EX-99 2 c53032_ex-99.htm

Exhibit 99

Public Service Enterprise Group

Morgan Stanley

15th Annual Global Electricity and
Energy Conference

April 2, 2008


Forward-Looking Statement

Readers are cautioned that statements contained in this presentation about our and our subsidiaries’ future performance, including future
revenues, earnings, strategies, prospects and all other statements that are not purely historical, are forward-looking statements for purposes of
the safe harbor provisions under The Private Securities Litigation Reform Act of 1995. Although we believe that our expectations are based on
reasonable assumptions, we can give no assurance they will be achieved.  The results or events predicted in these statements may differ
materially from actual results or events.  Factors which could cause results or events to differ from current expectations include, but are not
limited to:

Adverse Changes in energy industry, policies and regulation, including market rules that may adversely affect our operating results.

Any inability of our energy transmission and distribution businesses to obtain adequate and timely rate relief and/or regulatory approvals from
federal and/or state regulators.

Changes in federal and/or state environmental regulations that could increase our costs or limit operations of our generating units.

Changes in nuclear regulation and/or developments in the nuclear power industry generally, that could limit operations of our nuclear
generating units.

Actions or activities at one of our nuclear units that might adversely affect our ability to continue to operate that unit or other units at the same
site.

Any inability to balance our energy obligations, available supply and trading risks.

Any deterioration in our credit quality.

Any inability to realize anticipated tax benefits or retain tax credits.

Increases in the cost of or interruption in the supply of fuel and other commodities necessary to the operation of our generating units.

Delays or cost escalations in our construction and development activities.

Adverse capital market performance of our decommissioning and defined benefit plan trust funds.

Changes in technology and/or increased customer conservation.

For further information, please refer to our Annual Report on Form 10-K, including Item 1A. Risk Factors, and subsequent reports on Form 10-
Q and Form 8-K filed with the Securities and Exchange Commission.  These documents address in further detail our business, industry issues
and other factors that could cause actual results to differ materially from those indicated in this presentation.  In addition, any  forward-looking
statements included herein represent our estimates only as of today and should not be relied upon as representing our estimates as of any
subsequent date.  While we may elect to update forward-looking statements from time to time, we specifically disclaim any obligation to do so,
even if our estimates change, unless otherwise required by applicable securities laws.

2


GAAP Disclaimer

PSEG presents Operating Earnings in addition to its Net Income reported
in accordance with accounting principles generally accepted in the United
States (GAAP). Operating Earnings is a non-GAAP financial measure that
differs from Net Income because it excludes the impact of the sale of
certain non-core domestic and international assets and costs stemming
from the terminated merger agreement with Exelon Corporation. PSEG
presents Operating Earnings because management believes that it is
appropriate for investors to consider results excluding these items in
addition to the results reported in accordance with GAAP. PSEG believes
that the non-GAAP financial measure of Operating Earnings provides a
consistent and comparable measure of performance of its businesses to
help shareholders understand performance trends.  This information is
not intended to be viewed as an alternative to GAAP information. The last
slide in this presentation includes a list of items excluded from Net Income
to reconcile to Operating Earnings
, with a reference to that slide included
on each of the slides where the non-GAAP information appears.  
These
slides are intended to be reviewed in conjunction with the oral
presentation to which they relate.

3


PSEG Overview

Tom O’Flynn

Executive Vice President and Chief Financial Officer - PSEG      
President and Chief Operating Officer – PSEG Energy Holdings


Our platform …

… provides earnings stability and multiple sources of revenue for
growth.

Stable electric and gas
distribution and
transmission company
rated top quartile for
reliability providing
service in mature
service territory in New
Jersey.

Major electric generation
company with 13,300
MW of base-load,
intermediate and load
following capability
operating in attractive
markets in the Northeast
with operating control of
additional 2,000 MW of
capacity in Texas.

Redeployment of capital
through the sale of
international assets.  
Focused on managing
lease portfolio and
potential investment in
renewables.

2007 Operating
Earnings:

$949M*

$115M*

$376M*

2008 Guidance:

$1,040M - $1,140M

$45M – $60M

$350M – $370M

* See page 62 for Items excluded from Net Income to reconcile to Operating Earnings

5


Our focus is to maximize benefits from existing assets …

… and build a substantial platform for ongoing growth.

Processes embedded
throughout the
organization on how
to manage, operate
and invest with
excellence as the
goal

Regulatory
mechanisms in place
supporting best-in-
class reliability
enhanced by market
dynamics
encouraging
investment

Maintain strong
balance sheet
providing
opportunity to
deploy capital to
meet shareholder
objectives for
growth with
reasonable risk

Operational
Excellence

Regulatory and
Market Environment

Growth with
Manageable Risk

6


Major influences on business environment remain:

PSEG Power’s base-
load nuclear assets
well situated in carbon
constrained
environment

PSE&G pursuing
investments in energy
efficiency and
renewables

Significant new
transmission capital
program to improve
reliability

Capital investment in
coal fleet to meet
environmental
requirements
maintains critical
infrastructure and
expands capability

New peaking capacity
leverages existing
brownfield sites;
potential for new
nuclear

Climate Change

Infrastructure
Requirements

Capacity Needs

PSEG assets are well positioned to meet the needs of customers
and shareholders in a challenging environment.

