XML 93 R70.htm IDEA: XBRL DOCUMENT v3.8.0.1
Commitments And Contingent Liabilities (Environmental Matters) (Detail)
$ in Millions
Mar. 31, 2018
USD ($)
Potentially_Responsible_Party
entity
site
Station
Plant
mi
Dec. 31, 2017
mi
Site Contingency [Line Items]    
Number of miles related to the Passaic River constituting a facility as determined by the US Environmental Protection Agency | mi 17 17
Number of additional legal entities contacted by EPA in conjunction with Newark Bay study area contamination | entity 11  
Number of operating electric generating stations located on Hackensack River | Station 2  
Number of former MGP contamination sites located on Hackensack river in conjunction with Newark Bay study area contamination | site 1  
PSE And G [Member]    
Site Contingency [Line Items]    
Percentage of cost attributable to potentially responsible party 7.60%  
Pse G S Former Mgp Sites [Member] | Power [Member]    
Site Contingency [Line Items]    
Percentage of cost attributable to potentially responsible party 1.90%  
Passaic River Site Contingency [Member]    
Site Contingency [Line Items]    
Estimated Cleanup Costs EPA Preferred Method $ 2,300  
Accrual for Environmental Loss Contingencies $ 57  
Number Of Additional Potentially Responsible Parties Directed By New Jersey Department Of Environmental Protection To Arrange Damage Assessment For Lower Passaic River | Potentially_Responsible_Party 56  
Estimated cost of interim natural resource injury restoration $ 950  
Passaic River Site Contingency [Member] | PSE And G [Member]    
Site Contingency [Line Items]    
Number of former generating electric station | Plant 1  
Number of former Manufactured Gas Plant (MGP) sites | Plant 4  
Accrual for Environmental Loss Contingencies $ 46  
Passaic River Site Contingency [Member] | Power [Member]    
Site Contingency [Line Items]    
Accrual for Environmental Loss Contingencies 11  
Mgp Remediation Site Contingency [Member] | PSE And G [Member]    
Site Contingency [Line Items]    
Remediation Liability Recorded As Other Current Liabilities 79  
Remediation Liability Recorded As Other Noncurrent Liabilities 266  
Regulatory Assets 345  
Minimum [Member] | Passaic River Site Contingency [Member]    
Site Contingency [Line Items]    
Loss Contingency, Estimate of Possible Loss 518  
Minimum [Member] | Mgp Remediation Site Contingency [Member] | PSE And G [Member]    
Site Contingency [Line Items]    
Loss Contingency, Estimate of Possible Loss 345  
Accrual for Environmental Loss Contingencies 345  
Maximum [Member] | Passaic River Site Contingency [Member]    
Site Contingency [Line Items]    
Loss Contingency, Estimate of Possible Loss 3,200  
Maximum [Member] | Mgp Remediation Site Contingency [Member] | PSE And G [Member]    
Site Contingency [Line Items]    
Loss Contingency, Estimate of Possible Loss $ 391