14. Contractual Obligations, Commercial Commitments and Contingencies

DPL Inc. – Guarantees

In the normal course of business, DPL enters into various agreements with its wholly-owned subsidiaries, DPLE and DPLER and its indirect wholly-owned subsidiary, MC Squared, providing financial or performance assurance to third parties. These agreements are entered into primarily to support or enhance the creditworthiness otherwise attributed to these subsidiaries on a stand-alone basis, thereby facilitating the extension of sufficient credit to accomplish these subsidiaries' intended commercial purposes. Certain of DPL's financial or performance assurance agreements contain provisions that require our debt to maintain an investment grade credit rating from credit rating agencies. If our debt were to fall below investment grade, we would be in violation of the provisions, and the counterparties to the assurance agreements could demand alternative credit assurance or, in some instances, early termination. The changes in our credit ratings in April 2011 have not triggered these provisions. DPL's and DP&L's credit ratings may have additional downgrades as a result of the Proposed Merger discussed in Note 16 of Notes to Condensed Consolidated Financial Statements. This may cause the need for additional credit assurance to satisfy various creditors.

At September 30, 2011, DPL had $86.7 million of guarantees to third parties for future financial or performance assurance under such agreements including $69.7 million of guarantees on behalf of DPLE and DPLER and $17.0 million of guarantees on behalf of MC Squared. The guarantee arrangements entered into by DPL with these third parties cover select present and future obligations of DPLE, DPLER and MC Squared to such beneficiaries and are terminable by DPL upon written notice within a certain time to the beneficiaries. The carrying amount of obligations for commercial transactions covered by these guarantees and recorded in our Condensed Consolidated Balance Sheets was $0.5 million and $1.7 million at September 30, 2011 and December 31, 2010, respectively.

To date, DPL has not incurred any losses related to the guarantees of DPLE's, DPLER's and MC Squared's obligations and we believe it is remote that DPL would be required to perform or incur any losses in the future associated with any of the above guarantees of DPLE's, DPLER's and MC Squared's obligations.

DP&L – Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in an electric generation company which is recorded using the cost method of accounting under GAAP. As of September 30, 2011, DP&L could be responsible for the repayment of 4.9%, or $61.0 million, of a $1,244.5 million debt obligation that matures in 2026. This would only happen if this electric generation company defaulted on its debt payments. As of September 30, 2011, we have no knowledge of such a default.

Other than the guarantees discussed in our Annual Report on Form 10-K and the guarantees discussed above, DPL and DP&L do not have any other off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.

Commercial Commitments and Contractual Obligations

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Annual Report on Form 10-K for the fiscal year ended December 31, 2010 except for the changes in our debt as discussed in Note 5 of Notes to Condensed Consolidated Financial Statements.

Contingencies

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under laws and regulations. We believe the amounts provided in our Condensed Consolidated Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies. However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Consolidated Financial Statements. As such, costs, if any, that may be incurred in excess of those amounts provided as of September 30, 2011, cannot be reasonably determined.

Environmental Matters

DPL, DP&L and our subsidiaries' facilities and operations are subject to a wide range of environmental regulations and laws by federal, state and local authorities. As well as imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions. In the normal course of business, we have investigatory and remedial activities underway at these facilities to comply, or to determine compliance, with such regulations. We record liabilities for losses that are probable of occurring and can be reasonably estimated. We have reserves of approximately $2.2 million for environmental matters. We evaluate the potential liability related to probable losses quarterly and may revise our estimates. Such revisions in the estimates of the potential liabilities could have a material effect on our results of operations, financial position or cash flows.

We have several pending environmental matters associated with our power plants. Some of these matters could have material adverse impacts on the operation of the power plants; especially the plants that do not have SCR and FGD equipment installed to further control certain emissions. Currently, Hutchings and Beckjord are our only coal-fired power plants that do not have this equipment installed. DP&L owns 100% of the Hutchings plant and a 50% interest in Beckjord Unit 6.

On July 15, 2011, Duke Energy, co-owner at the Beckjord Unit 6 facility, filed their Long-term Forecast Report with the PUCO. The plan indicated that Duke Energy plans to cease production at the Beckjord Station, including our jointly-owned Unit 6, in December 2014. We are depreciating Unit 6 through December 2014 and do not believe that any additional accruals or impairment charges are needed as a result of this decision. We are considering options for Hutchings Station, but have not yet made a final decision.  We do not believe that any accruals or impairment charges are needed related to the Hutchings Station.


 

Environmental Matters Related to Air Quality

Clean Air Act Compliance

In 1990, the federal government amended the CAA to further regulate air pollution. Under the law, the USEPA sets limits on how much of a pollutant can be in the air anywhere in the United States. The CAA allows individual states to have stronger pollution controls, but states are not allowed to have weaker pollution controls than those set for the whole country. The CAA has a material effect on our operations and such effects are detailed below with respect to certain programs under the CAA.

On October 27, 2003, the USEPA published final rules regarding the equipment replacement provision (ERP) of the routine maintenance, repair and replacement (RMRR) exclusion of the CAA. Activities at power plants that fall within the scope of the RMRR exclusion do not trigger new source review (NSR) requirements, including the imposition of stricter emission limits. On December 24, 2003, the United States Court of Appeals for the D.C. Circuit stayed the effective date of the rule pending its decision on the merits of the lawsuits filed by numerous states and environmental organizations challenging the final rules. On June 6, 2005, the USEPA issued its final response on the reconsideration of the ERP exclusion. The USEPA clarified its position, but did not change any aspect of the 2003 final rules. This decision was appealed and the D.C. Circuit vacated the final rules on March 17, 2006. The scope of the RMRR exclusion remains uncertain due to this action by the D.C. Circuit, as well as multiple litigations not directly involving us where courts are defining the scope of the exception with respect to the specific facts and circumstances of the particular power plants and activities before the courts. While we believe that we have not engaged in any activities with respect to our existing power plants that would trigger the NSR requirements, if NSR requirements were imposed on any of DP&L's existing power plants, the results could have a material adverse impact on us.

The USEPA issued a proposed rule on October 20, 2005, concerning the test for measuring whether modifications to electric generating units should trigger application of NSR standards under the CAA. A supplemental rule was also proposed on May 8, 2007, to include additional options for determining if there is an emissions increase when an existing electric generating unit makes a physical or operational change. The rule was challenged by environmental organizations and has not been finalized. While we cannot predict the outcome of this rulemaking, any finalized rules could materially affect our operations.

Interstate Air Quality Rule

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap SO2 and NOx emissions from electric utilities. The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States. On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, then renamed the Clean Air Interstate Rule (CAIR). The final rules were signed on March 10, 2005, and were published on May 12, 2005. CAIR created an interstate trading program for annual NOx emission allowances and made modifications to an existing trading program for SO2. On August 24, 2005, the USEPA proposed additional revisions to the CAIR. On July 11, 2008, the U.S. Court of Appeals for the District of Columbia Circuit issued a decision to vacate the USEPA's CAIR and its associated Federal Implementation Plan and remanded to the USEPA with instructions to issue new regulations that conformed with the procedural and substantive requirements of the CAA. The Court's decision, in part, invalidated the new NOx annual emission allowance trading program and the modifications to the SO2 emission trading program established by the March 10, 2005 rules, and created uncertainty regarding future NOx and SO2 emission reduction requirements and their timing. The USEPA and a group representing utilities filed a request on September 24, 2008, for a rehearing before the entire Court. On December 23, 2008, the U.S. Court of Appeals issued an order on reconsideration that permits CAIR to remain in effect until the USEPA issues new regulations that would conform to the CAA requirements and the Court's July 11, 2008 decision.

On July 6, 2010, the USEPA proposed the Clean Air Transport Rule (CATR) to replace CAIR. We reviewed this proposal and submitted comments to the USEPA on September 30, 2010. These rules were finalized as the Cross-State Air Pollution Rule (CSAPR) on July 6, 2011. CSAPR responds to the court ruling remanding the 2005 CAIR. CSAPR creates four separate trading programs: two SO2 areas (Group 1 and Group 2), and two NOx reduction requirements (annual and ozone season). Group 1 states (16 states including Ohio) will have to meet a 2012 cap and additional reductions in 2014. Group 2 states (7 states) will only have to meet the 2012 cap. The rule is effective January 1, 2012, and allowances were distributed in the fourth quarter of 2011. We are in the process of reviewing the rule and are currently unable to predict the ultimate financial effect. We do not believe the rule will have a material impact on our operations in 2012.

In 2007, the Ohio EPA revised their State Implementation Plan (SIP) to incorporate a CAIR program consistent with the IAQR. The Ohio EPA had received partial approval from the USEPA and had been awaiting full program approval from the USEPA when the U.S. Court of Appeals issued its July 11, 2008 decision. As a result of the December 23, 2008 order, the Ohio EPA proposed revised rules on May 11, 2009, which were finalized on July 15, 2009. On September 25, 2009, the USEPA issued a full SIP approval for the Ohio CAIR program. CSAPR, finalized on July 6, 2011, institutes a federal implementation plan (FIP) in lieu of state SIPs for 2012 and allows for the states to develop SIPs for approval as early as 2013. We do not expect the FIP will have a significant impact on operations.

