Regulatory and Rate Matters
12 Months Ended
Dec. 31, 2022
Regulated Operations [Abstract]  
Regulatory and Rate Matters Regulatory and Rate Matters
The Company is involved in various regulatory matters, some of which contain contingencies that are subject to the same uncertainties as those described in Note 16.

PNMR

Merger Regulatory Proceedings

On October 20, 2020, PNMR, Avangrid and Merger Sub entered into the Merger Agreement pursuant to which Merger Sub will merge with and into PNMR, with PNMR surviving the Merger as a wholly-owned subsidiary of Avangrid. Among other conditions, consummation of the Merger is subject to receipt of all required regulatory approvals. In 2021, five federal agencies and the PUCT completed their reviews and approved the Merger, with the NMPRC as the only regulatory agency yet to approve the Merger. The original application before the NMPRC was filed in November 2020. For additional information on the Merger regulatory proceedings, including supplemental regulatory filings that were required due to the Merger Agreement being amended in January 2022, see Note 22.

PNM

New Mexico General Rate Case

2024 Rate Change

On December 5, 2022, PNM filed an application with the NMPRC for a general increase in retail electric rates. The requested change primarily reflects investments in transmission and distribution infrastructure, largely offset by cost reductions resulting from PNM’s transition to lower-cost, clean generation resources. Key aspects of PNM’s request are:

Recovery on total rate base of $2.7 billion, based on a calendar year 2024 FTY.
An increase of $63.8 million in retail non-fuel revenues
ROE of 10.25%
Drivers of revenue deficiency
Needed investments in transmission, distribution, and generation facilities for six years of operations, covering 2019 through 2024. In particular, PNM is focused on expanding and improving its aging infrastructure to provide the underlying infrastructure crucial to a successful energy transition and to support distribution generation.
Cost reductions from closing SJGS and the expiration of 114 MW leased PVNGS capacity.
Lower-cost replacements for SJGS and PVNGS using renewable energy purchases and battery storage systems. Some of these costs will be reflected in PNM’s requested base rates, while energy purchases will flow through PNM’s FPPAC.
Updated depreciation rates, including new terminal dates, for natural gas plants to align with the Company’s 2040 carbon-free portfolio goal.
Proposed customer-oriented services, such as fee-free payment options, and increased payment location options to address the needs of customers.
Increasing operating costs reflecting six years of inflation, including the impacts of today’s current high inflation and the expenses that come with providing quality electric service to customers. Distribution maintenance increases also are necessary to enhance vegetation management programs to protect lines and support wildfire mitigation efforts. PNM has endeavored to keep operating costs below inflationary levels.
Increased energy sales and customer loads since PNM’s last filing help cover the increased cost of doing business as PNM continues the energy transition.
Overall cost of capital based on PNM’s actual regulatory capital structure of 52% equity / 48% debt, reflecting the increase in the ROE that shareholders require to fund new investments in PNM’s system, which is partially offset by lower cost of debt.
Proposed ratemaking treatment of PVNGS Leased Interest and testimony supporting the prudence of PNM’s decisions to renew the five leases and repurchase 64.1 MW of PVNGS Unit 2 capacity regarding PVNGS; see PVNGS Lease Abandonment Application below.
Proposed return of the unamortized unprotected portion of excess deferred federal income taxes to customers over a five-year period, beginning when rates from the case go into effect.
Time-of-Day pilot proposal with the objective of incentivizing customers, through price signals, to use energy during the day when renewable generation is abundant.
On December 14, 2022, the NMPRC suspended PNM’s advice notice in the case for a period of nine months beginning January 4, 2023 and appointed hearing examiners. On January 6, 2023, the hearing examiners issued an order setting out a procedural schedule with a hearing to begin June 20, 2023. On February 3, 2023, the hearing examiners issued a recommended decision recommending extension of the statutory suspension period for an additional three months. PNM is unable to predict the outcome of this matter.

On January 3, 2023, a joint motion and brief for accounting order was filed with the NMPRC. NM AREA, Staff, WRA, Bernalillo County, NEE, and CCAE (the “Joint Movants”) jointly filed the motion which asked that the NMPRC issue an accounting order for the purpose of requiring PNM to create a regulatory liability to track the costs associated with the retirement of SJGS which are currently embedded in base rates. The Joint Movants requested that the NMPRC order PNM to track all costs associated with the running and management of SJGS totaling $98.3 million annually and requested that the accounting order require PNM to create a regulatory liability to track the SJGS costs from the time Unit 1 and Unit 4 were abandoned, July 1, 2022, and October 1, 2022, respectively, until the date new rates are put into effect, and for any other relief the NMPRC deems is just and reasonable. On February 3, 2023, the hearing examiners issued an order requiring PNM to create a pure accounting order regulatory liability that tracks cost of SJGS which are currently embedded in base rates. On February 6, 2023, PNM filed a motion to permit interlocutory appeal of the hearing examiners order requiring PNM to create a pure accounting order regulatory liability. On February 10, 2023, the hearing examiners issued an order denying PNM’s interlocutory appeal and clarified that the accounting order only required PNM to track the costs of SJGS. On February 14, 2023, NM AREA, Staff, WRA, ABCWUA, and CCAE filed a joint motion for clarification of the hearing examiners accounting order. For additional discussion on the retirement of SJGS and the associated accounting impacts see SJGS Abandonment Application discussion below.

Renewable Energy Portfolio Standard

As discussed in Note 16, the ETA amends the REA including removal of diversity requirements and certain customer caps and exemptions relating to the application of the RPS under the REA.
The REA provides for streamlined proceedings for approval of utilities’ renewable energy procurement plans, assures that utilities recover costs incurred consistent with approved procurement plans, and requires the NMPRC to establish a RCT for the procurement of renewable resources to prevent excessive costs being added to rates. The ETA sets a RCT of $60 per MWh using an average annual levelized resource cost basis. PNM makes renewable procurements consistent with the NMPRC approved plans and recovers certain renewable procurement costs from customers through the renewable energy rider billed on a KWh basis.

Included in PNM’s approved procurement plans are the following renewable energy resources:
158 MW of PNM-owned solar-PV facilities
A PPA through 2044 for the output of New Mexico Wind, having a current aggregate capacity of 200 MW, and a PPA through 2035 for the output of Red Mesa Wind, having an aggregate capacity of 102 MW
A PPA through 2040 for 140 MW of output from La Joya Wind II
A PPA through 2042 for the output of the Lightning Dock Geothermal facility with a current capacity of 11 MW
Solar distributed generation, aggregating 239.1 MW at December 31, 2022, owned by customers or third parties from whom PNM purchases any net excess output and RECs

On June 1, 2021 PNM filed its 2022 renewable energy procurement plan which proposed to collect $66.9 million for the year. PNM did not propose any new procurements in the plan, but proposed to retire a small number of RECs in 2022 from resources that had not been previously approved as part of the RPS plan. The NMPRC assigned this matter to a hearing examiner and a hearing was held on September 30, 2021. On October 15, 2021, NMPRC Staff and PNM jointly filed the post-hearing brief stating that pending issues to the case had been resolved with PNM agreeing to certain compliance provisions. On October 30, 2021, the hearing examiner issued a recommended decision recommending approval of PNM’s filing. On November 17, 2021, the NMPRC issued a final order adopting the recommended decision. The 2022 renewable energy procurement plan became effective on January 1, 2022.

