Commitments And Contingencies
9 Months Ended
Sep. 30, 2011
Commitments And Contingencies

(15) COMMITMENTS AND CONTINGENCIES

Regulatory and Other Matters

District of Columbia Divestiture Case

In June 2000, the District of Columbia Public Service Commission (DCPSC) approved a divestiture settlement under which Pepco is required to share with its District of Columbia customers the net proceeds realized by Pepco from the sale of its generation-related assets in 2000. This approval left unresolved issues of (i) whether Pepco should be required to share with customers the excess deferred income taxes (EDIT) and accumulated deferred investment tax credits (ADITC) associated with the sold assets and, if so, whether such sharing would violate the normalization provisions of the Internal Revenue Code and its implementing regulations and (ii) whether Pepco was entitled to deduct certain costs in determining the amount of proceeds to be shared.

In May 2010, the DCPSC issued an order addressing all of the remaining issues related to the sharing of the proceeds of Pepco's divestiture of its generating assets. In the order, the DCPSC ruled that Pepco is not required to share EDIT and ADITC with customers. However, the order also disallowed certain items that Pepco had included in the costs deducted from the proceeds of the sale of the generation assets. The disallowance of these costs, together with interest on the disallowed amount, increased the aggregate amount Pepco was required to distribute to customers, pursuant to the sharing formula, by approximately $11 million, which Pepco recognized as an expense in 2010 and refunded the amounts to its customers. In June 2010, Pepco filed an application for reconsideration of the DCPSC's order. In July 2010, the DCPSC denied Pepco's application for reconsideration. In September 2010, Pepco filed an appeal of the DCPSC's decision with the District of Columbia Court of Appeals. On April 12, 2011, the Court of Appeals affirmed the DCPSC order. Pepco does not intend to appeal this decision.

Maryland Public Service Commission Reliability Investigation

In August 2010, following major storm events that occurred in July and August 2010, the Maryland Public Service Commission (MPSC) initiated a proceeding for the purpose of investigating the reliability of the Pepco distribution system and the quality of distribution service Pepco is providing its customers. On February 10, 2011, the MPSC issued a notice identifying as possible remedies the imposition of civil penalties, changes in the manner of Pepco's operations, modification of Pepco's service territory and revocation of Pepco's authority to exercise its public utility franchise. Pepco's position in this proceeding is that while it is implementing a comprehensive program that will improve the reliability of its distribution system and its planning for, and response to, adverse weather events, there is no evidentiary support to impose sanctions for past performance. The other parties, including the staff of the MPSC, the Maryland Office of People's Counsel, the Maryland Energy Administration, and Montgomery County, Maryland, contend that Pepco's service reliability has not met an acceptable level and have recommended a variety of sanctions, including, but not limited to, the imposition of significant fines, the denial of rate recovery for reliability improvement costs, a reduction in Pepco's return on equity (ROE), restrictions on dividends to PHI in order to fund reliability improvement costs, compliance with enhanced reliability requirements within a specified period and various reporting requirements. While Pepco is committed to improving the reliability of its electric service, it is vigorously opposing the imposition of the sanctions requested by the other parties, which Pepco believes are unsupported by the record in this case. Pepco is unable to predict the outcome of this proceeding at this time.

Rate Proceedings

Over the last several years, PHI's utility subsidiaries have proposed in each of their respective service territories the adoption of a mechanism to decouple retail distribution revenue from the amount of power delivered to retail customers. To date:

 

   

A bill stabilization adjustment (BSA) has been approved and implemented for Pepco and DPL electric service in Maryland and for Pepco electric service in the District of Columbia. The MPSC has initiated a proceeding to review how the BSA operates in Maryland to recover revenues lost as a result of major storm outages (as discussed below).

 

   

A modified fixed variable rate design (MFVRD) has been approved in concept for DPL electric service in Delaware, but the implementation has been deferred by the DPSC pending the development of an implementation plan and a customer education plan. DPL anticipates that the MFVRD will be in place for electric service by early 2013.

 

   

A MFVRD has been approved in concept for DPL natural gas service in Delaware, but implementation likewise has been deferred until development of an implementation plan and a customer education plan. DPL anticipates that the MFVRD will be in place for natural gas service by early 2013.

 

   

In New Jersey, a BSA proposed by ACE as part of a Phase 2 to the base rate proceeding filed in August 2009 was not included in the final settlement approved by the NJBPU on May 16, 2011. Accordingly, there is no BSA proposal currently pending in New Jersey.

Under the BSA, customer distribution rates are subject to adjustment (through a credit or surcharge mechanism), depending on whether actual distribution revenue per customer exceeds or falls short of the revenue-per-customer amount approved by the applicable public service commission. The MFVRD approved in concept in Delaware provides for a fixed customer charge (i.e., not tied to the customer's volumetric consumption) to recover the utility's fixed costs, plus a reasonable rate of return. Although different from the BSA, PHI views the MFVRD as an appropriate distribution revenue decoupling mechanism.

On February 1, 2011, the MPSC initiated proceedings involving Pepco and DPL, as well as unaffiliated utilities including Baltimore Gas & Electric Company and Southern Maryland Electric Cooperative, for the purpose of reviewing how the BSA operates to recover revenues lost as a result of major storm outages. In its orders initiating the proceedings, the MPSC expressed concern that the utilities' respective BSAs may be allowing them to recover revenues lost during extended outages, therefore unintentionally eliminating an incentive to restore service quickly. The MPSC will consider whether the BSA, as currently in effect, is appropriate, whether the calculations or determinant factors for calculating the BSA should be modified, and if so, what modifications should be made. On July 22, 2011, the MPSC held a legislative-style hearing on this matter. A provision that excludes revenues lost as a result of major storm outages from the calculation of future BSA adjustments is already included in the BSA for Pepco in the District of Columbia as approved by the DCPSC. If the MPSC were to implement a change similar to the provision in effect in the District of Columbia, the financial impact of service interruptions due to a major storm would generally depend on the scope and duration of the outages. The potential financial impact of any modification to the BSA cannot be assessed until the details of the modification are known.

Delaware

DPL makes an annual Gas Cost Rate (GCR) filing with the DPSC for the purpose of allowing DPL to recover gas procurement costs through customer rates. In August 2010, DPL made its 2010 GCR filing, which proposes rates that would allow DPL to recover an amount equal to a two-year amortization of currently under-recovered gas costs. In October 2010, the DPSC issued an order allowing DPL to place the new rates into effect on November 1, 2010, subject to refund and pending final DPSC approval. The effect of the proposed two-year amortization upon rates is an increase of 0.1% in the level of GCR. The parties in the proceeding submitted a proposed settlement to the hearing examiner on June 3, 2011, which includes the first year of DPL's two-year amortization but provides that DPL will forego the interest (a total of $342,000 for the two-year period 2011-2013) associated with that amortization. The proposed settlement was approved by the DPSC on October 18, 2011.

In August 2011, DPL made its 2011 GCR filing. The filing includes the second year of the effect of the proposed two-year amortization as proposed in DPL's 2010 filing. On September 20, 2011, the DPSC issued an order allowing DPL to place the new rates into effect on November 1, 2011, subject to refund and pending final DPSC approval.

