
on January 1, 2014
PSEG:  Cost-control benefits continue
Financial
Strength
Strong cash flows supported credit rating increases
Pension fully funded
Dividend increased
Disciplined
Investment
PSE&G
Transmission capital program execution and growth
Energy Strong infrastructure program underway
Solar 4 All Extension and Solar Loan III programs
Power:  Investments to enhance the fleet’s competitiveness –
130 MW Nuclear uprate, 150 MW CCGT uprate and efficiency improvement
th
th


8
Operating Earnings Mix 
Long term investment program has driven increased earnings
contribution from stable, regulated business
*SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/
NET INCOME TO RECONCILE TO OPERATING EARNINGS; DISCONTINUED OPERATIONS REFLECT
TEXAS.
E=ESTIMATE
**
2014
PERCENTS
USE
MIDPOINT
OF
EARNINGS
GUIDANCE.
Power’s
diverse fuel mix
and dispatch flexibility
continues to generate
earnings and free cash flow
PSE&G’s
investment
in
transmission has
diversified its asset base
and, coupled with other
investments
and cost controls,
supported compound
annual earnings growth of
~18% over  2009 –
2013
Operating Earnings* Contribution by Subsidiary (%)
PSE&G
Power
Other
$2.44
$2.58
$2.60 -
$2.75E
$3.12
$2.74
$3.09


9
Maintaining a robust capital program
focused on growth
PSEG 2014 -
2018E Capital Spending
$13.1 Billion
PSEG 2009 -
2013 Capital Spending
$11.3 Billion
NOTE:
POWER
2009–2013
ACTUALS
ARE
RESTATED
TO
INCLUDE
SOLAR
CAPITAL
SPEND.     
POWER
CAPITAL
SPENDING
EXCLUDES
NUCLEAR
FUEL.
E=ESTIMATE.
DATA AS OF MARCH 31, 2014.
Power
$1.6B
PSE&G
$11.3B
Power
$2.8B
PSE&G
$8.4B


10
PSEG’s business profile has been transformed
through significant growth in utility capital spending, and we have consistently
identified attractive opportunities for additional investment
3 YEAR AVERAGE PSE&G CAPITAL
SPENDING GREW AT A RATE OF
23% PER YEAR FROM 2008 -
2013
AVERAGE PSE&G CAPITAL SPENDING
FOR THE 3-YEAR PERIOD
ENDING IN BASE YEAR.
PSE&G TOTAL CAPITAL SPENDING
IN BASE YEAR.


11
Energy Strong Agreement reached with all parties
Agreement recognizes the benefits of system investments that prevent or shorten
outages
Supports $1.22 billion capital program over several years on reasonable terms:
$1 billion recovered through accelerated, rate recovery mechanism
-
$820 million Electric  
-
$400 million Gas 
Allows PSE&G to earn a 9.75% ROE on the $1 billion recovered on accelerated basis
Requires PSE&G to file a base rate case by November 2017
Approved by the NJBPU in May 2014
Over 100 New Jersey municipalities supported Energy Strong
Energy Strong agreement clears path for PSE&G to begin the initial phase of this
robust capital program
Energy
Strong
Agreement
recognizes
benefits
of
system
investments


12
PSEG
Power
Value-advantaged
through
asset
diversity,
fuel flexibility, location and installed environmental controls
2013
PERIOD
*
INCLUDES
NEW
JERSEY
COAL
UNITS
THAT
FUEL
SWITCH
TO
GAS.
Fuel Diversity
Total MW: 13,450
Energy Produced
Total GWh: 54,264
Energy Market Served
Total MW: 13,450
Load Following
Peaking
Base load
Gas
Pumped
Storage
Nuclear
Oil
Coal*
Solar


13
PSEG –
Year to Date 2014 Highlights
Operating Earnings YTD up 9% to $2.27 per share from $2.09 for YTD 2013
PSE&G on track to record double-digit growth in earnings on expanded capital
investment program
PSEG Power expected to earn at upper level of expectations for the full year
Narrowed 2014 full–year, operating earnings guidance to $2.60-$2.75 per share,
from $2.55-$2.75 per share prior
Executing on our capital program
Replacement of PSE&G’s gas cast-iron pipe underway as part of $1.22 billion
Energy Strong capital program
Major transmission projects under $6.8 billion capital program are on-time
and on-budget
Market developments
PJM proposed changes to its Reliability Price Mechanism, Demand Curve Adjustment
and pending Demand Response (DR) issues supportive of price formation


14
SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING
OPERATIONS/NET INCOME TO RECONCILE TO OPERATING EARNINGS.      
E = ESTIMATE.
$2.44
$2.58
$2.60 -
$2.75E
2014 operating earnings guidance narrowed; forecast full-year at upper end
of range, assuming normal weather and unit operations for rest of year
PSEG –
2014 Another Year of Growth


15
Balance Sheet Strength
2009
2013:
Reduced
risk
profile
and
transformed
business mix
Invested
$8.4
billion
in
PSE&G
Improved
credit
ratings
Monetized
and
de-risked
Holdings’
portfolio
2014
Forward:
Strong
cash
flows
and
increasingly
regulated business mix fully support:
PSE&G’s
$11.3
billion
approved
investment
program
through
2018
Opportunity for consistent
and
sustainable
dividend
growth
Additional
investment
capacity
to
deploy
in
opportunities
beyond
those
in
the
current
capital
plan
No
need
to
issue
equity


16
Investment opportunities exceeding $1 billion
Focused on providing our customers with access to low-cost gas
and cost-effective technologies that reduce emissions
as they also improve system reliability
Potential Investment
Description
Amount
($ Millions)
Bridgeport Harbor Station
New 450 MW CCGT Unit
$500 --
$700 
PSEG --
Long Island
Utility 2.0 Energy Efficiency Filing
$200 --
$345
Artificial Island
FERC 1000 Project*
$250 --
$300
PennEast Pipeline
Equity Interest
$100 --
$120
PSE&G Energy Efficiency
Program Extension
$100 --
$100
Total
$1,150-$1,565
*Artificial Island Project includes amount for related compensator which has been assigned to PSE&G.
INFORMATION AS OF NOVEMBER 11, 2014.


17
PSEG
Annual
Dividend
A
long
history
of
growth
and returning cash to shareholders with a financial position that
provides opportunity for consistent and sustained growth
Payout Ratio
70%
63%
66%
43%
44%
43%
44%
50%
58%
56%
55%*
PSEG Annual Dividend Rate 
*2014E PAYOUT RATIO REFLECTS THE MIDPOINT OF OPERATING EARNINGS GUIDANCE.  E=ESTIMATE
10-YEAR COMPOUND ANNUAL
RATE OF GROWTH 3.0%


18
Value Proposition
PSEG is positioned to expand its investment in PSE&G
projects that provide reasonable, risk-adjusted returns,
in ways that meet customer needs and state goals,
given strong cash flow of Power and growing cash
contribution from PSE&G.
PSEG will maintain a strong financial profile that
provides the opportunity to achieve our growth
objectives
and
maintains
our
track
record
of
returning
cash
to
shareholders.