On June 1, 2022, PNM filed its renewable energy procurement plan for 2023 which proposed to collect $61.0 million for the year. PNM did not propose any new resource procurements, and the plan states that existing projects will meet the applicable RPS standards of 2023. A hearing was held September 8, 2022, briefs were filed September 23, 2022, and response briefs were filed September 28, 2022. On October 18, 2022, the hearing examiners issued a recommended decision recommending approval of all PNM's requests. On November 9, 2022, the NMPRC issued a final order adopting the
recommended decision. The 2023 renewable energy procurement plan became effective on January 1, 2023.

The following sets forth PNM’s revenues recorded for the renewable energy rider:

Year EndedAnnual Revenues
(In millions)
2020$56.4
202161.7
202260.3
Under the renewable rider, if PNM’s earned rate of return on jurisdictional equity in a calendar year, adjusted for items not representative of normal operations, exceeds the NMPRC-approved rate by 0.5%, PNM is required to refund the excess to customers during May through December of the following year. PNM slightly exceeded this limitation in 2022 and accordingly, recorded a current regulatory liability on the Consolidated Balance Sheets and a reduction to electric operating revenues in the Consolidated Statement of Earnings as of and for the period ending December 31, 2022. PNM did not exceed the limitation in 2021. The NMPRC currently has an open inquiry docket into the continued use of renewable riders by New Mexico utilities. PNM is unable to predict the outcome of the NMPRC’s inquiry.
Energy Efficiency and Load Management
Program Costs and Incentives/Disincentives

The New Mexico Efficient Use of Energy Act (“EUEA”) requires public utilities to achieve specified levels of energy savings and to obtain NMPRC approval to implement energy efficiency and load management programs. The EUEA requires the NMPRC to remove utility disincentives to implementing energy efficiency and load management programs and to provide incentives for such programs. The NMPRC has adopted a rule to implement this act. PNM’s costs to implement approved programs and incentives are recovered through a rate rider. During the 2019 New Mexico legislative session, the EUEA was amended to, among other things, include a decoupling mechanism for disincentives, preclude a reduction to a utility’s ROE based on approval of disincentive or incentive mechanisms, establish energy savings targets for the period 2021 through 2025, and require that annual program funding be 3% to 5% of an electric utility’s annual customer bills excluding gross receipt taxes, franchise and right-of-way access fees, provided that a customer’s annual cost not exceed seventy-five thousand dollars.
On April 15, 2020, PNM filed an application for energy efficiency and load management programs to be offered in 2021, 2022, and 2023. The proposed program portfolio consists of twelve programs with a total annual budget of $31.4 million in 2021, $31.0 million in 2022, and $29.6 million in 2023. The application also sought approval of an annual base incentive of 7.1% of the portfolio budget if PNM were to achieve energy savings of at least 80 GWh in a year. The proposed incentive would increase if PNM is able to achieve savings greater than 94 GWh in a year. The application also proposed an advanced metering infrastructure (“AMI”) pilot program, which included the installation of 5,000 AMI meters at a cost of $2.9 million. PNM proposed the pilot program to comply with an NMPRC order denying PNM’s February 2016 application to replace its existing customer metering equipment with AMI. PNM did not recommend the AMI pilot program due to the limited cost-effective benefits under a pilot structure. On September 17, 2020, the hearing examiner in the case issued a recommended decision recommending that PNM's proposed energy efficiency and load management program be approved, with the exception of the proposed AMI pilot program. On October 28, 2020, the NMPRC issued an order adopting the recommended decision in its entirety.

On April 15, 2022, PNM filed an advice notice which reconciles the actual 2021 energy efficiency profit incentive collections with the profit incentive authorized by the NMPRC resulting in an additional $0.3 million incentive to be collected through the energy efficiency rider during the remainder of 2022. The additional incentive was authorized for 2021 because annual energy savings for the year exceeded 94 GWh. PNM began collecting the incentive effective May 31, 2022.

2020 Decoupling Petition

As discussed above, the legislature amended the EUEA to, among other things, include a decoupling mechanism for disincentives. On May 28, 2020, PNM filed a petition for approval of a rate adjustment mechanism that would decouple the rates of its residential and small power rate classes. Decoupling is a rate design principle that severs the link between the recovery of fixed costs of the utility through volumetric charges. On July 13, 2020, NEE, ABCWUA, the City of Albuquerque, and Bernalillo County filed motions to dismiss the petition on the grounds that approving PNM’s proposed rate adjustment mechanism outside of a general rate case would result in retroactive ratemaking and piecemeal ratemaking. The motions to
dismiss also alleged that PNM’s proposed rate adjustment mechanism is inconsistent with the EUEA. On October 2, 2020, PNM requested an order to vacate the public hearing, scheduled to begin October 13, 2020, and staying the proceeding until the NMPRC decides whether to entertain a petition to issue a declaratory order resolving the issues raised in the motions to dismiss. On October 7, 2020, the hearing examiner approved PNM's request to stay the proceeding and vacate the public hearing and required PNM to file a petition for declaratory order by October 30, 2020. On October 30, 2020, PNM filed a petition for declaratory order asking the NMPRC to issue an order finding that full revenue decoupling is authorized by the EUEA. On November 4, 2020, ABCWUA and Bernalillo County jointly filed a competing petition asking the NMPRC to issue a declaratory order on the EUEA’s requirements related to disincentives. On November 24, 2020, the NMAG requested that the NMPRC deny both petitions for declaratory orders and instead address disincentives under the EUEA in a rulemaking. On March 17, 2021, the NMPRC issued an order granting the petitions for declaratory order, commencing a declaratory order proceeding to address the petitions, denying the NMAG’s request to initiate a rulemaking, and appointing a hearing examiner to preside over the declaratory order proceeding.

On January 14, 2022, the hearing examiner issued a recommended decision recommending the NMPRC find that the EUEA does not mandate the NMPRC to authorize or approve a full decoupling mechanism, defining full decoupling as limited to energy efficiency and load management measures and programs. The recommended decision also states that a utility may request approval of a rate adjustment mechanism to remove regulatory disincentives to energy efficiency and load management measures and programs through a stand-alone petition, as part of the utility’s triennial energy efficiency application or a general rate case and that PNM is not otherwise precluded from petitioning for a rate adjustment mechanism prior to its next general rate case. Finally, the recommended decision stated that the EUEA does not permit the NMPRC to reduce a utility’s ROE based on approval of a disincentive removal mechanism founded on removing regulatory disincentives to energy efficiency and load management measures and programs. The recommended decision does not specifically prohibit a downward adjustment to a utility’s capital structure, based on approval of a disincentive removal mechanism. On April 27, 2022, the NMPRC issued an order adopting the recommended decision in its entirety. On May 24, 2022, PNM filed a notice of appeal with the NM Supreme Court. On June 23, 2022, PNM and other parties filed Statement of Issues with the NM Supreme Court. On September 6, 2022, PNM and other parties filed Briefs in Chief with the NM Supreme Court. On October 21, 2022, NEE filed Answer Briefs with the NM Supreme Court. PNM cannot predict the outcome of this matter.