7


We are continuing to improve operational practices and participate
in market design discussions …

… to support long-term growth and reliability.

NJ enacted Regional Greenhouse Gas Initiative
(RGGI)

Awaiting NJ Energy Master Plan

PSEG Power exposed to heat rate expansion, gas
prices and carbon

Plan to add 300-400MW peaking capacity

Pursuing RFPs in CT and NY

Awaiting RTEP decision on additional transmission

PSE&G pursuing pilot programs to test energy  
efficiency and conservation

Hope Creek uprate and Salem steam generator adding  
140MW

Fossil fleet adopted operating model based on                                       
Nuclear’s success

Goal is to maintain (at a minimum) operating   
capability of nuclear fleet at 90% capacity factor

PSE&G pursuing pilot programs in advanced metering
and back office technology

Operational
Excellence

Regulatory and
Market Environment

Growth with
Manageable Risk

8


Improved processes and investment …

$1,800

$2,000

$2,200

$2,400

2007

2008

2009

2010

2011

… are expected to control the rate of growth in operating
expenses.

2007 -2011 :
CAGR: 2.1%

9


$2.80 - $3.05

Improved processes, markets and well-positioned assets …

2006

2007

2008

… allowed us to meet our commitments to earnings growth as we
also reduced balance sheet and international risk.

$1.73*

161

515

949

1,040 - 1,140

115

45 - 60

262

(66)

376

350 - 370

(15) - (10)

(63)

$2.71*

Holdings

PSE&G

Power

Parent

Operating Earnings by Subsidiary

* See page 62 for Items excluded from Net Income to reconcile to Operating Earnings

8% Growth

10


Spending for the next four years …

PSE&G

Other

PSEG Power

* As per 2006 10-K                                                                                                                                                         
** As per 2007 10-K; also includes plans for PSEG Energy Holdings

PSEG Energy
Holdings

$ 4.5B

$ 7.3B

$10.0

$8.0

$6.0

$4.0

$2.0

$0.0

… has increased primarily at PSE&G to support growth strategy.

2007 Forecast*
(2008 – 2011)

2008 Forecast**
(2008 – 2011)

Capital Expenditures

11


… supporting our growth initiatives, maintaining financial
flexibility.

Shareholder
Dividend

Debt
Reduction

Discretionary Cash

PSEG Use of Cash

Investment

$15.0

$10.0

$5.0

$0.0

$1.5 – $2.0B

$3.0B

Forecast*
(2008 –2011)

Forecast
(2008 –2011)

PSEG’s financing capability has improved with forecasted
discretionary cash expected to reach $3 billion …

* As presented at 2007 March Analyst Conference

12


PSEG Power’s capital program

2008

2007

2009

2010

2011

2007 10-K
($ millions)

$890

$562

$675

$620

$430

Program focused on meeting environmental commitments,
capital associated with new capacity ($500M) and exploring the
opportunity for new nuclear to improve the fleet’s reliability and
performance.

2006 10-K
($ millions)

$626

$584

$516

$527

$198

13


At Power, strong cash generation and declining
capital expenditures …

… should result in substantial discretionary cash available to
PSEG for additional growth and/or share repurchases.

($2.0)

($1.0)

$0.0

$1.0

$2.0

2007

2008

2009

2010

2011

$0.0

$2.0

$4.0

$6.0

$8.0

$10.0

Sources

Uses

Cash from
Ops

Net
Financing

Dividends
to Parent

Investments

Power Sources and Uses  
(2008 – 2011 Forecast)

Power Cash Flow

Cash
from Ops

Declining Investments

Net Cash
Flow

Asset
Sales

Incremental debt
capacity while
maintaining target
credit measures

14


PSE&G’s capital program focused on improving reliability

2008

2007

2009

2010

2011

2012

2006 10-K

June 2007 10-Q

2007 10-K

5-year capital program: $3.0B

5-year capital program: $4.1B

5-year capital program: $5.3B

$10,200

$6,400

TOTAL

4,900

3,330

Electric

3,060

2,240

Gas

2,240

830

Transmission

2012 Base Plan

2007 Actual

PSE&G Rate Base ($ millions)

15


PSE&G’s capital program

                             
Transmission

               

Electric and
Gas
Distribution

New
Programs

Future investment associated with meeting State energy
efficiency and renewable goals dependent on receiving
regulatory support before committing new capital, e.g.
$550M investment budgeted for AMI

Anticipate approval of $100M investment in solar in April
2008 as part of $225M capital investment program

Investments focused on improving customer support
enhancing efficiency and upgrading infrastructure

Expect to file electric and gas rate case in 2009 with rates
effective in 2010

Rate base growth supported by investment in new 500kV   
lines to improve reliability ($900M) and upgrade of sub-
transmission system ($250M)

Seeking FERC approval for CWIP in rate base and 150 bps
adder to ROE on $600M - $650M Susquehanna line – if
approved, capital will be recovered as expensed

16


($1.5)

($0.5)

$0.5

$1.5

2007

2008

2009

2010

2011

Cash from
Ops

Net
Financing

Dividends
to Parent

Investments

PSE&G Sources and Uses  
(2008 – 2011 Forecast)

PSE&G Cash Flow

Cash from
Ops

Growing Investments

Net Cash
Flow

At PSE&G, cash flow will be primarily directed towards
attractive reinvestment opportunities.

