EX-99 2 c53794_ex99.htm

Exhibit 99

 

Public Service Enterprise Group

Deutsche Bank

May 29, 2008

2008 Energy and Utilities Conference

Miami Beach, FL


Forward-Looking Statement

Readers are cautioned that statements contained in this presentation about our and our subsidiaries' future performance, including
future revenues, earnings, strategies, prospects and all other statements that are not purely historical, are forward-looking statements
for purposes of the safe harbor provisions under The Private Securities Litigation Reform Act of 1995. Although we believe that our
expectations are based on reasonable assumptions, we can give no assurance they will be achieved. The results or events predicted in
these statements may differ materially from actual results or events. Factors which could cause results or events to differ from current
expectations include, but are not limited to:

Adverse changes in energy industry, policies and regulation, including market rules that may adversely affect our operating results.

Any inability of our energy transmission and distribution businesses to obtain adequate and timely rate relief and/or regulatory approvals
from federal and/or state regulators.

Changes in federal and/or state environmental regulations that could increase our costs or limit operations of our generating units.

Changes in nuclear regulation and/or developments in the nuclear power industry generally, that could limit operations of our nuclear

generating units.

Actions or activities at one of our nuclear units that might adversely affect our ability to continue to operate that unit or other units at
the same site.

Any inability to balance our energy obligations, available supply and trading risks.

Any deterioration in our credit quality.

Any inability to realize anticipated tax benefits or retain tax credits.

Increases in the cost of or interruption in the supply of fuel and other commodities necessary to the operation of our generating units.

Delays or cost escalations in our construction and development activities.

Adverse capital market performance of our decommissioning and defined benefit plan trust funds.

Changes in technology and/or increased customer conservation.

For further information, please refer to our Annual Report on Form 10-K, including Item 1A. Risk Factors, and subsequent reports on
Form 10-Q and Form 8-K filed with the Securities and Exchange Commission. These documents address in further detail our
business, industry issues and other factors that could cause actual results to differ materially from those indicated in this presentation. 
In addition, any forward-looking statements included herein represent our estimates only as of today and should not be relied upon as
representing our estimates as of any subsequent date. While we may elect to update forward-looking statements from time to time,
we specifically disclaim any obligation to do so, even if our estimates change, unless otherwise required by applicable securities laws.

2


GAAP Disclaimer

PSEG presents Operating Earnings in addition to its Net Income reported
in accordance with accounting principles generally accepted in the United
States (GAAP). Operating Earnings is a non-GAAP financial measure that
differs from Net Income because it excludes the impact of the sale of
certain non-core domestic and international assets and costs stemming
from the terminated merger agreement with Exelon Corporation. PSEG
presents Operating Earnings because management believes that it is
appropriate for investors to consider results excluding these items in
addition to the results reported in accordance with GAAP. PSEG believes
that the non-GAAP financial measure of Operating Earnings provides a
consistent and comparable measure of performance of its businesses to
help shareholders understand performance trends. This information is not
intended to be viewed as an alternative to GAAP information. The last
slide in this presentation includes a list of items excluded from Net Income
to reconcile to Operating Earnings, with a reference to that slide included
on each of the slides where the non-GAAP information appears. These
slides are intended to be reviewed in conjunction with the oral
presentation to which they relate.

3


PSEG Power

Dan Cregg

Vice President – Finance, PSEG Power


PSEG Power represents the largest subsidiary within a diverse
platform…

Major electric generation

Stable electric and gas

Redeployment of capital

company with 13,300

distribution and

through the sale of

MW of base-load,

transmission company

international assets.

intermediate and load

rated top quartile for

Focused on managing

following capability

reliability providing

lease portfolio and

operating in attractive

service in mature

potential investment in

markets in the Northeast

service territory in New

renewables.

with operating control of

Jersey.

additional 2,000 MW of

capacity in Texas.

2007 Operating

Earnings:

$949M*

$376M*

$115M*

2008 Guidance:

$1,040M - $1,140M

$350M – $370M

5

* See page 30 for Items excluded from Net Income to reconcile to Operating Earnings

$45M – $60M

… providing earnings stability, multiple growth opportunities and
substantial cash flow.