FPPAC Continuation Application

NMPRC rules require public utilities to file an application to continue using their FPPAC every four years. On June 17, 2022, PNM filed the required continuation application and requested that its FPPAC be continued without modification. On July 21, 2022, the NMPRC issued an order requiring Staff to file a response to PNM's application and set certain procedural dates. On August 4, 2022, Staff filed a response to PNM's application stating that while PNM’s filing demonstrates that PNM’s FPPAC meets the requirements of NMPRC rules, it would support a hearing if the NMPRC desires one. On October 26, 2022, the NMPRC appointed a hearing examiner and a hearing is scheduled to begin April 24, 2023. On December 30, 2022, the hearing examiner issued an order requiring briefing on consolidation of this case into the 2024 Rate Change and PNM and other parties filed responses to the order on January 6, 2023. On January 27, 2023, the hearing examiner issued a recommended decision recommending that the FPPAC Continuation Application be consolidated into the 2024 Rate Change. On January 5, 2023, ABCWUA, Bernalillo County, CCAE, NEE, and WRA filed a joint motion to expand the scope of the case to include a prudence review. PNM cannot predict the outcome of this matter.

Integrated Resource Plans

NMPRC rules require that investor-owned utilities file an IRP every three years. The IRP is required to cover a 20-year planning period and contain an action plan covering the first four years of that period. On September 14, 2022, the NMPRC adopted revisions to the IRP Rule. The final order revamps and modernizes the planning process to accommodate increased stakeholder involvement. The IRP Rule establishes a collaborative facilitated process for a utility and stakeholders to agree on a statement of need for potential new or additional resources, as well as an action plan to guide procurement or development of resources to meet the stated need. A most-cost-effective portfolio of resources shall be derived from the statement of need analysis. The statement of need and action plan must be accepted before the utility begins the resource solicitation process pursuant to the IRP Rule. Following acceptance of the statement of need and action plan, a utility will provide the NMPRC and intervenors drafts of the request for proposals (“RFP”) and a timeline for issuing, receiving, evaluating, and ranking bids. The NMPRC will then appoint an Independent Monitor (“IM”) to oversee the RFP process, which allows for parties and the IM to comment on the RFP consistency with the IRP, after which the utility issues the RFP. Within 75 days of receiving bids the utility shall provide the IM with results including pricing and non-price evaluation criteria, ranking of bids, chosen portfolio and alternatives that also meet the needs; the IM then rules on the fairness of the RFP execution. Acceptance of the statement of need and action plan will not constitute a finding of prudency or pre-approval of costs associated with the additional resources.
Following the RFP and IM processes, the utility may apply approvals, and any costs incurred to implement the action plan will be considered in a general rate case and/or resource acquisition proceeding. On October 14, 2022, PNM and other investor-owned utilities filed motions for rehearing with the NMPRC. On October 26, 2022, the NMPRC issued an order partially granting and partially denying certain aspects of PNM's and the other investor-owned utilities' motions for rehearing. On November 2, 2022, the NMPRC adopted an amended IRP Rule. On December 2, 2022, PNM filed an appeal with the NM Supreme Court of the NMPRC’s final order which adopted revisions to the IRP Rule. On January 3, 2023, PNM and two other investor-owned utilities filed statements of issues with the NM Supreme Court. PNM cannot predict the outcome of this matter.
Abandonment Applications made under the ETA

As discussed in Note 16, the ETA sets a statewide standard that requires investor-owned electric utilities to have specified percentages of their electric-generating portfolios be from renewable and zero-carbon generating resources.

SJGS Abandonment Application

On July 1, 2019, PNM filed a Consolidated Application for the Abandonment and Replacement of SJGS and Related Securitized Financing Pursuant to the ETA (the “SJGS Abandonment Application”). The SJGS Abandonment Application sought NMPRC approval to retire PNM’s share of SJGS after the existing coal supply and participation agreements end in June 2022, for approval of replacement resources, and for the issuance of energy transition bonds. PNM’s application proposed several replacement resource scenarios. The SJGS Abandonment Application also included a request to issue approximately $361 million of energy transition bonds (the “Securitized Bonds”). PNM’s request for the issuance of Securitized Bonds included approximately $283 million of forecasted undepreciated investments in SJGS at June 30, 2022, an estimated $28.6 million for plant decommissioning and coal mine reclamation costs, approximately $9.6 million in upfront financing costs, and approximately $20.0 million for job training and severance costs for affected employees. Proceeds from the Securitized Bonds would also be used to fund approximately $19.8 million for economic development in the Four Corners area.

On July 10, 2019, the NMPRC issued an order requiring the SJGS Abandonment Application be considered in two proceedings: one addressing SJGS abandonment and related financing, and the other addressing replacement resources. Hearings on the abandonment and securitized financing proceedings were held in December 2019 and hearings on replacement resources were held in January 2020. On February 21, 2020, the hearing examiners issued two recommended decisions recommending approval of PNM’s proposed abandonment of SJGS, subject to approval of replacement resources, and approval of PNM’s proposed financing order to issue Securitized Bonds.  The hearing examiners recommended that PNM be authorized to abandon SJGS by June 30, 2022, and to record regulatory assets for certain other abandonment costs that are not specifically addressed under the provisions of the ETA to preserve its ability to recover the costs in a future general rate case. The hearing examiners recommended that this authority only extend to the deferral of the costs and it not be an approval of any ratemaking treatment. The hearing examiners also recommended PNM be authorized to issue Securitized Bonds of up to $361 million and establish a rate rider to collect non-bypassable customer charges for repayment of the bonds and be subject to bi-annual adjustments (the “Energy Transition Charge”). The hearing examiners recommended an interim rate rider adjustment upon the start date of the Energy Transition Charge to provide immediate credits to customers for the full value of PNM’s revenue requirement related to SJGS until those reductions are reflected in base rates. In addition, the hearing examiners recommended PNM be granted authority to establish regulatory assets to recover costs that PNM will pay prior to the issuance of the Securitized Bonds, including costs associated with the bond issuances as well as for severances, job training, economic development, and workforce training. On April 1, 2020, the NMPRC unanimously approved the hearing examiners’ recommended decisions regarding the abandonment of SJGS and the related securitized financing under the ETA. On April 10, 2020, CFRE and NEE filed a notice of appeal with the NM Supreme Court of the NMPRC’s approval of PNM’s request to issue securitized financing under the ETA. On January 10, 2022, the NM Supreme Court issued its decision rejecting CFRE’s and NEE’s constitutional challenges to the ETA and affirmed the NMPRC final order.

In March 2020, PNMR and PNM recorded obligations of $9.4 million and $8.1 million for estimated severances, $8.9 million for obligations to fund severances and other costs of WSJ LLC employees and to fund $19.8 million to state agencies for economic development and workforce training. The total amount recorded for these estimates in 2021 was $36.9 million and $36.0 million reflected in other current liabilities and $36.9 million as a corresponding deferred regulatory asset on PNMR's and PNM's Consolidated Balance Sheets at December 31, 2021. In 2022, PNM made payments of $6.6 million for severances, $8.9 million for obligations to fund severances and other costs of WSJ LLC employees and funded the $19.8 million to state agencies and PNMR's and PNM's Consolidated Balance Sheets at December 31, 2022 reflects other current liabilities of $0.7 million and deferred regulatory assets of $37.2 million. In addition, PNM recorded $1.6 million as Regulatory disallowance and restructuring costs on PNMR's and PNM's Consolidated Statements of Earnings for PNM's non-retail share of estimated severance in the year ended December 31, 2022.
On September 29, 2022, SJGS was removed from service and as a result, PNM made the following adjustments reflected on the Consolidated Balance Sheets as of December 31, 2022:

Net Increase (decrease)
(In thousands)
Current Assets:
Inventory$(6,430)
Utility Plant:
Net utility plant(382,798)
Deferred Charges and Other Assets:
Regulatory assets - ETA (1)
289,381 
Regulatory assets - Non-ETA (2)
22,593 
Deferred Credits and Other Liabilities:
Regulatory liabilities (3)
(77,254)
$— 
(1) To be recovered through the Energy Transition Charge, which includes undepreciated investments of $274.9 million and plant decommissioning of $14.5 million, previously reflected in Net utility plant.
(2) Authorized to be recorded as regulatory assets for certain other abandonment costs that are not specifically addressed under the provisions of the ETA to preserve its ability to recover the costs in a future general rate case, which includes obsolete inventory of $6.4 million and plant decommissioning of $16.2 million, previously reflected in Net utility plant.
(3) Includes cost of removal and accelerated depreciation of SNCRs.

