XML 52 R63.htm IDEA: XBRL DOCUMENT v2.4.0.8
Commitments And Contingent Liabilities (Environmental Matters) (Detail) (USD $)
1 Months Ended 9 Months Ended 9 Months Ended
Sep. 30, 2013
entity
Station
site
mi
Dec. 31, 2012
Apr. 30, 2009
MW
Turbines
Sep. 30, 2013
PSE And G [Member]
Dec. 31, 2012
PSE And G [Member]
Sep. 30, 2013
Power [Member]
Dec. 31, 2011
PSEG [Member]
Jun. 30, 2008
Passaic River Site Contingency [Member]
Sep. 30, 2013
Passaic River Site Contingency [Member]
Dec. 31, 2003
Passaic River Site Contingency [Member]
Potentially_Responsible_Party
Sep. 30, 2013
Passaic River Site Contingency [Member]
PSE And G [Member]
Plant
Feb. 28, 2009
Passaic River Site Contingency [Member]
Power [Member]
Defendant
Sep. 30, 2013
PSE&G's Former MGP Sites [Member]
site
Sep. 30, 2013
PSE&G's Former MGP Sites [Member]
PSE And G [Member]
Potentially_Responsible_Party
Person
Sep. 30, 2013
PSD NSR Regulations Site Contingency [Member]
Power [Member]
Sep. 30, 2013
MGP Remediation Site Contingency [Member]
PSE And G [Member]
Sep. 30, 2013
Remedial Investigation And Feasibility Study [Member]
Sep. 30, 2013
Passaic River mile 10.9 contaminant removal [Member]
Dec. 31, 2006
PSE&G's Former MGP Sites [Member]
PSE And G [Member]
Dec. 31, 2006
PSE&G's Former MGP Sites [Member]
Power [Member]
Sep. 30, 2013
Transferred To Power From Pse G [Member]
Passaic River Site Contingency [Member]
Plant
Site Contingency [Line Items]                                          
Number of miles related to the Passaic River constituting a facility as determined by the US Environmental Protection Agency 8                                        
Number of miles on Passaic River tidal reach required to be studied as determined by the US Environmental Protection Agency 17                                        
Number of operating electric generating station (Essex Site)                                         1
Number of former generating electric station                     1                    
Number of former Manufactured Gas Plant (MGP) sites                     4                    
Estimated, total cost of the study                           $ 117,000,000     $ 30,000,000        
Number of potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                           73              
Number of current potentially responsible parties ("PRPs") in connection with environmental liabilities for operations conducted near Passaic River                           70              
Percentage of cost attributable to potentially responsible party                                   3.00% 1.00% 5.00%  
Estimated cleanup costs-low estimate                 1,300,000,000                        
Estimated cleanup costs-high estimate                 3,700,000,000                        
Estimated cleanup costs agreed to by two potentially responsible parties               80,000,000                          
Aggregate number of defendants including registrant entities Power and PSE&G included in NJDEP complaint filed February 2009                       320                  
Number of additional PRPs directed by the NJDEP to arrange for natural resource damage assessment and interim compensatory restoration along the lower Passaic River                   56                      
Estimated cost of interim natural resource injury restoration                 950,000,000                        
Number of additional legal entities contacted by EPA in conjunction with Newark Bay study area contamination 11                                        
Number of operating electric generating stations located on Hackensack River 2                                        
Number of former MGP contamination sites located on Hackensack river in conjunction with Newark Bay study area contamination 1                                        
Number of MGP sites identified by registrant and the NJDEP requiring some level of remedial action                         38                
Estimated expenditures, low end of range                               476,000,000          
Estimated expenditures, high end of range                               552,000,000          
Accrued environmental costs 431,000,000 537,000,000   380,000,000 486,000,000                     476,000,000          
Remediation liability recorded as other current liabilities                               107,000,000          
Remediation liability recorded as environmental costs in noncurrent liabilities                               369,000,000          
Regulatory assets                               476,000,000          
Penalty per day from date of violation-minimum                             25,000            
Penalty per day from date of violation-maximum                             37,500            
Ownership percentage of Keystone Coal fired plant in Pennsylvania           23.00%                              
Parent companies share of investment in Clean Air Act requirements             147,000,000                            
Number of combustion turbines required to be retired to meet NOx emission reduction requirements     86                                    
Number of MW required to be retired to meet NOx emission reduction requirements     1,750                                    
Number of steam electric generation units requiring significant capital investment for additional controls or retirement as determined by NJDEP     4                                    
Number of MW requiring significant capital investment for additional controls or retirement as determined by NJDEP     400                                    
New Salem facility cooling towers estimated cost total $ 1,000,000,000         $ 1,000,000,000