Mercury and Other Hazardous Air Pollutants

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants. The USEPA "de-listed" mercury as a hazardous air pollutant from coal-fired and oil-fired utility plants and, instead, proposed a cap-and-trade approach to regulate the total amount of mercury emissions allowed from such sources. The final Clean Air Mercury Rule (CAMR) was signed March 15, 2005, and was published on May 18, 2005. On March 29, 2005, nine states sued the USEPA, opposing the cap-and-trade regulatory approach taken by the USEPA. In 2007, the Ohio EPA adopted rules implementing the CAMR program. On February 8, 2008, the U.S. Court of Appeals for the District of Columbia Circuit struck down the USEPA regulations, finding that the USEPA had not complied with statutory requirements applicable to "de-listing" a hazardous air pollutant and that a cap-and-trade approach was not authorized by law for "listed" hazardous air pollutants. A request for rehearing before the entire Court of Appeals was denied and a petition for review before the U.S. Supreme Court was filed on October 17, 2008. On February 23, 2009, the U.S. Supreme Court denied the petition. On May 3, 2011, the USEPA published proposed Maximum Achievable Control Technology (MACT) standards for coal- and oil-fired electric generating units and is expected to finalize this rule during the quarter ending December 31, 2011. Upon publication in the Federal Register following finalization, affected electric generating units (EGUs) will have three years to come into compliance with the new requirements. DP&L is unable to determine the impact on its financial condition or results of operations or the costs that may be incurred to comply with any new requirement; however, a MACT standard could have a material adverse effect on our operations and result in material compliance costs.

On April 29, 2010, the USEPA issued a proposed rule that would reduce emissions of toxic air pollutants from new and existing industrial, commercial and institutional boilers, and process heaters at major and area source facilities. The final rule was published in the Federal Register on March 21, 2011. This regulation affects seven auxiliary boilers used for start-up purposes at DP&L's generation facilities. The regulations contain emissions limitations, operating limitations and other requirements. The compliance date was originally March 21, 2014. However, the USEPA has announced that the compliance date for existing boilers will be delayed until a judicial review is no longer pending or until the EPA completes its reconsideration of the rule. Compliance costs are not expected to be material to DP&L's operations.

On May 3, 2010, the USEPA finalized the "National Emissions Standards for Hazardous Air Pollutants" (NESHAP) for compression ignition (CI) reciprocating internal combustion engines (RICE). The units affected at DP&L are 18 diesel electric generating engines and eight emergency "black start" engines. The existing CI RICE units must comply by May 3, 2013. The regulations contain emissions limitations, operating limitations and other requirements. Compliance costs are not expected to be material to DP&L's operations.

National Ambient Air Quality Standards

On January 5, 2005, the USEPA published its final non-attainment designations for the National Ambient Air Quality Standard (NAAQS) for Fine Particulate Matter 2.5 (PM 2.5). These designations included counties and partial counties in which DP&L operates and/or owns generating facilities. On March 4, 2005, DP&L and other Ohio electric utilities and electric generators filed a petition for review in the D.C. Circuit Court of Appeals, challenging the final rule creating these designations. On November 30, 2005, the court ordered the USEPA to decide on all petitions for reconsideration by January 20, 2006. On January 20, 2006, the USEPA denied the petitions for reconsideration. On July 7, 2009, the D.C. Circuit Court of Appeals upheld the USEPA non-attainment designations for the areas impacting DP&L's generation plants. As of September 30, 2011, DP&L's Stuart, Killen and Hutchings Stations were located


 

in non-attainment areas for the 24-hour PM 2.5 standard. There is a possibility that these areas will be re-designated as "attainment" for PM 2.5 within the next few quarters. We cannot predict the impact the revisions to the PM 2.5 standard will have on DP&L's financial condition or results of operations.

On May 5, 2004, the USEPA issued its proposed regional haze rule, which addresses how states should determine the Best Available Retrofit Technology (BART) for sources covered under the regional haze rule. Final rules were published July 6, 2005, providing states with several options for determining whether sources in the state should be subject to BART. In the final rule, the USEPA made the determination that CAIR achieves greater progress than BART and may be used by states as a BART substitute. Numerous units owned and operated by us will be impacted by BART. We cannot determine the extent of the impact until Ohio determines how BART will be implemented.

On September 16, 2009, the USEPA announced that it would reconsider the 2008 national ground level ozone standard. On September 2, 2011, the USEPA decided to postpone their revisiting of this standard until 2013. DP&L cannot determine the effect of this potential change, if any, on its operations.

Effective April 12, 2010, the USEPA implemented revisions to its primary NAAQS for nitrogen dioxide. This change may affect certain emission sources in heavy traffic areas like the I-75 corridor between Cincinnati and Dayton after 2016. Several of our facilities or co-owned facilities are within this area. DP&L cannot determine the effect of this potential change, if any, on its operations.

Effective August 23, 2010, the USEPA implemented revisions to its primary NAAQS for SO2 replacing the current 24-hour standard and annual standard with a one hour standard. DP&L cannot determine the effect of this potential change, if any, on its operations. No effects are anticipated before 2014.

Carbon Emissions and Other Greenhouse Gases

In response to a U.S. Supreme Court decision that the USEPA has the authority to regulate CO2 emissions from motor vehicles, the USEPA made a finding that CO2 and certain other GHGs are pollutants under the CAA. Subsequently, under the CAA, USEPA determined that CO2 and other GHGs from motor vehicles threaten the health and welfare of future generations by contributing to climate change. This finding became effective in January 2010. Numerous affected parties have petitioned the USEPA Administrator to reconsider this decision. On April 1, 2010, USEPA signed the "Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards" rule. Under USEPA's view, this is the final action that renders carbon dioxide and other GHGs "regulated air pollutants" under the CAA.

The USEPA plans to propose GHG standards for new and modified electric generating units (EGUs) under CAA subsection 111(b) – and propose and promulgate guidelines for states to address GHG standards for existing EGUs under CAA subsection 111(d) – later in 2011, and such final standards by May 2012. These rules may focus on energy efficiency improvements at power plants. We cannot predict the effect of these standards, if any, on DP&L's operations.

Legislation proposed in 2009 to target a reduction in the emission of GHGs from large sources was not enacted. Approximately 99% of the energy we produce is generated by coal. DP&L's share of CO2 emissions at generating stations we own and co-own is approximately 16 million tons annually. Proposed GHG legislation finalized at a future date could have a significant effect on DP&L's operations and costs, which could adversely affect our net income, cash flows and financial condition. However, due to the uncertainty associated with such legislation, we cannot predict the final outcome or the financial impact that such legislation will have on DP&L.

On September 22, 2009, the USEPA issued a final rule for mandatory reporting of GHGs from large sources that emit 25,000 metric tons per year or more of CO2, including electric generating units. The first report to the USEPA was submitted prior to the September 30, 2011 due date for 2010 emissions. This reporting rule will guide development of policies and programs to reduce emissions. DP&L does not anticipate that this reporting rule will result in any significant cost or other impact on current operations.


 

Litigation, Notices of Violation and Other Matters Related to Air Quality

Litigation Involving Co-Owned Plants

On June 20, 2011, the Supreme Court rejected federal common law nuisance claims brought initially in 2004 by eight states, the City of New York and three land trusts, who had sought injunctive relief and limitations on GHGs emitted by American Electric Power Company, Inc. (AEP), one of AEP's subsidiaries, Cinergy Corp. (a subsidiary of Duke Energy Corporation (Duke Energy)) and four other electric power companies. The Supreme Court ruled that the Clean Air Act and the authority given to EPA under that Act to regulate GHGs displaced any right that plaintiffs may have had to seek similar regulation through federal common law litigation in the court system. Although we are not named as a party to these lawsuits, DP&L is a co-owner of coal-fired plants with Duke Energy and AEP (or their subsidiaries) that could have been affected by the outcome of these lawsuits or similar suits that may have been filed against other electric power companies, including DP&L. Because the issue was not squarely before it, the Supreme Court did not rule against the portion of plaintiffs' original suits that sought relief under State law. However, such claims appear likely to be dismissed by a lower court on similar pre-emption grounds.

As a result of a 2008 consent decree entered into with the Sierra Club and approved by the U.S. District Court for the Southern District of Ohio, DP&L and the other owner of the J.M. Stuart generating station are subject to certain specified emission targets related to NOx, SO2 and particulate matter. The consent decree also includes commitments for energy efficiency and renewable energy activities. An amendment to the consent decree was entered into and approved in 2010 to clarify how emissions would be computed during malfunctions. Continued compliance with the consent decree, as amended, is not expected to have a material effect on DP&L's results of operations, financial condition or cash flows in the future.

Notices of Violation Involving Co-Owned Plants

In November 1999, the USEPA filed civil complaints and NOVs against operators and owners of certain generation facilities for alleged violations of the CAA. Generation units operated by Duke Energy (Beckjord Unit 6) and CSP (Conesville Unit 4) and co-owned by DP&L were referenced in these actions. Although DP&L was not identified in the NOVs, civil complaints or state actions, the results of such proceedings could materially affect DP&L's co-owned plants.