Modest dividends to the Parent are expected to continue as
PSE&G grows its asset base.

17


At Holdings, asset sales could continue to be a
significant source of cash in 2008.

Holdings plans to build renewables business with internal cash.  

$1.2

$0.9

$0.6

$0.3

$0.0

Cash from
Ops

Net Financing

Dividends to
Parent

Investments*

Holdings Sources and Uses
(2008 – 2011 Forecast)

Asset
Sales

Sources

Uses

* Investments exclude Intercompany loans.

18


$0.0

$2.0

$4.0

$6.0

Sources

Uses

Holdings cash
generated
(remaining asset
sales and cash
ops) less cash
earmarked for
potential
renewable
investments

Holdings
Dividend

Shareholder
Dividend

PSE&G
Dividend

Discretionary  
Cash

Parent Sources and Uses  
(2008 – 2011 Forecast)

Power
Dividend

$3.0B

At PSEG, we forecast $3.0B of discretionary cash through
2011.

Cash flow from Power is the primary driver of discretionary cash.

19


2006 Operating

Earnings*

2007 Operating

Earnings*

2010E

2011E

Markets, assets and use of capital …

* See page 62 for Items excluded from Net Income to reconcile to Operating Earnings

… should continue to drive annual earnings guidance growth        
of 8 - 9%.

$1.73

$2.71

$2.80 - $3.05

$3.05 - $3.35

2008
Guidance

2009
Guidance

+ 8 - 9%

+ 8 - 9%

20


Our returns have improved…

… and are forecast to remain strong on larger capital base.

Note: Calculations exclude the effects of non-recurring items

Note: Calculations exclude the effects of non-recurring items

PSEG

0

5

10

15

20

25

2006

2007

2008

2009

2010

2011

ROE

ROIC

21


Holdings

PSE&G

Power

Parent

$2.80

  - 

$3.05

2008

2009

2010

2011

1040

  -

1140

45

-

60

350

 -

370

(15)

  – 

(10)

Subsidiary

Annual Growth        

5

7%

Discretionary Cash

Annual Growth        

6

 – 

8%

5

7%

3%

Redeploying our $3.0B of discretionary cash towards
additional growth and / or share repurchases …

… drives our Consolidated earnings growth rate resulting in a total
shareholder return between 10 – 13%.

8 – 9% Annual Growth

Subsidiary Earnings

Annual Growth         

5

7%

“Discretionary Cash”
– Annual Growth /
Share Repurchases
  3%

Annual
Dividend Yield
3%

Total Shareholder
Return
10 - 13%

22


$1.12

$1.14

$1.29

$1.17

$1.00

$1.25

$1.50

2005

2006

2007

2008

2009E

Our recent 10% dividend increase continues 100-year
history of paying common dividends.

Payout objective of 40 – 50% provides opportunity for growth with
earnings.

* Indicated annual dividend rate

*

44%

Payout
Ratio

40 – 50%

43%

66%

63%

?

23


PSEG’s current stock price…

… implies a low valuation for PSEG Power.

PSE&G

2008 Earnings Guidance                        $350M - $370M

Indicative 2008 P/E Multiple              12.5x – 13.5x

Resulting Value/Share                               $8.75 - $10.00/Share

PSEG Power

Stock Price as of 3/26/08 (per share)

                        $39.31

Less Indicative Value of PSE&G, Energy Holdings              $11.50 - $12.75

Implied PSEG Power Value (per share)

                $26.56 - $27.81

Implied Power Enterprise Value   

$16.7B - $17.3B

Implied EV as a Multiple of:

        2008 EBITDA

                    7.4x – 8.4x

       Open EBITDA

                  6.0x – 6.7x

        Plus $10 Carbon

                                      5.6x – 6.2x

            Plus $20 Carbon

   5.2x – 5.8x

(1) Excludes incremental value of Texas generating assets (2,000 MW of combined cycle capacity) and potential tax liability at Resources

Energy Holdings

Book Equity Value/Share(1)                 $2.75

24


Fitting the pieces together - PSEG value proposition

PSEG well positioned in current business environment

Process improvement programs support efforts to:
                                - maintain reliability                                                      
                                - control costs                                                                  
                                - provide value to the customer

Asset mix provides opportunities in attractive markets

Strengthened balance sheet supports capital investment

Return of cash to shareholders through dividends
provides discipline to investment process

Earnings growth and yield offer opportunity for double
digit shareholder returns of 10 – 13%

25


APPENDIX


PSEG Power


Low-cost portfolio

Strong cash generator

Regional focus in competitive,
liquid markets

Assets favorably located

Many units east of PJM constraints

Southern NEPOOL/ Connecticut

Near customers/load centers

80% of Fossil capacity has dual
fuel capabilities

Integrated generation and portfolio
management optimizes asset-
based revenues

… we continue to like the assets we have and their location.

