Commitments and Contingencies Commitments and Contingencies (North Carolina Ash Basins) (Details) (North Carolina Ash Basins [Member], USD $)
In Billions, unless otherwise specified
Jun. 30, 2014
Minimum [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Minimum $ 2.0 [1]
Minimum [Member] | Baseline Assumptions [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Minimum 2.0 [2]
Minimum [Member] | Estimated Additional Costs Related To Full Excavation [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Minimum 4.0 [3]
Minimum [Member] | Estimated Additional Costs Related to All Dry Systems [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Minimum 1.0 [4]
Maximum [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Maximum 10.0 [1]
Maximum [Member] | Baseline Assumptions [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Maximum 2.5 [2]
Maximum [Member] | Estimated Additional Costs Related To Full Excavation [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Maximum 5.5 [3]
Maximum [Member] | Estimated Additional Costs Related to All Dry Systems [Member]
 
Loss Contingencies [Line Items]  
Loss Contingency, Range of Possible Loss, Maximum $ 2.0 [4]
Duke Energy Carolinas [Member]
 
Loss Contingencies [Line Items]  
Estimated Allocation of Remediation Costs 65.00%
Duke Energy Progress [Member]
 
Loss Contingencies [Line Items]  
Estimated Allocation of Remediation Costs 35.00%
[1] On average, the allocation of these estimates is approximately 65 percent to Duke Energy Carolinas and 35 percent to Duke Energy Progress. However, this allocation could vary significantly based on site-specific compliance actions.
[2] Assumes (i) hybrid cap in place closure for ash basins at ten coal plants, (ii) excavation and relocation of ash to lined structural fills or landfills for the retired Dan River, Riverbend and Sutton coal plants, (iii) dry fly ash conversion at the Asheville units and Cliffside Unit 5, (iv) continued structural fill disposal for the Asheville coal plant, and (v) dry bottom ash handling conversions and fly ash reliability improvements. Includes costs for actions noted in the March 12, 2014 letter to the governor of North Carolina and existing plans to close ash basins.
[3] Represents estimated additional costs to excavate and relocate ash to lined landfills for the ten plants under hybrid cap in place closure in the baseline assumptions.
[4] Represents estimated additional costs to convert all active coal plants to all-dry pneumatic bottom ash handling systems and thermally-driven evaporation of other process water.