Commitments and Contingencies

Except to the extent noted below and in Note 5, the circumstances set forth in Notes 11 and 12 to the consolidated financial statements included in PSCo’s Annual Report on Form 10-K for the year ended Dec. 31, 2013, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to PSCo’s financial position.

Purchased Power Agreements (PPAs)

Under certain PPAs, PSCo purchases power from independent power producing entities that own natural gas fueled power plants for which PSCo is required to reimburse natural gas fuel costs, or to participate in tolling arrangements under which PSCo procures the natural gas required to produce the energy that it purchases. These specific PPAs create a variable interest in the associated independent power producing entity.

PSCo had approximately 1,802 megawatts (MW) and 1,441 MW of capacity under long-term PPAs as of June 30, 2014 and Dec. 31, 2013, respectively, with entities that have been determined to be variable interest entities. PSCo has concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance. These agreements have expiration dates through 2032.

Environmental Contingencies

Environmental Requirements

Water and waste
Federal Clean Water Act (CWA) Effluent Limitations Guidelines (ELG) — In June 2013, the U.S. Environmental Protection Agency (EPA) published a proposed ELG rule for power plants that use coal, natural gas, oil or nuclear materials as fuel and discharge treated effluent to surface waters as well as utility-owned landfills that receive coal combustion residuals. The final rule is now expected in September 2015. Under the current proposed rule, facilities would need to comply as soon as possible after July 2017 but no later than July 2022. The impact of this rule on PSCo is uncertain at this time.

Federal CWA Section 316 (b) — The federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to aquatic species. In 2011, the EPA published the proposed rule that sets standards for minimization of aquatic species impingement, but leaves entrainment reduction requirements at the discretion of the permit writer and the regional EPA office. A final rule was signed by the EPA in May 2014. The timing of compliance with the requirements will vary from plant-to-plant since the new rules do not have a final compliance deadline. Since some of the compliance requirements depend on site-specific determinations by state regulators, the exact cost is somewhat uncertain. At June 30, 2014, the estimated cost of compliance for PSCo did not have a material impact on the results of operations, financial position or cash flows.

Federal CWA Waters of the United States Rule — In April 2014, the EPA and the U.S. Army Corps of Engineers issued a proposed rule that significantly expands the types of water bodies regulated under the CWA. If finalized as proposed, this rule could delay the siting of new pipelines, transmission lines and distribution lines, increase project costs and expand permitting and reporting requirements. The ultimate impact of the proposed rule will depend on the specific requirements of the final rule and cannot be determined at this time. A final rule is not anticipated before the first quarter of 2015.

Air
EPA Greenhouse Gas (GHG) Permitting — In 2011, new EPA permitting requirements became effective for GHG emissions of new and modified large stationary sources, which were applicable to the construction of new power plants or power plant modifications that increase emissions above a certain threshold. These rules were upheld by the United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit), but in June 2014 the U.S. Supreme Court reversed the EPA’s GHG emission thresholds for this program. The Supreme Court decided the EPA could not adopt GHG thresholds that would require permitting for new and modified large stationary sources. However, the Supreme Court also decided if a new or modified stationary source becomes subject to the permitting requirements by exceeding emission thresholds for other pollutants, then GHG emissions may be evaluated as part of the permitting process. PSCo is unable to determine the cost of compliance with these new EPA requirements as it is not clear whether these requirements will apply to future changes at PSCo’s power plants.

GHG Emission Standard for Existing Sources — In June 2014, the EPA published its proposed rule on GHG emission standards for existing power plants. Comments are due to the EPA on Oct. 16, 2014 and a final rule is anticipated in June 2015. Following adoption of the final rule, states must develop implementation plans by June 2016, with the possibility of an extension to June 2017 (June 2018 if submitting a joint plan with other states). Among other things, the proposed rule would require that state plans include enforceable measures to ensure emissions from existing power plants in the state achieve the EPA’s state-specific interim (2020-2029) and final (2030 and thereafter) emission performance targets. The plan will likely require additional emission reductions in Colorado. It is not possible to evaluate the impact of existing source standards until the EPA promulgates a final rule and states have adopted their applicable state plans.