Right set of assets, right markets at the right time …

18%

47 %

8 %

26 %

Fuel Diversity – 2007

Coal

Gas

Oil

Nuclear

Pumped

Storage

1%

Energy Produced - 2007

54%

25%

19%

Oil 1%

Pumped
Storage
1%

Nuclear

Coal

Gas

Total GWh: 53,200

Total MW: 13,300

28


Baseload units

Load following units

Peaking units

Salem

Hope

Creek

Keystone

Conemaugh

Hudson 2

Linden 1,2

Burlington 8-9-11

Edison 1-2-3

Essex 10-11-12

Bergen 1

Sewaren 1-4

Hudson 1

Mercer1, 2

Bergen 2

… position the company to serve full requirement load contracts.

Sewaren 6

Mercer 3

Kearny 10-11

Linden 5-8 / Essex 9

Burlington 12  / Kearny 12

Peach

Bottom

Bridgeport

New

Haven

Nuclear

Coal

Combined Cycle

Steam

GT Peaking

Power’s assets along the dispatch curve …

BEC

Illustrative

Yards

Creek

National Park

X

X

Ancillary Revenue

X

X

X

X

Capacity Revenue

X

X

Energy Revenue

X

X

Dual Fuel

2% to 10%

Peaking CF

30% to 50%

Combined Cycle CF

50% to 70%

85% to 90%

Coal CF

90% to 92%

Nuclear CF

29


24.8

27.4

28.5

28.8

29.2

2004

2005

2006

2007

2008  Target

We have delivered strong nuclear performance …

… while reducing cost of operations.

$589

$567

$564

$542

$554

2004

2005

2006

2007

2008 Target

Total Nuclear Output  
(000 GWh)

O&M Total Incurred Cost  
($ millions)

Note: Values represent Salem/Hope Creek/Peach Bottom, PSEG Share

30


We have some major 2008 initiatives …

… that will drive value for years to come.

Hope Creek Uprate

Unit 2 outage commenced
March 11 (Unit 1 complete)

$148 million (PS share)
multi-year project

15 MW uprate (PS share)
expected for 2008 summer
run

Salem Steam Generator Outage

Corporate

Salem

Hope Creek

INPO Assessments

Work to support extended
power uprate largely
completed in 2007

Technical issue under review
at NRC

125 MW uprate expected for
2008 summer run

31


Total Power Output (GWh)

… we are expanding the output of our existing fleet.

Through our ongoing focus on operational excellence …

0

10,000

20,000

30,000

40,000

50,000

60,000

2004

2005

2006

2007

Year

Nuclear

Coal

CC

Peaking/Steam

Strong Performance

Continued growth in output

Improved fleet performance

3,500

Nuclear

4,300

Peaking / Steam

3,150

Combined Cycle

2,350

Coal

A Diverse 13,300 MW Fleet

32


0

5,000

10,000

15,000

20,000

25,000

30,000

2004

2005

2006

2007

`

Total Fossil Output     
(GWh)

… through a low-cost portfolio in which the majority of the output is
from coal facilities.

Fossil operations contribute to earnings …

A Diverse 9,800 MW Fleet (MW)

4,300

Steam / Peaking

3,150

Combined Cycle

2,350

Coal

Right Assets – Right Location

Fuel diversity

Technical diversity

Near load centers

Operation of 2,000 MW Texas Portfolio

Shared best practices

Leverage scale

33


Power’s eastern coal plants are in the right areas …

… and after capital investments, anticipate increased capacity factors.

System Interface

Power is also making considerable
investments beyond the pollution
control facilities for its coal assets.

Power’s New Jersey coal units are
mid-merit, with capacity factors
averaging 50% to 60%.

Capacity (MW)

Coal Units

1,578

Total

372

Bridgeport

648

Mercer 1&2

558

Hudson 2

Mercer 1&2

Hudson 2

Bridgeport Harbor 3

34


$0

$20

$40

$60

$80

2004

2005

2006

2007

2008E

$0

$2

$4

$6

$8

PJM Western Hub Off-Peak Prices

Coal Prices

$0

$20

$40

$60

$80

$100

2004

2005

2006

2007

2008E

$0

$5

$10

$15

$20

PJM Western Hub On-Peak Prices

Gas Prices

On-Peak Versus Gas

Off-Peak Versus Coal

$/MWh

$/MWh

Power market dynamics …

… have led to stronger electricity prices both on-peak and off-peak.