In June 2000, the USEPA issued a NOV to the DP&L-operated J.M. Stuart generating station (co-owned by DP&L, Duke Energy, and CSP) for alleged violations of the CAA. The NOV contained allegations consistent with NOVs and complaints that the USEPA had recently brought against numerous other coal-fired utilities in the Midwest. The NOV indicated the USEPA may: (1) issue an order requiring compliance with the requirements of the Ohio SIP; or (2) bring a civil action seeking injunctive relief and civil penalties of up to $27,500 per day for each violation. To date, neither action has been taken. DP&L cannot predict the outcome of this matter.

In December 2007, the Ohio EPA issued a NOV to the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) for alleged violations of the CAA. The NOVs alleged deficiencies in the continuous monitoring of opacity. We submitted a compliance plan to the Ohio EPA on December 19, 2007. To date, no further actions have been taken by the Ohio EPA.

On March 13, 2008, Duke Energy, the operator of the Zimmer generating station, received a NOV and a Finding of Violation (FOV) from the USEPA alleging violations of the CAA, the Ohio State Implementation Program (SIP) and permits for the station in areas including SO2, opacity and increased heat input. A second NOV and FOV with similar allegations was issued on November 4, 2010. Also in 2010, USEPA issued an NOV to Zimmer for excess emissions, which may have been resolved through resubmission of monitoring reports. DP&L is a co-owner of the Zimmer generating station and could be affected by the eventual resolution of these matters. Duke Energy is expected to act on behalf of itself and the co-owners with respect to these matters. DP&L is unable to predict the outcome of these matters.


 

Other Issues Involving Co-Owned Plants

In 2006, DP&L detected a malfunction with its emission monitoring system at the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) and ultimately determined its SO2 and NOx emissions data were under reported. DP&L has petitioned the USEPA to accept an alternative methodology for calculating actual emissions for 2005 and the first quarter of 2006. More than five years have passed since the malfunction was reported and management does not believe that there will be a resolution of this matter that would have a material impact on results of operations, financial condition or cash flows.

Notices of Violation Involving Wholly-Owned Plants

In 2007, the Ohio EPA and the USEPA issued NOVs to DP&L for alleged violations of the CAA at the O.H. Hutchings Station. The NOVs' alleged deficiencies relate to stack opacity and particulate emissions. Discussions are under way with the USEPA, the U.S. Department of Justice and Ohio EPA. DP&L has provided data to those agencies regarding its maintenance expenses and operating results. On December 15, 2008, DP&L received a request from the USEPA for additional documentation with respect to those issues and other CAA issues including issues relating to capital expenses and any changes in capacity or output of the units at the O.H. Hutchings Station. During 2009, DP&L continued to submit various other operational and performance data to the USEPA in compliance with its request. DP&L is currently unable to determine the timing, costs or method by which the issues may be resolved and continues to work with the USEPA on these issues.

On November 18, 2009, the USEPA issued a NOV to DP&L for alleged NSR violations of the CAA at the O.H. Hutchings Station relating to capital projects performed in 2001 involving Unit 3 and Unit 6. DP&L does not believe that the two projects described in the NOV were modifications subject to NSR. DP&L is unable to determine the timing, costs or method by which these issues may be resolved and continues to work with the USEPA on this issue.

Environmental Matters Related to Water Quality, Waste Disposal and Ash Ponds

Clean Water Act – Regulation of Water Intake

On July 9, 2004, the USEPA issued final rules pursuant to the Clean Water Act governing existing facilities that have cooling water intake structures. The rules require an assessment of impingement and/or entrainment of organisms as a result of cooling water withdrawal. A number of parties appealed the rules to the Federal Court of Appeals for the Second Circuit in New York and the Court issued an opinion on January 25, 2007, remanding several aspects of the rule to the USEPA for reconsideration. Several parties petitioned the U.S. Supreme Court for review of the lower court decision. On April 14, 2008, the Supreme Court elected to review the lower court decision on the issue of whether the USEPA can compare costs with benefits in determining the best technology available for minimizing adverse environmental impact at cooling water intake structures. Briefs were submitted to the Court in the summer of 2008 and oral arguments were held in December 2008. In April 2009, the U.S. Supreme Court ruled that the USEPA did have the authority to compare costs with benefits in determining best technology available. The USEPA released new proposed regulations on March 28, 2011, published in the Federal Register on April 20, 2011. We submitted comments to the proposed regulations on August 17, 2011. The final rules are expected to be in place by mid-2012.  We do not yet know the impact these proposed rules will have on our operations.

Clean Water Act – Regulation of Water Discharge

On May 4, 2004, the Ohio EPA issued a final National Pollutant Discharge Elimination System permit (the Permit) for J.M. Stuart Station that continued our authority to discharge water from the station into the Ohio River. During the three-year term of the Permit, we conducted a thermal discharge study to evaluate the technical feasibility and economic reasonableness of water cooling methods other than cooling towers. In December 2006, we submitted an application for the renewal of the Permit that was due to expire on June 30, 2007. In July 2007, we received a draft permit proposing to continue our authority to discharge water from the station into the Ohio River. On February 5, 2008, we received a letter from the Ohio EPA indicating that they intended to impose a compliance schedule as part of the final Permit, that requires us to implement one of two diffuser options for the discharge of water from the station into the Ohio River as identified in the thermal discharge study. Subsequently, representatives from DP&L and the Ohio EPA agreed to allow DP&L to restrict public access to the water discharge area as an alternative to installing one of the diffuser options. Ohio EPA issued a revised draft permit that was


 

received on November 12, 2008. In December 2008, the USEPA requested that the Ohio EPA provide additional information regarding the thermal discharge in the draft permit. In June 2009, DP&L provided information to the USEPA in response to their request to the Ohio EPA. In September 2010, the USEPA formally objected to a revised Permit provided by Ohio EPA due to questions regarding the basis for the alternate thermal limitation. In December 2010, DP&L requested a public hearing on the objection, which was held on March 23, 2011. We participated in and presented our position on the issue at the hearing and in written comments submitted on April 28, 2011. In a letter to the Ohio EPA dated September 28, 2011, the USEPA reaffirmed its objection to the revised permit as previously drafted by the Ohio EPA. This reaffirmation stipulated that if the Ohio EPA does not re-draft the permit to address the USEPA's objection, then the authority for issuing the permit will pass to the USEPA. DP&L is unable to predict the timing for issuance of a final permit.

In September 2009, the USEPA announced that it will be revising technology-based regulations governing water discharges from steam electric generating facilities. The rulemaking included the collection of information via an industry-wide questionnaire as well as targeted water sampling efforts at selected facilities. Subsequent to the information collection effort, it is anticipated that the USEPA will release a proposed rule by mid-2012 with a final regulation in place by early 2014. At present, DP&L is unable to predict the impact this rulemaking will have on its operations.

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site. In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach. In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS. No recent activity has occurred with respect to that notice or PRP status. However, on August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L's service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site's contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site.  DP&L has granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010. DP&L believes the chemicals used at its service center building site were appropriately disposed of and have not contributed to the contamination at the South Dayton Dump landfill site. On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and are seeking reimbursement of the PRP group's costs associated with the investigation and remediation of the site. DP&L filed a motion to dismiss the complaint and intends to vigorously defend against any claim that it has any financial responsibility to remediate conditions at the landfill site. On February 10, 2011, the Court dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site's contamination. The Court, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill. While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.

In December 2003, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the Tremont City landfill site. Information available to DP&L does not demonstrate that it contributed hazardous substances to the site. While DP&L is unable to predict the outcome of this matter, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.


 

On April 7, 2010, the USEPA published an Advance Notice of Proposed Rulemaking (ANPRM) announcing that it is reassessing existing regulations governing the use and distribution in commerce of polychlorinated biphenyls (PCB). While this reassessment is in the early stages and the USEPA is seeking information from potentially affected parties on how it should proceed, the outcome may have a material effect on DP&L. At present, DP&L is unable to predict the impact this initiative will have on its operations.

Regulation of Ash Ponds

During 2008, a major spill occurred at an ash pond owned by the Tennessee Valley Authority (TVA) as a result of a dike failure. The spill generated a significant amount of national news coverage, and support for tighter regulations for the storage and handling of coal combustion products. DP&L has ash ponds at the Killen, O.H. Hutchings and J.M. Stuart Stations which it operates, and also at generating stations operated by others in which DP&L has an ownership interest.

During March 2009, the USEPA, through a formal Information Collection Request, collected information on ash pond facilities across the country, including those at Killen and J.M. Stuart Stations. Subsequently, the USEPA collected similar information for O.H. Hutchings Station.

In October 2009, the USEPA conducted an inspection of the J.M. Stuart Station ash ponds. In March 2010, the USEPA issued a final report from the inspection including recommendations relative to the J.M. Stuart Station ash ponds. In May 2010, DP&L responded to the USEPA final inspection report with our plans to address the recommendations.