PSE&G


20
PSE&G
strategy
Building a
sustainable
platform that
balances
reliability,
customer rates
and public
policy to ensure
growth at
reasonable
returns


21
PSE&G
is
the
largest
electric
and
gas
distribution
and
transmission utility company in New Jersey
*
WEATHER
NORMALIZED
-
ESTIMATED
ANNUAL
GROWTH
PER
YEAR
OVER
FORECAST
PERIOD.
**
SPECIFIC
PROJECTS
APPROVED
FOR
INCENTIVE
RATE
TREATMENT
WITH
ADDITIONAL
ROE.
Electric
Gas
Customers
Growth
(2009
2013)
2.2 Million
0.6%
1.8 Million
0.6%
Electric Sales and Gas Sold and Transported
41,286 GWh
3,813M
Therms
Projected
Annual
Load
Growth
(2014
2016)
0.6%*
0.5%*
Projected Annual Load Growth
Transmission
(2014
2016)
1.1%
Sales Mix
Residential
33%
60%
Commercial
57%
36%
Industrial
10%
4%
Transmission
Electric
Gas
Approved Rate of Return
11.68% ROE**
10.3% ROE
10.3% ROE
Renewables and Energy Efficiency
Approved Programs
2009-2013
Total
Program
Plan
Solar Loan Capacity
79 MW
178.5 MW
Solar 4 All  Capacity
79 MW
125 MW
Energy Efficiency Annual Electric savings
182  GWh
204 GWh
Energy Efficiency Annual Gas savings
5M Therms
6M Therms


22
12 time
Mid-Atlantic
ReliabilityOne
award winner
and Outstanding
Response to a
Major Event


23
PSE&G’s operating earnings grew ~18%      
per
year
over
the
5-year
period
with
increased
investment,
cost control and supportive rate mechanisms
*SEE
SLIDE
A
FOR
ITEMS
EXCLUDED
FROM
INCOME
FROM
CONTINUING
OPERATIONS/NET
INCOME
TO
RECONCILE
TO
OPERATING
EARNINGS.
PSE&G Operating Earnings* Per Share


24
Growth in rate base is driven by investments with
constructive recovery mechanisms
PSE&G Rate Base
PSE&G’s
rate base
has
grown
~9%
annualized
with investment
focused on
meeting
customers’
requirements


25
Successfully
worked
with
regulators
to develop multiple solutions for New Jersey’s energy and
economic development goals
Solar Loan I
2008
Solar Loan II
2009
Solar 4 All
2009
Solar Loan III
2013
Solar 4 All Ext
2013
RENEWABLES
creative solutions to install
solar generation:
$0.7B
Carbon
Abatement
2008
Energy Efficiency
2009
Demand Response
2009
Energy Efficiency Ext –
2011
ENERGY EFFICIENCY
assisting customers with
controlling energy usage: 
$0.3B
NJ Capital Infrastructure
Program 1 (CIP 1)
2009
NJ Capital Infrastructure
Program 2 (CIP 2)
2011
Energy Strong
2014
DISTRIBUTION
improving electric and gas
delivery infrastructure:
$1.0B
NOTE: SPENDING THROUGH 2013 UNLESS INDICATED OTHERWISE


26
A 60% increase to $11.3 billion, in our
5-year investment program, including Energy Strong
PSE&G’s Capital Expenditures
2013-2017E
$7.0 Billion
2014-2018E
$11.3 Billion
E = ESTIMATE.   DATA AS OF MARCH 31, 2014.


27
Energy Strong Agreement supports customers
needs in the aftermath of Superstorm Sandy
Settled with NJBPU Staff and all other parties in May 2014
for $1.22 billion; approved by the NJBPU in May 2014
Program addresses system resiliency and hardening by:
$620 million to raise, relocate or protect 29 switching and substations that
were damaged by water in recent storms
$350 million to replace and modernize 250 miles of low-pressure, cast
iron gas mains in or near flood areas
$100 million to create redundancy in the electric system, reducing outages
when damage occurs
$100 million to deploy smart grid technologies to better monitor
system
operations to increase our ability to more swiftly deploy repair
teams
$50 million to protect five natural gas metering stations and a liquefied
natural gas station affected by Sandy or located in flood zones


28
Over
70%
of
PSE&G’s
$11.3
billion
investment
program
will be recovered through contemporaneous mechanisms
Clause Recovery Mechanisms
Energy
Strong
/
Solar
/
Energy
Efficiency
FERC Formula Rates
Transmission
Traditional Recovery Mechanisms
Distribution Base Rates
E = ESTIMATE.   DATA AS OF MARCH 31, 2014.
2014-2018E PSE&G Capital Spending by Recovery Method
$11.3 Billion


29
The Energy Strong impact to customer bills is
expected to be fully offset
OUT-YEAR
BGS/BGSS,
SBC,
AND
DISTRIBUTION
RATES
HELD
CONSTANT
AT
CURRENT
2014
RATES.
RATES
RELATED
TO
ELECTRIC
RESTRUCTURING:
SECURITIZATION
(STC),
NON-UTILITY
GENERATION
CHARGE
(NGC),
&
TRANSITIONAL 
ENERGY
FACILITIES
ASSESSMENT
(TEFA),
ARE
REDUCED
TO
ZERO
BY
2017.
THE
RGGI
RECOVERY
CHARGE
(RRC),
SOLAR
PILOT
RECOVERY
CHARGE
(SPRC),
AND
CAPITAL
ECONOMIC
STIMULUS
INFRASTRUCTURE
INVESTMENT
PROGRAM
EXTENSION
(CIP
II)
BILL IMPACTS
ARE
INCLUDED
IN
THEIR
RESPECTIVE
GAS
AND
ELECTRIC
BARS
AND
FORECASTED
IN
OUT-
YEARS
BASED
UPON
LATEST ESTIMATE.
ENERGY
STRONG
BILL
IMPACTS
ARE
BASED
UPON
SETTLEMENT.
PSE&G’s Typical Average Residential Bill
Consumer
Price Index


PSE&G
TRANSMISSION


31
Transmission
represented
~36%
of
rate
base
at
YE
2013
up
from
~15%
at
YE
2009
Transmission
has
delivered,
and has grown
to represent 
~36% of rate
base
PSE&G’s Transmission Capital Expenditures


32
PSE&G’s existing major transmission
investment program remains on schedule and on budget
Major Transmission Projects
Project Roster
Approved
ROE
Inclusion
of CWIP in
Rate Base
100%
Recovery
of Costs
Due to
Abandonment
Project
Estimate
Up To
($ Millions)
Expected
In-service
Date
Susquehanna-Roseland
12.93%
$790
June 2014 /
June 2015
Northeast Grid Reliability
11.93%
$907
Jun-Dec
2015
North Central Reliability
11.68%
$390
Completed
Burlington–Camden 230kV
11.68%
$399
Completed
Mickleton–Gloucester–Camden 230kV
11.68%
$435
June 2015
Bergen—Linden Corridor 345kV
11.68%
$1,200
June 2018


33
Susquehanna-Roseland
consists
of
constructing
150 miles of 500kV circuit (46 miles in NJ) with two new 500kV
GIS switching stations at Roseland and Hopatcong
Project
Estimate
Up To*
Through
Year-end 2013
Expected
In-service Date
$790M
$661M
Phase 1 –
Completed
Phase 2 –
June 2015
PJM RTEP project b0489
ROE of 12.93% (including 1.25% incentive)
100% CWIP in rate base during development
100% recovery of prudently incurred costs due to abandonment
Customer Benefit: Improves reliability and reduces congestion
*PROJECT IS SHARED WITH PPL. PROJECT ESTIMATE REPRESENTS PSE&G’S CONSTRUCTION RESPONSIBILITY FOR THE NJ PORTION.    
Project Status:  The eastern part of line from Hopatcong to
Roseland, NJ in service April 2014; NJ construction planned to be
completed in Q3 2014.  PA portion outside plant construction in
progress.  Western portion in NJ and the PA portion is planned to go
in service June 2015. 