Major influences on our business environment remain …

Infrastructure

Climate Change

Capacity Needs

Requirements

Capital investment in

PSEG Power’s base-

Significant new

coal fleet to meet

load nuclear assets
well situated in carbon
constrained
environment

transmission capital

environmental

program to improve

requirements

reliability

maintains critical

infrastructure and

expands capability

PSE&G pursuing

investments in energy

Potential to leverage

efficiency and

existing brownfield

renewables

sites; potential for

new nuclear

… and PSEG’s assets are well positioned to meet the needs of

6

customers and shareholders in a challenging environment.


Right set of assets, right markets at the right time …

Fuel Diversity – 2007

•  Low-cost portfolio

Total MW: 13,300*

•  Strong cash generator

Oil

Nuclear

8%

•  Regional focus in competitive,

26%

Pumped

liquid markets

Storage

18%

1%

47%

•  Assets favorably located

Coal

Gas

Many units east of PJM constraints

Energy Produced - 2007

Near customers/load centers

Total GWh: 53,200*

•  80% of Fossil capacity has dual

Nuclear

fuel capabilities

54%

Pumped

Integrated generation and portfolio

Storage

1%

19%

management optimizes asset-

25%

Gas

based revenues

Oil 1%

Coal

… we continue to like the assets we have and their location.

7

* Excludes 2,000MW of combined cycle generation in Texas under PSEG Power’s operating control.

Southern NEPOOL/ Connecticut


Power’s assets along the dispatch curve …

Nuclear

National Park

Coal

Sewaren 6

Mercer 3

Kearny 10-11

Combined Cycle

Burlington 8-9-11

Steam

GT Peaking

Edison 1-2-3

Essex 10-11-12

New

Haven

Linden 5-8 / Essex 9

Bergen 1

Burlington 12   / Kearny 12

Linden 1,2

Keystone

Yards

Sewaren 1-4

Conemaugh

Creek

Hudson 1

Peach

BEC

Bottom

Bridgeport

Hudson 2

Hope

Bergen 2

Creek

Salem

Mercer1, 2

Illustrative

Baseload units

Load following units

Peaking units

Energy Revenue

X

X

X

Capacity Revenue

X

X

X

Ancillary Revenue

X

X

Dual Fuel

X

X

Nuclear CF

90% to 92%

Coal CF

85% to 90%

50% to 70%

Combined Cycle CF

30% to 50%

Peaking CF

2% to 10%

8

… position the company to serve full requirement load contracts.


Our five unit nuclear fleet …

Hope Creek

Operated by PSEG Nuclear

Salem Units 1 and 2

PSEG Ownership: 100%

Operated by PSEG Nuclear

Technology:

Boiling Water Reactor

Ownership: PSEG - 57%,

Exelon – 43%

Peach Bottom Units 2 and 3

Total Capacity: 1,061MW

Technology:

Pressurized Water Reactor

Operated by Exelon

Owned Capacity:  1,061MW*

License Expiration: 2026

Total Capacity: 2,304MW

PSEG Ownership: 50%

*125MW uprate expected for 2008 summer run

Owned Capacity: 1,323MW*

Technology:

Boiling Water Reactor

License Expiration: 2016 and
  2020

Total Capacity: 2,224MW

Owned Capacity: 1,112MW

*15MW uprate expected for 2008 summer run

License Expiration: 2033

and 2034

… is a critical element of Power’s success.

9


We have delivered strong nuclear performance …

Total Nuclear Output

O&M Total Incurred Cost

(000 GWh)

($ millions)

$589

$567

$564

$554

$542

29.2

28.5

28.8

27.4

24.8

2004

2005

2006

2007

2008   Target

2004

2005

2006

2007

10

Note: Values represent Salem/Hope Creek/Peach Bottom, PSEG Share

2008 Target

… while reducing cost of operations.