On July 29, 2020, the NMPRC issued an order approving resource selection criteria identified in the ETA that would include PPAs for 650 MW of solar and 300 MW of battery storage. On September 28, 2020, PNM filed an application for approval of the final executed contracts for the replacement resources, which was approved by the NMPRC on December 2, 2020. On October 14, 2022, PNM filed a motion for approval of amendments on a 200 MW solar PPA combined with the 100 MW battery storage agreement, as well as a letter agreement with the project developer providing payments to PNM for delay damages. The amendments included price increases on both the solar PPA and battery storage agreement and the commercial operation date extension to May 2024. No party filed objections and the amendments were deemed approved.

On February 28, 2022, WRA and CCAE filed a joint motion for order to show cause and enforce financing order and supporting brief, which requests that the NMPRC order PNM to show cause why its rates should not be reduced at the time SJGS is abandoned and to otherwise enforce the NMPRC’s April 1, 2020 final order. On March 14, 2022, PNM filed its response to the joint motion to show cause refuting the movants' claims that the ETA and April 1, 2020 financing order require Securitized Bonds be issued at the time of abandonment and that rates be reduced upon abandonment as not being legally supportable. The movants filed joint replies on March 24, 2022. In response, on March 30, 2022, the NMPRC issued an order appointing hearing examiners to conduct a hearing, if necessary, and to issue a recommended decision to address the issues raised by the motion. PNM filed testimony on April 20, 2022, and a hearing was held on May 23, 2022.

On June 17, 2022, the hearing examiners issued a recommended decision requesting the NMPRC issue an order that would require PNM to:

Revise its rates to remove all of the costs of SJGS Unit 1 by issuing rate credits of $21.1 million on an annual basis, to customers by July 1, 2022
Revise its rates again, to remove all costs of SJGS Unit 1, Unit 4, and common facilities by increasing the rate credits to $98.3 million on an annual basis, by October 1, 2022
Transfer payments due and owing to the Indian Affairs Fund, Economic Development Assistance Fund, and the Displaced Workers Assistance Fund within 30 days of the abandonment of SJGS Unit 1
Include (in its next rate case application) an explanation and defense of the prudence in the timing of the issuance of Securitized Bonds beyond the abandonment dates and what actions were taken to protect customers from interest rate increases occurring as well as the continued marketability of the Securitized Bonds issued

Following the filing of exceptions and responses, on June 29, 2022, the NMPRC issued its final order adopting and approving the recommended decision in its entirety with certain additions. The additions to the final order include requirements for PNM file a report, no later than October 15, 2022, that contains a record of all of its costs incurred in the show cause proceeding so that the prudence of those costs will be known and be subject to review in PNM's future rate case and that the prudency review shall include a compliance filing to enable a review of the prudence of PNM's decision to delay bond issuance
beyond the dates of the SJGS abandonment. On June 29, 2022, PNM filed an Emergency Motion and Supporting Brief for Stay with the NMPRC ("PNM's NMPRC Emergency Motion"). On June 30, 2022, PNM filed a Notice of Appeal and an Emergency Motion for Partial Interim Stay of the NMPRC's Final Order with the NM Supreme Court ("PNM's NM Supreme Court Emergency Motion"). On July 12, 2022, several parties filed responses to PNM's NMPRC Emergency Motion. On July 21, 2022, the NMPRC adopted an order denying PNM's NMPRC Emergency Motion. Subsequently, on July 25, 2022, PNM filed another emergency motion seeking an immediate and ongoing stay from the NM Supreme Court for the pendency of the appeal. In the interim, PNM began issuing rate credits effective July 31, 2022. On July 28, 2022, PNM made payments totaling $19.8 million to the Indian Affairs Fund, Economic Development Assistance Fund, and the Displaced Workers Assistance Fund. On September 2, 2022, the NM Supreme Court issued an order granting PNM's July 25, 2022 motion for partial stay and as a result PNM suspended issuing rate credits. On October 11, 2022, WRA filed a motion for emergency oral argument in PNM's NM Supreme Court Emergency Motion. On October 14, 2022, PNM made its required compliance filing under the NMPRC's June 29, 2022 final order. On November 1, 2022, the NM Supreme Court issued an order continuing the partial stay of the rate credits during the pendency of the appeal. On November 15, 2022, PNM filed a supplemental compliance filing to its October 14, 2022 compliance filing. On November 21, 2022, NEE filed a motion for rehearing and to lift the stay and WRA, CCAE, Prosperity Works, the NMAG and Bernalillo County filed a joint motion for rehearing with the NM Supreme Court in PNM’s appeal of the NMPRC’s final order in the SJGS financing order to show cause. On December 22, 2022, the NM Supreme Court issued an order denying the motions for rehearing. PNM cannot predict the outcome of this matter.

As required under GAAP, PNM evaluated the consequences of the NMPRC's June 29, 2022 order and the related NM Supreme Court appeal and order granting the stay, as well as the subsequent motions and the hearing examiners order filed in the 2024 Rate Change. Specifically, PNM assessed the likelihood PNM would be required to establish a regulatory liability for the benefit of the rate credits and the associated carrying charge during the pendency of the stay. These evaluations indicate that it is reasonably possible that PNM would be successful on the issues it was appealing and defending at the NMPRC, and therefore, no loss or regulatory liability has been recorded as of December 31, 2022. The amount of any such loss to be recorded would depend on the ultimate outcome of the appeal, however based on amounts currently included in base rates, discussed above, PNM estimates the potential loss as of December 31, 2022 to be $28.7 million.

Four Corners Abandonment Application

On November 1, 2020, PNM entered into the Four Corners Purchase and Sale Agreement with NTEC, pursuant to which PNM agreed to sell its 13% ownership interest (other than certain transmission assets) in Four Corners to NTEC. The sale is contingent upon NMPRC approval and is expected to close by the end of 2024. In connection with the sale, PNM would make payments of $75.0 million to NTEC for relief from its obligations under the coal supply agreement for Four Corners after December 31, 2024. Pursuant to the Four Corners Purchase and Sale Agreement, PNM would retain its current plant decommissioning and coal mine reclamation obligations. PNM made an initial payment to NTEC of $15.0 million in November 2020, subject to refund with interest upon termination of the Four Corners Purchase and Sale Agreement prior to closing. Under the terms of the Four Corners Purchase and Sale Agreement, upon receipt of the NMPRC approval, PNM would make a final payment of $60.0 million. The initial $15.0 million payment is recorded in other deferred charges on the Consolidated Balance Sheet as of December 31, 2022 and 2021.

