Commitments and Contingencies

Except to the extent noted below and in Note 5 above, the circumstances set forth in Notes 11 and 12 to the consolidated financial statements included in PSCo’s Annual Report on Form 10-K for the year ended Dec. 31, 2015, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to PSCo’s financial position.

Purchased Power Agreements (PPAs)

Under certain PPAs, PSCo purchases power from independent power producing entities that own natural gas fueled power plants for which PSCo is required to reimburse natural gas fuel costs, or to participate in tolling arrangements under which PSCo procures the natural gas required to produce the energy that it purchases. These specific PPAs create a variable interest in the associated independent power producing entity.

PSCo had approximately 1,802 megawatts (MW) of capacity under long-term PPAs as of March 31, 2016 and Dec. 31, 2015, with entities that have been determined to be variable interest entities. PSCo has concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance. These agreements have expiration dates through 2032.

Environmental Contingencies

Environmental Requirements

Air
Regional Haze Rules — The regional haze program is designed to address widespread haze that results from emissions from a multitude of sources. In 2005, the United States Environmental Protection Agency (EPA) amended the best available retrofit technology (BART) requirements of its regional haze rules, which require the installation and operation of emission controls for industrial facilities emitting air pollutants that reduce visibility in certain national parks and wilderness areas. In its first regional haze state implementation plan (SIP), Colorado identified the PSCo facilities that will have to reduce sulfur dioxide (SO2), nitrous oxide (NOx), and particulate matter emissions under BART and set emissions limits for those facilities.

In 2011, the Colorado Air Quality Control Commission approved a SIP that included the Clean Air Clean Jobs Act (CACJA) emission reduction plan as satisfying regional haze requirements for facilities included within the CACJA plan. In addition, the SIP included a BART determination for Comanche Units 1 and 2. The EPA approved the SIP in 2012. Emission controls at Hayden Unit 1 were placed into service in November 2015 and Hayden Unit 2 is expected to be placed into service in late 2016, at an estimated combined cost of $75.2 million, completing the pollution control equipment required on PSCo plants under the CACJA. PSCo anticipates these costs will be fully recoverable through regulatory mechanisms.

Implementation of the National Ambient Air Quality Standard (NAAQS) for SO2 — The EPA adopted a more stringent NAAQS for SO2 in 2010. In 2013, the EPA designated areas as not attaining the revised NAAQS, which did not include any areas where PSCo operates power plants. However, many other areas of the country were unable to be classified by the EPA due to a lack of air monitors.

Following a lawsuit alleging that the EPA had not completed its area designations in the time required by the Clean Air Act (CAA) and under a consent decree the EPA is requiring states to evaluate areas in three phases. The first phase includes areas near PSCo’s Pawnee plant. The Pawnee plant recently installed an SO2 scrubber to reduce SO2 emissions. In February 2016, the EPA notified the Colorado Department of Health and Environment of its preliminary SO2 designations. The EPA has proposed to designate the area near the Pawnee plant as “unclassifiable.” If finalized as proposed, the unclassifiable areas will be monitored for three years and final designations will be made by December 2020. The EPA’s final decision is expected by July 2016.

If an area is designated nonattainment, the respective states will need to evaluate all SO2 sources in the area. The state would then submit an implementation plan, which would be due in 18 months, designed to achieve the NAAQS within five years. The areas near the Comanche and Hayden power plants will be evaluated in the next designation phase, ending December 2017. PSCo’s Comanche and Hayden plants already utilize scrubbers to control SO2 emissions. PSCo cannot evaluate the impacts until the designation of nonattainment areas is made and any required state plan has been developed. PSCo believes that, should SO2 control system costs be required for a plant, compliance costs will be recoverable through regulatory mechanisms and therefore does not expect a material impact on results of operations, financial position or cash flows.

Legal Contingencies

PSCo is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on PSCo’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Employment, Tort and Commercial Litigation

Pacific Northwest Federal Energy Regulatory Commission (FERC) Refund Proceeding — A complaint with the FERC posed that sales made in the Pacific Northwest in 2000 and 2001 through bilateral contracts were unjust and unreasonable under the Federal Power Act. The City of Seattle (the City) alleges between $34 million to $50 million in sales with PSCo is subject to refund. In 2003, the FERC terminated the proceeding, although it was later remanded back to the FERC in 2007 by the U.S. Court of Appeals for the Ninth Circuit (Ninth Circuit).

In May 2015, in the remand proceeding, the FERC issued an order rejecting the City’s claim that any of the sales made resulted in an excessive burden and concluded that the City failed to establish a causal link between any contracts and any claimed unlawful market activity. In June 2015, the City requested the FERC grant rehearing of its order, which the FERC denied in December. The City subsequently appealed this decision to the Ninth Circuit on Feb. 22, 2016.

Also in December 2015, the Ninth Circuit issued an order and held that the standard of review applied by the FERC to the contracts which the City was challenging is appropriate. The Ninth Circuit dismissed questions concerning whether the FERC properly established the scope of the hearing, and determined that the challenged orders are preliminary and that the Ninth Circuit lacks jurisdiction to review evidentiary decisions until after the FERC’s proceedings are final. The City joined the State of California in its request seeking rehearing of this order.

Preliminary calculations of the City’s claim for refunds from PSCo are approximately $28 million, excluding interest. PSCo has concluded that a loss is reasonably possible with respect to this matter; however, given the surrounding uncertainties, PSCo is currently unable to estimate the amount or range of reasonably possible loss in the event of an adverse outcome of this matter. In making this assessment, PSCo considered two factors. First, notwithstanding PSCo’s view that the City has failed to apply the standard that the FERC has established in this proceeding, and the recognition that this case raises a novel issue and the scope of the proceeding established by FERC is being challenged in the Ninth Circuit, the outcome of such an appeal cannot be predicted with any certainty. Second, PSCo would expect to make equitable arguments against refunds even if the City were to establish that it was overcharged for transactions. If a loss were sustained, PSCo would attempt to recover those losses from other PRPs. No accrual has been recorded for this matter.

Line Extension Disputes — In December 2015, Development Recovery Company (DRC) filed a lawsuit in Denver State Court, stating PSCo failed to award proper allowances and refunds for line extensions to new developments pursuant to the terms of electric service agreements entered into by PSCo and various developers. The dispute involves assigned interests in those claims by over fifty developers. On May 9, 2016, the district court granted PSCo’s motion to dismiss the lawsuit, essentially concluding that jurisdiction over this dispute resides with the CPUC. It is uncertain whether plaintiffs will appeal this decision. PSCo has concluded that a loss is remote with respect to this matter as the service agreements were developed to implement CPUC approved tariffs and PSCo has complied with the tariff provisions. Also, if a loss were sustained, PSCo believes it would be allowed to recover these costs through traditional regulatory mechanisms as the line extension payments from developers, for which DRC is seeking a refund, have served to reduce rate base over the period in dispute. The amount or range in dispute is presently unknown and no accrual has been recorded for this matter.