Similarly, in August 2010, the USEPA conducted an inspection of the O.H. Hutchings Station ash ponds. The draft report relating to the inspection was received in November 2010 and DP&L provided comments on the draft report in December 2010. In June 2011, the USEPA issued a final report from the inspection including recommendations relative to the O.H. Hutchings Station ash ponds. On July 27, 2011, DP&L responded to the USEPA final inspection report with plans to address the recommendations.  DP&L is unable to predict whether there will be additional USEPA action relative to DP&L's proposed plan or the effect on operations that might arise under a different plan.

In June 2011, the USEPA conducted an inspection of the Killen Station ash ponds. DP&L is unable to predict the outcome this inspection will have on its operations.

In addition, as a result of the TVA ash pond spill, there has been increasing advocacy to regulate coal combustion byproducts under the Resource Conservation Recovery Act (RCRA). On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D. DP&L submitted comments regarding the proposed regulation on November 19, 2010. DP&L is unable to predict the financial impact of this regulation, but if coal combustion byproducts are regulated as hazardous waste, it is expected to have a material adverse impact on operations.

Notice of Violation involving Co-Owned Plants

On September 9, 2011, DP&L received a notice of violation from the USEPA with respect to its co-owned J.M. Stuart generating station based on a compliance evaluation inspection conducted by the USEPA and Ohio EPA in 2009. The notice alleges non-compliance by DP&L with certain provisions of the RCRA, the Clean Water Act National Pollutant Discharge Elimination System permit program and the station's storm water pollution prevention plan.  The notice requests that DP&L respond with the actions it has taken or plans to take to remedy the USEPA's findings and ensure that further violations will not occur. Based on its initial review of the findings, although there can be no assurance, we believe that the notice will not result in any material impact on its results of operations, financial condition or cash flow.

Ohio Regulation

SB 221 and the implementation rules contain targets relating to advanced energy portfolio standards, renewable energy, demand reduction and energy efficiency standards. If any targets are not met, compliance penalties will apply unless the PUCO makes certain findings that would excuse performance.

The implementation rules required that on January 1, 2010, DP&L file an extensive energy efficiency portfolio plan, outlining how DP&L plans to comply with the energy efficiency and demand reduction benchmarks. DP&L filed a separate request for a finding that it had already complied with this requirement in the form of DP&L's portfolio plan that had been filed in 2008 as part of its CCEM plan, which had been approved by the PUCO and is being implemented. On May 19, 2010 the PUCO approved in part and denied in part DP&L's request that the PUCO find that it met the 2009 energy efficiency portfolio requirements and directed DP&L to file a measurement and verification plan as well as a market potential study within 60 days of the date of the order. The Company made this filing on July 15, 2010. A settlement was reached in this case and approved by the PUCO in April 2011. DP&L made a filing on April 29, 2011 seeking PUCO authorization to increase the energy efficiency rider to recover costs associated with energy efficiency and peak demand reduction compliance. On October 18, 2011, the PUCO approved this filing.

In compliance with the PUCO rules implementing SB 221, DP&L and DPLER made compliance filings on April 15, 2010 and again on April 15, 2011 demonstrating how each entity met the renewable and solar benchmarks for 2009 and 2010. The PUCO issued an order on July 27, 2011 finding that DP&L was in compliance with its 2009 renewable energy resource compliance obligation. Further the PUCO issued an order on October 3, 2011 finding that DPLER met its 2009 renewable energy resource compliance obligations. The proceedings initiated to demonstrate 2010 compliance with renewable and solar benchmarks are still pending. On June 1, 2011 DP&L filed an amendment to its Alternative Energy Rider case that is pending before the PUCO. This request will increase the rider to recover additional compliance costs.

As the energy efficiency and alternative energy targets get increasingly larger over time, the costs of complying with SB 221 and the PUCO's implementing rules could have a material impact on DP&L's financial condition.

DP&L established a fuel and purchased power recovery rider beginning January 1, 2010. The fuel rider fluctuates based on actual costs and recoveries and is modified at the start of each seasonal quarter: March 1, June 1, September 1 and December 1 each year. DP&L recently underwent an audit of its fuel and purchased power recovery rider but there is some uncertainty as to the costs that will be recovered from or returned to customers. On October 6, 2011, DP&L and all of the active participants in this proceeding reached a Stipulation and Recommendation that resolves the majority of the issues raised by the auditor. On October 19, 2011, we had a hearing on this case. Although the Stipulation and Recommendation was uncontested, the PUCO may approve, disapprove, or modify the stipulation. DP&L expects to record a favorable or unfavorable adjustment to earnings after the final order is received.

As a member of PJM, DP&L receives revenues from the RTO related to its transmission and generation assets and incurs costs associated with its load obligations for retail customers. SB 221 included a provision that would allow Ohio electric utilities to seek and obtain a reconcilable rider to recover RTO-related costs and credits. DP&L's TCRR and PJM RPM riders were initially approved in November 2009 to recover these costs. Both the TCRR and the RPM riders assign costs and revenues from PJM monthly bills to retail ratepayers based on the percentage of SSO retail customers' load and sales volumes to total retail load and total retail and wholesale volumes. Customer switching to CRES providers decreases DP&L's SSO retail customers' load and sales volumes. Therefore, increases in customer switching cause more of the RPM capacity costs and revenues to be excluded from the RPM rider calculation. DP&L's annual true-up of these two riders was approved by the PUCO by an order dated April 27, 2011.

DP&L entered into an economic development arrangement with its single largest electricity consumer. This arrangement was approved by the PUCO on June 8, 2011 and became effective in July 2011. Under Ohio law, DP&L is permitted to seek recovery of costs associated with economic development programs including foregone revenues from all customers. On October 26, 2011 the PUCO approved our Economic Development Rider, as filed, related to this arrangement.


 

Legal and Other Matters

In February 2007, DP&L filed a lawsuit against a coal supplier seeking damages incurred due to the supplier's failure to supply approximately 1.5 million tons of coal to two jointly owned plants under a coal supply agreement, of which approximately 570 thousand tons was DP&L's share. DP&L obtained replacement coal to meet its needs. The supplier has denied liability, and is currently in federal bankruptcy proceedings in which DP&L is participating as an unsecured creditor. DP&L is unable to determine the ultimate resolution of this matter. DP&L has not recorded any assets relating to possible recovery of costs in this lawsuit.

On May 16, 2007, DPL filed a claim with Energy Insurance Mutual (EIM) to recoup legal costs associated with our litigation against certain former executives. On February 15, 2010, after having engaged in both mediation and arbitration, DPL and EIM entered into a settlement agreement resolving all coverage issues and finalizing all obligations in connection with the claim, under which DPL received $3.4 million (net of associated expenses).

As a member of PJM, DP&L is also subject to charges and costs associated with PJM operations as approved by the FERC. FERC orders issued in 2007 and thereafter regarding the allocation of costs of large transmission facilities within PJM could result in additional costs being allocated to DP&L of approximately $12 million or more annually by 2012. Although we continue to maintain that these costs should be borne by the beneficiaries of these projects and that DP&L is not one of these beneficiaries, any credits or costs resulting from these proceedings would be reflected in DP&L's retail transmission rider.

In connection with DP&L and other utilities joining PJM, in 2006 the FERC ordered utilities to eliminate certain charges to implement transitional payments, known as SECA, effective December 1, 2004 through March 31, 2006, subject to refund. Through this proceeding, DP&L was obligated to pay SECA charges to other utilities, but received a net benefit from these transitional payments. A hearing was held and an initial decision was issued in August 2006. A final FERC order on this issue was issued on May 21, 2010 that substantially supports DP&L's and other utilities' position that SECA obligations should be paid by parties that used the transmission system during the timeframe stated above. Prior to this final order being issued, DP&L entered into a significant number of bi-lateral settlement agreements with certain parties to resolve the matter, which by design will be unaffected by the final decision. With respect to unsettled claims, DP&L management has deferred $14.1 million and $15.4 million as of September 30, 2011 and December 31, 2010, respectively, as Other deferred credits representing the amount of unearned income where the earnings process is not complete. On September 30, 2011, the FERC issued two SECA-related orders that affirmed an earlier order issued in 2010 by denying the rehearing requests that a number of different parties, including DP&L, had filed. These orders are now final, subject to possible appellate court review. These orders do not affect prior settlements that had been reached with other parties that owed SECA revenues to DP&L or were recipients of amounts paid by DP&L. For other parties that had not previously settled with DP&L, the exact timing and amounts of any payments that would be made or received by DP&L under these orders is still uncertain.

Refer to Note 16 of Notes to Condensed Consolidated Financial Statements for additional information surrounding the Proposed Merger and any related legal matters.

Collective Bargaining Agreement

During the three months ended September 30, 2011, we began negotiations with employees covered under our collective bargaining agreement which is set to expire on October 31, 2011. On October 17, 2011, we reached a tentative agreement with these employees on a new three year labor agreement. Though we expect the tentative agreement to be ratified and that our employees will continue to work during the ratification process, it is possible that this tentative agreement will not be ratified, which could result in labor disruptions affecting some or all of our operations. We have contingency plans in place to mitigate the impact that any labor stoppages could have on our customers. A lengthy strike by our employees could have an adverse effect on our operations and financial condition.

