CONTINGENCIES
CONTINGENCIES

PGE is subject to legal, regulatory, and environmental proceedings, investigations, and claims that arise from time to time in the ordinary course of its business. Contingencies are evaluated using the best information available at the time the condensed consolidated financial statements are prepared. Legal costs incurred in connection with loss contingencies are expensed as incurred. The Company may seek regulatory recovery of certain costs that are incurred in connection with such matters, although there can be no assurance that such recovery would be granted.

Loss contingencies are accrued, and disclosed if material, when it is probable that an asset has been impaired or a liability incurred as of the financial statement date and the amount of the loss can be reasonably estimated. If a reasonable estimate of probable loss cannot be determined, a range of loss may be established, in which case the minimum amount in the range is accrued, unless some other amount within the range appears to be a better estimate.

A loss contingency will also be disclosed when it is reasonably possible that an asset has been impaired or a liability incurred if the estimate or range of potential loss is material. If a probable or reasonably possible loss cannot be determined, then the Company: i) discloses an estimate of such loss or the range of such loss, if the Company is able to determine such an estimate; or ii) discloses that an estimate cannot be made and the reasons.

If an asset has been impaired or a liability incurred after the financial statement date, but prior to the issuance of the financial statements, the loss contingency is disclosed, if material, and the amount of any estimated loss is recorded in the subsequent reporting period.

The Company evaluates, on a quarterly basis, developments in such matters that could affect the amount of any accrual, as well as the likelihood of developments that would make a loss contingency both probable and reasonably estimable. The assessment as to whether a loss is probable or reasonably possible, and as to whether such loss or a range of such loss is estimable, often involves a series of complex judgments about future events. Management is often unable to estimate a reasonably possible loss, or a range of loss, particularly in cases in which: i) the damages sought are indeterminate or the basis for the damages claimed is not clear; ii) the proceedings are in the early stages; iii) discovery is not complete; iv) the matters involve novel or unsettled legal theories; v) significant facts are in dispute; vi) a large number of parties are represented (including circumstances in which it is uncertain how liability, if any, will be shared among multiple defendants); or vii) a wide range of potential outcomes exist. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution, including any possible loss, fine, penalty, or business impact.

Carty

Background—The Company is involved in several litigation proceedings that involve claims concerning the Company’s termination of the construction agreement relating to the Carty natural gas-fired generating plant (Carty) located in Eastern Oregon, and the payment obligations of two sureties who provided a performance bond in connection with such agreement. The Company is seeking recovery of incremental construction costs and other damages pursuant to breach of contract claims against the contractor and claims against the sureties pursuant to the performance bond. There are currently several lawsuits pending in U.S. District Court, as well as an arbitration proceeding before the International Chamber of Commerce (ICC). The Company is seeking to have all claims relating to this matter tried in U.S. District Court for the District of Oregon, but several procedural motions concerning jurisdiction remain pending as of the filing date of this report.

Arbitration Proceeding—In 2013, the Company entered into an agreement (Construction Agreement) with its engineering, procurement and construction contractor - Abeinsa EPC LLC, Abener Construction Services, LLC, Teyma Construction USA, LLC, and Abeinsa Abener Teyma General Partnership, an affiliate of Abengoa S.A. (collectively, the “Contractor”) - for the construction of Carty. Liberty Mutual Insurance Company and Zurich American Insurance Company (hereinafter referred to collectively as the “Sureties”) provided a performance bond of $145.6 million (Performance Bond) under the Construction Agreement.

On December 18, 2015, the Company declared the Contractor in default under the Construction Agreement and terminated the Construction Agreement. Following termination of the Construction Agreement, PGE, in consultation with the Sureties, brought on new contractors and construction resumed during the week of December 21, 2015.