34
Northeast
Grid
Reliability
consists
of
upgrading approximately 50 overhead circuit miles of 138kV
transmission line to 230kV, constructing ~18 miles of new
underground 230kV lines, and converting/upgrading 12
existing stations to 230kV operation
Project Estimate
Up To
Through Year-end
2013
Expected
In-service Date
$907M
$228M
Jun -
Dec 2015
PJM RTEP project b1304
ROE of 11.93% (including 0.25% incentive)
100% CWIP in rate base during development
100% recovery of prudently incurred costs due to abandonment
Project estimate has increased ~$12M associated with hardening
related scope changes as a result of Superstorm Sandy
Customer Benefit: Improves reliability and increases transfer capability
Project Status: Nearing completion of engineering/design and
licensing/permitting phase.  Outside and inside plant construction
are in progress


35
North Central Reliability consists of upgrading
55 circuit miles of 138kV transmission line to 230kV, and
converting six existing stations to 230kV operation
Project Estimate
Up To
Through Year-end
2013
Expected
In-service Date
$390M
$349M
Completed
PJM RTEP project b1154
ROE of 11.68%
100% CWIP in rate base during development
100% recovery of prudently incurred costs due to abandonment
Project Status: In service April 2014
Customer Benefit: Improves power quality and increases transfer
capability


36
Burlington-Camden
230kV
consists
of
upgrading 37 circuit miles (30 miles of overhead and 7 miles of
underground) of 138kV transmission line to 230kV, converting
the existing stations to 230kV operation
Project
Estimate
Up To
Through Year-end
2013
Expected
In-service Date
$399M
$301M
Completed
PJM RTEP project b1156
ROE of 11.68%
100% CWIP in rate base during development
100% recovery of prudently incurred costs due to
abandonment
Project Status: In service April 2014
Customer Benefit: Addresses voltage reliability and
increases transfer capability


37
Mickleton-Gloucester-Camden
230kV
consists of upgrading 10 circuit miles of overhead transmission,
installing ~16 circuit miles of new 230kV underground, 10
circuit miles of new 230kV overhead, and
modifications/upgrades at five existing stations
Project Estimate
Up To
Through Year-end
2013
Expected
In-service Date
$435M
$122M
June 2015
PJM RTEP project b1398
ROE of 11.68%
100% CWIP in rate base during development
100% recovery of prudently incurred costs due to abandonment
Customer Benefit: Addresses thermal reliability and increases transfer
capability
Project Status: Major permitting & siting complete, outside and inside
plant construction in progress


38
Bergen-Linden
Corridor
is
a
recently
approved
project which will provide a double-circuit 345kV line to
maintain reliability
Project Estimate
Up To
Through Year-end
2013
Expected
Completion Date
$1,200M
-
June 2018
PJM RTEP project b2436
30 miles of underground cable
New ~ 23 miles
Reconductor (Upgrade of 138 to 345) ~7 miles
13 miles of double circuit overhead conductor (replacing
double circuit 138 with double circuit 345)
11 station upgrades to 345kV
Customer Benefit: Addresses thermal and short-circuit
reliability
Project Status: Engineering


39
Planned transmission spend of $6.8 billion
is driven by PJM reliability projects, 69kV conversions and
life-cycle replacement projects
PSE&G’s Transmission Capital Expenditures
E= ESTIMATE.    DATA AS OF MARCH 31, 2014.


40
PSE&G’s
processes
and
culture
are
the
foundation for project execution success
Diverse, well-rounded team
Culture with a focus for on-time, on-scope and on-budget
execution
Successful recruitment, development and retention
strategies
Strong unions and supplier relationships
Cradle to grave project execution organization
Processes designed to be scalable, repeatable and
improvable
Emphasis on best practices and lessons learned
sharing
Improvements driven by performance metric
management
Collaborative relationship with regulatory agencies
Innovative design and construction practices to minimize
environmental impacts
Robust environmental compliance system


41
PSE&G’s
demonstrated
ability
to
successfully
execute large
projects leaves us
well positioned to
pursue new
opportunities
Future RTEP as
identified by PJM
Near-term participation
in RTO competitive
open planning windows
PJM
MISO
NYISO
Participating in
competitive solicitations
under FERC 1000 --
Artificial Island
recommendation


42
PSE&G’s
2014
operating
earnings
to benefit from increased investment in transmission and
on-going cost control
*SEE SLIDE A FOR ITEMS EXCLUDED FROM NET INCOME TO RECONCILE TO
OPERATING EARNINGS.  E =ESTIMATE.  DATA AS OF MARCH 31, 2014.
PSE&G Operating Earnings*
($ Millions)


PSEG LONG ISLAND


44
PSEG was selected to operate Long Island Power
Authority’s (LIPA) electric transmission and distribution system
for 12 years starting in 2014
Pursuant
to
the
Operating
Services
Agreement
(OSA),
all
expenses
and
capital costs to operate the system are pre-funded by LIPA and passed
through to their customers
Compensation consists of a fixed fee and an incentive fee
Fixed compensation fee for 2014 with scheduled increases in 2015
and 2016
Starting in 2015 PSEG Energy Resources and Trading (ER&T) begins
managing fuel/energy contracts
PSEG Long Island expected to contribute $0.03 to operating earnings in 2014
increasing to $0.07 per share in 2016 including contribution at ER&T
Potential for an 8-year extension of the OSA


45
PSEG
Long
Island
commenced
operations
on January 1, 2014
Key elements of Operating Services Agreement
Increased PSEG
scope and control
Performance metrics
NY Department of
Public Service
oversight
Utility 2.0 –
Expanded program
filed ~$345 million
Use of PSEG brand
as PSEG Long Island
3-Year rate freeze
(2013-2015)
Early performance
Successful transition
to PSEG Long Island
Improved 
stakeholder
communications
Achieving reliability
and customer
satisfaction metrics


PSEG POWER


47
PSEG Power
strategy
Excellence in
operating our units
safely, reliably, cost-
competitively and in
an environmentally,
responsible manner


48
PSEG Power creating value by responding to
changing markets and regulations
Safety/Environmental Focus
Fleet Diversity/Efficiency
Focus
Financial/Economic
Focus
Regulatory Focus
Nuclear units operated at over 90%
capacity
factors
for
the
9
consecutive
year through 2013
Fleet diversity across the dispatch
curve and fuel types provide flexibility
to meet changing conditions
Linden CCGT and Salem 2 nuclear unit
achieved record output in 2013
“Getting the most out of
existing fleet”
Locational advantage
O&M control programs
have delivered a CAGR of
1.6% between 2009 and
2014
Sites offer competitive
advantage for expansion
Strong regulatory
performance
Industry leadership in the
changing business
environment
th


49
Financial
Strength
Disciplined
Investment
Operational
Excellence
Maximize value of existing generating
plants through implementation of the
Operational Excellence Model (OEM)
Workforce engagement and development
Deliver on Business Plan Commitments
Maintain competitive markets and improve
constituent
communication on issues    
important to Power
Successfully complete the Advanced Gas         
Path (AGP) uprates
Seek new opportunities in target markets        
(PJM, ISO-NE, NYISO)
Develop our renewables business (solar)
Maintain new nuclear option by successfully
managing the Early Site Permit (ESP) process
PSEG Power Delivering on priorities
OEM implemented and
achieving measures
Resource sharing program
initiated
Exceeded earnings guidance
in 2013
Ongoing effort in key markets
showing success
Successful court outcome
against subsidized generation
Accelerated schedule for
AGP to maximize opportunity
LIPA contract for fuel and generation
dispatch begins January 2015
New 13 MW Rockfish solar project
announced, established robust
pipeline
Nuclear ESP is expected in 2015


50
PSEG Power met 2013 challenges
Storm and
weather challenges
SuperStorm Sandy
impacted
our generating sites
Cold and hot weather
extremes created
challenging
operating
environment, but
also presented
opportunities
Market
challenges
Unit outages and
planned
transmission
outages resulted in
pressure on basis
Lower gas cost
impacted dark
spread pressuring
coal unit dispatch
Load impacted by
economy
Value
delivered
Optimized unit dispatch across fleet
during storm recovery
Expedited return from storm outages,
restored margin opportunities
High availability when needed
Achieved fuel cost savings
Captured value through coal/gas
switching, unit flexibility
Coal & oil sales optimized inventory
Flexibility of portfolio captured real-
time basis opportunities


51
PSEG Power exceeded 2013s earnings guidance
$630-$685M
$710M
$535-$600M
Winter/
Summer
Volatility
Lower
Gas
Cost
Basis
Volatility
Spark/
Dark
Spread
Fuel
Flexibility
SOLAR/
KALAELOA
$15M*
GUIDANCE
RANGE
Over $100M of additional
value gained from fleet
flexibility, locational
advantage and market
volatility
Initial
Guidance
Actual
Revised
Guidance
OPERATING EARNINGS FOR PSEG POWER IN 2013; SEE SLIDE A FOR ITEMS
EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET
INCOME TO RECONCILE TO OPERATING EARNINGS.  *ASSETS TRANSFERRED TO POWER AT YEAR-END 2013.