In July 2010, DPL submitted an application with the DPSC to increase its natural gas distribution base rates. As subsequently amended, the filing sought approval of an annual rate increase of approximately $10.2 million, assuming the implementation of the MFVRD, based on a requested ROE of 11.00%. As permitted by Delaware law, DPL placed an annual increase of approximately $2.5 million into effect, on a temporary basis, on August 31, 2010, and the remainder of approximately $7.7 million of the requested increase was placed into effect on February 2, 2011, in each case subject to refund and pending final DPSC approval. On June 21, 2011, the DPSC approved a settlement providing for an annual rate increase of approximately $5.8 million, based on an ROE of 10% (which was memorialized in an order issued August 9, 2011). The decision deferred the implementation of the MFVRD until an implementation plan and a customer education plan are developed. As of September 30, 2011, the amount collected in excess of the approved rate has been refunded to customers through a bill credit.

 

District of Columbia

On July 8, 2011, Pepco filed an application with the DCPSC to increase its electric distribution base rates by approximately $42 million annually, based on an ROE of 10.75%. A decision by the DCPSC is expected in the second quarter of 2012.

Maryland

On December 21, 2010, DPL filed an application with the MPSC to increase its electric distribution base rates by $17.8 million annually, based on an ROE of 10.75%. On May 25, 2011, DPL and the other parties to the proceeding filed a unanimous stipulation and settlement providing for a rate increase of approximately $12.2 million and proposing a Phase II proceeding to explore methods to address the issue of regulatory lag (which is the delay experienced by DPL in recovering increased costs in its distribution rate base). Although no ROE was specified in the proposed settlement, it did provide that the ROE for purposes of calculating the allowance for funds used during construction and regulatory asset carrying costs would remain unchanged. The current ROE for those items is 10%. On July 8, 2011, the MPSC approved the proposed settlement. On October 17, 2011, the parties notified the MPSC that they were unable to reach an agreement on the regulatory lag issues in the Phase II proceeding. DPL will pursue a regulatory lag mitigation mechanism in its upcoming rate case filing.

New Jersey

On August 5, 2011, ACE filed a petition with the NJBPU to increase its electric distribution rates by the net amount of approximately $58.9 million, based on a return on equity of 10.75%. The net increase consists of a rate increase proposal of approximately $70.5 million, less a deduction from base rates of approximately $17 million attributable to excess depreciation expenses, plus approximately a $4.9 million increase in sales-and-use taxes and an upward adjustment of approximately $0.5 million in the Regulatory Asset Recovery Charge. ACE has requested that the rate increase be effective in May 2012.

In July 2009, the NJBPU approved certain rate recovery mechanisms in connection with ACE's Infrastructure Investment Program (the IIP). In exchange for the increase in infrastructure investment, the NJBPU, through the IIP, allowed recovery of ACE's infrastructure investment capital expenditures through a special rate outside the normal rate recovery mechanism of a base rate filing. The IIP is designed to stimulate the New Jersey economy and provide incremental employment in ACE's service territory by increasing the level of infrastructure expenditures invested above otherwise normal budgeted levels. On October 18, 2011, ACE filed a petition with the NJBPU for approval of an extension and expansion to the IIP, which is intended to become effective on or about January 1, 2012, and remain in effect until December 31, 2014. In calendar year 2012, ACE proposes as part of the IIP to recover approximately $69 million in reliability-related capital expenditures out of total reliability-related annual capital expenditures of approximately $103 million. For calendar years 2013 and 2014, ACE proposes to recover IIP capital expenditures of approximately $94 million and $81 million, respectively. Capital expenditures related to the proposed special rate would be subject to annual reconciliation and approval by the NJBPU.

On August 26, 2011, ACE filed a petition with the NJBPU seeking authorization for deferred accounting treatment of uninsured incremental storm damage restoration costs not otherwise recovered through base rates. In this petition, ACE proposed that storm costs for each individual storm would qualify for deferred accounting if the storm causes disruption to service of 10% or more of ACE's customers or if any of ACE's customers are without utility service for more than 24 hours. The deferred accounting treatment would include recovery of such costs incurred during Hurricane Irene, which impacted ACE's service territory in the third quarter of 2011.

 

Retained Environmental Exposures from the Sale of the Conectiv Energy Wholesale Power Generation Business

On July 1, 2010, PHI sold the Conectiv Energy wholesale power generation business to Calpine. Under New Jersey's Industrial Site Recovery Act (ISRA), the transfer of ownership triggered an obligation on the part of Conectiv Energy to remediate any environmental contamination at each of the nine Conectiv Energy generating facility sites located in New Jersey. Under the terms of the sale, Calpine has assumed responsibility for performing the ISRA-required remediation and for the payment of all related ISRA compliance costs up to $10 million. PHI is obligated to indemnify Calpine for any ISRA compliance remediation costs in excess of $10 million. According to preliminary estimates, the costs of ISRA-required remediation activities at the nine generating facility sites located in New Jersey are in the range of approximately $7 million to $18 million. PHI has accrued approximately $4 million as of September 30, 2011 for the ISRA-required remediation activities at the nine generating facility sites.

The sale of the Conectiv Energy wholesale power generation business to Calpine did not include a coal ash landfill site located at the Edge Moor generating facility, which PHI intends to close. The preliminary estimate of the costs to PHI to close the coal ash landfill ranges from approximately $2 million to $3 million, plus annual post-closure operations, maintenance and monitoring costs, estimated to range between $120,000 and $193,000 per year for 30 years. As of September 30, 2011, PHI had accrued approximately $5 million for landfill closure and monitoring.

On September 14, 2011, PHI received a request for data from the U.S. Environmental Protection Agency (EPA) regarding operations at the Deepwater generating facility in New Jersey (which was included in the sale to Calpine) between January 1, 2001 and July 1, 2010, to demonstrate compliance with the Clean Air Act's new source review permitting program. In subsequent discussions, EPA agreed to limit the time period for which it is seeking data to February 2004 to July 1, 2010. Under the terms of the Calpine sale, PHI is obligated to indemnify Calpine for any failure of PHI, on or prior to the closing date of the sale, to comply with environmental laws attributable to the construction of new, or modification of existing, sources of air emissions. At this time, PHI does not expect this inquiry to have a material effect on its financial position or results of operations.

General Litigation

In 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other corporate entities were brought into these cases on a theory of premises liability. Under this theory, the plaintiffs argued that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant.

As of September 30, 2011, there are approximately 180 cases still pending against Pepco in the Maryland State Courts, of which approximately 90 cases were filed after December 19, 2000, and were tendered to Mirant Corporation (Mirant) for defense and indemnification in connection with the sale by Pepco of its generation assets to Mirant in 2000.

While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) is approximately $360 million, PHI and Pepco believe the amounts claimed by the remaining plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time. If an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's financial condition, results of operations and cash flows.

 

Environmental Litigation

PHI, through its subsidiaries, is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from customers of the operating utilities, environmental clean-up costs incurred by Pepco, DPL and ACE would be included by each company in its respective cost of service for ratemaking purposes.

Franklin Slag Pile Site. In November 2008, ACE received a general notice letter from EPA concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA's claims are based on ACE's sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA's expenditures for response measures at the site have exceeded $6 million. EPA estimates the cost for future response measures will be approximately $6 million. ACE believes that EPA sent similar general notice letters to three other companies and various individuals.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE's position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Peck Iron and Metal Site. EPA informed Pepco in a May 2009 letter that Pepco may be a PRP under CERCLA with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck's metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List (NPL). The NPL, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In a July 12, 2011 letter, EPA invited Pepco to enter into discussions with the agency to conduct a remedial investigation/feasibility study (RI/FS) at the site. Pepco is evaluating EPA's invitation, but cannot at this time predict the costs of the RI/FS, the cost of performing a remedy at the site or the amount of such costs that EPA might seek to impose on Pepco.