On January 28, 2016, the Company received notice from the International Chamber of Commerce (ICC) International Court of Arbitration that Abengoa S.A. had submitted a request for arbitration. In the request, Abengoa S.A. alleged that the Company’s termination of the Construction Agreement was wrongful and in breach of the agreement terms and does not give rise to any liability of Abengoa S.A. under the terms of a guaranty in favor of PGE and pursuant to which Abengoa S.A. agreed to guaranty certain obligations of the Contractor under the Construction Agreement. PGE disagrees with the assertions in the request for arbitration and on February 29, 2016 filed a complaint and motion for preliminary injunction in the U.S. District Court for the District of Oregon seeking to have the arbitration claim dismissed on the grounds that the Company has not made a demand under the Abengoa S.A. guaranty, and therefore the matter is not ripe for arbitration. In addition, the Contractor has been joined as a party to the arbitration and is seeking damages of approximately $117 million based on a claim that PGE wrongfully terminated the Construction Agreement. The Contractor is also seeking estimated damages of $44 million based on a claim that PGE failed to disclose to the Contractor, in connection with the Contractor’s bid submitted pursuant to the Company’s request for proposals, certain information regarding union labor productivity rates in eastern Oregon, and that this failure caused the Contractor to submit a bid with a contract price that was lower than the contract price that would have been submitted had Contractor known such information. PGE disagrees with both of these claims.

Bankruptcy Proceedings - On March 28, 2016, Abengoa S.A. and several of its foreign affiliates filed petitions for recognition under Chapter 15 of the U.S. Bankruptcy Code requesting interim relief, including an injunction precluding the prosecution of any proceedings against the Chapter 15 debtors. On March 29, 2016, a number of Abengoa S.A.’s U.S. subsidiaries, including the four entities that collectively comprise the Contractor, filed voluntary petitions for relief under Chapter 11 of the U.S. Bankruptcy Code. As a result, on April 5, 2016, the U.S. District Court issued an order stating that the Company’s District Court action against Abengoa S.A. was stayed. In early October 2016, the bankruptcy court in the Chapter 11 proceeding granted the Company’s motion for relief from stay with respect to the four entities that collectively comprise the Contractor, which allows the Company to bring claims against such entities in the U.S. District Court.

U.S. District Court Proceedings against Sureties - On March 9, 2016, the Sureties delivered a letter to the Company denying liability in whole under the Performance Bond. In the letter, the Sureties make the following assertions in support of their determination:

1.
that, because Abengoa S.A. has alleged that PGE wrongfully terminated the Construction Agreement, PGE must disprove such claim as a condition precedent to recovery under the Performance Bond; and

2.
that, irrespective of the outcome of the foregoing wrongful termination claim, the Sureties have various contractual and equitable defenses to payment and are not liable to PGE for any amount under the Performance Bond.


The Company disagrees with the foregoing assertions and, on March 23, 2016, filed a breach of contract action against the Sureties in the U.S. District Court for the District of Oregon. The Company’s complaint disputes the Sureties’ assertion that the Company wrongfully terminated the Construction Agreement and asserts that the Sureties are responsible for the payment of all damages sustained by PGE as a result of the Sureties’ breach of contract, including damages in excess of the 
$145.6 million stated amount of the Performance Bond. Such damages include additional costs incurred by PGE to complete Carty.

On April 15, 2016, the Sureties filed a motion to stay this U.S. District Court proceeding, alleging that PGE’s claims should be addressed in the arbitration proceeding initiated by Abengoa S.A. and referenced above because PGE’s claims are intertwined with the issues involved in such arbitration and all parties necessary to resolve PGE’s claims are parties to the arbitration. PGE opposed the motion and filed a motion to enjoin the Sureties from pursuing, in the ICC arbitration proceeding, claims relating to the Performance Bond. On July 27, 2016, the court denied the Sureties’ motion to stay and granted PGE’s motion for a preliminary injunction. The Sureties appealed the rulings to the Ninth Circuit Court of Appeals. On December 13, 2016, the Ninth Circuit issued an order staying the district court proceeding, pending a decision on the Sureties’ appeal. Oral argument on the Sureties’ appeal is scheduled for May 8, 2017.

U.S. District Court Proceedings against Contractor - On October 21, 2016, PGE filed a complaint in the U.S. District Court for the District of Oregon against Abeinsa for failure to satisfy its obligations under the Construction Agreement. PGE is seeking damages from Abeinsa in excess of $200 million for: i) costs incurred to complete construction of Carty, settle claims with unpaid contractors and vendors and remove liens; and ii) damages in excess of the construction costs, including a project management fee, liquidated damages under the Construction Agreement, legal fees and costs, damages due to delay of the project, warranty costs, and interest. On March 21, 2017, the U.S. District Court for the District of Oregon entered an order staying the case for 120 days.