52
PSEG Power has generating assets
in three competitive markets
Assets near loads
Low cost portfolio
Fuel flexibility with gas
cost advantage
Poised to benefit from
volatility in real-time
markets
Fleet will maintain
diversity and efficiency
after HEDD
Most sites suitable for
expansion
ISO
New
England
New Haven
Bridgeport
Bethlehem Energy Center
(Albany)
Conemaugh
Keystone
Peach Bottom
Bergen
Kearny
Essex
Sewaren
Edison
Linden
Mercer
Burlington
National Park
Hudson
Hope Creek
Salem
Yards Creek
New York ISO
PJM


53
PSEG Power will maintain diversity and efficiency after a
realignment of the fleet due to HEDD
Maintain fuel diversity
Maintain load-serving
capability
Maintain low cost
structure
Environmental
improvement
Peach Bottom (PB)
uprate
Advanced Gas Path
(AGP)
Kalaeloa and Solar
transfer adds ~200MW
of capacity
Objective
2013
2017
13,450 MW
11,900 MW
Fuel Diversity
Energy Produced
55 -
56 TWh
54 TWh
E=ESTIMATE.


54
Power’s PJM assets along the dispatch curve reduce
the risk of serving full requirement load contracts and can take
advantage of volatile market conditions
Energy Revenue
X
X
X
Capacity Revenue
X
X
X
Ancillary Revenue
X
X
Dual Fuel
X
X
Illustrative
Salem
Hope
Creek
Keystone
Conemaugh
Hudson 2
Linden 1,2
Bergen 1
Mercer 1, 2
Bergen 2
Peach
Bottom
Burlington 8-9-11
Edison 1-2-3
Essex 10-11-12
Sewaren 6
Linden 5-8 / Essex 9
National Park
Salem 3
Bergen 3
Mercer 3
Sewaren 1-4
Burlington 12
Yards Creek
Base Load Units
Peaking Units
Load Following Units
Kearny 9-12-13-14
Nuclear
Coal
Coal/Gas
Combined Cycle
Steam
Combustion Turbine /
Pumped Storage
Base Load ensures cash flow certainty
Load Following provides ability to serve load shape
Peaking takes advantage of real-time prices and
reduces operational risk
Dual fuel flexibility for >60% of fleet


55
PSEG
Power
Nuclear
is
a
critical
element
of
our
success
Hope Creek
Operated by PSEG Nuclear
PSEG Ownership: 100%
Technology: Boiling Water
Reactor
Total Capacity: 1,178 MW
Owned Capacity:  1,178
MW
License Expiration: 2046
Next Refueling
Spring 2015
Salem
Units 1 and 2
Operated by PSEG Nuclear
PSEG Ownership:  57%
Technology: Pressurized Water
Reactor
Total Capacity: 2,365 MW
Owned Capacity: 1,358 MW
License Expiration: 2036
and 2040
Next Refueling
Unit 1 –
Spring 2016
Unit  2 --
Fall 2015
Peach Bottom
Units 2 and 3
Operated by Exelon
PSEG Ownership: 50%
Technology: Boiling Water
Reactor
Total Capacity: 2,251 MW
Owned Capacity:
1,125 MW
License Expiration: 2033
and 2034
Next Refueling
Unit 2 –
Spring 2016
Unit 3 –
Fall 2015
Uprate:  130 MW (PS Share)
Unit 2 -
2015/Unit 3 -
2016


56
PSEG Power Nuclear is core to the fleet and
has competitive advantages
*STRATEGY KNOWN AS THE “DIVERSE AND FLEXIBLE MITIGATION CAPABILITY”
OR FLEX, ADDRESSES
RECOMMENDATIONS OF THE NUCLEAR REGULATORY COMMISSION’S FUKUSHIMA TASK FORCE.
Continued strong nuclear operations:
nine consecutive years of >90% capacity
factor through 2013
Significant earnings contributor
Top quartile of cost performance/MWh
One third new staff, recruitment of the
best new and experienced talent, and
attractive training program
Fukushima action plan
in response to NRC staff review
FLEX* plan submitted with implementation
starting with Fall outage
Peach Bottom extended power
uprate, 130 MW Power’s share,
scheduled in service 2015/2016
Active and influential participation at
INPO, NEI, EPRI, USA Alliance


57
Power’s nuclear fleet is well positioned
with significantly lower-than-average US cost structure
*SOURCE: ELECTRIC UTILITY COST GROUP
** SOURCE: PSEG NUCLEAR
Total
Fuel,
Capital
and
O&M
Costs*
3 YEAR AVERAGE 2010 -
2012


58
PSEG Power’s Fossil Fleet Performance
has shown improvement
*LM6000 AND 7EA UNITS
Capacity Factor
NJ Coal EFORp
Peaking Start Success*
NJ Combined Cycle EFORp
Fossil Capacity Factor rebounded with market
Peaking Units maintain high start success
Coal EFORp improving
CC EFORp less than 1% in 2013
Consistent recipient of EFORp payments


59
PSEG Power
improvements
achieved in
combined cycle
fleet efficiency
Actions Taken to Create Value
Operational Excellence Model
Training programs
Unit testing initiative
Outage work to restore
efficiency
Second gas line at BEC
Heat rate improvement
2008-2013 translates to
meaningful fuel savings
at current market prices
Advanced Gas Path (AGP)
investments 2014 through
2018 to provide additional
fuel savings
Combined Cycle Operating Heat Rate
*E= ESTIMATE.


60
Investing to expand CCGT capacity and
improve efficiency
o
Expand Power’s CCGT fleet, one of the
largest gas-fired portfolios in PJM, with
incremental base and peaking MWs
o
Retrofit Bergen, Linden and BEC with
Advanced Gas Path (AGP) components
at
cost
of
~$120M
over
2014
-
2018
AGP Project Benefits 
PSEG Power -
CCGT Uprate Project
CCGT capacity uprates of ~150 MW:   
-
Linden (63 MW –
Completed)
-
Bergen (31 MW –
2015)
-
BEC (58 MW –
2017-2018)
Increases Efficiency -
Combined Cycle
(CC)
heat
rate
improvement
~
1.2%
Upgrades technology and extends
maintenance outage cycles


61
PSEG Power’s fleet is among the lowest
emitting in the industry
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2006
2007
2008
2009
2010
2011
2012
2013
Generation
SO2
NOx
Mercury reduced 80% across the timeframe above
More efficient testing and improved operational flexibility through utilization of Continuous
Emission Monitoring System testing
Cost control through testing coordination program


62
PSEG Power’s capital expenditures for
environmental requirements are essentially complete*
*BASED ON CURRENTLY KNOWN AND QUANTIFIABLE ENVIRONMENTAL REQUIREMENTS.  E=ESTIMATE. 
DATA  AS OF MARCH 31, 2014.


63
PSEG Power is well-positioned
for
growth
when market conditions warrant
Available locations
Our sites possess infrastructure advantages
Bergen
Burlington
Essex
Edison
Kearny
Hudson
Linden
Sewaren
Bridgeport
Harbor
Electric Transmission Interconnections
Access to Gas Pipelines
Space
Emissions


64
Shasta A & B
California (4 MW)
COD March 2014
Polycrystalline -
single axis
Investment $13 million
20 year PPAs with PG&E
Hackettstown  (Mars)
New Jersey (2 MW)
COD September 2009
Thin film panels –
fixed tilt
Investment $13 million
15 year PPA with Mars, Inc.
Wyandot
Ohio (12 MW)
COD May 2010
Thin film panels –
fixed tilt
Investment $45 million
20 year PPA with AEP
JEA
Florida (15 MW)
COD September 2010
Thin film panels –
fixed tilt
Investment $59 million
30 year PPA with JEA
Queen Creek
Arizona (25 MW)
COD October 2012
Polycrystalline -
single axis
Investment $79 million
20 year PPA with SRP
Milford
Delaware (15 MW)
COD December 2012
Polycrystalline -
fixed tilt
Investment $49 million
20 year PPA with DEMEC
Badger I
Arizona (19 MW)
COD November 2013
Polycrystalline -
single axis
Investment $50 million
30 year PPA with APS
PSEG Solar Source owns ~123 MW
of solar facilities with long term contracted revenues*
Newman
Texas (13 MW)
COD December 2014
Polycrystalline -
single axis
Investment $22 million
30 year PPA with El Paso Elec.
Whitcomb
Vermont (4 MW)
COD October 2014
Polycrystalline -
single axis
Investment $10 million
25 year PPA with VT Electric
Power Producers, Inc.
*PROJECT SIZE IN MEGAWATTS SHOWN IN DC (DIRECT CURRENT).  E=ESTIMATE.
In Construction –
Rockfish
Maryland (13 MW)
COD -
June 2015E
Polycrystalline -
single axis
20 year PPA with SMECO