$/MB

$/MB

Note: Forward prices as of 2/29/08

35


$55

$60

$65

$70

$75

2009

2010

2011

8.5

9.0

9.5

10.0

10.5

2009

2010

2011

Rising coal and natural gas prices have driven LMPs ...

… and this trend may continue.

Central Appalachian Coal ($/Ton)

Natural Gas Henry Hub ($/MMbtu)

Electric PJM Western Hub RTC Price ($/MWh)

On Peak Heat Rate Expansion (MMbtu/MWh)

Note: Forward prices as of 2/29/08

$40

$50

$60

$70

$80

$90

2009

2010

2011

$6.5

$7.0

$7.5

$8.0

$8.5

$9.0

2009

2010

2011

36


$0

$5

$10

$15

$20

$25

$30

$35

$0

$5

$10

$15

$20

$25

$30

$35

$40

$45

As policymakers are looking to reduce CO2 emissions …

… Power stands in good position based on its low carbon fleet.

($/Ton)

The diversity of the portfolio makes Power well positioned to capture value
in a wide range of potential regulatory outcomes, with about half of Power’s
revenue increase expected to remain in EBITDA after the cost of carbon
credits.

$0

$200

$400

$600

$800

Estimated Impact of Carbon Prices on Energy Prices
and on Power’s EBITDA

37


Capacity prices in PJM to date have cleared above Net
Cost of New Entry (“CONE”) …

… with a proposal from PJM to increase Net CONE for the
2011/2012 auction to better represent rising construction costs.

$100

$150

$200

$250

$300

'07/'08

'08/'09

'09/'10

'10/'11

'11/'12

Delivery Year

Net Cost of
New Entry

Proposed Net
Cost of New
Entry

Proposed
Gross Cost of
New Entry

Gross Cost of
New Entry

Note: Auction prices and CONE reflect Eastern MAAC prices for 07/08, 08/09, and 09/10, and MAAC for 10/11, and RTO for 11/12

Auction pricing
for most of
Power’s assets

Potential
increase in
CONE

38


2003

2004

2005

2006

2007

2008

Ancillary services

Capacity

Congestion

Load shape

RECs

Transmission

Risk premium

Full Requirements

Round the Clock
PJM West
Forward Energy
Price

$33 - $34

$36 - $37

$55.59

$55.05            

$65.41

$44 - $46

~ $21

~ $18

~ $21

$102.51

$67 - $70

~ $32

$98.88

~ $41

$58-$60

$68 - $71

~ $43

$111.50

Increase in Full Requirements Component Due to:

Increased Congestion (East/West Basis)

Increase in Capacity Markets/RPM

Volatility in Market Increases Risk Premium

Power’s fleet diversity and location ...

Market Perspective – BGS Auction Results

… has enabled successful participation in each BGS auction and
cushioned customer impacts.

Note: BGS prices reflect PSE&G Zone

39


0%

25%

50%

75%

100%

2008

2009

2010

2011

$0

$50

$100

$150

$200

0%

25%

50%

75%

100%

2008

2009

2010

2011

$60

$70

$80

Power’s hedging program provides near-term stability from
market volatility …

… while remaining open to long-term market forces.

Estimated impact of
$10/MWh PJM West
around the clock
price change*
($/share)

Contracted Energy

Contracted Capacity

% sold

(left

scale)

Estimated impact of
$30/MW-day capacity
price change*
($/share)

Price
(right
scale)

Price

(right
scale)

* Assuming normal market commodity correlations

Power has
contracted for a
considerable
percent of its
output over the
next three years
at increasing
prices.

The pricing for
most of Power’s
capacity has been
fixed through May
of 2011, by virtue
of the completed
auctions in PJM
and NE.   

% sold

(left

scale)

$0.30 - $0.70

$0.15 - $0.45

$0.04 - $0.10

$0.01 - $0.02

$0.05 - $0.15

$0.00 - $0.01

$0.00 - $0.01

$0.00 - $0.01

40


Historical and Contracted Nuclear Fuel Cost

While nuclear fuel was volatile during 2007 …

… Power’s hedging strategy has mitigated market price
increases, with 100% hedged through 2011.

Contracted

$0

$2

$4

$6

$8

$10

2004

2005

2006

2007

2008

2009

2010

2011

41


0

6,000

12,000

18,000

2008

2009

2010

2011

Hedged

Coal

Total Output

85-95%

75-85%

55-65%

Power has contracts for supply of its coal through 2010 …

… and after installation of pollution control equipment, Power
anticipates increasing flexibility in fuel choices.

Coal Output

Percent coal hedged as
of Feb. 15
th, 2008

42


… are expected to drive continued increases in Power’s gross
margin.

Operational improvements and recontracting in
current markets …

Gross Margin ($/MWh)

Hedged Energy

Hedged Capacity

Unhedged Energy

Unhedged Capacity

$0

$20

$40

$60

2005

2006

2007

2008E

2009E

2010E

2011E

43


Power’s open EBITDA is approximately $2.6 - $2.8 billion …

… which will vary depending upon market drivers.