Recovery of Capital Costs in Excess of $514 millionFollowing termination of the Construction Agreement, PGE brought on new contractors and resumed construction. Carty was placed into service on July 29, 2016 and the Company began collecting its revenue requirement in customer prices on August 1, based on the approved cost of $514 million. Actual costs for Carty have exceeded the $514 million approved for inclusion in customer prices by the OPUC. As of March 31, 2017, PGE has capitalized $636 million for Carty classified as Electric utility plant. The incremental costs resulted from various matters relating to the resumption of construction activities following the termination of the Construction Agreement, including, among other things, determining the remaining scope of construction, preparing work plans for contractors, identifying new contractors, negotiating contracts, and procuring additional materials. Costs also increased as a result of PGE’s discovery through the construction process of latent defects in work performed by the former Contractor and the corresponding labor and materials required to correct the work. Other items contributing to the increase include costs relating to the removal of certain liens filed on the property for goods and services provided under contracts with the former Contractor, and costs to repair equipment damage resulting from poor storage and maintenance on the part of the former Contractor.

PGE estimates the total cost of Carty will be approximately $640 million. This cost estimate does not reflect any offsetting amounts that may be received from the Sureties pursuant to the Performance Bond. This estimate also excludes approximately $14 million of lien claims filed against PGE for goods and services provided under contracts with the former Contractor. The Company believes these liens are invalid and is contesting the claims in the courts.

In the event the total project costs incurred by PGE, net of offsetting amounts that may be received from the Sureties, Abengoa S.A., or the Contractor, ultimately exceed the $514 million amount approved by the OPUC for inclusion in customer prices, the Company intends to seek approval to recover the excess amounts in customer prices in a subsequent rate proceeding after exhausting all remedies against the aforementioned parties. However, there is no assurance that such recovery would be allowed by the OPUC. In accordance with GAAP and the Company’s accounting policies, any such excess costs would be charged to expense at the time disallowance of recovery becomes probable and a reasonable estimate of the amount of such disallowance can be made. As of the date of this report, the Company has concluded that the likelihood that a portion of the cost of Carty will be disallowed for recovery in customer prices is less than probable. Accordingly, no loss has been recorded to date related to the project.

As actual project costs for Carty exceed $514 million, the Company is incurring a higher cost than what is reflected in the current authorized revenue requirement amount, primarily due to higher depreciation and interest expense. On July 29, 2016, the Company requested from the OPUC a regulatory deferral for the recovery of the revenue requirement associated with the incremental capital costs for Carty starting from its in service date to the date that such amounts are approved in a subsequent General Rate Case (GRC) proceeding. The Company has requested that the OPUC delay its review of this deferral request until the Company’s claims against the Sureties have been resolved. Until such time, the effects of this higher cost are recognized in the Company’s results of operations, as a deferral for such amounts would not be considered probable of recovery at this time, in accordance with GAAP. Any amounts approved by the OPUC for recovery under the deferral filing will be recognized in earnings in the period of such approval, however there is no assurance that such recovery would be granted by the OPUC. The Company believes that costs incurred to date and capitalized in Electric utility plant, net in the consolidated balance sheet were prudently incurred. There has been no settlement discussions with regulators related to such costs.

EPA Investigation of Portland Harbor

A 1997 investigation by the United States Environmental Protection Agency (EPA) of a segment of the Willamette River known as Portland Harbor revealed significant contamination of river sediments. The EPA subsequently included Portland Harbor on the National Priority List pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as a federal Superfund site and listed 69 Potentially Responsible Parties (PRPs). PGE was included among the PRPs as it has historically owned or operated property near the river. In 2008, the EPA requested information from various parties, including PGE, concerning additional properties in or near the original segment of the river under investigation as well as several miles beyond. Subsequently, the EPA has listed additional PRPs, which now number over one hundred.

The Portland Harbor site remedial investigation (RI) has been completed pursuant to an Administrative Order on Consent (AOC) between the EPA and several PRPs known as the Lower Willamette Group (LWG), which does not include PGE. The LWG has funded the RI and feasibility study (FS) and has stated that it has incurred $115 million in investigation-related costs. The Company anticipates that such costs will ultimately be allocated to PRPs as a part of the allocation process for remediation costs of the EPA’s preferred remedy.