GHG New Source Performance Standard (NSPS) Proposal — In January 2014, the EPA re-proposed a GHG NSPS for newly constructed power plants which would set performance standards (maximum carbon dioxide emission rates) for coal- and natural gas-fired power plants. For coal power plants, the NSPS requires an emissions level equivalent to partial carbon capture and storage (CCS) technology; for gas-fired power plants, the NSPS reflects emissions levels from combined cycle technology with no CCS. The EPA continues to propose that the NSPS not apply to modified or reconstructed existing power plants. In addition, installation of control equipment on existing plants would not constitute a “modification” to those plants under the NSPS program. It is not possible to evaluate the impact of the re-proposed NSPS until its final requirements are known.

GHG NSPS for Modified and Reconstructed Power Plants — In June 2014, the EPA published a proposed NSPS that would apply to GHG emissions from power plants that are modified or reconstructed. Comments are due to the EPA on Oct. 16, 2014 and a final rule is anticipated in June 2015. A modification is a change to an existing source that increases the maximum achievable hourly rate of emissions. A reconstruction involves the replacement of components at a unit to the extent that the capital cost of the new components exceeds 50 percent of the capital cost of an entirely new comparable unit. The proposed standards are not based on and would not require installation of CCS technology. Instead, the proposed standard for coal-fired power plants would require a combination of best operating practices and equipment upgrades. The proposal for gas-fired power plants would require emissions standards based on efficient combined cycle technology. It is not possible to evaluate the impact of these proposed standards until the final requirements are known. In addition, it is not clear whether these requirements, once adopted, would apply to future changes at PSCo’s power plants.

Regional Haze Rules — The regional haze program is designed to address widespread, regionally homogeneous haze that results from emissions from a multitude of sources. In 2005, the EPA amended the best available retrofit technology (BART) requirements of its regional haze rules, which require the installation and operation of emission controls for industrial facilities emitting air pollutants that reduce visibility in certain national parks and wilderness areas. In its first regional haze state implementation plan (SIP), Colorado identified the PSCo facilities that will have to reduce sulfur dioxide, nitrous oxide and particulate matter emissions under BART and set emissions limits for those facilities.

In 2011, the Colorado Air Quality Control Commission approved a SIP that included the CACJA emission reduction plan as satisfying regional haze requirements for the facilities included in the CACJA plan. In addition, the SIP included a BART determination for Comanche Units 1 and 2. The EPA approved the SIP in 2012. Emission controls at the Hayden and Pawnee plants are projected to cost $359.7 million and are expected to be installed between 2014 and 2017. PSCo anticipates these costs will be fully recoverable in rates.

In March 2013, WildEarth Guardians petitioned the U.S. Court of Appeals for the 10th Circuit to review the EPA’s decision approving the SIP. WildEarth Guardians has stated it will challenge the BART determination made for Comanche Units 1 and 2. In comments before the EPA, WildEarth Guardians urged that current emission limitations be made more stringent or that selective catalytic reduction be added to the units. PSCo intervened in the case. The 10th Circuit is anticipated to hear argument in January 2015, following completion of the briefs in November 2014.

In 2010, two environmental groups petitioned the U.S. Department of the Interior (DOI) to certify that 12 coal-fired boilers and one coal-fired cement kiln in Colorado are contributing to visibility problems in Rocky Mountain National Park. The following PSCo plants are named in the petition: Cherokee, Hayden, Pawnee and Valmont. The groups allege the Colorado BART rule is inadequate to satisfy the Clean Air Act mandate of ensuring reasonable further progress towards restoring natural visibility conditions in the park. It is not known when the DOI will rule on the petition.