 

Ward Transformer Site. In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE, DPL and Pepco with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. With input from the court, the parties are discussing the next step in the litigation, which is likely to be the filing of summary judgment motions regarding liability for certain "test case" defendants other than ACE, DPL and Pepco. The case is expected to be stayed as to the remaining defendants pending rulings upon the test cases. Although the magnitude of the potential liability at this site is not known at this time, PHI does not believe that any of its three utility subsidiaries had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Benning Road Site. In September 2010, PHI received a letter from EPA stating that EPA and the District of Columbia Department of the Environment (DDOE) have identified the Benning Road location, consisting of a transmission and distribution facility operated by Pepco and a generation facility operated by Pepco Energy Services, as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons, that EPA is monitoring the efforts of DDOE and that EPA intends to use federal authority to address the Benning Road site if an agreement for a comprehensive study to evaluate (and, if necessary, to clean up) the facility is not reached.

In January 2011, Pepco and Pepco Energy Services entered into a proposed consent decree with DDOE that requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE's selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. In February 2011, the District filed a complaint against Pepco and Pepco Energy Services in the United States District Court for the District of Columbia for the purpose of obtaining judicial approval of the consent decree. The complaint asserted claims under CERCLA, the Resource Conservation and Recovery Act, and District of Columbia law seeking to compel Pepco and Pepco Energy Services to take actions to investigate and clean up contamination allegedly originating from the Benning Road site, and to reimburse the District for its response costs. The filing of this complaint was not intended to lead to active litigation. Rather, after receiving public comment on the proposed consent decree, DDOE planned to file a motion requesting the District Court to enter the consent decree. In March 2011, Anacostia Riverkeeper, Inc., the Anacostia Watershed Society and the Natural Resources Defense Council (collectively, the Environmental Organizations) submitted comments to DDOE objecting to the proposed consent decree on several grounds. In April 2011, while DDOE was preparing its response to comments received on the proposed consent decree, the Environmental Organizations filed a motion to intervene as plaintiffs in the District Court action. Pepco and Pepco Energy Services and DDOE have filed briefs opposing their intervention motion. In August, DDOE, Pepco and Pepco Energy Services agreed to certain revisions to the consent decree to address some of the comments from the Environmental Organizations. On September 1, 2011, DDOE filed a motion asking the District Court to enter the revised consent decree (and at the same time deny the Environmental Organizations' motion to intervene). Briefing is complete on the motion to intervene and the motion to enter the consent decree. These motions are ready for decision by the District Court, but no decision has yet been issued. If the District Court allows the Environmental Organizations to intervene and become parties to the litigation, the settlement of the litigation by means of the consent decree will require their agreement, which could require changes to the terms of the consent decree – including the nature and scope of the work required to be performed by Pepco and Pepco Energy Services. Work on the RI/FS is not expected to begin until this matter is resolved.

At the present time, in light of the efforts by DDOE, Pepco and Pepco Energy Services to address the site through the proposed consent decree, Pepco and Pepco Energy Services anticipate that EPA will continue to refrain from listing the Benning Road facility on the NPL. The current estimate of the costs for performing the RI/FS is approximately $1 million. The remediation costs cannot be determined until the RI/FS is completed and the nature and scope of any remedial action are defined. However, the remediation costs are preliminarily projected to be approximately $13 million. As of September 30, 2011, PHI had an accrued liability of approximately $14 million with respect to this matter.

Price's Pit Site. ACE owns a transmission and distribution right-of-way that traverses the Price's Pit superfund site in Egg Harbor Township, New Jersey. EPA placed Price's Pit on the NPL in 1983 and the New Jersey Department of Environmental Protection (NJDEP) undertook an environmental investigation to identify and implement remedial action at the site. NJDEP's investigation revealed that landfill waste had been disposed on ACE's right-of-way and NJDEP determined that ACE was a responsible party as the owner of a facility on which a hazardous substance has been deposited. ACE, EPA and NJDEP entered into a settlement agreement effective on August 11, 2011 to resolve ACE's alleged liability. The settlement agreement requires ACE to make a payment of approximately $1 million (the amount accrued by ACE in 2010) to the EPA Hazardous Substance Superfund, which has been paid, and donate a four-acre parcel of land adjacent to the site to NJDEP.

Indian River Oil Release. In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. As of September 30, 2011, DPL's accrual for expected future costs to fulfill its obligations under the consent agreement was approximately $5 million, of which approximately $1 million is expected to be incurred during the remainder of 2011.

Potomac River Mineral Oil Release. On January 23, 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco's Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

The release falls within the regulatory jurisdiction of multiple federal and state agencies. Beginning in March 2011, DDOE issued a series of compliance directives that require Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco has submitted the requested incident report and provided the requested records and on October 21, 2011, received DDOE approval of Pepco's work plans for the sampling and assessment work.

On March 16, 2011, the Virginia Department of Environmental Quality (VADEQ) requested documentation regarding the release and the preparation of an emergency response report, which Pepco submitted to the agency on April 20, 2011. On March 25, 2011, Pepco received a notice of violation from VADEQ and in August 2011, Pepco executed a consent agreement with VADEQ pursuant to which Pepco will be obligated to pay a civil penalty of approximately $40,000. The consent agreement states that VADEQ has determined that no further action is necessary to remediate the mineral oil spill at the facility (although DDOE retains jurisdiction to require further response actions to assess possible impacts to the river). The Virginia State Water Control Board is expected to approve the consent agreement at its December 2011 meeting, after which it will be executed by VADEQ.

During March 2011, EPA conducted an inspection of the Potomac River substation to review compliance with federal regulations regarding Spill Prevention, Control, and Countermeasure (SPCC) plans for facilities using oil-containing equipment in proximity to surface waters. Following the inspection, EPA advised Pepco that it had identified several potential violations of the SPCC regulations relating to SPCC plan content, recordkeeping, and secondary containment, which may lead to an EPA demand for noncompliance penalties. As a result of the oil release, Pepco submitted a revised SPCC plan to EPA on August 18, 2011. Pepco also implemented certain changes to the existing containment systems at the facility on an interim basis in accordance with the revisions to the SPCC plan, and is evaluating certain permanent changes to the containment systems. During the third quarter of 2011, a study performed by PHI estimated the remediation costs at, and PHI accrued, approximately $1 million.

The U.S. Coast Guard has assessed a $5,000 penalty against Pepco for the release of oil into the waters of the United States, which Pepco has paid.

The amount of penalties, if any, that may be imposed by DDOE and/or EPA and the costs associated with possible additional changes to the containment system, possible additional response actions, or possible natural resource damage claims cannot be estimated at this time; however, based on current information, PHI and Pepco do not believe this matter will have a material adverse effect on their respective financial conditions, results of operations or cash flows.

Fauquier County Landfill Site. On October 7, 2011, Pepco Energy Services received a notice of violation dated October 5, 2011, from the VADEQ, which advised Pepco Energy Services of information on which VADEQ may rely to institute an administrative or judicial enforcement action in connection with alleged violation of Virginia air pollution control law and regulations at the facility of Pepco Energy Services' subsidiary Fauquier County Landfill Gas, LLC in Warrenton, Virginia. The notice of violation is based on an on-site VADEQ inspection during which VADEQ observed certain alleged deficiencies relating to the facility's permit to construct and operate. The notice of violation invited Pepco Energy Services to discuss the alleged deficiencies and indicated that Pepco Energy Services may be asked to enter into a consent order to formalize a plan and schedule of corrective action along with the assessment of civil charges. Pepco Energy Services is scheduled to meet with VADEQ on November 29, 2011. The amount of penalties, if any, that may be imposed by VADEQ cannot be predicted at this time; however, based on information currently known, Pepco Energy Services does not believe this matter will have a material adverse effect on its financial condition, results of operations or cash flows.