PSEG POWER
ER&T


66
Portfolio Management Strategy
Optimize value of assets
Manage risk vs. reward
Directly engage with
regulatory agencies


67
PSEG Power:  Enjoys real and sustainable
advantages in the merchant generation space
Market Review
Gas, Power, Spark Spreads
Regulatory construct
PSEG’s Competitive Advantage
Fuel flexibility
Heat Rate diversity
Access to Marcellus Shale gas
Asset flexibility
PSEG’s Sustainable Advantage
Positive cash-flow hedging into the long-term
Robust capacity market pricing in most concentrated load pocket in US
Long-term access to discounted Marcellus gas


68
Market Review:
Long-term fundamentals remain sound
Market influenced by increased gas
supply and capacity retirements
Insufficient gas infrastructure
continues to place upward pressure on
fuel prices during seasonal peaks
Market liquidity remains weak beyond
2015
NYMEX Natural Gas Price
PJM West RTC
PJM West Spark Spreads
F = FORWARDS AS OF DECEMBER 17, 2014; 2014F INCLUDES HISTORY AND
FORWARDS. 


69
Market Review:
New generation in PJM not
keeping pace with coal retirements
Forecast Reserve Margin (PJM October 2014)
PJM
forecasts
a
declining
Reserve
Margin
through
2018,
which
may
improve
forward
prices
Brattle estimates energy prices could rise at least $3-4/MWh from today’s prices
*PJM AS OF DECEMBER 23, 2014
SOURCE OF CHART DATA:  PJM
Cumulative Generation Retirements*


70
Competitive Advantage:
Heat Rate Diversity &
Flexible Dispatch
Illustrative
Salem
Hope
Creek
Keystone
Conemaugh
Hudson 2
Linden 1,2
Bergen 1
Mercer 1, 2
Bergen 2
Peach
Bottom
Burlington 8-9-11
Edison 1-2-3
Essex 10-11-12
Sewaren 6
Linden 5-8 / Essex 9
National Park
Salem 3
Bergen 3
Mercer 3
Sewaren 1-4
Burlington 12
Yards Creek
Base Load Units
Peaking Units
Load Following Units
Kearny 9-12-13-14
Nuclear
Coal
Coal/Gas
Combined Cycle (gas/oil)
Steam (gas/oil)
Combustion Turbine / Pumped Storage
(gas/oil)
PJM Dispatch Curve


71
Competitive/Sustainable Advantage:
PSEG expanding supply of low-cost Marcellus gas
PSEG plans to invest $100 -
$120 million in
the to-be-constructed PennEast Pipeline, a
105.5 mile pipeline that would bring gas
from eastern Pennsylvania to New Jersey
PSEG ER&T would contract for approximately
125mmcf/day of PennEast’s 1 bcf/day
capacity under a 15-year contract; other
project sponsors have committed to offtake
~500mmcf/day
PSEG and its customers would benefit from
the displacement of higher-cost, Gulf Coast
gas supply
Targeted in-service date is November 2017
Proposed PennEast Pipeline Project


72
Industry infrastructure build through 2018
to meet demand growth
New England 1.4 bcf/d 
Southeast 6.5 bcf/d
Midwest 2.3 bcf/d
Gulf Coast  2.8 bcf/d
New investment
will increase pipeline
takeaway capacity
from low-cost
Marcellus and Utica
shale basins to
meet demand in the
South and Midwest
NJ/NY 1.4 bcf/d


73
Sustainable Advantage: Forward power curves
indicate PSEG Zone retains premium price
* MARKET AS OF DECEMBER 17, 2014
SOURCE: ICE/BROKER QUOTES
Growing importance of the winter peak has influenced PJM reliability planning
with supportive implications for price formation
Monthly Power Price Summary*


74
Competitive Advantage:
PSEG’s extensive gas
asset portfolio gives unparalleled access to Marcellus Shale gas


75
Competitive Advantage:
In 2014, ~40% of Power’s
gas for generation comes from Marcellus
Our Combined Cycle and Peaking assets have been able to take advantage of locational gas price
volatility driven by production and logistical constraints
Lower cost shale supply provides additional savings during periods of lower residential gas demand
Spot Natural Gas Prices:  June 2013 –
December 2014*
* AS OF DECEMBER 17, 2014


76
Competitive Advantage:
Locational advantage
from short term basis volatility
$37
-
$38
$39
-
$40
ANNUAL FORWARD (F) BASIS TO PJM-WEST AS OF DECEMBER 17, 2014,  2014F INCLUDES HISTORY AND FORWARDS.
Annual basis benefits baseload
units
Intermediate units flexible to
seasonal opportunities
Combined Cycle and Peaking units
positioned to optimize daily and
hourly volatility
PS Zone On Peak Annual Basis to PJM-W
PS Zone Day Ahead On Peak Monthly Basis to PJM-W
PS Zone Real Time On Peak Hourly Basis to PJM-W


77
Sustainable Advantage:
BGS Auction provides
excellent opportunity to forward hedge our generation
Capacity
Load shape
Transmission
Congestion
Ancillary services
Risk premium
Green
BGS sales account for about a quarter of our forward portfolio of hedges
3 Year Average
Round the Clock
PJM West
Forward Energy
Price
$/MWH; BGS PRICES REFLECT PSE&G ZONE; RESULTS FOR 2012-2014 ARE THE NEW BLENDED PRICES BEGINNING JUNE 1, 2014.


78
Oct-Dec
2014
2015
2016
Volume TWh
8
36
36
Base Load
% Hedged
100%
100%
55-60%
(Nuclear and Base Load Coal)
Price $/MWh
$49
$50
$49
Volume TWh
5
21
21
Intermediate Coal, Combined
% Hedged
50-55%
5-10%
0%
Cycle, Peaking
Price $/MWh
$49
$50
$49
Volume TWh
13
55-57
55-57
Total
% Hedged
80-85%
65-70%
35-40%
Price $/MWh
$49
$50
$49
Sustainable Advantage: Hedging strategy
designed to protect gross margin while leveraging the portfolio
HEDGE PERCENTAGES AND PRICES AS OF SEPTEMBER 30, 2014. REVENUES OF FULL REQUIREMENT LOAD DEALS BASED ON CONTRACT PRICE, INCLUDING RENEWABLE
ENERGY CREDITS, ANCILLARY, AND TRANSMISSION COMPONENTS BUT EXCLUDING CAPACITY. HEDGES INCLUDE POSITIONS WITH MTM ACCOUNTING TREATMENT AND
OPTIONS.   EXCLUDES SOLAR AND KALAELOA.