We have some major 2008 initiatives …

Hope Creek Uprate

Salem Steam Generator Outage

NRC approved Hope Creek’s

Unit 2 outage concluded

extended power uprate

within 58 days – on time

license amendment in May

15 MW uprate (PS share)

2008

expected for 2008 summer

125 MW uprate expected for

run

2008 summer run

INPO Assessments

Hope Creek

Salem

Corporate

… that will drive value for years to come.

11


Fossil operations contribute to earnings …

Total Fossil Output

A Diverse 9,800 MW Fleet (MW)

(GWh)

Coal

2,350

30,000

Combined Cycle

3,150

25,000

Steam / Peaking

4,300

Right Assets – Right Location

20,000

Fuel diversity

15,000

Technical diversity

`

Near load centers

10,000

Operation of 2,000 MW Texas Portfolio

5,000

Shared best practices

Leverage scale

0

2004

2005

2006

2007

… through a low-cost portfolio in which the majority of the output is

from coal facilities.

12


Fossil’s capital spending on pollution control equipment
declines over time …

Coal Environmental Capital

Coal Emissions Output

$600

80,000

60,000

$300

40,000

20,000

$0

0

2007

2008

2009

2010

2011

2007

2008

2009

2010

2011

Coal – SO2

Coal – NOx

•   Fossil spending on BET reaches a peak of over

•   Aggregate emissions will decline nearly 70%

$500 million in 2008

after installation of the pollution control

equipment

•   Fossil’s coal fleet will be well positioned in

2010, with a dramatic reduction in capital

•   The installation will allow for fuel flexibility in

spending on pollution control equipment

future years

… and the coal fleet’s profile results in lower emissions and

13

higher output.


Power’s eastern coal plants are in the right areas …

System Interface

Coal Units

Capacity (MW)

Bridgeport Harbor 3

Hudson 2

558

Mercer 1&2

648

Hudson 2

Bridgeport

372

Mercer 1&2

Total

1,578

Power’s New Jersey coal units are

Power is also making considerable

mid-merit, with capacity factors

investments beyond the pollution

averaging 50% to 60%.

control facilities for its coal assets.

… and after capital investments, anticipate increased capacity factors.

14


Markets remain attractive …

      Energy markets have seen rising prices

     Fuel costs have risen

      Reserve margins have tightened

     Capacity pricing mechanisms have been implemented in Power’s
     key markets

      Five RPM auctions implemented in PJM

     Power’s hedging strategy enables strong and stable cash flows

     Increasingly visible and stable margin

     BGS results in line with markets, including load serving value

     Gas asset optimization and other products round out a strong
     portfolio

      2007 delivered strong results

… in response to rising fuel costs and the need for new capacity.

15

      First FCM auction implemented in NE

     Other recontracting to drive value


Through the new capacity constructs, and repricing at
market prices …

Power’s capacity is located in three Northeast markets.

NE

NY

Total Capacity 13,300MW*

(~ 1,000 - 1,500 MW under RMR)

PJM

* Excludes 2,000MW of combined cycle generation in Texas under PSEG Power’s operating control.

The RPM Auction to date has provided strong price signals in PJM.

Delivery Year ($MW/Day)

2007 / 2008

2008 / 2009

2009 / 2010

2010 / 2011

2011 / 2012

Zones

Eastern MAAC*

$197.67

$148.80

$191.32

$174.29

$110.00

MAAC

---

---

$191.32 (a)

$174.29

$110.00

Rest of Pool

$40.80

$111.92

$102.04

$174.29

$110.00

* Majority of Power’s assets
(a) – includes APS

16

… Power expects to maintain strong margins.


Power’s fleet diversity and location ...

Market Perspective – BGS Auction Results

Increase in Full Requirements Component Due to:

Increased Congestion (East/West Basis)

Full Requirements

Increase in Capacity Markets/RPM

$111.50

$102.51

Ancillary services

Volatility in Market Increases Risk Premium

$98.88

Capacity

Congestion

~ $43

Load shape

~ $32

~ $41

$65.41

RECs

Transmission

$55.59

$55.05

Risk premium

~ $21

~ $18

~ $21

$58-$60

$68 - $71

$44 - $46

$67 - $70

$33 - $34

Round the Clock
PJM West
Forward Energy
Price

2003

2004

2005

2006

2007

2008

… has enabled successful participation in each BGS auction and

17

cushioned customer impacts.