PHI's Cross-Border Energy Lease Investments

Between 1994 and 2002, PCI, a subsidiary of PHI, entered into eight cross-border energy lease investments involving public utility assets (primarily consisting of hydroelectric generation and coal-fired electric generation facilities and natural gas distribution networks) located outside of the United States. Each of these investments is comprised of multiple leases and the investment is structured as a sale and leaseback transaction commonly referred to by the IRS as a sale-in/lease-out or SILO transaction. PHI had previously received annual tax benefits from these eight cross-border energy lease investments of approximately $56 million, which as of March 31, 2011, had an aggregate book value of approximately $1.4 billion.

As more fully discussed in Note (7), "Leasing Activities," PHI entered into early termination agreements with two lessees, at their request, with respect to all of the leases comprising one cross-border energy lease investment and a small portion of the leases comprising another cross-border energy lease investment in the second quarter of 2011. PHI received net cash proceeds of $161 million (net of a termination payment of $423 million used to retire the non-recourse debt associated with the terminated leases) and recorded a pre-tax gain of $39 million, representing the excess of the net cash proceeds over the carrying value of the lease investments. Going forward, PHI anticipates that it will receive annual tax benefits from these lease investments of approximately $52 million. As of September 30, 2011, the book value of PHI's investment in its cross-border energy lease investments was approximately $1.3 billion. After taking into consideration the $74 million paid with the 2001-2002 audit (as discussed below), the net federal and state tax benefits received for the remaining leases from January 1, 2001, the earliest year that remains open to audit, to September 30, 2011, has been approximately $499 million.

 

Since 2005, PHI's cross-border energy lease investments have been under examination by the IRS as part of the PHI federal income tax audits. In connection with the audit of PHI's 2001-2002 and 2003-2005 income tax returns, respectively, the IRS disallowed the depreciation and interest deductions in excess of rental income claimed by PHI with respect to each of its cross-border energy lease investments. In addition, the IRS has sought to recharacterize each of the leases as a loan transaction as to which PHI would be subject to original issue discount income. PHI disagrees with the IRS' proposed adjustments and in August 2006 and May 2009 filed protests of these findings with the Office of Appeals of the IRS. Effective November 2010, PHI entered into a settlement agreement with the IRS for the 2001 and 2002 tax years and subsequently filed refund claims for the disallowed tax deductions relating to the leases for these years. Earlier this year, as part of this settlement, PHI paid $74 million of additional tax for 2001 and 2002, penalties of $1 million, and $28 million in interest associated with the disallowed deductions. PHI expects the IRS to deny its refund claims, and if so, PHI intends to pursue litigation against the IRS in the U.S. Court of Federal Claims to defend its tax position and recover the tax payment, interest and penalties. The IRS has up to six months (until January 2012) to act on the refund claim. Absent a settlement, any litigation against the IRS may take several years to resolve. The 2003-2005 income tax return review continues to be in process with the IRS Office of Appeals and at present, will not be a part of any U.S. Court of Federal Claims litigation discussed above.

At September 30, 2011, PHI modified its tax cash flow assumptions for two of the investments in the lease portfolio associated with the change in tax laws in the District of Columbia. Accordingly, PHI recalculated the equity investment and recorded a $7 million pre-tax ($3 million after-tax) charge.

At December 31, 2010, PHI modified its tax cash flow assumptions under its cross-border energy lease investments for the periods 2010-2013, to reflect the anticipated timing of potential litigation with the IRS concerning the investments. As a result of the 2010 recalculation, PHI recorded a $1 million after-tax non-cash charge to earnings at December 31, 2010.

In the event that the IRS were to be successful in disallowing 100% of the tax benefits associated with these leases and recharacterizing these leases as loans, PHI estimates that, as of September 30, 2011, it would be obligated to pay approximately $628 million in additional federal and state taxes and $116 million of interest on the remaining leases. The $628 million in additional federal and state taxes is net of the $74 million tax payment made in January 2011. In addition, the IRS could require PHI to pay a penalty of up to 20% on the amount of additional taxes due.

PHI anticipates that any additional taxes that it would be required to pay as a result of the disallowance of prior deductions or a re-characterization of the leases as loans would be recoverable in the form of lower taxes over the remaining terms of the affected leases. Moreover, the entire amount of any additional federal and state tax would not be due immediately, but rather, the federal and state taxes would be payable when the open audit years are closed and PHI amends subsequent tax returns not then under audit. To mitigate the taxes due in the event of a total disallowance of tax benefits, PHI could elect to liquidate all or a portion of its seven remaining cross-border energy lease investments, which PHI estimates could be accomplished over a period of six months to one year. Based on current market values, PHI estimates that liquidation of the remaining portfolio would generate sufficient cash proceeds to cover the estimated $744 million in federal and state taxes and interest due as of September 30, 2011, in the event of a total disallowance of tax benefits and a recharacterization of the leases as loans. If payments of additional taxes and interest preceded the receipt of liquidation proceeds, the payments would be funded by currently available sources of liquidity.

To the extent that PHI does not prevail in this matter and suffers a disallowance of the tax benefits and incurs imputed original issue discount income, PHI would be required under FASB guidance on leases (ASC 840) to recalculate the timing of the tax benefits generated by the cross-border energy lease investments and adjust the equity value of the investments, which would result in a non-cash charge to earnings.

 

District of Columbia Tax Legislation

On June 14, 2011, the Council of the District of Columbia approved the Budget Support Act of 2011. The Budget Support Act includes a provision requiring that corporate taxpayers in the District calculate taxable income allocable or apportioned to the District by reference to the income and apportionment factors applicable to commonly controlled entities organized within the United States that are engaged in a unitary business. This new reporting method was enacted on September 14, 2011 and is effective for tax years beginning on or after December 31, 2010. This new tax reporting method is reflected in PHI's consolidated results of operations, as further discussed in Note (7), "Leasing Activities," and Note (10), "Income Taxes."

Third Party Guarantees, Indemnifications, and Off-Balance Sheet Arrangements

Pepco Holdings and certain of its subsidiaries have various financial and performance guarantees and indemnification obligations that they have entered into in the normal course of business to facilitate commercial transactions with third parties as discussed below.

As of September 30, 2011, Pepco Holdings and its subsidiaries were parties to a variety of agreements pursuant to which they were guarantors for standby letters of credit, performance residual value, and other commitments and obligations. The commitments and obligations, in millions of dollars, were as follows:

 

Pepco Holdings and certain of its subsidiaries have entered into various indemnification agreements related to purchase and sale agreements and other types of contractual agreements with vendors and other third parties. These indemnification agreements typically cover environmental, tax, litigation and other matters, as well as breaches of representations, warranties and covenants set forth in these agreements. Typically, claims may be made by third parties under these indemnification agreements over various periods of time depending on the nature of the claim. The maximum potential exposure under these indemnification agreements can range from a specified dollar amount to an unlimited amount depending on the nature of the claim and the particular transaction. The total maximum potential amount of future payments under these indemnification agreements is not estimable due to several factors, including uncertainty as to whether or when claims may be made under these indemnities.