On January 8, 2021, PNM filed the Four Corners Abandonment Application, which sought NMPRC approval to exit PNM’s share of Four Corners as of December 31, 2024, and issuance of approximately $300 million of Securitized Bonds as provided by the ETA. PNM’s request for the issuance of Securitized Bonds included approximately $272 million of forecasted undepreciated investments in Four Corners at December 31, 2024, an estimated $4.6 million for plant decommissioning costs, an estimated $7.3 million in upfront financing costs, and an estimated $16.5 million for economic development in the Four Corners area. PNM intends to submit a separate application for NMPRC approval of a replacement resource portfolio following NMPRC action on this application.

On March 15, 2021, PNM filed an amended application and supplemental testimony for the approval of the abandonment and transfer of Four Corners and issuance of a financing order pursuant to the ETA and a motion to withdraw the January 8, 2021 Four Corners Application. The amended application and supplemental testimony provided additional information to support PNM's request to abandon its interest in Four Corners and transfer that interest to NTEC, and also provided additional detail explaining how the proposed sale and abandonment provides a net public benefit.

On November 12, 2021, the hearing examiner issued a recommended decision recommending approval of the Four Corners Abandonment Application and the corresponding request for issuance of securitized financing. On December 15, 2021, the NMPRC issued a final order rejecting the hearing examiner’s recommended decision and denying approval of the Four Corners Abandonment Application and the corresponding request for issuance of securitized financing. In its order, the NMPRC concluded that PNM needed to conduct a review of the actual replacement resource portfolio and determined that the
record was insufficient to determine the prudence of PNM’s investments in Four Corners. On December 22, 2021, PNM filed a notice of appeal with the NM Supreme Court of the NMPRC decision to deny the application. On January 21, 2022, PNM filed a statement of issues outlining the arguments for appeal asserting, among other things, that the NMPRC misinterpreted and improperly applied the ETA in concluding that the NMPRC needed to review the actual replacement resource portfolio before authorizing abandonment and that the NMPRC improperly deferred the issue of prudence with respect to certain of PNM’s investments in Four Corners, where other parties were given the opportunity to present evidence and failed to demonstrate PNM was imprudent in its decisions. On March 24, 2022, PNM filed its Brief in Chief and answer briefs were filed on May 9, 2022. On June 17, 2022, PNM filed its Consolidated Reply Brief. The NM Supreme Court has scheduled oral arguments to be held on March 27, 2023.

GAAP requires a loss be recognized when it is probable that a loss has been incurred and the amount of loss can be reasonably estimated. As of December 31, 2022, PNM evaluated the NMPRC order in the Four Corners Abandonment Application and determined it was reasonably possible that PNM would be successful in recovery of its undepreciated investment in a future proceeding. Therefore, no loss has been recorded.

The financial impact of an early exit of Four Corners and the NMPRC approval process is influenced by many factors outside of PNM’s control, including the overall political and economic conditions of New Mexico. See additional discussion of the ETA in Note 16. PNM cannot predict the outcome of these matters.

PVNGS Leased Interest Abandonment Application

On April 2, 2021, PNM filed the PVNGS Leased Interest Abandonment Application, an application for the sale and transfer of related assets, and approval to procure new resources. As discussed in Note 8, PNM had Leased Interest under five separate leases that were approved and certificated by the predecessor agency to the NMPRC in the 1980s. Four of the five leases for 104 MW of Leased Interest terminated in January 2023, while the remaining lease for 10 MW of Leased Interest terminates in January 2024. Associated with the Leased Interest are certain PNM-owned assets and nuclear fuel that are necessary for the ongoing operation and maintenance of the Leased Interest and integration of the Leased Interest generation to the transmission network. PNM determined that there will be net benefits to its customers to return the Leased Interest to the lessors in conformity with the leases, sell and transfer the related PNM-owned assets, and to replace the Leased Interest with new resources. In the application, PNM requested NMPRC authorization to decertify and abandon its Leased Interest and to create regulatory assets for the associated remaining undepreciated investments with consideration of cost recovery of the undepreciated investments in a future rate case. PNM also sought NMPRC approval to sell and transfer the PNM-owned assets and nuclear fuel supply associated with the Leased Interest to SRP, which will be acquiring the Leased Interest from the lessors upon termination of the existing leases. In addition, PNM sought NMPRC approval for a 150 MW solar PPA combined with a 40 MW battery storage agreement, and a stand-alone 100 MW battery storage agreement to replace the Leased Interest. To ensure system reliability and load needs are met in 2023, when a majority of the leases expire, PNM also requested NMPRC approval for a 300 MW solar PPA combined with a 150 MW battery storage agreement. PNM's application sought a six-month regulatory time frame.

On April 21, 2021, the NMPRC issued an order assigning a hearing examiner and stated PNM's request to abandon the Leased Interest does not have any statutory or rule time limitation and the six-month limit in which the NMPRC must issue an order regarding the request for approvals of the solar PPAs and battery storage agreements does not begin until after the NMPRC acts on the abandonment request. The NMPRC’s April 21, 2021, order also stated that issues reserved to a separate proceeding in the NM 2015 Rate Case regarding the decision to permanently disallow recovery of certain future decommissioning costs related to PVNGS Units 1 and 2 shall be addressed in this case and PNM shall file testimony addressing the issue. On June 28, 2021, NEE and CCAE jointly filed a motion to dismiss a portion of the application claiming that since PNM's request to abandon the Leased Interest was filed after PNM had already provided irrevocable notice it would not acquire the Leased Interest, abandonment is no longer required. On July 28, 2021, the hearing examiner issued a recommended decision on NEE's and CCAE's joint motion to dismiss, recommending dismissal of PNM's requests for approval to abandon and decertify the Leased Interest; dismissal of PNM's request for approval to sell and transfer the related assets; and dismissal of PNM's request to create regulatory assets for the associated remaining undepreciated investments, but did not preclude PNM seeking recovery of the costs in a general rate case in which the test year period includes the time period in which PNM incurs such costs. The hearing examiner's recommended decision further provides that PNM's request for replacement and system reliability resources and the decision to permanently disallow recovery of certain future decommissioning costs related to PVNGS Units 1 and 2 should remain within the scope of this case.

On August 25, 2021, the NMPRC issued an order granting portions of the July 28, 2021 recommended decision that were not contested related to dismissal of PNM's request for approval to abandon and decertify the Leased Interest and dismissal of PNM's request for approval to sell and transfer the related assets. In addition, the order bifurcated the issue of
approval for the two PPAs and three battery storage agreements into a separate docket so it may proceed expeditiously. On September 8, 2021, the NMPRC issued an order on the remaining issues in the recommended decision. The order found that PNM's request for a regulatory asset to record costs associated with obtaining an abandonment order should be dismissed. However, the requests for regulatory assets associated with the remaining undepreciated investments should be addressed at an evidentiary hearing. On September 20, 2021, ABCWUA, Bernalillo County, NEE, and the NMAG filed a joint motion to reconsider the September 8, 2021 NMPRC order. Also, on September 20, 2021, PNM filed a motion for rehearing of the September 8, 2021 order stating that certain requirements of the order would lead to compromising PNM's First Amendment rights. On October 6, 2021, the NMPRC issued an order granting the motions for reconsideration and vacated the September 8, 2021 order, without specifically addressing issues raised in the motions.