DP&L [Member]
 
Contractual Obligations, Commercial Commitments and Contingencies

14. Contractual Obligations, Commercial Commitments and Contingencies

DPL Inc. – Guarantees

In the normal course of business, DPL enters into various agreements with its wholly-owned subsidiaries, DPLE and DPLER and its indirect wholly-owned subsidiary, MC Squared, providing financial or performance assurance to third parties. These agreements are entered into primarily to support or enhance the creditworthiness otherwise attributed to these subsidiaries on a stand-alone basis, thereby facilitating the extension of sufficient credit to accomplish these subsidiaries' intended commercial purposes. Certain of DPL's financial or performance assurance agreements contain provisions that require our debt to maintain an investment grade credit rating from credit rating agencies. If our debt were to fall below investment grade, we would be in violation of the provisions, and the counterparties to the assurance agreements could demand alternative credit assurance or, in some instances, early termination. The changes in our credit ratings in April 2011 have not triggered these provisions. DPL's and DP&L's credit ratings may have additional downgrades as a result of the Proposed Merger discussed in Note 16 of Notes to Condensed Consolidated Financial Statements. This may cause the need for additional credit assurance to satisfy various creditors.

At September 30, 2011, DPL had $86.7 million of guarantees to third parties for future financial or performance assurance under such agreements including $69.7 million of guarantees on behalf of DPLE and DPLER and $17.0 million of guarantees on behalf of MC Squared. The guarantee arrangements entered into by DPL with these third parties cover select present and future obligations of DPLE, DPLER and MC Squared to such beneficiaries and are terminable by DPL upon written notice within a certain time to the beneficiaries. The carrying amount of obligations for commercial transactions covered by these guarantees and recorded in our Condensed Consolidated Balance Sheets was $0.5 million and $1.7 million at September 30, 2011 and December 31, 2010, respectively.

To date, DPL has not incurred any losses related to the guarantees of DPLE's, DPLER's and MC Squared's obligations and we believe it is remote that DPL would be required to perform or incur any losses in the future associated with any of the above guarantees of DPLE's, DPLER's and MC Squared's obligations.

DP&L – Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in an electric generation company which is recorded using the cost method of accounting under GAAP. As of September 30, 2011, DP&L could be responsible for the repayment of 4.9%, or $61.0 million, of a $1,244.5 million debt obligation that matures in 2026. This would only happen if this electric generation company defaulted on its debt payments. As of September 30, 2011, we have no knowledge of such a default.

Other than the guarantees discussed in our Annual Report on Form 10-K and the guarantees discussed above, DPL and DP&L do not have any other off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.

Commercial Commitments and Contractual Obligations

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Annual Report on Form 10-K for the fiscal year ended December 31, 2010 except for the changes in our debt as discussed in Note 5 of Notes to Condensed Consolidated Financial Statements.

Contingencies

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under laws and regulations. We believe the amounts provided in our Condensed Consolidated Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies. However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Consolidated Financial Statements. As such, costs, if any, that may be incurred in excess of those amounts provided as of September 30, 2011, cannot be reasonably determined.

Environmental Matters

DPL, DP&L and our subsidiaries' facilities and operations are subject to a wide range of environmental regulations and laws by federal, state and local authorities. As well as imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions. In the normal course of business, we have investigatory and remedial activities underway at these facilities to comply, or to determine compliance, with such regulations. We record liabilities for losses that are probable of occurring and can be reasonably estimated. We have reserves of approximately $2.2 million for environmental matters. We evaluate the potential liability related to probable losses quarterly and may revise our estimates. Such revisions in the estimates of the potential liabilities could have a material effect on our results of operations, financial position or cash flows.

We have several pending environmental matters associated with our power plants. Some of these matters could have material adverse impacts on the operation of the power plants; especially the plants that do not have SCR and FGD equipment installed to further control certain emissions. Currently, Hutchings and Beckjord are our only coal-fired power plants that do not have this equipment installed. DP&L owns 100% of the Hutchings plant and a 50% interest in Beckjord Unit 6.

On July 15, 2011, Duke Energy, co-owner at the Beckjord Unit 6 facility, filed their Long-term Forecast Report with the PUCO. The plan indicated that Duke Energy plans to cease production at the Beckjord Station, including our jointly-owned Unit 6, in December 2014. We are depreciating Unit 6 through December 2014 and do not believe that any additional accruals or impairment charges are needed as a result of this decision. We are considering options for Hutchings Station, but have not yet made a final decision.  We do not believe that any accruals or impairment charges are needed related to the Hutchings Station.


 

Environmental Matters Related to Air Quality

Clean Air Act Compliance

In 1990, the federal government amended the CAA to further regulate air pollution. Under the law, the USEPA sets limits on how much of a pollutant can be in the air anywhere in the United States. The CAA allows individual states to have stronger pollution controls, but states are not allowed to have weaker pollution controls than those set for the whole country. The CAA has a material effect on our operations and such effects are detailed below with respect to certain programs under the CAA.

On October 27, 2003, the USEPA published final rules regarding the equipment replacement provision (ERP) of the routine maintenance, repair and replacement (RMRR) exclusion of the CAA. Activities at power plants that fall within the scope of the RMRR exclusion do not trigger new source review (NSR) requirements, including the imposition of stricter emission limits. On December 24, 2003, the United States Court of Appeals for the D.C. Circuit stayed the effective date of the rule pending its decision on the merits of the lawsuits filed by numerous states and environmental organizations challenging the final rules. On June 6, 2005, the USEPA issued its final response on the reconsideration of the ERP exclusion. The USEPA clarified its position, but did not change any aspect of the 2003 final rules. This decision was appealed and the D.C. Circuit vacated the final rules on March 17, 2006. The scope of the RMRR exclusion remains uncertain due to this action by the D.C. Circuit, as well as multiple litigations not directly involving us where courts are defining the scope of the exception with respect to the specific facts and circumstances of the particular power plants and activities before the courts. While we believe that we have not engaged in any activities with respect to our existing power plants that would trigger the NSR requirements, if NSR requirements were imposed on any of DP&L's existing power plants, the results could have a material adverse impact on us.

The USEPA issued a proposed rule on October 20, 2005, concerning the test for measuring whether modifications to electric generating units should trigger application of NSR standards under the CAA. A supplemental rule was also proposed on May 8, 2007, to include additional options for determining if there is an emissions increase when an existing electric generating unit makes a physical or operational change. The rule was challenged by environmental organizations and has not been finalized. While we cannot predict the outcome of this rulemaking, any finalized rules could materially affect our operations.

Interstate Air Quality Rule

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap SO2 and NOx emissions from electric utilities. The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States. On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, then renamed the Clean Air Interstate Rule (CAIR). The final rules were signed on March 10, 2005, and were published on May 12, 2005. CAIR created an interstate trading program for annual NOx emission allowances and made modifications to an existing trading program for SO2. On August 24, 2005, the USEPA proposed additional revisions to the CAIR. On July 11, 2008, the U.S. Court of Appeals for the District of Columbia Circuit issued a decision to vacate the USEPA's CAIR and its associated Federal Implementation Plan and remanded to the USEPA with instructions to issue new regulations that conformed with the procedural and substantive requirements of the CAA. The Court's decision, in part, invalidated the new NOx annual emission allowance trading program and the modifications to the SO2 emission trading program established by the March 10, 2005 rules, and created uncertainty regarding future NOx and SO2 emission reduction requirements and their timing. The USEPA and a group representing utilities filed a request on September 24, 2008, for a rehearing before the entire Court. On December 23, 2008, the U.S. Court of Appeals issued an order on reconsideration that permits CAIR to remain in effect until the USEPA issues new regulations that would conform to the CAA requirements and the Court's July 11, 2008 decision.

On July 6, 2010, the USEPA proposed the Clean Air Transport Rule (CATR) to replace CAIR. We reviewed this proposal and submitted comments to the USEPA on September 30, 2010. These rules were finalized as the Cross-State Air Pollution Rule (CSAPR) on July 6, 2011. CSAPR responds to the court ruling remanding the 2005 CAIR. CSAPR creates four separate trading programs: two SO2 areas (Group 1 and Group 2), and two NOx reduction requirements (annual and ozone season). Group 1 states (16 states including Ohio) will have to meet a 2012 cap and additional reductions in 2014. Group 2 states (7 states) will only have to meet the 2012 cap. The rule is effective January 1, 2012, and allowances were distributed in the fourth quarter of 2011. We are in the process of reviewing the rule and are currently unable to predict the ultimate financial effect. We do not believe the rule will have a material impact on our operations in 2012.

In 2007, the Ohio EPA revised their State Implementation Plan (SIP) to incorporate a CAIR program consistent with the IAQR. The Ohio EPA had received partial approval from the USEPA and had been awaiting full program approval from the USEPA when the U.S. Court of Appeals issued its July 11, 2008 decision. As a result of the December 23, 2008 order, the Ohio EPA proposed revised rules on May 11, 2009, which were finalized on July 15, 2009. On September 25, 2009, the USEPA issued a full SIP approval for the Ohio CAIR program. CSAPR, finalized on July 6, 2011, institutes a federal implementation plan (FIP) in lieu of state SIPs for 2012 and allows for the states to develop SIPs for approval as early as 2013. We do not expect the FIP will have a significant impact on operations.

