XML 53 R62.htm IDEA: XBRL DOCUMENT v2.4.0.6
Commitments And Contingent Liabilities (Environmental Matters) (Detail) (USD $)
1 Months Ended 6 Months Ended 1 Months Ended 6 Months Ended 6 Months Ended
Apr. 30, 2011
gal
Jun. 30, 2012
mi
Dec. 31, 2011
Jul. 31, 2011
Apr. 30, 2009
Turbines
MW
Dec. 15, 2007
Jun. 30, 2012
PSE And G [Member]
Dec. 31, 2011
PSE And G [Member]
Jun. 30, 2012
Power [Member]
Dec. 31, 2011
PSEG [Member]
Jun. 30, 2008
Passaic River Site Contingency [Member]
Jun. 30, 2012
Passaic River Site Contingency [Member]
Dec. 31, 2007
Passaic River Site Contingency [Member]
mi
Dec. 31, 2003
Passaic River Site Contingency [Member]
Jun. 30, 2012
Passaic River Site Contingency [Member]
Transferred To Power From PSE&G [Member]
Jun. 30, 2012
Passaic River Site Contingency [Member]
PSE And G [Member]
Feb. 28, 2009
Passaic River Site Contingency [Member]
PSE And G [Member]
Segment
Feb. 28, 2009
Passaic River Site Contingency [Member]
Power [Member]
Jun. 30, 2012
PSE&G's Former MGP Sites [Member]
Jun. 30, 2012
PSE&G's Former MGP Sites [Member]
PSE And G [Member]
Person
Dec. 31, 2006
PSE&G's Former MGP Sites [Member]
PSE And G [Member]
Dec. 31, 2006
PSE&G's Former MGP Sites [Member]
Power [Member]
Jun. 30, 2012
PSD NSR Regulations Site Contingency [Member]
Power [Member]
Jun. 30, 2012
MGP Remediation Site Contingency [Member]
PSE And G [Member]
Jun. 30, 2012
Remedial Investigation And Feasibility Study [Member]
Site Contingency [Line Items]                                                  
Number of miles related to the Passaic River constituting a facility as determined by the US Environmental Protection Agency   8                                              
Number of miles on Passaic River tidal reach required to be studied as determined by the US Environmental Protection Agency   17                                              
Number of operating electric generating station (Essex Site)                             1                    
Number of former generating electric station                               1                  
Number of former Manufactured Gas Plant (MGP) sites                               4 11                
Original estimated cost of feasibility study                                         $ 20,000,000        
Estimated, total cost of the study                                       105,000,000         30,000,000
Number of potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                                       73          
Number of current potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                                       70          
Percentage of cost attributable to potentially responsible party                                         5.00% 1.00%      
Number of miles of Passaic River which EPA released a draft (Focused Feasibility Study) that proposes six options to address the contamination cleanup                         8                        
Estimated cleanup costs-low estimate                       1,300,000,000                          
Estimated cleanup costs-high estimate                       3,700,000,000                          
Estimated cleanup costs agreed to by two potentially responsible parties                     80,000,000                            
PSEG's share of Pilot study                                                 3.00%
Aggregate number of defendants including registrant entities Power and PSE&G included in NJDEP complaint filed February 2009                                   320              
Aggregate number of PRPs directed by the NJDEP to arrange for natural resource damage assessment and interim compensatory restoration along the lower Passaic River                           56                      
Estimated cost of interim natural resource injury restoration                       950,000,000                          
Number of legal entities contacted by EPA in conjunction with Newark Bay study area contamination   11                                              
Number of operating electric generating stations located on Hackensack River   2                                              
Number of former MGP contamination sites located on Hackensack river in conjunction with Newark Bay study area contamination   1                                              
Number of MGP sites identified by registrant and the NJDEP requiring some level of remedial action                                     38            
Estimated expenditures, low end of range                                               616,000,000  
Estimated expenditures, high end of range                                               714,000,000  
Accrued environmental costs   588,000,000 643,000,000       537,000,000 592,000,000                               616,000,000  
Remediation liability recorded as other current liabilities                                               90,000,000  
Remediation liability recorded as environmental costs in noncurrent liabilities                                               526,000,000  
Regulatory assets                                               616,000,000  
Penalty per day from date of violation-minimum                                             25,000    
Penalty per day from date of violation-maximum                                             37,500    
Ownership percentage of Keystone Coal fired plant in Pennsylvania                 23.00%                                
Estimated cost of additional control   5,000,000                                              
Parent companies share of investment in Clean Air Act requirements                   147,000,000                              
Percentage of reduction required by New Jersey regulations on coal fired electric generating units           90.00%                                      
Number of combustion turbines required to be retired to meet NOx emission reduction requirements         102                                        
Number of MW required to be retired to meet NOx emission reduction requirements         2,000                                        
Number of steam electric generation units requiring significant capital investment for additional controls or retirement as determined by NJDEP         4                                        
Number of MW requiring significant capital investment for additional controls or retirement as determined by NJDEP         400                                        
Number of states with limits on emissions under CSAPR       28                                          
Total production capacity 2,000,000                                                
New Salem facility cooling towers estimated cost total   $ 1,000,000,000             $ 575,000,000