79
2017/2018 RPM Auction Influenced By:
Updated Demand Curve
Updated Transfer Capabilities
Environmental Retirements
New Build/Cost of New Entry
Minimum Offer Price Rule
Demand Response
Sustainable Advantage:
PJM’s capacity market
continues to recognize locational value
*PSEG POWER’S AVERAGE PRICES AND CLEARED CAPACITY (MW) REFLECT BASE AND INCREMENTAL
RPM
AUCTION
RESULTS.
DELIVERY
YEAR
RUNS
FROM
JUNE
1
TO
MAY
31
OF
THE
NEXT
CALENDAR
YEAR.
RPM Auction Results
($/MW-day)
2013 / 2014*
2014 / 2015*
2015 / 2016*
2016 / 2017*
2017 / 2018
Power’s
Average Prices
$242
$166
$166
$166
$165
Rest of Pool
Prices
$28
$126
$136
$59
$120
Power’s Cleared
Capacity (MW)
10,890
10,710
9,210
8,610
~8,700


80
PJM Capacity Performance Proposal:
aims to increase electric supply reliability
Capacity
performance
(CP)
proposal
places
emphasis
on
reliability
given
observed outages during times of extreme weather stress and anticipated
retirements;
Imposition
of
higher
penalty
structure
to
encourage
availability
Generator
availability
/
flexibility
is
key
objective
for
units
with
secure
fuel
supply capable of meeting operating standards
Elimination
of
2.5
%
holdback,
making
all
capacity
resources
annual
products,
net CONE bidding safe harbor, and the change in the demand curve
(VRR)
support price formation and improve resource adequacy


81
PSEG Power’s Value Proposition
Well-positioned fleet of merchant generating assets
concentrated in PJM market
Advantaged by low cost structure, fuel diversity and
dispatch flexibility
Low environmental capital requirements
Capacity uprates to enhance value of nuclear and
combined cycle stations
Consistent hedging strategy recognizes asset flexibility
Continue to meet commitments and to provide
free cash flow


PSEG
FINANCIAL
REVIEW & OUTLOOK


83
Strong financial position to support our
business initiatives
2013 Financial Position
Exceeded upwardly revised 2013 earnings guidance
Pension fully funded
Strong balance sheet and upgraded credit ratings
2014 and Beyond
Continued positive earnings trend in 2014
Controlled O&M growth
Balance Sheet and Cash Flow support investments without equity issuance
Growth in PSE&G investments with contemporaneous returns
Diversified Power assets with a balanced hedge profile
Growth
in
PSE&G
Cash
from
Operations,
with
continued
significant
Cash
from
Operations/FFO
at
Power
Increased
Dividend
by
$0.04
to
annual
rate
of
$1.48
per
share
for
2014
Opportunity for consistent and sustainable dividend growth


84
Exceeded upwardly revised guidance
in both businesses
PSEG Operating Earnings
$ Millions (except EPS)
2012
2013
PSE&G
$528
$612
PSEG Power
$663
$710
Other
$45
($13)
Operating Earnings
$1,236
$1,309
Operating EPS*
$2.44
$2.58
Upwardly Revised Earnings Guidance (Nov 2013)
$2.40 -
$2.55
Earnings Guidance (Feb 2013)
$2.25 -
$2.50
*SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET INCOME TO RECONCILE TO OPERATING EARNINGS.
NOTE: 2012 OPERATING EARNINGS RE-STATED FOR TRANSFER OF ASSETS FROM PSEG HOLDINGS TO PSEG POWER.


85
PSE&G Cash
from Ops
(1)
~$1.4B
PSE&G
Capital
Investment
~$2.2B
In 2013, PSE&G invested over $2B, using $1.4B of
internally generated cash flow and debt, while maintaining its
capital structure  
(1) PSE&G CASH FROM OPERATIONS ADJUSTS FOR SECURITIZATION PRINCIPAL REPAYMENTS OF ~$220 MILLION.
Cash ~$0.1B
PSE&G 2013 Cash Flows


86
In 2013, Powers Free Cash Flow supported PSE&Gs
capital program and shareholder dividend
Power
Cash from Ops
~$1.3B
PSE&G
Cash from Ops
(1)
~$1.4B
PSE&G
Capital
Investment
~$2.2B
Power
Capital
Investment
~$0.6B
Shareholder
Dividend
~$0.7B
Net Debt
Issuances
~$0.7B
PSEG Consolidated
2013 Sources and Uses
(1)
PSE&G CASH FROM OPERATIONS ADJUSTS FOR SECURITIZATION PRINCIPAL REPAYMENTS OF ~$220 MILLION.
(2)
OTHER CASH FLOW INCLUDES HOLDINGS NET CASH FLOW AND PARENT CASH.
Other
Cash Flow
(2)
~$0.1B


87
PSEG growth spend, including Energy Strong, of ~$6.4B
represents ~76% of total investment
PSEG 2014 –
2016E Capital Investment
Power & Other
Maintenance
PSE&G
Distribution
Maintenance
Power
Growth
PSE&G
Transmission
Growth
PSE&G
Solar and  
New Business
PSE&G
Energy
Strong
Approved Growth Investment ~$6.4B
E = ESTIMATE; CAPITAL INCLUDES AFUDC AND IDC.
DATA AS OF MARCH 31, 2014.
PSEG
Planned
Spend
Maintenance ~$2B


88
PSE&G’s Capital Program drives double-digit
growth in rate base and earnings over the 2013 to 2016 period
2013 –
2016E Rate Base CAGR Growth of ~12%
Distribution
Transmission
~$10.4B
~$14.6B
~$6.6B
~$3.8B
~$2.7B
~$6.5B
~$0.5B
~$1.0B
~$8.1B
2013
Rate Base
2016E
Rate Base
Transmission
Growth
Energy
Strong
Solar and
New Business
E = ESTIMATE.    DATA AS OF MARCH 31, 2014.


89
PSE&G’s Cash from Operations and Powers Free Cash Flow
support growth investments without the need for new equity
PSE&G
Net Debt
2014 –
2016E
PSEG Sources and Uses
(1)
PSE&G CASH FROM OPERATIONS ADJUSTS FOR SECURITIZATION PRINCIPAL REPAYMENTS OF ~$500M FROM 2014-2016
(2)
OTHER CASH FLOW INCLUDES PSEG LI, HOLDINGS NET CASH FLOW, CASH, AND SHORT TERM DEBT
PSE&G
Cash from Ops
(1)
PSE&G
Capital
Investment
With Energy Strong
Shareholder
Dividend
Power
Cash from Ops
Other
Cash Flow
(2)
Power Net
Debt
Power
Capital
Investment
E = ESTIMATE.        DATA AS OF MARCH 31, 2014.


90
Power’s key credit metric
supports incremental
investment opportunities
PSEG Power
Funds From Operations /
Debt
2014-2016E
Average
Increased contribution to earnings from the more
stable regulated business allows us to reset
Power’s FFO/Debt threshold from 35% to 30%,
providing additional financial flexibility
Power’s annual Cash From Operations and Funds
From Operations each average ~$1.1B over the
2014 to 2016 period supported by:
-
Capacity Revenues
-
Hedged Generation
-
O&M Control
Financial strength can be used to pursue future
growth in both businesses beyond current plans
E = ESTIMATE.  DATA AS OF MARCH 31, 2014.


91
Pension: Our Long Term Asset allocation
strategy resulted in a ~17% increase in pension assets during
2013
Trust Assets
12/31/2012
Cash
Contributions
Investment
Return
Gross Benefits
Paid
Trust Assets
12/31/2013
PBO Funded
Ratio
83%
Fully
Funded
Pension
106%


92
Improving Operating Earnings
and increased contribution from PSE&G
PSEG Operating Earnings
$ Millions (except EPS)
2012
2013
2014E
PSE&G
$528
$612
$710 -
$745
PSEG Power
$663
$710
$575 -
$610
Enterprise/Other
$45
($13)
$35 -
$40
Operating Earnings*
$1,236
$1,309
$1,320 -
$1,395
Operating EPS*
$2.44
$2.58
$2.60 -
$2.75
Regulated % of Earnings
43%
47%
53% -
54%
*SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET  INCOME TO RECONCILE TO OPERATING EARNINGS.
NOTE: 2012 OPERATING EARNINGS RE-STATED FOR TRANSFER OF ASSETS FROM PSEG HOLDINGS TO PSEG POWER.
E=ESTIMATE.