On November 1, 2022, ABCWUA, Bernalillo County, CCAE, NEE, NM AREA, the NMAG, WRA, and Staff filed a joint motion for an accounting order to require PNM to track in a regulatory liability, all costs associated with the PVNGS Leased Interests that will be abandoned in January 2023 and January 2024 that are still being collected in rates, which PNM opposes. On November 18, 2022, the NMPRC issued its order on joint motion for an accounting order requiring PNM to establish a regulatory liability to track and account for, upon termination of the PVNGS leases, all costs currently borne by ratepayers associated with those leases during pendency of the 2024 Rate Change, subject to a determination of ratemaking treatment. In addition, PNM may establish a regulatory asset account to record undepreciated investment for improvements to the Unit 1 and Unit 2 Leased Interests upon termination of the leases, and to record cost differences in the proceeds from SRP for the sale of the PVNGS Leased Assets and the actual book value. Recovery of these items will be determined in the 2024 Rate Change. In the 2024 Rate Change, PNM must also address unresolved issues including whether PNM’s decision to renew the five leases and repurchase 64.1 MW of PVNGS Unit 2 capacity exposed ratepayers to additional financial liability beyond that to which they would otherwise have been exposed, and whether PNM should be denied recovery of future decommissioning expenses as a remedy for imprudence. See 2024 Rate Change discussion above.

PNM is evaluating the consequences of the NMPRC's November 18, 2022 order, as required under GAAP, and whether it should establish a regulatory liability in 2023 to account for revenue collected from ratepayers during the pendency of the 2024 Rate Change. In addition, PNM is evaluating whether it should establish a regulatory asset account to record undepreciated investment for improvements to the Unit 1 and Unit 2 Leased Interests upon termination of the leases in January 2023 and 2024.

The hearing on the two PPAs and three battery storage agreements was held on November 12 and 15, 2021 and December 3, 2021 and post-hearing briefing was completed on January 18, 2022. On February 14, 2022, the hearing examiner issued a recommended decision recommending the NMPRC approve the 150 MW solar PPA combined with a 40 MW battery storage agreement, the stand-alone 100 MW battery storage agreement, and the 300 MW solar PPA combined with a 150 MW battery storage agreement. On February 16, 2022, the NMPRC adopted an order approving the recommended decision. On April 15, 2022, PNM made a compliance filing with the NMPRC in which it updated the NMPRC on the status of the PPAs and the battery storage agreements listed above. On June 16, 2022, PNM made a second compliance filing on the status of PPAs and battery storage agreements notifying the NMPRC that none of the developers of the two PPAs and three battery storage agreements have moved forward under the terms of the agreements approved by the NMPRC on February 16, 2022, and none of the replacement resource projects would be operational in 2023. All five projects will have significant delays and price increases as evidenced in the current alternative offers from the developers. PNM entered into amendments to the 300 MW solar PPA combined with a 150 MW battery storage agreement and proposed those amendments to the NMPRC for approval in a filing with the NMPRC on June 24, 2022. PNM determined the terms offered by the 150 MW solar PPA combined with a 40 MW battery storage agreement and the stand-alone 100 MW battery storage agreement are not satisfactory in comparison with other potential projects that might be utilized instead, and PNM did not support the proposed amendments to those agreements in the June 24, 2022 filing. No party filed objections following PNM's June 24, 2022 filing and pursuant to the NMPRC's February 16, 2022 order the 300 MW solar PPA combined with 150 MW battery storage agreement and the decision not to proceed with the other agreements, are deemed approved. On September 2, 2022, PNM entered into amendments to the 150 MW battery storage agreement to increase the capacity to 300 MW and proposed those amendments to the NMPRC for approval. On September 8, 2022, the NMPRC issued an order to extend the 10-day period for filing for an additional two days. No party filed objections within 12 days following PNM's September 2, 2022 filing and pursuant to the NMPRC's February 16, 2022 order the 300 MW solar battery storage agreement was deemed approved. PNM anticipates these facilities will be in service in 2024.

In addition to approval by the NMPRC, PNM and SRP received NRC approval for the transfer of the associated possessory licenses at the end of the term of each of the respective leases.

Summer Peak Resource Adequacy
Throughout 2021 and continuing into 2022, PNM provided notices of delays and status updates to the NMPRC for the approved SJGS replacement resource projects. All four project developers had notified PNM that completion of the projects would be delayed and no longer available for most, if any of the 2022 summer peak load period. The delays in the SJGS replacement resources, coupled with the abandonment of SJGS Units 1 and 4 presented a risk that PNM would have insufficient operational resources to meet the 2022 summer peak to reliably serve its customers if PNM was unable to find additional generation resources. PNM entered into three agreements to purchase power from third parties in the second half of 2021 to minimize potential impacts to customers; the purchase of 85 MW, unit contingent from Four Corners for June through September of 2022; the purchase of 150 MW, firm power in June and September 2022; and the purchase of 40 MW, unit contingent from PVNGS Unit 3 for the full year of 2022. Even after accounting for these additional contracts, PNM projected a very low system reserve margin during the 2022 summer peak. As a result, on February 17, 2022, PNM filed a Notice and Request for Modification to or Variance from Abandonment Date for SJGS Unit 4 with the NMPRC. The filing provided notice that PNM had obtained agreement from the SJGS owners and WSJ LLC to extend operation of Unit 4 until September 30, 2022. SJGS Unit 4 provided 327 MW of capacity and improved PNM’s projected system reserve margin. On February 23, 2022, the NMPRC issued an order finding that PNM did not require NMPRC approval to extend operation of SJGS Unit 4 for an additional three-month period. The NMPRC’s order states that issues regarding the prudence or reasonableness of the decisions made, actions taken by PNM, and recoverability of costs related to the continued operation of SJGS Unit 4, including fuel costs collected through PNM’s FPPAC, shall be subject to review in a future proceeding. On February 25, 2022, an amended San Juan Project Participation Agreement was filed with FERC. On March 18, 2022, PNM filed its compliance notice updating its January 26, 2022 compliance notice indicating that 65 MW of SJGS Unit 4 owned as a deregulated merchant resource would be available to PNM retail operations on a system contingent basis, which further increased PNM's projected system reserve margin during the 2022 summer peak. On March 24, 2022, FERC accepted the amended SJGS participation agreement. While PNM experienced a new system peak retail load of 2,139 MW on July 19, 2022, PNM’s generation resources performed sufficiently with no significant challenges to resource adequacy during the 2022 summer peak season.

PNM faces similar concerns in the summer of 2023 as a result of continued delays in the SJGS replacement resources as well as delays in replacement resources for the PVNGS leased capacity that expires in January 2023. As discussed above, PNM has made a number of compliance filings with the NMPRC on the status of the SJGS and PVNGS leased capacity interest replacement resources. On January 30, 2023, PNM informed the NMPRC that it had provided written notice to one of the SJGS replacement resource developers for 100 MW solar PPA and a 30 MW battery storage agreement of an event of seller default and of early termination and as a result the project would not proceed. In the second half of 2022, PNM entered into agreements totaling 270 MW of firm power purchases for June through September 2023, and the purchase of 40 MW of firm capacity at PVNGS for all twelve months of 2023, providing PNM with a projected system reserve margin with a range of 10.3% to 6.0% for the 2023 summer peak period. PNM continues to evaluate other potential firm power agreements with various providers, as well as all potential short-term resource options to address these resource adequacy concerns. PNM is unable to predict the outcome of this matter.