Energy Savings Performance Contracts

Pepco Energy Services has a diverse portfolio of energy savings performance contracts that are associated with the installation of energy savings equipment for federal, state and local government customers. As part of those contracts, Pepco Energy Services typically guarantees that the equipment or systems installed by Pepco Energy Services will generate a specified amount of energy savings on an annual basis over a multi-year period. As of September 30, 2011, Pepco Energy Services' energy savings guarantees on both completed projects and projects under construction totaled $422 million over the life of the performance contracts with the longest remaining term being 15 years. On an annual basis, Pepco Energy Services undertakes a measurement and verification process to determine the amount of energy savings for the year and whether there is any shortfall in the annual energy savings compared to the guaranteed amount. Pepco Energy Services recognizes a liability for the value of the estimated energy savings shortfall when it is probable that the guaranteed energy savings will not be achieved and the amount is reasonably estimable. As of September 30, 2011, Pepco Energy Services did not have an accrued liability for energy savings performance contracts. There was no significant change in the type of contracts issued for the three and nine months ended September 30, 2011. Based on its historical experience, Pepco Energy Services believes the probability of incurring a material loss under its energy savings performance contracts is remote.

Dividends

On October 27, 2011, Pepco Holdings' Board of Directors declared a dividend on common stock of 27 cents per share payable December 30, 2011, to shareholders of record on December 12, 2011.

Potomac Electric Power Co [Member]
 
Commitments And Contingencies

(10) COMMITMENTS AND CONTINGENCIES

Regulatory and Other Matters

District of Columbia Divestiture Case

In June 2000, the District of Columbia Public Service Commission (DCPSC) approved a divestiture settlement under which Pepco is required to share with its District of Columbia customers the net proceeds realized by Pepco from the sale of its generation-related assets in 2000. This approval left unresolved issues of (i) whether Pepco should be required to share with customers the excess deferred income taxes (EDIT) and accumulated deferred investment tax credits (ADITC) associated with the sold assets and, if so, whether such sharing would violate the normalization provisions of the Internal Revenue Code and its implementing regulations and (ii) whether Pepco was entitled to deduct certain costs in determining the amount of proceeds to be shared.

In May 2010, the DCPSC issued an order addressing all of the remaining issues related to the sharing of the proceeds of Pepco's divestiture of its generating assets. In the order, the DCPSC ruled that Pepco is not required to share EDIT and ADITC with customers. However, the order also disallowed certain items that Pepco had included in the costs deducted from the proceeds of the sale of the generation assets. The disallowance of these costs, together with interest on the disallowed amount, increased the aggregate amount Pepco was required to distribute to customers, pursuant to the sharing formula, by approximately $11 million, which Pepco recognized as an expense in 2010 and refunded the amounts to its customers. In June 2010, Pepco filed an application for reconsideration of the DCPSC's order. In July 2010, the DCPSC denied Pepco's application for reconsideration. In September 2010, Pepco filed an appeal of the DCPSC's decision with the District of Columbia Court of Appeals. On April 12, 2011, the Court of Appeals affirmed the DCPSC order. Pepco does not intend to appeal this decision.

Maryland Public Service Commission Reliability Investigation

In August 2010, following major storm events that occurred in July and August 2010, the Maryland Public Service Commission (MPSC) initiated a proceeding for the purpose of investigating the reliability of the Pepco distribution system and the quality of distribution service Pepco is providing its customers. On February 10, 2011, the MPSC issued a notice identifying as possible remedies the imposition of civil penalties, changes in the manner of Pepco's operations, modification of Pepco's service territory and revocation of Pepco's authority to exercise its public utility franchise. Pepco's position in this proceeding is that while it is implementing a comprehensive program that will improve the reliability of its distribution system and its planning for, and response to, adverse weather events, there is no evidentiary support to impose sanctions for past performance. The other parties, including the staff of the MPSC, the Maryland Office of People's Counsel, the Maryland Energy Administration, and Montgomery County, Maryland, contend that Pepco's service reliability has not met an acceptable level and have recommended a variety of sanctions, including, but not limited to, the imposition of significant fines, the denial of rate recovery for reliability improvement costs, a reduction in Pepco's return on equity (ROE), restrictions on dividends to PHI in order to fund reliability improvement costs, compliance with enhanced reliability requirements within a specified period and various reporting requirements. While Pepco is committed to improving the reliability of its electric service, it is vigorously opposing the imposition of the sanctions requested by the other parties, which Pepco believes are unsupported by the record in this case. Pepco is unable to predict the outcome of this proceeding at this time.

Rate Proceedings

Over the last several years, Pepco has proposed in each of its service territories the adoption of a mechanism to decouple retail distribution revenue from the amount of power delivered to retail customers. To date, a bill stabilization adjustment (BSA) has been approved and implemented for electric service in Maryland and in the District of Columbia. The MPSC has initiated a proceeding to review how the BSA operates in Maryland to recover revenues lost as a result of major storm outages (as discussed below). Under the BSA, customer distribution rates are subject to adjustment (through a credit or surcharge mechanism), depending on whether actual distribution revenue per customer exceeds or falls short of the revenue-per-customer amount approved by the applicable public service commission.

On February 1, 2011, the MPSC initiated proceedings involving Pepco, as well as DPL and unaffiliated utilities including Baltimore Gas & Electric Company and Southern Maryland Electric Cooperative, for the purpose of reviewing how the BSA operates to recover revenues lost as a result of major storm outages. In its orders initiating the proceedings, the MPSC expressed concern that the utilities' respective BSAs may be allowing them to recover revenues lost during extended outages, therefore unintentionally eliminating an incentive to restore service quickly. The MPSC will consider whether the BSA, as currently in effect, is appropriate, whether the calculations or determinant factors for calculating the BSA should be modified, and if so, what modifications should be made. On July 22, 2011, the MPSC held a legislative-style hearing on this matter. A provision that excludes revenues lost as a result of major storm outages from the calculation of future BSA adjustments is already included in the BSA for Pepco in the District of Columbia as approved by the DCPSC. If the MPSC were to implement a change similar to the provision in effect in the District of Columbia, the financial impact of service interruptions due to a major storm would generally depend on the scope and duration of the outages. The potential financial impact of any modification to the BSA cannot be assessed until the details of the modification are known.

District of Columbia

On July 8, 2011, Pepco filed an application with the DCPSC to increase its electric distribution base rates by approximately $42 million annually, based on an ROE of 10.75%. A decision by the DCPSC is expected in the second quarter of 2012.

General Litigation

In 1993, Pepco was served with Amended Complaints filed in the state Circuit Courts of Prince George's County, Baltimore City and Baltimore County, Maryland in separate ongoing, consolidated proceedings known as "In re: Personal Injury Asbestos Case." Pepco and other corporate entities were brought into these cases on a theory of premises liability. Under this theory, the plaintiffs argued that Pepco was negligent in not providing a safe work environment for employees or its contractors, who allegedly were exposed to asbestos while working on Pepco's property. Initially, a total of approximately 448 individual plaintiffs added Pepco to their complaints. While the pleadings are not entirely clear, it appears that each plaintiff sought $2 million in compensatory damages and $4 million in punitive damages from each defendant.

As of September 30, 2011, there are approximately 180 cases still pending against Pepco in the Maryland State Courts, of which approximately 90 cases were filed after December 19, 2000, and were tendered to Mirant Corporation (Mirant) for defense and indemnification in connection with the sale by Pepco of its generation assets to Mirant in 2000.