The EPA has finalized the FS, along with the RI, and these documents provided the framework for the EPA to determine a clean-up remedy for Portland Harbor that was documented in a Record of Decision (ROD) issued on January 6, 2017. The ROD outlines the EPA’s selected remediation alternative to clean-up for Portland Harbor which has an estimated total cost of $1.7 billion, comprised of $1.2 billion related to remediation construction costs and $0.5 billion related to long-term operation and maintenance costs, for a combined discounted present value of $1.05 billion. As stated within the ROD, such cost ranges were estimated with an accuracy between -30% and +50% of actual costs. Remediation construction costs are estimated to be incurred over a 13 year period, with long-term operation and maintenance costs estimated to be incurred over a 30 year period from the start of construction. The Company anticipates that prior to the commencement of remediation activities, a phase of resampling of the river will be necessary to better refine the remedial design and may impact estimated costs.

PGE is participating in a voluntary process to determine an appropriate allocation of costs amongst the PRPs. Significant uncertainties remain surrounding facts and circumstances that are integral to the determination of such an allocation percentage, including a final allocation methodology and data with regard to property specific activities and history of ownership of sites within Portland Harbor. Based on the above facts and remaining uncertainties, PGE cannot reasonably estimate its potential liability or determine an allocation percentage that represents PGE’s portion of the liability to clean-up Portland Harbor.

Where injuries to natural resources have occurred as a result of releases of hazardous substances, federal and state natural resource trustees may seek to recover for damages at such sites, which are referred to as natural resource damages. As it relates to the Portland Harbor, PGE has been participating in the Portland Harbor Natural Resource Damages assessment (NRDA) process. The EPA does not manage NRDA activities, but provides claims information and coordination support to the Natural Resource Damages (NRD) trustees. Damage assessment activities are typically conducted by a Trustee Council made up of the trustee entities for the site. The Portland Harbor NRD trustees are the National Oceanic and Atmospheric Administration, the U.S. Fish and Wildlife Service, the State of Oregon, and certain tribal entities.

The NRD trustees may seek to negotiate legal settlements or take other legal actions against the parties responsible for the damages. Funds from such settlements must be used to restore injured resources and may also compensate the trustees for costs incurred in assessing the damages. The NRD trustees are in the process of negotiating NRDA liability with several PRPs, including PGE. PGE believes that the Company’s portion of NRDA liabilities related to Portland Harbor will not have a material impact on its results of operations, financial position, or cash flows.

As discussed above, significant uncertainties still remain concerning the precise boundaries for clean-up, the assignment of responsibility for clean-up costs, the final selection of a proposed remedy by the EPA, and the method of allocation of costs amongst PRPs. It is probable that PGE will share in a portion of these costs. However, the Company does not currently have sufficient information to reasonably estimate the amount, or range, of its potential costs for investigation or remediation of the Portland Harbor site, although such costs could be material. The Company plans to seek recovery of any costs resulting from the Portland Harbor proceeding through claims under insurance policies and regulatory recovery in customer prices.

In July 2016, the Company filed a deferral application with the OPUC seeking the deferral of the future environmental remediation costs, as well as, seeking authorization to establish a regulatory cost recovery mechanism for such environmental costs. The Company reached an agreement with OPUC Staff and other parties regarding the details of the recovery mechanism, which the OPUC approved in the first quarter of 2017. The mechanism will allow the Company to defer and recover incurred environmental expenditures through a combination of third-party proceeds, such as insurance recoveries, and through customer prices, as necessary. The mechanism establishes annual prudency reviews of environmental expenditures and is subject to an annual earnings test.

Trojan Investment Recovery Class Actions

In 1993, PGE closed the Trojan nuclear power plant (Trojan) and sought full recovery of, and a rate of return on, its Trojan costs in a general rate case filing with the OPUC. In 1995, the OPUC issued a general rate order that granted the Company recovery of, and a rate of return on, 87% of its remaining investment in Trojan.

Numerous challenges and appeals were subsequently filed in various state courts on the issue of the OPUC’s authority under Oregon law to grant recovery of, and a return on, the Trojan investment. In 2007, following several appeals by various parties, the Oregon Court of Appeals issued an opinion that remanded the matter to the OPUC for reconsideration.

In 2003, in two separate legal proceedings, lawsuits were filed in Marion County Circuit Court (Circuit Court) against PGE on behalf of two classes of electric service customers. The class action lawsuits seek damages totaling $260 million, plus interest, as a result of the Company’s inclusion, in prices charged to customers, of a return on its investment in Trojan.

In August 2006, the OSC issued a ruling ordering the abatement of the class action proceedings. The Oregon Supreme Court (OSC) concluded that the OPUC had primary jurisdiction to determine what, if any, remedy could be offered to PGE customers, through price reductions or refunds, for any amount of return on the Trojan investment that the Company collected in prices.