Grid Modernization Application

On October 3, 2022, in compliance with New Mexico Grid Modernization Statute, PNM filed its Grid Modernization Application with the NMPRC. The projects included in the Grid Modernization Application improve customers’ ability to customize their use of energy and ensure that customers, including low-income customers, are a top priority and will benefit consistent with the Grid Modernization Statute. PNM’s proposal to modernize its electricity grid through infrastructure and technology improvements also increases the efficiency, reliability, resilience, and security of PNM’s electric system. PNM's application seeks approval of grid modernization investments of approximately $344 million for the first six years of a broader 11-year strategy. PNM's application requested NMPRC approval by July 1, 2023 for PNM's grid modernization plan in addition to approval of PNM's proposed Grid Modernization Rider by September 1, 2023. The proposed Grid Modernization Rider would recover capital costs, operating expenses, and taxes associated with the investments included in the Grid Modernization Application. PNM also requested authorization to create related regulatory assets and liabilities, permitting PNM to record costs incurred for the development and implementation of PNM’s plan between the requested approval of the application on July 1, 2023, and the implementation of the Grid Modernization Rider by September 1, 2023; undepreciated investments associated with legacy meters being replaced with AMI meters; and over- or under-collection of costs through the Grid Modernization Rider. In addition, PNM requested approval of the proposed format of an Opt-Out Consent Form and methodology to determine PNM’s proposed cost-based opt-out fees, which includes a one-time fee and a monthly fee. On October 25, 2022, the hearing examiner issued a procedural schedule with a hearing to begin March 20, 2023. PNM is unable to predict the outcome of this matter.
COVID-19 Regulatory Matters
On June 24, 2020, the NMPRC issued an order authorizing all public utilities regulated by the NMPRC to create a regulatory asset to defer incremental costs related to COVID-19, including increases to bad debt expense incurred during the period beginning March 11, 2020 through the termination of the Governor of New Mexico’s emergency executive order. The NMPRC order requires public utilities creating regulatory assets to pursue all federal, state, or other subsidies available, to record a regulatory liability for all offsetting cost savings resulting from the COVID-19 pandemic, and allows PNM to request recovery in future ratemaking proceedings. As a result, PNM has deferred bad debt expense related to COVID-19 of $5.7 million and $6.9 million in regulatory assets on the Consolidated Balance Sheets at December 31, 2022 and 2021. Although PNM is seeking recovery for the increase in bad debt expense resulting from COVID-19 through a regulatory asset in the 2024 Rate Change, it no longer intends to seek recovery of other incremental costs related to the pandemic and therefore, reversed regulatory assets of $2.7 million previously deferred at December 31, 2020. In addition, PNM has cost savings related to COVID-19 of $0.9 million in regulatory liabilities on the Consolidated Balance Sheets at both December 31, 2022 and 2021.

The Community Solar Act

In June 2021, the Community Solar Act established a program that allows for the development of community solar facilities and provides customers of a qualifying utility with the option of accessing solar energy produced by a community solar facility in accordance with the Community Solar Act. The NMPRC is charged with administering the Community Solar Act program, establishing a total maximum capacity of 200 MW community solar (applicable until November 2024) facilities and allocating proportionally to the New Mexico electric investor-owned utilities and participating cooperatives. As required under the Community Solar Act, the NMPRC opened a docket on May 12, 2021 to adopt rules to establish a community solar program no later than April 1, 2022. On June 15, 2021, the NMPRC issued an order which required utilities provide a notice to all future applicants and to any likely applicants that, until the effective date of the NMPRC's rules in this area the NMPRC's existing interconnection rules and manual remain in place until amended or replaced by the NMPRC, and further, that a place in a utility's applicant queue for interconnection does not and will not provide any advantage for selection as a community solar project. PNM has provided the required notices. On October 27, 2021, the NMPRC adopted an order issuing a NOPR starting the formal process for adoption of rules pursuant to the Community Solar Act. On March 30, 2022, the NMPRC issued an order that adopted a rule on the administration of the Community Solar Act program. The rule requires utilities to file proposed community solar tariffs with the NMPRC within 60 days from the publication of the rule. A number of motions for rehearing and requests for clarification were filed between April 7 and May 2, 2022. On May 18, 2022, the NMPRC issued an order partially granting motions for rehearing, reconsideration and clarification and staying implementation pending further rulemaking. On June 16, 2022, PNM requested clarification related to the existing interconnection queue, which would not delay implementation of the Community Solar Act program. On July 12, 2022, the NMPRC provided notice of publication of its final rule in the New Mexico Register, starting the 60-day clock for utilities to file their proposed community solar tariffs, forms, and other relevant agreements. On September 14, 2022, PNM filed Community Solar tariffs. On October 12, 2022, the NMPRC issued an order to suspend PNM's and two other investor-owned utilities tariffs and required the utilities to file information Staff has identified as necessary for a complete evaluation of the tariffs but did not appoint a hearing examiner or schedule a public hearing. Another investor-owned utility has filed an appeal with the NM Supreme Court seeking review of the NMPRC’s decisions. On November 16, 2022, PNM filed its Community Solar tariff which establishes the Community Solar bill credit to be applied to an eligible retail customer of PNM who is a subscriber to a community solar facility. On December 23, 2022, PNM filed an updated Community Solar tariff under protest and filed a motion for clarification, suspension, and timely hearing on PNM’s Community Solar tariff. On January 18, 2023, the NMPRC suspended PNM’s Community Solar tariff. PNM cannot predict the outcome of the pending matters.

Formula Transmission Rates

PNM charges wholesale electric transmission service customers using a formula rate mechanism pursuant to which wholesale transmission service rates are calculated annually in accordance with an approved formula. The formula reflects a ROE of 10% and includes updating cost of service components, including investment in plant and operating expenses, based on information contained in PNM’s annual financial report filed with FERC, as well as including projected large transmission capital projects to be placed into service in the following year. The projections included are subject to true-up in the following year formula rate. Certain items, including changes to return on equity and depreciation rates, require a separate filing to be made with FERC before being included in the formula rate. On June 1, 2022, PNM submitted an informational filing regarding the annual update to FERC. The new rates are effective June 1, 2022 through May 31, 2023.

On April 21, 2022, FERC instituted a show cause proceeding under Section 206 of the Federal Power Act to investigate the justness and reasonableness of PNM's transmission formula rate protocols. The order directs PNM, within 60 days to revise its formula rate protocols to provide interested parties the information necessary to understand and evaluate the implementation of the formula rate for both the correctness of inputs and calculations, and the reasonableness and prudence of the costs to be
recovered in the formula rate or show cause why it should not be required to do so. On June 21, 2022, PNM submitted a compliance filing pursuant to FERC's April 21, 2022 order, which proposes modifications to its formula rate protocols to enhance and provide greater transparency to its customers as well as fix other ministerial issues. On August 12, 2022, FERC Staff issued a deficiency letter to PNM's June 21, 2022 compliance filing seeking minor adjustments and additional clarity. On September 9, 2022, PNM filed a response to FERC's deficiency letter making adjustments to its June 21, 2022 proposal and providing additional clarity. On September 23, 2022, the DOE filed comments to PNM's deficiency letter response. On October 13, 2022, PNM responded to comments raised by the DOE. On November 8, 2022, FERC issued an order accepting PNM’s proposed tariff revisions, effective June 22, 2022, as requested, thereby terminating the April 21, 2022 proceeding under section 206 of the Federal Power Act. This matter is now concluded.