While the aggregate amount of monetary damages sought in the remaining suits (excluding those tendered to Mirant) is approximately $360 million, PHI and Pepco believe the amounts claimed by the remaining plaintiffs are greatly exaggerated. The amount of total liability, if any, and any related insurance recovery cannot be determined at this time. If an unfavorable decision were rendered against Pepco, it could have a material adverse effect on Pepco's and PHI's financial condition, results of operations and cash flows.

Environmental Litigation

Pepco is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from Pepco's customers, environmental clean-up costs incurred by Pepco would be included in its cost of service for ratemaking purposes.

Peck Iron and Metal Site. The U.S. Environmental Protection Agency (EPA) informed Pepco in a May 2009 letter that Pepco may be a potentially responsible party (PRP) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) with respect to the cleanup of the Peck Iron and Metal site in Portsmouth, Virginia, and for costs EPA has incurred in cleaning up the site. The EPA letter states that Peck Iron and Metal purchased, processed, stored and shipped metal scrap from military bases, governmental agencies and businesses and that Peck's metal scrap operations resulted in the improper storage and disposal of hazardous substances. EPA bases its allegation that Pepco arranged for disposal or treatment of hazardous substances sent to the site on information provided by former Peck Iron and Metal personnel, who informed EPA that Pepco was a customer at the site. Pepco has advised EPA by letter that its records show no evidence of any sale of scrap metal by Pepco to the site. Even if EPA has such records and such sales did occur, Pepco believes that any such scrap metal sales may be entitled to the recyclable material exemption from CERCLA liability. In a Federal Register notice published on November 4, 2009, EPA placed the Peck Iron and Metal site on the National Priorities List (NPL). The NPL, among other things, serves as a guide to EPA in determining which sites warrant further investigation to assess the nature and extent of the human health and environmental risks associated with a site. In a July 12, 2011 letter, EPA invited Pepco to enter into discussions with the agency to conduct a remedial investigation/feasibility study (RI/FS) at the site. Pepco is evaluating EPA's invitation, but cannot at this time predict the costs of the RI/FS, the cost of performing a remedy at the site or the amount of such costs that EPA might seek to impose on Pepco.

Ward Transformer Site. In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including Pepco with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. With input from the court, the parties are discussing the next step in the litigation, which is likely to be the filing of summary judgment motions regarding liability for certain "test case" defendants other than Pepco. The case is expected to be stayed as to the remaining defendants pending rulings upon the test cases. Although the magnitude of the potential liability at this site is not known at this time, Pepco does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Benning Road Site. In September 2010, PHI received a letter from EPA stating that EPA and the District of Columbia Department of the Environment (DDOE) have identified the Benning Road location, consisting of a transmission and distribution facility operated by Pepco and a generation facility operated by Pepco Energy Services, Inc. and its subsidiaries (collectively, Pepco Energy Services), as one of six land-based sites potentially contributing to contamination of the lower Anacostia River. The letter stated that the principal contaminants of concern are polychlorinated biphenyls and polycyclic aromatic hydrocarbons, that EPA is monitoring the efforts of DDOE and that EPA intends to use federal authority to address the Benning Road site if an agreement for a comprehensive study to evaluate (and, if necessary, to clean up) the facility is not reached.

In January 2011, Pepco and Pepco Energy Services entered into a proposed consent decree with DDOE that requires Pepco and Pepco Energy Services to conduct a RI/FS for the Benning Road site and an approximately 10-15 acre portion of the adjacent Anacostia River. The RI/FS will form the basis for DDOE's selection of a remedial action for the Benning Road site and for the Anacostia River sediment associated with the site. In February 2011, the District filed a complaint against Pepco and Pepco Energy Services in the United States District Court for the District of Columbia for the purpose of obtaining judicial approval of the consent decree. The complaint asserted claims under CERCLA, the Resource Conservation and Recovery Act, and District of Columbia law seeking to compel Pepco and Pepco Energy Services to take actions to investigate and clean up contamination allegedly originating from the Benning Road site, and to reimburse the District for its response costs. The filing of this complaint was not intended to lead to active litigation. Rather, after receiving public comment on the proposed consent decree, DDOE planned to file a motion requesting the District Court to enter the consent decree. In March 2011, Anacostia Riverkeeper, Inc., the Anacostia Watershed Society and the Natural Resources Defense Council (collectively, the Environmental Organizations) submitted comments to DDOE objecting to the proposed consent decree on several grounds. In April 2011, while DDOE was preparing its response to comments received on the proposed consent decree, the Environmental Organizations filed a motion to intervene as plaintiffs in the District Court action. Pepco and Pepco Energy Services and DDOE have filed briefs opposing their intervention motion. In August, DDOE, Pepco and Pepco Energy Services agreed to certain revisions to the consent decree to address some of the comments from the Environmental Organizations. On September 1, 2011, DDOE filed a motion asking the District Court to enter the revised consent decree (and at the same time deny the Environmental Organizations' motion to intervene). Briefing is complete on the motion to intervene and the motion to enter the consent decree. These motions are ready for decision by the District Court, but no decision has yet been issued. If the District Court allows the Environmental Organizations to intervene and become parties to the litigation, the settlement of the litigation by means of the consent decree will require their agreement, which could require changes to the terms of the consent decree – including the nature and scope of the work required to be performed by Pepco and Pepco Energy Services. Work on the RI/FS is not expected to begin until this matter is resolved.

At the present time, in light of the efforts by DDOE, Pepco and Pepco Energy Services to address the site through the proposed consent decree, Pepco and Pepco Energy Services anticipate that EPA will continue to refrain from listing the Benning Road facility on the NPL. The current estimate of the costs for performing the RI/FS is approximately $1 million. The remediation costs cannot be determined until the RI/FS is completed and the nature and scope of any remedial action are defined. However, the remediation costs are preliminarily projected to be approximately $13 million. As of September 30, 2011, PHI had an accrued liability of approximately $14 million with respect to this matter.

 

Potomac River Mineral Oil Release. On January 23, 2011, a coupling failure on a transformer cooler pipe resulted in a release of non-toxic mineral oil at Pepco's Potomac River substation in Alexandria, Virginia. An overflow of an underground secondary containment reservoir resulted in approximately 4,500 gallons of mineral oil flowing into the Potomac River.

The release falls within the regulatory jurisdiction of multiple federal and state agencies. Beginning in March 2011, DDOE issued a series of compliance directives that require Pepco to prepare an incident report, provide certain records, and prepare and implement plans for sampling surface water and river sediments and assessing ecological risks and natural resources damages. Pepco has submitted the requested incident report and provided the requested records and on October 21, 2011, received DDOE approval of Pepco's work plans for the sampling and assessment work.

On March 16, 2011, the Virginia Department of Environmental Quality (VADEQ) requested documentation regarding the release and the preparation of an emergency response report, which Pepco submitted to the agency on April 20, 2011. On March 25, 2011, Pepco received a notice of violation from VADEQ and in August 2011, Pepco executed a consent agreement with VADEQ pursuant to which Pepco will be obligated to pay a civil penalty of approximately $40,000. The consent agreement states that VADEQ has determined that no further action is necessary to remediate the mineral oil spill at the facility (although DDOE retains jurisdiction to require further response actions to assess possible impacts to the river). The Virginia State Water Control Board is expected to approve the consent agreement at its December 2011 meeting, after which it will be executed by VADEQ.