The OSC further stated that if the OPUC determined that it could provide a remedy to PGE’s customers, then the class action proceedings may become moot in whole or in part. The OSC added that, if the OPUC determined that it could not provide a remedy, the court system may have a role to play. The OSC also ruled that the plaintiffs retained the right to return to the Circuit Court for disposition of whatever issues remained unresolved from the remanded OPUC proceedings. In October 2006, the Circuit Court abated the class actions in response to the ruling of the OSC.

In 2008, the OPUC issued an order (2008 Order) that required PGE to provide refunds of $33 million, including interest, which were completed in 2010. Following appeals, the 2008 Order was upheld by the Oregon Court of Appeals in February 2013 and by the OSC in October 2014.

In June 2015, based on a motion filed by PGE, the Circuit Court lifted the abatement and in July 2015, the Circuit Court heard oral argument on the Company’s motion for Summary Judgment. Following oral argument on PGE’s motion for Summary Judgment, the plaintiffs moved to amend the complaints. On February 22, 2016, the Circuit Court denied the plaintiff’s motion to amend the complaint and on March 16, 2016, the Circuit Court entered a general judgment that granted the Company’s motion for Summary Judgment and dismissed all claims by the plaintiffs. On April 14, 2016, the plaintiffs appealed the Circuit Court dismissal to the Court of Appeals for the State of Oregon.

PGE believes that the October 2, 2014 OSC decision and the recent Circuit Court decisions have reduced the risk of a loss to the Company in excess of the amounts previously recorded and discussed above. However, because the class actions remain subject to a decision in the appeal, management believes that it is reasonably possible that a loss in excess of amounts previously recorded could result. As these matters involve unsettled legal theories and have a broad range of potential outcomes, sufficient information is currently not available to determine the amount of any such loss.

Deschutes River Alliance Clean Water Act Claims

On August 12, 2016, the Deschutes River Alliance (DRA) filed a lawsuit against the Company in the U.S. District Court of the District of Oregon. DRA’s claims seek injunctive and declaratory relief against PGE under the Clean Water Act (CWA) related to alleged past and continuing violations of the CWA. Specifically, DRA claims PGE has violated certain conditions contained in PGE’s Water Quality Certification for the Pelton/Round Butte Hydroelectric Project (Project) related to dissolved oxygen, temperature, and measures of acidity or alkalinity of the water. DRA alleges the violations are related to PGE’s operation of the Selective Water Withdrawal (SWW) facility at the Project. The SWW, located above Round Butte Dam, is, among other things, designed to blend water from the surface of the reservoir with water near the bottom of the reservoir and was constructed and placed into service in 2010 as part of the FERC license requirements for the purpose of restoration and enhancement of native salmon and steelhead fisheries above the Project. DRA has alleged that PGE’s operation of the SWW has caused the above-referenced violations of the CWA, which in turn have degraded the Deschutes River’s fish and wildlife habitat below the Project and harmed the economic and personal interests of DRA’s members and supporters.

On September 30, 2016, PGE filed a motion to dismiss, which asserted that the CWA does not allow citizen suits of this nature, and that FERC has jurisdiction over all licensing issues, including the alleged CWA violations. On March 27, 2017, the court denied PGE’s motion to dismiss. On April 6, 2017, PGE filed a motion for certification to file an interlocutory appeal with the U.S. Ninth Circuit Court of Appeals and for a stay of the District Court proceeding. A court decision on that motion has not yet been issued. On April 7, 2017, the court granted an unopposed motion filed by the Confederated Tribes of Warm Springs (the Tribes) to appear in the case as Amicus Curiae (friend of the court). The Tribes share ownership of the Project with PGE, but have not been named as a defendant.

The Company cannot predict the outcome of this matter, but believes that it has strong defenses to DRA’s claims and intends to defend against them. Because i) this matter involves novel issues of law and ii) the mechanism and costs for achieving the relief sought in DRA’s claims have not yet been determined, the Company cannot, at this time, determine the likelihood of whether the outcome of this matter will result in a material loss.

Other Matters

PGE is subject to other regulatory, environmental, and legal proceedings, investigations, and claims that arise from time to time in the ordinary course of business that may result in judgments against the Company. Although management currently believes that resolution of such matters, individually and in the aggregate, will not have a material impact on its financial position, results of operations, or cash flows, these matters are subject to inherent uncertainties, and management’s view of these matters may change in the future.