93
PSE&G
EPS
$1.47
$1.40
Annual Dividend Per Share
(10 YEAR HISTORICAL CAGR ~3%)
(1)
THE 2014 PAYOUT RATIO IS BASED ON THE MIDPOINT OF PSEG'S 2014 OPERATING EARNINGS GUIDANCE OF $2.60-$2.75E PER SHARE. SEE SLIDE A FOR ITEMS
EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET INCOME TO RECONCILE TO OPERATING EARNINGS.
Opportunity
for
consistent and sustainable
dividend growth supported by strong cash flow from both
businesses
2.8% increase
Payout Ratio
43%
44%
50%
58%
56%
55%
(1)
E = ESTIMATE
$1.60


94
PSEG’s longer-term outlook is influenced by
Power’s hedge position and increased investment at PSE&G
2015E
2016E
Each $0.75/mcf Change in Natural Gas
Each $2/MWh Change in Spark Spread
Each $5/MWh Change in Dark Spread
Each 1% Change in Nuclear Capacity Factor
Segment EPS Drivers
Each $100 Million of Incremental Investment
Each 1% Change in Sales
Electric
Gas
Each 1% Change in O&M
Each 10 basis point Change in Distribution ROE
Each 10 basis point Change in Transmission ROE
$0.01
$0.01
$0.01
$0.01
<$0.01
<$0.01
$0.07-$0.10
$0.05
$0.04
$0.01
$0.00-$0.02
$0.05
$0.02
$0.01
$0.01
$0.01
$0.01
$0.01
<$0.01
<$0.01
Sensitivities derived from typical annual market variability*
*
Estimated
annual
variability
approximating
one
standard
deviation
based
on
2011
2013
historical
data
and
forward
curve
estimates
applied
to
PSEG
Power
open
positions.
E = ESTIMATE.    POWER EARNINGS SENSITIVITIES UPDATED FOR OCTOBER 31, 2014 PRICE CURVES.   


PSE&G
APPENDIX


96
PSE&G provides high reliability at below
average cost which creates superior value to customers
SAIDI = SYSTEM AVERAGE INTERRUPTION DURATION INDEX, A MEASURE OF
AVERAGE OUTAGE DURATION FOR ALL CUSTOMERS SERVED.


97
PSE&G prioritizes public safety
while maintaining value to customers
LEAK RESPONSE RATE = PERCENTAGE OF UTILITY RESPONSES TO REPORTED
LEAKS WITHIN ONE HOUR.


PSEG POWER
AND ER&T
APPENDIX


99
Nuclear
fuel
needs
have
been
hedged
through
2016
Anticipated Nuclear Fuel Cost
Hedged
$0
$5
$10
2014
2015
2016
($/MWh)


100
Power’s coal hedging reflects 2014 supply
matched with 2014 sales
Contracted Coal
Station
Coal Type
Pricing
($/MWh)*
Comments
Bridgeport
Harbor
Adaro
Low $40’s
Higher price,
lower BTU,
enviro coal
Hudson
CAPP
Mid $40’s
Coal/Gas
Fuel
Flexibility
Mercer
Metallurgical
CAPP/NAPP
Low $40’s
More limited
segment of
coal market
Keystone
NAPP
Mid $20’s
Prices
steady
Conemaugh
NAPP
Mid $20’s
Prices
steady
% Hedged
(left scale)
$/MWh
(right scale)
*COMMODITY PLUS TRANSPORTATION.


101
The full requirements BGS rate recognizes the
forward PJM capacity market price
Capacity Price per RPM Auction for PSEG Zone
Capacity Price per BGS Tranche
2014-2015
$172
Three Year Average ($/MW-day)
$172
2015-2016
$166
MW per Tranche (varies by EDC)
109
2016-2017
$178
Days per Year
365
   Three Year Average ($/MW-day)
$172
   Capacity Cost per Tranche
6,841,016
$  
MWh per Tranche
Energy MW per Tranche (varies by EDC)
109
                              
Hours per Year
8,768
                           
Load Factor (varies by EDC)
~37%
MWh per Tranche, approx.
350,090
                      
Capacity Cost per MWh
$20


PSEG
FINANCIAL
APPENDIX


103
Q3 Operating Earnings by Subsidiary
Operating Earnings
Earnings per Share
$ millions (except EPS)
2014
2013
2014
2013
PSE&G
$  200
$  168
$  0.39
$  0.33
PSEG Power
171
221
0.34
0.43
PSEG Enterprise/Other
22
(4)
0.04 
-
Operating Earnings*
$  393
$  385
$ 0.77
$ 0.76
Quarter ended September 30
*
SEE
SLIDE
B
FOR
ITEMS
EXCLUDED
FROM
NET
INCOME
TO
RECONCILE
TO
OPERATING
EARNINGS.


104
$0.76
0.06
0.04
$0.77
(0.09)
0.00
0.25
0.50
0.75
1.00
Capacity  (0.09)
Re-Contracting
& Market
Pricing  (0.04)
Weather  (0.03)
O&M  0.06
Taxes &
Other  0.01
Transmission  0.04
Electric Volume
& Demand  0.01
Weather  (0.02)
Distribution
O&M  0.02
Interest  &
Other  0.01
Q3 2014       
Operating
Earnings*
Q3 2013       
Operating
Earnings*
PSEG Power
PSE&G
Enterprise/
Other
* SEE SLIDE B FOR ITEMS EXCLUDED FROM NET INCOME TO RECONCILE TO
OPERATING EARNINGS.
PSEG Long Island
and Other
PSEG
EPS
Reconciliation
Q3
2014
vs.
Q3
2013


105
Year to Date Operating Earnings by Subsidiary
Operating Earnings
Earnings per Share
$ millions (except EPS)
2014
2013
2014
2013
PSE&G
$  565
$  468
$  1.11
$  0.92
PSEG Power
551
595
1.09
1.17
PSEG Enterprise/Other
37
(2)
0.07
-
Operating Earnings*
$  1,153
$  1,061
$  2.27
$  2.09
Nine months ended September 30
*
SEE
SLIDE
B
FOR
ITEMS
EXCLUDED
FROM
NET
INCOME
TO
RECONCILE
TO
OPERATING
EARNINGS.


106
$2.09
0.19
0.07
$2.27
(0.08)
0.00
0.50
1.00
1.50
2.00
2.50
YTD 2014       
Operating
Earnings*
YTD 2013       
Operating
Earnings*
Capacity  0.05
Re-Contracting
& Market Pricing
(0.07)
Weather  (0.03)
Lower Volume  (0.01)
O&M  (0.02)
D&A, Taxes
and Other  0.00
PSEG Power**
Transmission  0.10
Gas Volume,
Demand & Other
Revenue  0.03
Electric Volume
& Demand  0.01
Weather  (0.02)
Distribution
O&M  0.04
Lower Interest Expense &
Other  0.03
PSE&G
**
Enterprise/
Other
PSEG Long Island
And Other
*
SEE SLIDE B FOR ITEMS EXCLUDED FROM NET INCOME TO RECONCILE TO OPERATING EARNINGS.
**
PRIOR QUARTER RESULTS FOR RECONCILING ITEMS MAY NOT ADD TO YEAR-TO-DATE (YTD) TOTALS DUE TO ROUNDING.
PSEG EPS Reconciliation
YTD 2014 vs. YTD 2013


107
September 30, 2014
$ Billions 
PSEG
PSE&G
Power
Cash and Cash Equivalents
$0.7
$0.3
$0.0
Short Term Debt
$0.0
$0.0
N/A
Long Term Debt
(2)
8.6
6.1
2.5
Common Equity
12.1
6.6
5.5
Total Capitalization
$20.7
$12.7
$8.0
Total Debt / Capitalization
42%
48%
32%
PSE&G Regulated Equity Ratio
(1)
51.8%
Our balance sheet remains strong
(1)
REGULATED EQUITY RATIO INCLUDES CUSTOMER DEPOSITS OF ~$97 MILLION AND EXCLUDES SHORT-TERM DEBT.
(2)   INCLUDES L-T DEBT DUE WITHIN 1 YEAR; EXCLUDES SECURITIZATION DEBT OF $326 MILLION AND
NON-RECOURSE DEBT OF $16 MILLION.