Note: BGS prices reflect PSE&G Zone

$36 - $37


Rising coal and natural gas prices have driven LMPs ...

Central Appalachian Coal ($/Ton)

Natural Gas Henry Hub ($/MMbtu)

$90

$10.0

$9.5

$80

$9.0

$70

$8.5

$60

$8.0

$7.5

$50

$7.0

$40

$6.5

2009

2010

2011

2009

2010

2011

On Peak Heat Rate Expansion (MMbtu/MWh)

Electric PJM Western Hub RTC Price ($/MWh)

$80

10.5

$75

10.0

$70

9.5

$65

9.0

$60

$55

8.5

2009

2010

2011

2009

2010

2011

18

… and this trend may continue.

Note: Forward prices as of 4/28/08


The Regional Greenhouse Gas Initiative (RGGI) …

•   Cooperative effort by Northeast states to
    design a regional cap-and-trade program to
    reduce carbon dioxide (CO
2 ) emissions

–  Full participants – CT, MA, MD, ME, NH, VT,
    NY, NJ, RI, and DE

RGGI
States

ME

–  Observers – PA, DC, and Eastern Canadian
    Provinces and New Brunswick

VT

NH

Timeline

NY

  April 2003 process proposed by Governor Pataki

MA

  2003 – 2006 – Stakeholder process

CT

PA

RI

  December 20, 2005 Final 7 state MOU

NJ

  March 23, 2006 – Draft Model Rule

  August 15, 2006 – Final Model Rule & amended
    MOU

MD

Participating States

DE

  2007-2008 – State level adoption

Observer States

   First RGGI allowance auction September 2008

  January 1, 2009 – Implementation

… is a potential influence on market prices.

19


The RGGI cap shows headroom …

•  Affected Sources

  Fossil fired electric generating units

CO2 Emissions vs. RGGI Cap

with a capacity of 25 megawatts

(Actuals through 2007)

(MW) and larger

200

RGGI Cap

Actual &

Forecast CO2

190

  Three-year compliance periods

180

with the first running from 2009-

2011

170

   Stabilization of CO2 emissions at

160

recent levels through 2015 (~188

million tons per year)

150

   Achieve a 10% reduction of CO2

Actual

Projected

140

emissions below recent levels by

2019

130

2000

2002

2004

2006

2008

2010

2012

2014

2016

2018

  This translates into ~13% reduction

below 1990 levels or ~35%
reduction from BAU levels by 2020

20

… when viewed in comparison to historical emissions.

•  Targets and Timing


RGGI’s CO2 pricing projections …

$10

$8

$0

2009

2011

2013

2015

2017

2019

2021

2023

2025

RGGI - ICF Base

RGGI - ICF Base (Rev. Oct-06)

… reflect moderate prices, based on the headroom in the cap.

21

$2

$4

$6


Power’s open EBITDA is approximately $2.6 - $2.8 billion …

$3.0

EBITDA

Assumption

Sensitivity

Impact

$2.5

Capacity

~ $60 - $65/KW-yr
(~ $165 - $178/MW-day)

$10/KW-yr

~ $120M

Energy

$1/MWh

~ $40M

~ $69 - 73/MWh

(PJM-West)

$2.0

Fuel

Gas ~$8.50 to $9.00/MB
Coal ~ $2.85 to $3.15/MB

O&M

~ $1.0 - 1.05B

$1.5

2008 Forecasted EBITDA $2.05B - $2.25B

$1.0

… which will vary depending upon market drivers.

22

* Open EBITDA reflects unhedged results of Power at market prices shown above


PSEG Power’s capital program

2007

2008

2009

2010

2011

2006 10-K

$584

$626

$516

$527

$198

($ millions)

2007 10-K

$562

$890

$675

$620

$430

($ millions)

Program focused on meeting environmental commitments,
capital associated with new capacity ($500M*) and exploring
the opportunity for new nuclear.   All initiatives focused on
improving the fleet’s reliability and performance.

