XML 91 R61.htm IDEA: XBRL DOCUMENT v2.3.0.15
Commitments And Contingent Liabilities (Environmental Matters) (Details) (USD $)
9 Months Ended3 Months Ended12 Months Ended12 Months Ended
Sep. 30, 2011
gal
mW
Dec. 31, 2010
Apr. 30, 2009
mW
Dec. 15, 2007
Aug. 31, 2006
Sep. 30, 2011
Power [Member]
NJ Industrial Site Recovery Act Site Contingency [Member]
Dec. 31, 2010
NJ Industrial Site Recovery Act Site Contingency [Member]
Sep. 30, 2011
Power [Member]
PSD NSR Regulations Site Contingency [Member]
Feb. 28, 2009
PSE&G [Member]
Power [Member]
Passaic River Site Contingency [Member]
Jun. 30, 2008
Passaic River Site Contingency [Member]
Sep. 30, 2011
Passaic River Site Contingency [Member]
Dec. 31, 2007
Passaic River Site Contingency [Member]
Dec. 31, 2003
Passaic River Site Contingency [Member]
Sep. 30, 2011
Passaic River Site Contingency [Member]
PSE&G [Member]
Sep. 30, 2011
Passaic River Site Contingency [Member]
Transferred To Power From PSE&G [Member]
Sep. 30, 2011
PSE&G [Member]
MGP Remediation Site Contingency [Member]
Sep. 30, 2011
MGP Remediation Site Contingency [Member]
PSE&G [Member]
Dec. 31, 2006
Power [Member]
PSE&G's Former MGP Sites [Member]
Sep. 30, 2011
PSE&G's Former MGP Sites [Member]
Dec. 31, 2006
PSE&G's Former MGP Sites [Member]
PSE&G [Member]
Sep. 30, 2011
PSE&G's Former MGP Sites [Member]
PSE&G [Member]
Sep. 30, 2011
PSE&G [Member]
Dec. 31, 2010
PSE&G [Member]
Dec. 31, 2010
Power [Member]
Sep. 30, 2011
Power [Member]
Site Contingency [Line Items]                         
Number of miles related to the Passaic River constituting a facility as determined by the US Environmental Protection Agency8                        
Number of miles on Passaic River tidal reach required to be studied as determined by the US Environmental Protection Agency17                        
Number of operating electric generating station (Essex Site)              1          
Number of former generating electric station             1           
Number of former Manufactured Gas Plant (MGP) sites             4           
Number of former MGP locations (Harrison Site) which EPA believes that hazardous substances were released                    1    
Original estimated cost of feasibility study                   $ 20,000,000     
Estimated, total cost of the study                   86,000,000     
Number of potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                   73     
Number of current potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                   71     
Percentage of cost attributable to potentially responsible party                 1.00% 5.00%     
Number of miles of Passaic River which EPA released a draft (Focused Feasibility Study) that proposes six options to address the contamination cleanup           8             
Estimated cleanup costs-low estimate          1,300,000,000              
Estimated cleanup costs-high estimate          3,700,000,000              
Estimated cleanup costs agreed to by two potentially responsible parties         80,000,000               
Aggregate number of defendants including registrant entities Power and PSE&G included in NJDEP complaint filed February 2009        320                
Aggregate number of PRPs directed by the NJDEP to arrange for natural resource damage assessment and interim compensatory restoration along the lower Passaic River            56            
Estimated cost of interim natural resource injury restoration          950,000,000              
Number of legal entities contacted by EPA in conjunction with Newark Bay study area contamination    11                    
Number of operating electric generating stations located on Hackensack River2                        
Number of former MGP contamination sites located on Hackensack river in conjunction with Newark Bay study area contamination1                        
Number of MGP sites identified by registrant and the NJDEP requiring some level of remedial action                  38      
Estimated expenditures, low end of range                643,000,000        
Estimated expenditures, high end of range                741,000,000        
Accrued environmental costs651,000,000669,000,000   50,000,00050,000,000         643,000,000    600,000,000617,000,00051,000,00051,000,000
Remediation liability recorded as other current liabilities                53,000,000        
Remediation liability recorded as environmental costs in noncurrent liabilities                590,000,000        
Regulatory assets               643,000,000         
Penalty per day from date of violation-minimum       25,000                 
Penalty per day from date of violation-maximum       37,500                 
Amount spent on Mercer and Hudson up to date                       1,300,000,000 
Ownership percentage of Keystone Coal fired plant in Pennsylvania                        23.00%
Percentage of reduction required by New Jersey regulations on coal fired electric generating units   90.00%                     
Number of combustion turbines required to be retired to meet NOx emission reduction requirements  102                      
Number of MW required to be retired to meet NOx emission reduction requirements  2,000                      
Number of steam electric generation units requiring significant capital investment for additional controls or retirement as determined by NJDEP  5                      
Number of MW requiring significant capital investment for additional controls or retirement as determined by NJDEP  800                      
Total production capacity2,000,000                        
New Salem facility cooling towers estimated cost total$ 1,000,000,000                       $ 575,000,000