108
PSEG Liquidity as of September 30, 2014


109
PSEG Energy Holdings
Investment Portfolio
Equipment
Investment Balance*             
at 9/30/2014
($ millions)
Merchant Energy Leases
NRG REMA
Keystone, Conemaugh & Shawville (PA)
3 coal-fired plants (1,162 equity MW)
$345
NRG Energy/Midwest Gen **
Powerton & Joliet Generating Stations (IL)                     
2 coal-fired generating facilities (1,640 equity MW)
$218
Regulated Energy Leases
Merrill Creek
Reservoir in NJ  (PECO, MetEd, Delmarva Power & Light)
$197
Grand Gulf
Nuclear station in Mississippi (175 equity MW)
Real Estate Leveraged Leases
GM Renaissance Center; Wal-Marts; E-D (shopping) Centers
$73
Real Estate Operating Leases
Office Towers, Shopping Centers -
28 properties
$57
Generation Legacy Assets
GWF (in wind down stage), Bridgewater, GSOE 
$3
Other
Land & Receivables
$5
Total Holdings Investments
$898
*BOOK BALANCE EXCLUDING DEFERRED TAX ACCOUNTS.
**EME AND ITS SUBSIDIARIES FILED CHAPTER 11 BANKRUPTCY ON 12/17/2012.
ON APRIL 1,2014, EME WAS ACQUIRED BY NRG; ALL MONETARY DEFAULTS WERE CURED AT CLOSING
WITH NO CHANGE TO HOLDINGS’
STATED EQUITY VALUE.


110
Strong,
full
year
2013
operating
earnings
delivered
*
SEE SLIDE A FOR ITEMS EXCLUDED FROM INCOME FROM CONTINUING OPERATIONS/NET INCOME TO RECONCILE TO OPERATING EARNINGS.
Operating Earnings
Earnings per Share
$ millions (except EPS)
2013
2012
2013
2012
PSEG Power
$  710
$  663 
$  1.40
$  1.31
PSE&G
612
528
1.21
1.04
PSEG Enterprise/Other
(13)
45
(0.03)
0.09
Operating Earnings*
$  1,309 
$  1,236
$  2.58
$  2.44
Twelve Months ended December 31


A
Items Excluded from Income from Continuing
Operations/Net Income to Reconcile to Operating Earnings
PLEASE
SEE
PAGE
3
FOR
AN
EXPLANATION
OF
PSEG’S
USE
OF
OPERATING
EARNINGS
AS
A
NON-GAAP
FINANCIAL
MEASURE
AND
HOW
IT
DIFFERS
FROM
NET
INCOME.
2013
2012
2011
2010
2009
2008
Earnings Impact ($ Millions)
Operating Earnings
1,309
$            
1,236
$       
1,389
$       
1,584
$          
1,567
$       
1,478
$       
Gain (Loss) on Nuclear Decommissioning Trust (NDT)
Fund Related Activity (PSEG Power)
40
                    
52
              
50
              
46
                 
9
                
(71)
             
Gain (Loss) on Mark-to-Market (MTM)
(a)
(PSEG Power)
(74)
                 
(10)
             
107
            
(1)
                 
(11)
             
14
              
Lease Transaction Activity (PSEG Enterprise/Other)
-
                      
36
              
(173)
           
-
                    
29
              
(490)
           
Storm O&M (PSEG Power)
(32)
                 
(39)
             
-
                 
-
                    
-
                 
-
                 
Market Transition Charge Refund (PSE&G)
-
                      
-
                 
-
                 
(72)
               
-
                 
-
                 
Gain (Loss) on Asset Sales and Impairments (PSEG Enterprise/Other)
-
                      
-
                 
34
              
-
                    
-
                 
(13)
             
Income from Continuing Operations
1,243
$            
1,275
$       
1,407
$       
1,557
$          
1,594
$       
918
$          
Discontinued Operations
-
                 
-
             
96
              
7
                    
(2)
               
270
            
Net Income
1,243
$            
1,275
$       
1,503
$       
1,564
$          
1,592
$       
1,188
$       
Fully Diluted Average Shares Outstanding (in Millions)
508
                 
507
            
507
            
507
               
507
            
508
            
Per Share Impact (Diluted)
Operating Earnings
2.58
$              
2.44
$         
2.74
$         
3.12
$            
3.09
$         
2.91
$         
Gain (Loss) on NDT Fund Related Activity (PSEG Power)
0.08
                
0.10
           
0.10
           
0.09
              
0.02
           
(0.14)
          
Gain (Loss) on MTM
(a)
(PSEG Power)
(0.14)
              
(0.02)
          
0.21
           
-
               
(0.02)
          
0.03
           
Lease Transaction Activity (PSEG Enterprise/Other)
-
                 
0.07
           
(0.34)
          
-
               
0.05
           
(0.96)
          
Storm O&M (PSEG Power)
(0.07)
              
(0.08)
          
-
             
-
               
-
             
-
             
Market Transition Charge Refund (PSE&G)
-
                 
-
             
-
             
(0.14)
            
-
             
-
             
Gain (Loss) on Asset Sales and Impairments (PSEG Enterprise/Other)
-
                 
-
             
0.06
           
-
               
-
             
(0.03)
          
Income from Continuing Operations
2.45
$              
2.51
$         
2.77
$         
3.07
$            
3.14
$         
1.81
$         
Discontinued Operations
-
                 
-
             
0.19
           
0.01
              
-
             
0.53
           
Net Income
2.45
$              
2.51
$         
2.96
$         
3.08
$            
3.14
$         
2.34
$         
For the Year Ended
December 31,
(Unaudited)
Reconciling Items, net of tax
(a)
Includes the financial impact from positions with forward delivery months.
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED


B
2014
2013
2014
2013
2013
2012
Earnings Impact ($ Millions)
Operating Earnings
393
$             
385
$          
1,153
$          
1,061
$       
1,309
$          
1,236
$          
Gain (Loss) on Nuclear Decommissioning Trust (NDT)
Fund Related Activity (PSEG Power)
17
                 
12
              
40
                 
29
              
40
                 
52
                 
Gain (Loss) on Mark-to-Market (MTM)
(a)
(PSEG Power)
36
                 
3
                
(138)
             
(22)
             
(74)
               
(10)
               
Lease Related Activity (PSEG Enterprise/Other)
-
                     
-
                 
-
                    
-
                 
-
                    
36
                 
Storm O&M, net of insurance recoveries (PSEG Power)
(2)
                   
(10)
             
(13)
               
(25)
             
(32)
               
(39)
               
Net Income
444
$             
390
$          
1,042
$          
1,043
$       
1,243
$          
1,275
$          
Fully Diluted Average Shares Outstanding (in Millions)
507
               
508
            
507
               
507
            
508
               
507
               
Per Share Impact (Diluted)
Operating Earnings
0.77
$            
0.76
$         
2.27
$            
2.09
$         
2.58
$            
2.44
$            
Gain (Loss) on NDT Fund Related Activity (PSEG Power)
0.04
              
0.02
           
0.08
              
0.06
           
0.08
              
0.10
              
Gain (Loss) on MTM
(a)
(PSEG Power)
0.07
              
0.01
           
(0.27)
            
(0.04)
          
(0.14)
            
(0.02)
            
Lease Related Activity (PSEG Enterprise/Other)
-
                
-
             
-
               
-
             
-
               
0.07
              
Storm O&M, net of insurance recoveries (PSEG Power)
(0.01)
             
(0.02)
          
(0.03)
            
(0.05)
          
(0.07)
            
(0.08)
            
Net Income
0.87
$            
0.77
$         
2.05
$            
2.06
$         
2.45
$            
2.51
$            
(a) Includes the financial impact from positions with forward delivery months.
PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED
Reconciling Items, net of tax
Three Months Ended
Nine Months Ended
Year Ended
September 30,
September 30,
December 31,
(Unaudited)
Items Excluded from Income from Continuing
Operations/Net Income to Reconcile to Operating Earnings
PLEASE
SEE
PAGE
3
FOR
AN
EXPLANATION
OF
PSEG’S
USE
OF
OPERATING
EARNINGS
AS
A
NON-GAAP
FINANCIAL
MEASURE
AND
HOW
IT
DIFFERS
FROM
NET
INCOME.