During March 2011, EPA conducted an inspection of the Potomac River substation to review compliance with federal regulations regarding Spill Prevention, Control, and Countermeasure (SPCC) plans for facilities using oil-containing equipment in proximity to surface waters. Following the inspection, EPA advised Pepco that it had identified several potential violations of the SPCC regulations relating to SPCC plan content, recordkeeping, and secondary containment, which may lead to an EPA demand for noncompliance penalties. As a result of the oil release, Pepco submitted a revised SPCC plan to EPA on August 18, 2011. Pepco also implemented certain changes to the existing containment systems at the facility on an interim basis in accordance with the revisions to the SPCC plan, and is evaluating certain permanent changes to the containment systems. During the third quarter of 2011, a study performed by PHI estimated the remediation costs at, and PHI accrued, approximately $1 million.

The U.S. Coast Guard has assessed a $5,000 penalty against Pepco for the release of oil into the waters of the United States, which Pepco has paid.

The amount of penalties, if any, that may be imposed by DDOE and/or EPA and the costs associated with possible additional changes to the containment system, possible additional response actions, or possible natural resource damage claims cannot be estimated at this time; however, based on current information, PHI and Pepco do not believe this matter will have a material adverse effect on their respective financial conditions, results of operations or cash flows.

District of Columbia Tax Legislation

On June 14, 2011, the Council of the District of Columbia approved the Fiscal Year 2012 Budget Support Act of 2011 (Budget Support Act). The Budget Support Act includes a provision requiring that corporate taxpayers in the District of Columbia (the District) calculate taxable income allocable or apportioned to the District by reference to the income and apportionment factors applicable to commonly controlled organizations organized within the United States that are engaged in a unitary business. This new reporting method was enacted on September 14, 2011 and is effective for tax years beginning on or after December 31, 2010. This new tax reporting method is reflected in Pepco's results of operations, as further discussed in Note (8), "Income Taxes."

Delmarva Power & Light Co/De [Member]
 
Commitments And Contingencies

(12) COMMITMENTS AND CONTINGENCIES

Regulatory and Other Matters

Rate Proceedings

Over the last several years, DPL has proposed in each of their respective service territories the adoption of a mechanism to decouple retail distribution revenue from the amount of power delivered to retail customers. To date:

 

   

A bill stabilization adjustment (BSA) has been approved and implemented for electric service in Maryland. The Maryland Public Service Commission (MPSC) has initiated a proceeding to review how the BSA operates in Maryland to recover revenues lost as a result of major storm outages (as discussed below).

 

   

A modified fixed variable rate design (MFVRD) has been approved in concept for electric service in Delaware, but the implementation has been deferred by the DPSC pending the development of an implementation plan and a customer education plan. DPL anticipates that the MFVRD will be in place for electric service by early 2013.

 

   

A MFVRD has been approved in concept for DPL natural gas service in Delaware, but implementation likewise has been deferred until development of an implementation plan and a customer education plan. DPL anticipates that the MFVRD will be in place for natural gas service by early 2013.

Under the BSA, customer distribution rates are subject to adjustment (through a credit or surcharge mechanism), depending on whether actual distribution revenue per customer exceeds or falls short of the revenue-per-customer amount approved by the applicable public service commission. The MFVRD approved in concept in Delaware provides for a fixed customer charge (i.e., not tied to the customer's volumetric consumption) to recover the utility's fixed costs, plus a reasonable rate of return.

On February 1, 2011, the MPSC initiated proceedings involving DPL, as well as Pepco and unaffiliated utilities including Baltimore Gas & Electric Company and Southern Maryland Electric Cooperative, for the purpose of reviewing how the BSA operates to recover revenues lost as a result of major storm outages. In its orders initiating the proceedings, the MPSC expressed concern that the utilities' respective BSAs may be allowing them to recover revenues lost during extended outages, therefore unintentionally eliminating an incentive to restore service quickly. The MPSC will consider whether the BSA, as currently in effect, is appropriate, whether the calculations or determinant factors for calculating the BSA should be modified, and if so, what modifications should be made. On July 22, 2011, the MPSC held a legislative-style hearing on this matter. A provision that excludes revenues lost as a result of major storm outages from the calculation of future BSA adjustments is already included in the BSA for Pepco in the District of Columbia as approved by the District of Columbia Public Service Commission. If the MPSC were to implement a change similar to the provision in effect in the District of Columbia, the financial impact of service interruptions due to a major storm would generally depend on the scope and duration of the outages. The potential financial impact of any modification to the BSA cannot be assessed until the details of the modification are known.

 

Delaware

DPL makes an annual Gas Cost Rate (GCR) filing with the DPSC for the purpose of allowing DPL to recover gas procurement costs through customer rates. In August 2010, DPL made its 2010 GCR filing, which proposes rates that would allow DPL to recover an amount equal to a two-year amortization of currently under-recovered gas costs. In October 2010, the DPSC issued an order allowing DPL to place the new rates into effect on November 1, 2010, subject to refund and pending final DPSC approval. The effect of the proposed two-year amortization upon rates is an increase of 0.1% in the level of GCR. The parties in the proceeding submitted a proposed settlement to the hearing examiner on June 3, 2011, which includes the first year of DPL's two-year amortization but provides that DPL will forego the interest (a total of $342,000 for the two-year period 2011 to 2013) associated with that amortization. The proposed settlement was approved by the DPSC on October 18, 2011.

In August 2011, DPL made its 2011 GCR filing. The filing includes the second year of the effect of the proposed two-year amortization as proposed in DPL's 2010 filing. On September 20, 2011, the DPSC issued an order allowing DPL to place the new rates into effect on November 1, 2011, subject to refund and pending final DPSC approval.

In July 2010, DPL submitted an application with the DPSC to increase its natural gas distribution base rates. As subsequently amended, the filing sought approval of an annual rate increase of approximately $10.2 million, assuming the implementation of the MFVRD, based on a requested return on equity (ROE) of 11.00%. As permitted by Delaware law, DPL placed an annual increase of approximately $2.5 million into effect, on a temporary basis, on August 31, 2010, and the remainder of approximately $7.7 million of the requested increase was placed into effect on February 2, 2011, in each case subject to refund and pending final DPSC approval. On June 21, 2011, the DPSC approved a settlement providing for an annual rate increase of approximately $5.8 million, based on an ROE of 10% (which was memorialized in an order issued August 9, 2011). The decision deferred the implementation of the MFVRD until an implementation plan and a customer education plan are developed. As of September 30, 2011, the amount collected in excess of the approved rate has been refunded to customers through a bill credit.

Maryland

On December 21, 2010, DPL filed an application with the MPSC to increase its electric distribution base rates by $17.8 million annually, based on an ROE of 10.75%. On May 25, 2011, DPL and the other parties to the proceeding filed a unanimous stipulation and settlement providing for a rate increase of approximately $12.2 million and proposing a Phase II proceeding to explore methods to address the issue of regulatory lag (which is the delay experienced by DPL in recovering increased costs in its distribution rate base). Although no ROE was specified in the proposed settlement, it did provide that the ROE for purposes of calculating the allowance for funds used during construction and regulatory asset carrying costs would remain unchanged. The current ROE for those items is 10%. On July 8, 2011, the MPSC approved the proposed settlement. On October 17, 2011, the parties notified the MPSC that they were unable to reach an agreement on the regulatory lag issues in the Phase II proceeding. DPL will pursue a regulatory lag mitigation mechanism in its upcoming rate case filing.

Environmental Litigation

DPL is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from DPL's customers, environmental clean-up costs incurred by DPL would be included in its cost of service for ratemaking purposes.