Mercury and Other Hazardous Air Pollutants

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants. The USEPA "de-listed" mercury as a hazardous air pollutant from coal-fired and oil-fired utility plants and, instead, proposed a cap-and-trade approach to regulate the total amount of mercury emissions allowed from such sources. The final Clean Air Mercury Rule (CAMR) was signed March 15, 2005, and was published on May 18, 2005. On March 29, 2005, nine states sued the USEPA, opposing the cap-and-trade regulatory approach taken by the USEPA. In 2007, the Ohio EPA adopted rules implementing the CAMR program. On February 8, 2008, the U.S. Court of Appeals for the District of Columbia Circuit struck down the USEPA regulations, finding that the USEPA had not complied with statutory requirements applicable to "de-listing" a hazardous air pollutant and that a cap-and-trade approach was not authorized by law for "listed" hazardous air pollutants. A request for rehearing before the entire Court of Appeals was denied and a petition for review before the U.S. Supreme Court was filed on October 17, 2008. On February 23, 2009, the U.S. Supreme Court denied the petition. On May 3, 2011, the USEPA published proposed Maximum Achievable Control Technology (MACT) standards for coal- and oil-fired electric generating units and is expected to finalize this rule during the quarter ending December 31, 2011. Upon publication in the Federal Register following finalization, affected electric generating units (EGUs) will have three years to come into compliance with the new requirements. DP&L is unable to determine the impact on its financial condition or results of operations or the costs that may be incurred to comply with any new requirement; however, a MACT standard could have a material adverse effect on our operations and result in material compliance costs.

On April 29, 2010, the USEPA issued a proposed rule that would reduce emissions of toxic air pollutants from new and existing industrial, commercial and institutional boilers, and process heaters at major and area source facilities. The final rule was published in the Federal Register on March 21, 2011. This regulation affects seven auxiliary boilers used for start-up purposes at DP&L's generation facilities. The regulations contain emissions limitations, operating limitations and other requirements. The compliance date was originally March 21, 2014. However, the USEPA has announced that the compliance date for existing boilers will be delayed until a judicial review is no longer pending or until the EPA completes its reconsideration of the rule. Compliance costs are not expected to be material to DP&L's operations.

On May 3, 2010, the USEPA finalized the "National Emissions Standards for Hazardous Air Pollutants" (NESHAP) for compression ignition (CI) reciprocating internal combustion engines (RICE). The units affected at DP&L are 18 diesel electric generating engines and eight emergency "black start" engines. The existing CI RICE units must comply by May 3, 2013. The regulations contain emissions limitations, operating limitations and other requirements. Compliance costs are not expected to be material to DP&L's operations.

National Ambient Air Quality Standards

On January 5, 2005, the USEPA published its final non-attainment designations for the National Ambient Air Quality Standard (NAAQS) for Fine Particulate Matter 2.5 (PM 2.5). These designations included counties and partial counties in which DP&L operates and/or owns generating facilities. On March 4, 2005, DP&L and other Ohio electric utilities and electric generators filed a petition for review in the D.C. Circuit Court of Appeals, challenging the final rule creating these designations. On November 30, 2005, the court ordered the USEPA to decide on all petitions for reconsideration by January 20, 2006. On January 20, 2006, the USEPA denied the petitions for reconsideration. On July 7, 2009, the D.C. Circuit Court of Appeals upheld the USEPA non-attainment designations for the areas impacting DP&L's generation plants. As of September 30, 2011, DP&L's Stuart, Killen and Hutchings Stations were located


 

in non-attainment areas for the 24-hour PM 2.5 standard. There is a possibility that these areas will be re-designated as "attainment" for PM 2.5 within the next few quarters. We cannot predict the impact the revisions to the PM 2.5 standard will have on DP&L's financial condition or results of operations.

On May 5, 2004, the USEPA issued its proposed regional haze rule, which addresses how states should determine the Best Available Retrofit Technology (BART) for sources covered under the regional haze rule. Final rules were published July 6, 2005, providing states with several options for determining whether sources in the state should be subject to BART. In the final rule, the USEPA made the determination that CAIR achieves greater progress than BART and may be used by states as a BART substitute. Numerous units owned and operated by us will be impacted by BART. We cannot determine the extent of the impact until Ohio determines how BART will be implemented.

On September 16, 2009, the USEPA announced that it would reconsider the 2008 national ground level ozone standard. On September 2, 2011, the USEPA decided to postpone their revisiting of this standard until 2013. DP&L cannot determine the effect of this potential change, if any, on its operations.

Effective April 12, 2010, the USEPA implemented revisions to its primary NAAQS for nitrogen dioxide. This change may affect certain emission sources in heavy traffic areas like the I-75 corridor between Cincinnati and Dayton after 2016. Several of our facilities or co-owned facilities are within this area. DP&L cannot determine the effect of this potential change, if any, on its operations.

Effective August 23, 2010, the USEPA implemented revisions to its primary NAAQS for SO2 replacing the current 24-hour standard and annual standard with a one hour standard. DP&L cannot determine the effect of this potential change, if any, on its operations. No effects are anticipated before 2014.

Carbon Emissions and Other Greenhouse Gases

In response to a U.S. Supreme Court decision that the USEPA has the authority to regulate CO2 emissions from motor vehicles, the USEPA made a finding that CO2 and certain other GHGs are pollutants under the CAA. Subsequently, under the CAA, USEPA determined that CO2 and other GHGs from motor vehicles threaten the health and welfare of future generations by contributing to climate change. This finding became effective in January 2010. Numerous affected parties have petitioned the USEPA Administrator to reconsider this decision. On April 1, 2010, USEPA signed the "Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards" rule. Under USEPA's view, this is the final action that renders carbon dioxide and other GHGs "regulated air pollutants" under the CAA.

The USEPA plans to propose GHG standards for new and modified electric generating units (EGUs) under CAA subsection 111(b) – and propose and promulgate guidelines for states to address GHG standards for existing EGUs under CAA subsection 111(d) – later in 2011, and such final standards by May 2012. These rules may focus on energy efficiency improvements at power plants. We cannot predict the effect of these standards, if any, on DP&L's operations.

Legislation proposed in 2009 to target a reduction in the emission of GHGs from large sources was not enacted. Approximately 99% of the energy we produce is generated by coal. DP&L's share of CO2 emissions at generating stations we own and co-own is approximately 16 million tons annually. Proposed GHG legislation finalized at a future date could have a significant effect on DP&L's operations and costs, which could adversely affect our net income, cash flows and financial condition. However, due to the uncertainty associated with such legislation, we cannot predict the final outcome or the financial impact that such legislation will have on DP&L.

On September 22, 2009, the USEPA issued a final rule for mandatory reporting of GHGs from large sources that emit 25,000 metric tons per year or more of CO2, including electric generating units. The first report to the USEPA was submitted prior to the September 30, 2011 due date for 2010 emissions. This reporting rule will guide development of policies and programs to reduce emissions. DP&L does not anticipate that this reporting rule will result in any significant cost or other impact on current operations.


 

Litigation, Notices of Violation and Other Matters Related to Air Quality

Litigation Involving Co-Owned Plants

On June 20, 2011, the Supreme Court rejected federal common law nuisance claims brought initially in 2004 by eight states, the City of New York and three land trusts, who had sought injunctive relief and limitations on GHGs emitted by American Electric Power Company, Inc. (AEP), one of AEP's subsidiaries, Cinergy Corp. (a subsidiary of Duke Energy Corporation (Duke Energy)) and four other electric power companies. The Supreme Court ruled that the Clean Air Act and the authority given to EPA under that Act to regulate GHGs displaced any right that plaintiffs may have had to seek similar regulation through federal common law litigation in the court system. Although we are not named as a party to these lawsuits, DP&L is a co-owner of coal-fired plants with Duke Energy and AEP (or their subsidiaries) that could have been affected by the outcome of these lawsuits or similar suits that may have been filed against other electric power companies, including DP&L. Because the issue was not squarely before it, the Supreme Court did not rule against the portion of plaintiffs' original suits that sought relief under State law. However, such claims appear likely to be dismissed by a lower court on similar pre-emption grounds.

As a result of a 2008 consent decree entered into with the Sierra Club and approved by the U.S. District Court for the Southern District of Ohio, DP&L and the other owner of the J.M. Stuart generating station are subject to certain specified emission targets related to NOx, SO2 and particulate matter. The consent decree also includes commitments for energy efficiency and renewable energy activities. An amendment to the consent decree was entered into and approved in 2010 to clarify how emissions would be computed during malfunctions. Continued compliance with the consent decree, as amended, is not expected to have a material effect on DP&L's results of operations, financial condition or cash flows in the future.

Notices of Violation Involving Co-Owned Plants

In November 1999, the USEPA filed civil complaints and NOVs against operators and owners of certain generation facilities for alleged violations of the CAA. Generation units operated by Duke Energy (Beckjord Unit 6) and CSP (Conesville Unit 4) and co-owned by DP&L were referenced in these actions. Although DP&L was not identified in the NOVs, civil complaints or state actions, the results of such proceedings could materially affect DP&L's co-owned plants.