~ $40M

  $1/MWh

~ $69 - 73/MWh

(PJM-West)

         
Energy

Gas ~$8.50 to $9.00/MB

Coal ~ $2.85 to $3.15/MB

Fuel

~ $1.0 – 1.05B

O&M

Capacity

~ $120M

$10/KW-yr

~ $60 - $65/KW-yr

(~ $165 - $178/MW-day)

EBITDA
Impact

Sensitivity

Assumption

$1.0

$1.5

$2.0

$2.5

$3.0

2008 Forecasted EBITDA $2.05B - $2.25B

* Open EBITDA reflects unhedged results of Power at market prices shown above

44


PSE&G


PSE&G operates in an attractive market …

NJ is ranked 3rd nationally in personal
income per capita

Mid-Atlantic ReliabilityOne Award winner
six years running

Solid regulatory relationships on traditional
utility matters

(0.2%)

1.6%

Historical Annual
Load Growth

2003-2007

3,502 M Therms

44,709 GWh  

Electric Sales and  Gas Sold
and Transported

0.4%

1.7 Million

Gas

1.0%

2.1 Million

Electric

Projected Annual
Load Growth

2008 - 2012

Customers

1.3%

Historical Annual Load Growth

2003-2007

10,378*

Billing Peak (MW)

1,429

Network Circuit
Miles

1.4%

Projected Annual Load Growth

2008 - 2012

Electric and Gas Distribution Statistics (12/31/07)

Transmission Statistics (12/31/07)

… and through a disciplined capital allocation process has become
a recognized leader in delivering safe and reliable service.

N

E

W

S

N

E

W

S

COMBINED ELECTRIC &

GAS TERRITORIES

ELECTRIC TERRITORY

GAS TERRITORY

KEY:

*Billing Peak includes adjustment for Voltage Reduction

46


By 2018, NJ’s load is expected to grow by 4,000 MW …

Projects to NY

•  The Neptune HVDC project (685
   MW) connecting Sayreville to
   Long Island

•  The Linden VFT project (330
   MW) connecting Linden to
   Staten Island

•  The Bergen O66 project (670
   MW) connecting Bergen to
   ConEd's West 49th Street
   substation

•  The Bergen Q75 project (1,200
   MW) connecting Bergen to
   ConEd’s West 49th Street
   substation

•  Linden S104 project (200 MW)
   connecting Linden to Goethals

Projects to NJ

•  PSEG’s evaluation of
   the proposed backbone
   transmission projects:

•  Northern 500kV
   route into Jefferson
   and Roseland

•  Central 765kV route
   into Deans

•  Southern 500kV
   route into Salem

… yet the net import capability into NJ is only increasing by ~1,900 MW
indicating need for additional generation, DSM or transmission imports
requiring RTEP investment.

Total Import
Capability

~ 5,000 MW

Total Export
Capability

~ 3,100 MW

2008-2018 NJ Summer Peak
Annual Growth Rate = 1.8%

Sources: Imports: PSE&G Estimates; Exports:  PJM 2008 Regional Transmission Expansion Plan; and Load Growth: PJM 2008 Load Forecast Report

47


Transmission opportunities will require substantial
deployment of capital.

Transmission Growth

•  PJM approval was received for the $600-$650
   million Susquehanna to Roseland line in October
   2007

Siting and permitting process underway

Incentive filing submitted to FERC for:

•  150 BPS adder to ROE

•  100% CWIP in Rate Base

•  FERC approval of the MAPP projects also mandates
   an additional $100 million of capital at Salem/Hope
   Creek (2014-2015)

•  Pending FERC approval of Sub Transmission to
   Transmission system reliability investments
   represents about $250 million through 2012, post-
   2012 ~$60 million/year

•  Other approved RTEP projects ~$250 million also
   contribute meaningfully to improved reliability and
   earnings growth

•  Backbone projects are in preliminary stages but
   present real opportunity to improve reliability
   throughout the state, with the potential investment of
   ~ $1.5B through 2015

When coupled with formula rate design and additional incentives, it
will provide current return on forecasted capital expenditures
thereby improving profitability.  

Branchburg

Roseland

Jefferson

New Freedom

Smithburg

Deans

MAPP

Hope Creek

Salem

Project

I-765

Interstate

Project

48


RGGI enabling legislation was signed into law in January
2008.  It enables the utility to begin work with the BPU …

Section 13 of the RGGI Law permits utilities to invest and/or
offer programs in renewables, conservation and energy
efficiency

– The BPU will be adopting rules and regulations to determine utility
   participation and the mechanisms for recovery of costs, which must be
   completed during May/June 2008

Active Filings

– Carbon Abatement

$5 million pilot program intended to demonstrate PSE&G capabilities

– AMI

$15 million pilot program for advanced two-way communications.  Potential
$600 million in capital through 2013

– Solar Initiative

$100 million pilot program to finance installation of PV Solar.  Potential
PSE&G market up to $1.8 billion assuming 2% Solar RPS through 2020

… while we await the release of the Energy Master Plan.  Our three
pilot programs will prove our capabilities at reducing carbon in an
economic manner.