 

Ward Transformer Site. In April 2009, a group of potentially responsible parties (PRPs) with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including DPL with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. With input from the court, the parties are discussing the next step in the litigation, which is likely to be the filing of summary judgment motions regarding liability for certain "test case" defendants other than DPL. The case is expected to be stayed as to the remaining defendants pending rulings upon the test cases. Although the magnitude of the potential liability at this site is not known at this time, DPL does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Indian River Oil Release. In 2001, DPL entered into a consent agreement with the Delaware Department of Natural Resources and Environmental Control for remediation, site restoration, natural resource damage compensatory projects and other costs associated with environmental contamination resulting from an oil release at the Indian River generating facility, which was sold in June 2001. As of September 30, 2011, DPL's accrual for expected future costs to fulfill its obligations under the consent agreement was approximately $5 million, of which approximately $1 million is expected to be incurred during the remainder of 2011.

Atlantic City Electric Co [Member]
 
Commitments And Contingencies

(11) COMMITMENTS AND CONTINGENCIES

Regulatory and Other Matters

Rate Proceedings

Over the last several years, ACE has proposed the adoption of a mechanism to decouple retail distribution revenue from the amount of power delivered to retail customers. To date, a bill stabilization adjustment (BSA) it proposed as part of a Phase 2 to the base rate proceeding filed in August 2009 was not included in the final settlement approved by the NJBPU on May 16, 2011. Accordingly, there is no BSA proposal currently pending in New Jersey. Under the BSA, customer distribution rates are subject to adjustment (through a credit or surcharge mechanism), depending on whether actual distribution revenue per customer exceeds or falls short of the revenue-per-customer amount approved by the applicable public service commission.

On August 5, 2011, ACE filed a petition with the NJBPU to increase its electric distribution rates by the net amount of approximately $58.9 million, based on a return on equity of 10.75%. The net increase consists of a rate increase proposal of approximately $70.5 million, less a deduction from base rates of approximately $17 million attributable to excess depreciation expenses, plus approximately a $4.9 million increase in sales-and-use taxes and an upward adjustment of approximately $0.5 million in the Regulatory Asset Recovery Charge. ACE has requested that the rate increase be effective in May 2012.

In July 2009, the NJBPU approved certain rate recovery mechanisms in connection with ACE's Infrastructure Investment Program (the IIP). In exchange for the increase in infrastructure investment, the NJBPU, through the IIP, allowed recovery of ACE's infrastructure investment capital expenditures through a special rate outside the normal rate recovery mechanism of a base rate filing. The IIP is designed to stimulate the New Jersey economy and provide incremental employment in ACE's service territory by increasing the level of infrastructure expenditures invested above otherwise normal budgeted levels. On October 18, 2011, ACE filed a petition with the NJBPU for approval of an extension and expansion to the IIP, which is intended to become effective on or about January 1, 2012, and remain in effect until December 31, 2014. In calendar year 2012, ACE proposes as part of the IIP to recover approximately $69 million in reliability-related capital expenditures out of total reliability-related annual capital expenditures of approximately $103 million. For calendar years 2013 and 2014, ACE proposes to recover IIP capital expenditures of approximately $94 million and $81 million, respectively. Capital expenditures related to the proposed special rate would be subject to annual reconciliation and approval by the NJBPU.

On August 26, 2011, ACE filed a petition with the NJBPU seeking authorization for deferred accounting treatment of uninsured incremental storm damage restoration costs not otherwise recovered through base rates. In this petition, ACE proposed that storm costs for each individual storm would qualify for deferred accounting if the storm causes disruption to service of 10% or more of ACE's customers or if any of ACE's customers are without utility service for more than 24 hours. The deferred accounting treatment would include recovery of such costs incurred during Hurricane Irene, which impacted ACE's service territory in the third quarter of 2011.

 

Environmental Litigation

ACE is subject to regulation by various federal, regional, state, and local authorities with respect to the environmental effects of its operations, including air and water quality control, solid and hazardous waste disposal, and limitations on land use. Although penalties assessed for violations of environmental laws and regulations are not recoverable from ACE's customers, environmental clean-up costs incurred by ACE would be included in its cost of service for ratemaking purposes.

Franklin Slag Pile Site. In November 2008, ACE received a general notice letter from the U.S. Environmental Protection Agency (EPA) concerning the Franklin Slag Pile site in Philadelphia, Pennsylvania, asserting that ACE is a potentially responsible party (PRP) that may have liability for clean-up costs with respect to the site and for the costs of implementing an EPA-mandated remedy. EPA's claims are based on ACE's sale of boiler slag from the B.L. England generating facility, then owned by ACE, to MDC Industries, Inc. (MDC) during the period June 1978 to May 1983. EPA claims that the boiler slag ACE sold to MDC contained copper and lead, which are hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and that the sales transactions may have constituted an arrangement for the disposal or treatment of hazardous substances at the site, which could be a basis for liability under CERCLA. The EPA letter also states that, as of the date of the letter, EPA's expenditures for response measures at the site have exceeded $6 million. EPA estimates the cost for future response measures will be approximately $6 million. ACE believes that EPA sent similar general notice letters to three other companies and various individuals.

ACE believes that the B.L. England boiler slag sold to MDC was a valuable material with various industrial applications and, therefore, the sale was not an arrangement for the disposal or treatment of any hazardous substances as would be necessary to constitute a basis for liability under CERCLA. ACE intends to contest any claims to the contrary made by EPA. In a May 2009 decision arising under CERCLA, which did not involve ACE, the U.S. Supreme Court rejected an EPA argument that the sale of a useful product constituted an arrangement for disposal or treatment of hazardous substances. While this decision supports ACE's position, at this time ACE cannot predict how EPA will proceed with respect to the Franklin Slag Pile site, or what portion, if any, of the Franklin Slag Pile site response costs EPA would seek to recover from ACE. Costs to resolve this matter are not expected to be material and are expensed as incurred.

Ward Transformer Site. In April 2009, a group of PRPs with respect to the Ward Transformer site in Raleigh, North Carolina, filed a complaint in the U.S. District Court for the Eastern District of North Carolina, alleging cost recovery and/or contribution claims against a number of entities, including ACE with respect to past and future response costs incurred by the PRP group in performing a removal action at the site. In a March 2010 order, the court denied the defendants' motion to dismiss. With input from the court, the parties are discussing the next step in the litigation, which is likely to be the filing of summary judgment motions regarding liability for certain "test case" defendants other than ACE. The case is expected to be stayed as to the remaining defendants pending rulings upon the test cases. Although the magnitude of the potential liability at this site is not known at this time, ACE does not believe that it had extensive business transactions, if any, with the Ward Transformer site and therefore, costs incurred to resolve this matter are not expected to be material.

Price's Pit Site. ACE owns a transmission and distribution right-of-way that traverses the Price's Pit superfund site in Egg Harbor Township, New Jersey. EPA placed Price's Pit on the NPL in 1983 and the New Jersey Department of Environmental Protection (NJDEP) undertook an environmental investigation to identify and implement remedial action at the site. NJDEP's investigation revealed that landfill waste had been disposed on ACE's right-of-way and NJDEP determined that ACE was a responsible party as the owner of a facility on which a hazardous substance has been deposited. ACE, EPA and NJDEP entered into a settlement agreement effective on August 11, 2011 to resolve ACE's alleged liability. The settlement agreement requires ACE to make a payment of approximately $1 million (the amount accrued by ACE in 2010) to the EPA Hazardous Substance Superfund, which has been paid, and donate a four-acre parcel of land adjacent to the site to NJDEP.