In June 2000, the USEPA issued a NOV to the DP&L-operated J.M. Stuart generating station (co-owned by DP&L, Duke Energy, and CSP) for alleged violations of the CAA. The NOV contained allegations consistent with NOVs and complaints that the USEPA had recently brought against numerous other coal-fired utilities in the Midwest. The NOV indicated the USEPA may: (1) issue an order requiring compliance with the requirements of the Ohio SIP; or (2) bring a civil action seeking injunctive relief and civil penalties of up to $27,500 per day for each violation. To date, neither action has been taken. DP&L cannot predict the outcome of this matter.

In December 2007, the Ohio EPA issued a NOV to the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) for alleged violations of the CAA. The NOVs alleged deficiencies in the continuous monitoring of opacity. We submitted a compliance plan to the Ohio EPA on December 19, 2007. To date, no further actions have been taken by the Ohio EPA.

On March 13, 2008, Duke Energy, the operator of the Zimmer generating station, received a NOV and a Finding of Violation (FOV) from the USEPA alleging violations of the CAA, the Ohio State Implementation Program (SIP) and permits for the station in areas including SO2, opacity and increased heat input. A second NOV and FOV with similar allegations was issued on November 4, 2010. Also in 2010, USEPA issued an NOV to Zimmer for excess emissions, which may have been resolved through resubmission of monitoring reports. DP&L is a co-owner of the Zimmer generating station and could be affected by the eventual resolution of these matters. Duke Energy is expected to act on behalf of itself and the co-owners with respect to these matters. DP&L is unable to predict the outcome of these matters.


 

Other Issues Involving Co-Owned Plants

In 2006, DP&L detected a malfunction with its emission monitoring system at the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) and ultimately determined its SO2 and NOx emissions data were under reported. DP&L has petitioned the USEPA to accept an alternative methodology for calculating actual emissions for 2005 and the first quarter of 2006. More than five years have passed since the malfunction was reported and management does not believe that there will be a resolution of this matter that would have a material impact on results of operations, financial condition or cash flows.

Notices of Violation Involving Wholly-Owned Plants

In 2007, the Ohio EPA and the USEPA issued NOVs to DP&L for alleged violations of the CAA at the O.H. Hutchings Station. The NOVs' alleged deficiencies relate to stack opacity and particulate emissions. Discussions are under way with the USEPA, the U.S. Department of Justice and Ohio EPA. DP&L has provided data to those agencies regarding its maintenance expenses and operating results. On December 15, 2008, DP&L received a request from the USEPA for additional documentation with respect to those issues and other CAA issues including issues relating to capital expenses and any changes in capacity or output of the units at the O.H. Hutchings Station. During 2009, DP&L continued to submit various other operational and performance data to the USEPA in compliance with its request. DP&L is currently unable to determine the timing, costs or method by which the issues may be resolved and continues to work with the USEPA on these issues.

On November 18, 2009, the USEPA issued a NOV to DP&L for alleged NSR violations of the CAA at the O.H. Hutchings Station relating to capital projects performed in 2001 involving Unit 3 and Unit 6. DP&L does not believe that the two projects described in the NOV were modifications subject to NSR. DP&L is unable to determine the timing, costs or method by which these issues may be resolved and continues to work with the USEPA on this issue.

Environmental Matters Related to Water Quality, Waste Disposal and Ash Ponds

Clean Water Act – Regulation of Water Intake

On July 9, 2004, the USEPA issued final rules pursuant to the Clean Water Act governing existing facilities that have cooling water intake structures. The rules require an assessment of impingement and/or entrainment of organisms as a result of cooling water withdrawal. A number of parties appealed the rules to the Federal Court of Appeals for the Second Circuit in New York and the Court issued an opinion on January 25, 2007, remanding several aspects of the rule to the USEPA for reconsideration. Several parties petitioned the U.S. Supreme Court for review of the lower court decision. On April 14, 2008, the Supreme Court elected to review the lower court decision on the issue of whether the USEPA can compare costs with benefits in determining the best technology available for minimizing adverse environmental impact at cooling water intake structures. Briefs were submitted to the Court in the summer of 2008 and oral arguments were held in December 2008. In April 2009, the U.S. Supreme Court ruled that the USEPA did have the authority to compare costs with benefits in determining best technology available. The USEPA released new proposed regulations on March 28, 2011, published in the Federal Register on April 20, 2011. We submitted comments to the proposed regulations on August 17, 2011. The final rules are expected to be in place by mid-2012. We do not yet know the impact these proposed rules will have on our operations.

Clean Water Act – Regulation of Water Discharge

On May 4, 2004, the Ohio EPA issued a final National Pollutant Discharge Elimination System permit (the Permit) for J.M. Stuart Station that continued our authority to discharge water from the station into the Ohio River. During the three-year term of the Permit, we conducted a thermal discharge study to evaluate the technical feasibility and economic reasonableness of water cooling methods other than cooling towers. In December 2006, we submitted an application for the renewal of the Permit that was due to expire on June 30, 2007. In July 2007, we received a draft permit proposing to continue our authority to discharge water from the station into the Ohio River. On February 5, 2008, we received a letter from the Ohio EPA indicating that they intended to impose a compliance schedule as part of the final Permit, that requires us to implement one of two diffuser options for the discharge of water from the station into the Ohio River as identified in the thermal discharge study. Subsequently, representatives from DP&L and the Ohio EPA agreed to allow DP&L to restrict public access to the water discharge area as an alternative to installing one of the diffuser options. Ohio EPA issued a revised draft permit that was


 

received on November 12, 2008. In December 2008, the USEPA requested that the Ohio EPA provide additional information regarding the thermal discharge in the draft permit. In June 2009, DP&L provided information to the USEPA in response to their request to the Ohio EPA. In September 2010, the USEPA formally objected to a revised Permit provided by Ohio EPA due to questions regarding the basis for the alternate thermal limitation. In December 2010, DP&L requested a public hearing on the objection, which was held on March 23, 2011. We participated in and presented our position on the issue at the hearing and in written comments submitted on April 28, 2011. In a letter to the Ohio EPA dated September 28, 2011, the USEPA reaffirmed its objection to the revised permit as previously drafted by the Ohio EPA. This reaffirmation stipulated that if the Ohio EPA does not re-draft the permit to address the USEPA's objection, then the authority for issuing the permit will pass to the USEPA. DP&L is unable to predict the timing for issuance of a final permit.

In September 2009, the USEPA announced that it will be revising technology-based regulations governing water discharges from steam electric generating facilities. The rulemaking included the collection of information via an industry-wide questionnaire as well as targeted water sampling efforts at selected facilities. Subsequent to the information collection effort, it is anticipated that the USEPA will release a proposed rule by mid-2012 with a final regulation in place by early 2014. At present, DP&L is unable to predict the impact this rulemaking will have on its operations.

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site. In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach. In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS. No recent activity has occurred with respect to that notice or PRP status. However, on August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L's service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site's contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site. DP&L has granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010. DP&L believes the chemicals used at its service center building site were appropriately disposed of and have not contributed to the contamination at the South Dayton Dump landfill site. On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and are seeking reimbursement of the PRP group's costs associated with the investigation and remediation of the site. DP&L filed a motion to dismiss the complaint and intends to vigorously defend against any claim that it has any financial responsibility to remediate conditions at the landfill site. On February 10, 2011, the Court dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site's contamination. The Court, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill. While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.

In December 2003, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the Tremont City landfill site. Information available to DP&L does not demonstrate that it contributed hazardous substances to the site. While DP&L is unable to predict the outcome of this matter, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.


 

On April 7, 2010, the USEPA published an Advance Notice of Proposed Rulemaking (ANPRM) announcing that it is reassessing existing regulations governing the use and distribution in commerce of polychlorinated biphenyls (PCB). While this reassessment is in the early stages and the USEPA is seeking information from potentially affected parties on how it should proceed, the outcome may have a material effect on DP&L. At present, DP&L is unable to predict the impact this initiative will have on its operations.

Regulation of Ash Ponds

During 2008, a major spill occurred at an ash pond owned by the Tennessee Valley Authority (TVA) as a result of a dike failure. The spill generated a significant amount of national news coverage, and support for tighter regulations for the storage and handling of coal combustion products. DP&L has ash ponds at the Killen, O.H. Hutchings and J.M. Stuart Stations which it operates, and also at generating stations operated by others in which DP&L has an ownership interest.

During March 2009, the USEPA, through a formal Information Collection Request, collected information on ash pond facilities across the country, including those at Killen and J.M. Stuart Stations. Subsequently, the USEPA collected similar information for O.H. Hutchings Station.

In October 2009, the USEPA conducted an inspection of the J.M. Stuart Station ash ponds. In March 2010, the USEPA issued a final report from the inspection including recommendations relative to the J.M. Stuart Station ash ponds. In May 2010, DP&L responded to the USEPA final inspection report with our plans to address the recommendations.