49


Even with our planned investments, delivery prices to
customers ...

6.8

5.5

5.1

0.00

4.00

8.00

2007

2012

2007

Regional

Average

Note: 2007 Rates are based on tariff rates in effect on December 31, 2007; Regional Average may not include Electric Transmission for all firms.

… are expected to grow less than inflation.

Electricity

0.48

0.45

0.42

0.00

0.20

0.40

0.60

2007

2012

2007

Regional

Average

Gas

2007-2012 Growth = 0.7%

Inflation = 2.1%

2007-2012 Growth = 1.4%

Inflation = 2.1%

Distribution

Transmission

Source: Rates from PSE&G, NYPSC and PAPUC; Inflation from Moody’s Economy.com, February 2008

50


PSEG Energy Holdings


Holdings’ portfolio has a diverse asset base . . .

Two businesses focused on maximizing value of existing investments

$45M - $60M projected 2008 operating earnings contribution

~ 55% of earnings from Resources

~ 45% of earnings from Global, targeting no international exposure by 2009

… with improved stability.

PSEG
Resources
49%

Chile & Peru
Distribution

Texas
Merchant
Generation

Other US
Generation

Two 1,000 MW CCGT‘s                 
1 in Central Texas (South Zone)     
1 in West Texas

2007 Operating Earnings*

86% of the portfolio is
in energy-related
leveraged leases

2008 Guidance - Operating Earnings

12%

22%

17%

Texas
Merchant
Generation

25%

PSEG
Resources   
56%

Other US
Generation

19%

~390MW owned  in
       CA, HI, NH         
fully contracted

$ 115M

$ 45M - $60M

* See page 62 for Items excluded from Net Income to reconcile to Operating Earnings

Two companies sold
in 2007. SAESA in
         Disc Ops.                 

52


Texas assets are a driver of Global’s results.

Two 1,000MW combined cycle facilities

- Two of the most efficient gas-fired plants in
     Texas, constructed in 2001

- Forced outage rate less than 2%

Market Environment:

Bilateral forward market

Day ahead balancing and ancillary services
bid market

No capacity payments…margins derived
from energy and ancillary services

Nodal market transition begins in 2009

Natural gas units on the margin 90%

Reserve margins have been decreasing

Assets favorably located

15%

4,700

3,820

880

1.9%

4,100

West

Odessa

-8%

21%

Reserve
Margin
2007*

1.9%

1.9%


Annual
Growth

14,796

20,280



Total



Gas

Nuclear,
Coal, Wind**

Hydro



Load



Zone

12,161

2,635

16,000

Houston

12,680

7,600

16,750

South

Guadalupe

* Reserve Margins calculated on data provided by Global Energy.                        
** Wind is based on 8.7% of installed capacity (ERCOT Peak reliability %).   

Odessa

Midland

Guadalupe

Austin

San Antonio




53


Due to market uncertainty …

Key drivers behind decision to remain largely unhedged beyond 2008:

Oversold market: Many generators seeking a hedge, limited appetite among hedge providers

Market uncertainty:

Uncertainty relating to move to a nodal pricing market

Recent sudden loss of wind generation in western ERCOT resulting in grid instability

Transmission maintenance: Extensive maintenance of 345kV line near Global’s Odessa unit

0%

20%

40%

60%

80%

100%

2008

2009

2010

2011

Texas CCGT Generation Output

… Global’s Texas assets are largely unhedged beyond 2008.

2008 Hedged
Spark Spread

$20-22/MWh

+/- $ 27 M

+/- $ 22 M

+/- $22 M

+/- $15M

Heat Rate:
+/- 500 Btu/KWh*

+/- $16M

+/- $14M

+/- $11M

+/- $7M

Natural Gas:
+/- $1/MMBtu*

*Pretax income effect




54


Projected long-term (2011) EBITDA influenced by several key
assumptions:

Major maintenance: approximately $10M higher in 2011 than in
2008

Capacity factor: projected to moderately increase due to decreasing
reserve margins impacting South Zone

Spark spreads: projected to be in line with 2008 levels

While there are a number of uncertainties relating to
future Texas market dynamics …

85 - 105

48 - 52%

19 – 20

13 -14%

8.25

2011

PSEG

Market

19 – 20

19.04

19.42

16.52

$11.97

Spark
Spread

85 - 105

45 - 47%

13%

8.50

2008

104

48.7%

15%

6.76

2007

130

54.4%

16%

10.82

2006

93

54.6%

17%

6.34

2005

$48

50.4%

25%

$5.42

2004

EBITDA

($M)

Capacity
Factors

Reserve
Margin

Nat Gas
NYMEX

… EBITDA is projected to remain at 2008 levels.




55


As renewable opportunities emerge …

… Global will focus on developing a renewable presence in core
markets.