FERC Compliance

PNM conducted a comprehensive internal review of its filings with FERC regarding the potential timely filing of certain agreements that contained deviations from PNM’s standard form of service agreement in its OATT and assessing any applicable FERC waivers or refund requirements. Upon completion of the comprehensive review, PNM identified service agreements containing provisions that do not conform to the standard form of agreement on file with FERC. On March 18 and March 21, 2022, PNM filed applications with FERC requesting acceptance of certain agreements as well as rejection of other service agreements and further requesting that FERC not assess time-value refunds on the accepted agreements. On May 17, 2022, FERC issued two delegated letter orders accepting the service agreements and requiring PNM to pay the time-value refunds on the revenues it received on unaffiliated, late-filed, service agreements which contained language alleged to be non-conforming.

On June 16, 2022, PNM filed two requests for rehearing on the two proceedings. In the first proceeding, PNM argues that FERC has failed to address PNM's request for waiver of unlawful time-value refunds requiring PNM to pay its customers approximately $7 million, for a ministerial error. In this proceeding, PNM waived the requirement for a customer to reimburse PNM for line losses and limited the rollover rights of another customer, which was not specifically addressed under the OATT. In the second proceeding, PNM argues that FERC's assessment of approximately $28 million in unlawful, time-value refunds is in error and FERC failed to address the substantive arguments regarding why the agreements do not materially deviate from the OATT and as such were not required to be filed with FERC. In this proceeding, PNM had non-material deviations to certain provisions of the service agreements which were consistent with the OATT. Also on June 16, 2022, FERC granted PNM's request for a 75-day extension for PNM to issue refunds and an additional 30 days thereafter to prepare and file refund reports. On July 18, 2022, FERC issued two notices of denial of rehearing by operations of law and providing for further consideration. On July 29, 2022, PNM filed two separate petitions for reviews of the FERC's May 17, 2022 delegated letter orders, with the DC Court of Appeals. On August 23, 2022, FERC granted PNM's request for a 45-day extension for PNM to issue refunds and an additional 30 days thereafter to prepare and file refund reports. On August 30, 2022, FERC filed with the DC Court of Appeals to consolidate the proceedings and hold the petitions for review in abeyance until the earlier of (i) the issuance of the rehearing orders or (ii) October 30, 2022. PNM filed another motion, which was granted by FERC, for extension to issue time value refunds to December 1, 2022, with reports due on January 3, 2023.

On November 21, 2022, FERC issued an order on rehearing that required PNM to pay its customers approximately $8.1 million in time-value refunds. On November 28, 2022, PNM filed an unopposed motion for voluntary dismissal with the United States Court of Appeals for the District of Columbia of its petitions for review, which was granted on December 22, 2022. In the fourth quarter of 2022, PNM made payments totaling $8.1 million to customers which were recorded as a reduction to electric operating revenues on the Consolidated Statements of Earnings. This matter is now concluded.

FERC Order 864

In November 2019, FERC issued Order No. 864, which required public utility transmission providers with transmission formula rates to revise those rates to account for changes resulting from the Tax Cuts and Jobs Act of 2017 (the “Tax Act”). PNM had already made revisions to its formula rate to account for Tax Act changes, and, as a result of the Order, PNM proposed additional changes to its formula rate to implement the remaining requirements of the Order. In July 2022, FERC issued an order finding that PNM had predominantly complied with the requirements, but set aside certain matters for settlement and hearing procedures. PNM is unable to determine the outcome of this matter.

TNMP
Energy Efficiency
TNMP recovers the costs of its energy efficiency programs through an energy efficiency cost recovery factor (“EECRF”), which includes projected program costs, under or over collected costs from prior years, rate case expenses, and performance bonuses (if the programs exceed mandated savings goals).
The following sets forth TNMP’s EECRF increases:
Effective DateAggregate Collection AmountPerformance Bonus
(In millions)
March 1, 2020$5.9 $0.8 
March 1, 20215.9 1.0
March 1, 20227.2 2.3

On May 27, 2022, TNMP filed its request to adjust the EECRF to reflect changes in costs for 2023. The total amount requested was $7.4 million, which includes a performance bonus of $1.9 million based on TNMP's energy efficiency achievements in the 2021 plan year. On August 24, 2022, a unanimous stipulation and settlement was filed with the PUCT to recover $7.3 million in 2023, including the performance bonus of $1.9 million. On October 6, 2022, the PUCT approved the unanimous stipulation.

Transmission Cost of Service Rates

TNMP can update its TCOS rates twice per year to reflect changes in its invested capital although updates are not allowed while a general rate case is in process. Updated rates reflect the addition and retirement of transmission facilities, including appropriate depreciation, federal income tax and other associated taxes, and the approved rate of return on such facilities. The following sets forth TNMP’s recent interim transmission cost rate increases:
Effective DateApproved Increase in Rate BaseAnnual Increase in Revenue
(In millions)
March 27, 2020$59.2 $7.8 
October 7, 202010.8 2.0 
March 12, 2021112.6 14.1 
September 20, 202141.2 6.3 
March 25, 202295.6 14.2 
September 22, 202236.0 5.3 

On January 23, 2023, TNMP filed an application to further update its transmission rates, which would increase revenues by $19.4 million annually, based on an increase in rate base of $150.5 million. The application is pending before the PUCT.
Periodic Distribution Rate Adjustment

PUCT rules permit interim rate adjustments to reflect changes in investments in distribution assets. Distribution utilities may file for a periodic rate adjustment between April 1 and April 8 of each year as long as the electric utility is not earning more than its authorized rate of return using weather-normalized data. Utilities are limited to four periodic interim distribution rate adjustments between general rate cases.

On April 5, 2021, TNMP filed its 2021 DCOS that requested an increase in TNMP annual distribution revenue requirement of $14.0 million based on an increase in rate base of $104.5 million. On July 1, 2021, TNMP reached a unanimous settlement agreement with parties that would authorize TNMP to collect an increase in annual distribution revenues of $13.5 million beginning in September 2021, which was approved by the PUCT. On April 5, 2022, TNMP filed its 2022 DCOS that requested an increase in TNMP annual distribution revenue requirement of $9.7 million based on an increase in rate base of $100.7 million. TNMP reached a unanimous settlement agreement in principle with parties that would authorize TNMP to collect an increase in annual distribution revenues of $6.8 million. The reduction from the filed increase reflects removal of AMS technological upgrades from the current year's DCOS revenue requirement, but allows for deferral of operating costs to a regulatory asset, along with carrying charges. The regulatory asset and AMS technological upgrades can be included in future DCOS or general rate filings. On July 18, 2022, the ALJ issued an order approving interim rates based on an increase in the annual distribution revenue requirement of $6.8 million, effective September 1, 2022. On November 3, 2022, the PUCT approved the unanimous settlement.
AMS Reconciliation

On July 14, 2021, TNMP filed a request with the PUCT to consider and approve its final reconciliation of the costs spent on the deployment of AMS from April 1, 2018 through December 31, 2018 of $9.0 million and approve appropriate carrying charges until full collection. On September 13, 2021, the PUCT Staff filed a recommendation for approval of TNMP's application for substantially all costs from April 1, 2018 through December 31, 2018. On February 10, 2022, the PUCT approved substantially all costs included in TNMP's AMS reconciliation application. TNMP will include recovery of these costs and associated carrying charges in a future general rate proceeding.