Site Contingency [Line Items]              
Percentage of residential gas supply permitted to be recovered in gas hedging by BPU   80.00%          
Number of miles related to the Passaic River constituting a facility as determined by the US Environmental Protection Agency | mi   17          
Number Of Miles Pertaining To Passaic River Tidal Reach Required To Be Studied By Epa | mi   8          
Number of legal entities contacted by EPA in conjunction with Newark Bay study area contamination | entity   11          
Number of operating electric generating stations located on Hackensack River | Station   2          
Number of former MGP contamination sites located on Hackensack river in conjunction with Newark Bay study area contamination | site   1          
Accrued environmental costs   $ 401,000,000 $ 415,000,000        
Operation and Maintenance   3,008,000,000 2,978,000,000 $ 3,150,000,000      
New England Generation Fleet   13,156,000,000 11,842,000,000        
Clean Energy Program Current   142,000,000 142,000,000        
PSE&G [Member]              
Site Contingency [Line Items]              
Percentage Of Cost Attributable To Potentially Responsible Party           7.00%  
Accrued environmental costs   332,000,000 365,000,000        
Regulatory assets   3,518,000,000 3,360,000,000        
Operation and Maintenance   1,475,000,000 1,560,000,000 1,558,000,000      
New England Generation Fleet   591,000,000 569,000,000        
Clean Energy Program Current   $ 142,000,000 142,000,000        
Power [Member]              
Site Contingency [Line Items]              
Ownership Percentage Of Keystone Coal Fired Plant In Pennsylvania   23.00%          
Operation and Maintenance   $ 1,143,000,000 1,057,000,000 $ 1,186,000,000      
New England Generation Fleet   12,565,000,000 $ 11,273,000,000        
PSD NSR Regulations Site Contingency [Member] | Power [Member]              
Site Contingency [Line Items]              
Penalty per day from date of violation-minimum   25,000          
Penalty per day from date of violation-maximum   37,500          
MGP Remediation Site Contingency [Member] | PSE&G [Member]              
Site Contingency [Line Items]              
Estimated expenditures, low end of range   403,000,000          
Estimated expenditures, high end of range   460,000,000          
Accrued environmental costs   403,000,000          
Remediation liability recorded as other current liabilities   81,000,000          
Remediation liability recorded as environmental costs in noncurrent liabilities   322,000,000          
Regulatory assets   403,000,000          
Remedial Investigation And Feasibility Study [Member]              
Site Contingency [Line Items]              
Estimated, total cost of the study   30,000,000          
Estimated Total Cost Of Study Low End of Range   $ 25,000,000          
Passaic River mile 10.9 contaminant removal [Member]              
Site Contingency [Line Items]              
Percentage Of Cost Attributable To Potentially Responsible Party   3.00%          
PSE&G's Former MGP Sites [Member]              
Site Contingency [Line Items]              
Estimated, total cost of the study   $ 190,000,000          
Number Of Potentially Responsible Parties In Connection With Environmental Liabilities For Operations Conducted Near Passaic River | Potentially_Responsible_Party   52     73    
Number of MGP sites identified by registrant and the NJDEP requiring some level of remedial action | site   38          
Total Spend of Study to date   $ 158,000,000          
Company Share of Total Spend of Study to date   11,000,000          
PSE&G's Former MGP Sites [Member] | Power [Member]              
Site Contingency [Line Items]              
Percentage Of Cost Attributable To Potentially Responsible Party           1.00%  
Passaic River Site Contingency [Member]              
Site Contingency [Line Items]              
Estimated Cleanup Costs EPA Preferred Method   2,300,000,000          
Estimated cleanup costs agreed to by two potentially responsible parties $ 80,000,000            
Aggregate number of PRPs directed by the NJDEP to arrange for natural resource damage assessment and interim compensatory restoration along the lower Passaic River | Potentially_Responsible_Party             56
Estimated cost of interim natural resource injury restoration   950,000,000          
CPG Estimated Cleanup Costs Low Estimate   518,000,000          
CPG Estimated Cleanup Costs High Estimate   3,200,000,000          
CPG Targeted Method Cleanup Costs Low Estimate   518,000,000          
CPG Targeted Remedy Cleanup Costs High Estimate   772,000,000          
Accrual for Environmental Loss Contingencies   $ 57,000,000          
Passaic River Site Contingency [Member] | Transferred To Power From PSE&G [Member]              
Site Contingency [Line Items]              
Number of operating electric generating station (Essex Site) | Plant   1          
Passaic River Site Contingency [Member] | PSE&G [Member]              
Site Contingency [Line Items]              
Number of former generating electric station | Plant   1          
Number of former Manufactured Gas Plant (MGP) sites | Plant   4          
CPG Targeted Method Cleanup Costs Low Estimate   $ 10,000,000          
Accrual for Environmental Loss Contingencies, Period Increase (Decrease)   36,000,000          
Accrual for Environmental Loss Contingencies   46,000,000          
Passaic River Site Contingency [Member] | Power [Member]              
Site Contingency [Line Items]              
CPG Targeted Method Cleanup Costs Low Estimate   3,000,000          
Accrual for Environmental Loss Contingencies, Period Increase (Decrease)   8,000,000          
Accrual for Environmental Loss Contingencies   $ 11,000,000