Emerging aggressive RPS
targets in core PSEG markets
create an opportunity

PSEG is well positioned to
participate

Familiarity with infrastructure development, asset management,
energy policy, project financing and power markets

Experience with domestic and international renewable assets

PSEG Global is pursuing potential development of wind, biomass and solar projects, primarily in core markets

Cumulative 2008-2011 planned investment in renewables of
~$500 million

PSEG’s newly created entity, PSEG Renewable Generation, along with a private developer, submitted a proposal in response to a New Jersey BPU Office of Clean Energy Solicitation, to develop a 350 MW, 96 turbine wind farm approximately 16 miles off the southern New Jersey shore

The proposal is subject to receipt of all required permits, financing and other conditions

National Renewable Portfolio Standards (RPS)

56


0

20

40

60

2007

2008E

2009E

2010E

2011E

Resources is focused on managing its current investment
portfolio …

… which has experienced an improvement in counterparties credit
ratings (A3/A-).

PSEG Resources - Earnings Profile

2007 Adoption of FIN 48/FSP 13-2

Changes accounting methodology to record reserves

Results in lower lease revenues and higher interest expense totaling
approximately $25M (after-tax) per year

Cash flows will decrease modestly as the portfolio matures and as leases
terminate

$58M*

$30M-
$35M

$20M-
$25M

* Includes $12M gain from airline recovery and CBO settlement.

$5M-
$10M

$5M-
$10M

(Net Income)

57


Resources continues to monitor its tax risks …

PSEG position:

IRS disallowed deductions in November 2006 (as part of 1997-2000 audit)

PSEG has been in dialogue with the IRS

Ultimate resolution expected to take several years

In December 2007, PSEG made $100 million deposit to mitigate
financial risk associated with disallowed deductions

Other cases / legislative activity:

Monitoring several cases under appeal or scheduled for decision in 2008

No draft legislation providing for retroactive treatment of leases; prior
attempts were unsuccessful

… and maintains a flexible plan to handle the uncertainty.

58


PSEG


PSEG’s generating portfolio is well positioned …

… across multiple attractive markets.

Open Capacity

PSEG                                      

2007 Total US Generation

15,700 MW

PSEG Power                           

2007 Total Capacity

13,300 MW

PSEG Global

2007 Total Owned Capacity

2,400 MW

NY

NE

PJM

Texas

CA

Other

PJM

Other

Texas

NE

NY

PSEG Power              

2007 Energy Produced

53,200

GWh

Nuclear

54%

Coal

25%

Gas

19%

Oil 1%

Pumped

Storage

1%

Gas

92%

Oil 8%

PSEG Global              

2007 Energy Produced

9,800

GWh

Nuclear

46%

Gas

30%

Coal

21%

PSEG                        

2007 Energy Produced

63,000

GWh

Oil 2%

Pumped

Storage

1%

+

+

=

=

60


PSEG’s generation portfolio provides attractive cash …

Combined fleet represents 15,700 MW of competitive generation

Assets are positioned in four attractive merchant markets

Growth opportunity available

Existing assets positioned for incremental growth

Site expansion capability

$1,993

TOTAL

$104

PSEG Global
(Texas)

$1,889

PSEG Power

PSEG Generation

2007 EBITDA ($M)

$2,700 - $2,900

TOTAL

~$100

PSEG Global
(Texas)

$2,600 - $2,800

PSEG Power

PSEG Generation

Open EBITDA* ($M)

… with opportunity for additional growth in a disciplined manner.

* Open EBITDA reflects unhedged results at PSEG Power and PSEG Global at market prices and current volume.

61


Items Excluded from Net Income to Reconcile to Operating Earnings

Please see Slide 3 for an explanation of PSEG’s use of Operating Earnings as a non-GAAP financial measure and how it differs from Net Income.

2007

2006

2007

2006

Merger related Costs:

PSE&G

-

$      

(1)

$         

-

$        

Enterprise

-

         

(7)

           

(0.02)

      

Total Merger related Costs

-

$      

(8)

$         

        -

$      

(0.02)

$     

Impact of Asset Sales:

Loss on Sale of RGE

-

         

(178)

      

-

$      

(0.35)

$     

Chilquinta & Luz Del Sur

(23)

         

-

         

(0.05)

      

-

         

Write down of Turboven

(7)

           

-

         

(0.01)

      

-

         

Premium on bond redemption

(28)

         

(7)

           

(0.06)

      

(0.02)

      

Total Impact of Asset Sales

(58)

$      

(185)

$     

(0.12)

$   

(0.37)

$     

Discontinued Operations:

Power - Lawrenceburg

(8)

$         

(239)

$     

(0.02)

$   

(0.47)

$     

Holdings:

SAESA

(33)

         

57

         

(0.06)

      

0.11

        

Electroandes

57

         

16

         

0.11

      

0.03

        

Elcho and Skawina

-

            

226

        

-

         

0.45

        

                Total Holdings

24

$        

299

$      

0.05

$     

0.59

$      

Total Discontinued Operations

16

$        

60

$        

0.03

$     

0.12

$      

Years Ended Dec. 31,

Years Ended Dec. 31,

($ millions)

(EPS)

62