Legal Contingencies

PSCo is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on PSCo’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Employment, Tort and Commercial Litigation

Pacific Northwest FERC Refund Proceeding — In July 2001, the FERC ordered a preliminary hearing to determine whether there were unjust and unreasonable charges for spot market bilateral sales in the Pacific Northwest for December 2000 through June 2001. PSCo supplied energy to the Pacific Northwest markets during this period and has been a participant in the hearings. In September 2001, the presiding ALJ concluded that prices in the Pacific Northwest during the referenced period were the result of a number of factors, including the shortage of supply, excess demand, drought and increased natural gas prices. Under these circumstances, the ALJ concluded that the prices in the Pacific Northwest markets were not unreasonable or unjust and no refunds should be ordered. Subsequent to the ruling, the FERC has allowed the parties to request additional evidence. Parties have claimed that the total amount of transactions with PSCo subject to refund is $34 million. In June 2003, the FERC issued an order terminating the proceeding without ordering further proceedings. Certain purchasers filed appeals of the FERC’s orders in this proceeding with the Ninth Circuit Court of Appeals (Ninth Circuit).

In an order issued in August 2007, the Ninth Circuit remanded the proceeding back to the FERC and indicated that the FERC should consider other rulings addressing overcharges in the California organized markets. The Ninth Circuit denied a petition for rehearing in April 2009, and the mandate was issued.

The FERC issued an order on remand establishing principles for the review proceeding in October 2011. In September 2012, the City of Seattle filed its direct case against PSCo and other Pacific Northwest sellers claiming refunds for the period January 2000 through June 2001. The City of Seattle indicated that for the period June 2000 through June 2001 PSCo had sales to the City of Seattle of approximately $50 million. The City of Seattle did not identify specific instances of unlawful market activity by PSCo, but rather based its claim for refunds on market dysfunction in the Western markets. PSCo submitted its answering case in December 2012.

In April 2013, the FERC issued an order on rehearing. The FERC confirmed that the City of Seattle would be able to attempt to obtain refunds back from January 2000, but reaffirmed the transaction-specific standard that the City of Seattle and other complainants would have to comply with to obtain refunds. In addition, the FERC rejected the imposition of any market-wide remedies. Although the FERC order on rehearing established the period for which the City of Seattle could seek refunds as January 2000 through June 2001, it is unclear what claim the City of Seattle has against PSCo prior to June 2000. In the proceeding, the City of Seattle does not allege specific misconduct or tariff violations by PSCo but instead asserts generally that the rates charged by PSCo and other sellers were excessive.

A hearing in this case was held before a FERC ALJ and concluded in October 2013. On March 28, 2014, the FERC ALJ issued an initial decision which rejected all of the City of Seattle’s claims against PSCo and other respondents. With respect to the period Jan. 1, 2000 through Dec. 24, 2000, the FERC ALJ rejected the City of Seattle’s assertion that any of the sales made to the City of Seattle resulted in an excessive burden to the City of Seattle, the applicable legal standard for the City of Seattle’s challenges during this period. With respect to the period Dec. 25, 2000 through June 20, 2001, the FERC ALJ concluded that the City of Seattle had failed to establish a causal link between any contracts and any claimed unlawful market activity, the standard required by the FERC in its remand order. The City of Seattle may contest the FERC ALJ’s initial decision by filing a brief on exceptions to the FERC.

Preliminary calculations of the City of Seattle’s claim for refunds from PSCo are approximately $28 million excluding interest. PSCo has concluded that a loss is reasonably possible with respect to this matter; however, given the surrounding uncertainties, PSCo is currently unable to estimate the amount or range of reasonably possible loss in the event of an adverse outcome of this matter. In making this assessment, PSCo considered two factors. First, not withstanding PSCo’s view that the City of Seattle has failed to apply the standard that the FERC has established in this proceeding, and the recognition that this case raises a novel issue and the FERC’s standard has been challenged on appeal to the Ninth Circuit, the outcome of such an appeal cannot be predicted with any certainty. Second, PSCo would expect to make equitable arguments against refunds even if the City of Seattle were to establish that it was overcharged for transactions. If a loss were sustained, PSCo would attempt to recover those losses from other potentially responsible parties. No accrual has been recorded for this matter.