Similarly, in August 2010, the USEPA conducted an inspection of the O.H. Hutchings Station ash ponds. The draft report relating to the inspection was received in November 2010 and DP&L provided comments on the draft report in December 2010. In June 2011, the USEPA issued a final report from the inspection including recommendations relative to the O.H. Hutchings Station ash ponds. On July 27, 2011, DP&L responded to the USEPA final inspection report with plans to address the recommendations. DP&L is unable to predict whether there will be additional USEPA action relative to DP&L's proposed plan or the effect on operations that might arise under a different plan.

In June 2011, the USEPA conducted an inspection of the Killen Station ash ponds. DP&L is unable to predict the outcome this inspection will have on its operations.

In addition, as a result of the TVA ash pond spill, there has been increasing advocacy to regulate coal combustion byproducts under the Resource Conservation Recovery Act (RCRA). On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D. DP&L submitted comments regarding the proposed regulation on November 19, 2010. DP&L is unable to predict the financial impact of this regulation, but if coal combustion byproducts are regulated as hazardous waste, it is expected to have a material adverse impact on operations.

Notice of Violation involving Co-Owned Plants

On September 9, 2011, DP&L received a notice of violation from the USEPA with respect to its co-owned J.M. Stuart generating station based on a compliance evaluation inspection conducted by the USEPA and Ohio EPA in 2009. The notice alleges non-compliance by DP&L with certain provisions of the RCRA, the Clean Water Act National Pollutant Discharge Elimination System permit program and the station's storm water pollution prevention plan. The notice requests that DP&L respond with the actions it has taken or plans to take to remedy the USEPA's findings and ensure that further violations will not occur. Based on its initial review of the findings, although there can be no assurance, we believe that the notice will not result in any material impact on its results of operations, financial condition or cash flow.

Ohio Regulation

SB 221 and the implementation rules contain targets relating to advanced energy portfolio standards, renewable energy, demand reduction and energy efficiency standards. If any targets are not met, compliance penalties will apply unless the PUCO makes certain findings that would excuse performance.

The implementation rules required that on January 1, 2010, DP&L file an extensive energy efficiency portfolio plan, outlining how DP&L plans to comply with the energy efficiency and demand reduction benchmarks. DP&L filed a separate request for a finding that it had already complied with this requirement in the form of DP&L's portfolio plan that had been filed in 2008 as part of its CCEM plan, which had been approved by the PUCO and is being implemented. On May 19, 2010 the PUCO approved in part and denied in part DP&L's request that the PUCO find that it met the 2009 energy efficiency portfolio requirements and directed DP&L to file a measurement and verification plan as well as a market potential study within 60 days of the date of the order. The Company made this filing on July 15, 2010. A settlement was reached in this case and approved by the PUCO in April 2011. DP&L made a filing on April 29, 2011 seeking PUCO authorization to increase the energy efficiency rider to recover costs associated with energy efficiency and peak demand reduction compliance. On October 18, 2011, the PUCO approved this filing.

In compliance with the PUCO rules implementing SB 221, DP&L and DPLER made compliance filings on April 15, 2010 and again on April 15, 2011 demonstrating how each entity met the renewable and solar benchmarks for 2009 and 2010. The PUCO issued an order on July 27, 2011 finding that DP&L was in compliance with its 2009 renewable energy resource compliance obligation. Further the PUCO issued an order on October 3, 2011 finding that DPLER met its 2009 renewable energy resource compliance obligations. The proceedings initiated to demonstrate 2010 compliance with renewable and solar benchmarks are still pending. On June 1, 2011 DP&L filed an amendment to its Alternative Energy Rider case that is pending before the PUCO. This request will increase the rider to recover additional compliance costs.

As the energy efficiency and alternative energy targets get increasingly larger over time, the costs of complying with SB 221 and the PUCO's implementing rules could have a material impact on DP&L's financial condition.

DP&L established a fuel and purchased power recovery rider beginning January 1, 2010. The fuel rider fluctuates based on actual costs and recoveries and is modified at the start of each seasonal quarter: March 1, June 1, September 1 and December 1 each year. DP&L recently underwent an audit of its fuel and purchased power recovery rider but there is some uncertainty as to the costs that will be recovered from or returned to customers. On October 6, 2011, DP&L and all of the active participants in this proceeding reached a Stipulation and Recommendation that resolves the majority of the issues raised by the auditor. On October 19, 2011, we had a hearing on this case. Although the Stipulation and Recommendation was uncontested, the PUCO may approve, disapprove, or modify the stipulation. DP&L expects to record a favorable or unfavorable adjustment to earnings after the final order is received.

As a member of PJM, DP&L receives revenues from the RTO related to its transmission and generation assets and incurs costs associated with its load obligations for retail customers. SB 221 included a provision that would allow Ohio electric utilities to seek and obtain a reconcilable rider to recover RTO-related costs and credits. DP&L's TCRR and PJM RPM riders were initially approved in November 2009 to recover these costs. Both the TCRR and the RPM riders assign costs and revenues from PJM monthly bills to retail ratepayers based on the percentage of SSO retail customers' load and sales volumes to total retail load and total retail and wholesale volumes. Customer switching to CRES providers decreases DP&L's SSO retail customers' load and sales volumes. Therefore, increases in customer switching cause more of the RPM capacity costs and revenues to be excluded from the RPM rider calculation. DP&L's annual true-up of these two riders was approved by the PUCO by an order dated April 27, 2011.

DP&L entered into an economic development arrangement with its single largest electricity consumer. This arrangement was approved by the PUCO on June 8, 2011 and became effective in July 2011. Under Ohio law, DP&L is permitted to seek recovery of costs associated with economic development programs including foregone revenues from all customers. On October 26, 2011 the PUCO approved our Economic Development Rider, as filed, related to this arrangement.


 

Legal and Other Matters

In February 2007, DP&L filed a lawsuit against a coal supplier seeking damages incurred due to the supplier's failure to supply approximately 1.5 million tons of coal to two jointly owned plants under a coal supply agreement, of which approximately 570 thousand tons was DP&L's share. DP&L obtained replacement coal to meet its needs. The supplier has denied liability, and is currently in federal bankruptcy proceedings in which DP&L is participating as an unsecured creditor. DP&L is unable to determine the ultimate resolution of this matter. DP&L has not recorded any assets relating to possible recovery of costs in this lawsuit.

On May 16, 2007, DPL filed a claim with Energy Insurance Mutual (EIM) to recoup legal costs associated with our litigation against certain former executives. On February 15, 2010, after having engaged in both mediation and arbitration, DPL and EIM entered into a settlement agreement resolving all coverage issues and finalizing all obligations in connection with the claim, under which DPL received $3.4 million (net of associated expenses).

As a member of PJM, DP&L is also subject to charges and costs associated with PJM operations as approved by the FERC. FERC orders issued in 2007 and thereafter regarding the allocation of costs of large transmission facilities within PJM could result in additional costs being allocated to DP&L of approximately $12 million or more annually by 2012. Although we continue to maintain that these costs should be borne by the beneficiaries of these projects and that DP&L is not one of these beneficiaries, any credits or costs resulting from these proceedings would be reflected in DP&L's retail transmission rider.

In connection with DP&L and other utilities joining PJM, in 2006 the FERC ordered utilities to eliminate certain charges to implement transitional payments, known as SECA, effective December 1, 2004 through March 31, 2006, subject to refund. Through this proceeding, DP&L was obligated to pay SECA charges to other utilities, but received a net benefit from these transitional payments. A hearing was held and an initial decision was issued in August 2006. A final FERC order on this issue was issued on May 21, 2010 that substantially supports DP&L's and other utilities' position that SECA obligations should be paid by parties that used the transmission system during the timeframe stated above. Prior to this final order being issued, DP&L entered into a significant number of bi-lateral settlement agreements with certain parties to resolve the matter, which by design will be unaffected by the final decision. With respect to unsettled claims, DP&L management has deferred $14.1 million and $15.4 million as of September 30, 2011 and December 31, 2010, respectively, as Other deferred credits representing the amount of unearned income where the earnings process is not complete. On September 30, 2011, the FERC issued two SECA-related orders that affirmed an earlier order issued in 2010 by denying the rehearing requests that a number of different parties, including DP&L, had filed. These orders are now final, subject to possible appellate court review. These orders do not affect prior settlements that had been reached with other parties that owed SECA revenues to DP&L or were recipients of amounts paid by DP&L. For other parties that had not previously settled with DP&L, the exact timing and amounts of any payments that would be made or received by DP&L under these orders is still uncertain.

Refer to Note 16 of Notes to Condensed Consolidated Financial Statements for additional information surrounding the Proposed Merger and any related legal matters.

Collective Bargaining Agreement

During the three months ended September 30, 2011, we began negotiations with employees covered under our collective bargaining agreement which is set to expire on October 31, 2011. On October 17, 2011, we reached a tentative agreement with these employees on a new three year labor agreement. Though we expect the tentative agreement to be ratified and that our employees will continue to work during the ratification process, it is possible that this tentative agreement will not be ratified, which could result in labor disruptions affecting some or all of our operations. We have contingency plans in place to mitigate the impact that any labor stoppages could have on our customers. A lengthy strike by our employees could have an adverse effect on our operations and financial condition.