23

* Forecast capital spending associated with new peaking could be lower than amount indicated.


At Power, strong cash generation and declining
capital expenditures …

Power Cash Flow

Power Sources and Uses

(2008 – 2011 Forecast)

Net Cash
Flow

$2.0

Asset
Sales

Cash

from Ops

Incremental debt

$10.0

Net

capacity while

Dividends

Financing

maintaining target

to Parent

$1.0

credit measures

$8.0

$0.0

$6.0

Cash from
Ops

$4.0

($1.0)

Investments

Declining Investments

$2.0

($2.0)

$0.0

2007

2008

2009

2010

2011

Sources

Uses

… should result in substantial discretionary cash available to

24

PSEG for additional growth and/or share repurchases.


Public Service Enterprise Group


APPENDIX


The implementation of carbon legislation will address
the critical issue of global warming …

By Fuel Type

Coal

CTs

CC

Carbon tons/MWh

1.0

0.6

0.4

PSEG Power Generation by Fuel

Price ($/MWh)

2007 Total GWh: 53,200*

@$10/ton

$10.0

$6.0

$4.0

Nuclear

@$20/ton

$20.0

$12.0

$8.0

@$30/ton

$30.0

$18.0

$12.0

54%

Dispatch curve implication @ $20/ton**

Pumped

Storage

On margin

$/MWh

Impact

19%

1%

(Illustrative)

25%

($/MWh)

Gas

Coal

50%

$20.0

$10.0

Coal

CTs

10%

$12.0

$1.2

Oil 1%

Gas CC

40%

$8.0

$3.2

Nuclear

0%

$0.0

$0.0

Total

100%

$14.4

… and will put additional upward pressure on energy prices.

27

  * Excludes 2,000MW of combined cycle generation in Texas under PSEG Power’s operating control.
** For illustration purposes – potential impact of CO
2  on power prices with current dispatch – not an indication of net effect on income.


Power’s fleet has a low carbon profile …

2006 CO2 Emissions Rate Ranking

3,000

(Companies in PJM States)

2,500

2,000

1,500

1,000

500

0

* Source: Energy Information Administration (2006)

… which is well positioned for virtually any form of carbon restrictions.

28


The separation between coal and gas pricing …

Allowance Price Needed to

Dispatch Gas over Coal

•  Fuel switching is an expensive
   option

$120.00

$100.00

•  At current fuel and allowance

$23.25

$80.00

prices, switching from coal to

CO2 Adder

$52.62

combined-cycle natural gas

$60.00

NOx & SO2

Fuel Cost

may require an allowance price

$40.00

of about $50/ton

$20.00

Politically infeasible in the near
   term

$-

Coal

CC NG

… may require significant carbon prices to alter dispatch.

29


Items Excluded from Net Income to Reconcile to Operating Earnings

($ millions )

(EPS)

Years Ended Dec. 31,

Years Ended Dec. 31,

2007

2006

2007

2006

Merger related Costs:

PSE&G

$

-

$

(1)

$

-

Enterprise

-

(7)

(0.02)

Total Merger related Costs

$

-

$

(8)

$

-

$

(0.02)

Impact of Asset Sales:

Loss on Sale of RGE

-

(178)

$

-

$

(0.35)

Chilquinta & Luz Del Sur

(23)

-

(0.05)

-

Write down of Turboven

(7)

-

(0.01)

-

Premium on bond redemption

(28)

(7)

(0.06)

(0.02)

Total Impact of Asset Sales

$

(58)

$

(185)

$

(0.12)

$

(0.37)

Discontinued Operations:

Power - Lawrenceburg

$

(8)

$

(239)

$

(0.02)

$

(0.47)

Holdings:

SAESA

(33)

57

(0.06)

0.11

Electroandes

57

16

0.11

0.03

Elcho and Skawina

-

226

-

0.45

Total Holdings

$

24

$

299

$

0.05

$

0.59

Total Discontinued Operations

$

16

$

60

$

0.03

$

0.12

Please see Slide 3 for an explanation of PSEG’s use of Operating Earnings as a non-GAAP financial measure and how it differs from Net Income.

30